Professional Documents
Culture Documents
Fixed
charges
Rs./Kw
(1)
Energy
charges
Rs./kWh
(2)
Variable
Charges
Rs./kWh
(5)
(2 to 4)
0.61
0.47
0.79
Rs.
1.87
0.46
0.63
1.56
1.93
1.93
2.34
3.76
5.70
7.20
7.20
1.74
2.47
3.82
4.69
4.69
0.61
0.47
1 to 100 kWh
101 to 300 kWh
301 to 700 kWh
Above 700 kWh
0.46
0.63
1.56
1.93
FSA
Electricity Duty
Sindh
Balochistan
% of
% of Energy Charges (2)
Variable
Charges (5)
%
7.35
4.54
6.86
11.08
13.82
13.82
1.50
1.50
1.50
1.50
1.50
1.50
1.50
0.79
1.87
0.00
0.00
2.34
3.76
5.70
7.20
1.74
2.47
3.82
4.69
4.54
6.86
11.08
13.82
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.91
3.15
6.43
6.07
4.18
4.30
13.52
13.52
2.00
2.00
2.78
2.50
2.91
3.15
6.43
6.07
4.18
4.30
13.52
13.52
0.00
0.00
0.00
0.00
367
367
367
356
356
356
343
343
343
1.86
1.35
1.25
2.03
1.34
1.20
2.02
1.29
1.16
1.92
4.03
4.04
3.17
6.36
4.28
3.39
6.75
3.96
3.28
6.64
3.37
2.50
2.34
3.13
2.34
1.91
2.66
2.15
1.77
2.56
9.26
7.89
6.76
11.52
7.96
6.50
11.43
7.40
6.21
11.12
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
2.55
4.20
4.20
4.20
4.30
4.30
4.30
4.75
4.75
4.75
340
340
1.16
1.92
3.31
4.98
1.70
2.51
6.17
9.41
1.50
1.50
4.75
4.75
367
356
1.14
1.11
4.42
4.44
3.54
3.45
9.10
9.00
2.00
2.00
4.00
7.14
105
0.80
2.36
2.36
5.52
1.00
4.00
105
0.80
2.36
2.36
5.52
1.00
4.00
2.20
5.40
495 (per year per lamp)
908 (per year per lamp)
4.88
4.70
4.70
12.48
4.70
4.70
4.00
4.00
1 to 100 kWh
101 to 300 kWh
301 to 700 kWh
Above 700 kWh
Above 1000 kWh
Domestic ( Tax Free )
upto 50 kWh
T47
6.80
5.94
5.00
5.00
3.57
A1-R
Industrial
B-1
(upto 50 kW)
B-2
(41-500kW)
B-2 TOD
A2-C
B-3
11KV (501-5000kW)
B-3 TOD 11KV (501-5000kW)
B-4
66/132KV (over 5000kW)
B-4 TOD 66/132KV (over 5000kW)
B-5 220KV and above for all loads
B-5 TOD 220KV & above for all loads
Bulk Supply
C-1 400 Volts
C-2
11 Kv
Agriculture
D-1
D-2
Public Lights
G 2a for 60 watts
G 2b for 100 watts
Temporary
E-1 (i) Domestic
E-1 (ii) Commercial
2.16
3.86
12.42
12.22
3.88
5.28
18.46
21.36
1.50
2.00
6.00
4.00
2.41
1.81
11.83
12.56
3.82
4.09
18.06
18.46
1.50
2.00
4.20
4.00
1.69
12.46
3.91
18.06
2.00
7.14
Minimum charges
Single
Phase
Three
Phase
A1-R
Rs.75/Rs.150/A2-C
Rs.175/Rs.350/B-1
Rs. 350 per month
B-2
Rs. 2,000 per month
B-3
Rs. 50,000 per month
B-4
Rs. 500,000 per month
B-5
Rs. 1,000,000 per month
E-1(i) & E-1(ii Rs.50/- per day subject to minimum of Rs.500/- per day for the entire period of supply.
Remaining tariff as per fixed charges.
Rs. 7.50
15.00
20.00
Income Tax
Taxable Amount = Energy Charges + Fuel Adj.
Charges + Addl. Charges + Fixed Charges +
Electricity Duty + Meter Rent + PF Penalty+Fsa
Steel Melters
Rs./ 6.00 per Unit
Industrial Zero Consumer List Provided by CBR
LPS
Others Charges
TV License Fee
Bank Charges
(Energy Charges + Fuel Adj Charges + Surcharge + Additional Surcharge + Fixed Charges + PF Penalty +Fsa) * 0.10
Domestic
@ Rs. 35/= per TV Set, implemented since 01-01-2010
Commercial / Ind@ Rs. 60/= per TV Set, implemented since 01-01-2010
@ Rs. 8/= per Payment implemented since 01-07-2006.