Professional Documents
Culture Documents
Prepared by:
LIYANLONG
Date:
Reviewed by:
Date:
Approved by:
Date:
6-4-2016
CONTENT
Description of Change
1.1
Description of Sites.................................................................................................4
1.2
Purpose....................................................................................................................4
1.3
1.4
1.5
Version information................................................................................................6
1.6
1.7
During 00:00 8th to 23:00 8th Sep, we need to ask customer stop any operation
2.2
Change Period.........................................................................................................7
2.3
2.2.1
2.2.2
2.2.3
2.4
2.5
Procedure
11
3.1
3.2
Back up.................................................................................................................12
3.3
Change Period.......................................................................................................15
3.4
17
4.1
4.2
Check Alarms after adjustment and ensure no related alarms to this activity......18
4.3
Monitor KPIs........................................................................................................18
Rollback
19
5.1
Rollback Responsibility........................................................................................19
5.2
5.3
Rollback Procedure...............................................................................................19
5.4
Page 2 of 16
5.5
5.6
5.7
5.7.1
After roll back, check RNC and NODEB cells status normal or not...................22
5.7.2
5.7.3
5.7.4
Monitor KPIs........................................................................................................24
5.8
Resources
25
Page 3 of 16
1 Description of Change
1.1
Description of Sites
Mexico city 20 sites need active IPPM to check the transmission
1.2
Purpose
Activate IPPM of 20 sites to check the transmission.
1.3
This activation of IPPM is to check the transmission quality between RNC and NODEB;
When active we will use the information of QOS so if the QOS configuration on the TX
is different with RNC&NODEB there will has alarms and we need try to fix it
together with transmission team.
1.4
License .
This operation not related to license.
1.5
Version information
Current Version:
RNC: V900R016C00SPC660
NODEB: V100R009C00SPC230
U2000: V200R014C00SPC220
The current version supports to implement these adjustments.
1.6
1.7
Page 4 of 16
During 00:00 6th to 05:00 6th Apr., we need to ask customer stop any operation
with this RNC and sites.
2.2
Change Period
Node_B_M2000
Tracker
HID-9021_0630_Tulancingo_II
HID-9029_0633_GUADALUPE
HID-9033_0629_SAN_NICOLAS
HTGO8002
HID-9035_0634_Hinojosa
HID-9039_0763_Tulancingo_Centro
HTGO8010
HID-9069_0963_Santiago_Tulantepec
HID-9071_0698_Tepeyac
HID-9080_1685_Blvd_Bicentenario
HID-9083_1686_Tulancingo_Oriente
HID-9084_1687_Huapalcalco
HTGO8001
HID-9124_1946_Glorieta_Zapata
HTGO0001
HID-9121_1935_Tulancingo_Centro
HTGO0013
COW-0017-2_1529_COW_Tulancingo
MCR92-0006A_0099_CAE_Tulancingo
MCR92-
HID-9021
HID-9029
HID-9033
HID-9033
HID-9035
HID-9039
HID-9039
HID-9069
HID-9071
HID-9080
HID-9083
HID-9084
HID-9009
HTGO0001
HTGO0001
HTGO0013
HTGO0013
0054A_0364_Calle_Sinaloa_Tulancingo_I
MCR92-0012A_0141_Elektra_Tulancingo
HID-9009_0631_Tulancingo
2.3
Date
00:00~05:00 Apr 7
00:00~05:00 Apr 7
00:00~05:00 Apr 7
00:00~05:00 Apr 7
00:00~05:00 Apr 7
00:00~05:00 Apr 7
00:00~05:00 Apr 7
00:00~05:00 Apr 7
00:00~05:00 Apr 7
00:00~05:00 Apr 7
00:00~05:00 Apr 7
00:00~05:00 Apr 7
00:00~05:00 Apr 7
00:00~05:00 Apr 7
00:00~05:00 Apr 7
00:00~05:00 Apr 7
00:00~05:00 Apr 7
00:00~05:00 Apr 7
00:00~05:00 Apr 7
00:00~05:00 Apr 7
00:00~05:00 Apr 7
00:00~05:00 Apr 7
2.2.1
Name
Technical support website:
http://support.huawei.com
Responsibility
Telephone No.
Page 5 of 16
Braulio
2.2.2
Name
Luis Edwin
2.2.3
Responsibility
Wireless Department
RF Department
Telephone No.
5510070841
Name
Xiongchanmou
2.4
5570470797
Wireless Department
Responsibility
GTAC Mexico
Telephone No.
5519628010
Support
2.5
3
P
rocedure
3.1
N Change Step
1
1
2
Operation
Implementat
Time
ion Person
Braulio
11:00
Enrique
function on M2000.
RNC equipment running
status check
Braulio
11:25
Enrique
Page 6 of 16
Open U2000run
ACT IPPM on
RNC&NODEB side
command
Braulio
12:00
Enrique
Braulio
1:00
Enrique
Braulio
2:00
Enrique
Braulio
before
Enrique
operation failure )
4:30
antennas back.
3.2
Back up
Query Alarms
Obtain the current alarm list and save. In the Main Topology click right button
on the RNC, select Query Alarm/Event and then choose Alarm List.
Backup license;
RNC CFGMML and backup files
Use M2000 backup function to select related RNC and backup.
Page 7 of 16
And export the configuration, open target RNC LMT ,run command :EXP CFGMML; and
EXP CFGBCP; then collect the result like this:
Page 8 of 16
Page 9 of 16
3.3
Change Period
The change period is from 00:00 to 1:00.
3.4
Page 10 of 16
ACT IPPM.txt
ADD
IPPMSESSION.txt
Page 11 of 16
4.2
Check Alarms after adjustment and ensure no related alarms to this activity.
4.3
Monitor KPIs
*If the verification results are normal, the operation is successful.
*If a fault occurs during the verification and cannot be rectified, perform the rollback.
Page 12 of 16
5 Rollback
5.1
Rollback Responsibility
Name
Braulio Enrique
5.2
Responsibility
Wireless Department
RF Department
Telephone No.
5570470797
Rollback Procedure
N Change Step
1
Get information for
This RNC
1
Operation
Time
ion Person
Braulio
4:30
Enrique
from RNC.
Open U2000run
command
Fallback IPPM
Implementat
Braulio
4:40
Enrique
5.4
command.
Check the alarms about
IPPM
Braulio
5:00
Enrique
5.5
Collect alarms, KPIs and activity logs and make some port trace to see where the error
originated and what can be done to avoid it.
5.6
Page 13 of 16
5.7
5.7.1
Page 14 of 16
5.7.2
5.7.3
5.7.4
Monitor KPIs
5.8
Page 15 of 16
6 Resources
M2000 ACCOUNTS
Page 16 of 16