You are on page 1of 3

Inspection & Test Plan for Khabat PP

132kV Switchyard Circuit Breaker


Installation Works
PROJECT NAME

: Khabat Thermal Power Plant Units 1&2

DOCUMENT NO.

: KP-00+++-CQ712-B7357

TITLE

: Inspection&Test Plan for Khabat PP


132kV Switchyard Circuit Breaker Installation
Works

OWNER

TOTAL 3 PAGES
(Including Cover)

Purpose
For Information
For Review
For Approval
For Construction

: Ministry of Electricity (MOE) of


Kurdistan Regional Government

As-Built

12.02.2015

For Construction

DE

AY

09.02.2015

First Issue

DE

AY

PREPARED

CHECKED

REVIEWED

APPROVED

Rev.
No.

DATE

DESCRIPTION

GAMA POWER SYSTEMS ENG &CONTRACTING,INC.

Owner

Ministry of Electricity (MOE)


of Kurdistan Regional Government
Contractor

POSCO ENGINEERING
& CONSTRUCTION CO., LTD.
Main Subcontractor

GAMA POWER SYSTEMS


ENGINEERING & CONTRACTING,INC.

ITP No.

Inspection & Test Plan


for CIRCUIT BREAKER INSTALLATION WORKS

Item Name

Circuit Breakers

No.

Inspection & Test


Activity

Inspection & Test


Description

Application
Document/Code/Spec.
Supplier/
No.

KP-00+++-CQ712-B7357

Rev. No.

Page

1/1

Document Submittal

Remarks

Inspection Status

Subcontractor

GAMA

3rd Party POSCO


/ AI
E&C

Owner

1
1.1

Receiving
Inspection

Visually checking of the


busbar for and physical
damage.

Drawings and Technical


Specifications

Check List for Circuit Breaker Erection Item 1

1.2

Release of Steel
Structure

Checking release of steel


structure for circuit breaker
erection

Drawings and Technical


Specifications

Check List for Circuit Breaker Erection Item 2

1.3

Package List

Checking of package list

Assembly Catalog

Check List for Circuit Breaker Erection Item 3

1.4

Assembly and
fixing

Checking assembly and


fixing of circuit breaker

Drawings and Technical


Specifications

Check List for Circuit Breaker Erection Item 4

1.5

Screw Torques

Checking of Screw toques

Drawings and Technical


Specifications

Check List for Circuit Breaker Erection Item 4

1.6

Filling of SF6 gas

Checking filling of SF6 gas

Assembly Catalog

Check List for Circuit Breaker Erection Item 4

1.7

Site Construction
Dossier

Document preparation and


review

Drawings and Technical


Specifications

Site Construction Dossier

Notes) #1 CL (Check List) form of Circuit Breaker Erection is submitted as attachment of this ITP.
Legend

SIEMENS

P
H
W
S
V
R

Perform
Hold Point
Witness Point
Spot Witness
Surveillance
Report Review

CHECK LIST of Circuit Breaker


Erection
Num
.

Identification

Visual check of the equipment

Checking release of steel structure for equipment


installation

Checking of Package list

Assembly and fixing


a.

Accept

Reject

KHABAT THERMAL POWER PLANT UNITS


1 & 2 PROJECT 132kV AIR INSULATED
SWITCHGEAR
Rev: 0
Page No:1 of 1
Job No:

N/A

Signature

Comments

Subcontractor

Checking of steel support assembly

b. Checking of Pole and Chamber assembly


of the Circuit Breaker
c.

Reviewing and checking of lifting plan

d.

Checking of operating panels erection

e.

Mechanical Operating and Phase


Synchronous

f.

Checking of screw torques

g.

Vacuum Level

h.

Gas Pressure

i.

Checking of Gas Leakage

SIGN OFF AS ACCEPTED


SIEMENS

GAMA

POSCO

Employer

Name:
Date:
Sign:

Name:
Date:
Sign:

Name:
Date:
Sign:

Name:
Date:
Sign:

GAMA

Employer

You might also like