Professional Documents
Culture Documents
Purpose
This newsletter is to update you on work that is underway with the Ministry of
Health and Ministry of Education in relation to Speech Language Therapy for school
aged children. This will also include taking the opportunity to look at Early
Intervention transitions from Child Development Teams to the Ministry of Education.
Background
For several years there has been an Operational Protocol in place between the
Ministry of Health and the Ministry of Education, covering therapy and equipment
for school aged children. It includes the disciplines of occupational therapy and
physiotherapy. In 2009 a project was undertaken to update the Operational
Protocol. As part of this project a consensus was reached with the project team that
it would be useful to have Speech Language Therapy also included. The Protocol
was updated and is now called an Operational Guideline. Work is now underway to
scope and include Speech Language Therapy in that Operational Guideline.
Working Group
There has been a working group established to advise and assist with the project.
Their names and contact details are below. Christine Howard- Brown has been
contracted to lead the work on behalf of the Ministry of Health. Christine can be
contacted via email Christine_howard-brown@moh.govt.nz or 021 439 775.
Roseanne Webb is the lead project person on behalf of the Ministry of Education.
Her e-mail is roseanne.webb@minedu.govt.nz
Health Education
Name Contact Name Contact
Alison AlisonP@adhb.govt.nz Roseanne Roseanne.Webb@minedu.g
Paulin Web ovt.nz
Morgan DemetraM@waikatodhb.g Silvia Silvia.Cavallo@minedu.gov
Demetras ovt.nz Cavallo t.nz
Candy Candy.James@bopdhb.go Kathy Kathy.Arlidge@minedu.gov
James vt.nz Arlidge t.nz
Sheila Sheila.Coldrey@tdhb.org. Elizabeth Elizabeth.Doell@minedu.go
Coldrey nz Doell vt.nz
Turid turidp@adhb.govt.nz Justine Justine.Simpson@minedu.g
Peters Simpson ovt.nz
If you have any queries you can contact any member of the working group.
A further update will be sent out when the project is complete, in August 2010.
Christine Howard-Brown
Project Manager