System Structure
Monitoring Software
For more information about the software operations, refer to the
ZXDU58/ZXDU68 B121-CSU (V2.20) Monitoring Unit Operation Manual.
Setup Para
15
Operation Instruction:
7
Real Msg
12
11
5
13
14
Ent
Parameter List
DC out
Battery
AC In
SMR
Work Mode
ENV
IN-Relays
Next Equal Time
Version
Ent
Sys Para.
9. ZXD2400 rectifiers
11. AC SPD
12. DC output breakers (LLVD1)
13. Battery breakers (1-2)
100
100
RS232 Bauds
9600
RS485 Bauds
9600
Device No.
Passw ord
0000
Language
Chinese
On
No
Alm 1-n
Alm 2-n
Auto Alarm
Enabled
Enabled
Alm n-n
Current Date
Current Time
Default
Buzz Sw itch
Real Alm.
Param eter
14. DC SPD
15. Monitoring unit
His.Record
Primary Cabinet
(V4.0R06M03
Secondary Cabinet
V4.0R06M04
Alm Rec.
Operate Rec.
Discharge Rec.
Peak Rec.
Maintain Rec.
Ent
Description
AC input voltage
Rectifier
(ZXD2400)
Msg Alm
CtrlSetupRec
Para
Ent
Monitoring Unit
-53.5 VDC
ZXD2400 rectifier
Rated current: 50 A
Rectifier quantity
Three at most
REC1
L1
REC2
L2
REC3
L3
REC4
1. Sys Para
2. Batt Para
3. Alarm Para
1. SMR ON
2. SMR OFF
3. FlOAT
4. EQUAL...
5.TEST
6. Auto Save
7. Temp Nonsave
8. Perm Nonsave
9. Manual Detect
CSU
L1
ZTE Corporation Address: No. 55, Hi-tech Road South, ShenZhen, P.R.China
Postcode: 518057
Website: http://ensupport.zte.com.cn
Email: 800@zte.com.cn
53.5
Equal Vol.
56.4
Cur. Limited
Equal Func.
Period
(Day)
Safe Mode
Float Vol.
Test Vol.
Batt Para.
Work Mode
46
0.125
Enabled
180
BatVol Min.
47
1-Shut Vol.
45
2-Shut Vol.
Auto Test
Test Period
44
Disabled
30
Test StartTime
10:00
A1-A6
Alarm Para
Actual
User Guide
Status Indication
IN
OUT
CL
ALM
Indicator
Status
Description
Sym ptom
IN
Lit (green)
AC input is normal
OUT
Lit (green)
DC output is normal
CL
Lit (yellow )
ALM
Lit (red)
Alarm occurs
Status
Description
PWR
Lit (green)
Invalid keypad
operation
RUN
Lit (green)
EQU
Lit (green)
The CSU indicates that Query the real-time alarm information and take measures according
an alarm occurs
to the specific alarm.
Lit (yellow )
&
Lit (red)
PWR
Premise for the running of the monitoring unit: The input DC power
is normal and the power indicator is ON.
RUN
EQU
COMM
ALM
(1) Make sure that the AC input breaker of the rectifier is turned on.
(2) Make sure that the AC input voltage is w ithin the w orking voltage
of the rectifier.
(3) If the above tw o items are not the causes, re-install the rectifier
or replace the installation slot and then re-install the rectifier.
(4) If the symptom persists, troubleshoot the faulty rectifier and
install a new rectifier in the slot.
Rectifier alarm
Rectifier fault
ZTE Corporation Address: No. 55, Hi-tech Road South, ShenZhen, P.R.China
Emergency Shutdown
Warning: The emergency shutdown can be
performed only when there is an emergency!
1. Turn off the external AC input breakers of the system.
2. Turn off the battery breakers in the cabinet.
The possible cause might be that the AC input voltage is too high or
too low , the temperature is too high, the load-sharing quality is bad
or the addresses conflict. The alarm might be caused by the
surrounding conditions or the other equipment and might not be
caused by the rectifier itself. Check the alarm information through
the CSU and take measures accordingly.
The possible cause might be that the AC output voltage/current is
too high, the fan is faulty or the output fuse is blow n.
(1) Re-install the rectifier to reset it.
(2) If the fault persists, troubleshoot the faulty rectifier and install a
new rectifier in the slot.
Postcode: 518057
Shutdown
supply interruption to the loads connected. Be cautious!
Indicator
ALM
&
Communication
(1) Make sure that the communication cable (serial port cable or
interruption w ith the
netw ork cable) is firmly connected to the corresponding
monitoring background communication interface.
(2) Make sure that the communication parameters of the CSU are
correctly set according to the netw orking requirement.
(3) If the symptom persists, take out the CSU to troubleshoot it.
Remark: The communication parameters include RS232 Bauds,
RS485 Bauds, and Device No.. For specific parameter values,
consult the netw ork management engineer.
COMM
2 /2
Website: http://ensupport.zte.com.cn
Startup
Prerequisites: This equipment has passed the electrical
check and is qualified for the debugging. The Quick Installation and
Commissioning Guide (V4.0R06M03/M04) describes the check and
debugging in detail.
1. Turn on the battery breakers.
2. Wait for the CSU startup. Proceed to the next step after the CSU displays
the main menu interface.
3. Turn on the external power switch.
4. Turn on the AC input breaker in the cabinet.
5. If any loads need to be powered-on, turn on the DC output breakers