Open Access Charges on Monthly basis

Sl No Details of charges
1 Wheeling Charges /KVA/Month

2 Wheeling Losses %

3 Cross Subsidy surcharges /Unit

4 Additional Surcharge
(10% if wheeling charges)

Contracted
Demand of
Voltage
User
at Source
1000
33
1000
11
1000
LT
1000

33

1000

33

1000
1000

33

1000

Monthly basis
Voltage at
Drawal
NA
NA
NA

Loss %

33

3.96%

11

7.80%

LT
11
33
132
33
11
LT

12.50%

Rate/KVA
Amount
33.43
33430
204.79
204790
649.23
649230

1.88
1.72
1.43
10%
10%
10%

3343
20479
64923

Not Applicable for First Seven years if the power is wheeled within the state
Not Applicable for First Seven years if the power is wheeled within the state
Not Applicable for First Seven years if the power is wheeled within the state
Generator needs to inject 1042 units so that 1000 units are received by
the consumer
Generator needs to inject 1080 units so that 1000 units are received by
the consumer
Generator needs to inject 11120 units so that 1000 units are received by
the consumer
Not Applicable for First Seven years if the power is wheeled within the state
Not Applicable for First Seven years if the power is wheeled within the state
Not Applicable for First Seven years if the power is wheeled within the state
Not Applicable for First Seven years if the power is wheeled within the state
Not Applicable for First Seven years if the power is wheeled within the state
Not Applicable for First Seven years if the power is wheeled within the state

A: WHEELING CHARGES/RATES(Rs./KVA/Month)
Voltage
2012-13 2013-14
33KV
32.66
33.43
11KV
207.47
204.79
Low Tension
658.76
649.23
B. WHEELING LOSSES
2012-12/ Supply Point
Drawn at
33KV
11KV
LT
33KV
3.99%
8.07% 13.36%
11KV
8.07%
4.25%
9.76%
LT
13.36%
9.76%
5.75%

- APCPDCL

2013-14/ Supply Point


33KV
11KV
LT
3.96% 7.80% 12.50%
7.80% 4.00%
8.90%
12.50% 8.90%
5.10%

Cross Subsidy Surcharge


CPDCL
EPDCL
NPDCL SPDCL
Rs./Unit
LT Category
Domestic
LT-I
Non-Domestic
LT-II
Advertising Hoardings
Industrial (Normal)
LT-III
Industries (SSI)
HT Category
Indl - 11 kV
HT-I A
Indl - 33 kV
Indl 132 kV & above
Ferro Alloys -11 kV
HT- IB
Ferro Alloys - 33 kV

HT-II

HT-III

HT-V
HT-VI

0.20
1.29
3.44
0.95
2.06

0.14
1.92
4.76
1.87
2.13

0.12
0.72
3.47
1.27
1.35

0.18
1.68
0.00
1.55
0.65

1.88
1.72
1.43
0.34
0.65

2.18
2.00
2.26
0.00
0.83

1.71
1.78
1.70
0.00
0.00

1.58
1.69
2.28
0.00
0.36

Ferro Alloys -132 kV


and Above
Others - 11 kV
Others - 33 kV
Others- 132 kV & abo

0.51
2.65
2.72
2.61

0.45
3.29
3.26
2.80

0.00
3.31
3.06
2.95

0.00
2.87
2.71
0.00

Aviation activity at
Airports-11KV

2.27

2.73

2.51

2.22

Aviation activity at
Airports- 33KV

2.22

2.63

2.42

2.20

2.33
1.50

2.28
1.26

0.86
1.08
0.76

2.15
0.00
0.00

Aviation activity at
Airports-132KV
2.02
2.53
Railway Traction
1.31
1.67
Townships & Residential Colonly lighting
11KV
0.61
1.03
33KV
0.93
3.91
132KV & above
0.00
0.00

Additional Surcharge (for all voltages)

10% of of the wheeling charges

heeling charges

UNIT for
levy of Energy Charges

LT II
LT II(A)

LT II(B)

LT II(C )
HT I
HT I(A)

HT I(B)

HT II

Non Domestic/Commercial #
Contracted load of 500 watt and below
0-50 units
51-100 units
>100 units
Contracted load of above 500 watt
0-100 units
>100 units
Advertising Hoardings
Industrial
General
11 kV
33 kV
132 kV and above
Lights and Fans
11 kV
33 kV
132 kV and above
Colony Consumption
11 kV
33 kV
132 kV and above
Seasonal Industries (off season tariff)
11 kV
33 kV
132 kV and above
Ferro Alloy Units
11 kV
33 kV
132 kV and above
Others
11 kV
33 kV
132 kV and above

kWh
kWh
kWh
kWh/kVAh
kWh/kVAh
kWh/kVAh

kVAh
kVAh
kVAh
kVAh
kVAh
kVAh
kVAh
kVAh
kVAh
kVAh
kVAh
kVAh
kVAh
kVAh
kVAh
kVAh
kVAh
kVAh

HP/kW Charge
(Rs/Month)

kVA Charge
(Rs/Month)

Energy Charge
(Rs./Unit)

0.00
0.00
0.00

0.00
0.00
0.00

3.85
6.00
7.00

15.00
15.00
0.00

0.00
0.00
0.00

6.00
7.00
9.00

0.00
0.00
0.00

250.00
250.00
250.00

4.80
4.37
3.97

0.00
0.00
0.00

0.00
0.00
0.00

6.00
5.82
5.67

0.00
0.00
0.00

0.00
0.00
0.00

4.50
4.50
4.50

0.00
0.00
0.00

250.00
250.00
250.00

5.97
5.35
5.10

0.00
0.00
0.00

0.00
0.00
0.00

4.48
4.05
3.65

0.00
0.00
0.00

250.00
250.00
250.00

5.97
5.35
5.10

UNIT for
levy of Energy Charges

LT 1 (B)

LT II
LT II(B)

LT II(C )
HT I
HT I(A)

Domestic
< 50
51-100
101-150
151-200
201-250
251-300
301-400
401-500
>500
Non Domestic/Commercial #
< 50
51-100
101-300
301-500
> 500
Advertising Hoardings
Industrial
General
11 kV
33 kV
132 kV and above
Lights and Fans
11 kV
33 kV
132 kV and above
Colony Consumption
11 kV
33 kV
132 kV and above
FSA Orders
2010-11 - I Quarter
2010-11 - II Quarter
2010-11 - III Quarter
2010-11 - IV Quarter
2011-12 - I Quarter
2011-12 - II Quarter
2011-12 - III Quarter
2011-12 - IV Quarter
2012-13 - I Quarter
2012-13 - II Quarter
2012-13 - III Quarter
2012-13 - IV Quarter
Average FSA

KWhr
KWhr
KWhr
KWhr
KWhr
KWhr
KWhr
KWhr
KWhr
KWhr
KWhr
KWhr
KWhr
KWhr
KWhr

kVAh
kVAh
kVAh
kVAh
kVAh
kVAh
kVAh
kVAh
kVAh

Ps/
Ps/
Ps/
Ps/
Ps/
Ps/
Ps/
Ps/
Ps/
Ps/
Ps/
Ps/

KWhr
KWhr
KWhr
KWhr
KWhr
KWhr
KWhr
KWhr
KWhr
KWhr
KWhr
KWhr

HP/kW Charge
(Rs/Month)

kVA Charge Energy Charge


(Rs/Month)
(Rs./Unit)

50.00
50.00
50.00
50.00
50.00
0.00

FSA Charge
(Rs/ Unit)

Gross Energy
Charge Rs/ Unit

2.60
3.25
4.88
5.63
6.38
6.88
7.38
7.88
8.38

0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87
0.87

3.47
4.12
5.75
6.50
7.25
7.75
8.25
8.75
9.25

6.63
7.38
8.13
8.63
9.13
11.03

0.87
0.87
0.87
0.87
0.87
0.87

7.50
8.25
9.00
9.50
10.00
11.90

TOD Usage
Rs/ Unit

0.00
0.00
0.00

350.00
350.00
350.00

5.73
5.30
4.90

0.87
0.87
0.87
0.87

6.60
6.17
5.77

1.00
1.00
1.00

0.00
0.00
0.00

0.00
0.00
0.00

5.73
5.30
4.90

0.87
0.87
0.87

6.60
6.17
5.77

1.00
1.00
1.00

0.00
0.00
0.00

0.00
0.00
0.00

5.68
5.68
5.68

0.87
0.87
0.87

6.55
6.55
6.55

1.00
1.00
1.00

15.13
14.22
29.41
122.39
32.58
103.48
94.87
94.94
132.75
62.13

86.79

OFFER FROM SEVEN ENERGIES FOR SALE OF POWER AT 33 KV LEVEL


Unit for levy of HP/kW Charge
Energy Charges
(Rs/Month)

kVA Charge Energy Charge FSA Charge*


(Rs/Month)
(Rs./Unit)
(Rs/ Unit)

Gross Energy
Charge Rs/ Unit

TOD Usage 7EN offer


Rs/ Unit

-5.00%
LT 1 (B) Domestic
< 50
KWhr
51-100
KWhr
101-150
KWhr
151-200
KWhr
201-250
KWhr
251-300
KWhr
301-400
KWhr
401-500
KWhr
>500
KWhr
LT II
Non Domestic/Commercial #
LT II(B) < 50
KWhr
51-100
KWhr
101-300
KWhr
301-500
KWhr
> 500
KWhr
LT II(C ) Advertising Hoardings
KWhr
HT I
Industrial
HT I(A) General
11 kV
kVAh
33 kV
kVAh
132 kV and above
kVAh
Lights and Fans
11 kV
kVAh
33 kV
kVAh
132 kV and above
kVAh
Colony Consumption
11 kV
kVAh
33 kV
kVAh
132 kV and above
kVAh
FSA Orders
2011-12 - I Quarter
1 2011-12 - II Quarter
2011-12 - III Quarter
2011-12 - IV Quarter
2012-13 - I Quarter
2012-13 - II Quarter
2012-13 - III Quarter
2012-13 - IV Quarter
Average FSA

Ps/
Ps/
Ps/
Ps/
Ps/
Ps/
Ps/
Ps/

KWhr
KWhr
KWhr
KWhr
KWhr
KWhr
KWhr
KWhr

50.00
50.00
50.00
50.00
50.00
0.00

2.60
3.25
4.88
5.63
6.38
6.88
7.38
7.88
8.38

0.78
0.78
0.78
0.78
0.78
0.78
0.78
0.78
0.78

3.38
4.03
5.66
6.41
7.16
7.66
8.16
8.66
9.16

8.70

6.63
7.38
8.13
8.63
9.13
11.03

0.78
0.78
0.78
0.78
0.78
0.78

7.41
8.16
8.91
9.41
9.91
11.81

9.42
11.22

0.00
0.00
0.00

350.00
350.00
350.00

5.73
5.30
4.90

0.78
0.78
0.78

6.51
6.08
5.68

1.00
1.00
1.00

5.78

0.00
0.00
0.00

350.00
350.00
350.00

5.73
5.30
4.90

0.78
0.78
0.78

6.51
6.08
5.68

1.00
1.00
1.00

5.78

0.00
0.00
0.00

350.00
350.00
350.00

5.68
5.68
5.68

0.78
0.78
0.78

6.46
6.46
6.46

1.00
1.00
1.00

6.14

32.58
103.48
94.87
94.94
132.75
62.13
54.70
49.14
78.07

Notes:
1. Tariff applicable for FY 2013-14
2. FSA considered at Ps 87/ KWhr average
3. Variation in FSA from this figure to consumer A/C
4. The tariff future hike will be linked to APERC hike