m/day
kg/m
m/day
kg/m
m/day
Value
Source
45 Plant production capacities and Mother liquor generation capacity
calculations of the plant.
Thermax Technical Offer: Wws:Tmn:DDIL: Biogas: TCOff-05 dt. 06Mar-08
(Refer:Thermax Offer-Design Basis,Page No.3)
390 Analysis report carried out by MITCON dated 07-Feb-08
75 From the plant
0.100 From the plant
120 Calculated
m/year
43,800 Calculated
m/year
kg/m
kg/m
kg CH/kg
COD
%
kg/m
m/day
kg/m
kg/m
kg/m
m/day
m/year
kcal /m
kcal/kg
Page: 1 of 2
Unit
kW
kW
Hours
kW
Hours
kW
32
33
34
35
36
37
38
39
40
41
days
kg/yr
%
tCO2/TJ
tCO2/MW
INR/Kwh
INR/litre
kg/litre
hr/Day
%
42
43
44
45
46
47
48
49
Operating days
Total steam flow for boilers
Thermal Efficiency of Boiler
Emission factor of FO
Emission factor of Grid
Cost of electricity
Cost of furnace oil
Density of furnace oil
Working hours per day
Depreciation on Plant & Machinery
Corporate Tax
CER rate
Exchange Rate (INR per Euro)
Caustic Soda Consumption per m
Cost of Caustic Soda
Sensivity Criteria
Sensivity Criteria
Depreciation on Plant & Machinery Mother Liquor Treatment - for 1st year
50 Depreciation on Plant & Machinery Mother Liquor Treatment - from 2nd
year onwards
51 Depreciation on Plant & Machinery Waste Water Treatment - for 1st year
kW
kW
%
Euro
INR
kg
INR/kg
%
%
%
Value
Source
30.02 Thermax Technical Offer:Wws:Tmn:DDIL: Biogas: TCOff-05 dt. 06Mar-08 (Refer: Thermax Offer, Page No.6 - Operating load for MLTP
& Page.17 - Operating load of Booster pump (11.25 KW = 15 HP *
0.75)
30 Thermax Technical Offer:Wws:Tmn:DDIL: Biogas: TCOff-05 dt. 06Mar-08 (Refer: Thermax Offer, Page No.6 - Operating load for
Digester recirculation pump
22 Letter by Thermax Ltd. (Technology Supplier) dt. 02-July-10
3.7 Thermax Technical Offer:Wws:Tmn:DDIL: Biogas: TCOff-05 dt. 06Mar-08 (Refer: Thermax Offer, Page No.6 - Operating load for Sludge
disposal pump
22 Letter by Thermax Ltd. (Technology Supplier) dt. 02-July-10
0.37 Thermax Technical Offer:Wws:Tmn:DDIL: Biogas: TCOff-05 dt. 06Mar-08 (Refer: Thermax Offer, Page No.6 - Operating load for caustic
tank mixer
20 Letter by Thermax Ltd. (Technology Supplier) dt. 02-July-10
153.49 Thermax Offer:Wws:DDIL:ETP:2000:TCOff-03 dt.07-Feb-05, Page no:
25,
174.32 Thermax Offer:Wws:DDIL:ETP:2000:TCOff-03 dt.07-Feb-05, Page no:
12,
30 Thermax Technical Offer:Wws:Tmn:DDIL: Biogas: TCOff-05 dt. 06Mar-08
(Refer: Thermax Offer, Page No. 14)
365 Calendar days
100717803 Based on 3 years historical data of steam generation
89% As per para 26 (b) of AMS I.C. ver.18
77.4 IPCC (Intergovermental Panel on Climate Change) default value
0.84 NEWNE (North East West North East) Grid Emission factor
4.06 Cost of power: 16th Annual report 2007 -08 page no: 6
21.45 Cost of furnace oil: 16th Annual report 2007 -08 page no: 6
0.99 http://www.ncdex.com/Knowledge/PDFs/Oil%20Furnace.pdf
24 Standard
10% 16th Annual Report 2007-2008 (refer Page 20)
33.99% Income Tax Act
7
63
5 Letter by Thermax Ltd. (Technology Supplier) dated 07-Mar-08
20 Purchase price (Existing Practice)
10% Standard for calculations
-10% Standard for calculations
80% Income Tax Act