You are on page 1of 45

Data Sheet Whr Parklift 340

Single unit = 2 cars


Double unit = 4 cars

Suitable for condominium and ofce buildings.


For permanent use only!*
400
100

Both platforms are inclined.


20

Load per platform max. 2000 kg


(load per wheel max. 500 kg)

free space for door


85

60
X

= only applicaple if garage


doors are to be fitted.
For roller doors x = 10/15 cm

= to be clarified with
door supplier

slope 7,5=

13%

clear height
for a lintel

Dimensions in cm

15
15

min. 300 cm horizontal


max. slope 1%

155

0
us 5
pl 0 x
x2 p 5
10 um
el p
nn p
ha sum
c
e r
i b l fo
ss ss
po ece
r

70

ac
sp
le n
sib ctio
s
po r su
fo

+3
0

2%

x2

r
fo
es
ng
ni nd vic
pe al a ser
ll o ric lic
wa lect rau
e yd
h

slope 5= 9%

60

150

+3
0

min.18

2%

50
460
530

Parklift 340-155/150 (height 295)

+10
0

Parklift 340-155/150 (height 305)

305 +30

295 +30

155 +30

150 +30

Upper level
Lower level

155 +30

car height
distance (h)
saloon cars
up to 150 cm
saloon/estate cars
158
up to 154 cm

150 +30

car height
distance (h)
saloon cars
up to 160 cm
saloon/estate cars
158
up to 154 cm

Upper level
Lower level

Please attend to restricted car- and platform distance height! If higher cars or platform distance heights are requested, we suggest to use
our Parklift 440 system.

Clearance prole (standard saloon/estate car)


10
25
20

55

90

65

162

13 40

48

37

150*
46 (154*)
(160*)
22

275

60
120

14
max. 290
500

38
90

Examples (09.2008)

75

162

48
46 154*

275

22
60
120

14
max. 290
500

38
90

The various model-series versions may vary in


size and/or dimensionally, based on version
conguration, design and execution!
Cars up to 150 cm/154 cm height:
e.g. Audi Variant; BMW-Touring; Opel-Caravan;
VW-Variant, always without roof rails
Cars up to 160 cm height:
e.g. MB A-class; VW Golf V, New Beetle; Smart

* The total car height includes roof rail and antenna xture and must not exceed the
mentioned max. height dimension.

Parklift 340 09.2008 C027-3040

Notes

1. Car width max. 190 cm (see width details page 2). In case of special platform widths narrower than 230 and 460 cm respectively, the maximum vehicle
width is reduced accordingly. For cars with two outside mirrors, a minimum platform width of 250 cm or 500 cm is recommended.
2. For standard lowered cars or cars with front spoilers exceeding the above clearance proles, we recommend to use our system Parklift 440.
3. Due to recent increases in car length dimensions, and potential future developments, a pit length of 540 cm is advisable. This offers bigger
safety distances also for future cars.
4. At the edge of the pit a 10cm wide, yellow-black marking according to ISO 3864 has to be provided by the purchaser
(see statics and construction requirements on page 3).
5. The manufacturer reserves the right to modify or alter above specications.

Otto Whr GmbH


Auto-Parksysteme

P. O. Box 1151
71288 Friolzheim/Germany

Fon +49 [0] 7044 46-0


Fax +49 [0] 7044 46-149

www.woehr.de
info@woehr.de
We compact parking space

Width dimensions Underground garages


All dimensions shown are minimum. Construction tolerances must be taken into consideration.
All dimensions in cm.
The access to the Parklift should be level for a distance of 300 cm immediately in front of the pit (max. slope allowable 1%).
Beyond this max. slope 10%.
If not stated differently in the offer, platform widths of 230 cm or 460 cm will be delivered. Bigger/smaller platform widths can be delivered
at additional price.

Wall to wall
Single unit (2 cars)

Double unit (4 cars)

Space required
B
260
270
280
290
300

gives clear
platform width
230
240
250
260
270

Combinated unit (6 cars)

Wall openings required between


partitions for electrical and hydraulic
conduits must be provided where
applicable. Wall openings may not
be closed after installation.

S
B

Space required
B
490
510
530

gives clear
platform width
460
480
500

Space required
B
750
780
810
820
830

gives clear
platform width
460+230
480+240
500+250
500+260
500+270

Minimum driveway
width according to
local requirements

Further width combinations as well as smaller widths are possible

Pillars outside pit


Single unit (2 cars)

Double unit (4 cars)

min. 20
B

min. 20

B1

Space required
wallpillarpillar
pillar
B
B1
250
240
260
250
270
260
280
270
290
280

Combinated unit (6 cars)

gives clear
platform width
230
240
250
260
270

B1

Space required
wallpillarpillar
pillar
B
B1
480
470
500
490
520
510

min. 20

gives clear
platform width
460
480
500

Space required
wallpillarpillar
pillar
B
B1
740
730
770
760
800
790
810
800
820
810

B1

gives clear
platform width

Minimum driveway
width according to
local requirements

460+230
480+240
500+250
500+260
500+270

Further width combinations as well as smaller widths are possible

Pillars inside pit


Single unit (2 cars)

Double unit (4 cars)

min.15

B1

Space required
wallpillarpillar
pillar
B
B1
255
245
265
255
275
265
285
275
295
285

min.15
max.100

Combinated unit (6 cars)

gives clear
platform width
230
240
250
260
270

Space required
wallpillarpillar
pillar
B
B1
485
475
505
495
525
515

min.15

max.100
B1

gives clear
platform width
460
480
500

Space required
wallpillarpillar
pillar
B
B1
745
735
775
765
805
795
815
805
825
815

max.100
B1

gives clear
platform width

Minimum driveway
width according to
local requirements

460+230
480+240
500+250
500+260
500+270

Parklift 340 09.2008 C027-3040

Further width combinations as well as smaller widths are possible

Important notes
If maximum platform widths are not installed, difculties might
arise when entering or exiting the cars on the parking units.
This depends on the car type, the access and the individual
driving behaviour.

Cars wider than 190 cm should be parked on platforms


270/500 cm width only.
For spaces against walls, or at end of rows, we
recommend that largest possible platform widths are
utilized to assist turning motion.

Width dimensions Garages with doors


All dimensions shown are minimum. Construction tolerances must be taken into consideration.
All dimensions in cm.
The access to the Parklift should be level for a distance of 300 cm immediately in front of the pit (max. slope allowable 1%).
Beyond this max. slope 10%.
If not stated differently in the offer, platform widths of 230 cm or 460 cm will be delivered. Bigger/smaller platform widths can be delivered
at additional price.

Single garages (2 cars)

Double garages (4 cars)

S
X

B1
15

15

Space required
B
B1
260
230
270
240
280
250
290
260
300
270

gives clear
platform width
230
240
250
260
270

15

Space required
B
B1
490
460
510
480
530
500

Serial garages with single doors (2 cars)

Wall openings required between


partitions for electrical and hydraulic
conduits must be provided where
applicable. Wall openings may not
be closed after installation.

B1
15

x = for doors. See page 1

Serial garages with double doors (4 cars)

B1
15

B1
30

Space required
B
B1
260
230
270
240
280
250
290
260
300
270

B1

B1
30

15

30

gives clear
platform width
230
240
250
260
270

Minimum driveway
width according to
local requirements

gives clear
platform width
460
480
500

B1
30

Space required
B
B1
490
460
510
480
530
500

30
Minimum driveway
width according to
local requirements

gives clear
platform width
460
480
500

Statics and construction requirements

P6

P1

P2 P3

P5
P4
P4

P6

P1

P2 P3

clear
platform
width +12

P5

Marking according to ISO 3864

P1 = +36 kN*
P2 = + 5 kN
12 kN
P3 = +16 kN
P4 = 2kN
P5 = +21 kN
8 kN
P6 = 5 kN

Double unit
P6

P1

P2 P3

P5
P4
clear
platform
width +12
P4

P6

P1

P2 P3

P5

P1 = +70 kN
P2 = + 6 kN
17 kN
P3 = +27 kN
P4 = 2 kN
P5 = +35 kN
13 kN
P6 = 8 kN
*all static loadings
include the weight
of the car

35
P6

110
P1
~247
~380
~520

P3
P2

P4
P5

Bearing loads are transmitted


to the pit oor by base plates of
approximately 140 cm2, xed by
heavy duty anchor bolts to a depth
of approximately 1012cm.
Base plate thickness min. 18 cm
(recommended concrete quality
C20/25). When xing to waterproof concrete oors chemical
anchors are employed (to be
advised by Whr).
The front wall of the pits must be
formed of concrete and must
be perfectly at and vertical
without any protrusions.
The specied lengths to the
support points are mean values.
Please contact us for exact
positions for any variations on
the standard units.

Parklift 340 09.2008 C027-3040

Single unit

Electrical datas

Installation diagram

Item Performance Quantity Designation

Position

by customer 1 unit

electric meter

in the feed cable

by customer 1 unit

fuse or automatic circuit


in the feed cable
breaker 3x16A slow blow
acc. to DIN VDE 0100 p. 430

by customer as locally acc. to local power supply


required regulations
3 Ph + N + PE*
by customer each
foundation earth
10 m
connector
by customer 1 unit
equipotential bonding
acc. to local requirements

by customer 1 unit

by customer 10 m

1 per
power pack

marked main switch,


above operating
lockable to prevent
device
unauthorized switching on

120 cm

110 cm

1 per
Parklift

* DIN VDE 0100 part 410 + 430 (not under permanent load) 3PH+N+PE
(three-phase current) Note: Where a door is used to close the garage, the
manufacturer of the door must be consulted before the electric cable is laid.
prior to or during installation to
enable our tters to complete
their work satisfactorily and to
check the correct functioning
of the units.
Parklifts has to be grounded to
the foundation earth connector
by customer. A foundation earth
connector should be provided by
customer each 10 m or acc. to
local requirements.

14 Cylinder valve cable


PVC control cable 3 x1.5 2
12 Operating device for UP/DOWN with
EMERGENCY-STOP. If possible on the
left, but always outside the platforms
movement range. Cables always feed in
from below. (2 keys per parking place.)

Recesses and conduits for rotary


switches with rolling and sectional gates

15
115 above access level
=

At differing constructional
conditions additional sound
absorbing measures are
necessary.
The best results are reached
by separated sole plates from
the construction.
Increased noise protection:
If increased noise protection
must be provided planning has
to be conrmed on a project
basis by Whr (further building
measures are required).

min.20
B

Noise protection

8
A

Plastic or steel armoured conduit M 20

Flexible plastic insulation pipe M 20

7 +0,5
8

Railings
The units need to be provided acc. EN ISO 13857 with safety railings
if the gap between unit and wall exceeds 20cm. If walkways are arranged
directly to the side or behind the systems, railings have to be provided by
client acc. to local requirements, height min. 200 cm this is applicable
during the construction phase too.

Free spaces
Special drawings for free spaces to accommodate air ducts or other
pipes can be requested at Whr Agent!

Temperature

Maintenance

The installation is designed to operate between +5and +40C.


Atmospheric Humidity: 50% at +40C. If the local circumstances
differ from the above please contact Whr.

Drainage
We recommend the provision
of a drainage channel at the
front of the pit which can either
incorporate a pump sump
50 x 50 x 20 cm, or a connection
into the storm water sewerage

Under plaster

Above plaster

Basis is the German DIN 4109


Noise protection in buildings.
With the following conditions
required 30 dB (A) in rooms
can be provided:
noise protection package
from our accessory
insulation gure of the
construction of min. Rw = 57dB
walls which are bordering
the parking systems must be
done as single wall and
deection resistant with min.
m= 300 kg/m2
solid ceiling above the
parking systems with min.
m= 400 kg/m2

4 Foundation earth connector


5 Equipotential bonding from
foundation earth connector
to Parklift
11 PVC control cable 5 x1.52
to the next facility

1 per
power pack

PVC control cable with


from main switch 1 per
marked strands and proto hydraulic power power pack
tective conductor 5 x 1,5 2 pack
Items 814 are included in Whrs scope of delivery unless otherwise specied in the
offer/order.

The electrical components


suppliedbythemanufacturer
must be connected in accordance with the appropriate wiring
diagram and local regulations.
German VDE electrical requirements must be adhered to, in
order to validate the TV tested
circuit.
The electrical supply to the
power pack(s) must be provided

13 PVC control cable


7 x1.5 2

conduit

corner pit oor/


rear wall
from foundation
earth connector
to Parklift

7 PVC control cable 5 x 1.52


from main switch to assembly
8 Hydraulic unit with three-phase
motor, 230/400 V, 50 Hz, 1.5/3.0 kW.
Switching cabinet with motor,
protection, wired already for
installation
9 PVC control cable 5 x1.52
10 Branch connector

6 Lockable main switch

1 per
power pack

Regular maintenance by qualied personnel can be provided by means


of an Annual Service Contract.

Protection against corrosion


system via a petrol/oil interceptor. To prevent any possibility
of contamination of the groundwater we recommend that the
pit oor is coated with an oil
proof paint.

Conformity test
All our systems are checked according to EC machinery directive
98/37/EG and EN 14010.

Illumination
Illumination has to be considered acc. to local requirements by client.

Independent of a maintenance workings has to be carried out acc. to


Whr Cleaning and Maintenance Instruction regularly.
Clean up galvanized parts and platforms of dirt and road salt as well
as other pollution (corrosion danger)!
Pit must be always ventilated and dearated well.

Dimensions
All dimensions shown are minimum. Construction tolerances must
be taken into consideration. All dimensions in cm.

Notes
In case of standard lowered cars with spoilers, contact Company
Whr or local agent.

Parklift 340 09.2008 C027-3040

feed cable to
main switch

1 Electric meter
2 Fuse or automatic circuit breaker
3 x 16 A slow blow according to
DIN VDE 0100 part 430
3 Feed line to the main switch

Frequency

Data Sheet Whr Parkbox 401


dependent parking
For permanent use only!*

* In case of short time user


(e.g. for office-, hotel-,
commercial building) only
possible on lower platform
and only if technically
adjusted, ask WHR!
Or with attendant or valet
parking both levels are
possible for short time user.
Load per platform
max. 2000 kg
(load per wheel 500 kg)

290 +30

Dimensions in cm
155

min. 300 cm horizontal


max. slope 10%
min.18

Please attend to restricted carand platform distance height!

70
500

315 +30

305 +30
155

170

min.18

min.18

70

70

530

500

280 +30

260 220
(280)

155

min.18

hydraulic power pack

100
585

Parklift 401 09.2008 C027-4302

Notes

1. According to the examples shown above the required height and length dimensions depend on the car size and parking
direction (frontwards/reverse).
2. Max.car width 190 cm, clear platform width 220 cm. Installation width 260 cm (forwards), installation width 280 cm
(forwards and reverse parking).P
3. According to ISO 3864 the oor has to be marked with 10 cm wide yellow-black stripes at a distance of 90 cm from the platform
edge by the purchaser (see statics and construction requirements on page 2).
4. The manufacturer reserves the right to modify or alter above specications.

Otto Whr GmbH


Auto-Parksysteme

P. O. Box 1151
71288 Friolzheim/Germany

Fon +49 [0] 7044 46-0


Fax +49 [0] 7044 46-149

www.woehr.de
info@woehr.de
We compact parking space

Electrical datas

Installation diagram
Position

by customer 1 unit

electric meter

in the feed cable

by customer 1 unit

fuse or automatic circuit


in the feed cable
breaker 3x16A slow blow
acc. to DIN VDE 0100 p. 430

by customer as locally acc. to local power supply


required regulations
3 Ph + N + PE*
by customer each
foundation earth
10 m
connector
by customer 1 unit
equipotential bonding
acc. to local requirements

4
5

by customer 1 unit

feed cable to
main switch
corner pit oor/
rear wall
from foundation
earth connector
to Parklift

marked main switch,


above operating
lockable to prevent
device
unauthorized switching on

Frequency

1 Electric
2 Fuse or automatic circuit breaker
3 x16 A slow blow according to
DIN VDE 0100 part 430
3 Feed line to the main switch

1 per
power pack

6 Lockable main switch

1 per
power pack

1 per
power pack

The electrical components


suppliedbythemanufacturer
must be connected in accordance with the appropriate wiring
diagram and local regulations.
German VDE electrical requirements must be adhered to, in
order to validate the TV tested
circuit.
The electrical supply to the
power pack(s) must be provided

prior to or during installation to


enable our tters to complete
their work satisfactorily and to
check the correct functioning
of the units.
Parklifts has to be grounded to
the foundation earth connector
by customer. A foundation earth
connector should be provided by
customer each 10m or acc. to
local requirements.

Temperature

Hydraulic unit with three-phase


motor, 230/400V, 50Hz,
1.5 kW. Switching cabinet
with motor, protection, wired
already for installation
Foundation earth connector
Equipotential bonding from
foundation earth connector
to Parklift
PVC control cable 5 x1.5 2 from
assembly to branch connector

15 Cylinder valve
16 PVC control cable 3 x1.5 2 from
branch connector to valve

Maintenance
Regular maintenance by qualied personnel can be provided by means
of an Annual Service Contract.

Protection against corrosion


Independent of a maintenance workings has to be carried out acc. to
Whr Cleaning and Maintenance Instruction regularly.
Clean up galvanized parts and platforms of dirt and road salt as well
as other pollution (corrosion danger)!
Pit must be always ventilated and dearated well.

Statics and construction requirements

3,2
4

=5

,6%

At differing constructional
conditions additional sound
absorbing measures are
necessary.
The best results are reached
by separated sole plates from
the construction.
Increased noise protection:
If increased noise protection
must be provided planning has
to be conrmed on a project
basis by Whr (further building
measures are required).

The installation is designed to operate between +5and +40C.


Atmospheric Humidity: 50% at +40C. If the local circumstances
differ from the above please contact Whr.

13 Operating device for UP/DOWN


with EMERGENCY-STOP. If
possible on the left, but always
outside the platforms movement
range. Cables always feed in
from below. (2 keys per parking place.)

Noise protection
Basis is the German DIN 4109
Noise protection in buildings.
With the following conditions
required 30 dB (A) in rooms
can be provided:
noise protection package
from our accessory
insulation gure of the
construction of min. Rw = 57dB
walls which are bordering
the parking systems must be
done as single wall and
deection resistant with min.
m= 300 kg/m2
solid ceiling above the
parking systems with min.
m= 400 kg/m2

12 PVC Steuerleitung
5 x1.5 2 von Abzweigdose zum Drehtaster

by customer 10 m

* DIN VDE 0100 part 410 + 430 (not under permanent load) 3PH+N+PE
(three-phase current) Note: Where a door is used to close the garage, the
manufacturer of the door must be consulted before the electric cable is laid.

10 Branch
connector

1 per
Parklift

PVC control cable 5 x 1.52


from main switch to
assembly

11 PVC control cable 3 x1.5 2


from branch connector
to unlock magnet

14 Unlock magnet

PVC control cable with


from main switch 1 per
marked strands and proto hydraulic power power pack
tective conductor 5 x 1,5 2 pack
Items 816 are included in Whrs scope of delivery unless otherwise specied in the
offer/order.

x = 70: small and


middle sized
cars
155
(170)

P1
220

Conformity test

All our systems are checked according to EC machinery directive


98/37/EG and EN 14010.

x = 100: big sized


cars e.g.
BMW series 7

P2

Marking according to ISO 3864

P1

P1 = 12 kN*
P2 = 4 kN

P2

Dimensions
All dimensions shown are minimum. Construction tolerances must
be taken into consideration. All dimensions in cm.

238

220

Railings
If walkways are arranged directly to the side or behind the systems,
railings have to be provided acc. EN ISO 13857 by client acc. to local
requirements, height min. 200cm.

Notes
In case of lower cars with spoilers, sontact Company Whr or local agent.

P1

P2

*all static
loadings
include the
weight of
the car

90

The Parkbox will be xed on the anchor points with heavy duty
anchor bolts to a depth of approx. 1012cm.
Slab thickness min. 18cm. Recommended concrete quality C20/25!
Special foundations are required with asphalt oors or paving-stones.

Parklift 401 09.2008 C027-4302

Item Performance Quantity Designation

Data Sheet Whr Parklift 402


Single unit = 2 cars
Double unit = 4 cars

* In case of short time user


only possible on upper platform
and only if technically adjusted,
ask WHR!
Or with attendant or valet parking both
levels are possible for short time user.

for roller shutters:

Suitable for condominium and ofce buildings.


For permanent use only!*
25

25 25

free space
for doors

40

free space
90

60

Special reinforced
units for higher
platform loadings
are available.

slope 8

= 14,1%

clear height
for a lintel

Load per platform 2000 kg


(load per wheel max. 500 kg)
X

free space for door

20

Upper platform is in a
horizontal position to drive on.
Lower platform is in an
inclined position to drive on.

390
20

115

min. 300 cm horizontal,


or else
slope
max.14% min. 200 cm
slope max.5%

= only applicable if garage


doors are to be fitted.
For sectional doors: X = 25 cm
For roller shutters: X = 10/15 cm

min.18
e
ac

p
es
ibl ion
ss uct
o
p rs
fo

= to be clarified with
doors supplier

2%

0
us 5
pl 0 x
x2 p 5
0
m
l1 u
ne p p
an m
ch r su
e
i b l fo
ss ss
po ece
r

Standard type 402-185/180

min.18
530 540*

Compact type 402-170/165

Comfort type 402-200/195

335+30

320+30

295 +30

185 +30

180

Upper level
Lower level

+3
0

165 +30

170 +30

car height
distance (h)
saloon cars
up to 165 cm
saloon/estate cars
170
up to 165 cm

Upper level: estate cars up to a height of 150 cm


Clear height of 310 cm is sufficient, if just cars up
to a height of 150 cm (no estate cars) should be
parked on the upper platform.

Upper level
Lower level

car height
distance (h)
saloon cars
up to 150 cm
saloon/estate cars
155
up to 150 cm

If sufficient headroom is available (305 cm),


estate cars up to a height of 150 cm can be
parked on the upper platform provided that the
free space for door (see section) is not utilized.
Please attend to restricted car- and platform
distance height!

Clearance prole (standard saloon/estate car)


10
25
20

10
15
15

2%

50

Dimensions in cm

g for
penin
wall otrical and ices
elec ulic serv
hydra

0
x2

55

90

65

162

275

60
120

14
max. 290
500

38
90

10 40

48
150*
46 (165*)
(180*)
22

40

195

+3
0

car height
distance (h)
saloon cars
up to 165 cm
Lower level cars/vans up to 180 cm 185
and max. 2000 kg
Upper level

Estate cars up to a height of 150 cm can be parked


on the upper platform provided that the free
space for door is not utilized.
Clear height of 325 cm is sufficient, if just cars up
to a height of 150 cm (no estate cars) should be
parked on the upper platform.
If vans up to a height of 180 cm are to be parked
on the upper level a clear height of 365 cm above
entrance level is required.
*Pit length min. 540 cm.

Examples (09.2008)
8

162

60

48
150*
46 (165*)
(180*)
22

275

60
120

+3
0

200

14
max. 290
500

38
90

* The total car height includes roof rail and antenna xture and must not exceed the
mentioned max. height dimension.

The various model-series versions may vary in


size and/or dimensionally, based on version
conguration, design and execution!
Cars up to 150 cm height:
e.g. Audi A3 to A6; BMW-Touring; OpelCaravan; VW-Variant, always without roof rails
Cars up to 165 cm height:
e.g. MB A-class, E-class estate, B-class;
Opel Omega, Astra; VW Golf V
Cars/Vans up to 180 cm height:
e.g. Mazda MPV; Opel Sintra, Zara;
Renault Espace; VW Sharan

Parklift 402 09.2008 C027-4100

Notes

1. Car width max. 190 cm (see width details page 2). In case of special platform widths narrower than 230 and 460 cm respectively, the maximum vehicle
width is reduced accordingly. For cars with two outside mirrors, a minimum platform width of 250 cm or 500 cm is recommended.
2. Due to recent increases in car length dimensions, and potential future developments, a pit length of 540 cm is advisable. This offers bigger
safety distances also for future cars.
3. At the edge of the pit a 10 cm wide, yellow-black marking according to ISO 3864 has to be provided by the purchaser (see statics and construction
requirements on page 3).
4. The manufacturer reserves the right to modify or alter above specications.

Otto Whr GmbH


Auto-Parksysteme

P. O. Box 1151
71288 Friolzheim/Germany

Fon +49 [0] 7044 46-0


Fax +49 [0] 7044 46-149

www.woehr.de
info@woehr.de
We compact parking space

Width dimensions Underground garages


All dimensions shown are minimum. Construction tolerances must be taken into consideration.
All dimensions in cm.
The access to the Parklift should be flat of with an declination of max. 5% for a distance of 200 cm immediately in front of the pit.
Beyond this the slope should not exceed 14%.
If not stated differently in the offer, platform widths of 230 cm or 460 cm will be delivered. Bigger/smaller platform widths can be delivered
at additional price.
With platform widths 250, 260 and 270 cm special reinforced units with max. platform loading capacity of 2.300 kg are available for
big limousines e.g. Mercedes-Benz S-class, BMW 7, Audi A8 etc.

Wall to wall
Single unit (2 cars)

Double unit (4 cars)

Space required
B
260
270
280
290
300

gives clear
platform width
230
240
250
260
270

Combinated unit (6 cars)

Wall openings required between


partitions for electrical and hydraulic
conduits must be provided where
applicable. Wall openings may not
be closed after installation.

S
B

Space required
B
490
510
530

gives clear
platform width
460
480
500

Space required
B
750
780
810
820
830

gives clear
platform width
460+230
480+240
500+250
500+260
500+270

Minimum driveway
width according to
local requirements

Further width combinations as well as smaller widths are possible

Pillars outside pit


Single unit (2 cars)

Double unit (4 cars)

min. 20
B

min. 20

B1

Space required
wallpillarpillar
pillar
B
B1
250
240
260
250
270
260
280
270
290
280

Combinated unit (6 cars)

gives clear
platform width
230
240
250
260
270

B1

Space required
wallpillarpillar
pillar
B
B1
480
470
500
490
520
510

min. 20

gives clear
platform width
460
480
500

Space required
wallpillarpillar
pillar
B
B1
740
730
770
760
800
790
810
800
820
810

B1

gives clear
platform width

Minimum driveway
width according to
local requirements

460+230
480+240
500+250
500+260
500+270

Further width combinations as well as smaller widths are possible

Pillars inside pit


Single unit (2 cars)

Double unit (4 cars)

min.15

B1

Parklift 402 09.2008 C027-4100

Space required
wallpillarpillar
pillar
B
B1
255
245
265
255
275
265
285
275
295
285

min.15
max.100

Combinated unit (6 cars)

gives clear
platform width
230
240
250
260
270

Space required
wallpillarpillar
pillar
B
B1
485
475
505
495
525
515

min.15

max.100
B1

gives clear
platform width
460
480
500

Space required
wallpillarpillar
pillar
B
B1
745
735
775
765
805
795
815
805
825
815

max.100
B1

gives clear
platform width

Minimum driveway
width according to
local requirements

460+230
480+240
500+250
500+260
500+270

Further width combinations as well as smaller widths are possible

Important notes
If maximum platform widths are not installed, difculties might
arise when entering or exiting the cars on the parking units.
This depends on the car type, the access and the individual
driving behaviour.

Cars wider than 190 cm should be parked on platforms


270/500 cm width only.
For spaces against walls, or at end of rows, we recommend
that largest possible platform widths are utilized to assist
turning motion.

Width dimensions Garages with doors


All dimensions shown are minimum. Construction tolerances must be taken into consideration.
All dimensions in cm.
The access to the Parklift should be flat of with an declination of max. 5% for a distance of 200 cm immediately in front of the pit.
Beyond this the slope should not exceed 14%.
If not stated differently in the offer, platform widths of 230 cm or 460 cm will be delivered. Bigger/smaller platform widths can be delivered
at additional price.
With platform widths 250, 260 and 270 cm special reinforced units with max. platform loading capacity of 2.300 kg are available for
big limousines e.g. Mercedes-Benz S-class, BMW 7, Audi A8 etc.

Single garages (2 cars)

Double garages (4 cars)

S
X

B1
15

15

Space required
B
B1
260
230
270
240
280
250
290
260
300
270

gives clear
platform width
230
240
250
260
270

15

Space required
B
B1
490
460
510
480
530
500

Serial garages with single doors (2 cars)

Wall openings required between


partitions for electrical and hydraulic
conduits must be provided where
applicable. Wall openings may not
be closed after installation.

B1
15

x = for doors. See page 1

Serial garages with double doors (4 cars)

B1
15

B1
30

Space required
B
B1
260
230
270
240
280
250
290
260
300
270

B1

B1
30

15

30

gives clear
platform width
230
240
250
260
270

Minimum driveway
width according to
local requirements

gives clear
platform width
460
480
500

B1
30

Space required
B
B1
490
460
510
480
530
500

30
Minimum driveway
width according to
local requirements

gives clear
platform width
460
480
500

Statics and construction requirements


Single unit

P3

P2
clear
platformwidth +15

P1

P3

P1 = +35 kN *
kN
P2 = +10
8 kN
P3 = + 3 kN

P2
P3

Marking according to ISO 3864

P1

Double unit

P1

P3

P2
clear
platformwidth +15

P1

P3

P2

P1 = +50 kN
kN
P2 = +15
10 kN
P3 = + 3 kN

P2
+

230
320
430

*all static loadings


include the weight
of the car

Bearing loads are transmitted


to the pit oor by base plates of
approximately 140 cm2, xed by
heavy duty anchor bolts to a depth
of approximately 1012cm.
Base plate thickness min. 18 cm
(recommended concrete quality
C20/25). When xing to waterproof concrete oors chemical
anchors are employed (to be
advised by Whr).
The front wall of the pits must be
formed of concrete and must
be perfectly at and vertical
without any protrusions.
The specied lengths to the
support points are mean values.
Please contact us for exact
positions for any variations on
the standard units.

Hydraulic power pack


The location of the hydraulic power pack is determined
according to your plan space requirements are as follows:

Dimensions are in cm
Length =
Height =
Depth =

1 5 Parklifts
100
140
35

6 10 Parklifts
150
140
35

Parklift 402 09.2008 C027-4100

P1

Electrical datas

Installation diagram

Item Performance Quantity Designation

Position

by customer 1 unit

electric meter

in the feed cable

by customer 1 unit

fuse or automatic circuit


in the feed cable
breaker 3x16A slow blow
acc. to DIN VDE 0100 p. 430

by customer as locally acc. to local power supply


required regulations
3 Ph + N + PE*
by customer each
foundation earth
10 m
connector
by customer 1 unit
equipotential bonding
acc. to local requirements

by customer 1 unit

by customer 10 m

corner pit oor/


rear wall
from foundation
earth connector
to Parklift

marked main switch,


above operating
lockable to prevent
device
unauthorized switching on

1 per
power pack

6 Lockable main switch

1 per
power pack

conduit
1 per
Parklift

120 cm

110 cm

* DIN VDE 0100 part 410 + 430 (not under permanent load) 3PH+N+PE
(three-phase current) Note: Where a door is used to close the garage, the
manufacturer of the door must be consulted before the electric cable is laid.
prior to or during installation to
enable our tters to complete
their work satisfactorily and to
check the correct functioning
of the units.
Parklifts has to be grounded to
the foundation earth connector
by customer. A foundation earth
connector should be provided by
customer each 10 m or acc. to
local requirements.

13 PVC control cable


7 x1.5 2
14 Cylinder valve cable
PVC control cable
3 x1.5 2

12 Operating device for UP/DOWN with


EMERGENCY-STOP. If possible on the
left, but always outside the platforms
movement range. Cables always feed in
from below. (2 keys per parking place.)

Recesses and conduits for rotary


switches with rolling and sectional gates

15
115 above access level
=

min.20

8
A

Plastic or steel armoured conduit M 20

Flexible plastic insulation pipe M 20

7 +0,5
8

Railings
The units need to be provided acc. EN ISO 13857 with safety railings
if the gap between unit and wall exceeds 20cm. If walkways are arranged
directly to the side or behind the systems, railings have to be provided by
client acc. to local requirements, height min. 200 cm this is applicable
during the construction phase too.

Free spaces
Special drawings for free spaces to accommodate air ducts or other
pipes can be requested at Whr Agent!

Temperature
The installation is designed to operate between +5and +40C.
Atmospheric Humidity: 50% at +40C. If the local circumstances
differ from the above please contact Whr.

Drainage
We recommend the provision
of a drainage channel at the
front of the pit which can either
incorporate a pump sump
50 x 50 x 20 cm, or a connection
into the storm water sewerage

=
B

At differing constructional
conditions additional sound
absorbing measures are
necessary.
The best results are reached
by separated sole plates from
the construction.
Increased noise protection:
If increased noise protection
must be provided planning has
to be conrmed on a project
basis by Whr (further building
measures are required).

Under plaster

Above plaster

Noise protection
Basis is the German DIN 4109
Noise protection in buildings.
With the following conditions
required 30 dB (A) in rooms
can be provided:
noise protection package
from our accessory
insulation gure of the
construction of min. Rw = 57dB
walls which are bordering
the parking systems must be
done as single wall and
deection resistant with min.
m= 300 kg/m2
solid ceiling above the
parking systems with min.
m= 400 kg/m2

7 PVC control cable 5 x 1.52


from main switch to assembly
8 Hydraulic unit with three-phase
motor, 230/400V, 50Hz, 1.5/3.0 kW.
Switching cabinet with motor,
protection, wired already for
installation
9 PVC control cable 5 x1.52
10 Branch
4 Foundation earth connector
5 Equipotential bonding from
foundation earth connector
to Parklift
11 PVC control cable 5 x1.52
to the next facility

1 per
power pack

PVC control cable with


from main switch 1 per
marked strands and proto hydraulic power power pack
tective conductor 5 x 1,5 2 pack
Items 814 are included in Whrs scope of delivery unless otherwise specied in the
offer/order.

The electrical components


suppliedbythemanufacturer
must be connected in accordance with the appropriate wiring
diagram and local regulations.
German VDE electrical requirements must be adhered to, in
order to validate the TV tested
circuit.
The electrical supply to the
power pack(s) must be provided

1 Electric
2 Fuse or automatic circuit breaker
3 x16A slow blow according to
DIN VDE 0100 part 430
3 Feed line to the main switch

Maintenance
Regular maintenance by qualied personnel can be provided by means
of an Annual Service Contract.

Protection against corrosion


system via a petrol/oil interceptor. To prevent any possibility
of contamination of the groundwater we recommend that the
pit oor is coated with an oil
proof paint.

Conformity test
All our systems are checked according to EC machinery directive
98/37/EG and EN 14010.

Illumination
Illumination has to be considered acc. to local requirements by client.

Independent of a maintenance workings has to be carried out acc. to


Whr Cleaning and Maintenance Instruction regularly.
Clean up galvanized parts and platforms of dirt and road salt as well
as other pollution (corrosion danger)!
Pit must be always ventilated and dearated well.

Dimensions
All dimensions shown are minimum. Construction tolerances must
be taken into consideration. All dimensions in cm.

Notes
In case of standard lowered cars with spoilers, contact Company
Whr or local agent.

Parklift 402 09.2008 C027-4100

feed cable to
main switch

Frequency

Data Sheet Whr Parklift 403


Single unit = 3 cars
Double unit = 6 cars

Suitable for condominium and ofce buildings.


For permanent use only!*

free space for door


Upper plattform is in a horizontal
position to drive on, middle and
lower plattforms are in an inclined
position to drive on.

350

100

20

free space

80

Covered installation:
Load per platform max. 2000 kg
(load per wheel max. 500 kg)
X = only applicable if garage doors
are to be fitted

slope 8=
X

Roller doors:
X = 15

14,1%

Sectional doors:
X = 25 (single doors)
X = 30 (double doors)
X = to be clarified with
door supplier

clear height
for a lintel
min. 300 cm horizontal, or else
slope
max.14%

Dimensions in cm

min. 200 cm
slope max.5%
10
15

70

for
ning
ope l and ices
wallctrica c serv
li
le
u
e dra
15
hy

e
ac
sp
le n
sib ctio
s
po r su
fo

0
us 5
pl 0 x
x2 5
0 ump
1
el p
nn p
ha um
ec rs
is bl s fo
s s
po ece
r
2%

x2

mind. 18

2%

50

530 540

Standard type 403-345/340

Comfort type 403-385/380

460 +30

525 +30

345 +30

Please attend to
restricted car- and
platform distance
height!

340 +30

car height
saloon cars up to 150 cm
saloon/estate cars up to 150 cm
saloon/estate cars up to 150 cm

Upper level
Entrance level
Lower level

+3

+3

385 0

380 0

distance (h)
Upper level
Entrance level
Lower level

155
155

If sufficient headroom is available (475 cm), estate cars up to a height of


150 cm can be parked on the upper platform provided that the
free space for door is not utilized.

car height
saloon cars up to 170 cm
saloon/estate cars up to 170 cm
saloon/estate cars up to 170 cm

55

90

65

162

275

60
120

14
max. 290
500

38
90

10 40

48
46 150*
(170*)

40

22

275

Examples (09.2008)
8

162

60

48
46 150*
(170*)
22
60
120

14
max. 290
500

38
90

Parklift 403 09.2008 C027-4130

* The total car height includes roof rail and antenna xture and must not exceed the mentioned
max. height dimension.

175
175

Estate cars up to a height of 170 cm can be parked on the upper platform


provided that the free space for door is not utilized.

Clearance prole (standard saloon/estate car)


10
25
20

distance (h)

The various model-series versions may vary in


size and/or dimensionally, based on version
conguration, design and execution!
Cars up to 150 cm height:
e.g. Audi A3 to A6; BMW-Touring; OpelCaravan; VW-Variant, always without roof rails
Cars up to 170 cm height:
e.g. MB A-class, B-class; Fiat Tempra;
VW New Beetle; Smart

Notes
1. Car width max. 190 cm (see width details page 2). In case of special platform widths narrower than 230 and 460 cm respectively, the maximum vehicle
width is reduced accordingly.For cars with two outside mirrors, a minimum platform width of 250 cm or 500 cm is recommended.
2. Due to recent increases in car length dimensions, and potential future developments, a pit length of 540 cm is advisable. This offers bigger
safety distances also for future cars.
3. At the edge of the pit a 10cm wide, yellow-black marking according to ISO 3864 has to be provided by the purchaser (see statics and construction
requirements on page 3).
4. The manufacturer reserves the right to modify or alter above specications.
Otto Whr GmbH
Auto-Parksysteme

P. O. Box 1151
71288 Friolzheim/Germany

Fon +49 [0] 7044 46-0


Fax +49 [0] 7044 46-149

www.woehr.de
info@woehr.de
We compact parking space

Width dimensions Underground garages


All dimensions shown are minimum. Construction tolerances must be taken into consideration.
All dimensions in cm.
The access to the Parklift should be flat of with an declination of max. 5% for a distance of 200 cm immediately in front of the pit.
Beyond this the slope should not exceed 14%.
If not stated differently in the offer, platform widths of 230 cm or 460 cm will be delivered. Bigger/smaller platform widths can be delivered
at additional price.

Wall to wall
Single unit (3 cars)

Double unit (6 cars)

Space required
B
270
280
290
300
310

gives clear
platform width
230
240
250
260
270

Combinated unit (9 cars)

Wall openings required between


partitions for electrical and hydraulic
conduits must be provided where
applicable. Wall openings may not
be closed after installation.

S
B

Space required
B
500
520
540

gives clear
platform width
460
480
500

Space required
B
765
795
825
835
845

gives clear
platform width
460+230
480+240
500+250
500+260
500+270

Minimum driveway
width according to
local requirements

Further width combinations as well as smaller widths are possible

Pillars outside pit


Single unit (3 cars)

Double unit (6 cars)

min. 20
B

gives clear
platform width
230
240
250
260
270

B1

Space required
wallpillarpillar
pillar
B
B1
490
475
510
495
530
515

min. 20

min. 20

B1

Space required
wallpillarpillar
pillar
B
B1
260
245
270
255
280
265
290
275
300
285

Combinated unit (9 cars)

gives clear
platform width
460
480
500

Space required
wallpillarpillar
pillar
B
B1
750
740
780
770
810
800
820
810
830
820

B1

gives clear
platform width

Minimum driveway
width according to
local requirements

460+230
480+240
500+250
500+260
500+270

Further width combinations as well as smaller widths are possible

Pillars inside pit


Single unit (3 cars)

Double unit (6 cars)

min. 20

B1

Space required
wallpillarpillar
pillar
B
B1
260
245
270
255
280
265
290
275
300
285

min. 20
max.140

Combinated unit (9 cars)

gives clear
platform width
230
240
250
260
270

Space required
wallpillarpillar
pillar
B
B1
490
475
510
495
530
515

min. 20

max.140
B1

gives clear
platform width
460
480
500

Space required
wallpillarpillar
pillar
B
B1
750
740
780
770
810
800
820
810
830
820

max.140
B1

gives clear
platform width

Minimum driveway
width according to
local requirements

460+230
480+240
500+250
500+260
500+270

Parklift 403 09.2008 C027-4130

Further width combinations as well as smaller widths are possible

Important notes
If maximum platform widths are not installed, difculties might
arise when entering or exiting the cars on the parking units.
This depends on the car type, the access and the individual
driving behaviour.

Cars wider than 190 cm should be parked on platforms


270/500 cm width only.
For spaces against walls, or at end of rows, we
recommend that largest possible platform widths are
utilized to assist turning motion.

Width dimensions Garages with doors


All dimensions shown are minimum. Construction tolerances must be taken into consideration.
All dimensions in cm.
The access to the Parklift should be flat of with an declination of max. 5% for a distance of 200 cm immediately in front of the pit.
Beyond this the slope should not exceed 14%.
If not stated differently in the offer, platform widths of 230 cm or 460 cm will be delivered. Bigger/smaller platform widths can be delivered
at additional price.

Single garages (3 cars)


270

280

Double garages (6 cars)

290

300

310

500

520

540

230

240

250

260

270

460

480

500

230
20

240
20 20

250
20 20

260
20 20

270
20 20

475

500

125

20

x = for doors. See page 1


Wall openings required between
partitions for electrical and hydraulic
conduits must be provided where
applicable. Wall openings may not
be closed after installation.

500

125 10

10 20

20

Minimum driveway
width according to
local requirements

Serial garages with single doors (3 cars)


266

262

262

276

272

272

286

282

282

296

292

292

306

302

302

230

230

230

240

240

240

250

250

250

260

260

260

270

270

270

270

270

230
20

230
32

240

230
32

32 20

240
32

250

240
32

32 20

250
32

260

250

32 20

32

260
32

270

260
32

32 20

32

32
32
Minimum driveway
width according to
local requirements

Serial garages with double doors (6 cars)


496

516

492

512

536

532

460

460

480

480

500

500

460

480

460

20

32

32

20

480
32

500
32

20

500
32

Minimum driveway
width according to
local requirements

32

Statics and construction requirements


Single unit

P1

P3

P3

P4
clear
platform
width +20

P2 = +11 kN
3 kN
P3 = + 3 kN
P4 = +20 kN

P4

325

Marking according to ISO 3864

P2

P1 = +100 kN *

P1

P3

P4

P2 = +20 kN
6 kN

clear
platform
width +20
P2

P1

P3

P4

20

Double unit

P2

P3

P3 = + 3 kN
P4 = +34 kN

P1
*all static loadings
include the weight
of the car

P4

Bearing loads are transmitted


to the pit floor by base plates of
approximately 700cm2, fixed by
heavy duty anchor bolts to a depth
of approximately 1012 cm.
Base plate thickness min. 18 cm
(recommended concrete quality
C20/25). When xing to waterproof concrete oors chemical
anchors are employed (to be
advised by Whr).
The walls of the pit must be
formed of concrete and must
be perfectly flat and vertical
without any protrusions.
The specified lengths to the
support points are mean values.
Please contact us for exact
positions for any variations on
the standard units.

270
490

Hydraulic power pack


The location of the hydraulic power pack is determined according to your
plan space requirements are as follows:

Dimensions
are in cm
Length =
Height =
Depth =

1 single unit or
1 double unit
100
140
30

25 single units or
23 double units
200
140
30

Parklift 403 09.2008 C027-4130

P2

P1 = +60 kN *

P1

1330

P2

Electrical datas

Installation diagram

Item Performance Quantity Designation

Position

by customer 1 unit

electric meter

in the feed cable

by customer 1 unit

fuse or automatic circuit


in the feed cable
breaker 3 x 25 A slow blow
acc. to DIN VDE 0100 p. 430

by customer as locally acc. to local power supply


required regulations
3 Ph + N + PE*
by customer each
foundation earth
10 m
connector
by customer 1 unit
equipotential bonding
acc. to local requirements

by customer 1 unit

1 Electric meter
2 Fuse or automatic circuit breaker 3 x 25A slow blow
according to DIN VDE 0100 part 430
3 Feed line to the main switch
7 PVC control cable 5 x 2,52
from main switch to assembly
6 Lockable main switch

1 per
power pack
1 per
power pack
conduit

corner pit oor/


rear wall
from foundation
earth connector
to Parklift

marked main switch,


above operating
lockable to prevent
device
unauthorized switching on

1 per
Parklift

120 cm

13 PVC control
cable 7 x1.5 2
conduit

8 Hydraulic unit with three-phase


motor, 230/400V, 50Hz, 5.5 kW.
Switching cabinet with motor,
protection, wired already for
installation

110 cm

9 PVC control cable 5 x1.52

1 per
power pack

10 Branch connector
14 Cylinder valve cable
PVC control cable 3 x1.5 2

by customer 10 m

PVC control cable with


from main switch 1 per
marked strands and proto hydraulic power power pack
tective conductor 5 x 2,52 pack
Items 814 are included in Whrs scope of delivery unless otherwise specied in the
offer/order.

* DIN VDE 0100 part 410 + 430 (not under permanent load) 3PH+N+PE
(three-phase current) Note: Where a door is used to close the garage, the
manufacturer of the door must be consulted before the electric cable is laid.
The electrical components
suppliedbythemanufacturer
must be connected in accordance with the appropriate wiring
diagram and local regulations.
German VDE electrical requirements must be adhered to, in
order to validate the TV tested
circuit.
The electrical supply to the
power pack(s) must be provided

prior to or during installation to


enable our tters to complete
their work satisfactorily and to
check the correct functioning
of the units.
Parklifts has to be grounded to
the foundation earth connector
by customer. A foundation earth
connector should be provided by
customer each 10 m or acc. to
local requirements.

12 Operating device for UP/DOWN with


EMERGENCY-STOP. If possible on the
left, but always outside the platforms
movement range. Cables always feed in
from below. (2 keys per parking place.)

Recesses and conduits for rotary


switches with rolling and sectional gates

15
115 above access level
=

At differing constructional
conditions additional sound
absorbing measures are
necessary.
The best results are reached
by separated sole plates from
the construction.
Increased noise protection:
If increased noise protection
must be provided planning has
to be conrmed on a project
basis by Whr (further building
measures are required).

min.20

8
A

Plastic or steel armoured conduit M 20

Flexible plastic insulation pipe M 20

7 +0,5
8

Railings
The units need to be provided acc. EN ISO 13857 with safety railings
if the gap between unit and wall exceeds 20 cm. If walkways are arranged
directly to the side or behind the systems, railings have to be provided by
client acc. to local requirements, height min. 200 cm this is applicable
during the construction phase too.

Free spaces
Special drawings for free spaces to accommodate air ducts or other
pipes can be requested at Whr Agent!

Temperature
The installation is designed to operate between +5and +40C.
Atmospheric Humidity: 50% at +40C. If the local circumstances
differ from the above please contact Whr.

Drainage
We recommend the provision
of a drainage channel at the
front of the pit which can either
incorporate a pump sump
50 x 50 x 20 cm, or a connection
into the storm water sewerage

Under plaster

Above plaster

Noise protection
Basis is the German DIN 4109
Noise protection in buildings.
With the following conditions
required 30 dB (A) in rooms
can be provided:
noise protection package
from our accessory
insulation gure of the
construction of min. Rw = 57dB
walls which are bordering
the parking systems must be
done as single wall and
deection resistant with min.
m= 300 kg/m2
solid ceiling above the
parking systems with min.
m= 400 kg/m2

4 Foundation earth connector


5 Equipotential bonding from
foundation earth connector
to Parklift
11 PVC control cable 5 x1.52
to the next facility

Maintenance
Regular maintenance by qualied personnel can be provided by means
of an Annual Service Contract.

Protection against corrosion


system via a petrol/oil interceptor. To prevent any possibility
of contamination of the groundwater we recommend that the
pit oor is coated with an oil
proof paint.

Conformity test
All our systems are checked according to EC machinery directive
98/37/EG and EN 14010.

Illumination
Illumination has to be considered acc. to local requirements by client.

Independent of a maintenance workings has to be carried out acc. to


Whr Cleaning and Maintenance Instruction regularly.
Clean up galvanized parts and platforms of dirt and road salt as well
as other pollution (corrosion danger)!
Pit must be always ventilated and dearated well.

Dimensions
All dimensions shown are minimum. Construction tolerances must
be taken into consideration. All dimensions in cm.

Notes
Standard lowered cars can park only partly, if necessary additional
adjustments can be carried out.

Parklift 403 09.2008 C027-4130

feed cable to
main switch

Frequency

Data Sheet Whr Parklift 411


dependent parking
For permanent user only!*
* In case of short time user (e.g. for office-, hotel-, commercial building) only possible on lower platform and only if technically
adjusted, ask WHR! Or with attendant or valet parking both levels are possible for short time user.
Parklift 411-2,0: load per platform max. 2000 kg (load per wheel max. 500 kg).
Parklift 411-2,6: load per platform max. 2600 kg (load per wheel max. 650 kg).
Dimensions in cm

Parklift 411 Standard type

Parklift 411 Comfort type

h1
h1
w
e all
hy lectr ope
dr ic nin
au al g
lic an fo
se d r
rvi
ce
s

w
e all
hy lectr ope
dr ic nin
au al g
lic an fo
se d r
rvi
ce
s

15
min.18

15
min.18

min. 300 cm
horizontal
max. -10%
slope

15

15
520

520

Height h1* single unit


Height h1* double unit
Car height lower level
Car height upper level*

Parklift
411-155
320
330
150
150

Parklift
411-165
330
340
160
150

* With greater h1 height, higher cars can be parked on the


upper platform

Parklift
411-175
340
350
170
150

Height h1* single unit


Height h1* double unit
Car height lower level
Car height upper level*

Parklift
411-185
350
360
180
150

Parklift
411-195
360
370
190
150

Parklift
411-205
370
380
200
150

* With greater h1 height, higher cars can be parked on the


upper platform

Please attend to restricted car heights on upper platforms! Please attend to restricted car- and platform distance height on the lower parking
space (Parklift 411-155 and Parklift 411-165)!

Width dimensions
Single unit

Double unit
Space
required
gives clear
B
platform width*
265
230
275
240
285
250
295
260
305
270

clear
platform width
B

Space
required
gives clear
B
platform width*
495
460
515
480
535
500

* Special platform widths


are available (e.g. 210,
220 cm), please check if
they correspond with
local regulations.

clear
platform width
B

* Special platform widths


are available (e.g. 420,
430, 440, 450 cm),
please check if they
correspond with
local regulations.

Parklift 411 12.2008 C027-4128

Notes

1. Car width max. 190 cm. In case of special platform widths narrower than 230 and 460 cm respectively, the maximum vehicle width is reduced
accordingly. For cars with two outside mirrors, a minimum platform width of 250 cm or 500 cm is recommended.
2. According to ISO 3864 the oor has to be marked with 10 cm wide yellow-black stripes at a distance of 50 cm from the platform edge by the
purchaser (see statics and construction requirements on page 2).
3. The lowering speed of an empty platform is considerably lower than a loaded one.
4. The manufacturer reserves the right to modify or alter above specications.

Otto Whr GmbH


Auto-Parksysteme

P. O. Box 1151
71288 Friolzheim/Germany

Fon +49 [0] 7044 46-0


Fax +49 [0] 7044 46-149

www.woehr.de
info@woehr.de
We compact parking space

Electrical datas

Installation diagram

Item Performance Quantity Designation

Position

by customer 1 unit

electric meter

in the feed cable

by customer 1 unit

fuse or automatic circuit


in the feed cable
breaker 3x16A slow blow
acc. to DIN VDE 0100 p. 430

4
5

by customer as locally acc. to local power supply


required regulations
3 Ph + N + PE*
by customer each
foundation earth
10 m
connector
by customer 1 unit
equipotential bonding
acc. to local requirements
by customer 1 unit

feed cable to
main switch
corner pit oor/
rear wall
from foundation
earth connector
to Parklift

marked main switch,


above operating
lockable to prevent
device
unauthorized switching on

Frequency

1 Electric meter
2 Fuse or automatic circuit breaker
3 x16 A slow blow according to
DIN VDE 0100 part 430
3 Feed line to the main switch

1 per
power pack
1 per
power pack

14 Unlock magnet
1 per
Parklift

10 Branch
connector

1 per
power pack

PVC control cable with


from main switch 1 per
marked strands and proto hydraulic power power pack
tective conductor 5 x 1,5 2 pack
Items 816 are included in Whrs scope of delivery unless otherwise specied in the
offer/order.

* DIN VDE 0100 part 410 + 430 (not under permanent load) 3PH+N+PE
(three-phase current) Note: Where a door is used to close the garage, the
manufacturer of the door must be consulted before the electric cable is laid.
prior to or during installation to
enable our tters to complete
their work satisfactorily and to
check the correct functioning
of the units.
Parklifts has to be grounded to
the foundation earth connector
by customer. A foundation earth
connector should be provided by
customer each 10 m or acc. to
local requirements.

Noise protection
Basis is the German DIN 4109
Noise protection in buildings.
With the following conditions
required 30 dB (A) in rooms
can be provided:
noise protection package
from our accessory
insulation gure of the
construction of min. Rw = 57dB
walls which are bordering
the parking systems must be
done as single wall and
deection resistant with min.
m= 300 kg/m2
solid ceiling above the
parking systems with min.
m= 400 kg/m2

At differing constructional
conditions additional sound
absorbing measures are
necessary.
The best results are reached
by separated sole plates from
the construction.
Increased noise protection:
If increased noise protection
must be provided planning has
to be conrmed on a project
basis by Whr (further building
measures are required).

Maintenance
Regular maintenance by qualied personnel can be provided by means
of an Annual Service Contract.

Protection against corrosion


Independent of a maintenance workings has to be carried out acc. to
Whr Cleaning and Maintenance Instruction regularly.
Clean up galvanized parts and platforms of dirt and road salt as well
as other pollution (corrosion danger)!
Pit must be always ventilated and dearated well.

Statics and construction requirements


Single
unit

P3

Double
unit

411-2,0
P1 = + 5 kN *
P2 = +16 kN
P3 = + 3 kN

300

P1

411-2,6
P1 = + 7 kN *
P2 = +19 kN
P3 = + 3 kN

P2

170
160
Marking according to ISO 3864

P1

P2
P3

clear
platform
width

clear
platform
width+ 20

P3
P1

The installation is designed to operate between +5and +40C.


Atmospheric Humidity: 50% at +40C. If the local circumstances
differ from the above please contact Whr.

For the accommodation of the hydraulic power packs an additional space


is required which will be determinded during the verications of the
drawings, e.g. in a wall recess.

Equipotential bonding from


foundation earth connector
to Parklift
9 PVC control cable 5 x1,5 2 from
assembly to branch connector
16 PVC control cable 3 x1,5 2 from
branch connector to valve
15 Cylinder valve

13 Operating device for UP/DOWN


with EMERGENCY-STOP. If
possible on the left, but always
outside the platforms movement
range. Cables always feed in
from below. (2 keys per parking place.)

Temperature

Hydraulic power packs

Foundation earth connector

12 PVC control cable


7 x1,5 2 from branch
connector to operating
element

by customer 10 m

The electrical components


suppliedbythemanufacturer
must be connected in accordance with the appropriate wiring
diagram and local regulations.
German VDE electrical requirements must be adhered to, in
order to validate the TV tested
circuit.
The electrical supply to the
power pack(s) must be provided

PVC control cable 5 x 1,52


from main switch to
assembly
8 Hydraulic unit with three-phase
motor, 230/400V, 50Hz,
1,5/3,0 kW. Switching cabinet
with motor, protection, wired
already for installation
11 PVC control cable 3 x1,5 2
from branch connector
to unlock magnet
7

6 Lockable main switch

411-2,6
P1 = +14 kN
P2 = +33 kN
P3 = + 3 kN

*all static
loadings
include the
weight
of the car

P2

50

The units will be xed on the anchor points with heavy duty anchor bolts
to a depth of approx. 1012cm.
Base plate thickness minimum 18cm! Concrete quality C20/25.
Special foundations are required with asphalt oors or paving-stones.

Notes
Dimensions
All dimensions shown are minimum. Construction tolerances must
be taken into consideration. All dimensions in cm.

In case of lower cars with spoilers, contact Company Whr or local agent
(see clearance prole).

Clearance prole (standard car)


All our systems are checked according to EC machinery directive
98/37/EG and EN 14010.

10

40

60

162

48 150*
(160*)
46 (170*)
(180*)
(190*)
(200*)
22

40

Railings
If walkways are arranged directly to the side or behind the systems, railings
have to be provided acc. EN ISO 13857 by client acc. to local requirements,
height min. 200cm.

275

38

14

60
120

max. 290
500

90

* The total car height includes roof rail and antenna fixture must not
exceed the mentioned max. height dimension.

Parklift 411 12.2008 C027-4128

Conformity test

Data Sheet Whr Parklift 413


Single unit = 3 cars
Double unit = 6 cars

Suitable for condominium and ofce buildings.


For permanent use only!*

free space for door


* In case of short time user
only possible on upper platform
and only if technically adjusted,
ask WHR!
Or with attendant or valet parking all
levels are possible for short time user.

50

25

60

25

40

free space
38

All platforms are in a horizontal


position to drive on.
Covered installation:
Load per platform max. 2000 kg
(load per wheel max. 500 kg)

X = only applicable if
garage doors are
to be fitted

Roller doors:
X = 15

clear height
for a lintel

Sectional doors:
X = 25 (single doors)
X = 30 (double doors)

max. + 3% slope
max. -10% slope

X = to be clarified with
door supplier

10
e

ac
sp
le n
sib ctio
s
u
po r s
fo

0
us 5
pl 0 x
x2 p 5
10 pum
l
e
nn p
ha um
ec rs
i b l s fo
s
s s
po ece
r
2%

x2

15

min.18

2%

50

530540

Normal type

Comfort type

C +30

C +30

+3

+3

A 0

B 0

Parklift 413-345/340:
Parklift 413-335/330:

A
345
335

B
340
330

Please attend to
restricted car- and
platform distance
height!

C
495
480

h
160
155

+3

+3

A 0

car height*
155
150

* upper level, entrance level and lower level for saloon and estate cars

B 0

Parklift 413-385/380:
Parklift 413-375/370:

55

90

65

162

275

60
120

14
max. 290
500

38
90

10 40

48 150/
46 155*
(170/
175*)
22

40

B
380
370

C
555
540

h
180
175

car height*
175
170

Examples (09.2008)
8

162

60

48 150/
46 155*
(170/
175*)
22

275

60
120

A
385
375

* upper level, entrance level and lower level for saloon and estate cars

Clearance prole (standard saloon/estate car)


10
25
20

15

for
ning
ope l and ices
wallctrica c serv
li
ele drau
hy

70

Dimensions in cm

14
max. 290
500

38
90

* The total car height includes roof rail and antenna xture and must not exceed the mentioned
max. height dimension.

The various model-series versions may vary in


size and/or dimensionally, based on version
conguration, design and execution!
Cars up to 150 cm/155 cm height:
e.g. Audi A3 bis A6; BMW-Touring; OpelCaravan; VW-Variant, always without roof rails
Cars up to 170 cm/175 cm height:
e.g. MB A-class, B-class; Fiat Tempra;
VW New Beetle; Smart

Parklift 413 09.2008 C027-4304

Notes

1. Car width max. 190 cm (see width details page 2). In case of special platform widths narrower than 230 and 460 cm respectively, the maximum vehicle
width is reduced accordingly. For cars with two outside mirrors, a minimum platform width of 250 cm or 500 cm is recommended.
2. Due to recent increases in car length dimensions, and potential future developments, a pit length of 540 cm is advisable.
This offers bigger safety distances also for future cars.
3. At the edge of the pit a 10cm wide, yellow-black marking according to ISO 3864 has to be provided by the purchaser
(see statics and construction requirements on page 3).
4. The manufacturer reserves the right to modify or alter above specications.

Otto Whr GmbH


Auto-Parksysteme

P. O. Box 1151
71288 Friolzheim/Germany

Fon +49 [0] 7044 46-0


Fax +49 [0] 7044 46-149

www.woehr.de
info@woehr.de
We compact parking space

Width dimensions Underground garages


All dimensions shown are minimum. Construction tolerances must be taken into consideration.
All dimensions in cm.
The access to the Parklift is possible with max. 3% declination and max. 10% inclination.
If not stated differently in the offer, platform widths of 230 cm or 460 cm will be delivered. Bigger/smaller platform widths can be delivered
at additional price.

Wall to wall
Single unit (3 cars)

Double unit (6 cars)

Space required
B
270
280
290
300
310

gives clear
platform width
230
240
250
260
270

Combinated unit (9 cars)

Wall openings required between


partitions for electrical and hydraulic
conduits must be provided where
applicable. Wall openings may not
be closed after installation.

S
B

Space required
B
500
520
540

gives clear
platform width
460
480
500

Space required
B
765
795
825
835
845

gives clear
platform width
460+230
480+240
500+250
500+260
500+270

Minimum driveway
width according to
local requirements

Further width combinations as well as smaller widths are possible

Pillars outside pit


Single unit (3 cars)

Double unit (6 cars)

min. 20
B

gives clear
platform width
230
240
250
260
270

B1

Space required
wallpillarpillar
pillar
B
B1
490
475
510
495
530
515

min. 20

min. 20

B1

Space required
wallpillarpillar
pillar
B
B1
260
245
270
255
280
265
290
275
300
285

Combinated unit (9 cars)

gives clear
platform width
460
480
500

Space required
wallpillarpillar
pillar
B
B1
750
740
780
770
810
800
820
810
830
820

B1

gives clear
platform width

Minimum driveway
width according to
local requirements

460+230
480+240
500+250
500+260
500+270

Further width combinations as well as smaller widths are possible

Pillars inside pit


Single unit (3 cars)

Double unit (6 cars)

min. 20

B1

Space required
wallpillarpillar
pillar
B
B1
260
245
270
255
280
265
290
275
300
285

min. 20
max.140

Combinated unit (9 cars)

gives clear
platform width
230
240
250
260
270

Space required
wallpillarpillar
pillar
B
B1
490
475
510
495
530
515

min. 20

max.140
B1

gives clear
platform width
460
480
500

Space required
wallpillarpillar
pillar
B
B1
750
740
780
770
810
800
820
810
830
820

max.140
B1

gives clear
platform width

Minimum driveway
width according to
local requirements

460+230
480+240
500+250
500+260
500+270

Parklift 413 09.2008 C027-4304

Further width combinations as well as smaller widths are possible

Important notes
If maximum platform widths are not installed, difculties might
arise when entering or exiting the cars on the parking units.
This depends on the car type, the access and the individual
driving behaviour.

Cars wider than 190 cm should be parked on platforms


270/500 cm width only.
For spaces against walls, or at end of rows, we
recommend that largest possible platform widths are
utilized to assist turning motion.

Width dimensions Garages with doors


All dimensions shown are minimum. Construction tolerances must be taken into consideration.
All dimensions in cm.
The access to the Parklift is possible with max. 3% declination and max. 10% inclination.
If not stated differently in the offer, platform widths of 230 cm or 460 cm will be delivered. Bigger/smaller platform widths can be delivered
at additional price.

Single garages (3 cars)


270

280

Double garages (6 cars)

290

300

310

500

520

540

230

240

250

260

270

460

480

500

230
20

240
20 20

250
20 20

260
20 20

270
20 20

475

500

125

20

x = for doors. See page 1


Wall openings required between
partitions for electrical and hydraulic
conduits must be provided where
applicable. Wall openings may not
be closed after installation.

500

125 10

10 20

20

Minimum driveway
width according to
local requirements

Serial garages with single doors (3 cars)


266

262

262

276

272

272

286

282

282

296

292

292

306

302

302

230

230

230

240

240

240

250

250

250

260

260

260

270

270

270

270

270

230
20

230
32

240

230
32

32 20

240
32

250

240
32

32 20

250
32

260

250

32 20

32

260
32

270

260
32

32 20

32

32
32
Minimum driveway
width according to
local requirements

Serial garages with double doors (6 cars)


496

516

492

512

536

532

460

460

480

480

500

500

460
20

480

460
32

32

20

480
32

500
32

20

500
32

32

Minimum driveway
width according to
local requirements

Statics and construction requirements


Single unit

P1

P3

P3

clear
platform
width +20

P2 = + 9 kN
3 kN
P3 = + 3 kN

325

Marking according to ISO 3864

Double unit
P2

P1 = +100 kN *

P1

P3
clear
platform
width +20

P2

P1

P3

P2

P3

P2 = +12 kN
6 kN
P3 = + 3 kN

P1
*all static loadings
include the weight
of the car

Bearing loads are transmitted


to the pit floor by base plates of
approximately 700cm2, fixed by
heavy duty anchor bolts to a depth
of approximately 1012 cm.
Base plate thickness min. 18 cm
(recommended concrete quality
C20/25). When xing to waterproof concrete oors chemical
anchors are employed (to be
advised by Whr).
The walls of the pit must be
formed of concrete and must
be perfectly flat and vertical
without any protrusions.
The specified lengths to the
support points are mean values.
Please contact us for exact
positions for any variations on
the standard units.

270

Hydraulic power pack


The location of the hydraulic power pack is determined according to your
plan space requirements are as follows:

Dimensions
are in cm
Lnge =
Hhe =
Tiefe =

1 single unit or
1 double unit
100
140
30

25 single units or
23 double units
200
140
30

Parklift 413 09.2008 C027-4304

P2

P1 = +60 kN *

P1

1330

P2

Electrical datas

Installation diagram

Item Performance Quantity Designation

Position

by customer 1 unit

electric meter

in the feed cable

by customer 1 unit

fuse or automatic circuit


in the feed cable
breaker 3 x 25 A slow blow
acc. to DIN VDE 0100 p. 430

by customer as locally acc. to local power supply


required regulations
3 Ph + N + PE*
by customer each
foundation earth
10 m
connector
by customer 1 unit
equipotential bonding
acc. to local requirements

by customer 1 unit

1 Electric meter
2 Fuse or automatic circuit breaker 3 x 25A slow blow
according to DIN VDE 0100 part 430
3 Feed line to the main switch
7 PVC control cable 5 x 2.52
from main switch to assembly
6 Lockable main switch

1 per
power pack
1 per
power pack
conduit

corner pit oor/


rear wall
from foundation
earth connector
to Parklift

marked main switch,


above operating
lockable to prevent
device
unauthorized switching on

1 per
Parklift

120 cm

13 PVC control
cable 7 x1.5 2
conduit

8 Hydraulic unit with three-phase


motor, 230/400V, 50Hz, 5.5 kW.
Switching cabinet with motor,
protection, wired already for
installation

110 cm

9 PVC control cable 5 x1.52

1 per
power pack

10 Branch connector
14 Cylinder valve cable
PVC control cable 3 x1.5 2

by customer 10 m

PVC control cable with


from main switch 1 per
marked strands and proto hydraulic power power pack
tective conductor 5 x 2,5 2 pack
Items 814 are included in Whrs scope of delivery unless otherwise specied in the
offer/order.

* DIN VDE 0100 part 410 + 430 (not under permanent load) 3PH+N+PE
(three-phase current) Note: Where a door is used to close the garage, the
manufacturer of the door must be consulted before the electric cable is laid.
The electrical components
suppliedbythemanufacturer
must be connected in accordance with the appropriate wiring
diagram and local regulations.
German VDE electrical requirements must be adhered to, in
order to validate the TV tested
circuit.
The electrical supply to the
power pack(s) must be provided

prior to or during installation to


enable our tters to complete
their work satisfactorily and to
check the correct functioning
of the units.
Parklifts has to be grounded to
the foundation earth connector
by customer. A foundation earth
connector should be provided by
customer each 10 m or acc. to
local requirements.

12 Operating device for UP/DOWN with


EMERGENCY-STOP. If possible on the
left, but always outside the platforms
movement range. Cables always feed in
from below. (2 keys per parking place.)

Recesses and conduits for rotary


switches with rolling and sectional gates
Under plaster

Above plaster

15

Noise protection
Basis is the German DIN 4109
Noise protection in buildings.
With the following conditions
required 30 dB (A) in rooms
can be provided:
noise protection package
from our accessory
insulation gure of the
construction of min. Rw = 57dB
walls which are bordering
the parking systems must be
done as single wall and
deection resistant with min.
m= 300 kg/m2
solid ceiling above the
parking systems with min.
m= 400 kg/m2

115 above access level


At differing constructional
conditions additional sound
absorbing measures are
necessary.
The best results are reached
by separated sole plates from
the construction.
Increased noise protection:
If increased noise protection
must be provided planning has
to be conrmed on a project
basis by Whr (further building
measures are required).

Temperature

min.20

8
A

Plastic or steel armoured conduit M 20

Flexible plastic insulation pipe M 20

7 +0,5
8

Railings
The units need to be provided acc. EN ISO 13857 with safety railings
if the gap between unit and wall exceeds 20 cm. If walkways are arranged
directly to the side or behind the systems, railings have to be provided by
client acc. to local requirements, height min. 200 cm this is applicable
during the construction phase too.

Free spaces

The installation is designed to operate between +5and +40C.


Atmospheric Humidity: 50% at +40C. If the local circumstances
differ from the above please contact Whr.

Special drawings for free spaces to accommodate air ducts or other


pipes can be requested at Whr Agent!

Maintenance

Drainage
We recommend the provision
of a drainage channel at the
front of the pit which can either
incorporate a pump sump
50 x 50 x 20 cm, or a connection
into the storm water sewerage

4 Foundation earth connector


5 Equipotential bonding from
foundation earth connector
to Parklift
11 PVC control cable 5 x1.52
to the next facility

system via a petrol/oil interceptor. To prevent any possibility


of contamination of the groundwater we recommend that the
pit oor is coated with an oil
proof paint.

Conformity test
All our systems are checked according to EC machinery directive
98/37/EG and EN 14010.

Illumination
Illumination has to be considered acc. to local requirements by client.

Regular maintenance by qualied personnel can be provided by means


of an Annual Service Contract.

Protection against corrosion


Independent of a maintenance workings has to be carried out acc. to
Whr Cleaning and Maintenance Instruction regularly.
Clean up galvanized parts and platforms of dirt and road salt as well
as other pollution (corrosion danger)!
Pit must be always ventilated and dearated well.

Dimensions
All dimensions shown are minimum. Construction tolerances must
be taken into consideration. All dimensions in cm.
Parklift 413 09.2008 C027-4304

feed cable to
main switch

Frequency

Data Sheet Whr Parklift 430


Single unit = 2 cars
Double unit = 4 cars

Suitable for condominium and ofce buildings.


For permanent use only!*

25 25
* In case of short time use
only possible on upper platform
and only if technically adjusted,
ask WHR!
Or with attendant or valet parking
both levels are possible for short
time user.

40

free space
for door

40

80

free space

40

Load per platform max. 2000 kg


(load per wheel max. 500 kg)
min. 295 +30
X

= only applicaple if garage


doors are to be fitted.
For roller doors x = 10/15 cm

clear height
for a lintel

= to be clarified with
door supplier
max. +2% slope
max. 2% slope
x2

Dimensions in cm

p
re oss
ce ibl
ss e c
fo h a
r s nn
um el
p 10 x
pu 2
m p
p lu
50 s
x5
0

e
ac
sp
e
l
n
ib io
ss ct
po r su
fo

70
155 +30
to
200 +30

2%

15

for
ing
penl and ices
o
l
l
a
wa ctric c serv
ele drauli
hy

80

15
150 +30
to
195 +30

min.18

2%

50

390
530540

We suggest to plan with min. car heights of 165 cm resp. platform distances of min. 170 cm!

Clearance prole (standard saloon/estate car)


10

90

55

65

162

25
20

13
48

40

75

162

48

37

150
46 bis
195*

275

22
14

60
120

38

max. 290
500

90

46

275

150
bis
195*

22
38

14

60
120

max.290
500

90

* The total car height includes roof rail and antenna xture and must not exceed the mentioned max. height dimension.

Parklift 430 09.2008 C027-4140

Notes

1. Car width max. 190 cm (see width details page 2). In case of special platform widths narrower than 230 and 460 cm respectively, the maximum vehicle
width is reduced accordingly. For cars with two outside mirrors, a minimum platform width of 250 cm or 500 cm is recommended.
2. Due to recent increases in car length dimensions, and potential future developments, a pit length of 540cm is advisable.
This offers bigger safety distances also for future cars
3. At the edge of the pit a 10cm wide, yellow-black marking according to ISO 3864 has to be provided by the purchaser
(see statics and construction requirements on page 3).
4. The manufacturer reserves the right to modify or alter above specications.

Otto Whr GmbH


Auto-Parksysteme

P. O. Box 1151
71288 Friolzheim/Germany

Fon +49 [0] 7044 46-0


Fax +49 [0] 7044 46-149

www.woehr.de
info@woehr.de
We compact parking space

Possible adjustemts
For different dimensions please contact WO
HR!
* = platform slope during use 8 (14,1%)

Pit depth 1,55 m | Height above entrance level 2,95 m

295

155

150
530

upper level

only saloon cars up to 1,50 m heigth, inclined*

lower level

saloon/estate cars up to 1,50 m heigth, inclined*

Pit depth 1,55 m | Height above entrance level 3,25 m

325

325

155

150

155

530

150
530

upper level

saloon/estate cars up to 1,50 m heigth, inclined*

saloon/estate cars up to 1,65 m heigth, inclined*

lower level

saloon/estate cars up to 1,50 m heigth, horizontal

saloon/estate cars up to 1,50 m heigth, inclined*

Pit depth 1,70 m | Height above entrance level 2,95 m

295

170

165
530

upper level

only saloon cars up to 1,50 m heigth, horizontal

lower level

saloon/estate cars up to 1,50 m heigth, inclined*

Pit depth 1,70 m | Height above entrance level 3,25 m

325

325

170

165

Parklift 430 09.2008 C027-4140

530

325

170

165
530

170

165
530

upper level

saloon/estate cars up to 1,50 m heigth, horizontal

saloon/estate cars up to 1,65 m heigth, horizontal

saloon/estate cars up to 1,50 m heigth, inclined*

lower level

saloon/estate cars up to 1,50 m heigth, horizontal

saloon/estate cars up to 1,50 m heigth, inclined*

saloon/estate cars up to 1,65 m heigth, inclined*

Possible adjustemts
For different dimensions please contact WO
HR!
* = platform slope during use 8 (14,1%)

Pit depth 1,85 m | Height above entrance level 3,20 m

320

185

180
530

upper level

only saloon cars up to 1,65 m heigth or


estate cars up to 1,50 m heigth, horizontal

lower level

saloon/estate cars up to 1,65 m heigth, inclined*

Pit depth 1,85 m | Height above entrance level 3,40 m

340

340

185

180

340

185

180

185

530

530

180
530

upper level

saloon/estate cars up to 1,50 m heigth, horizontal

saloon/estate cars up to 1,65 m heigth, horizontal

saloon/estate cars up to 1,50 m heigth, inclined*

lower level

saloon/estate cars up to 1,65 m heigth, horizontal

saloon/estate cars up to 1,65 m heigth, inclined*

saloon/estate cars up to 1,80 m heigth, inclined*

Pit depth 2,00 m | Height above entrance level 3,35 m

335

200

195
530

upper level

only saloon cars up to 1,65 m heigth or


estate cars up to 1,50 m heigth, horizontal

lower level

saloon/estate cars up to 1,80 m heigth, inclined*

Pit depth 2,00 m | Height above entrance level 3,55 m

355

355

200

195
530

200

195
530

200

195
530

upper level

saloon/estate cars up to 1,50 m heigth, horizontal

only saloon cars up to 1,80 m heigth or


estate cars up to 1,65 m heigth, horizontal

only saloon cars up to 1,65 m heigth or


estate cars up to 1,50 m heigth, inclined*

lower level

saloon/estate cars up to 1,80 m heigth, horizontal

saloon/estate cars up to 1,80 m heigth, inclined*

saloon/estate cars up to 1,95 m heigth, inclined*

355

200

195
530

upper level

saloon/estate cars up to 1,80 m heigth, horizontal

lower level

saloon/estate cars up to 1,50 m heigth, horizontal

Parklift 430 09.2008 C027-4140

355

Width dimensions Underground garages


All dimensions shown are minimum. Construction tolerances must be taken into consideration.
All dimensions in cm.
The access to the Parklift is possible with max. 2% declination and max. 2% inclination.
If not stated differently in the offer, platform widths of 230cm or 460cm will be delivered. Bigger/smaller platform widths can be delivered
at additional price.

Wall to wall
Single unit (2 Pkw)

Double unit (4 Pkw)

Space required
B
260
270
280
290
300

gives clear
platform width
230
240
250
260
270

Combinated unit (6 Pkw )

Wall openings required between


partitions for electrical and hydraulic
conduits must be provided where
applicable. Wall openings may not
be closed after installation.

S
B

Space required
B
490
510
530
550
570

gives clear
platform width
460
480
500
520
540

Space required
B
750
780
810
840
870

gives clear
platform width
460+230
480+240
500+250
520+260
540+270

Minimum driveway
width according to
local requirements

Further width combinations as well as smaller widths are possible

Pillars outside pit


Single unit (2 Pkw)

Double unit (4 Pkw)

min. 20
B

min. 20

B1

Space required
wallpillarpillar
pillar
B
B1
250
240
260
250
270
260
280
270
290
280

Combinated unit (6 Pkw )

gives clear
platform width
230
240
250
260
270

B1

Space required
wallpillarpillar
pillar
B
B1
480
470
500
490
520
510
540
530
560
550

min. 20

gives clear
platform width
460
480
500
520
540

Space required
wallpillarpillar
pillar
B
B1
740
730
770
760
800
790
830
820
860
850

B1

gives clear
platform width

Minimum driveway
width according to
local requirements

460+230
480+240
500+250
520+260
540+270

Further width combinations as well as smaller widths are possible

Pillars inside pit


Single unit (2 Pkw)

Double unit (4 Pkw)

min.15

B1

Space required
wallpillarpillar
pillar
B
B1
255
245
265
255
275
265
285
275
295
285

min.15
max.100

Combinated unit (6 Pkw )

gives clear
platform width
230
240
250
260
270

Space required
wallpillarpillar
pillar
B
B1
485
475
505
495
525
515
545
535
565
555

min.15

max.100
B1

gives clear
platform width
460
480
500
520
540

Space required
wallpillarpillar
pillar
B
B1
745
735
775
765
805
795
835
825
865
855

max.100
B1

gives clear
platform width

Minimum driveway
width according to
local requirements

460+230
480+240
500+250
520+260
540+270

Parklift 430 09.2008 C027-4140

Further width combinations as well as smaller widths are possible

Important notes
If maximum platform widths are not installed, difculties might
arise when entering or exiting the cars on the parking units.
This depends on the car type, the access and the individual
driving behaviour.

Cars wider than 190 cm should be parked on platforms


270/540 cm width only.
For spaces against walls, or at end of rows, we
recommend that largest possible platform widths are
utilized to assist turning motion.

Width dimensions Garages with doors


All dimensions shown are minimum. Construction tolerances must be taken into consideration.
All dimensions in cm.
The access to the Parklift is possible with max. 2% declination and max. 2% inclination.
If not stated differently in the offer, platform widths of 230cm or 460cm will be delivered. Bigger/smaller platform widths can be delivered
at additional price.

Single garages (2 cars)

Double garages (4 cars)

260

270

280

290

300

505

530

540

x = for doors. See page 1

230

240

250

260

270

460

480

500

Wall openings required between


partitions for electrical and hydraulic
conduits must be provided where
applicable. Wall openings may not
be closed after installation.

230
15

240
15 15

250
15 15

250
15 15

250
15 15

475
15

500

15

15 15

500
15 20

20

Minimum driveway
width according to
local requirements

Serial garages with single doors (2 cars)


260

260

260

270

270

270

280

280

280

290

290

290

300

300

300

230

230

230

240

240

240

250

250

250

260

260

260

270

270

270

250

250

250

230
15

230
30

240

230
30

30 15

240
30

240
30

30

260
15

260
30

270

260
30

30 15

270
30

270
30
30
Minimum driveway
width according to
local requirements

Serial garages with double doors (4 cars)


505

530

505

530

460

460

480
500

480
500

475
15

500

475
30

30

15

500
30

30

Minimum driveway
width according to
local requirements

Statics and construction requirements


Single unit
P1

clear
platform
width +15

P4
P4
P2

P1

P1 = +36 kN *
7 kN

P3

P2 = + 3 kN
3 kN
P3 = +18 kN

P3

P4 = + 3 kN

P4
P2

Marking according to ISO 3864

P1

Double unit
P2

P1

P1 = +66 kN
6 kN

P3

P4

P2 = + 3 kN
3 kN
clear
platform
width +15

P4
P2

10

20

P1

P3

P3

~160
~490

P3 = +30 kN
P4 = + 3 kN
*all static loadings
include the weight
of the car

Bearing loads are transmitted


to the pit oor by base plates of
approximately 140cm2, xed by
heavy duty anchor bolts to a depth
of approximately 1012cm.
Base plate thickness min. 18 cm
(recommended concrete quality
C20/25). When xing to waterproof concrete oors chemical
anchors are employed (to be
advised by Whr).
The front wall of the pits must
be formed of concrete and must
be perfectly at and vertical
without any protrusions.
The specied lengths to the
support points are mean values.
Please contact us for exact
positions for any variations on
the standard units.

Hydraulic power pack


The location of the hydraulic power pack is determined according to your
plan space requirements are as follows:

Dimensions are in cm
Length =
Height =
Depth =

1 5 Parklifts
100
140
35

6 10 Parklifts
150
140
35

Parklift 430 09.2008 C027-4140

P2

Elektro-Leistungsverzeichnis

Installation diagram

Item Performance Quantity Designation

Position

by customer 1 unit

electric meter

in the feed cable

by customer 1 unit

fuse or automatic circuit


in the feed cable
breaker 3x16A slow blow
acc. to DIN VDE 0100 p. 430

by customer as locally acc. to local power supply


required regulations
3 Ph + N + PE*
by customer each
foundation earth
10 m
connector
by customer 1 unit
equipotential bonding
acc. to local requirements

4
5

by customer 1 unit

by customer 10 m

feed cable to
main switch
corner pit oor/
rear wall
from foundation
earth connector
to Parklift

marked main switch,


above operating
lockable to prevent
device
unauthorized switching on

Frequency
1 per
power pack
1 per
power pack

6 Lockable main switch


conduit

1 per
Parklift

120 cm

13 PVC control cable


7 x1.5 2

110 cm

14 Cylinder valve cable


PVC control cable
3 x1.5 2

1 per
power pack

PVC control cable with


from main switch 1 per
marked strands and proto hydraulic power power pack
tective conductor 5 x 1,5 2 pack
Items 814 are included in Whrs scope of delivery unless otherwise specied in the
offer/order.

* DIN VDE 0100 part 410 + 430 (not under permanent load) 3PH+N+PE
(three-phase current) Note: Where a door is used to close the garage, the
manufacturer of the door must be consulted before the electric cable is laid.
The electrical components
suppliedbythemanufacturer
must be connected in accordance with the appropriate wiring
diagram and local regulations.
German VDE electrical requirements must be adhered to, in
order to validate the TV tested
circuit.
The electrical supply to the
power pack(s) must be provided

1 Electric
2 Fuse or automatic circuit breaker
3 x16A slow blow according to
DIN VDE 0100 part 430
3 Feed line to the main switch

prior to or during installation to


enable our tters to complete
their work satisfactorily and to
check the correct functioning
of the units.
Parklifts has to be grounded to
the foundation earth connector
by customer. A foundation earth
connector should be provided by
customer each 10m or acc. to
local requirements.

12 Operating device for UP/DOWN with


EMERGENCY-STOP. If possible on the
left, but always outside the platforms
movement range. Cables always feed in
from below. (2 keys per parking place.)

Recesses and conduits for rotary


switches with rolling and sectional gates

15
115 above access level
=

At differing constructional
conditions additional sound
absorbing measures are
necessary.
The best results are reached
by separated sole plates from
the construction.
Increased noise protection:
If increased noise protection
must be provided planning has
to be conrmed on a project
basis by Whr (further building
measures are required).

min.20
B

Noise protection

8
A

Plastic or steel armoured conduit M 20

Flexible plastic insulation pipe M 20

7 +0,5
8

Railings
The units need to be provided acc. EN ISO 13857 with safety railings
if the gap between unit and wall exceeds 20cm. If walkways are arranged
directly to the side or behind the systems, railings have to be provided by
client acc. to local requirements, height min. 200cm this is applicable
during the construction phase too.

Free spaces
Special drawings for free spaces to accommodate air ducts or other
pipes can be requested at Whr Agent!

Temperature

Maintenance

The installation is designed to operate between +5and +40C.


Atmospheric Humidity: 50% at +40C. If the local circumstances
differ from the above please contact Whr.

Drainage
We recommend the provision
of a drainage channel at the
front of the pit which can either
incorporate a pump sump
50x50x20cm, or a connection
into the storm water sewerage

Under plaster

Above plaster

Basis is the German DIN 4109


Noise protection in buildings.
With the following conditions
required 30 dB (A) in rooms
can be provided:
noise protection package
from our accessory
insulation gure of the
construction of min. Rw = 57dB
walls which are bordering
the parking systems must be
done as single wall and
deection resistant with min.
m= 300 kg/m2
solid ceiling above the
parking systems with min.
m= 400 kg/m2

7 PVC control cable 5 x 1.52


from main switch to assembly
8 Hydraulic unit with three-phase
motor, 230/400V, 50Hz, 1.5/3.0 kW.
Switching cabinet with motor,
protection, wired already for
installation
9 PVC control cable 5 x1.52
10 Branch connector
4 Foundation earth connector
5 Equipotential bonding from
foundation earth connector
to Parklift
11 PVC control cable 5 x1.52
to the next facility

Regular maintenance by qualied personnel can be provided by means


of an Annual Service Contract.

Protection against corrosion


system via a petrol/oil interceptor. To prevent any possibility
of contamination of the groundwater we recommend that the
pit oor is coated with an oil
proof paint.

Conformity test
All our systems are checked according to EC machinery directive
98/37/EG and EN 14010.

Independent of a maintenance workings has to be carried out acc. to


Whr Cleaning and Maintenance Instruction regularly.
Clean up galvanized parts and platforms of dirt and road salt as well
as other pollution (corrosion danger)!
Pit must be always ventilated and dearated well.

Dimensions
All dimensions shown are minimum. Construction tolerances must
be taken into consideration. All dimensions in cm.

Illumination
Parklift 430 09.2008 C027-4140

Illumination has to be considered acc. to local requirements by client.

Data Sheet Whr Parklift 440


Single unit = 2 cars
Double unit = 4 cars

Suitable for condominium and ofce buildings.


For permanent use only!*

25 25
* In case of short time user
only possible on upper platform
and only if technically adjusted,
ask WHR!
Or with attendant or valet parking both
levels are possible for short time user.

40

free space
for door

40

80

free space

40

Special reinforced units


for higher platform loadings
are available (see 440-2.6).
Both platforms are in a
horizontal position to drive in.
Load per platform max. 2000 kg
(load per wheel max. 500 kg)

clear height
for a lintel
h

= only applicaple if garage


doors are to be fitted.
For roller doors x = 10/15 cm
= to be clarified with
door supplier

15

for
ng
s
eni d
l opical anervice
l
a
w ctr ic s
ele draul
hy

max. + 3% slope
max. -10% slope
min.18

15

e
ac
sp
e
l
n
ib io
ss ct
po r su
fo

0
us 5
pl 0 x
x2 p 5
0
m
l1 u
ne p p
an m
ch r su
e
i b l fo
ss ss
po ece
r

2%

Dimensions in cm

80

x2

min.18

2%

50
390
530 540

Standard type
440-185/180 2000 kg

Compact type
440-170/165 2000 kg

355 +30

Comfort type
440-200/195 2000 kg

385+30

325 +30

185 +30

170

180+30

Upper level
Lower level

car height
distance (h)
saloon/estate cars
up to 165 cm
saloon/estate cars
170
up to 165 cm

+3
0

165

Upper level
Lower level

+3
0

200+30

car height
distance (h)
saloon/estate cars
up to 150 cm
saloon/estate cars
155
up to 150 cm

195

+3
0

car height
distance (h)
Upper level cars/vans up to 180 cm
and max. 2000 kg
Lower level cars/vans up to 180 cm 185
and max. 2000 kg

Please attend to restricted car- and platform


distance height!

Clearance prole (standard saloon/estate car)


10
25
20

55

90

65

162

60
120

14
max. 290
500

38
90

162

10 40

48

40

48

275

150*
46 (165*)
(180*)
22

150*
46 (165*)
(180*)
22

275

Examples (09.2008)

60

60
120

14
max. 290
500

38
90

* The total car height includes roof rail and antenna xture and must not exceed the
mentioned max. height dimension.

The various model-series versions may vary in


size and/or dimensionally, based on version
conguration, design and execution!
Cars up to 150 cm height:
e.g. Audi A3 to A6; BMW-Touring; OpelCaravan; VW-Variant, always without roof rails
Cars up to 165 cm height:
e.g. MB A-class, E-class estate, B-class;
Opel Omega, Astra; VW Golf V
Cars/Vans up to 180 cm height:
e.g. Mazda MPV; Opel Sintra, Zara;
Renault Espace; VW Sharan

Parklift 440 09.2008 C027-4303

Notes

1. Car width max. 190 cm (see width details page 2). In case of special platform widths narrower than 230 and 460 cm respectively, the maximum vehicle
width is reduced accordingly. For cars with two outside mirrors, a minimum platform width of 250270 cm or 500540 cm is recommended.
2. Due to recent increases in car length dimensions, and potential future developments, a pit length of 540 cm is advisable. This offers bigger
safety distances also for future cars.
3. At the edge of the pit a 10 cm wide, yellow-black marking according to ISO 3864 has to be provided by the purchaser (see statics and construction
requirements on page 3).
4. The manufacturer reserves the right to modify or alter above specications.

Otto Whr GmbH


Auto-Parksysteme

P. O. Box 1151
71288 Friolzheim/Germany

Fon +49 [0] 7044 46-0


Fax +49 [0] 7044 46-149

www.woehr.de
info@woehr.de
We compact parking space

Width dimensions Underground garages


All dimensions shown are minimum. Construction tolerances must be taken into consideration.
All dimensions in cm.
The access to the Parklift is possible with max. 3% declination and max.10% inclination.
If not stated differently in the offer, platform widths of 230 cm or 460 cm will be delivered. Bigger/smaller platform widths can be delivered
at additional price.
With platform widths 250, 260 and 270 cm special reinforced units with max. platform loading capacity of 2.300 kg
are available for big limousines e.g. Mercedes-Benz S-class

Wall to wall
Single unit (2 cars)

Double unit (4 cars)

Space required
B
260
270
280
290
300

gives clear
platform width
230
240
250
260
270

Combinated unit (6 cars)

Wall openings required between


partitions for electrical and hydraulic
conduits must be provided where
applicable. Wall openings may not
be closed after installation.

S
B

Space required
B
490
510
530
550
570

gives clear
platform width
460
480
500
520
540

Space required
B
750
780
810
840
870

gives clear
platform width
460+230
480+240
500+250
520+260
540+270

Minimum driveway
width according to
local requirements

Further width combinations as well as smaller widths are possible

Pillars outside pit


Single unit (2 cars)

Double unit (4 cars)

min. 20
B

min. 20

B1

Space required
wallpillarpillar
pillar
B
B1
250
240
260
250
270
260
280
270
290
280

Combinated unit (6 cars)

gives clear
platform width
230
240
250
260
270

B1

Space required
wallpillarpillar
pillar
B
B1
480
470
500
490
520
510
540
530
560
550

min. 20

gives clear
platform width
460
480
500
520
540

Space required
wallpillarpillar
pillar
B
B1
740
730
770
760
800
790
830
820
860
850

B1

gives clear
platform width

Minimum driveway
width according to
local requirements

460+230
480+240
500+250
520+260
540+270

Further width combinations as well as smaller widths are possible

Pillars inside pit


Single unit (2 cars)

Double unit (4 cars)

min.15

B1

Parklift 440 09.2008 C027-4303

Space required
wallpillarpillar
pillar
B
B1
255
245
265
255
275
265
285
275
295
285

min.15t
max.100

Combinated unit (6 cars)

gives clear
platform width
230
240
250
260
270

Space required
wallpillarpillar
pillar
B
B1
485
475
505
495
525
515
545
535
565
555

min.15
max.100
B1

gives clear
platform width
460
480
500
520
540

Space required
wallpillarpillar
pillar
B
B1
745
735
775
765
805
795
835
825
865
855

max.100
B1

gives clear
platform width

Minimum driveway
width according to
local requirements

460+230
480+240
500+250
520+260
540+270

Further width combinations as well as smaller widths are possible

Important notes
If maximum platform widths are not installed, difculties might
arise when entering or exiting the cars on the parking units.
This depends on the car type, the access and the individual
driving behaviour.

Cars wider than 190 cm should be parked on platforms


270/540 cm width only.
For spaces against walls, or at end of rows, we recommend
that largest possible platform widths are utilized to assist
turning motion.

Width dimensions Garages with doors


All dimensions shown are minimum. Construction tolerances must be taken into consideration.
All dimensions in cm.
The access to the Parklift is possible with max. 3% declination and max.10% inclination.
If not stated differently in the offer, platform widths of 230 cm or 460 cm will be delivered. Bigger/smaller platform widths can be delivered
at additional price.
With platform widths 250, 260 and 270 cm special reinforced units with max. platform loading capacity of 2.300 kg
are available for big limousines e.g. Mercedes-Benz S-class

Single garages (2 cars)

Double garages (4 cars)

S
X

B1
15

15

Space required
B
B1
260
230
270
240
280
250
290
260
300
270

gives clear
platform width
230
240
250
260
270

15

Space required
B
B1
490
460
510
480
530
500
550
520
570
540

Serial garages with single doors (2 cars)

Wall openings required between


partitions for electrical and hydraulic
conduits must be provided where
applicable. Wall openings may not
be closed after installation.

B1
15

x = for doors. See page 1

Serial garages with double doors (4 cars)

B1
15

B1
30

Space required
B
B1
260
230
270
240
280
250
290
260
300
270

B1

B1
30

Minimum driveway
width according to
local requirements

gives clear
platform width
460
480
500
520
540

15

30

gives clear
platform width
230
240
250
260
270

B1
30

Space required
B
B1
490
460
510
480
530
500
550
520
570
540

30
Minimum driveway
width according to
local requirements

gives clear
platform width
460
480
500
520
540

Statics and construction requirements


Single unit
P2

clear
platformwidth +15

P4
P4
P1

P1 =+36 kN *
7 kN

P3 P 4

P2

P2 = + 2 kN
3 kN
P3 =+14 kN
3 kN

P3 P 4

Marking according to ISO 3864

P1

Double unit
P1

P2

P1 =+66 kN
6 kN

P3 P4

P4

P2 = + 3 kN
6 kN
clear
platformwidth +15

P4

5
P4

P4 = + 3 kN

70

5
11
P2

P3

~200
~485
~500

P3 =+23 kN
3 kN
P4 = + 3 kN

P4
P1

P2

P3 P4

*all static loadings


include the weight
of the car

Bearing loads are transmitted


to the pit oor by base plates of
approximately 140 cm2, xed by
heavy duty anchor bolts to a depth
of approximately 1012cm.
Base plate thickness min. 18 cm
(recommended concrete quality
C20/25). When xing to waterproof concrete oors chemical
anchors are employed (to be
advised by Whr).
The front wall of the pits must be
formed of concrete and must
be perfectly at and vertical
without any protrusions.
The specied lengths to the
support points are mean values.
Please contact us for exact
positions for any variations on
the standard units.

Hydraulic power pack


The location of the hydraulic power pack is determined
according to your plan space requirements are as follows:

Dimensions are in cm
Length =
Height =
Depth =

1 5 Parklifts
100
140
35

6 10 Parklifts
150
140
35

Parklift 440 09.2008 C027-4303

P1

Electrical datas

Installation diagram

Item Performance Quantity Designation

Position

by customer 1 unit

electric meter

in the feed cable

by customer 1 unit

fuse or automatic circuit


in the feed cable
breaker 3x16A slow blow
acc. to DIN VDE 0100 p. 430

by customer as locally acc. to local power supply


required regulations
3 Ph + N + PE*
by customer each
foundation earth
10 m
connector
by customer 1 unit
equipotential bonding
acc. to local requirements

4
5

by customer 1 unit

by customer 10 m

feed cable to
main switch
corner pit oor/
rear wall
from foundation
earth connector
to Parklift

marked main switch,


above operating
lockable to prevent
device
unauthorized switching on

Frequency
1 per
power pack
1 per
power pack

1 per
Parklift

prior to or during installation to


enable our tters to complete
their work satisfactorily and to
check the correct functioning
of the units.
Parklifts has to be grounded to
the foundation earth connector
by customer. A foundation earth
connector should be provided by
customer each 10 m or acc. to
local requirements.

110 cm

14 Cylinder valve cable


PVC control cable
3 x1,5 2

12 Operating device for UP/DOWN with


EMERGENCY-STOP. If possible on the
left, but always outside the platforms
movement range. Cables always feed in
from below. (2 keys per parking place.)

Recesses and conduits for rotary


switches with rolling and sectional gates
Under plaster

Above plaster

15
115 above access level
=

At differing constructional
conditions additional sound
absorbing measures are
necessary.
The best results are reached
by separated sole plates from
the construction.
Increased noise protection:
If increased noise protection
must be provided planning has
to be conrmed on a project
basis by Whr (further building
measures are required).

min.20
B

Noise protection

8
A

Plastic or steel armoured conduit M 20

Flexible plastic insulation pipe M 20

7 +0,5
8

Railings
The units need to be provided acc. EN ISO 13857 with safety railings
if the gap between unit and wall exceeds 20cm. If walkways are arranged
directly to the side or behind the systems, railings have to be provided by
client acc. to local requirements, height min. 200 cm this is applicable
during the construction phase too.

Free spaces
Special drawings for free spaces to accommodate air ducts or other
pipes can be requested at Whr Agent!

Temperature

Maintenance

The installation is designed to operate between +5and +40C.


Atmospheric Humidity: 50% at +40C. If the local circumstances
differ from the above please contact Whr.

Drainage
We recommend the provision
of a drainage channel at the
front of the pit which can either
incorporate a pump sump
50 x 50 x 20 cm, or a connection
into the storm water sewerage

120 cm

13 PVC control cable


7 x1,5 2

1 per
power pack

* DIN VDE 0100 part 410 + 430 (not under permanent load) 3PH+N+PE
(three-phase current) Note: Where a door is used to close the garage, the
manufacturer of the door must be consulted before the electric cable is laid.

Basis is the German DIN 4109


Noise protection in buildings.
With the following conditions
required 30 dB (A) in rooms
can be provided:
noise protection package
from our accessory
insulation gure of the
construction of min. Rw = 57dB
walls which are bordering
the parking systems must be
done as single wall and
deection resistant with min.
m= 300 kg/m2
solid ceiling above the
parking systems with min.
m= 400 kg/m2

7 PVC control cable 5 x 1,52


from main switch to assembly
8 Hydraulic unit with three-phase
motor, 230/400V, 50Hz, 1.5/3.0 kW.
Switching cabinet with motor,
protection, wired already for
installation
9 PVC control cable 5 x1,52
10 Branch
4 Foundation earth connector
5 Equipotential bonding from
foundation earth connector
to Parklift
11 PVC control cable 5 x1,52
to the next facility

6 Lockable main switch


conduit

PVC control cable with


from main switch 1 per
marked strands and proto hydraulic power power pack
tective conductor 5 x 1,5 2 pack
Items 814 are included in Whrs scope of delivery unless otherwise specied in the
offer/order.

The electrical components


suppliedbythemanufacturer
must be connected in accordance with the appropriate wiring
diagram and local regulations.
German VDE electrical requirements must be adhered to, in
order to validate the TV tested
circuit.
The electrical supply to the
power pack(s) must be provided

1 Electric meter
2 Fuse or automatic circuit breaker
3 x16A slow blow according to
DIN VDE 0100 part 430
3 Feed line to the main switch

Regular maintenance by qualied personnel can be provided by means


of an Annual Service Contract.

Protection against corrosion


system via a petrol/oil interceptor. To prevent any possibility
of contamination of the groundwater we recommend that the
pit oor is coated with an oil
proof paint.

Conformity test
All our systems are checked according to EC machinery directive
98/37/EG and EN 14010.

Independent of a maintenance workings has to be carried out acc. to


Whr Cleaning and Maintenance Instruction regularly.
Clean up galvanized parts and platforms of dirt and road salt as well
as other pollution (corrosion danger)!
Pit must be always ventilated and dearated well.

Dimensions
All dimensions shown are minimum. Construction tolerances must
be taken into consideration. All dimensions in cm.

Illumination
Parklift 440 09.2008 C027-4303

Illumination has to be considered acc. to local requirements by client.

Data Sheet Whr Parklift 440-2,6


Suitable for condominium and ofce buildings.
For permanent use only!*

25 25
* In case of short time user
only possible on upper platform
and only if technically adjusted,
ask WHR!
Or with attendant or valet parking both
levels are possible for short time user.

40

free space
for door

40

80

40

free space

Both platforms are in a


horizontal position to
drive in.
Load per platform
max. 2600 kg
(load per wheel
max. 650 kg)
X

= only applicaple if garage


doors are to be fitted.
For roller doors x = 10/15 cm

clear height
for a lintel
h

= to be clarified with
door supplier

Dimensions in cm

15

for
ng
s
eni d
l opical anervice
l
a
w ctr ic s
ele draul
hy

max. + 3% slope
max. -10% slope
min.18

15

e
ac
sp
le on
b
i
i
ss ct
po r su
fo

0
us 5
pl 0 x
x2 p 5
10 um
el p
nn p
ha sum
c
e r
i b l fo
ss ss
po ece
r

2%

80

x2

min.18

2%

50
390
530 540

Comfort type 440-200/195 2600 kg

Premium type 440-225/220 2600 kg

385+30

435+30

200+30

195

Upper level
Lower level

+3
0

225 +30

car height
Cars/Vans/SUVs bis 180 cm
Pkw/Vans/SUVs bis 180 cm

distance
h = 185

Upper level
Lower level

Clearance prole (standard saloon/estate car)


10 40

60

162

40

48
46 180*
(205*)

275
14
max.290
500

+3
0

car height
Cars/Vans/SUVs bis 205 cm
Pkw/Vans/SUVs bis 205 cm

distance
h = 210

Examples (09.2008)

In general cars like MB S 500,


BMW 735745, VW Phaeton,
Audi A8 and Toyota Lexus can
park on the above mentioned
parking systems, min. garage
length 5.40 m.

22
60
120

220

38
90

* The total car height includes roof rail and antenna xture and must not exceed the
mentioned max. height dimension.

The various model-series versions may vary in


size and/or dimensionally, based on version
conguration, design and execution!
Cars/Vans/SUVs up to 180 cm height:
e.g. BMW X5; Chrysler Voyager; Opel Frontera,
Sintra; Porsche Cayenne; VW Touareg,
Sharan always without roof rails
Cars/Vans/SUVs up to 205 cm height:
e.g. Ford Explorer, Maverick; Jeep Cherokee;
Mercedes Benz M-class, V-class;
Nissan Terrano; Opel Monterey always
without roof rails

Parklift 440-2,6 09.2008 C027-4311

Notes

1. Several width options are available (see width details page 2). In case of special platform widths narrower than 250 and 500 cm respectively,
the maximum vehicle width is reduced accordingly.
2. Due to recent increases in car length dimensions, and potential future developments, a pit length of 540 cm is advisable. This offers bigger
safety distances also for future cars.
3. At the edge of the pit a 10 cm wide, yellow-black marking according to ISO 3864 has to be provided by the purchaser (see statics and construction
requirements on page 3).
4. The manufacturer reserves the right to modify or alter above specications.

Otto Whr GmbH


Auto-Parksysteme

P. O. Box 1151
71288 Friolzheim/Germany

Fon +49 [0] 7044 46-0


Fax +49 [0] 7044 46-149

www.woehr.de
info@woehr.de
We compact parking space

The solution for Sport Utility Vehicles (SUV), Minibuses, Jeeps and other heavy cars up to 2.6 to

Single unit = 2 cars


Double unit = 4 cars

Width dimensions Underground garages


All dimensions shown are minimum. Construction tolerances must be taken into consideration.
All dimensions in cm.
The access to the Parklift is possible with max. 3% declination and max.10% inclination.

Wall to wall
Single unit (2 cars)

Double unit (4 cars)

Space required
B
280
290
300

gives clear
platform width
250
260
270

Combinated unit (6 cars)

Wall openings required between


partitions for electrical and hydraulic
conduits must be provided where
applicable. Wall openings may not
be closed after installation.

S
B

Space required
B
530
550
570

gives clear
platform width
500
520
540

Space required
B
810
840
870

gives clear
platform width
500+250
520+260
540+270

Minimum driveway
width according to
local requirements

Further width combinations as well as smaller widths are possible

Pillars outside pit


Single unit (2 cars)

Double unit (4 cars)

min. 20
B

min. 20

B1

Space required
wallpillarpillar
pillar
B
B1
270
260
280
270
290
280

Combinated unit (6 cars)

gives clear
platform width
250
260
270

B1

Space required
wallpillarpillar
pillar
B
B1
520
510
540
530
560
550

min. 20

gives clear
platform width
500
520
540

Space required
wallpillarpillar
pillar
B
B1
800
790
830
820
860
850

B1

gives clear
platform width

Minimum driveway
width according to
local requirements

500+250
520+260
540+270

Further width combinations as well as smaller widths are possible

Pillars inside pit


Single unit (2 cars)

Double unit (4 cars)

min.15

B1

Space required
wallpillarpillar
pillar
B
B1
275
265
285
275
295
285

min.15
max.100

Combinated unit (6 cars)

gives clear
platform width
250
260
270

Space required
wallpillarpillar
pillar
B
B1
525
515
545
535
565
555

min.15
max.100
B1

gives clear
platform width
500
520
540

Space required
wallpillarpillar
pillar
B
B1
805
795
835
825
865
855

max.100
B1

gives clear
platform width

Minimum driveway
width according to
local requirements

500+250
520+260
540+270

Parklift 440-2,6 09.2008 C027-4311

Further width combinations as well as smaller widths are possible

Important notes
If maximum platform widths are not installed, difculties might
arise when entering or exiting the cars on the parking units.
This depends on the car type, the access and the individual
driving behaviour.

Cars wider than 190 cm should be parked on platforms


270/540 cm width only.
For spaces against walls, or at end of rows, we recommend
that largest possible platform widths are utilized to assist
turning motion.

Width dimensions Garages with doors


All dimensions shown are minimum. Construction tolerances must be taken into consideration.
All dimensions in cm.
The access to the Parklift is possible with max. 3% declination and max.10% inclination.

Single garages (2 cars)

Double garages (4 cars)

S
X

B1
15

15

Space required
B
B1
280
250
290
260
300
270

gives clear
platform width
250
260
270

15

Space required
B
B1
530
500
550
520
570
540

Serial garages with single doors (2 cars)

Wall openings required between


partitions for electrical and hydraulic
conduits must be provided where
applicable. Wall openings may not
be closed after installation.

B1
15

x = for doors. See page 1

Serial garages with double doors (4 cars)

B1
15

B1
30

Space required
B
B1
280
250
290
260
300
270

B1

B1
30

Minimum driveway
width according to
local requirements

gives clear
platform width
500
520
540

15

30

gives clear
platform width
250
260
270

B1
30

Space required
B
B1
530
500
550
520
570
540

30
Minimum driveway
width according to
local requirements

gives clear
platform width
500
520
540

Statics and construction requirements


Single unit
P3

clear
platformwidth +15

P4 P4
P4 P4
P1 P4

P3

P1 =+50 kN *
10 kN

P2

P2 = + 3 kN
3 kN
P3 =+18 kN
5 kN

P2

~500
~468
~190
P4

P4 =+ 3 kN

Marking according to ISO 3864

P1

Double unit
P1 P4

P3

P1 =+90 kN
9 kN

P2

P4 P4

P2 = + 5 kN
5 kN
clear
platformwidth +15

~180
~485

P3 =+32 kN
3 kN
P4 =+ 3 kN

P4 P4
P1 P4

P3

P2

*all static loadings


include the weight
of the car

P4 P4
P2
P3

Bearing loads are transmitted


to the pit oor by base plates of
approximately 300cm2 , xed by
heavy duty anchor bolts to a depth
of approximately 1012cm.
Base plate thickness min. 18 cm
27 (recommended concrete quality
37 C20/25). When xing to waterproof concrete oors chemical
anchors are employed (to be
advised by Whr).
The front wall of the pits must be
formed of concrete and must
be perfectly at and vertical
without any protrusions.
The specied lengths to the
support points are mean values.
Please contact us for exact
positions for any variations on
the standard units.

Hydraulic power pack


The location of the hydraulic power pack is determined
according to your plan space requirements are as follows:

Dimensions are in cm
Length =
Height =
Depth =

15 Single units or 13 Double units


200
140
35

Parklift 440-2,6 09.2008 C027-4311

P1 P4

Electrical datas

Installation diagram

Item Performance Quantity Designation

Position

by customer 1 unit

electric meter

in the feed cable

by customer 1 unit

fuse or automatic circuit


in the feed cable
breaker 3x25A slow blow
acc. to DIN VDE 0100 p. 430

by customer as locally acc. to local power supply


required regulations
3 Ph + N + PE*
by customer each
foundation earth
10 m
connector
by customer 1 unit
equipotential bonding
acc. to local requirements

4
5

by customer 1 unit

by customer 10 m

feed cable to
main switch
corner pit oor/
rear wall
from foundation
earth connector
to Parklift

marked main switch,


above operating
lockable to prevent
device
unauthorized switching on

Frequency
1 per
power pack

6 Lockable main switch

1 per
power pack

conduit
1 per
Parklift

120 cm

110 cm

13 PVC control cable


7 x1,5 2
14 Cylinder valve cable
PVC control cable
3 x1,5 2

1 per
power pack

PVC control cable with


from main switch 1 per
marked strands and proto hydraulic power power pack
tective conductor 5 x 2,5 2 pack
Items 814 are included in Whrs scope of delivery unless otherwise specied in the
offer/order.

* DIN VDE 0100 part 410 + 430 (not under permanent load) 3PH+N+PE
(three-phase current) Note: Where a door is used to close the garage, the
manufacturer of the door must be consulted before the electric cable is laid.
The electrical components
suppliedbythemanufacturer
must be connected in accordance with the appropriate wiring
diagram and local regulations.
German VDE electrical requirements must be adhered to, in
order to validate the TV tested
circuit.
The electrical supply to the
power pack(s) must be provided

1 Electric
2 Fuse or automatic circuit breaker
3 x 25A slow blow according to
DIN VDE 0100 part 430
3 Feed line to the main switch

prior to or during installation to


enable our tters to complete
their work satisfactorily and to
check the correct functioning
of the units.
Parklifts has to be grounded to
the foundation earth connector
by customer. A foundation earth
connector should be provided by
customer each 10 m or acc. to
local requirements.

12 Operating device for UP/DOWN with


EMERGENCY-STOP. If possible on the
left, but always outside the platforms
movement range. Cables always feed in
from below. (2 keys per parking place.)

Recesses and conduits for rotary


switches with rolling and sectional gates

Basis is the German DIN 4109


Noise protection in buildings.
With the following conditions
required 30 dB (A) in rooms
can be provided:
noise protection package
from our accessory
insulation gure of the
construction of min. Rw = 57dB
walls which are bordering
the parking systems must be
done as single wall and
deection resistant with min.
m= 300 kg/m2
solid ceiling above the
parking systems with min.
m= 400 kg/m2

15
115 above access level
=

min.20

8
A

Plastic or steel armoured conduit M 20

Flexible plastic insulation pipe M 20

7 +0,5
8

Railings
The units need to be provided acc. EN ISO 13857 with safety railings
if the gap between unit and wall exceeds 20cm. If walkways are arranged
directly to the side or behind the systems, railings have to be provided by
client acc. to local requirements, height min. 200 cm this is applicable
during the construction phase too.

Free spaces
Special drawings for free spaces to accommodate air ducts or other
pipes can be requested at Whr Agent!

Temperature

Maintenance

The installation is designed to operate between +5and +40C.


Atmospheric Humidity: 50% at +40C. If the local circumstances
differ from the above please contact Whr.

Drainage
We recommend the provision
of a drainage channel at the
front of the pit which can either
incorporate a pump sump
50 x 50 x 20 cm, or a connection
into the storm water sewerage

=
B

At differing constructional
conditions additional sound
absorbing measures are
necessary.
The best results are reached
by separated sole plates from
the construction.
Increased noise protection:
If increased noise protection
must be provided planning has
to be conrmed on a project
basis by Whr (further building
measures are required).

Under plaster

Above plaster

Noise protection

7 PVC control cable 5 x 2,52


from main switch to assembly
8 Hydraulic unit with three-phase
motor, 230/400V, 50 Hz, 3.0 / 5.5 kW.
Switching cabinet with motor,
protection, wired already for
installation
9 PVC control cable 5 x1,52
10 Branch
4 Foundation earth connector
5 Equipotential bonding from
foundation earth connector
to Parklift
11 PVC control cable 5 x1,52
to the next facility

Regular maintenance by qualied personnel can be provided by means


of an Annual Service Contract.

Protection against corrosion


system via a petrol/oil interceptor. To prevent any possibility
of contamination of the groundwater we recommend that the
pit oor is coated with an oil
proof paint.

Conformity test
All our systems are checked according to EC machinery directive
98/37/EG and EN 14010.

Independent of a maintenance workings has to be carried out acc. to


Whr Cleaning and Maintenance Instruction regularly.
Clean up galvanized parts and platforms of dirt and road salt as well
as other pollution (corrosion danger)!
Pit must be always ventilated and dearated well.

Dimensions
All dimensions shown are minimum. Construction tolerances must
be taken into consideration. All dimensions in cm.

Illumination
Parklift 440-2,6 09.2008 C027-4311

Illumination has to be considered acc. to local requirements by client.

Data Sheet Whr Parklift 440


Single unit = 2 cars

short version
25 25

40

40

For permanent use only!


40

Both platforms are in a


horizontal position to drive on.

355 +30
clear height
for a lintel

= to be clarified with
door supplier

Dimensions in cm

15

for
ning
ope nd
s
wallctrical aservice
ele raulic
hyd

max. + 3% slope
max. 10% slope
e

ac
sp
le on
b
i
i
t
ss c
po r su
fo

p
re oss
ce ibl
ss e c
fo h a n
rs n
um el
p 10 x
pu 2
m p
p lu
50 s
x5
0

min.18

185+30

2%
50

80

= only applicaple if garage


doors are to be fitted.
For roller doors x = 10/15 cm

x2

40

Load per platform max. 2000 kg


(load per wheel max. 500 kg)

free
space

free space
for door

15

180+30

min.18

2%

245
330

Width dimensions
Marking acc. to ISO 3864

Examples

Upper and lower level for cars up to 165 cm height, 300 cm length and 160 cm width
(town cars, motor cycles, small utility vehicles e.g. lawnmowers).
Platform distance h = 170 cm.

Clearance prole
27

67

45
67
165*

22

Space required
B

gives clear
platform width

230

200

240

210

250

220

260

230

22
50

Parklift 440 short version 03.2007 C027-4141

20

14

* The total car height includes


roof rail and antenna xture
and must not exceed the
mentioned max. height
dimension.

clear platform
width

max. 200
300

50

Notes
1. For further technical details see data sheet Parklift 440.
2. Statics and construction requirements can be requested at Whr Agent.
3. At the edge of the pit a 10 cm wide, yellow-black marking according to ISO 3864 has to be provided
by the purchaser (see Width dimensions).
4. The manufacturer reserves the right to modify or alter above specications.

Otto Whr GmbH


Auto-Parksysteme

P. O. Box 1151
71288 Friolzheim/Germany

Fon +49 [0] 7044 46-0


Fax +49 [0] 7044 46-149

www.woehr.de
info@woehr.de
We compact parking space

Data Sheet
Whr Parklift 461 462 463
Suitable for private houses, condominium and for retrotting of old buildings. For permanent use only!
Horizontal even platforms.
Platform load max. 2000 kg (wheel load max. 500 kg).
For single units a platform load with max. 2300 kg (wheel load max. 575 kg) is available against additional charge.

Parklift 461

drainage channel with connection In the back and rear area


into the sewerage system
safety fences are mounted

35
75

max.
10%
H1

H3

+3
0

H4

if required

2%

min.
18

2%

50
530 +30

maintenance shaft

Entrance side
max.
10
3%

pit depth
front rear
H1
H2
Parklift 461 250 255
285 290
Parklift 462 425 430
495 500
Parklift 463 605 610

H2

+3
0

drainage channel 10x2 plus


recess for sump pump 50x50x20

100

Parklift 462

platform
max.
distance height car
H3
H4 height
170
210
165
205
245 200
170
385 165
205
455 200
170
565 165

Parklift 463
75

75
H3
H3
H1 +30

H2 +30
H3

H3

H1

+3
0

H2

+3
0

H3

Clearance prole (standard saloon/estate car)


10
25
20

55

90

65

162

10 40

48

40

Examples (09.2008)
8

162

60

48
165*
46 (200*)

165*
46 (200*)
22

275

60
120

14
max. 290
500

38
90

275

22
60
120

14
max. 290
500

38
90

* The total car height includes roof rail and antenna xture and must not exceed the
mentioned max. height dimension.

The various model-series versions may vary in


size and/or dimensionally, based on version
conguration, design and execution!
Cars up to 165 cm height:
e.g. MB A-class, E-class estate, B-class;
Opel Omega, Astra; VW Golf V
Cars up to 200 cm height:
e.g. Ford Galaxy; Opel Sintra, Renault Espace;
VW Sharan

Parklift 461 462 463 09.2008 C027-4308

Notes

1. Car width max. 190 cm (see width details page 2). In case of special platform widths narrower than 230 and 460 cm respectively, the maximum vehicle
width is reduced accordingly. For cars with two outside mirrors, a minimum platform width of 250 cm or 500 cm is recommended.
2. The upper platform is a welded construction (manufactured acc. to EN ISO13920 with the tolerance class C). Finishes are available at the
customers request, for example sand bedding/pavement slabs, sand bedding/pebbles, topsoil/lawn a.s.o. Please contact Whr for details of
maximum allowed loadings.
3. When lowered, the upper platform is even to loor level and can be driven over by cars (max. weight 2500 kg, wheel load max. 625 kg).
On special conditions the upper platforms of Parklift 461 and 462 may be used as parking places please contact Whr.
4. In case higher loading is required e.g. passage for re brigade, please contact Whr.
5. A locked key arrangement ensures that the unit is always left in the lowered position after each use.
6. A separate maintenance shaft with ladder is required. A safe maintenance access with a door has to be provided by the customer please
contact Whr. This shaft is important for ventilation and passage to the pit and can also house the hydraulic power pack.
7. At the edge of the pit a 10 cm wide, yellow-black marking according to ISO 3864 has to be provided by the customer (see statics and construction
requirements on page 3).
8. The manufacturer reserves the right to modify or alter above specications.

Otto Whr GmbH


Auto-Parksysteme

P. O. Box 1151
71288 Friolzheim/Germany

Fon +49 [0] 7044 46-0


Fax +49 [0] 7044 46-149

www.woehr.de
info@woehr.de
We compact parking space

Width dimensions
All dimensions shown are minimum. Construction tolerances must be taken into consideration. All dimensions in cm.
Alle Mae in cm.
The access to the Parklift is possible with max. 3% declination and max. 10% inclination.
If not stated differently in the offer, platform widths of 230cm or 460cm will be delivered. Bigger/smaller platform widths can be delivered at
additional price.

Top view closed pit


Single unit

Double unit

Row arrangement
(Single- and Doubleunits are combinable)

shaft covering
(provided by
the customer)

upper platform

S/D

S/D

S /D

Entrance side

Pit dimensions
Single unit
(front view)

10

Double unit

10

10
35*

75

Row arrangement

35*

10

10

35*

75

15

17 5

10

35*

75

15

15

15
20

17 5

15
20

15
20
wall opening for
hydraulic conduits

* Measure 35 cm upon upper edge platform pavement

(top view)

shaft for
maintenance

door
(provided by
the customer)

80

80

0,00
top edge
finished
floor

80

0,00

0,00

top edge
finished
floor

top edge
finished
floor

- 0,35

- 0,35

- 0,35

drainage
channel

drainage
channel

drainage
channel

80

80

passage**

40

40

17 5

17 5

10
10

Parklift 461 462 463 09.2008 C027-4308

10

- 0,35
partition
walls

Space
required
B
275
285
295
305
315

gives clear
platform width
parking
upper
levels
platform
230
290
240
300
250
310
260
320
270
330

10
10

10

Space
required
B
505
525
545

gives clear
platform width
parking
upper
levels
platform
460
520
480
540
500
560

10
10

** The passageway to the neighbour units must have the


identical height like the passageway of the maintenance
shaft in the pit.

A rectangular angle is required from the


sidewalls to the front side. Max. tolerances
are 1 cm!

Important notes
Attention:
If sides or the back are freely accessible, a safeguard is necessary (safety fences, marking, electrical hauling cable counter, or similar).
This is planned dependent on project.
BeIf maximum platform widths are not installed, difculties might arise when entering or exiting the cars on the parking units. This depends on the
car type, the access and the individual driving behaviour.
Cars wider than 190 cm should be parked on platforms 270/500 cm width only for entering/exiting at drivers position.

10

Pit edge

Pit edge rear (with stone coating)


*
%*
.1
x
ma

m
ax
.1
%*
*

min.30
5*
9*

Illustration with
stone coating
(without Parklift)

** max. 1% slope of
drainage channel
to entrance side
Pit edge lateral (with stone coating)

Pit edge entrance side (with stone coating)


bordering angel
(supplied by the
10 customer)

35

sealing and stone


coating (supplied
by the customer)
max. 250 kg/m2
yellow parts are
included in delivery

35
5*
10
12*

5*
9*
10

*circular drainage
channel (supplied
by the customer)

Installation
For the installation a crane has to be provided by the customer.
For installations in underground car parks or roofed areas a mobile crane
must be provided by the client, min. hook height 5 m.

Parklift 461:
hook clearance min. 300 cm over height of entrance
crane load approx. 700 kg
Parklift 462 and Parklift 463:
hook clearance min. 600 cm over height of entrance
crane load approx. 1400 kg

Statics and construction requirements


Bearing loads are transmitted to the pit oor by base plates, xed by
heavy duty anchor bolts to a depth of approximately 1012cm. When
xing to waterproof concrete oors chemical anchors are employed
(to be advised by Whr). Base plate thickness and rear wall thickness
minimum 18cm (recommended concrete quality C20/25).
The walls of the pit must be formed of concrete and must be perfectly

Section

The specied lengths to the support points are mean values.


Please contact us for exact positions for any variations on the standard
units.

Statics
~72

38

at and vertical without any protrusions. Tolerance in the evenness and


angularity must be taken additionally into consideration.

P3

Parklift 461

~386
P5

P5

P2

P5

P4

Entrance
side

min.18

P1

Single unit
P1 = + 86 kN**

Double unit
P1 = + 142 kN

P2 = 13 kN

P2 = 16 kN

P3 = + 13 kN

P3 = + 16 kN

P4 = + 13 kN

P4 = + 16 kN

P5 = + 11 kN

P5 = + 11 kN

(upper platform with stone coating)

~ 230
Parklift 462
Marking according to ISO 3864

P3 * P5
clear
platform
width+ 25

P1

P2 *

P5

* P4

P5

P1

Double unit
P1 = + 178 kN

P2 =

9 kN

P2 = 12 kN

P3 = +

9 kN

P3 = + 12 kN

P4 = +

9 kN

P4 = + 12 kN

P5 = + 12 kN

P5 = + 12 kN

(upper platform with stone coating)

Parklift 463

P5
P3 * P5

Single unit
P1 = + 110 kN**

P2 *

P5

* P4

* The force P2 is only given when the pillars are tted to the side walls.
The forces P3 and P4 come only into effect when the pillars can not
be tted to the side walls.
** All static loadings include the weight of the car

Single unit
P1 = + 113 kN**

Double unit
P1 = + 215 kN

P2 =

8 kN

P2 = 11 kN

P3 = +

8 kN

P3 = + 11 kN

P4 = +

8 kN

P4 = + 11 kN

P5 = + 13 kN

P5 = + 13 kN

(upper platform with stone coating)

Parklift 461 462 463 09.2008 C027-4308

Top view

Electrical data

Installation diagram

Item Performance Quantity Designation

Position

by customer 1 unit

electric meter

in the feed cable

bauseits

fuse or automatic circuit


breaker acc. to
DIN VDE 0100 p. 430
3 x25 A slow blow
(5.5 kW power pack)
3 x 40 A slow blow
(2 x 5.5 kW power pack)

in the feed cable

1 x per
power pack

10 Switch post

by customer as locally acc. to local power supply


required regulations
3 Ph + N + PE*

feed cable to
main switch

1 per
power pack

by customer 1 unit

from feed cable


into the maintenance shaft
outside the pit,
max. 20 m away
from operating
device
from main switch
to hydraulic power
pack
corner pit oor/
rear wall
from foundation
earth connector
to Parklift
base pit/operating
device
for feed cable to
power pack

1 x per
Parklift

7
8

11 PVC control cable 4 x 1.52


1 x per
power pack

1 per
Parklift

* DIN VDE 0100 part 410 + 430 (not under permanent load)
3 PH + N + PE (three-phase current)
prior to or during installation to
enable our tters to complete
their work satisfactorily and to
check the correct functioning
of the units.
Parklifts has to be grounded to
the foundation earth connector
by customer. A foundation earth
connector should be provided
by customer each 10 m or acc.
to local requirements.

Noise protection
Outdoor installation:
The basis is the German DIN 4109
Noise insulation in buildings.
According to DIN 4109 equipment,
machinery and plant used in joint
technical facilities in buildings
must be provided with adequate
protection against air-borne and
solid-borne sound.
Indoor installation:
Basis is the German DIN 4109
Noise protection in buildings.
With the following conditions
required 30 dB (A) in rooms
can be provided:
noise protection package
from our accessory
insulation gure of the
construction of min. Rw = 57dB

walls which are bordering


the parking systems must be
done as single wall and
deection resistant with min.
m= 300 kg/m2
solid ceiling above the
parking systems with min.
m= 400 kg/m2
At differing constructional
conditions additional sound
absorbing measures are
necessary.
The best results are reached
by separated sole plates from
the construction.
Increased noise protection:
If increased noise protection
must be provided planning has
to be conrmed on a project
basis by Whr (further building
measures are required).

Operating device
The position of the operating
device depends on the project
(switch post, house wall). From

1 Electric meter
2 Fuse or automatic circuit
breaker according to
DIN VDE 0100 part 430
3 x 25 A slow blow
(5.5 kW power pack)
3 x 40 A slow blow
(2 x 5.5 kW power pack)
3 Feed line to the main switch
4 Separate feed cable (230 V)
with lighting and power outlet
5 Lockable main switch
6 PVC control cable
5 x 42 (5.5 kW power pack)
5 x 62 (2 x 5.5 kW power pack)
from main switch to hydraulic
power pack
9.2 Empty pipe DN 40 with taut wire

1 x per
power pack

9.1 by customer as locally empty pipe DN40


1 x per
required with taut wire
Parklift
9.2 by customer as locally empty pipe DN40
1 x per
required with taut wire
Parklift
10 by customer as locally switch post
1 x per
required
Parklift
Items 1117 are included in Whrs scope of delivery unless otherwise specied in
the offer/order.

The electrical components


supplied by the manufacturer
must be connected in accordance
with the appropriate wiring
diagram and local regulations.
German VDE electrical requirements must be adhered to, in
order to validate the TV tested
circuit.
The electrical supply to the
power pack(s) must be provided

16 Branch connector
17 PVC control cable
5 x1.52 for the next
facility

120 cm

separate feed cable


(230 V) with lighting
and power outlet
by customer 1 unit
marked main switch,
lockable to prevent
unauthorized switching
on
by customer as locally PVC control cable with
required marked strands and
protective conductor 5 x 42
by customer each
foundation earth
10 m
connector
by customer 1 unit
equipotential bonding
acc. to local requirements

15 Operating device for UP/DOWN with


EMERGENCY-STOP, keys are only pulled off in
the bottom position (locked key). Cables always
feed in from below (2 keys per parking space).

14 PVC control cable


7 x1.5 2
8 Equipotential bonding from foundation
earth connector to Parklift
7 Foundation earth connector
9.1 Empty pipe DN 40 with taut wire

12 Double hydraulic power pack


with three-phase motor,
230/400 V, 50 Hz:
Parklift 461: 5.5 kW.
Parklift 462/463: 2 x 5.5 kW.
Switching cabinet with motor,
protection, wired already for
installation
13 Cylinder valve cable
PVC control cable 3 x 1.5 2

Temperature
The installation is designed to operate between +5and +40C.
Atmospheric Humidity: 50% at +40C. If the local circumstances
differ from the above please contact Whr.

Hydraulic power pack


The power pack will be placed in the shaft for maintenance.

Illumination
Illumination has to be considered acc. to local requirements by client.
Illumination in the shaft for maintenance minimum 80 Lux.

Railings
During the building phase the pit has to be safeguarded by the customer.

Drainage (to be performed by the customer)


1) At the pit edge drainage
channel formed in the concrete
with connection to the
sewerage system is necessary
(see page 1).
2) For locations with particularly
exposed conditions we
recommend an additional
drainage channel around the
outside of the pit.
3) We recommend the provision
of a drainage channel at the
rear of the pit which can either
incorporate a pump sump

50 x 50 x 20, or a connection
into the sewerage system.
Lateral slope only formed
within the gutter.
4) To prevent any possibility of
contamination of the ground
water we recommend giving
the pit oor an oil resistant
coating as a means of
protecting the environment.
If this is to be connected to
the sewrage system, it is
advisable to provide oil and/
or petrol separators.

Ventilation
We recommend to provide a
ventilation system in consultation
with heating/ventilation/air
conditioning engineers with the
aim of obtaining continuous air
exchange, reducing air humidity,

preventing condensate and


reducing moisture from cars
(rain, snow, ice etc.). This helps
considerably to reduce or to
prevent corrosion and malfunctions due to corrosion.

Maintenance
Regular maintenance by qualied personnel can be provided by means
of an Annual Service Contract.

Protection against corrosion


bottom of the shaft to the
operating device an empty pipe
DN40 with taut wire is necessary.

Conformity test
All our systems are checked according to EC machinery directive
98/37/EG and EN 14010.

Dimensions
All dimensions shown are minimum. Construction tolerances must be
taken into consideration. All dimensions in cm.

Independent of a maintenance workings has to be carried out acc. to


Whr Cleaning and Maintenance Instruction regularly.
Clean up galvanized parts and platforms of dirt and road salt as well
as other pollution (corrosion danger)!
Pit must be always ventilated and dearated well.

Maintenance Shaft
A separate shaft for maintenance with an entrance to the pit is necessary.
On serial garages a shared maintenance shaft may be suitable but will
depend on individual projects. The covering and ladder for the shaft is
the clients responsibility.

Parklift 461 462 463 09.2008 C027-4308

1 Stck

Frequency

Data Sheet Carlift


(in accordance with EN 81-2)

Carlifts provide an access from street level to


parking areas without the need for ramps. Both
the vehicle and driver are transported quickly
and conveniently to parking levels either above

or below the entrance level. In conjunction


with the range of mechanical parking systems,
the carlifts offer a complete space-saving
solution.

Otto Whr GmbH


Auto-Parksysteme

P. O. Box 1151
71288 Friolzheim/Germany

Fon +49 [49] 7044 46-0


Fax +49 [49] 7044 46-149

Carlift 09.2008 C027-5211

J.C. BAUMANN Aufzge-Frderanlagen


P.O.B. 1106 D-71664 Vaihingen/Enz
Phone ++49-7042-17125
Fax
++49-7042-17803
E-Mail: info@baumann-aufzuege.de
Internet: www.baumann-aufzuege.de

www.woehr.de
info@woehr.de
We compact parking space

Carlifts Dimensions
Compact cabin

Standard cabin

79

Comfort cabin

We offer three cabin sizes to suit various


vehicle dimensions.
A wide cabin is more convenient for entering
and exiting and also should it be necessary
to open the vehicle door when in the lift, for
example in an emergency.

92

88

VW Golf

Audi A4

Mercedes S

W (250)

W (260)

W (280)

Lift car with one door


section

Door opening width 240 cm


Door opening height 200 cm
No. of
persons

Internal shaft dimensions


depth (DS)
width (WS)
height
door panels door panels
top
pit
4
6
4
6
(HT)
(DP)

Lifting
height

Cabin dimensions
Load
D
W
H capacity (kg)

3.000
6.000
9.000
14.000

550
550
550
550

250
250
250
250

210
210
210
210

3.800
3.800
3.800
3.800

50
50
50
50

595
595
600
600

605
605
610
610

375
375
375
375

340
340
370
370

340
340
350
350

140
150
150
150

3.000
6.000
9.000
14.000

560
560
560
560

260
260
260
260

210
210
210
210

4.000
4.000
4.000
4.000

53
53
53
53

605
605
610
610

615
615
620
620

375
375
380
380

340
340
380
380

340
340
350
350

140
150
150
150

3.000
6.000
9.000
14.000

580
580
580
580

280
280
280
280

210
210
210
210

4.400
4.400
4.400
4.400

58
58
58
58

625
625
630
630

635
635
640
640

375
375
400
400

340
360
400
400

340
340
350
350

140
150
150
150

height shaft
top (HT)
llifting
height

pit depth
(DP)
plan
shaft
width (WS)
shaft depth (DS)

Lift car with two doors (through loader)


section

Door opening width 240 cm


Door opening height 200 cm
No. of
persons

Internal shaft dimensions


depth (DS)
width (WS)
height
door panels door panels
top
pit
4
6
4
6
(HT)
(DP)

Lifting
height

Cabin dimensions
Load
D
W
H capacity (kg)

3.000
6.000
9.000
14.000

550
550
550
550

250
250
250
250

210
210
210
210

3.800
3.800
3.800
3.800

50
50
50
50

617
617
617
617

635
635
635
635

375
375
375
375

340
340
370
370

340
340
350
350

140
150
150
150

3.000
6.000
9.000
14.000

560
560
560
560

260
260
260
260

210
210
210
210

4.000
4.000
4.000
4.000

53
53
53
53

627
627
627
627

645
645
645
645

375
375
380
380

340
340
380
380

340
340
350
350

140
150
150
150

3.000
6.000
9.000
14.000

580
580
580
580

280
280
280
280

210
210
210
210

4.400
4.400
4.400
4.400

58
58
58
58

647
647
647
647

665
665
665
665

375
375
400
400

340
360
400
400

340
340
350
350

140
150
150
150

height shaft
top (HT)
lifting
height

pit depth
(DP)
plan
shaft
width (WS)
shaft depth (DS)

Carlift 09.2008 C027-5211

Door recess

door recess
shaft
depth (DS)

If it is possible, to locate the doors within


the thickness of the shaft walls, the overall
internal shaft dimension (DS) can be
reduced by up to 26 cm (4-panel doors)
and 30 cm (6-panel doors).

Carlifts Door Panels


Landing doors with four door panels

Landing doors with six door panels

For doors with four panels the shaft will be


slightly wider but not so long.
Six panel doors will require the shaft to be
a little narrower and longer.

Variant 1

The vehicle positioning system reassures the


driver that his vehicle is correctly positioned
to avoid contact with the closing doors.
If one of the green buttons lights up when
entering, the vehicle should be driven
backwards or forwards as indicated by the
arrow.
When correctly positioned the green light
goes out and the red STOP button lights up.
The driver can now activate the lift and the
doors close. Once the destination has been
reached a green light indicates the direction
of exit. The display panel can either be
mounted in the main operating panel or in
the door frame depending upon clearance
between overall cabin width and door
opening width.

Vehicle positioning in the cabin


Variant 2

forwards
backwards
forwards

backwards

Operating panel
in the cabin

Door frame

Photo electric
light barrier

Trafc Light Control

Appropriate Number of Runs

traffic lights
(red/green)

runs per hour

33

waiting area

32
31
30
29
28
27

0,28

0,32

0,38

0,43

0,54

0,64

0,75

0,86

94

106

travelling speed (m/sec)


runs per hour

33
32
31
30
29
28
27

35

40

47

53

67

78

drive wattage (kW)


Traffic lights are part of standard equipment. Waiting areas and
entries/exits to roads are an individual requirement and subject
to relevant approval from Local Authorities.

An increase in the number of runs leads to an exceptionally high


increase in drive wattage, and thus of the costs for the unit. Increasing
travelling speed does not lead to a much higher number of runs, as
other factors are involved. This can be seen from the diagram on the
left showing a carlift with a lifting height of three metres which makes
two stops. In general, 30 cars can be conveyed to the parking places
per hour.

load
capacity
(kg)

travel speed
(m/sec)
up down

Drive unit
rated
electricity
wattage
(A)
(kW)
rated
start

number of
run cycles
per hour

Lifting
height

Cabin dimensions
D
W
H

6.000
14.000

550
550

250
250

200
200

3.800
3.800

0,31
0,31

33
40

70
84

105
126

30
30

6.000
14.000

560
560

260
260

210
210

4.000
4.000

0,31
0,31

33
40

70
84

105
126

30
30

6.000
14.000

580
580

280
280

210
210

4.400
4.400

0,31
0,31

40
40

84
84

126
126

30
30

The basic program along with the standard


guide values are depicted here. If required,
we can supply intermediate dimensions
or other technically feasible drive unit
combinations, for example with higher
capacities.

Carlift 09.2008 C027-5211

Conveying Capacity

Carlifts Lift Cars


Ceiling panel,
hot-dip galvanized
Door frame
basic painted

Green and red


traffic lights

Display for vehicle


positioning in the
cabin door frame

Ventilation
openings

Stainless steel
car control panel:
manufacturers
nameplate
car position
indicator
emergency light or
overload warning
emergency call
drive control
push button with
confirm light
doors open/close
push button
emergency call
push button

Countersunk
ceiling lights

Car and landing


doors 4 or 6
panels with
automatic central
opening.
Panels and frames
with basic painting.
Fire protected in
accordance with
DIN 18091.
Car control panel

Side wall panels,


hot-dip galvanized

Call panel
with display
Lift coming

Side panels
protected with
2 wooden bars

Key-operated
switch for call
and door opening

Photo electric
light barrier to
confirm position

Patterned steel
base plate,
hot-dip galvanized
Remote control
optional

Light screen
between car
and landing
door 190 cm
high

Other equipment
on request

Shaft Equipment
For a lift height of up to 3
meters the lift car is directly
raised and lowered by two
offset hydraulic rams. This
system is equipped with a
pipe rupture valve safety
system. Lift heights in
excess of 3 metres utilise
an indirect hydraulic system
incorporating a rope sheave
arrangement, with speed
governors and safety stop
devices. Guide rails, fitted
to the shaft walls, ensure

Hydraulic Power Pack


smooth travel. The four or
six panel doors open automatically with the lift car
doors.
All fastenings from cylinders,
guide rails and landing doors
are adjustable screwed on
halfen channels which has
to be casted in concrete
according to our drawings.
Also scaffold sockets on the
walls and eye beams on the
ceiling from the shaft.

Lift car
The sturdily constructed
lift car consists of an outer
fabricated frame supporting
the cabin which is insulated
against noise and vibration.

The four or six panel doors


open and close automatically.
Other lift car equipment is
shown above.

Carlift 09.2008 C027-5211

unit must be air-ventilated.


Oil heaters and oil coolers
can be installed if necessary.
The electro-hydraulic control
guarantees smooth travelling
in the lift in all situations.
Pressure switches emits
signals to shutdown the
system if the permissible
maximum load is reached
or the pressure falls below
the minimum limit.

Electronic Lift Control


Electronic microprocessor
down collective control.
In addition to the standard
lift equipment, the following
functions are integrated:
fault memory
diagnosis interface

motor PTC thermistor


protection
inspection drive
correction drive
signal device
remote control (optional)
oil cooler control (optional)
cabin ventilator (optional)

Door control

Machine Room
A separate machine room
contains the hydraulic pump
unit and electric control
panel (in the control cabinet).
The radiated heat must be
removed by ventilation and
aeration units to be fitted
by the customer. We recommend that the machine room
is located adjacent to the

Is a low noise sub-oil model


with a 380/400 V submersibl
oil motor in star delta startin
configuration, a low pulsatio
screw pump and a pulsation
silencer. If the motor coil
temperature reaches 100 C
or the oil temperature rises
to 70 C, the system is stopped. The temperature in the
machine room should be
between 15 and 35 C. The

shaft on the level of the


lowest floor and not on a
facing side. Minimum
clearance dimensions:
Height 200 cm, width 180 cm,
Length 240 cm, door opening
90 cm.
Other configurations and
dimensions on request.

AC/DC pulse control with adjustable door opening times.


A service technican for lifts is on call for emergencies
A skilled service technican is on call 24 hours a day for
maintenance and in the event of emergency call out.
Notes
We reserve the right to make design changes. We reserve the
right to change construction details on the basis of technological progress and in the light of environment regulations.

Whr
EasyPark

The ultimate
parking aid for
easy access to
your narrow
parking space

axle load
max. 1.000 kg

sliding area
rail length

clear car park


width
A
165 cm

max. track and


tyre width
B
140 cm

175 cm

150 cm

185 cm

160 cm

195 cm

170 cm

205 cm

180 cm

215 cm

190 cm

215/265/315/365 cm
346/396/446/496 cm
(even and level)

e.g. for the following car models,


subject to the tyres
Daihatsu Cuore;
Rover Mini
Fiat Seicento; Smart;
Suzuki Alto
Ford Ka; Mazda 121;
Opel Corsa; VW Lupo, Polo
Audi A2; Ford Focus;
Opel Astra; VW Golf
Audi A4, A6; BMW 3 and 5 series;
VW Passat
Audi A8;
BMW 7 series

How to park the car

Operation

The car has to be parked so that its front wheels are


positioned into the tyre indent, place in first gear
(automatic transmission P-position). Cars with rear
wheel drive have to be backed into the tyre indent.
Maximum axle load 1.000 kg.

EasyPark 07.2007 C027-0096

Customers responsibility

Electrical mains supply to the car park space 230 V, AC,


fuse or automatic circuit breaker for 16 A slow blow.
Lockable main switch in the feed line (above the operating
device, in a height of 180 cm).
Even and level floor, suitable to be fixed by dowels to a
depth of approx. 8 cm).

Otto Whr GmbH


Auto-Parksysteme

P. O. Box 1151
71288 Friolzheim/Germany

Operation by a control unit with key. By turning the


key, EasyPark moves into or out of the parking space.
By releasing the key the movement stops immediately.
The control unit can be provided with a flexible cable
link.
Access

maximum slope
upwards and
downwards 1%

Fon +49 [0] 7044 46-0


Fax +49 [0] 7044 46-149

max. 2,5 cm doorstep


at garage threshold

www.woehr.de
info@woehr.de
We compact parking space

Whr
EasyPark

Votre aide pour le


stationnement
dans des garages
troits et exigus

Charge par essieu


1.000 kg maxi.

B
Voie de translation
Longueur de rails

Largeur intrieure
du garage
A
165 cm

Largeur maxi.
entre pneus/traces
B
140 cm

175 cm

150 cm

185 cm

160 cm

195 cm

170 cm

205 cm

180 cm

215 cm

190 cm

215/265/315/365 cm
346/396/446/496 cm
(zone plane)

p.ex. pour les modles de voitures


suivants (en fonction de
lquipement en pneus)
Daihatsu Cuore;
Rover Mini
Fiat Seicento; Smart;
Suzuki Alto
Ford Ka; Mazda 121;
Opel Corsa; VW Lupo, Polo
Audi A2; Ford Focus;
Opel Astra; VW Golf
Audi A4, A6; BMW srie 3 et 5;
VW Passat
Audi A8;
BMW srie 7

Garage de la voiture

Manuvre

La voiture est gare avec les roues avant dans le creux de


la plate-forme. Mettre la premire vitesse (pour les voitures
transmission automatique, position P). Les voitures dont
la premire vitesse ou la position P agissent sur les roues
arrire doivent tre gares en marche arrire dans le creux
de la plate-forme.
La charge dessieu maximale autorise est de 1.000 kg.
Fournitures client

La manuvre est effectue laide dun lment de


commande cl. Lorsque la cl est tourne, EasyPark se
dplace vers lextrieur ou lintrieur du garage. Ds que
la cl est relche, le mouvement sarrte. En option,
llment de commande peut aussi tre livr avec un cble
flexible (suspendu ou dans une tle de protection) pour
pouvoir commander EasyPark partir de nimporte quelle
position souhaite.
Voie daccs

Ligne lectrique dans le garage pour 230 V, courant alternatif,


protection par fusible 16 A action retarde. Interrupteur
principal verrouillable intgr dans la ligne d'alimentation
( 180 cm de hauteur, juste au-dessus de l'lment de
commande).

Pente 1% maxi.

Monte 1% maxi.

Sol plan, adapt une fixation par chevilles (profondeur


de forure denviron 8 cm).
Otto Whr GmbH
Auto-Parksysteme

P. O. Box 1151
71288 Friolzheim/Germany

Fon +49 [0] 7044 46-0


Fax +49 [0] 7044 46-149

2,5 cm maxi.
(seuil de porte)

www.woehr.de
info@woehr.de
Nous optimisons lespace parking

EasyPark 07.2007 C027-0096

You might also like