EPIC of Security Buildings, Boundary and Landscaping Work

CONTRACT REFERENCE: 2115D / GC


DPR No.:

DAILY CONSTRUCTION REP


Approved Sub Contractors: (With QP Letter of Approval)
S.No.

Subcontractor's Name

SURTEQA S.p.c

Topographic Survey

QATAR DESIGN CONSORTIUM (QDC)

Engineering & Design Consultants

ARAB CENTRE FOR ENGINEERING STUDIES

Geo technical Survey

OILFIELD PROJECTS DEVELOPMENT CO (OPD)

SAP maintaince data acquisition

ARAB CENTRE FOR ENGINEERING STUDIES

Third Party Testing Laboratory

CONTROL CONTRACTING TRADING COMPANY (CCTC)

ELV/ICT Works

TRADING & AGENCIES SERVICES LTD. (TRAGS)

Road Marking of Temporary Security F

THE MILESTONE MASHTAL ALHADAF

Soft Landscaping works

10

TADMUR TRADING WLL

Roof Waterproofing Works

11

BLUE HOUSE

Installation of Boom Barriers at Tempo

12

ALCAT CONTRACTING COMPANY

Asphalt & Road Marking Works

13

AL SHAIBETH ESTABLISHMENT

Interface of Fire Alarm Control Panel f

14
15

ABDULLAH IBRAHIM JAIDAH & SONS


Shaded car parking at TSF
ALUMINUM TECHNOLOGY AUXILLARY INDUSTRIES WLL (ALUTEC)For Aluminum Cladding & Glazing Wo

16

MZ & PARTNERS

Engineering & Design Consultant for S

17

LEO STEEL CONSTRUCTION CO. WLL

Fabrication & Installation of Structural

18

GENERAL SYNDICATE STRUCTURAL STEEL AND METAL


FABRICATION

Car Park Shade Work

19

QATAR PEST CONTROL

Anti Termite Treatment Work

TOTAL
Manpower at site:
Type

Sr.Staff

Sup.Level

F/M

Direct Manpower

C/H
4

Clerk

Skilled
Labour

24

Direct Manpower O/L


In-Direct Manpower
Camp

14

EPIC of Security Buildings, Boundary and Landscaping Work

CONTRACT REFERENCE: 2115D / GC


DPR No.:

DAILY CONSTRUCTION REP


In-Direct Manpower
Sub-Con

GRAND TOTAL
Equipment at site:
Pick up / Car & Buses
Wheel Loader

4
1

Telehandler
Water Tanker (3750 USG)

1
1

JCB/ Back Hoe

Half Lorry

Skid Loader

Steel Roller 2Ton

Grader

Steel Roller 10Ton


Generator / Compressor /
Welding Machine

Jumping Compactor

TOTAL

Min.(C)

Temperature
Max.(C)

We
Humidity

Sunny

Cloudy

Rainy
.

Dusty
.

Delays (Standby time) Affecting Progress of Works due to:


Work Stoppage

Weather Condition

Lack of Manpower

Equipment Breakdown

Material Rejected

Unforeseen
Other Events

MTC Representative:

Sankar Mohapatra

MTC-MPAC-PL-001 / Rev 1 / 1 Mar 2015

windy

scaping Works at MPAC, Ras Laffan (MPAC Phase 4)

NCE: 2115D / GC13111100

RUCTION REPORT
DATE

28-Jun-15

Work Descriptions

No of Staff

gn Consultants

ey

ta acquisition
Laboratory

emporary Security Facility

works

g Works

m Barriers at Temporary Security Facility

arking Works

arm Control Panel for Temporary Security Facility

g at TSF

ding & Glazing Works

gn Consultant for Structural Steel of Canopy & Walkways.

lation of Structural Steel Works of Canopy.

Unskilled
Labour

Drivers/Op Comp.
erators
Operators

25

Remarks

Total
58
0

24

11

61
0

scaping Works at MPAC, Ras Laffan (MPAC Phase 4)

NCE: 2115D / GC13111100

RUCTION REPORT
0
119

5
2
2
2
2
3
16

Weather Conditions
Windy
.

Remarks

Max

Min

Brief Statement of Delay:


Excavator was breakdown at 7 A.M, that's why excavation has been stopped in GS
Building

Total Pages:

DAIL

EPIC of Security Buildings, Boundary and Landscaping Works


Milestone 01 (Temporary Security Facilities) &SURVEY WORK
CIV/ARCH: Mohd. Hameed

Project Name
Location of Work
Person Incharge

S.No.

Activities

CIVIL / ARCHITECTURAL
A

MILE STONE -1 ( MS01 )

Porta cabin & Guard booth (MS1)

Shaded Car Park installation

Kerb stones & Paving works at MS 01

Removal of Existing Road Side Raised Kerb

Holding tank at MS 1

Fence & Gate at MS 1


Installation of Chainlink Fabric and gates

Boom Barrier

Installation of cabel protector hump

Temporary Access Road


Asphalt Work for the Temporary Access Road
Round About Construction
Installation of Concrete Road Barrier at Round about
Installation of Speed Hump
Road Marking

10

Pipe Culvert ( Access Road )

11

Concrete Protection Work

12

Back Filling Work

13

Porta Cabin External Remaining works


Encloser Works below the porta cabin
Site clearing and house keeping

14

Trench Soakaway

15

Stand Alone System


Woqod Bund wall rectification

Woqod Bund wall breaking


Excavation for the bund wall slab
Shuttering and Concreting of Slab
Formwork Shutter removal
16

Project Sign board


Erection of Project Sign Board

17

Precast Manhole Installation. ( JRC 12 )

18

Man holes And Catch pit


isolation Valve chamber cover installation work

19

Detour Road
Prime Coat application
Asphalt laying work
Paving Blocks laying work in Out-bound road
Paving Blocks laying work at In-bound Road
Concreting of RCC slab at utility crossing area ( out-bound )
Concreting of RCC slab at utility crossing area ( In-bound )
Paving blocks laying at Detour Road ( Infront of CCC Gate )
Chainlink Fence
Excavation of fence foundation
Concreteting of fence Post foundations
Backfilling of fence foundation trench
Chainlink fence installation work

MILE STONE - 2 ( MS02 )

Site Encloser Work ( Hoarding Board Installation )


Construction of Rest Shelter for workers in MS02
Punch list item work completion and compliance

Gate Security Building


Surveying and setting out of GSB foundation
Barricading the GSB Area Prior to Start the Excavation
Earth Work
Excavation for the Foundation of GSB
Dewatering Pump installation at work site

Boundary Fence Work MS02

Barricading work along the boundary fence and MTC work limit area.
Grading and clearing the top soil along the boundary fence line
Site Cleaning and grubbing and top soil removal between 8-9
Grading and top soil removal between cord no. 9-12
Cleaning, grubbing and levelling for the fill material stock pile area
Temporary Bench mark establishment at Boundary fence perimeter.
Foundation excavation
Boundary Fence post marking between Co-ordinate No. 8-9
Boundary Fence post foundation trench excavation between cord. No 8-9
Fence foundation shuttering preparation work
4

Main Gate Canopy


Removal of Existing Paver Blocks at Canopy Location.

ELECTRICAL
1

Cabel, Lights, fittings and accessories fixing at Shaded car park.


Boom barrier isolater installation Work
Installation of Distribution Box inside porta cabin

Under Ground Electrical cabel Trench Excavation work.


Under Ground Cabel laying work
Backfilling the cabel trench with sand and laying warning tap and tiles.
EARTHING WORK
Earthing pit trench excavation work.
Installation of Earthing Rod in Pit
Excavation for the earthing cabel connection to existing line
Backfilling of Earth pit in MS01

ELV & ICT SYSTEMS


1

IT cable Trench Excavation work.

IT Cable duct laying and connecting to the porta cabin

IT Cable termination

Fiber optical Cable pulling work

Fiber Optical Cable Testing Work

Face Plate Termination of data cable

Earthpit chamber installation

Termination Between DG & MTS

Diesel generator commissioning

10

Boom Barrier Commissioning

LOSS PREVENTION
1

Fire alarm cable commissioning

BUILDING SERVICES - MECHANICAL


1
2

AC installation Work at MS01 Porta Cabin


Pessure test for the plumbing work

DAILY PROGRESS REPORT

dary and Landscaping Works at MPAC, Ras Laffan (MPAC Phase 4)


y Facilities) &SURVEY WORKS
MEP:

ctivities

ad

bout

Actual
Start Date

General
Location

Grid

out-bound )

n-bound )

CCC Gate )

MTC work limit area.


boundary fence line
between 8-9

rial stock pile area

ary fence perimeter.

ate No. 8-9

on between cord. No 8-9

Shaded car park.

work.
warning tap and tiles.

existing line

cabin

Run Date:

28-Jun-15

ELV/IT:

General
Staff Nos.

Actual Completion

Remarks

100% Completed
100% Completed
100% Completed
100% Completed
100% Completed
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete

100% Complete

Extension of slab to maintain the


minimum 3 meter distance between
generator and Woqod

100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
85% Complete
100% Complete
80% Complete
95% Complete
100% Complete
100% Complete
100% Complete
87% Complete
100% Complete

Required Depth 1.5m

25% Complete

Started from NE part


Started from NE part

100% Complete
100% Complete
100% Complete
100% Complete

At MPAC NE portion

100% Complete
75% Complete

Total 45 Nos. finished

75% Complete

For 100 Nos. of post

55% Complete

100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete

Total two nos. of Earth Pit

100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete
100% Complete

2 Nos. completed

100% Complete
100% Complete

100% Complete
100% Complete

NEXT D

EPIC of Security Buildings, Boundary and Landscaping Works


Milestone 01 (Temporary Security Facilities) &SURVEY WORK
CIV/ARCH: Mohd. Hameed

Project Name
Location of Work
Person Incharge

S.No.

Activities

CIVIL / ARCHITECTURAL
1

Continue excavation of foundation trench for the GSB footings

Continue Kerb Stone and paver blocks removal at canopy location at MS02

Continue establisment of Temporary Bench mark for boundary fence at MS02

Continue barricading and grading work at MS02 Boundary fence

Continue detour road outside chainlink fence foundation excavation

Detour road Chainlink fence installation work

Continue GSB Building Foundation Excavation

ELV & ICT SYSTEMS

LOSS PREVENTION

BUILDING SERVICES - MECHANICAL

NEXT DAY ACTIVITY (PLANNED)

dary and Landscaping Works at MPAC, Ras Laffan (MPAC Phase 4)


y Facilities) &SURVEY WORKS
MEP:

Activities

e GSB footings

at canopy location at MS02

k for boundary fence at MS02

Boundary fence

undation excavation

Actual
Start Date

General
Location

Grid

Run Date:

28-Jun-15

ELV/IT:

General
Staff Nos.

Actual Completion

Remarks