You are on page 1of 4

Set up Solar PV Power Projects at

Nil Capital Investment. Lease your


Rooftops for fixed term period and
enjoy cheap, green, reliable,
constant & independent Power for
up to 25 years.

SOLAR PV
POWER
PROJECTS
Under BOOT Model

Asun Solar Power (P) Ltd


64, Navjivan Vihar, New Delhi
C: +91 011 26691663, 26693494
www.asun.co.in | Email: info@asun.co.in

_____________________________________________________________________________________________________________________
Setting up Grid Connected Solar PV Power Plants ranging from 100KW to MW scale power projects
under the Build, Operate, Own and Transfer (BOOT) Model

HOW THIS HAPPEN?

PROJECT VIABILITY FOR ROOTOP OWNERS:

Rooftop Lease: We utilize vacant


Rooftop spaces and set up a Solar PV

than their current power tariffs & cost

Power plant at our own Cost.

including the use of DG sets.

Captive Consumption: All power


generated from the Solar Plant is fed

Getting rid of Power Tariff Escalations


and inflation risks.

into the LT panel and is 100% utilized.

Rooftop Owners enjoy cheaper power

Buy back the project on the 15 or 20


th

th

Power Purchase Agreement (PPA): We

year at depreciated value and enjoy

sign a PPA with the Rooftop Owner and

free power for the remaining life of the

sell the power on monthly cycle for a

system which is expected to be 35

fixed term period.

years.

Operation & Maintenance: We maintain

Nil Capital Investment required.

the entire plant and station our team at

Comply with your Renewable Energy

site at our own costs and expense for

Purchase Obligations and reduce

the entire term.

Carbon footprints.

HIGHLIGHTS:

Technology:

Solar Photovoltaic (PV)

System Design:

Grid-Connected System {Solar + Grid}

Total rooftop area required

8,000 square feet per 100KW setup

Proposed Solar Panels (PV):

230 to 320 watt | Poly/Mono Crystalline


AAA Rated with Module efficiency higher than 14.8%

Solar Inverter:

100KW Tier I Multiple Sting Inverters, 3 phase


Maximum output efficiency at 98%

Estimated Annual Energy Generation:

150,000 kWh in the first year for every 100KW


system. (Leverage of + 10%)

Project Completion tenure:

Within Four (4) months

_____________________________________________________________________________________________________________________
GENERAL CONDITIONS OF CONTRACT:

Complete Project cost borne by:

Asun Group and affiliate Companies

Rooftop Right to Lease

Rooftop Owner shall provide the Right to Use of the


rooftop to Asun for the fixed term period from the
date of handing over the project.

Meter Accounting

Based on the Data logs (which accounts every unit

of power supplied) Asun shall raise the bill on the 1

st

date of every English calendar month. A separate


meter may also be installed to verify the actual
power supplied.
Billing

For all the kW/h of power supplied from the solar


plant, hospital shall pay the said dues to Asun on or
before 4 date of every English Calendar month
th

failing which there shall be a penalty of 2% per


month levied to the Rooftop Owner.
Termination of the PPA

The PPA shall be valid for the fixed lock in period.


Asun may terminate the said agreement. However,
the condition wherein PPA may be terminated by the
Rooftop Owner is after it compensates Asun for the
estimated power generation p.a. for the balance
number of years i.e. term; in accordance with the
defined power rates in the PPA.

Bank Guarantee

Asun shall require a revolving Bank Guarantee of the


amount equaling to the estimated power generation
on yearly basis.

Inverter replacement

On Part of Asun

Replacement of any defective equipment

On part of Asun

during the Term:


Operation & Maintenance of the Plant

On part of Asun

Installation of 3 Phase meter / sub-Meters

By Rooftop Owner

and all other necessary wirings from the


Distribution point.

_____________________________________________________________________________________________________________________

PPA TARIFFS AND ESCLATION RATES:


Based on a through feasibility and viability study, we have drawn down the PPA tariffs depending on
case to case basis; under which the financial modeling of the project is proposed for the Rooftop
Owner:
Scheme I PPA25
Project Tenure (PPA Term)

Lock-in period of Twenty five (25) years

Turnkey project cost borne by Asun:

@ 90/watt (As per the bench mark rate of the MNRE)


amounting to INR 90,00,000/- per 100KW.

Scheme II PPA20
Project Tenure (PPA Term)

Lock-in period of Twenty (20) years

Turnkey project cost borne by Asun:

@ 90/watt (As per the bench mark rate of the MNRE)


amounting to INR 90,00,000/- per 100KW.

Scheme III PPA15


Project Tenure (PPA Term)

Lock-in period of Fifteen (15) years

Turnkey project cost borne by Asun:

@ 90/watt (As per the bench mark rate of the MNRE)


amounting to INR 90,00,000/- per 100KW.

PPA tariffs ranging from INR 8/kWh to INR 11/kWh


PPA term ranging from 15 years to 25 years
Power Tariff escalation cycle from 5% to 15% every 3 to 5 years

REQUEST A PROJECT PROPOSAL


Contact:

Mr. Hitaksh Sachar, VP-Projects


Asun Solar Power (P) Ltd.
hitaksh@asun.co.in, +91 9811971111

You might also like