SIMHADRI

ISO 9001: 2008


ISO 14001:2004
DEPARTMENT SYSTEM MANUAL
DEPARTMENT: Electrical Maintenance
NTPC Ltd.,
Simhadri Thermal Power Project,
P.O. NTPC-Simhadri,
Dist. Visakhapatnam (A.P.) 531 020.

Dept. System Manual


Dept : Electrical
Maintenance
Document Title : Table of Contents
Sheet
: 01 of 02

Sl. No.

Description

SIMHADRI
Revision
06
Effective Date: 01.04.2016

No. of
Pages
02

Revision
No.
05

Effective
Date
01.04.2013

1.

Table of contents

2.

Amendment Record Sheet

05

06

01.04.2013

3.

Abbreviations

03

03

01.04.2012

4.

List of controlled copy holders

01

02A

10.03.2009

5.

ESHQSA Policy

01

03

21.11.2012

6.

Organization Chart of the Department

01

03

03.12.2012

7.

List of Procedure/Processes/Work
Instructions/EMPS

03

03

03.12.2012

8.

Procedure/Processes/Work
Instructions/EMPS as per list

---

03

03.12.2012

9.

Environment aspect evaluation

04

03

03.12.2012

10.

List of Forms

01

02

01.11.2010

11.

List of Drawings

01

03

03.12.2012

12.

List of Statutory Compliances required

01

02

01.11.2010

13.

List of LMIs

02

04

03.12.2012

14.

List of OEM / OES Manuals

03

02

15.03.2008

15

List of Reports

01

02

01.11.2010

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : Table of Contents
Sheet
: 02 of 02
Sl. No.
16.

Description

SIMHADRI
Revision
06
Effective Date: 01.04.2015

No. of
Pages
01

Revision
No.
04

Effective
Date
03.12.2012

02

06

01.04.2015

17.

Responsibility and authority of department


personnel
Process measures review matrix

18.

Departmental Quality Objectives

02

06

01.04.2015

19.

Action plan for achieving departmental


objectives

10

06

01.04.2015

20.

List of Records

03

02

01.11.2010

21.

List of Instruments for external calibration

01

02

15.03.2008

22.

List of Instruments for internal calibration

01

03

28.01.2013

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : Amendment record sheet
Sheet
: 01 of 06

Document Title
& Number

Previous
Rev. No. &
Effective
date

Current Rev.
No. &
Effective
Date

SIMHADRI
Revision
06
Effective Date: 01.04.2015

Brief Description of
Changes

Electrical System
manual

01, 10.10.07

02, 15.03.08

1. Simhadri system manual


revised on 01.03.2008.
2. Anurakshan system changed
to SAP.
3. Environment aspects evaluated.
EMPs & WIs added.

Process
measures review
matrix

02,15.03.08

02A,04.04.08

New targets set for the year 2008-09

Departmental
quality Objective

02, 15.03.08

02A, 04.04.08

Department quality objectives set for


the year 2008-09

List of Copy
holders

02, 15.03.08

02A, 10.03.09

TQM Dept has been named as


Business Excellence.

Organization
chart

02, 15.03.08

02A, 10.03.09

Department organization
chart revised due to transfers.

Responsibility
and authority of
department
personnel

02, 15.03.08

02A, 10.03.09

Due transfer & elevation of grades.

Environment
aspect evaluation

02, 13.03.08

02A,17.03.09

Aspect rating reevaluation carried


out.

Process
measures review
matrix

02A,04.04.08

03,03.04.09

New targets set for the year 2009-10

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : Amendment record sheet
Sheet
: 02 of 06

Document Title
& Number

Previous
Rev. No. &
Effective
date

Current Rev.
No. &
Effective
Date

SIMHADRI
Revision
06
Effective Date: 01.04.2015

Brief Description of
Changes

Departmental
quality Objective

02A, 04.04.08

02B,03.04.09

Department quality objectives set for


the year 2009-10

List of LMI

02,15.03.08

03,16.01.10

LMI List updated.

List of Reports

02,15.03.08

03,16.01.10

Reports list and format updated

Responsibility
and authority of
department
personnel

02A, 10.03.09

03,16.01.10

Change in the reporting structure of


HOD (EM)

Departmental
quality Objective

02B,03.04.09

03,16.01.10

As per the remarks of the internal


auditors, more specific target dates
were incorporated for quality
objectives.

Departmental
quality Objective

03,16.01.10

03A,05.04.10

Department quality objectives set for


the year 2010-11

Process
measures review
matrix

03,03.04.09

03A, 05.04.10

New targets set for the year 2010-11

List of LMI

03,16.01.10

03A, 01.07.10

LMI List updated.

List of Statutory
Compliances
required

02,15.03.08

02A,01.11.10

Validity changed from 15 years to 10


years.

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : Amendment record sheet
Sheet
: 03 of 06

Document Title
& Number

Previous
Rev. No. &
Effective
date

Current Rev.
No. &
Effective
Date

SIMHADRI
Revision
06
Effective Date: 01.04.2015

Brief Description of
Changes

List of forms

02,15.03.2008

02A,01.11.10

Form for Colony Consumption is


discontinued as the report is taken
from PI server by EEMG dept w.e.f
01.11.10

List of Reports

03,16.01.10

03A, 01.11.10

Form for Colony Consumption is


discontinued as the report is taken
from PI server by EEMG dept w.e.f
01.11.10

Responsibility
and authority of
department
personnel

03,16.01.10

03A,15.11.10

Department organization chart is


revised

Departmental
quality Objective

03A,05.04.10

04, 01.04.12

Department quality objectives set for


the year 2012-13

Process
measures review
matrix

03A, 05.04.10

04, 01.04.12

New targets set for the year 2012-13

Abbreviations

02,15.03.08

03, 01.04.12

List modified

Amendment
Record sheet

04, 01.02.11

05, 03.12.12

Amendments done

List of
procedures,
Process, WI

02, 15.03.08

03, 03.12.12

Necessary changes done to cover


4X 500 MW in the procedures,
process.

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : Amendment record sheet
Sheet
: 04 of 06

Document Title
& Number

Previous
Rev. No. &
Effective
date

Current Rev.
No. &
Effective
Date

SIMHADRI
Revision
06
Effective Date: 01.04.2015

Brief Description of
Changes

ESHQSA Policy

02, 15.03.08

03, 23.11.12

ESHQSA Policy revised

Organization
chart

02A, 10.03.09

03, 03.12.12

Department organization chart


revised due to transfers.

Environment
aspect evaluation

02A,17.03.09

03,03.12.12

Aspect rating re evaluation carried


out.

List of LMI

03, 01.07.10

04, 03.12.12

LMI list updated

List of OEM /
OES manual

02, 15.03.08

03, 03.12.12

List of OEM/ OES manuals updated


to cover Stage-2 equipments.

Responsibility
and authority of
department
personnel

03A,15.11.10

04, 03.12.12

Department organization chart is


revised

List of records

02, 01.11.10

03, 03.12.12

List of records updated to cover


changes in the WI.

List of
instruments /
equipment for
internal
calibration

02,15.03.08

03, 28.01.13

AC/DC, 3Phase High accuracy


Power Meter removed from the list
as it was reviewed and found that no
critical activity is being carried out
with this instrument.

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : Amendment record sheet
Sheet
: 05 of 06

Document Title
& Number
Departmental
quality Objective

Previous
Rev. No. &
Effective
date

Current Rev.
No. &
Effective
Date

SIMHADRI
Revision
06
Effective Date: 01.04.2015

Brief Description of
Changes

04, 01.04.12

05, 01.04.13

Department quality objectives set for


the year 2013-14

04, 01.04.12

05, 01.04.13

Action plan for achieving objectives


for 13-14

Process
measures review
matrix

04, 01.04.12

05, 01.04.13

New matrix prepared as per targets


set for the year 2013-14

Departmental
quality Objective

05, 01.04.13

06, 01.04.14

Department quality objectives set


for the year 2014-15

05, 01.04.13

06, 01.04.14

Action plan for achieving objectives


for 14-15

05, 01.04.13

06, 01.04.14

Organization Chart 03, 03.12.12

04, 01.03.14

Organization chart revised due to


transfers

04, 01.03.14

Due to revise of department


organization chart

Action plan for


achieving
objectives for 1314

Action plan for


achieving
objectives for 1415
Process
measures review
matrix

Responsibility and
authority of
department
03, 03.12.12
personnel

New matrix prepared as per targets


set for the year 2014-15

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : Amendment record sheet
Sheet
: 06 of 06

Document Title
& Number

Previous
Rev. No. &
Effective
date

Current Rev.
No. &
Effective
Date

SIMHADRI
Revision
06
Effective Date: 01.04.2015

Brief Description of
Changes

06, 01.04.14

07, 01.04.15

06, 01.04.14

07, 01.04.15

Action plan for achieving objectives


for 15-16

06, 01.04.14

07, 01.04.15

New matrix prepared as per targets


set for the year 2015-16

Organization Chart 04, 01.03.14

05, 01.03.15

Responsibility and
authority of
04, 01.03.14
department
personnel

Organization chart revised due to


transfers

05, 01.03.15

Due to revise of department


organization chart

Departmental
quality Objective
Action plan for
achieving
objectives for 1516
Process
measures review
matrix

Departmental quality Objectives set


for 15-16

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : Abbreviations
Sheet
: 01 of 03

Abbreviation
NTPC
EMD
BHEL
APTRANSCO
MTP
CHP
HT
LT
DC
LMI
GCB
EHV
PPA
ESP
TLP
SCE
BD
PM
WOC
LWC
PTW
TB
IR
CT
PT
ECP
TRF
OEM
MCC
SAP

SIMHADRI
Revision
03
Effective Date: 01.04.2012

Full form
NTPC Limited
Electrical Maintenance Department
Bharat Heavy Electricals Limited
Andhra Pradesh Transmission Corporation
Maintenance Planning
Coal Handling Plant
High Tension
Low Tension
Direct Current
Local Management
Instructions Generator Circuit
Breaker Extra High Voltage
Power Purchase Agreement
Electro Static Precipitator
Test Lead Point
Shift Charge Engineer
Break Down
Preventive
Maintenance Work
Order Card Limited
Work Certificate Permit
To Work Terminal Block
Insulation Resistance
Current Transformer
Potential Transformer
Electrical Control Panel
Transformer
Original Equipment Manufacturer
Motor Control Centre
Systems , Applications and Products in Data Processing

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : Abbreviations
Sheet
: 02 of 03

Abbreviation
ESHQSA
TG
HV
S/Y
CVT
SCC
OCC
HVR
BAPCON
O/H
O&M
DGM
QSP
HOD
DOC
UCB
H2
E/F
DG
KV
VAR
CGL
PPM
BDV
ID
C&S
Ni-Cd
TP
MUT
TTB
OTI
JB
LA

SIMHADRI
Revision
03
Effective Date: 01.04.2012

Full form
Environmental, Safety , Health, Quality & Social Accountability
Turbo Generator
High Voltage
Switchyard
Capacitive Voltage Transformer
Short Circuit Characteristics
Open Circuit Characteristics
High Voltage Rectiformer
BHEL Advanced Precipitator Controller
Over Hauling
Operation & Maintenance
Deputy General Manager
Quality System Procedure
Head Of the department
Document
Unit Control Board
Hydrogen
Earth Fault
Diesel Generator
Kilo Volt
Volt Amp Reactive
Crompton Greaves Ltd.
Parts per Million
Break down Voltage
Identification
Control & Switchgear
Nickel- Cadmium
Transfer Point
Meter Under Test
Test Terminal Block
Oil Temperature Indicator
Junction Box
Lightning Arrestor

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : Abbreviations
Sheet
: 03 of 03

Abbreviation
PF
HF
LCM
LBB
DE
NDE
Mtc
AGM
DOP
Eqpt.
Sr. Supdt.
SAP
CFC
EMP
CEA

SIMHADRI
Revision
03
Effective Date: 01.04.2012

Full form
Power Factor
High Frequency
Leakage Current Monitor
Local Breaker Back Up
Drive End
Non Drive end
Maintenance
Additional General Manager
Delegation of Power
Equipment
Senior Superintendent
System Application Program
Cloro Fluro carbon
Environment management programme
Central Electricity Authority

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : List of Controlled Copy holders
Sheet
: 01 of 01
Controlled
Copy No.

Controlled Copy Holder

SIMHADRI
Revision
: 02A
Effective Date: 10.03.2009
Soft Copy (CD)/
Hard Copy

1.

MR/AMR

Electrical Intranet site

2.

HOD-EM

Hard Copy

3.

Switch Yard -EM

Electrical Intranet site

4.

CHP-EM

Electrical Intranet site

5.

Auditors Copy

Electrical Intranet site

6.

O&M Library

Electrical Intranet site

7.

Business excellence
Department

Electrical Intranet site

Dept. System Manual


Dept. Electrical
Maintenance
Document Title : List of Procedure, Processes & Work
Instructions
Sheet
: 01 of 03

Sl.
No.

Document
(Procedure/Process/WI) Title

Document
(Procedure/Proc
ess/WI) No.
EMD/PR/01

Effective Date: 03.12.2012

02,
15.03.2008
02,
15.03.2008
02,
15.03.2008

6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001

02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008

6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001

EMD/WI/013

02 ,
15.03.2008

6.3 of 9001
4.4.6of 14001

Over Hauling of LT MCC

EMD/WI/014

Preventive Maintenance of
LT Motor .
Monthly PM of Batteries (NiCd)

EMD/WI/015

02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008

6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001

02

Preventive Maintenance

EMD/PC/01

03

Break down Maintenance

EMD/PC/02

04

Predictive Maintenance of
Electrical Equipments

EMD/PC/03

05

EMD/WI/001

06

Recording of various parameter


of generator.
Maintenance of paddle feeders.

07

P.M of motors for CHP.

EMD/WI/006

08

Calibration of Generation
related meters in ECP
Maintenance of 11/3.3 kV and
11/0.415 kV Transformer.
Transformer oil sampling for
detailed analysis

EMD/WI/008

11

Maintenance of Electrolyser
of hydrogen plant.

12
13
14

03

03 ,
03.12.2012

Departmental System
Procedure for EMD

10

Revision

ISO 9001/ ISO


14001 Clause
No.
6.3 of 9001
4.4.6of 14001

01

09

SIMHADRI

Approved By: HOD

EMD/WI/005

EMD/WI/009
EMD/WI/011

EMD/WI/016

Name : C.MALAKONDAIAH

Rev. No. &


Effective Date

Signature :

Dept. System Manual


Dept. Electrical
Maintenance
Document Title : List of Procedure, Processes & Work
Instructions
Sheet
: 02 of 03
Sl.
No.
15

Cathodic protection checking

Document
(Procedure/Proc
ess/WI) No.
EMD/WI/018

16

Calibration of energy meters.

EMD/WI/019

19

EMD/WI/023

26

400 kV CT annual / Bi Annual


maintenance.
400kV CVT annual / Bi Annual
maintenance
400kV surge /lighting arrestor
annual / Bi Annual
maintenance.
Annual / Bi Annual Bus bar
protection healthiness checking
Annual / Bi Annual Line
protection checking
Annual / Bi Annual 400kV bay
protection checking
HT Motor O/H.

27

HT Breaker O/H.

EMD/WI/031

28

HT Switchgear O/H.

EMD/WI/032

29

P.M. of HT Motors.

EMD/WI/033

30

Disposal of Batteries(Ni-Cd)

EMD /WI/034

31

Maintenance of Hydrogen plant


compressors

EMD /WI/035

20
21
23
24
25

Document
(Procedure/Process/WI) Title

EMD/WI/024
EMD/WI/025
EMD/WI/027
EMD/WI/028
EMD/WI/029
EMD/WI/030

SIMHADRI

Revision

03

Effective Date: 03.12.2012


Rev. No. &
Effective Date
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008

ISO 9001/ ISO


14001 Clause
No.
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001

02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008

6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001

Dept. System Manual


Dept. Electrical
Maintenance
Document Title : List of Procedure, Processes & Work
Instructions, EMPs
Sheet
: 03 of 03
Sl.
No.
32

Lead Acid battery disposal

Document
(Procedure/Proc
ess/WI) No.
EMD/WI/036

33

Handling of transformer oil

EMD/WI/037

34

Maintenance of Window ACHandling of CFC


Construction of room for
storage of discarded lead acid
battery

EMD/WI/020

35

Document
(Procedure/Process/WI) Title

EMD/EMP/001

SIMHADRI

Revision

03

Effective Date: 03.12.2012


Rev. No. &
Effective Date
01 ,
11.03.2008
01 ,
11.03.2008
01 ,
11.03.2008
01,
13.03.2008

ISO 9001/ ISO


14001 Clause
No.
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001

Dept.: ELECTRICAL MAINTENANCE


Doc. No.: EMD/PR/01
Rev. No.: 03

Doc. Title : Dept. System


Procedure for EMD

SIMHADRI
Date : 03.12.2012
Sheet : 01 of 06

1. PURPO
SE
To describe the procedure for carrying out maintenance of electrical equipments so as to
generate electricity (4 X 500 MW) as per plan / target, optimize availability of electrical
equipments with full compliance of statutory provisions and safety regulations.

2. SCO
PE
The procedure covers maintenance activities of the major electrical equipments of NTPC
SIMHADRI (4X 500MW) at main plant, Switchyard, CHP and Offsite areas. These
equipments are Generator & Auxiliaries, HT/LT Switchgears, Transformers, Switchyard
equipments, DC system, HT/LT motors etc.

3. REFERENC
ES
a. Work Instructions as per the list enclosed.
b. LMI as per the list enclosed.
c. Manufacturers O&M Manuals as per list enclosed.
4. RESPONSIBILIT
Y:
Sl. No

Description

Responsibility

1.

Overall responsibility

HOD (EM)

2.

Assisting HOD (EM)

Sectional Heads

3.

In Case of Absence of HOD (EM)

Authorized representative of
HOD (EM)

4.

Day to day Maintenance jobs

Area in charge/Area Engineers

5.

Planning and indenting of spares,


initiating contract proposals &
budget preparation

Section in charge

Dept.: ELECTRICAL MAINTENANCE


Doc. No.: EMD/PR/01
Rev. No.: 03

Doc. Title : Dept. System


Procedure for EMD

SIMHADRI
Date : 03.12.2012
Sheet : 02 of 06

5. RECORDS :
As per the list enclosed.
6. PROCEDURE :
6.1 The maintenance jobs in electrical maintenance are carried out as per SAP online maintenance system. Maintenance Jobs are planned daily in the planning
meeting indicating the defects/condition/faults raised by operation/MTP/
maintenance departments. As maintenance of electrical equipments are critical
activities, where- in absence of written instructions, the quality of work is likely to
get affected, the jobs are controlled through written work instructions
Four types of maintenance jobs are carried out in Electrical maintenance
department.
1) Preventative
maintenance
2) Condition
maintenance

based

3) Defect/breakdown
maintenance.
4) Overha
uling
6.1.1 Preventive maintenance
Preventive maintenance jobs are carried out as per the schedule mentioned in SAP
system. Depending upon the equipment, the preventive maintenance schedules are
forwarded to MTP department by the area engineers. Accordingly preventive
maintenance jobs are planned in SAP system. Upon planning in the system
respective area engineers are taking permits from operation department through
SAP system to execute the jobs. On job completion the permits are cancelled.

Dept.: ELECTRICAL MAINTENANCE


Doc. No.: EMD/PR/01
Rev. No.: 03

Doc. Title : Dept. System


Procedure for EMD

SIMHADRI
Date : 03.12.2012
Sheet : 03 of 06

6.1.2 Condition based/Predicative maintenance:


The condition of the critical & high cost equipment that effect process capability are
monitored by MTP department through SAP based on the schedule given by area
engineers. Accordingly predictive maintenance jobs are planned in SAPsystem.
After planning the jobs in the SAP system, respective area engineers are taking
permits from operation department to assess the condition of the of the equipment.
After conducting the test / taking the measurements permits are returned to operation
department and data is being uploaded to the SAP for usage by different user groups
like MTP , Corporate OS etc..

6.1.3 Defect/Breakdown Maintenance:


Defects/breakdowns are reported by operation / user departments by following means.
a) Daily planning meeting notes.
b) Over phone/log book records.
c) Work order cards raised in SAP.
d) Defects of emergent nature are taken up immediately and others are
planned in consultation with operation / MTP department.
6.1.4 Overhauling :
Overhauling of major / critical auxiliaries like Generator, GCB, Transformer, EHV
equipments etc, are planned & prepared by MTP in consultation with area in charges
and is carried out during Unit overhaul / shut downs. The section in charges is
responsible for adherence to the overhauling plans. In overhauling of critical & major
equipments, where assistance of manufacturers / reputed contractors are obtained for
repair / overhauling, the same would be carried out as per agreed quality plan /
procedure with the manufacturer and accordingly no work instructions has been
prepared.

Dept.: ELECTRICAL MAINTENANCE


Doc. No.: EMD/PR/01
Rev. No.: 03

6.2
Laboratory:

Doc. Title : Dept. System


Procedure for EMD

SIMHADRI
Date : 03.12.2012
Sheet : 04 of 06

Electrical

Protective relay testing, 400KV outgoing line energy meter calibration(Used in billing
purpose) and error checking of generator related meters & transducers in electrical
control panel activities are carried out in electrical laboratory . As these activities are
critical in nature & the quality of work is likely to get affected, the jobs are controlled
through written work instructions / LMIs. The list of equipments, which are maintained
for above purpose in electrical laboratory are calibrated with reference to substandard meters which in turn will be calibrated at national accredited laboratories.
The list of instruments which will be calibrated externally at national accredited
laboratories is enclosed as Annexure-1.

6.2.1 Relay testing:


Protective relay testing is done for electrical equipments once in a year / once in two
years in staggered manner. The testing activities are planned along with preventive
maintenance schedule of the equipments in SAP system & the equipments for which
shutdown cannot be availed during normal running of Unit, are planned in Unit
Overhauling or in any major outage of the unit. Adherence to the planning schedule is
monitored by MTP department. On planning, the system respective area engineers
are taking permits from operation department through SAP system to monitor the
equipment conditions. On job completion the permits are returned to operation.

Dept.: ELECTRICAL MAINTENANCE


Doc. No.: EMD/PR/01
Rev. No.: 03

Doc. Title : Dept. System


Procedure for EMD

SIMHADRI
Date : 03.12.2012
Sheet : 05 of 06

6.2.2 Energy meter Calibration:


Off-line energy meter calibration is being done for 400KV outgoing line energy
meters used in billing purpose as per PPA with Zera make 0.02 class accuracy
testing kit.
6.2.3. Error checking of meters:
Error checking of meters & transducers for generator related parameters in Electrical
Control Panel are carried out during overhauling of units as a part of overhauling
plan.
6.2.4 Internal calibration of Meters:
The meters, other than substandard meters which are required for testing &
calibration purpose, are calibrated with respect to substandard meters. The list of
instruments which will be calibrated internally is enclosed as Annexure-1.

6.2.5 External Calibration of meters.

Sub-standard meters are sent to national accredited laboratories for calibration


purpose.
6.3 Maintenance resource planning:
6.3.1 Procurement of spares and consumables:
1) Planning of spares and consumables
required.
2) Raising
purchase
requisitions in SAP.
3) Technical evaluation of offers furnished by
parties/vendors.
4) Inspection & verification of received
materials.
5) Issuing of materials
central stores.

from

Dept.: ELECTRICAL MAINTENANCE


Doc. No.: EMD/PR/01
Rev. No.: 03

Doc. Title : Dept. System


Procedure for EMD

SIMHADRI
Date : 03.12.2012
Sheet : 06 of 06

6.3.2 Work Contracts:


All maintenance jobs are carried out on Contract basis.
The following activities are carried out by area in charge to ensure timely award of
contracts & their execution.
1) Preparation of work contract proposals & estimates.
2) Technical evaluation of bids for contracts.
3) Execution of maintenance contracts awarded, complying the statuary
and other requirements.
4) Submission of contract closing report.
6.4 Work environment:
Cleanliness of work place, proper illumination, ventilation, house keeping are
taken care off with the help of concerned department / sections.

6.5 Safety & statutory regulations;


Maintenance jobs are carried out taking all necessary safety precautions as per
site requirement.
HOD (EM), sectional heads, area in charges and area engineers are responsible for
carrying out the work safely.

Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Preventive
Maintenance

Doc. No.: EMD/PC/01


Rev. No.: 03

SIMHADRI
Date : 03.12.2012
Sheet : 01 of 02

1. OBJECTIVE
To carryout preventive maintenance of electrical equipment so as to ensure and increase
the availability of the equipment.
2. BOUNDARY
Preparation of maintenance schedule to carry out maintenance.
3. REFERENCES
Procedure
Work Instructions as per the list enclosed.
SAP
4. PROCESS OWNER
Sl.No

Description

Responsibility

Over all performance

HOD (EM)

Preventive Maintenance of Electrical Equipments.

Area Engrs

5. RECORDS
As per the list enclosed.
6. PROCESS MAP
6.1 PROCESS INPUTS
Sl.No

Input

Source

Frequency

Reference

Review Criteria

6.1.1

PM WOC

MTP

As indicated by

SAP

% of PM WOC

area engineer
6.1.2

PM WOC

MTP

As indicated
by area
engineer

attended.
SAP

% Availability
of the Critical
equipment

Doc. No.: EMD/PC/01


Rev. No.: 03

Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Preventive
Maintenance

SIMHADRI
Date : 03.12.2012
Sheet : 02 of 02

6.2 KEY ACTIVITY AND INTERFACES


Sl.No

Activity

Responsibility

Reference
Document/format

6.2.1

Preparation of Maintenance

Area engineer

Schedules
6.2.2

Implementation of

MTP

PM Schedules
6.2.3

Follow up of PM

Sectional heads

Schedules and WOC


6.2.4

6.2.5

Isolations and normalizations

Work execution

Operation

PTW /LWC as

department

per SAP

Area engineer

6.3 PROCESS OUTPUT

Sl.No

Output

To

Reference
Document /

6.3.1

Availability of equipment

Sectional heads

6.5 PROCESS MEASURES


1. % of WOC = WOC attended / WOC raised

format

Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Break down
Maintenance

Doc. No.: EMD/PC/02


Rev. No.: 03

SIMHADRI
Date : 03.12.2012
Sheet : 01 of 03

1. OBJECTIVE :
To carryout breakdown maintenance of electrical equipment ( 4 X 500MW) so as to
reduce the down time and make the equipment available. Break down maintenance
is being carried out as per the SAP notifications raised by operation , electrical
maintenance or any other department. Breakdown maintenance jobs are planned by
MTP as per the schedules given by the area engineers for A and C priority jobs. E
priority jobs are carried out immediately by the area engineer.
2. BOUNDARY:
Application
equipment.

for

breakdown

maintenance

of

electrical

3. REFERENCES
Past experience.
O&M Manuals.
4. PROCESS OWNER
Sl.No

Description

Responsibility

Over all responsible

HOD (EM)

Breakdown Maintenance of Electrical Eqpts

Sectional Heads /
Area engineers

5. RECOR
DS SAP

Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Break down
Maintenance

Doc. No.: EMD/PC/02


Rev. No.: 03

SIMHADRI
Date : 03.12.2012
Sheet : 02 of 03

6. PROCESS MAP
6.1 PROCESS INPUTS
Sl.No

Input

Source

Review Criteria

6.1.1

Defect observed

Daily inspection by

BD WOC attended.

/ reported

maintenance personnel or

BD WOC

operation
SAP

6.1.2

BD WOC attended.

6.2 ACTIVITY AND INTERFACES


Sl.No

Activity

Responsibility

Reference
Doc

6.2.1

Identifying the problem,


attending the problem
and making the
equipment available.

Area engineer

Past experience,
O&M Instruction
Manual.

6.3 PROCESS OUTPUT


Sl.No

Output

To

6.3.1

Availability of the equipment.

Sectional heads

Reference Doc

Doc. No.: EMD/PC/02


Rev. No.: 03

Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Break down
Maintenance

SIMHADRI
Date : 03.12.2012
Sheet : 03 of 03

6.4 PROCESS MONITORING


Sl.No

Monitoring

Responsibility

Stage /

Reference Doc

Frequency
1

BD WOC raised

Area engineers

SOS

Not Applicable

Loss of generation due


to non availability of the
equipment.

Area engineers

As and when

Not Applicable

No. of Unit trips due to


electrical equipment

Sectional

As and when

heads

required

, attended
2

required

6.5 PROCESS MEASURES

1. % of WOC = WOC attended / WOC raised


2. Loss of generation due to non availability of the equipment.
3. No. of unit trips due to electrical equipment.

Not Applicable

Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Predictive
Maintenance of Electrical
Equipments

Doc. No.: EMD/PC/03


Rev. No.: 03

SIMHADRI
Date : 03.12.2012
Sheet : 01 of 03

1.OBJECTIVE
To carryout predictive (diagnostic) maintenance of electrical equipment ( 4 X 500MW
) for finding out abnormality in the equipment so that timely action can be taken to
avoid breakdowns. These type of Maintenance jobs are planned and carried out
by area engineers.
2. BOUNDARY
Application
equipment.

for

predictive

maintenance

of

electrical

3. REFERENCES

Procedure
Work
Instructions SAP

4. PROCESS OWNER
Sl.No

Description

Responsibility

Over all responsible

HOD (EM)

Predictive Maintenance of Electrical Eqpts

Sectional Heads

5. RECOR
DS SAP

Doc. No.: EMD/PC/03


Rev. No.: 03

Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Predictive
Maintenance of Electrical
Equipments

SIMHADRI
Date : 03.12.2012
Sheet : 02 of 03

6. PROCESS MAP
6.1 PROCESS INPUTS
Sl.No

Input

Source

Frequency

Reference

Review
Criteria

6.1.1

Predictive

SAP

As

NIL

Break down

maintenance

indicated by

of

schedules

area

equipments

engineer
6.2 ACTIVITY AND INTERFACES
Sl.No

Activity

Responsibility

Reference
Doc

6.2.1

Preparation of predictive

Area engineer

Maintenance Schedules
6.2.2

Implementation of

Area Engineer

predictive maintenance
6.2.3

Schedules
Follow up

Sectional heads

6.2.4

Isolations and normalizations

Operation

if applicable

department

Work execution

Area engineer

6.2.5

Doc. No.: EMD/PC/03


Rev. No.: 03

Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Predictive
Maintenance of Electrical
Equipments

SIMHADRI
Date : 03.12.2012
Sheet : 03 of 03

6.3 PROCESS OUTPUT

Sl.No

Output

To

Reference Doc

6.3.1

No. of breakdowns prevented

Sectional heads

due to predictive maintenance

6.4 PROCESS MONITORING

Sl.No

Monitoring

Responsibility

Stage /
Frequency

Predictive maintenance
WOC attended

Area engineers

As per the
schedule
in SAP

6.5 PROCESS MEASURES


1. Cumulative no. of unit tripping due to electrical equipment

Reference Doc

Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Recording of various
parameters of Generator

Doc. No.: EMD / WI /001


Rev. No.: 02

1.

SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02

PURPOSE

Parameter recording of Generator and finding out any abnormalities.


2.

REFERENCES

SUPPLIER MANUALS

3.

RESPONSIBILITY

Area engineer
4.

RESOURCES REQUIRED

SL

RESOURCE

DESCRIPTION

NO
1

MAN POWER

TOOLS & TACKLES

PERSONAL PROTECTION
EQUIPMENT

Approved By: HOD

ENGINEER-1, TECHNICIAN-1
FOR TWO HOURS.
Not Required
Safety Helmet and safety shoe

Name :
M.V.S.PRABHAKAR

Signature :

Doc. No.: EMD / WI /001


Rev. No.: 02

5.

Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Recording of various
parameters of Generator

SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02

RECORDS
SL NO
1

DESCRIPTION Location
CHECK

LIST Sankalp

FORMAT/

RETENTION

FORM NO.

PERIOD

EMD/FORM/001 01 Year

OF
GENERATOR
PARAMETERS
RECORD
BOOK

6.

INSTRUCTIONS

6.1 Take the EMD/FORM/001 for recording the parameters.


6.2 Go to the Units and record generator parameters from UCB/ Local in
EMD/FORM/001 .
6.3 Check for any abnormality in the parameters and take necessary
Corrective action .

SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /005 Doc. Title : Maintenance of Paddle Date : 15.03.2008
Rev. No.: 02
Sheet : 01 of 03
Feeders
1. PURPOSE

To carryout quarterly maintenance of Paddle feeders in CHP


2. REFERENCES

SUPPLIER MANUALS

3. RESPONSIBILITY

Area engineer
4. RESOURCES REQUIRED

SL
NO
1

RESOURCE
MAN POWER

DESCRIPTION
TECHNICIAN 1, HELPER 01.
AIR BLOWER, SPANNER SET, SCREW
DRIVER SET, HAIR BRUSH, CLEANING

TOOLS & TACKLES

AGENT, MEGGER.

PERSONAL
3

PROTECTION
EQUIPMENT

Safety helmet and safety shoe

SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /005 Doc. Title : Maintenance of Paddle Date : 15.03.2008
Rev. No.: 02
Sheet : 02 of 03
Feeders
5. RECORDS
SL

DESCRIPTION

Location

NO
1

History
for

Register CHP

FORMAT/

RETENTION

FORM NO.

PERIOD

EMD/REC/004

03 Years

Paddle

Feeders

6. INSTRUCTIONS
6.1
6.2
6.3

OBTAIN PTW.
CHECK FOR ISOLATION.
EXTERNALLY CLEAN THE PADDLE FEEDER OF ALL COAL PIECES AND DUST
ACCUMULATION COMPLETELY CLEAN THE CONTROL PANEL WITH AIR
BLOWER.

6.4
6.5

INSPECT THE MAIN CONTACTS OF MAIN CONTACTOR FOR PUMP CONTROL


REPLACE WORN OUT MOVING / FIXED CONTACTS IF ANY OR CLEAN THE
CONTACTS WITH PETROL AND CLOTH. NEVER USE EMERY PAPER FOR
CONTACT CLEANING.

6.6
6.7

CLEAN OTHER CONTACTORS WITH HAIR BRUSH & PETROL.


INCASE OF DUST ACCUMULATION OVER CONTROL CARDS CLEAN THEM BY
BLOWING AIR.

SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /005 Doc. Title : Maintenance of Paddle Date : 15.03.2008
Rev. No.: 02
Sheet : 03 of 03
Feeders

6.8

CHECK TIGHTNESS OF ALL CONNECTIONS AT CONTACTORS AND TERMINAL


BLOCK.

6.9

CHECK FOR CORRECT SETTING OF ALL OVERLOAD RELAYS.

6.10

THE COVER OF BOX HOUSING THE MAIN HYDRAULIC MOTOR


/PUMP ASSEMBLY.

6.11

CHECK CONNECTION TIGHTNESS OF MAIN MOTOR TERMINAL BOX,


FOUNDATION BOLTS AFTER CLEANING MOTOR OBSERVE FOR ANY SIGN OF
OVERHEATING IN MOTOR TERMINAL BOX.

6.12

CLEAN THE SLIP RING ASSEMBLY OF PCRD & CCRD AND CHECK FOR PROPER
CLAMPING OF THE CABLE.

6.13

CHECK TIGHTNESS OF ALL CABLE CONNECTION IN CCRD / PCRD,


HEALTHINESS OF BRASS RINGS AND CARBON BRUSHES.

6.14

CLEAN THE MOTORS FOR CCRD/PCRD

6.15

CLEAN THE TRAVEL MOTOR & CHECK CONNECTION TIGHTNESS.

6.16

MEASURE INSULATION RESISTANCE OF MOTOR OF HYDRAULIC PUMP.

6.17

CHECK FOR ANY JAMMING IN PUSH BUTTONS / SWITCHES

6.18

CHECK ALL INDICATING LAMPS.

6.19

CHECK THE CENTRE JUNCTION BOX AND CLEAN THE JUNCTION BOX AND
CHECK THE CONNECTION TIGHTNESS

6.20

RECORD THE OBSERVATIONS IN EMD / REC/004.

Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /006
Rev. No.: 02

Doc. Title : PM OF CHP


MOTORS

SIMHADRI

Date : 15.03.2008
Sheet : 01 of 02

1. PURPOSE
To carryout preventive maintenance of CHP area motors as per SAP Schedule.
2. REFERENCES
SUPPLIER
MANUALS

3. RESPONSIBILITY
Area engineer

4. RESOURCES REQUIRED

SL
NO
1

RESOURCE
MAN POWER

DESCRIPTION
TECHNICIAN 1, HELPER 01.
SPANNER SET, CRC 226, SCREW

TOOLS & TACKLES

PERSONAL PROTECTION
EQUIPMENT

DRIVER SET .

Safety helmet safety Shoe.

Dept.: ELECTRICAL MAINTENANCE


Doc. No.: EMD / WI /006
Rev. No.: 02

Doc. Title : PM OF CHP MOTORS

SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02

5. RECORDS
SL

DESCRIPTION

Location

NO
1

History Register for CHP

FORMAT/ FORM RETENTION


NO.

PERIOD

EMD/REC/005

03 Years

Motor Maintenance

6. INSTRUCTIONS
6.1
6.2

Obtain PTW.
Clean the motor body and open motor T.B cover and discharge the power
termination.

6.3
6.4

Check termination tightness and clean T.B.


If any problem like cable burning or T.B damage is noticed inform engineer incharge and attend the defect. damaged T.B should be replaced and retermination of power cable should be done if any heating in termination is
observed.

6.5

Check and ensure double earthing of motor body and ensure tightness.

6.6

Ensure proper glanding of power cable and seal extra gland holes if any.

6.7

Close the T.B cover and seal if required.

6.8

Measure the IR value of the motor & also winding resistance.

6.9

Open fan cover and clean before putting back the cover.

6.10

Clear PTW.

6.11

Record the observations in EMD/REC/005

Dept.: ELECTRICAL MAINTENANCE


Doc. No.: EMD / WI /008
Rev. No.: 02

SIMHADRI

Doc. Title : Calibration of Generation


related meters in ECP

Date : 15.03.2008
Sheet : 01 of 02

1. PURPOSE
Calibration of Generation related Transducer along with indication meters in
Electrical Control Panel (ECP).
2. References :
Manuals and drawings of BHEL on ECP
3. RESPONSIBILTY
Electrical Lab in-charge
4. Resources required
Sl
No
1

Resources

Description

Manpower

1 Engineer + 1 Technician+1 Skilled Man

Tools and tackles

1.
2.
3.
4.
5.
6.
7.

Personnel protective equipment

Three phase voltage, current


source.
Multimeter
Testing leads.
Screw driver set.
Testing pins.
Calculator
3 phase Power Meter

Safety shoe

4. Records
Sl
Description
No.
1
Transducer Calibration

Approved By: HOD

Location

Format Number

Retention Period

Electrical
Laboratory

EMD/FORM/009

3 Years

Name : MVS Prabhakar

Signature :

Dept.: ELECTRICAL MAINTENANCE


Doc. No.: EMD / WI /008
Rev. No.: 02

Doc. Title : Calibration 0f


Generation related meters in
ECP

SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02

6.1 Instructions
6.2 Ensure availability of PTW
6.3 Find out the applicable current & voltage terminals at the terminal block for
the selected transducer from the drawing.
6.4 The current terminals shall be shorted at the terminal block towards
Current transformer side.
6.5 Disconnect the current & voltage input terminals in the transducer
without disturbing the other circuit connections.
6.6 Connect the Power meter in between the Current & voltage injector
source & the transducer.
6.7 Inject the required current & voltage inputs to transducer input terminal
with the help of current/voltage source.
6.8 Check the output of the transducers. If the transducer reading is not
matching with the theoretical output, replace the transducer or adjust to get
the required output.
6.9 After ensuring healthiness of the transducer, check the power meter
indication readings with the ECP indication meters reading
6.10
Adjust the ECP indication meters if required.
6.11

Record all the parameters in the format.

6.12

Normalize the connections Including Current Transformer connections.

6.13

Arrange for cancellation of PTW.

Approved By: HOD

Name : C.MALAKONDAIAH

Signature :

Dept.: ELECTRICAL MAINTENANCE


Doc. No.: EMD / WI /009
Rev. No.: 02

1.

Doc. Title : Maintenance of 11/3.3KV


and 11/0.415 KV Transformer

SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02

PURPOSE
Preventive Maintenance (PM) of 11/3.3KV, 11/0.415KV Transformers as per
SAP schedule.

2.

References
Manuals of BHEL/CGL/Bharat Bijlee / Voltamp

3.

RESPONSIBILITY
Area Engineer

4.

Resources required
Sl .
No
1
2
3

5.

Resources

Description

Manpower

2 Technician+ 2 Skilled +1Skilled

Tools and tackles

Spanner set, Screw driver, Torque


wrench, Megger, Multimeter
As per requirement.

Spares
Records

Sl. Description
No.
1
Check list for
transformer
48weekly
PM
2
Check
list for UAT
48weekly PM

Location

Format Number

Retention Period

Sankalp EMD
Office

EMD/FORM/014

3 Years

Sankalp EMD
Office

EMD/FORM/014A 3 Years

Doc. No.: EMD/ WI /009


Rev. No.: 02

Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Maintenance of
11/3.3KV and 11/0.415 KV
Transformer

SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02

6.1 Instructions
6.2
6.3
6.4
6.5

Ensure availability for PTW.


Identify the transformer correctly.
Ensure isolation from up stream and down stream switchgear.
Identify the Marshalling Box A/C supply and isolate it.

6.6 Follow each and every step in line with transformer PM format
EMD/FORM/014.
6.7 Box up the transformer LV/HV compartments on completion of job.
6.8 Normalise chamber Marshalling Box AC supply.

Doc. No.: EMD / WI /011


Rev. No.: 02

1.

Dept.: ELECTRICAL
MAINTENANCE
Doc. Title: Transformer oil
sampling

SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02

PURPOSE
Transformer oil sampling for detailed analysis as per requirement

2.

References Previous
Experience
3.

RESPONSIBILITY
Area Engineer

4.

Resources required

Sl No
1

Resources
Manpower
Tools and tackles

2
3

5.

Personnel protective equipment

Description
1 Technician. 1 Skilled Man
Steel sampling bottles, set of
spanners, cotton waste, sampling
attachment, bucket
Safety Shoe and safety helmet

Records
Sl Description
Location
No.
Sankalp
1
Record of oil
Samples in data base EMD Office

Format
Number
EMD/FORM/016

Retention
Period
03 years

Doc. No.: EMD / WI /011


Rev. No.: 02

Dept.: ELECTRICAL
MAINTENANCE
Doc. Title: Transformer oil
sampling

SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02

6.0 Instructions

6.9

6.1.

Ensure availability of LWC.

6.2
6.3

Open the dummy flange and clean the sampling area.


Connect the sampling arrangement to the flange and also to the sampling bottle.

6.4

Open the sampling valve slowly and allow oil to flow freely through the bottle.

6.5

Close the valve.

6.6

Rinse the bottle thoroughly with the oil in the bottle.

6.7

Repeat the process two times.

6.8

The waste oil is to be collected in a bucket for proper disposal.

Collect the oil for final sampling with the non connected end of the bottle in 16
degree upward position.
6.10
Allow oil to flow freely to ensure that there is no entrapped air bubbles.
6.11

Close both the valves of the steel bottle.

6.12

Now the sampling valve can be closed.

6.13

Normalize all connections.

The date, transformer ID and oil temperature of the transformer. are to be


pasted on the steel bottle.
6.14
Arrange for returning of LWC.

6.13

Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Maintenance of
Electrolyser of Hydrogen
Plant

Doc. No.: EMD / WI /013


Rev. No.: 02

1.

SIMHADRI
Date :15.03.2008
Sheet : 01 of 02

PURPOSE
To carry out maintenance of the electrolyser as per SAP.

2.

References
Manufacturers manual
3.

RESPONSIBILITY
Hydrogen Plant In-Charge

4.
Sl
No
1

Resources required
Resources
Manpower
Tools and tackles

2
Personnel protective equipment
3

5.

1 Electrician + 1 Helper
1. Digital multimeter.
2. Plastic bottle.
3. Hydrometer with aspirator.
4. Thermometer.
5. Measuring Cylinder
1. Gum Boots
2. Face Mask
3. Apron
4. Plastic hand Gloves

Records

Sl Description
No.
1
Lye replacement
2

Description

Check list

Location

Format Number

Hydrogen
Plant
Hydrogen
Plant

EMD/FORM/018

Retention
Period
3 year

EMD/FORM/019

3 year

Doc. No.: EMD / WI /013


Rev. No.: 02

Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Maintenance of
Electrolyser of Hydrogen
Plant

SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02

6.1 Instructions
6.2 Ensure availability of PTW
6.3 Do not touch the live part of the electrolyser.
6.4 Check gas, Water and electrolyte leakage from the electrolyser.
6.5 Check and record the concentration and specific gravity of the

electrolyte.
6.6 Fill the details given in the check list formats.
6.7 Arrange for cancellation of PTW.

Doc. No.: EMD / WI /014


Rev. No.: 02

1.

Dept.: ELECTRICAL
MAINTENANCE
Doc. Title: Over Hauling of LT
MCC

SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02

PURPOSE
Carry out of Overhaul maintenance of LT MCC.

2.

REFERENCES :
C&S switchgear maintenance manual, breaker maintenance manual, past
experience.

3.

RESPONSIBILITY
Area Engineer

4.

5.

RESOURCES REQUIRED
SL.NO
1

RESOURCE
Manpower

Tools & Tackles

Personal Protection
Equipment

DESCRIPTION
1 Engineer + 2 Technician + 2 Skilled
workmen
Ring Spanner set, D Spanner set,
Screw driver(Heavy duty), Screw
driver(Light duty), Combination pliers,
Ratchet spanner set, Air Blower,
Brushes of various sizes, PVC
insulation
tape,
Cleaners,
Rust
removers/preventers,
Megger,
Multimeter, Markin cloth, Jute.
Safety Helmet and safety shoe

RECORDS
Sl.
No
1

Description

Location

Form No.

LT Switch gear
checklist

Sankalp
EMD Office

EMD/FORM/020

Retention
Period
5 Years

Doc. No.: EMD / WI /014


Rev. No.: 02

6.

Dept.: ELECTRICAL
MAINTENANCE
Doc.Title : Over Hauling of LT
MCC

SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02

INSTRUCTIONS

6.1.

Ensure availability of PTW.

6.2. Check all the necessary isolations and locking of Incomers and tie feeders.
6.3. Carry out the work and record all the observations as per the
format of check sheet.
6.4. Return the PTW

SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /015 Doc.Title: Preventive maintenance Date : 15.03.2008
Rev. No.: 01
Sheet : 01 of 02
of LT Motor

1. PURPOSE
Preventive Maintenance of LT Motor as per SAP schedule.
2. REFERENCES :
Motor manufacturers recommendations and past experience.
3. RESPONSIBILITY
Area engineer
4. RESOURCES REQUIRED
SL.NO
1

RESOURCE
Manpower

Tools & Tackles

Personal Protection
Equipment

DESCRIPTION
1 Engineer + 1 Technician + 1 Skilled
workmen
Spanner set, Screw driver, Ratchet
spanner set, Air Blower, Cleaning
Brushes,
Cleaning
solvent/agent,
Megger, Motor checker, Markin cloth,
Jute etc., as per the requirement
Safety Shoe and safety helmet

5. RECORDS
Sl.
No
1

Description

Location

LT Motor check list

Sankalp
EMD Office

Form No.
EMD/FORM/021

Retention
Period
3 Years

SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /015 Doc.Title: Preventive maintenance Date : 15.03.2008
Rev. No.: 02
Sheet : 02 of 02
of LT Motor

6. INSTRUCTIONS

6.1. Ensure availability of PTW.


6.2.

Ensure proper isolation.

6.3.

Carry out the work as per the check sheet and record the readings and
observations in check sheet.

6.4.

Return the PTW for cancellation.

Doc. No.: EMD / WI /016


Rev. No.: 02

SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Date : 15.03.2008
Doc.Title: Monthly Preventive
Sheet
: 01 of 02
maintenance of Batteries(Ni-Cd)

1. PURPOSE
To carry out monthly preventive maintenance of batteries ( Ni-CD )
2. References
Manuals of HBL- NIFE batteries and AMCO batteries.
3. RESPONSIBILITY
Area engineer
4. Resources required

Sl No
2

Manpower
Tools and tackles

Description
1 skilled workmen+1 unskill workmen.
Spanners multi- meter, pliers, screw dri

Personnel protective equipment

Gloves.

Resources

5.RECORDS

Sl.
No
1

Description

Location

Battery
Readings

Switchyard

Form No.
EMD/REC/006

Retention
Period
1 Year

Doc. No.: EMD / WI /016


Rev. No.: 02

Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Monthly Preventive
Maintenance of Batteries(Ni-Cd)

SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02

6 .0 Instructions
6.1

The work is to be carried out on monthly basis on each battery set as per the
instruction of the area engineer.

6.2

Sulphation at any cell terminals are to be removed with Insulated scrapper and
then tightness of all cell terminals to be ensured with insulated spanners.

6.3

Petroleum jelly is to be applied at cell terminals at required quantity so that a thin


layer of coating is formed over the cell terminals.

6.4

Outer surface of all the cells in the battery sets are to be cleaned with dry markin
cloth.

6.5

Reading of individual cell voltages shall be taken.

6.6 Any abnormality observed on battery set while performing the Work shall be
informed to the area engineer.

Doc. No.: EMD / WI /018


Rev. No.: 02

Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Cathodic Protection
Checking

SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02

1. PURPOSE
To Carryout Monthly Pipe to Soil Potential (PSP) reading for Cathodic
Protection system.
2. References
Supplier
Manuals
3. RESPONSIBILITY
Area engineer
4. Resources Required
Sl
No
1

Resource

Description

Man Power

Tools & Tackles

Personnel Protection
Equipment

Supervisor-1,Electrician-1,Helper1
Multimeter, Testing Electrode,
Panel key, Grease
Safety Shoe

5. Records
Sl.
No
1

Description

Location

Cathodic
Protection
Checking

Switchyard

Form No.
EMD/FORM/023

Retention
Period
3 Years

Doc. No.: EMD / WI /018


Rev. No.: 02

Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Cathodic Protection
Checking

SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02

6.0 Instructions
Necessary information to be given to the Operator Present at the
Location.
6.2 Record the Readings at TR Unit-1
6.3 Record the Readings at TR Unit-2
6.4 Record the Readings at all TLP Points
6.5 Ensure the readings between ( - ) 0.85 & ( - ) 1.2 Volts
6.6 Incase the recorded values are not in the range mentioned above, adjust
the Potentiometer/ Variac to adjust the impress Current at TR Units.

Doc. No.: EMD / WI /019


Rev. No.: 02

1.

Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Calibration of Energy
Meters

SIMHADRI
Date : 15.03.2008
Sheet : 01 of 03

PURPOSE
To carry out calibration of 0.2 class commercial energy meters installed
in the 400 KV out going lines as per PPA agreement.

2.

REFERENCES
Power Purchase Agreement
Energy meter Manual
Instruction manual for 0.02 Class ZERA testing Kit

3.

RESPONSIBILITY
Switchyard Area Engineer

4.

RESOURCES REQUIRED

SL.NO
1

RESOURCE
Manpower

Tools & Tackles

Personal Protection Equipment

DESCRIPTION
1 Engineer + 1 Technician + 1 Skilled
workmen
Screw drivers , 1-ph 230 V ac supply
, Off-line accuracy checking kit 0.02
Class (Zera)
Not applicable

Doc. No.: EMD / WI /019


Rev. No.: 02

5.

SIMHADRI
Date : 15.03.2008
Sheet : 02 of 03

RECORDS
Sl.
No
1
2

6.

Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Calibration of Energy
Meters

Description

Location

Form No.

Energy meter Test


Reports
Computed Energy
Statement

Switchyard

EMD/FORM-24

Retention
Period
5 Years

Switchyard

EMD/FORM-25

2 Years

INSTRUCTIONS
6.1

Obtain proper PTW from Switchyard SCE

6.2

Ensure the presence of representative from APTRANSCO (interested party).


Each out going line is having two 0.2 class static energy meters. One is called
as main meter and the other as check meter. If the meter under test is main
meter , then the substitute meter will be corresponding check meter of that
particular feeder.
Note down the initial readings of the substitute meter and Meter under test
(MUT) in the form EMD/FORM/025. Short the CT secondary terminals and
remove the voltage links at the energy meter TTB for MUT. Set up the testing
kit and check the functionality of the kit . Inject the voltage and current as per
the EMD/FORM/024 and record the errors obtained . If the errors obtained
are within specified limits i.e 0.2% then the meter can be put back in to
service . Otherwise put new tested spare meter in to service in place of failed
meter.
Put back the meter and normalize the CT , PT connections . Note down the
final readings of the substitute meter and MUT in EMD/FORM/025.

Doc. No.: EMD / WI /019


Rev. No.: 02

Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Calibration of Energy
Meters

SIMHADRI
Date : 15.03.2008
Sheet : 03 of 03

Make the computed energy statement as per the EMD/FORM/025. Get the
computed energy statement and test report signed by APTRANSCO
representative. Inform the switchyard SCE about the computed energy. Cancel
the PTW.

Doc. No.: EMD / WI /023


Rev. No.: 02

Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: 400 KV CT Annual /
Bi Annual maintenance

SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02

1. PURPOSE
To carry out the annual / bi annual maintenance of 400 KV Current
Transformer .
2. REFERENCES
400 KV CT Instruction manual.
3. RESPONSIBILITY
Switchyard Engineer
4. RESOURCES REQUIRED
SL.NO
1

RESOURCE
Manpower

Tools & Tackles

Personal Protection Equipment

DESCRIPTION
1 Engineer + 1 Technician + 2
skilled workmen + 2 unskilled
workmen.
Multimeter , screw drivers , Nitrogen
Filling hose , pressure gauge.
Safety Shoe , Safety Belt and safety
helmet.

5. RECORDS
Sl.
No
1

Description

Location

Form No.

400 KV CT History
Register

Switchyard

EMD/REC/010

Retention
Period
10 Years

Doc. No.: EMD / WI /023


Rev. No.: 02

Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: 400 KV CT Annual /
Bi Annual maintenance

SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02

6.1 INSTRUCTIONS
6.2 Obtain PTW from Switchyard SCE.
6.3 Ensure the proper isolation and earthing of the equipment under PTW.
6.4 Open the CT secondary terminal box and ensure that no water ingress is there.
If water ingress is observed, analyze the cause and attend the same.
6.5 Check the CT secondary terminal tightness in secondary terminal box, CT
JB and in Control and Relay panels.
6.6 Clean the porcelain bushings and check for any cracks.
6.7 Check the secondary terminal board, primary terminals and top chamber
cover for any oil leakages.
6.8 Check the oil level in the top view glass.
6.9 Check the nitrogen pressure and top up the nitrogen if required up to 5 psi.
6.10 Check the Capacitance and Tandelta values of the CT and record the same
in the CT History register. If the Tandelta value is >0.7% or Capacitance
value is
>1000pF then plan for the replacement of the CT at the earliest.
6.11Ensure the tightness of P.F terminal earthing connection after Capacitance
and tandelta measurement.
6.12Check the tightness of primary connections.
6.13Record any abnormalities and activities done in the history
register EMD/REC/010
6.14Apply RTV sealant to the CT secondary terminal box for ensuring
proper sealing of the box.
6.15Cancel the PTW

Doc. No.: EMD / WI /024


Rev. No.: 02

1.

SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: 400 KV CVT Annual / Bi Date : 15.03.2008
Sheet : 01 of 02
Annual maintenance

PURPOSE
To carry out the annual/ Bi annual maintenance of 400 KV Capacitive Voltage
Transformer (CVT).

2.

REFERENCES
400 KV CVT Instruction manual.

3.

RESPONSIBILITY
Switchyard Area engineer

4.

RESOURCES REQUIRED

SL.NO
1

RESOURCE
Manpower

Tools & Tackles

Personal Protection Equipment

DESCRIPTION
1 Engineer+ 1 Technician +
2
skilled workmen + 2 unskilled
workmen.
Multimeter , screw drivers , Nitrogen
Filling hose , pressure gauge.
Safety Shoe and safety helmet.

5. RECORDS
Sl.
No
1

Description

Location

Form No.

400 KV CVT History


Register

Switchyard

EMD/REC/011

Retention
Period
10 Years

Doc. No.: EMD / WI /024


Rev. No.: 02

SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: 400 KV CVT Annual / Bi Date : 15.03.2008
Sheet : 02 of 02
Annual maintenance

6.1 INSTRUCTIONS
6.2 Obtain PTW from Switchyard SCE.
6.3 Ensure the proper isolation and earthing of the equipment under PTW .
6.4 Open the CVT secondary terminal box and ensure that no water ingress is there.
If water ingress is observed , analyse the cause and attend the same .
6.5 Check the CVT secondary terminal tightness in secondary terminal box , CVT
JB and in Control and Relay panels.
6.6 Clean the porcelain bushings and check for any cracks.
6.7 Check the secondary terminal box and HF link chamber for any oil leakages
and attend the same .
6.8 Check the oil level in the view glass and top up if required .
6.9 Check the nitrogen pressure and top up the nitrogen if required up to 5 psi.
6.10Check the tightness of primary connections .
6.11Check the Capacitance and Tandelta values of the CVT and record the same
in the CT History register. If the Tandelta value is >0.7% then plan for the
replacement of the CVT at the earliest.
6.12Ensure the tightness of P.F terminal earthing connection after Capacitance
and tandelta measurement.
6.13Cancel the PTW
6.14Measure the secondary voltages after the energisation of CVT

and record

the values in the history register EMD/REC/011.


6.15Record the abnormalities found ,corrective actions taken and activities
done during the maintenance in the history register EMD/REC/011

Doc. No.: EMD / WI /025


Rev. No.: 02

Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: 400 KV Lightening
Arrestor Annual / Bi Annual
Maintenance

SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02

1. PURPOSE
To carry out the annual / Bi annual maintenance of 400 KV Lightening
Arrestor (LA).
2. REFERENCES
400 KV LA Instruction manual.
3. RESPONSIBILITY
Switchyard Area Engineer
4. RESOURCES REQUIRED
SL.NO
1

RESOURCE
Manpower

Tools & Tackles

Personal Protection Equipment

DESCRIPTION
1 Technician + 1 skilled workmen + 2
unskilled workmen.
Multimeter , screw drivers , Leakage
Current Monitor (LCM-II) kit , 1-phase
variac.
Safety Shoe and safety helmet.

5. RECORDS
Sl.
No
1

Description

Location

Form No.

400 KV LA History
Register

Switchyard

EMD/REC/012

Retention
Period
10 Years

Doc. No.: EMD / WI /025


Rev. No.: 02

Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: 400 KV Lightening
Arrestor Annual / Bi Annual
Maintenance

SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02

6.1 INSTRUCTIONS
6.2 Obtain PTW from Switchyard SCE.
6.3 Ensure the proper isolation and earthing of the equipment under PTW .
6.4 Clean the LA stacks and inspect for any cracks or damages in the
porcelain stacks.
6.5 Check the healthiness of the operation counter by applying 1-phase voltage
to the counter.
6.6 Cancel the PTW
6.7 Take LA into service.
6.8 Measure the LA leakage currents (both capacitive and resistive
components) On monthly basis with the LCM-II kit and record the values in
the LA history register EMD/ REC/012.

Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /027 Doc.Title: Annual / Bi Annual
Rev. No.: 02
Checking of 400 KV Bus bar
Protection Healthiness .

SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02

1. PURPOSE
To check the healthiness of 400 KV Bus bar protections Main 1 & Main 2 for
both 400 KV bus 1 and 2.
2. REFERENCES
Bus Bar Protection instruction manuals.
Bus Bar protection Schematic Drawings.
3. RESPONSIBILITY
Switchyard area engineer
4. RESOURCES REQUIRED
SL.NO
1

RESOURCE
Manpower

Tools & Tackles

Personal Protection Equipment

DESCRIPTION
1Engineer + 1 Technician +1 skilled
workmen.
Secondary injection kit , clamp on
meter , Multimeter , screw drivers.
Safety Shoe

5. RECORDS
Sl.
No
1

Description

Location

Form No.

Busbar protection
History register

400 KV
Switchyard

EMD/REC/014

Retention
Period
10 years

Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /027 Doc.Title: Annual / Bi Annual
Rev. No.: 02
Checking of 400 KV Bus bar
Protection Healthiness .

SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02

6.1 INSTRUCTIONS
6.2 Obtain PTW from Operation .
6.3 Ensure the proper isolation of the corresponding 400 KV Bus.
6.4 Inject the current in the secondary circuit of Main-1 protection and ensure
the operation of the relay . Check for the set values of alarm and trip and
actual operated values.
6.5 Inject the current in the secondary circuit of Main-2 protection and ensure
the operation of the relay . Check for the set values of alarm and trip and
actual operated values.
6.6 Inject the current in the secondary circuit of both Main-1 and Main-2
protection and check for the operation of bus bar trip relays (96) .Ensure
tripping of all the feeders connected to that particular bus.
6.7 Check the initiation of Bus bar to LBB protection for all the feeders connected
in that bus.
6.8 Check the alarm and event logger contacts.
6.9 Check the LBB to Bus bar initiation and ensure tripping of bus bar on
LBB initiation for all the feeders connected in that bus.
6.10Reset all the relays and ensure the changeover of all the LBB , Trip relay
contacts for all the feeders connected in that bus.
6.11Tighten all the connections .
6.12Record the set values and operated values of the currents and relays
operated in EMD/REC/014.
6.13Cancel the PTW and normalize the bus.

Doc. No.: EMD / WI /028


Rev. No.: 02

Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Annual / Bi Annual
Checking of 400 KV LINE
Protection .

SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02

1. PURPOSE
To check the healthiness of 400 KV line protections Main 1 & Main 2 and
carrier trippings for 400 KV Lines.
2. REFERENCES
Line distance protection instruction manuals.
Line protection Schematic Drawings .
Recommended Relay Settings for 400 KV Lines
3. RESPONSIBILITY
Switchyard Area Engineer
4. RESOURCES REQUIRED
SL.NO
1

RESOURCE
Manpower

Tools & Tackles

Personal Protection Equipment

DESCRIPTION
1Engineer + 1 Technician +1 skilled
workmen.
Distance
relays
testing
kit
,
Multimeter , screw drivers.
Safety Shoe

5. RECORDS
Sl.
No
1

Description

Location

Form No.

Line protection
History register

400 KV
Switchyard

EMD/REC/015

Retention
Period
05 years

Doc. No.: EMD / WI /028


Rev. No.: 02

Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Annual / Bi Annual
Checking of 400 KV LINE
Protection .

SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02

6.1 INSTRUCTIONS
6.2 Obtain PTW from Operation .
6.3 Ensure proper isolation of the line from both ends.
6.4 Isolate the Main-1 and Main-2 relays from yard side by opening the CT
/PT disconnecting links .
6.5 Setup the distance relay testing kit and give the CT /PT connections to the relay.
6.6 Inject the current and voltages as per the relay settings of Zone-1 ,2 , 3 etc
and ensure the operation of the relay for correct impedance and timings .
6.7 Ensure the carrier transmission as per the relay settings.
6.8 Check the operation of Auto re-close relay for single phase faults.
6.9 Check the operation of Over voltage relays and tee differential relays.
6.10

Check the carrier permissive and direct trippings . Check the

advancement of Tx/Rx counters for carrier send /receive and check event
logger contacts also.
6.10. Check the triggering of disturbance recorder and observe the waveforms .
6.11 Remove the kit connections and normalize the CT / PT connections .
6.12 Record the observations and relays operated in EMD/REC/015
6.13 Cancel the PTW and normalize the line.

Doc. No.: EMD / WI /029


Rev. No.: 02

Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Annual / Bi Annual
Checking of 400 KV Bay
Protection .

SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02

1. PURPOSE
To check the healthiness of 400 KV Switchyard bay protections Main 1 &
Main 2 , Interlocks and alarms .
2. REFERENCES
Bay protection Relays instruction Manual.
Bay protection Schematic Drawings .
Recommended relay Settings for 400 KV Switchyard .
3. RESPONSIBILITY

Switchyard Area engineer


4. RESOURCES REQUIRED
SL.NO
1

RESOURCE
Manpower

Tools & Tackles

Personal Protection Equipment

DESCRIPTION
1Engineer + 1 Technician +2 skilled
workmen.
Secondary injection kit , Multimeter ,
screw drivers.
Safety Shoe

5. RECORDS
Sl.
No
1

Description

Location

Form No.

400 KV Bay
protection History
register

400 KV
Switchyard

EMD/REC/016

Retention
Period
05 years

Doc. No.: EMD / WI /029


Rev. No.: 02

Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Annual / Bi Annual
Checking of 400 KV Bay
Protection .

SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02

6.1 INSTRUCTIONS
6.2 Obtain PTW from Operation .
6.3 Measure and record the spill currents of Main-1 and Main-2 protections .
6.4 Ensure proper isolation of the bay.
6.5 Check the bay protection Main-1 and Main-2 relays for their correct
operation with secondary injection kit . Ensure the changeover of the relay
aux. contacts.
6.6 Check the operation of the Master trip relay and ensure the tripping of the
breaker .
6.7 Check the correct operation of various breaker protection auxiliary relays
by Initiating the contacts from 400 KV breaker. Check the corresponding
alarms and event logger contacts.
6.8 Put back the Main-1 and Main-2 relays and normalize the connections.
6.9 Record the relays operated and observations in EMD/REC/016
6.10Cancel the PTW.

Doc. No.: EMD / WI /030


Rev. No.: 02

SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: HT MOTOR OVERHAULING Date : 15.03.2008
Sheet : 01 of 03

1. PURPOSE
Overhauling of HT motor 11/ 3.3 KV in the main plant and off site as & when
directed by MTP .
2. REFERENCES
Instruction manual for HT Motors .
3. RESPONSIBILITY
Area engineer
4. RESOURCES REQUIRED
SL.NO
1

RESOURCE
Manpower

Tools & Tackles

Personal Protection Equipment

DESCRIPTION
1Engineer + 1 Technician +2 skilled
workmen + 2 unskilled workmen + 1
Fitter + 1 rigger
Chain block , hook chuk , D-shackles
, slings , Inside & Outside micro
meter, Bearing Puller , spanner set ,
Alignment checker, Hydraulic Jack ,
0- 5 KV Megger.
Safety Shoe , Safety helmet.

5. RECORDS
Sl.
No
1

Description

Location

Form No.

HT Motors Mtc

Switchyard

EMD/REC/017

Retention
Period
5 years

Doc. No.: EMD / WI /030


Rev. No.: 02

SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: HT MOTOR OVERHAULING Date : 15.03.2008
Sheet : 02 of 03

6.1 . INSTRUCTIONS
6.2 Obtain PTW from Operation .
6.3 Ensure the proper isolation of the corresponding HT breaker and breaker
is isolated and panel is locked .
6.4 Open the motor T.B cover & discharge with earthing rod .
6.5 Open cable termination (power & CT cables) , earthing connection and
space heater connections.
6.6 Decouple the drive after noting down the alignment reading . Disconnect all
lube oil / cooling water lines ( Wherever applicable).
6.7 Dismantle and lift the rain hood wherever provided.
6.8 Lift and shift the motor with proper care to workshop or any other
suitable location.
6.9 Dismantle the motor coupling , fan, DE and NDE side end covers.
Take out the rotor.
6.10

Note down any abnormality in stator winding for over heating, condition of

stator wedges & slots , deposit of excess grease on stator over heating
portion , mechanical damage and crack in rotor , condition of bearings.
6.10. Clean the stator winding , rotor, bearings , end covers and all other dismantled
parts with proper cleaning agents . Clean heat exchanger tubes with nylon
brush.
6.11 Check bearing condition ,measure bearing clearances . Replace with new ones
if necessary .

Doc. No.: EMD / WI /030


Rev. No.: 02

SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: HT MOTOR OVERHAULING Date : 15.03.2008
Sheet : 03 of 03

6.12 Check the healthiness of space heaters .


6.13 Check varnishing of stator winding , rotor and apply new varnish if required.
6.14Ensure no foreign material inside , assemble the motor with proper care and
check for rotor freeness.
6.15Externally clean the motor surface & paint the motor with enamel painting with
existing shade .
6.16Measure bearing insulation at 100 V/260 V , stator winding insulation at 1 KV &
stator winding resistance.
6.17Clean motor base plate ( foundation ) & shift the motor back to the
foundation.
6.18Align the motor and check the alignment . Tight the foundation bolts and
terminate all the power & Control cables correctly . Connect all the lube oil
& cooling water pipes .
6.19 Check the IR of the motor along with power cable.
6.20Take the decoupled trial run and record no load current , vibration readings
in EMD/REC/017.
6.21 Couple the motor and fix the rain hood .
6.22 Cancel the PTW .

Doc. No.: EMD / WI /031


Rev. No.: 02

Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: HT Breaker OVERHAULING .

SIMHADRI
Date : 15.03.2008
Sheet : 01 of 03

1. PURPOSE
Overhauling of HT breaker 11/ 3.3 KV in the main plant and Ash handling
plant and off sites.
2. REFERENCES
Instruction manual for HT Breakers.
Past experience
3. RESPONSIBILITY
Area engineer
4. RESOURCES REQUIRED
SL.NO
1

RESOURCE
Manpower

Tools & Tackles

Personal Protection Equipment

DESCRIPTION
1Engineer + 1 Technician +2 skilled
workmen + 2 unskilled workmen.
0- 5 KV Megger, Contact resistance
meter , vacuum tester , timing kit ,
Multimeter, blower , spanner set ,
cleaning agents and grease.
Safety Shoe , Safety helmet.

5. RECORDS
Sl.
No
1

Description

Location

Form No.

HT Breaker Mtc

Switchyard

EMD/REC/018

Retention
Period
3 years

Doc. No.: EMD / WI /031


Rev. No.: 02

Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: HT Breaker OVERHAULING .

SIMHADRI
Date : 15.03.2008
Sheet : 02 of 03

6.1 INSTRUCTIONS
6.2 Obtain PTW from Operation .
6.3 Ensure the proper isolation of the corresponding HT breaker and Breaker is
kept in test position .
6.4 Clean the breaker thoroughly.
6.5 Check the tightness of all control cable terminations.
6.6 Inspect the healthiness of multi pin plug and replace if required .
6.7 Lubricate all moving parts .
6.8 Clean the isolating finger contacts.
6.9 Check the tightness of nut , bolts.
6.10

Inspect finger contacts for over heating , looseness and replace if necessary .

6.10. Perform close trip operation of the circuit breaker both manually and electrically
in test position .Measure close , open , Close-Open timings and adjust the
timings if required .
6.11 Measure the contact resistance and check the healthiness of vacuum
with vacuum tester.
6.12 Check the healthiness of all indicating lamps , aux.switches.
6.13 Check the electrical and mechanical interlocks.

Doc. No.: EMD / WI /031


Rev. No.: 03

Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: HT Breaker OVERHAULING .

SIMHADRI
Date : 15.03.2008
Sheet : 03 of 03

6.14 Clean the carbon brushes of spring charging Motor.


6.15 Check the tightness of finger contacts .
6.16 Record the activities done and any abnormalities in the HT Breaker
Mtc register EMD / REC/018.
6.17 Cancel the PTW .

Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /032
Rev. No.: 02

Doc.Title:

HT Switchgear
OVERHAULING .

SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02

1. PURPOSE
Overhauling of HT Switchgear 11/ 3.3 KV in the main plant and Ash handling
plan-t and off sites.
2. REFERENCES
Past experience
3. RESPONSIBILITY
Area Engineer
4. RESOURCES REQUIRED
SL.NO
1

RESOURCE
Manpower

Tools & Tackles

Personal Protection Equipment

DESCRIPTION
1Engineer + 1 Technician +2 skilled
workmen + 2 unskilled workmen.
0- 5 KV Megger, voltage detector ,
Discharge rod ,Torque wrench ,
markine cloth Multimeter, blower ,
spanner set , cleaning agents .
Safety Shoe , Safety helmet.

5. RECORDS
Sl.
No
1

Description

Location

Form No.

HT Switchgear Mtc

Switchyard

EMD/REC/019

Retention
Period
3 years

Doc. No.: EMD / WI /032


Rev. No.: 02

Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: HT Switchgear
OVERHAULING .

SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02

6.1 INSTRUCTIONS
6.2 Obtain PTW from Operation .
6.3 Ensure the proper isolation of the HT Switchgear from corresponding incomers.
Ensure isolations from remote end also for transformer feeders .
6.4 Check that board is dead by ensuring incomer breakers are switches off and
are in racked out condition. Rack in the bus earthing truck and close it.
6.5 Open the bus chamber . clean the bus bar chamber thoroughly and check
the tightness of nuts /bolts with torque wrench .
6.6 Check the tightness of power cables in all the feeders. Inspect the
surge suppressors and rectify the damages if any .
6.7 Ensure proper tightness of control circuit of Bus PT Cubicle.
6.8 Check the IR value of the Bus before opening and after boxing up with 1
KV megger and record in EMD/REC/019
6.9 Ensure that all the Tools & tackles are taken out from bus chamber and
no foreign material is inside the bus chamber .
6.9. Box up the bus chamber .
6.10 Open the bus earth truck and rack out the same .
6.11 Cancel the PTW .

Doc. No.: EMD / WI /033


Rev. No.: 02

SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Preventive maintenance Date : 15.03.2008
Sheet : 01 of 02
of HT Motors

1. PURPOSE
Preventive maintenance of HT Motors 11/ 3.3 KV in the main plant and Ash
handling plant and off sites.
2. REFERENCES
Instruction manual for HT Motors
Past experience
3. RESPONSIBILITY
Area engineer
4. RESOURCES REQUIRED
SL.NO
1

RESOURCE
Manpower

Tools & Tackles

Personal Protection Equipment

DESCRIPTION
1 Technician +2 skilled workmen + 2
unskilled workmen.
0- 5 KV Megger, Discharge rod ,
markine cloth ,Multimeter, blower ,
spanner set , cleaning agents .
Safety Shoe , Safety helmet.

5. RECORDS
Sl.
No
1

Description

Location

Form No.

HT Motors PM
Record

Switchyard

EMD/REC/020

Retention
Period
03 years

Doc. No.: EMD / WI /033


Rev. No.: 02

SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Preventive maintenance Date : 15.03.2008
Sheet : 02 of 02
of HT Motors

6. INSTRUCTIONS
6.1 Obtain PTW from Operation .
6.2 Ensure the proper isolation of the HT motor from corresponding breaker incomer.
6.3 Open the motor T.B cover and discharge with discharge rod.
6.4 Check the tightness of power and control cables .
6.5 Check the oil level of motor bearings is applicable and top up if required.
6.6 Check the tightness of earthing connections and ensure double
earthing of TB and motor body .
6.7 Check the power cable end terminations for any over heating.
6.8 Check the healthiness of space heaters.
6.9 close the TB cover.
6.10.

Cancel the PTW.

6.11 Record the history in EMD/REC/020.

Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /034 Doc.Title: Disposal of Ni-Cd
Rev. No.: 02
Batteries

SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02

1. PURPOSE
Identifying the defective Ni-Cd batteries , replacing with new ones and safe
disposal of the defective ones.
2. REFERENCES
Battery manufacturer Instruction Manual .
3. RESPONSIBILITY
Area engineer
4. RESOURCES REQUIRED
SL.NO
1
2
3

RESOURCE
Manpower
Tools & Tackles
Personal Protection Equipment

DESCRIPTION
1 Technician +1skilled workmen
Multimeter , cell tester , hydrometer
Safety Shoe , asbestos hand gloves

5. RECORDS
Sl.
No
1

Description

Location

Form No.

Battery History
Register

Switchyard

EMD/REC/021

Retention
Period
05 years

Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /034 Doc.Title: Disposal of Ni-Cd
Rev. No.: 02
Batteries

SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02

6. INSTRUCTIONS
6.1 Measure the individual cell voltages . Ensure that the voltage is not
less than the minimum voltages specified by the manufacturer as
indicated in the Instruction manual.
6.2 If voltage of any cell is found to be less than the specified minimum
value , then Identify the cell and record in the EMD / REC / 021 . Take
corrective action if any as suggested by OEM . If the cell voltage does
not improve then plan for Replacement of the defective cells.
6.3 Obtain the PTW and ensure proper isolation of the battery bank .
6.4 Replace the defective cell with new one and boost charge it up to
the voltage specified Instruction manual .
6.5 Cancel the PTW and ensure the normalization of the battery bank .
6.6 Hand over the defective cell to NTPC Stores for further handing over
to Original equipment manufacturer / supplier for the safe disposal /
re cycling of the cell .

Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /035 Doc.Title: Maintenance of
Rev. No.: 02
Hydrogen plant compressors

SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02

1. PURPOSE
Maintenance of Hydrogen plant compressors as per SAP schedule.
2. REFERENCES
Instruction manual (Fluitron)
Past experience
3. RESPONSIBILITY
Area engineer
4. RESOURCES REQUIRED
SL.NO
1

RESOURCE
Manpower

Tools & Tackles

Personal Protection Equipment

DESCRIPTION
1 Technician +1 skilled workmen + 1
unskilled workmen.
Cotton waste, Markine cloth, spanner
set , cleaning agents .
Safety Shoe , Safety helmet, Hand
gloves

5. RECORDS
Sl.
No
01
02

Description

Location

Form No.

Hydrogen leakage
check list (Daily)
Hydrogen
compressor
maintenance check
list

Hydrogen
Plant
Hydrogen
Plant

EMD/FORM/030

Retention
Period
03 years

EMD/FORM/031

03 years

Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /035
Rev. No.: 02

Doc.Title: Maintenance of
Hydrogen plant compressors

6. INSTRUCTIONS

6.1 Obtain PTW.


6.2 Ensure the proper isolation of the system.
6.3 Carry out maintenance work as per check list.
6.4. Cancel the PTW.
6.5 Record the history in EMD/REC/026 and EMD/REC/027.

SIMHADRI

Date : 15.03.2008
Sheet : 02 of 02

Doc. No.: EMD / WI /036


Rev. No.: 01
1.

Dept.: ELECTRICAL MAINTENANCE

SIMHADRI

Doc. Title: Lead Acid Battery Disposal

Date : 11.03.2008
Sheet : 01 of 02

PURPOSE
To control work environmental pollution in handling and disposal of
discarded lead acid batteries.

3.

References Past
Experience
4.

RESPONSIBILITY
Area Engineer

4.

Resources required
Sl .
Resources
No
Manpower
1
Tools and tackles
2
Spares
3

5.

Description
1 Technician+ 1 Skilled
Multimeter, Hand gloves
As per requirement.

Records
Sl. Description
No.
Battery disposal
Balance
1

Location
Sankalp EMD
Office

Format Number Retention Period


1802/43

5 Years

Dept.: ELECTRICAL MAINTENANCE


Doc. No.: EMD / WI /036
Rev. No.: 01

Doc. Title : Lead Acid Battery Disposal

SIMHADRI
Date : 11.03.2008
Sheet : 02 of 02

6.1 Instructions
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8

Limited quantity of Lead acid batteries are available for starting of Diesel
generators in main plant DG room & Fire water pump houses.
Check the lead acid batteries as per the respective scheduled Preventive
Maintenance to identify the defective batteries.
Check for defective batteries during attending breakdown work orders on
batteries.
Ensure availability of pre-designated earmarked area for temporary
storage of the discarded batteries.
Shift the discarded batteries to the earmarked area.
Return the discarded batteries to store through Material Return Note.
Care should be taken to avoid any spillage during the storage handling
and transportation to stores.
Keep a record of discarded batteries and update the records as and when
job is done.

Dept.: ELECTRICAL MAINTENANCE


Doc. No.: EMD / WI /037
Rev. No.: 01
1.

Doc. Title : Handling of Transformer Oil

SIMHADRI
Date : 11.03.2008
Sheet : 01 of 02

PURPOSE
To control work environmental pollution in handling and disposal of
Transformer Oil.

2.

References Past
Experience
3.

RESPONSIBILITY
Area Engineer

4.

Resources required
Sl .
Resources
No
Manpower
1
Tools and tackles
2
Spares
3

5.

Description
1 Technician+ 1 Skilled
Oil collecting/ Storage Containers
As per requirement.

Records
Sl. Description
No.
Transformer oil
1 disposal Balance

Location
Sankalp EMD
Office

Format Number Retention Period


1802/44

5 Years

Dept.: ELECTRICAL MAINTENANCE


Doc. No.: EMD / WI /037
Rev. No.: 01

Doc. Title: Handling of Transformer Oil

SIMHADRI
Date : 11.03.2008
Sheet : 02 of 02

6.1 Instructions
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10

Ensure observation of transformers for oil leakages and physical


healthiness as per respective scheduled checklist.
Identify the transformers from where oil leakages are observed and take
necessary steps to avoid ground contamination by placing a suitable
waste oil container, and then transferred into waste oil drums.
Depending upon severity of oil leakages problem will be attended during
opportunity/shutdown of the equipment.
Ensure availability of designated area for keeping Waste Oil to be
disposed.
Measure should be taken to handle used transformer oil with care to
avoid any land contamination due to spillage.
Proper care should be taken whenever transformer oil is drained from
tank for sampling, maintenance.
Note that waste transformer oil shall be properly handled and returned to
stores through MRN.
Keep a record of oil disposal and update the records as and when job is
done
During the storage handling and transportation to stores care should be
taken to avoid any spillage.
Return the waste transformer oil drums to store through MRN & keep the
record.

Dept.: ELECTRICAL MAINTENANCE


Doc. No.: EMD / WI /038
Rev. No.: 01

SIMHADRI

Doc.Title: Maintenance of Window Date : 11.03.2008


Sheet : 01 of 02
AC- Handling of CFC

1. PURPOSE
To Control and minimize CFC leakages into the atmosphere during operation
and Maintenance of Window, Split, Package Air Conditioners. and Water
coolers
2. REFERENCES
Past Experience
3. RESPONSIBILITY
Area Engineer
4. RESOURCES REQUIRED
SL.NO
1
2
3

RESOURCE
Manpower
Tools & Tackles
Personal Protection
Equipment

DESCRIPTION
1 Technician +2 skilled workmen.
Spanner Set, Screw Driver
Safety Shoe

5. RECORDS
Sl.
No
1

Description

Location

Form No.

Gas leak & filling


Record

SankalpEMD

EMD/REC/028

Retention
Period
05 years

Doc. No.: EMD / WI /038


Rev. No.: 01

Dept.: ELECTRICAL MAINTENANCE

SIMHADRI

Doc.Title: Maintenance of Window ACHandling of CFC

Date : 11.03.2008
Sheet : 02 of 02

6.0 INSTRUCTIONS
6.1. Window air conditioners , Split , Package Air Conditioners and Water coolers of
are located at various plant locations, Communication building, Documentation
building, Sea water and Sweet water pump houses.
6.2 Note that any release of Freon / CFC into the atmosphere has significant
environmental impact. Until eco-friendly technology replaces the existing
one, utmost importance to be given for control and minimize of CFC releases.
6.3 Ensure quarterly observation checklist for healthy running of Window, Split,
Package Air Conditioners. and Water coolers The item which is prone to
regular complaints is to be inspected for complete healthiness of components
including gas tightness check.
6.4 Whenever any air conditioner or water cooler is taken for any type of
Maintenance work for compressor/fan or other problems, gas leak check is
to be conducted without fail and Gas leak & filling Record is to be maintained.
6.5 All the Air Conditioners and Water coolers should be inspected once in three
months for observation of healthy functioning / maintaining normal grill
temperature.
6.6 Whenever compressor failure occurs for any Air Conditioner or Water cooler the
gas leak test with N2 should be carried out at the time of replacement of
compressor. Further, the manufacturers recommendations are to be followed
for maintenance works.

NTPC LIMITED
SIMHADRI THERMAL POWER PROJECT
ISO 14001 ENVIRONMENTAL ASPECTS EVALUATION
Dept./Section : ELECTRICAL MAINTENANCE
N/
Rating
D/I
F+
Applicable
Sl.
Activity
Aspect
A/
Impact
No.
D
L R F EI P T
E
01

02

03

04

Transformer
oil filtration &
use
400 kV
Breaker
Hydraulic
operating
machine
400
kV
Breaker
SF6
gas for arc
quenching
Lighting
maintenance

Oil spillage,
Waste oil
generation

Failure of
seals and oil
leakages

Gas leakage

Fused lamps

Ground
Contamination,
Water
Pollution
Ground
Contamination,
Health Hazard

Significance

HWM Sec
5,6,7,9,10,20(4)

Yes

HWM Sec
5,6,7,9,10,20(4)

No

Air Pollution

Ground
Contamination

11

N : Normal, A : Abnormal (startup/shutdown/process disturbance), E :


Emergency L : LEGAL / REGULATORY REQUIREMENT :
0= There is no legal requirement, 5= There is a legal requirement
R : RISK POTENTIAL RISK TO EMPLOYEES AND/OR NEIGHBOUR POPULATION
1=Low risk (No. effect on health/limbs) 3=Intermediate risk (Health hazard) 5=High risk (Fatal to human
life) F : ENVIRONMENTAL IMPACT FREQUENCY
1 : Low (once in an year or more) 3 : Intermediate (once in a month or more) 5 : High (once in a day or
more)
EI :ENVIRONMENTAL IMPACT (IMPACT ACCORDING TO THE IMPROTANCE
1 : Low (No loss to human/property/environment) 3 : Intermediate (Temporary effect on human
life/property/environment) 5 : High (Fatal to human life/Damage to property/environment)
P : PUBLIC PERCEPTION (IMPORTANCE OF THE ENVIRONMENTAL IMPACT IN TERMS OF PUBLIC PERCEPTION
1 : Low perception (No public concern) 3 : Intermediate perception (concern to
employees) 5 : High perception (concern to neighbour population)
CRITERIA FOR DETERMINING SIGNIFICANCE OF THE ASPECT :
1. Aspect where the sum of the value is > or = 15.
2. Aspect where F+EI > 6.
3. Aspect where P or L = 5.

Approved By: HOD

Rev :03, Dt: 03.12.2012

Name : C.MALAKONDAIAH

Signature :

Remark
Work instruction is
prepared.
(EMD/WI/037)

No
E waste
management
rule

No

Page 1 of 3

NTPC LIMITED
SIMHADRI THERMAL POWER PROJECT
ISO 14001 ENVIRONMENTAL ASPECTS EVALUATION
Dept./Section : ELECTRICAL MAINTENANCE
N/
Rating
D/I
Applicable
Sl.
Activity
Aspect
A/
Impact
F+EI
No.
D
L R F EI P T
E
05

Cleaning
electrical
equipment

06

Maintenance of
electrical
equipment

07

Maintenance of
Window A/C

Usage of
solvents
Generation of
Cotton waste,
waste oil,
soldering
waste
Leakage of
CFC

Air Pollution,
Health
Hazard

Approved By: HOD

Ground
Contamination

HWM Sec
6,7,10,20(4)

Air Pollution

11

ODS

Name : C.MALAKONDAIAH

Signature :

Significance

Remark

No

N : Normal, A : Abnormal (startup/shutdown/process disturbance), E :


Emergency L : LEGAL / REGULATORY REQUIREMENT :
0= There is no legal requirement, 5= There is a legal requirement
R : RISK POTENTIAL RISK TO EMPLOYEES AND/OR NEIGHBOUR POPULATION
1=Low risk (No. effect on health/limbs) 3=Intermediate risk (Health hazard) 5=High risk (Fatal to human
life) F : ENVIRONMENTAL IMPACT FREQUENCY
1 : Low (once in an year or more) 3 : Intermediate (once in a month or more) 5 : High (once in a day or more)
EI :ENVIRONMENTAL IMPACT (IMPACT ACCORDING TO THE IMPROTANCE
1 : Low (No loss to human/property/environment) 3 : Intermediate (Temporary effect on human
life/property/environment)
5 : High (Fatal to human life/Damage to property/environment)
P : PUBLIC PERCEPTION (IMPORTANCE OF THE ENVIRONMENTAL IMPACT IN TERMS OF PUBLIC PERCEPTION
1 : Low perception (No public concern) 3 : Intermediate perception (concern to
employees) 5 : High perception (concern to neighbour population)
CRITERIA FOR DETERMINING SIGNIFICANCE OF THE ASPECT :
1. Aspect where the sum of the value is > or = 15.
2. Aspect where F+EI > 6.
3. Aspect where P or L = 5.

Rev :03, Dt: 03.12.2012

No
Yes

Work instruction is
prepared.
(EMD/WI/038)

Page 2 of 3

NTPC LIMITED
SIMHADRI THERMAL POWER PROJECT
ISO 14001 ENVIRONMENTAL ASPECTS EVALUATION
Dept./Section : ELECTRICAL MAINTENANCE
N/
Rating
D/I
F+
Sl.
Activity
Aspect
A/
Impact
Applicable LOR
No.
D
L R F EI P T
E
Ni-Cd
batteries
usage

08

09

Actuator
maintenance

10

Switchgear
maintenance

11

Maintenance of
Lead Acid
batteries

Disposal of
damaged
cells
Generation of
Cotton
waste, waste
oil
Generation of
scrap, like
fuses
Acid spillage ,
Generation of
Used
batteries

Ground
Contamination

Ground
Contamination

Ground
Contamination,
Health hazard
Water
Pollution,
Ground
Contamination

N : Normal, A : Abnormal (startup/shutdown/process disturbance), E :


Emergency L : LEGAL / REGULATORY REQUIREMENT :
0= There is no legal requirement, 5= There is a legal requirement
R : RISK POTENTIAL RISK TO EMPLOYEES AND/OR NEIGHBOUR POPULATION
1=Low risk (No. effect on health/limbs) 3=Intermediate risk (Health hazard) 5=High risk (Fatal to human
life) F : ENVIRONMENTAL IMPACT FREQUENCY
1 : Low (once in an year or more) 3 : Intermediate (once in a month or more) 5 : High (once in a day or
more) EI :ENVIRONMENTAL IMPACT (IMPACT ACCORDING TO THE IMPROTANCE
1 : Low (No loss to human/property/environment) 3 : Intermediate (Temporary effect on human
life/property/environment) 5 : High (Fatal to human life/Damage to property/environment)
P : PUBLIC PERCEPTION (IMPORTANCE OF THE ENVIRONMENTAL IMPACT IN TERMS OF PUBLIC PERCEPTION
1 : Low perception (No public concern) 3 : Intermediate perception (concern to
employees) 5 : High perception (concern to neighbour population)
CRITERIA FOR DETERMINING SIGNIFICANCE OF THE ASPECT :
1.
2.

Aspect where the sum of the value is > or = 15.


Aspect where F+EI > 6. 3. Aspect where P or L = 5.

E waste
management
rule
HWM Sec
6,7,10,20(4)

Rev :03, Dt: 03.12.2012


Significan
ce
Remark

Yes

Work instruction
EMD/WI/034 is
prepared

No
No

Batteries
Mgmt rules 2001,
sec 10.1

Yes

Work instruction
(EMD/WI/036) is
prepared.

Page 3 of 3

NTPC LIMITED
SIMHADRI THERMAL POWER PROJECT
ISO 14001 ENVIRONMENTAL ASPECTS EVALUATION
Dept./Section : ELECTRICAL MAINTENANCE
Sl. Activity
ASPECT
N/ D/
IMPACT
RATING
F+ Applicable LOR
No
A/ In
L R F I
P T I
S/
D
HWM Sec
12 DG Set
1. Noise
A
D
Noise
0 1 3 1 1 1 4
5,6,7,9,10,20(4)
Running
Pollution
1
2. Exhaust
N
D
Air Pollution 0 1 2 1 1 6 3
3. Leakage of A
D
Water
0 1 1 1 1 5 2
Oil
Pollution
HWM Sec
13 Hydrogen Gas
1. Energy
N
I
Resource
0 1 3 1 1 7 4
5,6,7,9,10,20(4)
Generation
Consumption
Depletion
2. Leakages
A
D
Health
5 5 1 3 3 1 4
Hazard +
3
Safety
N : Normal, A : Abnormal (startup/shutdown/process disturbance), E :
Emergency L : LEGAL / REGULATORY REQUIREMENT :
0= There is no legal requirement, 5= There is a legal requirement
R : RISK POTENTIAL RISK TO EMPLOYEES AND/OR NEIGHBOUR POPULATION
1=Low risk (No. effect on health/limbs) 3=Intermediate risk (Health hazard) 5=High risk (Fatal to human
life) F : ENVIRONMENTAL IMPACT FREQUENCY
1 : Low (once in an year or more) 3 : Intermediate (once in a month or more) 5 : High (once in a day or more)
EI :ENVIRONMENTAL IMPACT (IMPACT ACCORDING TO THE IMPROTANCE
1 : Low (No loss to human/property/environment) 3 : Intermediate (Temporary effect on human
life/property/environment) 5 : High (Fatal to human life/Damage to property/environment)
P : PUBLIC PERCEPTION (IMPORTANCE OF THE ENVIRONMENTAL IMPACT IN TERMS OF PUBLIC PERCEPTION
1 : Low perception (No public concern) 3 : Intermediate perception (concern to
employees) 5 : High perception (concern to neighbour population)
CRITERIA FOR DETERMINING SIGNIFICANCE OF THE ASPECT :
1.
2.

Aspect where the sum of the value is > or = 15.


Aspect where F+EI > 6. 3. Aspect where P or L = 5.

Rev :03, Dt: 03.12.2012


SIGNIFIReference
CANT
NO

Yes

Work instruction
(EMD/WI/036) is
prepared.

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : List of Forms
Sheet
: 01 of 01

Sl.
No.
01

Format/Form title
Recording of various parameters of Generator

SIMHADRI
Revision
: 02A
Effective Date: 01.11.2010

Format/Form No.
EMD/FORM/001

Revision No. &


Effective date
01, 13.12.04

02

Transducers Calibration

EMD/FORM/009

02 ,23.11.04

03

Check list for transformer 48weekly PM

EMD/FORM/014

01 ,10.07.05

04

Check list for UAT 48weekly PM

EMD/FORM/014A

01 ,10.07.05

05

TRANSFORMER OIL SAMPLING


FOR DETAILED ANALYSIS

EMD/FORM/016

Lye replacement

EMD/FORM/018

Hydrogen Plant Check list

EMD/FORM/019

Over Hauling of LT MCC

EMD/FORM/020

Preventive Maintenance of LT Motor

EMD/FORM/021

Cathodic Protection Checking

EMD/FORM/023

Calibration of Energy Meters

EMD/FORM/024

06
07
08
09
10
11
12
13
14
15
16

Computed Energy

EMD/FORM/025
Joint Monthly Report (JMR) for energy sent out EMD/FORM/028
Thermo vision Scanning Report
EMD/FORM/029

Hydrogen leakage check list(daily)


Hydrogen compressor maintenance check

Approved By: HOD

EMD/FORM/030
EMD/FORM/031

Name : C.MALAKONDAIAH

Signature :

01 ,10.07.05
00, 07.11.03
01,24.02.05
01 ,20.05.04
02 , 30.07.04
00 ,07.11.03
00 ,07.11.03
00,07.11.03
00, 07.11.03
00,07.11.03
00,24.02.05
00,24.02.05

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : LIST OF DRAWINGS
Sheet
: 01 of 01

Sl.
No.
01

SIMHADRI
Revision
03
Effective Date: 03.12.2012

Drawing No.

Description of drawing

35620060357

Generator Relay Panel

Location of
Storage
Electrical Lab

02

36590050612

Electrical Control Panel -2

Electrical Lab

03

36590050610

Electrical Control Panel -1

Electrical Lab

04

35620060299

Line Protection Control Schematic

Switchyard

05

400 KV Bus bar protection Schematic

Switchyard

06

Switchyard

07

Stage-2 Lines protection and control


Schematic
Stage-2 GRP Schemes

08

Stage-2 HT switchgear Drawings

HT group

Approved By: HOD

Name : C.MALAKONDAIAH

Signature :

Electrical Lab

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : LIST OF STATUTORY COMPLIANCES
REQUIRED
Sheet
: 01 of 01

Sl.
No.
01

02

03

04

SIMHADRI
Revision

: 02A

Effective Date:25.03.2010

Statute

Requirement

Authority

Frequency

Responsibility

Indian
Explosive
Act 1884(4
of 1884)
Indian
Explosive
Act 1884(4
of 1884)
IE Act
1956

Filling of hydrogen gas


in to cylinders

Chief
Controller of
Explosives

10 Years
Valid up to
30.09.2015

Hydrogen Plant
In-charge

Storage of gas
Cylinders

Chief
Controller of
Explosives

10 Years
Valid up to
30.09.2015

Hydrogen Plant
In-charge

List of Authorized
Persons to operate
and maintain Electrical
Installations
Inspection of
installations by CEA

AGM(O&M)

Yearly

AGM(O&M)

CEA

CEA

Two Year

HOD(EM)

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : LIST OF LMIs
Sheet
: 01 of 03

Sl.
No.

Doc. Ref No.

SIMHADRI
Revision
04
Effective Date: 03.12.2012

Title / Purpose of LMI

Issue
No. /
Rev No.
1

April 2010

Issue Date

01

OD/OPS/ELEC/003

Testing of Electrical Protection

02

OD/OPS/ELEC/004

Jan 2010

03

OGN/OPS/ELEC/007

Feb 2010

04

OGN/OPS/ELEC/008

April 2010

05

OGN/OPS/ELEC/010

Feb 2010

06

OGN/OPS/ELEC/014

Feb 2010

07

OGN/OPS/ELEC/018

Feb 2010

08

OGN/OPS/ELEC/019

Feb 2010

09

OGN/OPS/ELEC/020

Capacity testing of DC
Batteries
Prevention and Detection of
generator rotor earth fault
Inspection and Protection of
water cooled generator stator
winding PTFE hose
connection
Maintenance and testing of
Generator Excitation Control
system
Shaft Voltage & Currents in
Large Turbo Generators
Pyrolytic carbon growth on tap
changer and off circuit tapping
switch contacts in transformer
Dissolved gas analysis of
transformer s & reactors
Clean condition during work of
generators

Feb 2010

10

OGN/OPS/ELEC/023

Feb 2010

11

OIN/OPS/ELEC/009

Feb 2010

12

LMI/OIN/OPS/ELEC/014

Negative Phase sequence


alarms at generating stations
Over fluxing of Generator
Transformer
Generator Stator core faults

April 2010

13

LMI/OGN/OPS/ELEC/004

April 2010

14

LMI/OGN/OPS/ELEC/005

April 2010

15

LMI/OGN/OPS/ELEC/021

Electrical testing of Generator


rotor winding insulation
Generator Rotor End winding
retaining rings
Maintenance & testing of
station earthing system

April 2010

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : LIST OF LMIs
Sheet
: 02 of 03

SIMHADRI
Revision
04
Effective Date: 03.12.2012

Sl.
No.

Doc. Ref No.

Title / Purpose of LMI

Issue
No. /
Rev No
0

Issue Date

16

LMI/OGN/OPS/SYST/006

17

LMI/OGN/OPS/ELEC/017

18

LMI/OGN/OPS/ELEC/035

19

LMI/OGN/ELEC/009

20

LMI/OGN/OPS/SYST/012

21

LMI/OD/OPS/ELEC/002

22

LMI/OIN/OPS/ELEC/024

Prevention of Hydrogen
explosions due to hydrogen
leak in Generator busduct
The use and processing of
insulating oil in power
transformers
High current bus bar systems
connected to generators &
Generator transformer
Insulator protection in polluted
atmosphere
Switching of power station
Distribution systems
Management of DC supply
system failure
Monitoring the healthiness of
400 KV current transformers

Dec 2010

April 2010

April 2010

Dec 2010

April 2009

April 2010

23

LMI/OIN/OPS/ELEC/025

Cathodic Protection in Sea


water and Sweet water
pipelines
Hydrogen Plant

April 2010

24

LMI/OIN/OPS/ELEC/026

April 2010

25

LMI/OIN/OPS/ELEC/007

Recommended Procedures to
assess the Quality of Insulation
on Generator and Motor Stator
Operation and Maintenance of
oil impregnated paper EHV
class bushings
Ring Flux Testing of Generator
cores

Dec 2010

26

LMI/OIN/OPS/ELEC/038

Jan 2009

27

LMI/OIN/OPS/ELEC/012

Jan 2009

April 2010

Dept. System Manual

SIMHADRI

Dept.: Electrical
Maintenance
Document Title : LIST OF LMIs
Sheet
: 03 of 03

Revision
04
Effective Date: 03.12.2012

Sl.
No.

Doc. Ref No.

Title / Purpose of LMI

28

LMI/OGN/OPS/ELEC/001

29

LMI/OIN/OPS/ELEC/044

Buchholz alarms in
Transformers and Reactors
Inspection of Brushless Exciter
BHEL -make

30

LMI/OIN/OPS/ELEC/045

31

LMI/OIN/OPS/ELEC/046

Procedure for oil filling in


Transformer with Atmoseal
conservator
Maintenance and
Management of DC system

Issue
No. /
Rev No
1

Issue Date

April 2010

June 2010

April 2010

Mar 2010

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : LIST OF OEM / OES MANUALS
Sheet
: 01 of 03

Sl.
No.
01

Transformer

BHEL

02

Transformer

BHEL

03

Transformer

BHEL

04

Transformer

BHEL

05

Transformer

BHEL

06

Transformer

BHEL

07

Transformer

BHEL

08

Transformer

BHEL

09

Transformer

BHEL

10

Transformer

BHEL

11

Transformer

BHEL

12

Transformer

BHEL

Equipment

OEM/OES

SIMHADRI
Revision
03
Effective Date: 03.12.2012

Location of
Storage
200MVA, 420/21KV, 1Phase, 50Hz
Electrical
OFAF cooled Generator Transformer. laboratory
Volume-I
50MVA, 420/11.5KV, 3Phase, 50Hz Electrical
ONAN/ONAF cooled Standby
laboratory
Transformer, Volume-I
50MVA, 420/11.5KV, 3Phase, 50Hz Electrical
ONAN/ONAF cooled Unit Auxiliary laboratory
Transformer, Volume-I
Instruction manual for Power
Electrical
Transformers 16MVA,34.5/11KV,
laboratory
Volume-I
Instruction manual for Power
Electrical
Transformers 16MVA,34.5/11KV,
laboratory
Volume-II
Instruction manual for Power
Electrical
Transformers 16MVA, 11/3.5KV,
laboratory
Volume-I
Instruction manual for Power
Electrical
Transformers 16MVA, 11/3.5KV,
laboratory
Volume-II
Instruction manual for Power
Electrical
Transformers 7.5MVA,33/11.5KV,
laboratory
Volume-I
Instruction manual for Power
Electrical
Transformers 7.5MVA,33/11.5KV,
laboratory
Volume-II
Instruction manual for Power
Electrical
Transformers 7.5MVA, 11/3.5KV,
laboratory
Volume-I
Instruction manual for Power
Electrical
Transformers 7.5MVA, 11/3.5KV,
laboratory
Volume-I
Instruction manual for Power
Electrical
transformers & reactors
laboratory
Document Description

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : LIST OF OEM / OES MANUALS
Sheet
: 02 of 03

SIMHADRI
Revision
03
Effective Date: 03.12.2012

Sl.
No.
13

Equipment

OEM/OES

Document Description

Transformer

BHEL

14

Transformer

CGL

15

Transformer

CGL

16

Transformer

17

Relay

Bharat
Bijlee
Limited
Alstom

Instruction Manual for Cast resin Dry


Type LT indoor Auxiliary
transformer
Operation, Erection,
Maintenance(Servicing) Manual for
CGL Make Transformer
O&M manual for oil filled LT CGL
make service Transformers
Installation, Commissioning and
Maintenance manual for Bharat
Bijlee limited
Alstom relay manual

18

Relay

ABB

19

Relay

ABB

20

Relay

Siemens

21

GRP Panel

SEMS

22

Hathaway

23

Disturbance
Recorder
LT Swgr

24

LT Swgr

C&S Ltd

25

H2 Plant

26

Energy meter

Electrolyse
r
ZERA

27

ESP

BHEL

Hathaway Disturbance recorder


Manual
C&S make Operation & maintenance
manual for power control centre &
Motor Control Centre
C&S Instruction manual for Air
circuit breaker
Electrolyser Manual for Hydrogen
Plant
ZERA manual for Energy meter
calibration kit
Rectiformer Manual

28

Current
Transformer

BHEL

CT manual

C&S Ltd

Manual for ABB make PPX-111


Low forward power relay
Manual for ABB make RAGUA
relay
Numerical M/C protection Relay
manual- 7UM515- Siemens
SEMS Energy meter Manual

Location of
Storage
Electrical
laboratory
Electrical
laboratory
Electrical
laboratory
Electrical
laboratory
Electrical
laboratory
Electrical
laboratory
Electrical
laboratory
Electrical
laboratory
Electrical
laboratory
Electrical
laboratory
LT Swgr.
Almira
LT Swgr.
Almira
Hydrogen
Plant
Switchyard
Switchyard
Switchyard

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : LIST OF OEM / OES MANUALS
Sheet
: 03 of 03
Sl.
No.
29

SIMHADRI
Revision
03
Effective Date: 03.12.2012

Equipment

OEM/OES

Document Description

BHEL

CVT manual

30

Capacitive
Voltage
Transformer
Lightning arrestor

Location of
Storage
Switchyard

WS

LA Manual

Switchyard

31

Busbar protection

Alstom

Switchyard

32

HT Swgr

BHEL

33

HT Motor

BHEL

Alstom relay manual for Busbar


protection
Instruction Manual for HT
Switchgear
HT Motor Manual

34

Compressor

Fluitron

Hydrogen Plant compressor Manual

35

REL 670

ABB

O&M manual

Hydrogen
Plant
Switchyard

36

REB 670

ABB

O&M manual

Switchyard

37

CGL

O&M manual

Switchyard

38

CGL 400KV
BREAKER
400KV CT

CGL

O&M manual

Switchyard

39

VFD

BHEL

O&M manual

VFD ROOM

Switchyard
Switchyard

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : LIST OF REPORTS
Sheet
: 01 of 01

Sl.
No.

Title of the Report

ORT Report for the


Month of ------containing
1. Failure of Trfrs
2. Details of
Electrical
01
Testing
3. Station Battery
System
4. Transformer
DGA Test
Status
5.
ERS
Compliance
Joint Meter
Readings
02 for energy sent out
through 400 KV Bus

SIMHADRI
Revision
: 03A
Effective Date: 01.11.2010

Furnished
to

Format No.

Periodicity

Responsibility

EEMG

Soft copy

Monthly

HOD(EM)

EEMG

EMD/
FORM/028

Monthly

HOD(EM)

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : RESPONSIBILITIES & AUTHORITIES
Sheet

: 01 of 01

SIMHADRI
Revision

04

Effective Date: 03.12.2012

RESPONSIBILITIES & AUTHORITIES


Sr.
No.
1.

2.

3.

4.

Job Title
HOD (EM)

Responsibilities

Authorities Reports to.

Overall responsibilities of As per DOP


Electrical
Maintenance
functions
at
NTPCSimhadri.
AGM(EM) -1
Responsible
for
-Domaintenance of electrical
equipments in the areas
indicated
in
the
organization chart
AGM(EM) -2
Responsible
for
-Domaintenance of electrical
equipments in the areas
indicated
in
the
organization chart
Sr. Supdt, Supdt Responsible
for
-Do, Area Engineers maintenance of electrical
equipments in the areas
indicated
in
the
organization chart

HOD
(O&M)
HOD(EM)

HOD(EM)

Respective
Sectional
heads

Remarks

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : PROCESS MEASURES REVIEW
MATRIX
Sheet
: 01 of 02
Dept. : EM

Sl. Process Title


No. & Number

Proce
ss
Owne
r

Compliance to HOD
PM,
Break
down and PDM
job schedules.
No
loss
of HOD
generation due
to breakdown
of
electrical
equipment

Zero tripping
due
electrical
equipment.

HOD

Continual
Improvement
in the process
and systems.

HOD

Provide
training to the
employees

HOD

Providing
training to
internal
customers to
enhance
their
knowledge
Reduction
in
Nonmoving
Items

HOD

HOD

SIMHADRI
Revision

07

Effective Date: 01.04.2015

Process
Measures

Target
For
2013-14

Source
of
Data

Review
Frequenc
y&
Responsi
bility

Status
for
MAR
2015

% of SAP
WOC
attended

95 % in
every
month.

ORT
Data /
SAP

Quarterly
by
HOD (EM)

97.94%
(761/
777)

Cumulative
% of loss of
generation
due
to
electrical
equipment.
Cumulative
no. of unit
tripping due
electrical
equipment.
No. of
suggestions
given.

0%
for ORT
Financial
Data
Year
2013-14

Quarterly
by
HOD (EM)

20.14
MU
5.58%

0
for ORT
Financial
Data
Year 201314

Quarterly
by
HOD (EM)

TQM
Site &
Record
: 1801 /
11
1801/

Quarterly
by
HOD(EM)

47

Quarterly
by
HOD(EM)

316

1801/

Quarterly
by
HOD(EM)

12

1801/

Quarterly
by
HOD(EM)

414
Lacs
1885
Items

Minimum
30
for
Financial
Year 201314
Cumulative
300
for
Training Man Financial
days
Year
2013-14
No.
of 20
for
interaction
Financial
meetings
Year 2013with
14
operation
dept.
Reduction of 5% of no.
NMI items
of items.
2%
of
value.

Re
m
ar
ks

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : PROCESS MEASURES REVIEW
MATRIX
Sheet
: 02 of 02
Dept. : EM
Sl. Process Title
No & Number
.

Proce
ss
Owne
r

Process
Measures

Target

Preventive, BD
& OH maint.
Process
Preventive, BD
& OH maint.
Process

HOD

100% in
every
month
100% by
th
7 of
every
month

Preventive, BD
& OH maint.
Process

HOD

Compliance
to 24X7
safety
points
Timely
payment of
wages to
contract
workmen
Availability
of ESP fields
from EMD
side

10

HOD

100%
availability

SIMHADRI
Revision

07

Effective Date: 01.04.2015

Source
of
Data

Review
Frequency
&
Responsi
bility

Statu
s for
MAR
2015

Quarterly by
HOD(EM)

100%

MIS
Report

Quarterly by
HOD(EM)

100%

DPM

Quarterly by
HOD(EM)

100%

Re
m
ar
ks

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : DEPARTMENTAL OBJECTIVES FOR
2015-16
Sheet
: 01 of 02
Dept.: EM
Sl.
No

DEPARTMENTAL
OBJECTIVE

MEASURE

Compliance to PM,
Break down and
PDM job schedules.
No
loss
of
generation due to
breakdown
of
electrical equipment
Zero tripping due
electrical
equipment.

% of SAP WOC
attended

Continual
Improvement in
the process and
systems.
Provide training
to the employees
Providing training
to internal
customers to
enhance their
knowledgein
Reduction
Non- moving
Items
Preventive, BD &
OH maint. Process

Preventive, BD &
OH maint. Process

10

Preventive, BD &
OH maint. Process

SIMHADRI
Revision: 07
Effective Date: 01.04.2015

TARGET
FOR 2015-16

REVIEW
FREQUENCY &
RESPONSIBILIT
Y
95 % in every Quarterly by
month.
HOD (EM)

Cumulative % of
loss of generation
due to electrical
equipment.
Cumulative no. of
unit t r i p p i n g d u e
electrical
equipment.
No. of
suggestions
given.

0%
for Quarterly by
Financial
HOD (EM)
Year 2015-16

Cumulative
Training
Man
days
No. of trainings/
interaction
meetings
with
operation dept.
Reduction of
NMI items

300
for
Financial
Year 2015-16
20
for
Financial
Year 201314
5% of no. of
items.
2% of value.
100% in
every month

Compliance to
24X7 safety
points
Timely payment
of wages to
contract
workmen of
Availability
ESP fields
from EMD side

0 for Financial Quarterly by


Year 2015-16 HOD (EM)
Minimum 30 Quarterly by
for Financial HOD (EM)
Year 2015-16

100% by 7
of every
month
100%
availability

th

Quarterly by
HOD (EM)
Quarterly by
HOD (EM)

Quarterly by
HOD (EM)
Quarterly by
HOD (EM)
Quarterly by
HOD (EM)
Quarterly by
HOD (EM)

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : ACTION PLAN FOR ACHIEVING
OBJECTIVE-1
Sheet
: 01 of 01

SIMHADRI
Revision

07

Effective Date: 01.04.2015

ACTION PLAN FOR ACHIEVING OBJECTIVE-1 :


95% compliance to PM, Break down and PDM job schedules.
SN
1
2
3
4

Activity

Target date

Responsibility

Taking PTW and executing


the jobs as per the schedule
Completion of PTW WOC by
filling relevant details as per
schedule
Co-ordination with MTP and
Operation for issue of PTW
Review of Status

Continuous
Process
Continuous
Process

Area In charge

Continuous
Process
Continuous
Process

Area In charge

Area In charge

HOD(EM)

Remarks

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : ACTION PLAN FOR ACHIEVING
OBJECTIVE-2
Sheet
: 01 of 01

SIMHADRI
Revision

07

Effective Date: 01.04.2015

ACTION PLAN FOR ACHIEVING OBJECTIVE-2 :


No loss of generation due to breakdown of electrical equipment
SN
1
2

Activity

Target date

Responsibility

Following PDM & PM activity


schedule of equipments
Reviewing
previous
occurrence
of
critical
equipment trippings

Continuous
Process

Area In charge

As and when
occurred

Area In charge

Analyzing the root causes,

Taking corrective / preventive


actions

As and when
occurred
As and when
occurred

Review of Status

Quarterly

HOD (EM)
Area In charge
HOD (EM)

Remarks

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : ACTION PLAN FOR ACHIEVING
OBJECTIVE-3
Sheet
: 01 of 01

SIMHADRI
Revision

07

Effective Date: 01.04.2015

ACTION PLAN FOR ACHIEVING OBJECTIVE-3 :


Zero tripping due electrical equipment.
SN
1
2

Activity

Target date

Responsibility

Reviewing tripping of NTPC


Simhadri and other plants &
analyzing the root causes.
Taking corrective / preventive
actions to avoid such tripping
at NTPC Simhadri.

As and when
occurred

Sectional In charge

As and when
occurred

Sectional In charge /
HOD (EM)

Remarks

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : ACTION PLAN FOR ACHIEVING
OBJECTIVE-4
Sheet
: 01 of 01

SIMHADRI
Revision

07

Effective Date: 01.04.2015

ACTION PLAN FOR ACHIEVING OBJECTIVE-4 :


Continual Improvement in the process and systems.
SN

1
2
3
4

Activity

Target date

Responsibility

Record the suggestions in on


line suggestion scheme or
make the proposal for
improvement.
Take the approval for
modifications if required.
Implement the approved
modifications
Review of Status

Continuous
Process

Individual employees
of EM

Continuous
Process
Continuous
Process
Quarterly

Individual employees
of EM
Individual employees
of EM
HOD(EM)

Remarks

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : ACTION PLAN FOR ACHIEVING
OBJECTIVE-5
Sheet
: 01 of 01

SIMHADRI
Revision

07

Effective Date: 01.04.2015

ACTION PLAN FOR ACHIEVING OBJECTIVE-5 :


Provide training to the employees on various systems and equipment
SN
1
2
3
4

Activity

Target date

Responsibility

Obtaining details of the training


programmes from EDC &
outside.
Nominate the employees for
the programmes and get the
approval of HOD(EM)
Send the approval to EDC for
processing.
After approval of the
nomination by competent
authority, intimate the
individual concerned.

Continuous
Process

Dept Training
coordinator

Continuous
Process

Dept Training
coordinator

Continuous
Process
Continuous
Process

Dept Training
coordinator
Dept Training
coordinator

Remarks

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : ACTION PLAN FOR ACHIEVING
OBJECTIVE-6
Sheet
: 01 of 01

SIMHADRI
Revision

07

Effective Date: 01.04.2015

ACTION PLAN FOR ACHIEVING OBJECTIVE-6 :


Providing training to internal customers to enhance their knowledge
SN

1
2
3
4
5

Activity

Target date

Responsibility

Obtaining details of the training


needs
of
the
operating
personnel
from
SCE
or
HOD(OPN) .
Make the schedule for
imparting the training.
Depute the concerned person
for imparting the training.
Discuss with the operating
personnel and impart training
Interaction meeting with
operation general shift people

Continuous
Process

HOD(EM)

Continuous
Process
Continuous
Process
Continuous
Process
Continuous
Process

HOD(EM)
HOD(EM)
Concerned engineer.
Concerned engineer.

Remarks

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : ACTION PLAN FOR ACHIEVING
OBJECTIVE-7
Sheet
: 01 of 01

SIMHADRI
Revision

07

Effective Date: 01.04.2015

ACTION PLAN FOR ACHIEVING OBJECTIVE-7 :


Reduction of Non Moving Items
SN
1
2
3
4
5

Activity

Target date

Responsibility

Identify the list of NMI

Continuous

Sectional Heads(EM)

Analyse the reasons

Continuous

Take necessary corrective and


preventive actions to reduce
the NMI
Control the indents ( PRs) to
reduce the inventory
Monitor the implementation

As and when
required

Sectional Heads(EM)
& HOD(EM)
Sectional Heads(EM)
& HOD(EM)

As and when
required
Continuous

HOD(EM)
HOD(EM)

Remarks

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : ACTION PLAN FOR ACHIEVING
OBJECTIVE-8
Sheet
: 01 of 01

SIMHADRI
Revision

07

Effective Date: 01.04.2015

ACTION PLAN FOR ACHIEVING OBJECTIVE- 8 :


Compliance to 24 X 7 CFST points
SN

1
2
3
4

Activity

Target date

Responsibility

Monitor the 24X 7 CFST points


of
the
CFST
register
maintained in the o/o HOD
(O&M)
Identify the points pertaining to
the relevant section
Take necessary corrective and
preventive actions to close the
points
Monitor the status

Continuous

Sectional Heads(EM)
& HOD(EM)

Continuous

Sectional Heads(EM)

Continuous

Sectional Heads(EM)

Continuous

HOD(EM)

Remarks

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : ACTION PLAN FOR ACHIEVING
OBJECTIVE-9
Sheet
: 01 of 01

SIMHADRI
Revision

07

Effective Date: 01.04.2015

ACTION PLAN FOR ACHIEVING OBJECTIVE-9:


th

Timely Payment of monthly wages to workmen by 7 of every month


SN

Activity

Target date

Responsibility

Ensure that payments are


being done to the workmen
th
deployed by 7
of every
month.
If any deviation is there , take
necessary corrective and
preventive action
If still problem is persisting and
payments were not done
report to HOD (EM) ,
HOD(O&M)
Monitoring the status and
sending the MIS report to HOP
and HOD(O&M)

Monthly by
7th

Concerned E-I-C.

Continuous

Concerned E-I-C.

Continuous

Concerned E-I-C/
Sectional head

Monthly

HOD(EM)

Remarks

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : ACTION PLAN FOR ACHIEVING
OBJECTIVE-10
Sheet
: 01 of 01

SIMHADRI
Revision

07

Effective Date: 01.04.2015

ACTION PLAN FOR ACHIEVING OBJECTIVE-10:


100% Availability of ESP Fields from EMD side.
SN
1
2
3
4

Activity

Target date

Responsibility

Monitor the status of ESP


fields availability.
If any field is not available due
to electrical problem , analyze
the cause
Take necessary corrective and
preventive action to make the
field available
Monitoring the status

Daily

Area Engineer

Continuous

Area Engineer

Continuous

Area Engineer

Continuous

Area Engineer

Remarks

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : LIST OF RECORDS
Sheet
: 01 of 04

Sl.
No.

Title of the Record

SIMHADRI
Revision
03
Effective Date: 03.12.2012

Soft Copy/
Hard Copy

Record
Ref. No.

Location

Retention
Period

01

QUALITY OBJECTIVE

Hard Copy

1801/1

SANKALP

5 Years

02

INTERNAL AUDITS

Hard Copy

1801/2

SANKALP

5 Years

03

EXTERNAL AUDITS

Hard Copy

1801/3

SANKALP

5 Years

04

MANAGEMENT REVIEW

Hard Copy

1801/4

SANKALP

5 Years

Hard Copy

1801/5

SANKALP

5 Years

Hard Copy

1801/6

SANKALP

5 Years

Hard Copy

1801/7

SANKALP

5 Years

CHP

3 Years

CHP

3 Years

Switchyard

1 year

Switchyard

10 year

Switchyard

10 year

Switchyard

10 year

05

06
07
08
09
10
11
12
13

LIST OF ENVIRONMENTAL
ASPECTS &
ENVIRONEMNTAL
MANAGEMENT
PROGRAMMES
DOCUMENT
DISTRIBUTION RECORD
CORRECTIVE &
PREVENTIVE ACTION
RECORD
MAINTENANCE OF
PADDLE FEEDERS.
P.M. OF LT MOTORS FOR
CHP.
MONTHLY PM OF
BATTERY SET.
400KV CT ANNUAL
MAINTENANCE.
400KV CVT YEARLY
MAINTENANCE
400KV SURGE/LIGHTING
ARRESTOR
MAINTENANCE.

Hard Copy
Hard Copy
Hard Copy
Hard Copy
Hard Copy
Hard Copy

EMD/REC
/004
EMD/REC
/005
EMD/REC
/006
EMD/REC
/010
EMD/REC
/011
EMD/REC
/012

Dept. System Manual


SIMHADRI
Dept.: Electrical Maintenance
Document Title : LIST OF RECORDS
Sheet
: 02 of 04
Sl.
No.
14
15
16

Title of the Record


BUSBAR PROTECTION
HEALTHINES CHECKING
LINE PROTECTION
CHECKING
400KV BAY PROTECTION
CHECKING

Revision
03
Effective Date: 03.12.2012
Soft Copy/
Hard Copy
Hard Copy
Hard Copy
Hard Copy

Record
Ref. No.
EMD/REC
/014
EMD/REC
/015
EMD/REC
/016
EMD/REC
/017
EMD/REC
/018
EMD/REC
/019
EMD/REC
/020
EMD/REC
/021

17

HT MOTOR O/H.

Hard Copy

18

HT BKR O/H.

Hard Copy

19

HT SWGR O/H.

Hard Copy

20

P.M. OF HT MOTORS.

Hard Copy

21

BATTERY HISTORY
REGISTER

Hard Copy

22

TRANSFORMER PM

Hard Copy

1802/T6

Hard Copy

1802/T20

Hard Copy

1802/T21

Hard Copy

1802/T18

Hard Copy

1802/T22

Hard Copy

1802/H2

Hard Copy

1802/H1

23
24
25
26
27
28

TRANSDUCER
CALLIBRATION REPORT
CALLIBRATION OF
MULTIMETERS
MISCELLEANEOUS
INSTRUMENTS
CALIBRATION
LYE PREPARTION
HYDROGEN PLANT
HYDROGEN PLANT
CHECK LIST

Location

Retention
Period

Switchyard

10 year

Switchyard

5 year

Switchyard

5 year

Switchyard

5 year

Switchyard

3 year

Switchyard

3 year

Switchyard

3 year

Switchyard

5 Years

Electrical
Lab.
Electrical
Lab.
Electrical
Lab.
Electrical
Lab.
Electrical
Lab.
Hydrogen
Plant
Hydrogen
Plant

3 Year
3 Year
3 Year
3 Year
3 Year
3 Year
3 Year

29

OVERHAULING OF LT MCC

Hard Copy

1802/L5

LT Group

5 Year

30

LT MOTOR PM

Hard Copy

1802/L1

LT Group

3 Year

Dept. System Manual


SIMHADRI
Dept.: Electrical Maintenance
Document Title : LIST OF RECORDS
Sheet
: 03 of 04
Sl.
No.

Title of the Record

Revision
03
Effective Date: 03.12.2012
Soft Copy/
Hard Copy

Record
Ref. No.

Location
Make Up
Group
Switchyard
Group

Retention
Period

31

CATHODIC PROTECTION

Hard Copy

1803/1

32

CALIBRATION OF
ENERGYMETER

Hard Copy

1803/2

33

List of formats

Hard Copy

1801/8

SANKALP

5 Years

Hard Copy

1801/9

SANKALP

5 Years

Hard Copy

1801/10

SANKALP

5 Years

Hard Copy

1801/11

SANKALP

5 Years

Hard Copy

EMD/REC
/024

Switchyard

5 year

Switchyard

5 year

34
35
36
37
38
39
40

Document modification
request
Documents & action plans
related to critical equipments
Suggestions &
implementation
Joint Meter Readings for
energy sent out through 400
KV Bus
Thermo vision scanning of
Switchyard O/H connections
Hydrogen leakage check list
(Daily)
Hydrogen compressor
maintenance check list

Hard Copy
Hard Copy
Hard Copy

EMD/REC
/025
EMD/REC
/026
EMD/REC
/027

Hydrogen
Plant
Hydrogen
Plant

3 Year
5 Year

3 years
3 years

41

Process measure review

Hard Copy

1801/12

SANKALP

5 Years

42

Audit schedule

Hard Copy

1801/13

SANKALP

3 Years

Hard Copy

1801/14

SANKALP

2 Years

Hard Copy

1801/15

SANKALP

5 Years

43
44

Obsolete documents from


the department system
manual
Approved LMI copies
(Electrical)

45

LMI Non EM

Hard Copy

1801/16

SANKALP

5 Years

46

Superseded LMI documents

Hard Copy

1801/17

SANKALP

5 Years

Dept. System Manual


SIMHADRI
Dept.: Electrical Maintenance
Document Title : LIST OF RECORDS
Sheet
: 04 of 04

Sl.
No.

Revision
03
Effective Date: 03.12.2012

Title of the Record

Soft Copy/
Hard Copy

Record
Ref. No.

Location

Retention
Period

Base documents for LMI

Hard Copy

1801/18

SANKALP

5 Years

48

Battery disposal balance

Hard Copy

1802/43

Switchyard

5 years

49

Transformer oil disposal


balance

Hard Copy

1802/44

Switchyard

5 years

50

Gas leak & filling Record

Hard Copy

EMD/REC
/028

SANKALP

5 Years

51

Customer Feedback

Hard Copy

1801/19

SANKALP

3 Years

47

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : List of instruments for external calibration
Sheet
: 01 of 01

SIMHADRI
Revision
02
Effective Date: 15.03.2008

LIST OF INSTRUMENTS / EQUIPMENT FOR EXTERNAL


CALIBRATION

Sl.
No
01
02

Name of the
equipment
Static energy meter
test set(0.02 class)
Fluke meter 336

03

Multimeter

04

Earth leakage clamp


tester
AC/DC Clamp leaker

05

Make & Eqpt.


Sl. no
ZERA ,
NR.02-925-04
Fluke 336,
85712369
Yokogawa,
2201671
AVO, HA39379

Measuring
parameter
Energy

Periodicity of
calibration
2 Years

AC & DC current

2 Years

Multimeter

2 Years

Low AC current

2 Years

Multi ,
00202

AC & DC Low
current

2 Years

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : List of instruments for internal calibration
Sheet
: 01 of 01

SIMHADRI
Revision
03
Effective Date: 28.01.2013

LIST OF INSTRUMENTS / EQUIPMENT FOR INTERNAL


CALIBRATION

Sl.
No.

Name of the equipment

01

NIL

Make &
Equipment
Sl. No.

Measuring
Parameter

Periodicity of
Calibration

Dept. System Manual


Dept.: Electrical
Maintenance

SIMHADRI

Document Title : DOCUMENT DISTRIBUTION RECORD


Sheet
: 01 of 01

Revision
02
Effective Date: 15.03.2008

Sl.
No.

Effective
Date

Document
No.

Document Title

Revision
No.

Distributed to :

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : MODIFICATION REQUEST FOR
DOCUMENTS
Sheet
: 01 of 01

SIMHADRI
Revision

Effective Date: 15.03.2008

To : MR / HOD
The following
modifications are
suggested to the existing
document(s) :

Sl.
No.

Reference (Sheet
No./ Para No.)

Suggested by (Sign.) :
Name & Designation :

02

Date :
ISO Clause
No.

Document No.& Title

Description of change

Approved by (Sign.) :
Name & Designation :

Revision No.

Dept. System Manual


Dept.: Electrical
Maintenance
Document Title : CORRECTIVE AND PREVENTIVE
ACTION RECORD
Sheet
: 01 of 01

SIMHADRI
Revision

02

Effective Date: 15.03.2008

Dept.:
Date

Details Of
Deviation/ NonConformity/
Potential
Nonconformity

Responsible
Section

Corrective
Action
Taken

Preventive
Action
Taken

Signature &
Remarks If
Any

You might also like