Professional Documents
Culture Documents
Sl. No.
Description
SIMHADRI
Revision
06
Effective Date: 01.04.2016
No. of
Pages
02
Revision
No.
05
Effective
Date
01.04.2013
1.
Table of contents
2.
05
06
01.04.2013
3.
Abbreviations
03
03
01.04.2012
4.
01
02A
10.03.2009
5.
ESHQSA Policy
01
03
21.11.2012
6.
01
03
03.12.2012
7.
List of Procedure/Processes/Work
Instructions/EMPS
03
03
03.12.2012
8.
Procedure/Processes/Work
Instructions/EMPS as per list
---
03
03.12.2012
9.
04
03
03.12.2012
10.
List of Forms
01
02
01.11.2010
11.
List of Drawings
01
03
03.12.2012
12.
01
02
01.11.2010
13.
List of LMIs
02
04
03.12.2012
14.
03
02
15.03.2008
15
List of Reports
01
02
01.11.2010
Description
SIMHADRI
Revision
06
Effective Date: 01.04.2015
No. of
Pages
01
Revision
No.
04
Effective
Date
03.12.2012
02
06
01.04.2015
17.
18.
02
06
01.04.2015
19.
10
06
01.04.2015
20.
List of Records
03
02
01.11.2010
21.
01
02
15.03.2008
22.
01
03
28.01.2013
Document Title
& Number
Previous
Rev. No. &
Effective
date
Current Rev.
No. &
Effective
Date
SIMHADRI
Revision
06
Effective Date: 01.04.2015
Brief Description of
Changes
Electrical System
manual
01, 10.10.07
02, 15.03.08
Process
measures review
matrix
02,15.03.08
02A,04.04.08
Departmental
quality Objective
02, 15.03.08
02A, 04.04.08
List of Copy
holders
02, 15.03.08
02A, 10.03.09
Organization
chart
02, 15.03.08
02A, 10.03.09
Department organization
chart revised due to transfers.
Responsibility
and authority of
department
personnel
02, 15.03.08
02A, 10.03.09
Environment
aspect evaluation
02, 13.03.08
02A,17.03.09
Process
measures review
matrix
02A,04.04.08
03,03.04.09
Document Title
& Number
Previous
Rev. No. &
Effective
date
Current Rev.
No. &
Effective
Date
SIMHADRI
Revision
06
Effective Date: 01.04.2015
Brief Description of
Changes
Departmental
quality Objective
02A, 04.04.08
02B,03.04.09
List of LMI
02,15.03.08
03,16.01.10
List of Reports
02,15.03.08
03,16.01.10
Responsibility
and authority of
department
personnel
02A, 10.03.09
03,16.01.10
Departmental
quality Objective
02B,03.04.09
03,16.01.10
Departmental
quality Objective
03,16.01.10
03A,05.04.10
Process
measures review
matrix
03,03.04.09
03A, 05.04.10
List of LMI
03,16.01.10
03A, 01.07.10
List of Statutory
Compliances
required
02,15.03.08
02A,01.11.10
Document Title
& Number
Previous
Rev. No. &
Effective
date
Current Rev.
No. &
Effective
Date
SIMHADRI
Revision
06
Effective Date: 01.04.2015
Brief Description of
Changes
List of forms
02,15.03.2008
02A,01.11.10
List of Reports
03,16.01.10
03A, 01.11.10
Responsibility
and authority of
department
personnel
03,16.01.10
03A,15.11.10
Departmental
quality Objective
03A,05.04.10
04, 01.04.12
Process
measures review
matrix
03A, 05.04.10
04, 01.04.12
Abbreviations
02,15.03.08
03, 01.04.12
List modified
Amendment
Record sheet
04, 01.02.11
05, 03.12.12
Amendments done
List of
procedures,
Process, WI
02, 15.03.08
03, 03.12.12
Document Title
& Number
Previous
Rev. No. &
Effective
date
Current Rev.
No. &
Effective
Date
SIMHADRI
Revision
06
Effective Date: 01.04.2015
Brief Description of
Changes
ESHQSA Policy
02, 15.03.08
03, 23.11.12
Organization
chart
02A, 10.03.09
03, 03.12.12
Environment
aspect evaluation
02A,17.03.09
03,03.12.12
List of LMI
03, 01.07.10
04, 03.12.12
List of OEM /
OES manual
02, 15.03.08
03, 03.12.12
Responsibility
and authority of
department
personnel
03A,15.11.10
04, 03.12.12
List of records
02, 01.11.10
03, 03.12.12
List of
instruments /
equipment for
internal
calibration
02,15.03.08
03, 28.01.13
Document Title
& Number
Departmental
quality Objective
Previous
Rev. No. &
Effective
date
Current Rev.
No. &
Effective
Date
SIMHADRI
Revision
06
Effective Date: 01.04.2015
Brief Description of
Changes
04, 01.04.12
05, 01.04.13
04, 01.04.12
05, 01.04.13
Process
measures review
matrix
04, 01.04.12
05, 01.04.13
Departmental
quality Objective
05, 01.04.13
06, 01.04.14
05, 01.04.13
06, 01.04.14
05, 01.04.13
06, 01.04.14
04, 01.03.14
04, 01.03.14
Responsibility and
authority of
department
03, 03.12.12
personnel
Document Title
& Number
Previous
Rev. No. &
Effective
date
Current Rev.
No. &
Effective
Date
SIMHADRI
Revision
06
Effective Date: 01.04.2015
Brief Description of
Changes
06, 01.04.14
07, 01.04.15
06, 01.04.14
07, 01.04.15
06, 01.04.14
07, 01.04.15
05, 01.03.15
Responsibility and
authority of
04, 01.03.14
department
personnel
05, 01.03.15
Departmental
quality Objective
Action plan for
achieving
objectives for 1516
Process
measures review
matrix
Abbreviation
NTPC
EMD
BHEL
APTRANSCO
MTP
CHP
HT
LT
DC
LMI
GCB
EHV
PPA
ESP
TLP
SCE
BD
PM
WOC
LWC
PTW
TB
IR
CT
PT
ECP
TRF
OEM
MCC
SAP
SIMHADRI
Revision
03
Effective Date: 01.04.2012
Full form
NTPC Limited
Electrical Maintenance Department
Bharat Heavy Electricals Limited
Andhra Pradesh Transmission Corporation
Maintenance Planning
Coal Handling Plant
High Tension
Low Tension
Direct Current
Local Management
Instructions Generator Circuit
Breaker Extra High Voltage
Power Purchase Agreement
Electro Static Precipitator
Test Lead Point
Shift Charge Engineer
Break Down
Preventive
Maintenance Work
Order Card Limited
Work Certificate Permit
To Work Terminal Block
Insulation Resistance
Current Transformer
Potential Transformer
Electrical Control Panel
Transformer
Original Equipment Manufacturer
Motor Control Centre
Systems , Applications and Products in Data Processing
Abbreviation
ESHQSA
TG
HV
S/Y
CVT
SCC
OCC
HVR
BAPCON
O/H
O&M
DGM
QSP
HOD
DOC
UCB
H2
E/F
DG
KV
VAR
CGL
PPM
BDV
ID
C&S
Ni-Cd
TP
MUT
TTB
OTI
JB
LA
SIMHADRI
Revision
03
Effective Date: 01.04.2012
Full form
Environmental, Safety , Health, Quality & Social Accountability
Turbo Generator
High Voltage
Switchyard
Capacitive Voltage Transformer
Short Circuit Characteristics
Open Circuit Characteristics
High Voltage Rectiformer
BHEL Advanced Precipitator Controller
Over Hauling
Operation & Maintenance
Deputy General Manager
Quality System Procedure
Head Of the department
Document
Unit Control Board
Hydrogen
Earth Fault
Diesel Generator
Kilo Volt
Volt Amp Reactive
Crompton Greaves Ltd.
Parts per Million
Break down Voltage
Identification
Control & Switchgear
Nickel- Cadmium
Transfer Point
Meter Under Test
Test Terminal Block
Oil Temperature Indicator
Junction Box
Lightning Arrestor
Abbreviation
PF
HF
LCM
LBB
DE
NDE
Mtc
AGM
DOP
Eqpt.
Sr. Supdt.
SAP
CFC
EMP
CEA
SIMHADRI
Revision
03
Effective Date: 01.04.2012
Full form
Power Factor
High Frequency
Leakage Current Monitor
Local Breaker Back Up
Drive End
Non Drive end
Maintenance
Additional General Manager
Delegation of Power
Equipment
Senior Superintendent
System Application Program
Cloro Fluro carbon
Environment management programme
Central Electricity Authority
SIMHADRI
Revision
: 02A
Effective Date: 10.03.2009
Soft Copy (CD)/
Hard Copy
1.
MR/AMR
2.
HOD-EM
Hard Copy
3.
4.
CHP-EM
5.
Auditors Copy
6.
O&M Library
7.
Business excellence
Department
Sl.
No.
Document
(Procedure/Process/WI) Title
Document
(Procedure/Proc
ess/WI) No.
EMD/PR/01
02,
15.03.2008
02,
15.03.2008
02,
15.03.2008
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
EMD/WI/013
02 ,
15.03.2008
6.3 of 9001
4.4.6of 14001
EMD/WI/014
Preventive Maintenance of
LT Motor .
Monthly PM of Batteries (NiCd)
EMD/WI/015
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
02
Preventive Maintenance
EMD/PC/01
03
EMD/PC/02
04
Predictive Maintenance of
Electrical Equipments
EMD/PC/03
05
EMD/WI/001
06
07
EMD/WI/006
08
Calibration of Generation
related meters in ECP
Maintenance of 11/3.3 kV and
11/0.415 kV Transformer.
Transformer oil sampling for
detailed analysis
EMD/WI/008
11
Maintenance of Electrolyser
of hydrogen plant.
12
13
14
03
03 ,
03.12.2012
Departmental System
Procedure for EMD
10
Revision
01
09
SIMHADRI
EMD/WI/005
EMD/WI/009
EMD/WI/011
EMD/WI/016
Name : C.MALAKONDAIAH
Signature :
Document
(Procedure/Proc
ess/WI) No.
EMD/WI/018
16
EMD/WI/019
19
EMD/WI/023
26
27
HT Breaker O/H.
EMD/WI/031
28
HT Switchgear O/H.
EMD/WI/032
29
P.M. of HT Motors.
EMD/WI/033
30
Disposal of Batteries(Ni-Cd)
EMD /WI/034
31
EMD /WI/035
20
21
23
24
25
Document
(Procedure/Process/WI) Title
EMD/WI/024
EMD/WI/025
EMD/WI/027
EMD/WI/028
EMD/WI/029
EMD/WI/030
SIMHADRI
Revision
03
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
02 ,
15.03.2008
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
6.3 of 9001
4.4.6of 14001
Document
(Procedure/Proc
ess/WI) No.
EMD/WI/036
33
EMD/WI/037
34
EMD/WI/020
35
Document
(Procedure/Process/WI) Title
EMD/EMP/001
SIMHADRI
Revision
03
SIMHADRI
Date : 03.12.2012
Sheet : 01 of 06
1. PURPO
SE
To describe the procedure for carrying out maintenance of electrical equipments so as to
generate electricity (4 X 500 MW) as per plan / target, optimize availability of electrical
equipments with full compliance of statutory provisions and safety regulations.
2. SCO
PE
The procedure covers maintenance activities of the major electrical equipments of NTPC
SIMHADRI (4X 500MW) at main plant, Switchyard, CHP and Offsite areas. These
equipments are Generator & Auxiliaries, HT/LT Switchgears, Transformers, Switchyard
equipments, DC system, HT/LT motors etc.
3. REFERENC
ES
a. Work Instructions as per the list enclosed.
b. LMI as per the list enclosed.
c. Manufacturers O&M Manuals as per list enclosed.
4. RESPONSIBILIT
Y:
Sl. No
Description
Responsibility
1.
Overall responsibility
HOD (EM)
2.
Sectional Heads
3.
Authorized representative of
HOD (EM)
4.
5.
Section in charge
SIMHADRI
Date : 03.12.2012
Sheet : 02 of 06
5. RECORDS :
As per the list enclosed.
6. PROCEDURE :
6.1 The maintenance jobs in electrical maintenance are carried out as per SAP online maintenance system. Maintenance Jobs are planned daily in the planning
meeting indicating the defects/condition/faults raised by operation/MTP/
maintenance departments. As maintenance of electrical equipments are critical
activities, where- in absence of written instructions, the quality of work is likely to
get affected, the jobs are controlled through written work instructions
Four types of maintenance jobs are carried out in Electrical maintenance
department.
1) Preventative
maintenance
2) Condition
maintenance
based
3) Defect/breakdown
maintenance.
4) Overha
uling
6.1.1 Preventive maintenance
Preventive maintenance jobs are carried out as per the schedule mentioned in SAP
system. Depending upon the equipment, the preventive maintenance schedules are
forwarded to MTP department by the area engineers. Accordingly preventive
maintenance jobs are planned in SAP system. Upon planning in the system
respective area engineers are taking permits from operation department through
SAP system to execute the jobs. On job completion the permits are cancelled.
SIMHADRI
Date : 03.12.2012
Sheet : 03 of 06
6.2
Laboratory:
SIMHADRI
Date : 03.12.2012
Sheet : 04 of 06
Electrical
Protective relay testing, 400KV outgoing line energy meter calibration(Used in billing
purpose) and error checking of generator related meters & transducers in electrical
control panel activities are carried out in electrical laboratory . As these activities are
critical in nature & the quality of work is likely to get affected, the jobs are controlled
through written work instructions / LMIs. The list of equipments, which are maintained
for above purpose in electrical laboratory are calibrated with reference to substandard meters which in turn will be calibrated at national accredited laboratories.
The list of instruments which will be calibrated externally at national accredited
laboratories is enclosed as Annexure-1.
SIMHADRI
Date : 03.12.2012
Sheet : 05 of 06
from
SIMHADRI
Date : 03.12.2012
Sheet : 06 of 06
Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Preventive
Maintenance
SIMHADRI
Date : 03.12.2012
Sheet : 01 of 02
1. OBJECTIVE
To carryout preventive maintenance of electrical equipment so as to ensure and increase
the availability of the equipment.
2. BOUNDARY
Preparation of maintenance schedule to carry out maintenance.
3. REFERENCES
Procedure
Work Instructions as per the list enclosed.
SAP
4. PROCESS OWNER
Sl.No
Description
Responsibility
HOD (EM)
Area Engrs
5. RECORDS
As per the list enclosed.
6. PROCESS MAP
6.1 PROCESS INPUTS
Sl.No
Input
Source
Frequency
Reference
Review Criteria
6.1.1
PM WOC
MTP
As indicated by
SAP
% of PM WOC
area engineer
6.1.2
PM WOC
MTP
As indicated
by area
engineer
attended.
SAP
% Availability
of the Critical
equipment
Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Preventive
Maintenance
SIMHADRI
Date : 03.12.2012
Sheet : 02 of 02
Activity
Responsibility
Reference
Document/format
6.2.1
Preparation of Maintenance
Area engineer
Schedules
6.2.2
Implementation of
MTP
PM Schedules
6.2.3
Follow up of PM
Sectional heads
6.2.5
Work execution
Operation
PTW /LWC as
department
per SAP
Area engineer
Sl.No
Output
To
Reference
Document /
6.3.1
Availability of equipment
Sectional heads
format
Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Break down
Maintenance
SIMHADRI
Date : 03.12.2012
Sheet : 01 of 03
1. OBJECTIVE :
To carryout breakdown maintenance of electrical equipment ( 4 X 500MW) so as to
reduce the down time and make the equipment available. Break down maintenance
is being carried out as per the SAP notifications raised by operation , electrical
maintenance or any other department. Breakdown maintenance jobs are planned by
MTP as per the schedules given by the area engineers for A and C priority jobs. E
priority jobs are carried out immediately by the area engineer.
2. BOUNDARY:
Application
equipment.
for
breakdown
maintenance
of
electrical
3. REFERENCES
Past experience.
O&M Manuals.
4. PROCESS OWNER
Sl.No
Description
Responsibility
HOD (EM)
Sectional Heads /
Area engineers
5. RECOR
DS SAP
Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Break down
Maintenance
SIMHADRI
Date : 03.12.2012
Sheet : 02 of 03
6. PROCESS MAP
6.1 PROCESS INPUTS
Sl.No
Input
Source
Review Criteria
6.1.1
Defect observed
Daily inspection by
BD WOC attended.
/ reported
maintenance personnel or
BD WOC
operation
SAP
6.1.2
BD WOC attended.
Activity
Responsibility
Reference
Doc
6.2.1
Area engineer
Past experience,
O&M Instruction
Manual.
Output
To
6.3.1
Sectional heads
Reference Doc
Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Break down
Maintenance
SIMHADRI
Date : 03.12.2012
Sheet : 03 of 03
Monitoring
Responsibility
Stage /
Reference Doc
Frequency
1
BD WOC raised
Area engineers
SOS
Not Applicable
Area engineers
As and when
Not Applicable
Sectional
As and when
heads
required
, attended
2
required
Not Applicable
Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Predictive
Maintenance of Electrical
Equipments
SIMHADRI
Date : 03.12.2012
Sheet : 01 of 03
1.OBJECTIVE
To carryout predictive (diagnostic) maintenance of electrical equipment ( 4 X 500MW
) for finding out abnormality in the equipment so that timely action can be taken to
avoid breakdowns. These type of Maintenance jobs are planned and carried out
by area engineers.
2. BOUNDARY
Application
equipment.
for
predictive
maintenance
of
electrical
3. REFERENCES
Procedure
Work
Instructions SAP
4. PROCESS OWNER
Sl.No
Description
Responsibility
HOD (EM)
Sectional Heads
5. RECOR
DS SAP
Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Predictive
Maintenance of Electrical
Equipments
SIMHADRI
Date : 03.12.2012
Sheet : 02 of 03
6. PROCESS MAP
6.1 PROCESS INPUTS
Sl.No
Input
Source
Frequency
Reference
Review
Criteria
6.1.1
Predictive
SAP
As
NIL
Break down
maintenance
indicated by
of
schedules
area
equipments
engineer
6.2 ACTIVITY AND INTERFACES
Sl.No
Activity
Responsibility
Reference
Doc
6.2.1
Preparation of predictive
Area engineer
Maintenance Schedules
6.2.2
Implementation of
Area Engineer
predictive maintenance
6.2.3
Schedules
Follow up
Sectional heads
6.2.4
Operation
if applicable
department
Work execution
Area engineer
6.2.5
Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Predictive
Maintenance of Electrical
Equipments
SIMHADRI
Date : 03.12.2012
Sheet : 03 of 03
Sl.No
Output
To
Reference Doc
6.3.1
Sectional heads
Sl.No
Monitoring
Responsibility
Stage /
Frequency
Predictive maintenance
WOC attended
Area engineers
As per the
schedule
in SAP
Reference Doc
Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Recording of various
parameters of Generator
1.
SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02
PURPOSE
REFERENCES
SUPPLIER MANUALS
3.
RESPONSIBILITY
Area engineer
4.
RESOURCES REQUIRED
SL
RESOURCE
DESCRIPTION
NO
1
MAN POWER
PERSONAL PROTECTION
EQUIPMENT
ENGINEER-1, TECHNICIAN-1
FOR TWO HOURS.
Not Required
Safety Helmet and safety shoe
Name :
M.V.S.PRABHAKAR
Signature :
5.
Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Recording of various
parameters of Generator
SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02
RECORDS
SL NO
1
DESCRIPTION Location
CHECK
LIST Sankalp
FORMAT/
RETENTION
FORM NO.
PERIOD
EMD/FORM/001 01 Year
OF
GENERATOR
PARAMETERS
RECORD
BOOK
6.
INSTRUCTIONS
SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /005 Doc. Title : Maintenance of Paddle Date : 15.03.2008
Rev. No.: 02
Sheet : 01 of 03
Feeders
1. PURPOSE
SUPPLIER MANUALS
3. RESPONSIBILITY
Area engineer
4. RESOURCES REQUIRED
SL
NO
1
RESOURCE
MAN POWER
DESCRIPTION
TECHNICIAN 1, HELPER 01.
AIR BLOWER, SPANNER SET, SCREW
DRIVER SET, HAIR BRUSH, CLEANING
AGENT, MEGGER.
PERSONAL
3
PROTECTION
EQUIPMENT
SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /005 Doc. Title : Maintenance of Paddle Date : 15.03.2008
Rev. No.: 02
Sheet : 02 of 03
Feeders
5. RECORDS
SL
DESCRIPTION
Location
NO
1
History
for
Register CHP
FORMAT/
RETENTION
FORM NO.
PERIOD
EMD/REC/004
03 Years
Paddle
Feeders
6. INSTRUCTIONS
6.1
6.2
6.3
OBTAIN PTW.
CHECK FOR ISOLATION.
EXTERNALLY CLEAN THE PADDLE FEEDER OF ALL COAL PIECES AND DUST
ACCUMULATION COMPLETELY CLEAN THE CONTROL PANEL WITH AIR
BLOWER.
6.4
6.5
6.6
6.7
SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /005 Doc. Title : Maintenance of Paddle Date : 15.03.2008
Rev. No.: 02
Sheet : 03 of 03
Feeders
6.8
6.9
6.10
6.11
6.12
CLEAN THE SLIP RING ASSEMBLY OF PCRD & CCRD AND CHECK FOR PROPER
CLAMPING OF THE CABLE.
6.13
6.14
6.15
6.16
6.17
6.18
6.19
CHECK THE CENTRE JUNCTION BOX AND CLEAN THE JUNCTION BOX AND
CHECK THE CONNECTION TIGHTNESS
6.20
Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /006
Rev. No.: 02
SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02
1. PURPOSE
To carryout preventive maintenance of CHP area motors as per SAP Schedule.
2. REFERENCES
SUPPLIER
MANUALS
3. RESPONSIBILITY
Area engineer
4. RESOURCES REQUIRED
SL
NO
1
RESOURCE
MAN POWER
DESCRIPTION
TECHNICIAN 1, HELPER 01.
SPANNER SET, CRC 226, SCREW
PERSONAL PROTECTION
EQUIPMENT
DRIVER SET .
SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02
5. RECORDS
SL
DESCRIPTION
Location
NO
1
PERIOD
EMD/REC/005
03 Years
Motor Maintenance
6. INSTRUCTIONS
6.1
6.2
Obtain PTW.
Clean the motor body and open motor T.B cover and discharge the power
termination.
6.3
6.4
6.5
Check and ensure double earthing of motor body and ensure tightness.
6.6
Ensure proper glanding of power cable and seal extra gland holes if any.
6.7
6.8
6.9
Open fan cover and clean before putting back the cover.
6.10
Clear PTW.
6.11
SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02
1. PURPOSE
Calibration of Generation related Transducer along with indication meters in
Electrical Control Panel (ECP).
2. References :
Manuals and drawings of BHEL on ECP
3. RESPONSIBILTY
Electrical Lab in-charge
4. Resources required
Sl
No
1
Resources
Description
Manpower
1.
2.
3.
4.
5.
6.
7.
Safety shoe
4. Records
Sl
Description
No.
1
Transducer Calibration
Location
Format Number
Retention Period
Electrical
Laboratory
EMD/FORM/009
3 Years
Signature :
SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02
6.1 Instructions
6.2 Ensure availability of PTW
6.3 Find out the applicable current & voltage terminals at the terminal block for
the selected transducer from the drawing.
6.4 The current terminals shall be shorted at the terminal block towards
Current transformer side.
6.5 Disconnect the current & voltage input terminals in the transducer
without disturbing the other circuit connections.
6.6 Connect the Power meter in between the Current & voltage injector
source & the transducer.
6.7 Inject the required current & voltage inputs to transducer input terminal
with the help of current/voltage source.
6.8 Check the output of the transducers. If the transducer reading is not
matching with the theoretical output, replace the transducer or adjust to get
the required output.
6.9 After ensuring healthiness of the transducer, check the power meter
indication readings with the ECP indication meters reading
6.10
Adjust the ECP indication meters if required.
6.11
6.12
6.13
Name : C.MALAKONDAIAH
Signature :
1.
SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02
PURPOSE
Preventive Maintenance (PM) of 11/3.3KV, 11/0.415KV Transformers as per
SAP schedule.
2.
References
Manuals of BHEL/CGL/Bharat Bijlee / Voltamp
3.
RESPONSIBILITY
Area Engineer
4.
Resources required
Sl .
No
1
2
3
5.
Resources
Description
Manpower
Spares
Records
Sl. Description
No.
1
Check list for
transformer
48weekly
PM
2
Check
list for UAT
48weekly PM
Location
Format Number
Retention Period
Sankalp EMD
Office
EMD/FORM/014
3 Years
Sankalp EMD
Office
EMD/FORM/014A 3 Years
Dept.: ELECTRICAL
MAINTENANCE
Doc. Title : Maintenance of
11/3.3KV and 11/0.415 KV
Transformer
SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02
6.1 Instructions
6.2
6.3
6.4
6.5
6.6 Follow each and every step in line with transformer PM format
EMD/FORM/014.
6.7 Box up the transformer LV/HV compartments on completion of job.
6.8 Normalise chamber Marshalling Box AC supply.
1.
Dept.: ELECTRICAL
MAINTENANCE
Doc. Title: Transformer oil
sampling
SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02
PURPOSE
Transformer oil sampling for detailed analysis as per requirement
2.
References Previous
Experience
3.
RESPONSIBILITY
Area Engineer
4.
Resources required
Sl No
1
Resources
Manpower
Tools and tackles
2
3
5.
Description
1 Technician. 1 Skilled Man
Steel sampling bottles, set of
spanners, cotton waste, sampling
attachment, bucket
Safety Shoe and safety helmet
Records
Sl Description
Location
No.
Sankalp
1
Record of oil
Samples in data base EMD Office
Format
Number
EMD/FORM/016
Retention
Period
03 years
Dept.: ELECTRICAL
MAINTENANCE
Doc. Title: Transformer oil
sampling
SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02
6.0 Instructions
6.9
6.1.
6.2
6.3
6.4
Open the sampling valve slowly and allow oil to flow freely through the bottle.
6.5
6.6
6.7
6.8
Collect the oil for final sampling with the non connected end of the bottle in 16
degree upward position.
6.10
Allow oil to flow freely to ensure that there is no entrapped air bubbles.
6.11
6.12
6.13
6.13
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Maintenance of
Electrolyser of Hydrogen
Plant
1.
SIMHADRI
Date :15.03.2008
Sheet : 01 of 02
PURPOSE
To carry out maintenance of the electrolyser as per SAP.
2.
References
Manufacturers manual
3.
RESPONSIBILITY
Hydrogen Plant In-Charge
4.
Sl
No
1
Resources required
Resources
Manpower
Tools and tackles
2
Personnel protective equipment
3
5.
1 Electrician + 1 Helper
1. Digital multimeter.
2. Plastic bottle.
3. Hydrometer with aspirator.
4. Thermometer.
5. Measuring Cylinder
1. Gum Boots
2. Face Mask
3. Apron
4. Plastic hand Gloves
Records
Sl Description
No.
1
Lye replacement
2
Description
Check list
Location
Format Number
Hydrogen
Plant
Hydrogen
Plant
EMD/FORM/018
Retention
Period
3 year
EMD/FORM/019
3 year
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Maintenance of
Electrolyser of Hydrogen
Plant
SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02
6.1 Instructions
6.2 Ensure availability of PTW
6.3 Do not touch the live part of the electrolyser.
6.4 Check gas, Water and electrolyte leakage from the electrolyser.
6.5 Check and record the concentration and specific gravity of the
electrolyte.
6.6 Fill the details given in the check list formats.
6.7 Arrange for cancellation of PTW.
1.
Dept.: ELECTRICAL
MAINTENANCE
Doc. Title: Over Hauling of LT
MCC
SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02
PURPOSE
Carry out of Overhaul maintenance of LT MCC.
2.
REFERENCES :
C&S switchgear maintenance manual, breaker maintenance manual, past
experience.
3.
RESPONSIBILITY
Area Engineer
4.
5.
RESOURCES REQUIRED
SL.NO
1
RESOURCE
Manpower
Personal Protection
Equipment
DESCRIPTION
1 Engineer + 2 Technician + 2 Skilled
workmen
Ring Spanner set, D Spanner set,
Screw driver(Heavy duty), Screw
driver(Light duty), Combination pliers,
Ratchet spanner set, Air Blower,
Brushes of various sizes, PVC
insulation
tape,
Cleaners,
Rust
removers/preventers,
Megger,
Multimeter, Markin cloth, Jute.
Safety Helmet and safety shoe
RECORDS
Sl.
No
1
Description
Location
Form No.
LT Switch gear
checklist
Sankalp
EMD Office
EMD/FORM/020
Retention
Period
5 Years
6.
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title : Over Hauling of LT
MCC
SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02
INSTRUCTIONS
6.1.
6.2. Check all the necessary isolations and locking of Incomers and tie feeders.
6.3. Carry out the work and record all the observations as per the
format of check sheet.
6.4. Return the PTW
SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /015 Doc.Title: Preventive maintenance Date : 15.03.2008
Rev. No.: 01
Sheet : 01 of 02
of LT Motor
1. PURPOSE
Preventive Maintenance of LT Motor as per SAP schedule.
2. REFERENCES :
Motor manufacturers recommendations and past experience.
3. RESPONSIBILITY
Area engineer
4. RESOURCES REQUIRED
SL.NO
1
RESOURCE
Manpower
Personal Protection
Equipment
DESCRIPTION
1 Engineer + 1 Technician + 1 Skilled
workmen
Spanner set, Screw driver, Ratchet
spanner set, Air Blower, Cleaning
Brushes,
Cleaning
solvent/agent,
Megger, Motor checker, Markin cloth,
Jute etc., as per the requirement
Safety Shoe and safety helmet
5. RECORDS
Sl.
No
1
Description
Location
Sankalp
EMD Office
Form No.
EMD/FORM/021
Retention
Period
3 Years
SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /015 Doc.Title: Preventive maintenance Date : 15.03.2008
Rev. No.: 02
Sheet : 02 of 02
of LT Motor
6. INSTRUCTIONS
6.3.
Carry out the work as per the check sheet and record the readings and
observations in check sheet.
6.4.
SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Date : 15.03.2008
Doc.Title: Monthly Preventive
Sheet
: 01 of 02
maintenance of Batteries(Ni-Cd)
1. PURPOSE
To carry out monthly preventive maintenance of batteries ( Ni-CD )
2. References
Manuals of HBL- NIFE batteries and AMCO batteries.
3. RESPONSIBILITY
Area engineer
4. Resources required
Sl No
2
Manpower
Tools and tackles
Description
1 skilled workmen+1 unskill workmen.
Spanners multi- meter, pliers, screw dri
Gloves.
Resources
5.RECORDS
Sl.
No
1
Description
Location
Battery
Readings
Switchyard
Form No.
EMD/REC/006
Retention
Period
1 Year
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Monthly Preventive
Maintenance of Batteries(Ni-Cd)
SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02
6 .0 Instructions
6.1
The work is to be carried out on monthly basis on each battery set as per the
instruction of the area engineer.
6.2
Sulphation at any cell terminals are to be removed with Insulated scrapper and
then tightness of all cell terminals to be ensured with insulated spanners.
6.3
6.4
Outer surface of all the cells in the battery sets are to be cleaned with dry markin
cloth.
6.5
6.6 Any abnormality observed on battery set while performing the Work shall be
informed to the area engineer.
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Cathodic Protection
Checking
SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02
1. PURPOSE
To Carryout Monthly Pipe to Soil Potential (PSP) reading for Cathodic
Protection system.
2. References
Supplier
Manuals
3. RESPONSIBILITY
Area engineer
4. Resources Required
Sl
No
1
Resource
Description
Man Power
Personnel Protection
Equipment
Supervisor-1,Electrician-1,Helper1
Multimeter, Testing Electrode,
Panel key, Grease
Safety Shoe
5. Records
Sl.
No
1
Description
Location
Cathodic
Protection
Checking
Switchyard
Form No.
EMD/FORM/023
Retention
Period
3 Years
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Cathodic Protection
Checking
SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02
6.0 Instructions
Necessary information to be given to the Operator Present at the
Location.
6.2 Record the Readings at TR Unit-1
6.3 Record the Readings at TR Unit-2
6.4 Record the Readings at all TLP Points
6.5 Ensure the readings between ( - ) 0.85 & ( - ) 1.2 Volts
6.6 Incase the recorded values are not in the range mentioned above, adjust
the Potentiometer/ Variac to adjust the impress Current at TR Units.
1.
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Calibration of Energy
Meters
SIMHADRI
Date : 15.03.2008
Sheet : 01 of 03
PURPOSE
To carry out calibration of 0.2 class commercial energy meters installed
in the 400 KV out going lines as per PPA agreement.
2.
REFERENCES
Power Purchase Agreement
Energy meter Manual
Instruction manual for 0.02 Class ZERA testing Kit
3.
RESPONSIBILITY
Switchyard Area Engineer
4.
RESOURCES REQUIRED
SL.NO
1
RESOURCE
Manpower
DESCRIPTION
1 Engineer + 1 Technician + 1 Skilled
workmen
Screw drivers , 1-ph 230 V ac supply
, Off-line accuracy checking kit 0.02
Class (Zera)
Not applicable
5.
SIMHADRI
Date : 15.03.2008
Sheet : 02 of 03
RECORDS
Sl.
No
1
2
6.
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Calibration of Energy
Meters
Description
Location
Form No.
Switchyard
EMD/FORM-24
Retention
Period
5 Years
Switchyard
EMD/FORM-25
2 Years
INSTRUCTIONS
6.1
6.2
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Calibration of Energy
Meters
SIMHADRI
Date : 15.03.2008
Sheet : 03 of 03
Make the computed energy statement as per the EMD/FORM/025. Get the
computed energy statement and test report signed by APTRANSCO
representative. Inform the switchyard SCE about the computed energy. Cancel
the PTW.
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: 400 KV CT Annual /
Bi Annual maintenance
SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02
1. PURPOSE
To carry out the annual / bi annual maintenance of 400 KV Current
Transformer .
2. REFERENCES
400 KV CT Instruction manual.
3. RESPONSIBILITY
Switchyard Engineer
4. RESOURCES REQUIRED
SL.NO
1
RESOURCE
Manpower
DESCRIPTION
1 Engineer + 1 Technician + 2
skilled workmen + 2 unskilled
workmen.
Multimeter , screw drivers , Nitrogen
Filling hose , pressure gauge.
Safety Shoe , Safety Belt and safety
helmet.
5. RECORDS
Sl.
No
1
Description
Location
Form No.
400 KV CT History
Register
Switchyard
EMD/REC/010
Retention
Period
10 Years
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: 400 KV CT Annual /
Bi Annual maintenance
SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02
6.1 INSTRUCTIONS
6.2 Obtain PTW from Switchyard SCE.
6.3 Ensure the proper isolation and earthing of the equipment under PTW.
6.4 Open the CT secondary terminal box and ensure that no water ingress is there.
If water ingress is observed, analyze the cause and attend the same.
6.5 Check the CT secondary terminal tightness in secondary terminal box, CT
JB and in Control and Relay panels.
6.6 Clean the porcelain bushings and check for any cracks.
6.7 Check the secondary terminal board, primary terminals and top chamber
cover for any oil leakages.
6.8 Check the oil level in the top view glass.
6.9 Check the nitrogen pressure and top up the nitrogen if required up to 5 psi.
6.10 Check the Capacitance and Tandelta values of the CT and record the same
in the CT History register. If the Tandelta value is >0.7% or Capacitance
value is
>1000pF then plan for the replacement of the CT at the earliest.
6.11Ensure the tightness of P.F terminal earthing connection after Capacitance
and tandelta measurement.
6.12Check the tightness of primary connections.
6.13Record any abnormalities and activities done in the history
register EMD/REC/010
6.14Apply RTV sealant to the CT secondary terminal box for ensuring
proper sealing of the box.
6.15Cancel the PTW
1.
SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: 400 KV CVT Annual / Bi Date : 15.03.2008
Sheet : 01 of 02
Annual maintenance
PURPOSE
To carry out the annual/ Bi annual maintenance of 400 KV Capacitive Voltage
Transformer (CVT).
2.
REFERENCES
400 KV CVT Instruction manual.
3.
RESPONSIBILITY
Switchyard Area engineer
4.
RESOURCES REQUIRED
SL.NO
1
RESOURCE
Manpower
DESCRIPTION
1 Engineer+ 1 Technician +
2
skilled workmen + 2 unskilled
workmen.
Multimeter , screw drivers , Nitrogen
Filling hose , pressure gauge.
Safety Shoe and safety helmet.
5. RECORDS
Sl.
No
1
Description
Location
Form No.
Switchyard
EMD/REC/011
Retention
Period
10 Years
SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: 400 KV CVT Annual / Bi Date : 15.03.2008
Sheet : 02 of 02
Annual maintenance
6.1 INSTRUCTIONS
6.2 Obtain PTW from Switchyard SCE.
6.3 Ensure the proper isolation and earthing of the equipment under PTW .
6.4 Open the CVT secondary terminal box and ensure that no water ingress is there.
If water ingress is observed , analyse the cause and attend the same .
6.5 Check the CVT secondary terminal tightness in secondary terminal box , CVT
JB and in Control and Relay panels.
6.6 Clean the porcelain bushings and check for any cracks.
6.7 Check the secondary terminal box and HF link chamber for any oil leakages
and attend the same .
6.8 Check the oil level in the view glass and top up if required .
6.9 Check the nitrogen pressure and top up the nitrogen if required up to 5 psi.
6.10Check the tightness of primary connections .
6.11Check the Capacitance and Tandelta values of the CVT and record the same
in the CT History register. If the Tandelta value is >0.7% then plan for the
replacement of the CVT at the earliest.
6.12Ensure the tightness of P.F terminal earthing connection after Capacitance
and tandelta measurement.
6.13Cancel the PTW
6.14Measure the secondary voltages after the energisation of CVT
and record
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: 400 KV Lightening
Arrestor Annual / Bi Annual
Maintenance
SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02
1. PURPOSE
To carry out the annual / Bi annual maintenance of 400 KV Lightening
Arrestor (LA).
2. REFERENCES
400 KV LA Instruction manual.
3. RESPONSIBILITY
Switchyard Area Engineer
4. RESOURCES REQUIRED
SL.NO
1
RESOURCE
Manpower
DESCRIPTION
1 Technician + 1 skilled workmen + 2
unskilled workmen.
Multimeter , screw drivers , Leakage
Current Monitor (LCM-II) kit , 1-phase
variac.
Safety Shoe and safety helmet.
5. RECORDS
Sl.
No
1
Description
Location
Form No.
400 KV LA History
Register
Switchyard
EMD/REC/012
Retention
Period
10 Years
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: 400 KV Lightening
Arrestor Annual / Bi Annual
Maintenance
SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02
6.1 INSTRUCTIONS
6.2 Obtain PTW from Switchyard SCE.
6.3 Ensure the proper isolation and earthing of the equipment under PTW .
6.4 Clean the LA stacks and inspect for any cracks or damages in the
porcelain stacks.
6.5 Check the healthiness of the operation counter by applying 1-phase voltage
to the counter.
6.6 Cancel the PTW
6.7 Take LA into service.
6.8 Measure the LA leakage currents (both capacitive and resistive
components) On monthly basis with the LCM-II kit and record the values in
the LA history register EMD/ REC/012.
Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /027 Doc.Title: Annual / Bi Annual
Rev. No.: 02
Checking of 400 KV Bus bar
Protection Healthiness .
SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02
1. PURPOSE
To check the healthiness of 400 KV Bus bar protections Main 1 & Main 2 for
both 400 KV bus 1 and 2.
2. REFERENCES
Bus Bar Protection instruction manuals.
Bus Bar protection Schematic Drawings.
3. RESPONSIBILITY
Switchyard area engineer
4. RESOURCES REQUIRED
SL.NO
1
RESOURCE
Manpower
DESCRIPTION
1Engineer + 1 Technician +1 skilled
workmen.
Secondary injection kit , clamp on
meter , Multimeter , screw drivers.
Safety Shoe
5. RECORDS
Sl.
No
1
Description
Location
Form No.
Busbar protection
History register
400 KV
Switchyard
EMD/REC/014
Retention
Period
10 years
Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /027 Doc.Title: Annual / Bi Annual
Rev. No.: 02
Checking of 400 KV Bus bar
Protection Healthiness .
SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02
6.1 INSTRUCTIONS
6.2 Obtain PTW from Operation .
6.3 Ensure the proper isolation of the corresponding 400 KV Bus.
6.4 Inject the current in the secondary circuit of Main-1 protection and ensure
the operation of the relay . Check for the set values of alarm and trip and
actual operated values.
6.5 Inject the current in the secondary circuit of Main-2 protection and ensure
the operation of the relay . Check for the set values of alarm and trip and
actual operated values.
6.6 Inject the current in the secondary circuit of both Main-1 and Main-2
protection and check for the operation of bus bar trip relays (96) .Ensure
tripping of all the feeders connected to that particular bus.
6.7 Check the initiation of Bus bar to LBB protection for all the feeders connected
in that bus.
6.8 Check the alarm and event logger contacts.
6.9 Check the LBB to Bus bar initiation and ensure tripping of bus bar on
LBB initiation for all the feeders connected in that bus.
6.10Reset all the relays and ensure the changeover of all the LBB , Trip relay
contacts for all the feeders connected in that bus.
6.11Tighten all the connections .
6.12Record the set values and operated values of the currents and relays
operated in EMD/REC/014.
6.13Cancel the PTW and normalize the bus.
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Annual / Bi Annual
Checking of 400 KV LINE
Protection .
SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02
1. PURPOSE
To check the healthiness of 400 KV line protections Main 1 & Main 2 and
carrier trippings for 400 KV Lines.
2. REFERENCES
Line distance protection instruction manuals.
Line protection Schematic Drawings .
Recommended Relay Settings for 400 KV Lines
3. RESPONSIBILITY
Switchyard Area Engineer
4. RESOURCES REQUIRED
SL.NO
1
RESOURCE
Manpower
DESCRIPTION
1Engineer + 1 Technician +1 skilled
workmen.
Distance
relays
testing
kit
,
Multimeter , screw drivers.
Safety Shoe
5. RECORDS
Sl.
No
1
Description
Location
Form No.
Line protection
History register
400 KV
Switchyard
EMD/REC/015
Retention
Period
05 years
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Annual / Bi Annual
Checking of 400 KV LINE
Protection .
SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02
6.1 INSTRUCTIONS
6.2 Obtain PTW from Operation .
6.3 Ensure proper isolation of the line from both ends.
6.4 Isolate the Main-1 and Main-2 relays from yard side by opening the CT
/PT disconnecting links .
6.5 Setup the distance relay testing kit and give the CT /PT connections to the relay.
6.6 Inject the current and voltages as per the relay settings of Zone-1 ,2 , 3 etc
and ensure the operation of the relay for correct impedance and timings .
6.7 Ensure the carrier transmission as per the relay settings.
6.8 Check the operation of Auto re-close relay for single phase faults.
6.9 Check the operation of Over voltage relays and tee differential relays.
6.10
advancement of Tx/Rx counters for carrier send /receive and check event
logger contacts also.
6.10. Check the triggering of disturbance recorder and observe the waveforms .
6.11 Remove the kit connections and normalize the CT / PT connections .
6.12 Record the observations and relays operated in EMD/REC/015
6.13 Cancel the PTW and normalize the line.
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Annual / Bi Annual
Checking of 400 KV Bay
Protection .
SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02
1. PURPOSE
To check the healthiness of 400 KV Switchyard bay protections Main 1 &
Main 2 , Interlocks and alarms .
2. REFERENCES
Bay protection Relays instruction Manual.
Bay protection Schematic Drawings .
Recommended relay Settings for 400 KV Switchyard .
3. RESPONSIBILITY
RESOURCE
Manpower
DESCRIPTION
1Engineer + 1 Technician +2 skilled
workmen.
Secondary injection kit , Multimeter ,
screw drivers.
Safety Shoe
5. RECORDS
Sl.
No
1
Description
Location
Form No.
400 KV Bay
protection History
register
400 KV
Switchyard
EMD/REC/016
Retention
Period
05 years
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Annual / Bi Annual
Checking of 400 KV Bay
Protection .
SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02
6.1 INSTRUCTIONS
6.2 Obtain PTW from Operation .
6.3 Measure and record the spill currents of Main-1 and Main-2 protections .
6.4 Ensure proper isolation of the bay.
6.5 Check the bay protection Main-1 and Main-2 relays for their correct
operation with secondary injection kit . Ensure the changeover of the relay
aux. contacts.
6.6 Check the operation of the Master trip relay and ensure the tripping of the
breaker .
6.7 Check the correct operation of various breaker protection auxiliary relays
by Initiating the contacts from 400 KV breaker. Check the corresponding
alarms and event logger contacts.
6.8 Put back the Main-1 and Main-2 relays and normalize the connections.
6.9 Record the relays operated and observations in EMD/REC/016
6.10Cancel the PTW.
SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: HT MOTOR OVERHAULING Date : 15.03.2008
Sheet : 01 of 03
1. PURPOSE
Overhauling of HT motor 11/ 3.3 KV in the main plant and off site as & when
directed by MTP .
2. REFERENCES
Instruction manual for HT Motors .
3. RESPONSIBILITY
Area engineer
4. RESOURCES REQUIRED
SL.NO
1
RESOURCE
Manpower
DESCRIPTION
1Engineer + 1 Technician +2 skilled
workmen + 2 unskilled workmen + 1
Fitter + 1 rigger
Chain block , hook chuk , D-shackles
, slings , Inside & Outside micro
meter, Bearing Puller , spanner set ,
Alignment checker, Hydraulic Jack ,
0- 5 KV Megger.
Safety Shoe , Safety helmet.
5. RECORDS
Sl.
No
1
Description
Location
Form No.
HT Motors Mtc
Switchyard
EMD/REC/017
Retention
Period
5 years
SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: HT MOTOR OVERHAULING Date : 15.03.2008
Sheet : 02 of 03
6.1 . INSTRUCTIONS
6.2 Obtain PTW from Operation .
6.3 Ensure the proper isolation of the corresponding HT breaker and breaker
is isolated and panel is locked .
6.4 Open the motor T.B cover & discharge with earthing rod .
6.5 Open cable termination (power & CT cables) , earthing connection and
space heater connections.
6.6 Decouple the drive after noting down the alignment reading . Disconnect all
lube oil / cooling water lines ( Wherever applicable).
6.7 Dismantle and lift the rain hood wherever provided.
6.8 Lift and shift the motor with proper care to workshop or any other
suitable location.
6.9 Dismantle the motor coupling , fan, DE and NDE side end covers.
Take out the rotor.
6.10
Note down any abnormality in stator winding for over heating, condition of
stator wedges & slots , deposit of excess grease on stator over heating
portion , mechanical damage and crack in rotor , condition of bearings.
6.10. Clean the stator winding , rotor, bearings , end covers and all other dismantled
parts with proper cleaning agents . Clean heat exchanger tubes with nylon
brush.
6.11 Check bearing condition ,measure bearing clearances . Replace with new ones
if necessary .
SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: HT MOTOR OVERHAULING Date : 15.03.2008
Sheet : 03 of 03
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: HT Breaker OVERHAULING .
SIMHADRI
Date : 15.03.2008
Sheet : 01 of 03
1. PURPOSE
Overhauling of HT breaker 11/ 3.3 KV in the main plant and Ash handling
plant and off sites.
2. REFERENCES
Instruction manual for HT Breakers.
Past experience
3. RESPONSIBILITY
Area engineer
4. RESOURCES REQUIRED
SL.NO
1
RESOURCE
Manpower
DESCRIPTION
1Engineer + 1 Technician +2 skilled
workmen + 2 unskilled workmen.
0- 5 KV Megger, Contact resistance
meter , vacuum tester , timing kit ,
Multimeter, blower , spanner set ,
cleaning agents and grease.
Safety Shoe , Safety helmet.
5. RECORDS
Sl.
No
1
Description
Location
Form No.
HT Breaker Mtc
Switchyard
EMD/REC/018
Retention
Period
3 years
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: HT Breaker OVERHAULING .
SIMHADRI
Date : 15.03.2008
Sheet : 02 of 03
6.1 INSTRUCTIONS
6.2 Obtain PTW from Operation .
6.3 Ensure the proper isolation of the corresponding HT breaker and Breaker is
kept in test position .
6.4 Clean the breaker thoroughly.
6.5 Check the tightness of all control cable terminations.
6.6 Inspect the healthiness of multi pin plug and replace if required .
6.7 Lubricate all moving parts .
6.8 Clean the isolating finger contacts.
6.9 Check the tightness of nut , bolts.
6.10
Inspect finger contacts for over heating , looseness and replace if necessary .
6.10. Perform close trip operation of the circuit breaker both manually and electrically
in test position .Measure close , open , Close-Open timings and adjust the
timings if required .
6.11 Measure the contact resistance and check the healthiness of vacuum
with vacuum tester.
6.12 Check the healthiness of all indicating lamps , aux.switches.
6.13 Check the electrical and mechanical interlocks.
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: HT Breaker OVERHAULING .
SIMHADRI
Date : 15.03.2008
Sheet : 03 of 03
Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /032
Rev. No.: 02
Doc.Title:
HT Switchgear
OVERHAULING .
SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02
1. PURPOSE
Overhauling of HT Switchgear 11/ 3.3 KV in the main plant and Ash handling
plan-t and off sites.
2. REFERENCES
Past experience
3. RESPONSIBILITY
Area Engineer
4. RESOURCES REQUIRED
SL.NO
1
RESOURCE
Manpower
DESCRIPTION
1Engineer + 1 Technician +2 skilled
workmen + 2 unskilled workmen.
0- 5 KV Megger, voltage detector ,
Discharge rod ,Torque wrench ,
markine cloth Multimeter, blower ,
spanner set , cleaning agents .
Safety Shoe , Safety helmet.
5. RECORDS
Sl.
No
1
Description
Location
Form No.
HT Switchgear Mtc
Switchyard
EMD/REC/019
Retention
Period
3 years
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: HT Switchgear
OVERHAULING .
SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02
6.1 INSTRUCTIONS
6.2 Obtain PTW from Operation .
6.3 Ensure the proper isolation of the HT Switchgear from corresponding incomers.
Ensure isolations from remote end also for transformer feeders .
6.4 Check that board is dead by ensuring incomer breakers are switches off and
are in racked out condition. Rack in the bus earthing truck and close it.
6.5 Open the bus chamber . clean the bus bar chamber thoroughly and check
the tightness of nuts /bolts with torque wrench .
6.6 Check the tightness of power cables in all the feeders. Inspect the
surge suppressors and rectify the damages if any .
6.7 Ensure proper tightness of control circuit of Bus PT Cubicle.
6.8 Check the IR value of the Bus before opening and after boxing up with 1
KV megger and record in EMD/REC/019
6.9 Ensure that all the Tools & tackles are taken out from bus chamber and
no foreign material is inside the bus chamber .
6.9. Box up the bus chamber .
6.10 Open the bus earth truck and rack out the same .
6.11 Cancel the PTW .
SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Preventive maintenance Date : 15.03.2008
Sheet : 01 of 02
of HT Motors
1. PURPOSE
Preventive maintenance of HT Motors 11/ 3.3 KV in the main plant and Ash
handling plant and off sites.
2. REFERENCES
Instruction manual for HT Motors
Past experience
3. RESPONSIBILITY
Area engineer
4. RESOURCES REQUIRED
SL.NO
1
RESOURCE
Manpower
DESCRIPTION
1 Technician +2 skilled workmen + 2
unskilled workmen.
0- 5 KV Megger, Discharge rod ,
markine cloth ,Multimeter, blower ,
spanner set , cleaning agents .
Safety Shoe , Safety helmet.
5. RECORDS
Sl.
No
1
Description
Location
Form No.
HT Motors PM
Record
Switchyard
EMD/REC/020
Retention
Period
03 years
SIMHADRI
Dept.: ELECTRICAL
MAINTENANCE
Doc.Title: Preventive maintenance Date : 15.03.2008
Sheet : 02 of 02
of HT Motors
6. INSTRUCTIONS
6.1 Obtain PTW from Operation .
6.2 Ensure the proper isolation of the HT motor from corresponding breaker incomer.
6.3 Open the motor T.B cover and discharge with discharge rod.
6.4 Check the tightness of power and control cables .
6.5 Check the oil level of motor bearings is applicable and top up if required.
6.6 Check the tightness of earthing connections and ensure double
earthing of TB and motor body .
6.7 Check the power cable end terminations for any over heating.
6.8 Check the healthiness of space heaters.
6.9 close the TB cover.
6.10.
Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /034 Doc.Title: Disposal of Ni-Cd
Rev. No.: 02
Batteries
SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02
1. PURPOSE
Identifying the defective Ni-Cd batteries , replacing with new ones and safe
disposal of the defective ones.
2. REFERENCES
Battery manufacturer Instruction Manual .
3. RESPONSIBILITY
Area engineer
4. RESOURCES REQUIRED
SL.NO
1
2
3
RESOURCE
Manpower
Tools & Tackles
Personal Protection Equipment
DESCRIPTION
1 Technician +1skilled workmen
Multimeter , cell tester , hydrometer
Safety Shoe , asbestos hand gloves
5. RECORDS
Sl.
No
1
Description
Location
Form No.
Battery History
Register
Switchyard
EMD/REC/021
Retention
Period
05 years
Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /034 Doc.Title: Disposal of Ni-Cd
Rev. No.: 02
Batteries
SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02
6. INSTRUCTIONS
6.1 Measure the individual cell voltages . Ensure that the voltage is not
less than the minimum voltages specified by the manufacturer as
indicated in the Instruction manual.
6.2 If voltage of any cell is found to be less than the specified minimum
value , then Identify the cell and record in the EMD / REC / 021 . Take
corrective action if any as suggested by OEM . If the cell voltage does
not improve then plan for Replacement of the defective cells.
6.3 Obtain the PTW and ensure proper isolation of the battery bank .
6.4 Replace the defective cell with new one and boost charge it up to
the voltage specified Instruction manual .
6.5 Cancel the PTW and ensure the normalization of the battery bank .
6.6 Hand over the defective cell to NTPC Stores for further handing over
to Original equipment manufacturer / supplier for the safe disposal /
re cycling of the cell .
Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /035 Doc.Title: Maintenance of
Rev. No.: 02
Hydrogen plant compressors
SIMHADRI
Date : 15.03.2008
Sheet : 01 of 02
1. PURPOSE
Maintenance of Hydrogen plant compressors as per SAP schedule.
2. REFERENCES
Instruction manual (Fluitron)
Past experience
3. RESPONSIBILITY
Area engineer
4. RESOURCES REQUIRED
SL.NO
1
RESOURCE
Manpower
DESCRIPTION
1 Technician +1 skilled workmen + 1
unskilled workmen.
Cotton waste, Markine cloth, spanner
set , cleaning agents .
Safety Shoe , Safety helmet, Hand
gloves
5. RECORDS
Sl.
No
01
02
Description
Location
Form No.
Hydrogen leakage
check list (Daily)
Hydrogen
compressor
maintenance check
list
Hydrogen
Plant
Hydrogen
Plant
EMD/FORM/030
Retention
Period
03 years
EMD/FORM/031
03 years
Dept.: ELECTRICAL
MAINTENANCE
Doc. No.: EMD / WI /035
Rev. No.: 02
Doc.Title: Maintenance of
Hydrogen plant compressors
6. INSTRUCTIONS
SIMHADRI
Date : 15.03.2008
Sheet : 02 of 02
SIMHADRI
Date : 11.03.2008
Sheet : 01 of 02
PURPOSE
To control work environmental pollution in handling and disposal of
discarded lead acid batteries.
3.
References Past
Experience
4.
RESPONSIBILITY
Area Engineer
4.
Resources required
Sl .
Resources
No
Manpower
1
Tools and tackles
2
Spares
3
5.
Description
1 Technician+ 1 Skilled
Multimeter, Hand gloves
As per requirement.
Records
Sl. Description
No.
Battery disposal
Balance
1
Location
Sankalp EMD
Office
5 Years
SIMHADRI
Date : 11.03.2008
Sheet : 02 of 02
6.1 Instructions
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
Limited quantity of Lead acid batteries are available for starting of Diesel
generators in main plant DG room & Fire water pump houses.
Check the lead acid batteries as per the respective scheduled Preventive
Maintenance to identify the defective batteries.
Check for defective batteries during attending breakdown work orders on
batteries.
Ensure availability of pre-designated earmarked area for temporary
storage of the discarded batteries.
Shift the discarded batteries to the earmarked area.
Return the discarded batteries to store through Material Return Note.
Care should be taken to avoid any spillage during the storage handling
and transportation to stores.
Keep a record of discarded batteries and update the records as and when
job is done.
SIMHADRI
Date : 11.03.2008
Sheet : 01 of 02
PURPOSE
To control work environmental pollution in handling and disposal of
Transformer Oil.
2.
References Past
Experience
3.
RESPONSIBILITY
Area Engineer
4.
Resources required
Sl .
Resources
No
Manpower
1
Tools and tackles
2
Spares
3
5.
Description
1 Technician+ 1 Skilled
Oil collecting/ Storage Containers
As per requirement.
Records
Sl. Description
No.
Transformer oil
1 disposal Balance
Location
Sankalp EMD
Office
5 Years
SIMHADRI
Date : 11.03.2008
Sheet : 02 of 02
6.1 Instructions
6.1
6.2
6.3
6.4
6.5
6.6
6.7
6.8
6.9
6.10
SIMHADRI
1. PURPOSE
To Control and minimize CFC leakages into the atmosphere during operation
and Maintenance of Window, Split, Package Air Conditioners. and Water
coolers
2. REFERENCES
Past Experience
3. RESPONSIBILITY
Area Engineer
4. RESOURCES REQUIRED
SL.NO
1
2
3
RESOURCE
Manpower
Tools & Tackles
Personal Protection
Equipment
DESCRIPTION
1 Technician +2 skilled workmen.
Spanner Set, Screw Driver
Safety Shoe
5. RECORDS
Sl.
No
1
Description
Location
Form No.
SankalpEMD
EMD/REC/028
Retention
Period
05 years
SIMHADRI
Date : 11.03.2008
Sheet : 02 of 02
6.0 INSTRUCTIONS
6.1. Window air conditioners , Split , Package Air Conditioners and Water coolers of
are located at various plant locations, Communication building, Documentation
building, Sea water and Sweet water pump houses.
6.2 Note that any release of Freon / CFC into the atmosphere has significant
environmental impact. Until eco-friendly technology replaces the existing
one, utmost importance to be given for control and minimize of CFC releases.
6.3 Ensure quarterly observation checklist for healthy running of Window, Split,
Package Air Conditioners. and Water coolers The item which is prone to
regular complaints is to be inspected for complete healthiness of components
including gas tightness check.
6.4 Whenever any air conditioner or water cooler is taken for any type of
Maintenance work for compressor/fan or other problems, gas leak check is
to be conducted without fail and Gas leak & filling Record is to be maintained.
6.5 All the Air Conditioners and Water coolers should be inspected once in three
months for observation of healthy functioning / maintaining normal grill
temperature.
6.6 Whenever compressor failure occurs for any Air Conditioner or Water cooler the
gas leak test with N2 should be carried out at the time of replacement of
compressor. Further, the manufacturers recommendations are to be followed
for maintenance works.
NTPC LIMITED
SIMHADRI THERMAL POWER PROJECT
ISO 14001 ENVIRONMENTAL ASPECTS EVALUATION
Dept./Section : ELECTRICAL MAINTENANCE
N/
Rating
D/I
F+
Applicable
Sl.
Activity
Aspect
A/
Impact
No.
D
L R F EI P T
E
01
02
03
04
Transformer
oil filtration &
use
400 kV
Breaker
Hydraulic
operating
machine
400
kV
Breaker
SF6
gas for arc
quenching
Lighting
maintenance
Oil spillage,
Waste oil
generation
Failure of
seals and oil
leakages
Gas leakage
Fused lamps
Ground
Contamination,
Water
Pollution
Ground
Contamination,
Health Hazard
Significance
HWM Sec
5,6,7,9,10,20(4)
Yes
HWM Sec
5,6,7,9,10,20(4)
No
Air Pollution
Ground
Contamination
11
Name : C.MALAKONDAIAH
Signature :
Remark
Work instruction is
prepared.
(EMD/WI/037)
No
E waste
management
rule
No
Page 1 of 3
NTPC LIMITED
SIMHADRI THERMAL POWER PROJECT
ISO 14001 ENVIRONMENTAL ASPECTS EVALUATION
Dept./Section : ELECTRICAL MAINTENANCE
N/
Rating
D/I
Applicable
Sl.
Activity
Aspect
A/
Impact
F+EI
No.
D
L R F EI P T
E
05
Cleaning
electrical
equipment
06
Maintenance of
electrical
equipment
07
Maintenance of
Window A/C
Usage of
solvents
Generation of
Cotton waste,
waste oil,
soldering
waste
Leakage of
CFC
Air Pollution,
Health
Hazard
Ground
Contamination
HWM Sec
6,7,10,20(4)
Air Pollution
11
ODS
Name : C.MALAKONDAIAH
Signature :
Significance
Remark
No
No
Yes
Work instruction is
prepared.
(EMD/WI/038)
Page 2 of 3
NTPC LIMITED
SIMHADRI THERMAL POWER PROJECT
ISO 14001 ENVIRONMENTAL ASPECTS EVALUATION
Dept./Section : ELECTRICAL MAINTENANCE
N/
Rating
D/I
F+
Sl.
Activity
Aspect
A/
Impact
Applicable LOR
No.
D
L R F EI P T
E
Ni-Cd
batteries
usage
08
09
Actuator
maintenance
10
Switchgear
maintenance
11
Maintenance of
Lead Acid
batteries
Disposal of
damaged
cells
Generation of
Cotton
waste, waste
oil
Generation of
scrap, like
fuses
Acid spillage ,
Generation of
Used
batteries
Ground
Contamination
Ground
Contamination
Ground
Contamination,
Health hazard
Water
Pollution,
Ground
Contamination
E waste
management
rule
HWM Sec
6,7,10,20(4)
Yes
Work instruction
EMD/WI/034 is
prepared
No
No
Batteries
Mgmt rules 2001,
sec 10.1
Yes
Work instruction
(EMD/WI/036) is
prepared.
Page 3 of 3
NTPC LIMITED
SIMHADRI THERMAL POWER PROJECT
ISO 14001 ENVIRONMENTAL ASPECTS EVALUATION
Dept./Section : ELECTRICAL MAINTENANCE
Sl. Activity
ASPECT
N/ D/
IMPACT
RATING
F+ Applicable LOR
No
A/ In
L R F I
P T I
S/
D
HWM Sec
12 DG Set
1. Noise
A
D
Noise
0 1 3 1 1 1 4
5,6,7,9,10,20(4)
Running
Pollution
1
2. Exhaust
N
D
Air Pollution 0 1 2 1 1 6 3
3. Leakage of A
D
Water
0 1 1 1 1 5 2
Oil
Pollution
HWM Sec
13 Hydrogen Gas
1. Energy
N
I
Resource
0 1 3 1 1 7 4
5,6,7,9,10,20(4)
Generation
Consumption
Depletion
2. Leakages
A
D
Health
5 5 1 3 3 1 4
Hazard +
3
Safety
N : Normal, A : Abnormal (startup/shutdown/process disturbance), E :
Emergency L : LEGAL / REGULATORY REQUIREMENT :
0= There is no legal requirement, 5= There is a legal requirement
R : RISK POTENTIAL RISK TO EMPLOYEES AND/OR NEIGHBOUR POPULATION
1=Low risk (No. effect on health/limbs) 3=Intermediate risk (Health hazard) 5=High risk (Fatal to human
life) F : ENVIRONMENTAL IMPACT FREQUENCY
1 : Low (once in an year or more) 3 : Intermediate (once in a month or more) 5 : High (once in a day or more)
EI :ENVIRONMENTAL IMPACT (IMPACT ACCORDING TO THE IMPROTANCE
1 : Low (No loss to human/property/environment) 3 : Intermediate (Temporary effect on human
life/property/environment) 5 : High (Fatal to human life/Damage to property/environment)
P : PUBLIC PERCEPTION (IMPORTANCE OF THE ENVIRONMENTAL IMPACT IN TERMS OF PUBLIC PERCEPTION
1 : Low perception (No public concern) 3 : Intermediate perception (concern to
employees) 5 : High perception (concern to neighbour population)
CRITERIA FOR DETERMINING SIGNIFICANCE OF THE ASPECT :
1.
2.
Yes
Work instruction
(EMD/WI/036) is
prepared.
Sl.
No.
01
Format/Form title
Recording of various parameters of Generator
SIMHADRI
Revision
: 02A
Effective Date: 01.11.2010
Format/Form No.
EMD/FORM/001
02
Transducers Calibration
EMD/FORM/009
02 ,23.11.04
03
EMD/FORM/014
01 ,10.07.05
04
EMD/FORM/014A
01 ,10.07.05
05
EMD/FORM/016
Lye replacement
EMD/FORM/018
EMD/FORM/019
EMD/FORM/020
EMD/FORM/021
EMD/FORM/023
EMD/FORM/024
06
07
08
09
10
11
12
13
14
15
16
Computed Energy
EMD/FORM/025
Joint Monthly Report (JMR) for energy sent out EMD/FORM/028
Thermo vision Scanning Report
EMD/FORM/029
EMD/FORM/030
EMD/FORM/031
Name : C.MALAKONDAIAH
Signature :
01 ,10.07.05
00, 07.11.03
01,24.02.05
01 ,20.05.04
02 , 30.07.04
00 ,07.11.03
00 ,07.11.03
00,07.11.03
00, 07.11.03
00,07.11.03
00,24.02.05
00,24.02.05
Sl.
No.
01
SIMHADRI
Revision
03
Effective Date: 03.12.2012
Drawing No.
Description of drawing
35620060357
Location of
Storage
Electrical Lab
02
36590050612
Electrical Lab
03
36590050610
Electrical Lab
04
35620060299
Switchyard
05
Switchyard
06
Switchyard
07
08
HT group
Name : C.MALAKONDAIAH
Signature :
Electrical Lab
Sl.
No.
01
02
03
04
SIMHADRI
Revision
: 02A
Effective Date:25.03.2010
Statute
Requirement
Authority
Frequency
Responsibility
Indian
Explosive
Act 1884(4
of 1884)
Indian
Explosive
Act 1884(4
of 1884)
IE Act
1956
Chief
Controller of
Explosives
10 Years
Valid up to
30.09.2015
Hydrogen Plant
In-charge
Storage of gas
Cylinders
Chief
Controller of
Explosives
10 Years
Valid up to
30.09.2015
Hydrogen Plant
In-charge
List of Authorized
Persons to operate
and maintain Electrical
Installations
Inspection of
installations by CEA
AGM(O&M)
Yearly
AGM(O&M)
CEA
CEA
Two Year
HOD(EM)
Sl.
No.
SIMHADRI
Revision
04
Effective Date: 03.12.2012
Issue
No. /
Rev No.
1
April 2010
Issue Date
01
OD/OPS/ELEC/003
02
OD/OPS/ELEC/004
Jan 2010
03
OGN/OPS/ELEC/007
Feb 2010
04
OGN/OPS/ELEC/008
April 2010
05
OGN/OPS/ELEC/010
Feb 2010
06
OGN/OPS/ELEC/014
Feb 2010
07
OGN/OPS/ELEC/018
Feb 2010
08
OGN/OPS/ELEC/019
Feb 2010
09
OGN/OPS/ELEC/020
Capacity testing of DC
Batteries
Prevention and Detection of
generator rotor earth fault
Inspection and Protection of
water cooled generator stator
winding PTFE hose
connection
Maintenance and testing of
Generator Excitation Control
system
Shaft Voltage & Currents in
Large Turbo Generators
Pyrolytic carbon growth on tap
changer and off circuit tapping
switch contacts in transformer
Dissolved gas analysis of
transformer s & reactors
Clean condition during work of
generators
Feb 2010
10
OGN/OPS/ELEC/023
Feb 2010
11
OIN/OPS/ELEC/009
Feb 2010
12
LMI/OIN/OPS/ELEC/014
April 2010
13
LMI/OGN/OPS/ELEC/004
April 2010
14
LMI/OGN/OPS/ELEC/005
April 2010
15
LMI/OGN/OPS/ELEC/021
April 2010
SIMHADRI
Revision
04
Effective Date: 03.12.2012
Sl.
No.
Issue
No. /
Rev No
0
Issue Date
16
LMI/OGN/OPS/SYST/006
17
LMI/OGN/OPS/ELEC/017
18
LMI/OGN/OPS/ELEC/035
19
LMI/OGN/ELEC/009
20
LMI/OGN/OPS/SYST/012
21
LMI/OD/OPS/ELEC/002
22
LMI/OIN/OPS/ELEC/024
Prevention of Hydrogen
explosions due to hydrogen
leak in Generator busduct
The use and processing of
insulating oil in power
transformers
High current bus bar systems
connected to generators &
Generator transformer
Insulator protection in polluted
atmosphere
Switching of power station
Distribution systems
Management of DC supply
system failure
Monitoring the healthiness of
400 KV current transformers
Dec 2010
April 2010
April 2010
Dec 2010
April 2009
April 2010
23
LMI/OIN/OPS/ELEC/025
April 2010
24
LMI/OIN/OPS/ELEC/026
April 2010
25
LMI/OIN/OPS/ELEC/007
Recommended Procedures to
assess the Quality of Insulation
on Generator and Motor Stator
Operation and Maintenance of
oil impregnated paper EHV
class bushings
Ring Flux Testing of Generator
cores
Dec 2010
26
LMI/OIN/OPS/ELEC/038
Jan 2009
27
LMI/OIN/OPS/ELEC/012
Jan 2009
April 2010
SIMHADRI
Dept.: Electrical
Maintenance
Document Title : LIST OF LMIs
Sheet
: 03 of 03
Revision
04
Effective Date: 03.12.2012
Sl.
No.
28
LMI/OGN/OPS/ELEC/001
29
LMI/OIN/OPS/ELEC/044
Buchholz alarms in
Transformers and Reactors
Inspection of Brushless Exciter
BHEL -make
30
LMI/OIN/OPS/ELEC/045
31
LMI/OIN/OPS/ELEC/046
Issue
No. /
Rev No
1
Issue Date
April 2010
June 2010
April 2010
Mar 2010
Sl.
No.
01
Transformer
BHEL
02
Transformer
BHEL
03
Transformer
BHEL
04
Transformer
BHEL
05
Transformer
BHEL
06
Transformer
BHEL
07
Transformer
BHEL
08
Transformer
BHEL
09
Transformer
BHEL
10
Transformer
BHEL
11
Transformer
BHEL
12
Transformer
BHEL
Equipment
OEM/OES
SIMHADRI
Revision
03
Effective Date: 03.12.2012
Location of
Storage
200MVA, 420/21KV, 1Phase, 50Hz
Electrical
OFAF cooled Generator Transformer. laboratory
Volume-I
50MVA, 420/11.5KV, 3Phase, 50Hz Electrical
ONAN/ONAF cooled Standby
laboratory
Transformer, Volume-I
50MVA, 420/11.5KV, 3Phase, 50Hz Electrical
ONAN/ONAF cooled Unit Auxiliary laboratory
Transformer, Volume-I
Instruction manual for Power
Electrical
Transformers 16MVA,34.5/11KV,
laboratory
Volume-I
Instruction manual for Power
Electrical
Transformers 16MVA,34.5/11KV,
laboratory
Volume-II
Instruction manual for Power
Electrical
Transformers 16MVA, 11/3.5KV,
laboratory
Volume-I
Instruction manual for Power
Electrical
Transformers 16MVA, 11/3.5KV,
laboratory
Volume-II
Instruction manual for Power
Electrical
Transformers 7.5MVA,33/11.5KV,
laboratory
Volume-I
Instruction manual for Power
Electrical
Transformers 7.5MVA,33/11.5KV,
laboratory
Volume-II
Instruction manual for Power
Electrical
Transformers 7.5MVA, 11/3.5KV,
laboratory
Volume-I
Instruction manual for Power
Electrical
Transformers 7.5MVA, 11/3.5KV,
laboratory
Volume-I
Instruction manual for Power
Electrical
transformers & reactors
laboratory
Document Description
SIMHADRI
Revision
03
Effective Date: 03.12.2012
Sl.
No.
13
Equipment
OEM/OES
Document Description
Transformer
BHEL
14
Transformer
CGL
15
Transformer
CGL
16
Transformer
17
Relay
Bharat
Bijlee
Limited
Alstom
18
Relay
ABB
19
Relay
ABB
20
Relay
Siemens
21
GRP Panel
SEMS
22
Hathaway
23
Disturbance
Recorder
LT Swgr
24
LT Swgr
C&S Ltd
25
H2 Plant
26
Energy meter
Electrolyse
r
ZERA
27
ESP
BHEL
28
Current
Transformer
BHEL
CT manual
C&S Ltd
Location of
Storage
Electrical
laboratory
Electrical
laboratory
Electrical
laboratory
Electrical
laboratory
Electrical
laboratory
Electrical
laboratory
Electrical
laboratory
Electrical
laboratory
Electrical
laboratory
Electrical
laboratory
LT Swgr.
Almira
LT Swgr.
Almira
Hydrogen
Plant
Switchyard
Switchyard
Switchyard
SIMHADRI
Revision
03
Effective Date: 03.12.2012
Equipment
OEM/OES
Document Description
BHEL
CVT manual
30
Capacitive
Voltage
Transformer
Lightning arrestor
Location of
Storage
Switchyard
WS
LA Manual
Switchyard
31
Busbar protection
Alstom
Switchyard
32
HT Swgr
BHEL
33
HT Motor
BHEL
34
Compressor
Fluitron
35
REL 670
ABB
O&M manual
Hydrogen
Plant
Switchyard
36
REB 670
ABB
O&M manual
Switchyard
37
CGL
O&M manual
Switchyard
38
CGL 400KV
BREAKER
400KV CT
CGL
O&M manual
Switchyard
39
VFD
BHEL
O&M manual
VFD ROOM
Switchyard
Switchyard
Sl.
No.
SIMHADRI
Revision
: 03A
Effective Date: 01.11.2010
Furnished
to
Format No.
Periodicity
Responsibility
EEMG
Soft copy
Monthly
HOD(EM)
EEMG
EMD/
FORM/028
Monthly
HOD(EM)
: 01 of 01
SIMHADRI
Revision
04
2.
3.
4.
Job Title
HOD (EM)
Responsibilities
HOD
(O&M)
HOD(EM)
HOD(EM)
Respective
Sectional
heads
Remarks
Proce
ss
Owne
r
Compliance to HOD
PM,
Break
down and PDM
job schedules.
No
loss
of HOD
generation due
to breakdown
of
electrical
equipment
Zero tripping
due
electrical
equipment.
HOD
Continual
Improvement
in the process
and systems.
HOD
Provide
training to the
employees
HOD
Providing
training to
internal
customers to
enhance
their
knowledge
Reduction
in
Nonmoving
Items
HOD
HOD
SIMHADRI
Revision
07
Process
Measures
Target
For
2013-14
Source
of
Data
Review
Frequenc
y&
Responsi
bility
Status
for
MAR
2015
% of SAP
WOC
attended
95 % in
every
month.
ORT
Data /
SAP
Quarterly
by
HOD (EM)
97.94%
(761/
777)
Cumulative
% of loss of
generation
due
to
electrical
equipment.
Cumulative
no. of unit
tripping due
electrical
equipment.
No. of
suggestions
given.
0%
for ORT
Financial
Data
Year
2013-14
Quarterly
by
HOD (EM)
20.14
MU
5.58%
0
for ORT
Financial
Data
Year 201314
Quarterly
by
HOD (EM)
TQM
Site &
Record
: 1801 /
11
1801/
Quarterly
by
HOD(EM)
47
Quarterly
by
HOD(EM)
316
1801/
Quarterly
by
HOD(EM)
12
1801/
Quarterly
by
HOD(EM)
414
Lacs
1885
Items
Minimum
30
for
Financial
Year 201314
Cumulative
300
for
Training Man Financial
days
Year
2013-14
No.
of 20
for
interaction
Financial
meetings
Year 2013with
14
operation
dept.
Reduction of 5% of no.
NMI items
of items.
2%
of
value.
Re
m
ar
ks
Proce
ss
Owne
r
Process
Measures
Target
Preventive, BD
& OH maint.
Process
Preventive, BD
& OH maint.
Process
HOD
100% in
every
month
100% by
th
7 of
every
month
Preventive, BD
& OH maint.
Process
HOD
Compliance
to 24X7
safety
points
Timely
payment of
wages to
contract
workmen
Availability
of ESP fields
from EMD
side
10
HOD
100%
availability
SIMHADRI
Revision
07
Source
of
Data
Review
Frequency
&
Responsi
bility
Statu
s for
MAR
2015
Quarterly by
HOD(EM)
100%
MIS
Report
Quarterly by
HOD(EM)
100%
DPM
Quarterly by
HOD(EM)
100%
Re
m
ar
ks
DEPARTMENTAL
OBJECTIVE
MEASURE
Compliance to PM,
Break down and
PDM job schedules.
No
loss
of
generation due to
breakdown
of
electrical equipment
Zero tripping due
electrical
equipment.
% of SAP WOC
attended
Continual
Improvement in
the process and
systems.
Provide training
to the employees
Providing training
to internal
customers to
enhance their
knowledgein
Reduction
Non- moving
Items
Preventive, BD &
OH maint. Process
Preventive, BD &
OH maint. Process
10
Preventive, BD &
OH maint. Process
SIMHADRI
Revision: 07
Effective Date: 01.04.2015
TARGET
FOR 2015-16
REVIEW
FREQUENCY &
RESPONSIBILIT
Y
95 % in every Quarterly by
month.
HOD (EM)
Cumulative % of
loss of generation
due to electrical
equipment.
Cumulative no. of
unit t r i p p i n g d u e
electrical
equipment.
No. of
suggestions
given.
0%
for Quarterly by
Financial
HOD (EM)
Year 2015-16
Cumulative
Training
Man
days
No. of trainings/
interaction
meetings
with
operation dept.
Reduction of
NMI items
300
for
Financial
Year 2015-16
20
for
Financial
Year 201314
5% of no. of
items.
2% of value.
100% in
every month
Compliance to
24X7 safety
points
Timely payment
of wages to
contract
workmen of
Availability
ESP fields
from EMD side
100% by 7
of every
month
100%
availability
th
Quarterly by
HOD (EM)
Quarterly by
HOD (EM)
Quarterly by
HOD (EM)
Quarterly by
HOD (EM)
Quarterly by
HOD (EM)
Quarterly by
HOD (EM)
SIMHADRI
Revision
07
Activity
Target date
Responsibility
Continuous
Process
Continuous
Process
Area In charge
Continuous
Process
Continuous
Process
Area In charge
Area In charge
HOD(EM)
Remarks
SIMHADRI
Revision
07
Activity
Target date
Responsibility
Continuous
Process
Area In charge
As and when
occurred
Area In charge
As and when
occurred
As and when
occurred
Review of Status
Quarterly
HOD (EM)
Area In charge
HOD (EM)
Remarks
SIMHADRI
Revision
07
Activity
Target date
Responsibility
As and when
occurred
Sectional In charge
As and when
occurred
Sectional In charge /
HOD (EM)
Remarks
SIMHADRI
Revision
07
1
2
3
4
Activity
Target date
Responsibility
Continuous
Process
Individual employees
of EM
Continuous
Process
Continuous
Process
Quarterly
Individual employees
of EM
Individual employees
of EM
HOD(EM)
Remarks
SIMHADRI
Revision
07
Activity
Target date
Responsibility
Continuous
Process
Dept Training
coordinator
Continuous
Process
Dept Training
coordinator
Continuous
Process
Continuous
Process
Dept Training
coordinator
Dept Training
coordinator
Remarks
SIMHADRI
Revision
07
1
2
3
4
5
Activity
Target date
Responsibility
Continuous
Process
HOD(EM)
Continuous
Process
Continuous
Process
Continuous
Process
Continuous
Process
HOD(EM)
HOD(EM)
Concerned engineer.
Concerned engineer.
Remarks
SIMHADRI
Revision
07
Activity
Target date
Responsibility
Continuous
Sectional Heads(EM)
Continuous
As and when
required
Sectional Heads(EM)
& HOD(EM)
Sectional Heads(EM)
& HOD(EM)
As and when
required
Continuous
HOD(EM)
HOD(EM)
Remarks
SIMHADRI
Revision
07
1
2
3
4
Activity
Target date
Responsibility
Continuous
Sectional Heads(EM)
& HOD(EM)
Continuous
Sectional Heads(EM)
Continuous
Sectional Heads(EM)
Continuous
HOD(EM)
Remarks
SIMHADRI
Revision
07
Activity
Target date
Responsibility
Monthly by
7th
Concerned E-I-C.
Continuous
Concerned E-I-C.
Continuous
Concerned E-I-C/
Sectional head
Monthly
HOD(EM)
Remarks
SIMHADRI
Revision
07
Activity
Target date
Responsibility
Daily
Area Engineer
Continuous
Area Engineer
Continuous
Area Engineer
Continuous
Area Engineer
Remarks
Sl.
No.
SIMHADRI
Revision
03
Effective Date: 03.12.2012
Soft Copy/
Hard Copy
Record
Ref. No.
Location
Retention
Period
01
QUALITY OBJECTIVE
Hard Copy
1801/1
SANKALP
5 Years
02
INTERNAL AUDITS
Hard Copy
1801/2
SANKALP
5 Years
03
EXTERNAL AUDITS
Hard Copy
1801/3
SANKALP
5 Years
04
MANAGEMENT REVIEW
Hard Copy
1801/4
SANKALP
5 Years
Hard Copy
1801/5
SANKALP
5 Years
Hard Copy
1801/6
SANKALP
5 Years
Hard Copy
1801/7
SANKALP
5 Years
CHP
3 Years
CHP
3 Years
Switchyard
1 year
Switchyard
10 year
Switchyard
10 year
Switchyard
10 year
05
06
07
08
09
10
11
12
13
LIST OF ENVIRONMENTAL
ASPECTS &
ENVIRONEMNTAL
MANAGEMENT
PROGRAMMES
DOCUMENT
DISTRIBUTION RECORD
CORRECTIVE &
PREVENTIVE ACTION
RECORD
MAINTENANCE OF
PADDLE FEEDERS.
P.M. OF LT MOTORS FOR
CHP.
MONTHLY PM OF
BATTERY SET.
400KV CT ANNUAL
MAINTENANCE.
400KV CVT YEARLY
MAINTENANCE
400KV SURGE/LIGHTING
ARRESTOR
MAINTENANCE.
Hard Copy
Hard Copy
Hard Copy
Hard Copy
Hard Copy
Hard Copy
EMD/REC
/004
EMD/REC
/005
EMD/REC
/006
EMD/REC
/010
EMD/REC
/011
EMD/REC
/012
Revision
03
Effective Date: 03.12.2012
Soft Copy/
Hard Copy
Hard Copy
Hard Copy
Hard Copy
Record
Ref. No.
EMD/REC
/014
EMD/REC
/015
EMD/REC
/016
EMD/REC
/017
EMD/REC
/018
EMD/REC
/019
EMD/REC
/020
EMD/REC
/021
17
HT MOTOR O/H.
Hard Copy
18
HT BKR O/H.
Hard Copy
19
HT SWGR O/H.
Hard Copy
20
P.M. OF HT MOTORS.
Hard Copy
21
BATTERY HISTORY
REGISTER
Hard Copy
22
TRANSFORMER PM
Hard Copy
1802/T6
Hard Copy
1802/T20
Hard Copy
1802/T21
Hard Copy
1802/T18
Hard Copy
1802/T22
Hard Copy
1802/H2
Hard Copy
1802/H1
23
24
25
26
27
28
TRANSDUCER
CALLIBRATION REPORT
CALLIBRATION OF
MULTIMETERS
MISCELLEANEOUS
INSTRUMENTS
CALIBRATION
LYE PREPARTION
HYDROGEN PLANT
HYDROGEN PLANT
CHECK LIST
Location
Retention
Period
Switchyard
10 year
Switchyard
5 year
Switchyard
5 year
Switchyard
5 year
Switchyard
3 year
Switchyard
3 year
Switchyard
3 year
Switchyard
5 Years
Electrical
Lab.
Electrical
Lab.
Electrical
Lab.
Electrical
Lab.
Electrical
Lab.
Hydrogen
Plant
Hydrogen
Plant
3 Year
3 Year
3 Year
3 Year
3 Year
3 Year
3 Year
29
OVERHAULING OF LT MCC
Hard Copy
1802/L5
LT Group
5 Year
30
LT MOTOR PM
Hard Copy
1802/L1
LT Group
3 Year
Revision
03
Effective Date: 03.12.2012
Soft Copy/
Hard Copy
Record
Ref. No.
Location
Make Up
Group
Switchyard
Group
Retention
Period
31
CATHODIC PROTECTION
Hard Copy
1803/1
32
CALIBRATION OF
ENERGYMETER
Hard Copy
1803/2
33
List of formats
Hard Copy
1801/8
SANKALP
5 Years
Hard Copy
1801/9
SANKALP
5 Years
Hard Copy
1801/10
SANKALP
5 Years
Hard Copy
1801/11
SANKALP
5 Years
Hard Copy
EMD/REC
/024
Switchyard
5 year
Switchyard
5 year
34
35
36
37
38
39
40
Document modification
request
Documents & action plans
related to critical equipments
Suggestions &
implementation
Joint Meter Readings for
energy sent out through 400
KV Bus
Thermo vision scanning of
Switchyard O/H connections
Hydrogen leakage check list
(Daily)
Hydrogen compressor
maintenance check list
Hard Copy
Hard Copy
Hard Copy
EMD/REC
/025
EMD/REC
/026
EMD/REC
/027
Hydrogen
Plant
Hydrogen
Plant
3 Year
5 Year
3 years
3 years
41
Hard Copy
1801/12
SANKALP
5 Years
42
Audit schedule
Hard Copy
1801/13
SANKALP
3 Years
Hard Copy
1801/14
SANKALP
2 Years
Hard Copy
1801/15
SANKALP
5 Years
43
44
45
LMI Non EM
Hard Copy
1801/16
SANKALP
5 Years
46
Hard Copy
1801/17
SANKALP
5 Years
Sl.
No.
Revision
03
Effective Date: 03.12.2012
Soft Copy/
Hard Copy
Record
Ref. No.
Location
Retention
Period
Hard Copy
1801/18
SANKALP
5 Years
48
Hard Copy
1802/43
Switchyard
5 years
49
Hard Copy
1802/44
Switchyard
5 years
50
Hard Copy
EMD/REC
/028
SANKALP
5 Years
51
Customer Feedback
Hard Copy
1801/19
SANKALP
3 Years
47
SIMHADRI
Revision
02
Effective Date: 15.03.2008
Sl.
No
01
02
Name of the
equipment
Static energy meter
test set(0.02 class)
Fluke meter 336
03
Multimeter
04
05
Measuring
parameter
Energy
Periodicity of
calibration
2 Years
AC & DC current
2 Years
Multimeter
2 Years
Low AC current
2 Years
Multi ,
00202
AC & DC Low
current
2 Years
SIMHADRI
Revision
03
Effective Date: 28.01.2013
Sl.
No.
01
NIL
Make &
Equipment
Sl. No.
Measuring
Parameter
Periodicity of
Calibration
SIMHADRI
Revision
02
Effective Date: 15.03.2008
Sl.
No.
Effective
Date
Document
No.
Document Title
Revision
No.
Distributed to :
SIMHADRI
Revision
To : MR / HOD
The following
modifications are
suggested to the existing
document(s) :
Sl.
No.
Reference (Sheet
No./ Para No.)
Suggested by (Sign.) :
Name & Designation :
02
Date :
ISO Clause
No.
Description of change
Approved by (Sign.) :
Name & Designation :
Revision No.
SIMHADRI
Revision
02
Dept.:
Date
Details Of
Deviation/ NonConformity/
Potential
Nonconformity
Responsible
Section
Corrective
Action
Taken
Preventive
Action
Taken
Signature &
Remarks If
Any