You are on page 1of 1

Citation Maintenance 2013 Citation 560

Citation 560 Phase Inspection Services

Citation 560 Phase Inspection Services


Inspection
Phase B
Phase 1
Phase 2
Phase 3
Phase 4
Phase 5
Phase 1 thru 5
Phase 6
Phase 7
Phase 8
Phase 11
Phase 13

Description
General Airframe & Engine
Nose, Cockpit, Interior
Landing Gear, Empennage, Powerplants (both)
Tailcone, Door Seal
Airframe & Powerplants
Complete Inspection
Complete Inspection
Airframe Exterior
Engine Oil Chip Detectors
I/B Wing Deice Boot
Standby Gyro Battery Pack
Cabin Door Locking Pins

Phase 14

Wing Structure

Phase 15

Crack Inspection Tail

Phase 16
Engine Mount
Phase 17
Cabin Structure
Phase 18
Stndby batt gyro & safety equip.
RVSM Yearly inspection
Phase 20
RVSM, 2 Yr. - FAR 91.411
Phase 20
non-RVSM, 2 Yr. - FAR 91.411
Phase 21
CVR, FDR Operational Tests
Phase 22
Oxygen Hydro (NDT extra)
Phase 23
Emergency Bottles Hydro
Hot Section Inspections
Phase 26
Ni-CAD Battery Deep Cycle

Time Interval
150 hours after Phase 1-4
300 hrs / 24 mo.
300 hrs / 24 mo.
300 hrs / 24 mo.
300 hrs / 24 mo.
1200 hrs /36 mo.
every 14 days
every 50 hrs
every 6 mo.
every 6 mo.
5000 hours
12,000 hrs, then 3,000 hrs
thereafter
10,000 hrs, then 4,000 hrs
thereafter
10K hrs, 15K hrs, 3,000 hrs
thereafter
10,000 hrs
Every Year
Every 12 months
Every 2 years
Every 2 years
Every 2 years
Every 3 years
Every 5 years
P&W manual
100 hrs

Cessnas
est. price1
n/a
2,612.00

Sierras
price
$524.00
$2,034.00

5,304.00
1,296.00
3,370.00
30,493.00
41,454.00
910.00
182.00
273.00
327.60
509.60

$4,131.00
$1,009.00
$2,624.00
$23,749.00
$29,294.00
$748.00
$150.00
$150.00
$249.00
$400.00

5,460.00

$4,115.00

1,456.00

$973.00

1,456.00
5,460.00
1,638.00
n/a
728.00
728.00
728.00
1,456.00
n/a
8,099.00
n/a

$1,122.00
$3,890.00
$1,421.00
$983.00
$1,047.00
$973.00
$983.00
$788.00
$788.00
$6,615.00
$411.00

Cessnas
est. price1
160.00
1,456.00
1,456.00
8,463.00
2,184.00
136.50
(NDT extra)
136.50

Inspection
Phase 30
Phase 32
Phase 33
Phase 34
Phase 35

Description
Refrigeration Unit Oil
Aileron Drive
Aileron Yoke
Fwd & Aft Bulkhd + Skin
Fuselage Skin (NDT extra)

Time Interval
600 hrs
15,000 landings, then ea 7500
15,000 landings, then ea 7500
every 6725 hrs
3600 hrs

Phase 47
Phase 48

Cockpit & Cabin Halon FE


Cockpit & Cabin Halon FE

Every 12 years
Every 72 mo.

Phase 49

Skin Joint & Doubler Inspection 1200 hours / 36 months

1,628.90

Phase 50

Wing Attachment inspection


Oxygen Cylinder Hydro Test
(NDT extra)
Copilot Side Window Inspect.
Engine Minor Inspection
Lead-Acid Battery Inspection
ELT Inspection
Copilot side window inspection
Honeywell standby control
head

1200 hours / 36 months

1,628.90

Sierras price
$150.00
$1,122.00
$1,122.00
$6,434.00
$1,646.00
$150.00
NDT included
$150.00
$1,958.00
NDT included
$2,011.00
NDT included

every 5 years
50 landings
600 hrs/12 mos.
per Battery Manual
Every 12 months
1st 150 hours after install

609.70
182.00
1,683.50
182.00
n/a
n/a

$449.00
$188.00
$1,272.00
$150.00
$150.00
Call for Price

n/a

Call for Price

n/a

T&M

n/a

T&M

n/a
n/a
n/a
n/a
n/a
n/a
n/a
5,978.00
T+M
4,168.00
n/a

T&M
Call for Price
Call for Price
Call for Price
Call for Price
Call for Price
Call for Price
Call for Price
Call for Price
Call for Price
Call for Price

n/a
6,908.00
2,301.00
11,577.00
1,074.00

Call for Price


$5,513.00
$2,205.00
$4,510.00
$1,024.00

Phase 51
Phase 53
Phase 54
Phase 55
Phase 56
Phase 59
Phase 60
Phase 61
Phase 62
Phase 63
Phase MA
Phase MC
Phase MD
Phase ME
Phase MF
Phase MG
Phase MI
Phase MJ
Phase MK
Phase ML

every 500 hours


13,200 landings, ea 1200 lndgs
I/B Lower Wing Spar
thereafter
15,600 landings, ea 1200 lndgs
O/B Lower Wing Spar
thereafter
15,600 landings, ea 1200 lndgs
Wing Spar Cap inspection
thereafter
Wing Anti-Ice Crossover Valve 150 hours
Emer. Exit Door Inspection
1456 hours
Fuselage Exterior Skin inspect. 2523 hours
Pressure Bulkhead Webs
4450 hours
Aft Pressure Bulkhead
5000 hours
Nose Lndg Gear Fork
10,000 lndgs / then ea. 1000
Windows / Frames
Every 5130 hrs
Cabin Skin Splice
Every 5900 hrs.
Pressure Bulkhead
Every 6725 hrs.
Vapor cycel system hour meter Every 300 hours
Time limited dispatch maintenance check, SN -0751 and up Every 250 hours

Phase MM
Engine Change
Certificate of Airworthiness
Prepurchase Evaluation
Aircraft Re-weigh

Flat rate prices include inspection labor. State and local taxes, discrepancy labor, parts, materials and freight are billed extra.
*NDT is not included except where noted.
1
Prices estimated from most recent published information and current CPI adjustment.

Flat rate prices include inspection labor. State and local taxes, discrepancy labor, parts, materials and freight are billed extra.
*NDT is not included except where noted.
1
Prices estimated from most recent published information and current CPI adjustment.

Prices subject to change without notice. Product application and pricing may vary based on aircraft specifications and configuration.

Prices subject to change without notice. Product application and pricing may vary based on aircraft specifications and configuration.

1-888-835-9377 Citation Maintenance 2013 Citation 560

You might also like