Dead Loads
Soil Bearing Capacity: 72.00kN/m2
Concrete Slabs: 4.00kN/m2
Masonry Walls: 2.50kN/m2
Wind Loads
Analysis: Method 1 Simplified Procedure
Base Wind Speed: 119mph (53.2m/s)
Importance Factor, I : 1.0
Exposure Category: C
SM1= 0.930
SD1= 0.6200
Seismic category= D
Importance Factor, I : 1.0
Devis Estimatif
Build Change Post-Earthquake Technical Assistance Program, Haiti
20-Apr-12
Note: All data should be entered on this page and will automatically be populated on other sheets.
Proprietaire:
Addresse: USAID Primer, Ground Floor
GPS:
Date: 02-May-12
Ingenieur: B. Biddick
Surface de la
maison (m2): 25.00
Telephone:
No.
QTY
Unit
UNIT
surface du plan =
m2
surface du plan =
m2
m2
m2
surface du plan =
longuer des murs =
Demolition clearance
surface du plan =
m2
Trash clearance
surface du site =
m2
surface en herbe =
m2
No.
Unit
A: Fondation (Foundation)
1
2
3
4
Strip footing
Isolated column footing
Stone masonry foundation
Mass concrete foundation walls
Longeur=
Nombre=
13
Longeur=
29
Longeur=
m
m
Longeur=
29
Longeur=
Longeur=
No.
Unit
A: Murs (Walls)
1
2
15cm blocks
20 cm blocks
m2
63
m2
Number of columns
15cm x 15cm Columns (1:2:4)
20cm x 20cm Columns (1:2:4)
25cm x 25cm Columns (1:2:4)
Nombre=
13
Longeur=
Longeur=
m
2.7
Longeur=
m
m
Longeur=
25.6
Longeur=
m
m
D: Ouvertures (Openings)
1
2
Doors
Height (up to the ring beam)
Windows
Window heights
Nombre=
Longeur=
2.5
Nombre=
Longeur=
1.1
m
m
Longeur=
Longeur=
m
28
Longeur=
m
m
No.
Unit
surface du plan =
25
m2
Gable Truss
Roof dimension 1 (length of truss span)
Roof dimension 2 (length along ridge)
Monopitch Truss
Roof dimension 1 (length of truss span)
Roof dimension 2 (length along ridge)
Lightweight roof with rafters
m
m
m
m
Roof area
Length perpendicular to slope
surface du plan =
m2
m
No.
Unit
A: Crepissage (Plastering)
1
2
150
m2
m2
m2
m2
m2
Paint
Nombre=
Nombre=
Windows
Iron window grilles
Venilation blocks 40cm x 20cm
Doors
Nombre=
C: Peinture (Paint)
150
Nombre=
m2
Engineer: B. Biddick
TRANCHE 1
Preparation &
Foundation
No
Article
Cement
2
3
Price
($US)
# of
Units
Unit
Total Price
TRANCHE 2
Construction up
to the Roof
# of
Units
Total Price
TRANCHE 3 Roof
& Finish
# of
Units
Total Price
$7.50
bag
36
$270.00
38
$285.00
27
$202.50
$25.00
m3
$100.00
$75.00
$25.00
River Sand
$19.00
m3
2
$40.00
$69.00
$92.00
$46.00
$105.00
White Sand
$20.00
m3
Crushed gravel
$23.00
m3
Pea gravel
$13.00
m3
River rock
$21.00
Limestone
$20.00
m3
30cm Block
$1.13
each
10
20cm Block
$0.80
each
11
15cm Block
$0.65
each
m3
707
TRANCHE 3
Holdback / Add'l
Req
# of Units
Total Price
$565.60
209
$135.85
Total Price
101
8
$757.50
$200.00
2
9
$40.00
$207.00
$105.00
707
209
$565.60
$135.85
$371.85
$476.63
$172.59
12
12cm Block
$0.45
each
13
10cm Block
$0.40
each
14
$32.00
each
15
Ventilation Blocks
$0.80
each
16
#7 Bars
$6.50
17
#6 Bars
$5.25
18
#5 Bars
$3.30
19
#4 Bars
$1.11
32
$35.52
303
$336.33
20
#3 Bars
$0.77
140
$107.80
119
$91.63
360
$277.20
116
$38.28
377
$124.41
30
$9.90
335
619
523
$264.00
$264.00
4
4
5
$1,040.00
$180.00
$50.00
354
50
50
$102.66
$84.00
$125.00
21
#2 Bars
$0.33
22
Binding Wire
$1.40
lb
23
1x4 Lumber
$1.97
24
1x6 Lumber
$2.30
25
$2.95
26
1x8 RS Lumber
$2.62
27
1x12 Lumber
$5.08
28
2x2 Lumber
$2.07
29
$3.44
30
$2.79
31
$13.00
each
32
$25.00
each
33
$36.00
each
34
Hardboard
35
Wood Preservative
$20.00
gallon
36
Hurricane Straps
$1.65
37
Assorted Nails
$1.20
lb
38
Roofing Nails
$1.40
lb
each
39
CGI 3'x6'
40
CGI 3'x8'
$26.00
each
each
41
CGI 3'x10'
$28.00
each
42
CGI 3'x12'
$30.00
each
43
44
45
46
Ridge Cap
47
48
each
$5.00
m3
m3
$5.00
$88.00
each
$16.00
each
49
Window
$260.00
each
$1,040.00
50
Window Grill
$45.00
each
$180.00
51
Paint
$10.00
gallon
$50.00
$0.29
$1.68
m2
Metal Shoring
$2.50
each
Cost of Materials
$726
Totals
58.00
$16.82
$1,570
296.00
$4,566
$2,270
$85.84
50
$84.00
50
$125.00
$17
$86
$209
$312
$237
$539
$806
$1,582
$979.27
$195.85
$2,194.76
$438.95
$3,285.46
$657.09
$6,459.49
$1,291.90
$1,175
$2,634
$3,943
$7,751
Grand Total
Area of House
2
Cost/m :
25
310.06
Devis Estimatif
Build Change Post-Earthquake Technical Assistance Program, Haiti
20-Apr-12
Note: All data should be entered on this page and will automatically be populated on other sheets.
Proprietaire:
Addresse: USAID Primer, Second Floor
GPS:
Date: 02-May-12
Ingenieur: B. Biddick
Surface de la
maison (m2): 25.00
Telephone:
No.
QTY
Unit
UNIT
surface du plan =
m2
surface du plan =
m2
m2
m2
surface du plan =
longuer des murs =
Demolition clearance
surface du plan =
m2
Trash clearance
surface du site =
m2
surface en herbe =
m2
No.
Unit
A: Fondation (Foundation)
1
2
3
4
Strip footing
Isolated column footing
Stone masonry foundation
Mass concrete foundation walls
Longeur=
Nombre=
Longeur=
Longeur=
Longeur=
Longeur=
Longeur=
No.
Unit
A: Murs (Walls)
1
2
15cm blocks
20 cm blocks
60
m2
m2
Number of columns
15cm x 15cm Columns (1:2:4)
20cm x 20cm Columns (1:2:4)
25cm x 25cm Columns (1:2:4)
Nombre=
11
Longeur=
2.7
Longeur=
Longeur=
Longeur=
25.6
Longeur=
m
m
D: Ouvertures (Openings)
1
2
Doors
Height (up to the ring beam)
Windows
Window heights
Nombre=
Longeur=
2.5
Nombre=
Longeur=
1.1
m
m
Longeur=
Longeur=
m
30
Longeur=
m
m
No.
Unit
surface du plan =
m2
Gable Truss
Roof dimension 1 (length of truss span)
Roof dimension 2 (length along ridge)
Monopitch Truss
Roof dimension 1 (length of truss span)
Roof dimension 2 (length along ridge)
Lightweight roof with rafters and Purlins
m
m
m
m
Roof area
Length perpendicular to slope
surface du plan =
25
m2
No.
Unit
A: Crepissage (Plastering)
1
2
150
m2
m2
m2
m2
m2
Paint
Nombre=
Nombre=
Windows
Iron window grilles
Venilation blocks 40cm x 20cm
Doors
Nombre=
C: Peinture (Paint)
150
Nombre=
m2
Engineer: B. Biddick
TRANCHE 1
Preparation &
Foundation
No
Price
($US)
Article
#
d'units
Unit
Prix Total
TRANCHE 2
Construction up
to the Roof
TRANCHE 3 Roof
& Finish
#
d'units
#
d'units
Prix Total
$292.50
$75.00
$40.00
$69.00
2
3
$40.00
$69.00
673
$437.45
673
$437.45
287
114
306
$318.57
$87.78
$100.98
bag
28
$210.00
m3
$75.00
$19.00
m3
White Sand
$20.00
m3
Crushed gravel
$23.00
m3
Pea gravel
$13.00
m3
River rock
$21.00
m3
Limestone
$20.00
m3
30cm Block
$1.13
each
10
20cm Block
$0.80
each
11
15cm Block
$0.65
each
12
12cm Block
$0.45
each
13
10cm Block
$0.40
each
14
$32.00
each
15
Ventilation Blocks
$0.80
each
16
#7 Bars
$6.50
17
#6 Bars
$5.25
18
#5 Bars
$3.30
19
#4 Bars
$1.11
287
$318.57
20
#3 Bars
$0.77
114
$87.78
21
#2 Bars
$0.33
306
$100.98
22
Binding Wire
$1.40
lb
1x4 Lumber
$1.97
1x6 Lumber
$2.30
$2.95
26
1x8 RS Lumber
$2.62
27
1x12 Lumber
$5.08
28
2x2 Lumber
$2.07
29
$3.44
30
$2.79
31
$13.00
each
32
$25.00
each
$36.00
Prix Total
39
3
$7.50
$25.00
River Sand
25
#
d'unit
s
Prix Total
$82.50
Cement
River Sand - washed
23
# d'units
11
1
2
24
Prix Total
TRANCHE 3
Holdback / Add'l
Req
30
$59.04
30
$59.04
56
$156.13
56
$156.13
33
34
Hardboard
35
Wood Preservative
$20.00
gallon
36
Hurricane Straps
$1.65
$13.20
37
Assorted Nails
$1.20
lb
$9.60
38
Roofing Nails
$1.40
lb
$4.20
8
8
3
$13.20
$9.60
$4.20
$26.00
each
10
$300.00
10
$300.00
5
3
$25.00
$264.00
3
3
5
$780.00
$135.00
$50.00
39
CGI 3'x6'
40
CGI 3'x8'
each
each
each
41
CGI 3'x10'
$28.00
each
42
CGI 3'x12'
$30.00
each
43
44
45
46
Ridge Cap
47
each
$5.00
m3
m3
$5.00
$25.00
$88.00
each
$264.00
48
$16.00
each
49
Window
$260.00
each
$780.00
50
Window Grill
$45.00
each
$135.00
51
Paint
$10.00
gallon
$50.00
$0.29
$1.68
m2
Metal Shoring
$2.50
each
Cost of Materials
$1,299
274.00
$3,217
$1,919
274
$79.46
$79.46
$79
$79
$441
$685
$1,126
Sub-total
20% contingency for transportation and unforseen costs
$1,818.94
$363.79
$2,603.68
$520.74
$4,422.62
$884.52
Totals
$2,183
$3,124
$5,307
Grand Total
25 m2
Area of House
2
Cost/m :
212.29
Item
Sink
Toilet
Pipe 2''
Pipe 4''
Reducer (2'' en 4'')
Elbow joint 2''
Elbow joint 4''
Unit Price
($US)
$67.50
$162.00
$4.60
$9.80
$6.00
$2.00
$3.00
Quantity
2
2
20
4
6
16
8
Total Price
($US)
$135.00
$324.00
$92.00
$39.20
$36.00
$32.00
$24.00
Sub Total
$682.20
Septic Tank
$700.00
Grand total
$1,382.20
Homeowner:___________________
BC Engineer:___________________
Homeowner Phone No:___________________
Slope?
< 10%
10 < 35%
> 35%
Planned?
Yes/No
Yes/No
Yes/No
Yes/No
SDS
1.05g
1.67g
Planned?
Yes/No
Yes/No
Yes/No
Soil?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
CHECKLIST
Homeowner Signature:__________________________________
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date: __________
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Date: __________
Date: __________
Date: __________
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Comments:
SOURCE
MTPTC 8
MTPTC 8
MTPTC 8
MTPTC 9
MTPTC 9
MTPTC 9
Build Change
Build Change
Build Change
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Date
MTPTC 13
MTPTC Design Criteria
MTPTC Design Criteria
Build Change
Build Change
Build Change
Build Change
Build Change
Build Change
Build Change
Build Change
Build Change
Build Change
Build Change
Build Change
Build Change
MTPTC 23
Homeowner:___________________
BC Engineer:___________________
Homeowner Phone No:___________________
ID No:_____________
GPS: ________________
Address: _________________________
Boss: _________________________
CONFIGURATION
CHECKLIST
PLAN
For single storey buildings with lightweight roof, length to width ratio equal to 3 or less
For other types of building, length to width ratio equal to 2.5 or less
Height to width ratio equal to 1.7 or less
Separate irregular shaped buildings(L,U,E)
ELEVATION
Building has not more than 2 storeys
Maximum height of ground floor walls = 2.7m
Maximum height of second floor walls = 2.5m
TYPE of FOUNDATION
Do not use short columns (use continuous strip foundation)
MINIMUM SHEAR WALL DENSITY
Only include properly confined walls longer than 1m in shear wall density calculation
Shear wall density complies with Build Change guidelines
SHEAR WALL LOCATION
At least two lines of shear walls in X direction
At least two lines of shear wallls in Y direction
Shear walls are symmetrically placed
Shear walls are as far as possible from one another
Shear walls are on exterior of building
Spacing or perpendicular or cross walls does not exceed Build Change guidelines
TIE COLUMN LOCATION
Every corner (L)
Every wall intersection (T)
Every change in the direction of the wall
At both ends of every wall longer than 30cm
BOND BEAM LOCATION
At the foundation (plinth beam)
At the roof level (ring beam)
Intermediate ring beam at sill level
OPENING SIZE
Maximum 1/2 length between to crosswalls
Openings positioned directly under ring beam
Doors reinforced on both sides with 8cm column
Windows reinforced on both sides with 8cm column
ACCESS and VENTILATION
At least two entrances/exits
Entrances on different sides of building
Opening/ventilation greater than 5% of floor area
Opening position based on wind direction
Gable not facing the wind
TWO STORY CONFIGURATION RULES
Do not build buildings with open ground floor
Do not build buildings with overhang
Columns are continuous both floors
Shear walls line up vertically
Openings line up vertically
Do not construct a second floor over a porch, or follow
Specific connection detailing
Planned?
Yes/No
Yes/No
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Yes/No
Planned?
Yes/No
Complies?
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Homeowner Signature:__________________________________
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date: __________
Done?
Yes/No
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Done?
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Yes/No
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Done?
Oui / No
Oui / No
Oui / No
Oui / No
Oui / No
Oui / No
Oui / No
Date
Photo #
Recommendation Implemented
Date: __________
Date: __________
Date: __________
Comments:
GNA
GNA
GNA
MTPTC 22
Build Change
GNA
GNA
Build Change
Build Change
Build Change
MTPTC 41
MTPTC 41
MTPTC 41
MTPTC 41
MTPTC 41
Build Change
MTPTC 41
MTPTC 41
Build Change
Build Change
MTPTC 39
MTPTC 39
MTPTC 79
MTPTC 43
Build Change
MTPTC 81
MTPTC 81
Build Change
Build Change
Build Change
Build Change
Build Change
MTPTC 15
MTPTC 25
MTPTC 25
MTPTC 25, 42
MTPTC 25, 42
MTPTC 17
Build Change
Homeowner:___________________
BC Engineer:___________________
Homeowner Phone No:___________________
MATERIALS QUALITY
CHECKLIST
h
a
b
c
d
e
Planned?
Yes/No
Yes/No
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Homeowner Signature:__________________________________
Date: __________
Done?
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Date: __________
Date: __________
Date: __________
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
MTPTC 48
Comments:
MTPTC 60
MTPTC 65
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Date
Build Change
Build Change
MTPTC 90
Build Change
Build Change
Build Change
MTPTC 37
MTPTC 37
_________________
_________________
Homeowner Phone No:___________________
ID No:_____________
GPS: ________________
Address: _________________________
Boss: _________________________
Planned?
Yes/No
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Yes/No
Yes/No
Planned?
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Yes/No
Yes/No
Yes/No
Done?
Yes/No
Yes/No
FOUNDATION
CHECKLIST
NG FOUNDATION
1
a
b
c
2
a
b
3
a
b
c
4
a
b
c
d
e
5
a
b
c
d
e
6-1
a
b
c
d
e
f
g
h
i
6-2
a
b
c
d
e
f
g
6-3
a
b
c
d
e
f
i
h
7
a
b
c
d
8
a
b
_____________________________
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Date
Date
Date
Date
Date
Date
Photo #
Photo #
Photo #
Photo #
Photo #
Photo #
Photo #
Recommendation Made
Recommendation Made
Recommendation Made
Recommendation Made
Recommendation Made
Recommendation Made
Recommendation Made
Date: __________
Date: __________
_______________________________
Date: __________
_____________________________
Date: __________
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
MTPTC 54
MTPTC 56
MTPTC 56 says min 50 cm in natural ground
MTPTC 56
MTPTC 56
MTPTC 56
Date
Photo #
Recommendation Implemented
MTPTC 59
MTPTC 59
MTPTC 59
Build Change
Date
Photo #
Recommendation Implemented
MTPTC 56, 59
MTPTC 48
MTPTC 48
MTPTC 48
Date
Photo #
Recommendation Implemented
MTPTC 48 - cyclopean
MTPTC 48 - cyclopean
MTPTC 48
MTPTC 48
MTPTC 64
MTPTC 64
MTPTC 64
Build Change
Date
Photo #
Recommendation Implemented
Build Change
Date
Photo #
Recommendation Implemented
GNA
Date
Photo #
Recommendation Implemented
MTPTC 57
MTPTC 61
Date
Photo #
Recommendation Implemented
_______________________________
Date
Comments:
MTPTC 63
MTPTC 63
Homeowner:___________________
BC Engineer:___________________
Homeowner Phone No:___________________
ID No:_____________
GPS: ________________
Address: _________________________
Boss: _________________________
REINFORCED CONCRETE
CHECKLIST
Planned?
Yes/ No
Date
Photo #
Recommendation Made
Done?
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Planned?
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Done?
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Planned?
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Done?
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Planned?
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Planned?
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Date
Photo #
Recommendation Implemented
MTPTC 65
Yes/ No
Date
Date
Photo #
Photo #
Recommendation Made
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Yes/ No
Yes/ No
Yes/ No
Yes/ No
MTPTC 60
MTPTC 60
MTPTC 60
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Done?
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Done?
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
MTPTC 66 says 60 cm
MTPTC 67
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
MTPTC 64
6
a
b
c
d
e
f
g
h
i
j
k
l
7
a
b
c
d
e
f
g
8
Planned?
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Planned?
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Planned?
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Homeowner Signature:__________________________________
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date: __________
Done?
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Oui / No
Oui / No
Oui / No
Oui / No
Oui / No
Done?
Oui / No
Oui / No
Oui / No
Oui / No
Oui / No
Oui / No
Oui / No
Done?
Oui / No
Oui / No
Oui / No
Oui / No
Date: __________
Date: __________
Date: __________
Photo #
Recommendation Implemented
MTPTC 68
MTPTC 68
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Date
Comments:
Homeowner:___________________
BC Engineer:___________________
Homeowner Phone No:___________________
Planned?
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Planned?
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Planned?
Yes / No
Yes / No
Yes / No
Yes / No
Planned?
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Planned?
Yes / No
Yes / No
Planned?
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Planned?
Yes / No
Yes / No
Yes / No
Done?
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Done?
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Done?
Yes / No
Yes / No
Yes / No
Yes / No
Done?
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Done?
Yes / No
Yes / No
Done?
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Done?
Yes / No
Yes / No
Yes / No
STRONG WALL
CHECKLIST
MORTAR MIXING
Use mortar 1:3 mix
Use clean, fine river sand
Use clean water (not salty or muddy)
Use Type 1 Cement
Mix a clean, concrete or asphalt surface, not on dirt
Using a mechanical mixer is best
Batch out gravel, then sand, then cement
Turn over 3 times or until color is uniform
Do not use too much water! Add water slowly
WALL MASONRY
Wet concrete blocks prior to use
Use a line and deadman
Prop up column steel so it remains plumb
Use 1/3 bonding, chase the bond before starting
Vibrate block
Tooth wall at tie columns and openings by 1/3 block
Maintain minimum 2.5 cm between block and column tie
Maximum bed joint thickness 12.5mm
Minimum head joint thickness 12.5mm
Maximum variation in mortar joint size 4mm
Prepare a reasonable amount of mortar to avoid wetting from time to time
Pour the beam in one time
Check the wall is plumb
Maximum variation from plumb 2cm over 3m height
Pour the column after completing min 1 m, max 1.2m heigh of wall
Cure the wall 3 times per day for 3 days
Check the top of the wall is level
INTERMEDIATE RING BEAM
Directly below window level, 8cm high, 15cm wide
Use two #3 (3/8") bars
Use #2 (1/4") stirrups spaced at 20 cm
Apply one of overlap detailling options
OPENING REINFORCEMENT
Form 8x15cm column either side of openings
Use 2 #4 (12mm) vertical bars
Use #2 (1/4") stirrups at 15 cm spacing
Tie reinforcement for doors into foundation beam
Grout reinforcement for windows into blocks 50cm below sill beam
Tie reinforcement into ring beam
Use at least 40 cm overlap
Fill space above door opening with lightweight material, or
Cast concrete lintel monolithic with ring beam
Reinforce concrete lintel according to standard detail
ELECTRICAL and PLUMBING
Never break the wall to put electrical or plumbing
Leave free space for utility piping
POURING COLUMN CONCRETE
Clean out the bottom before placing formwork
Pour column in one day to the same height as wall
Pour columns after minimum 1m wall built
Distance between formwork and steel bars 25mm minimum
Ensure toothed areas of columns completely filled with concrete
FINISH THE WALL WITH PLASTER
10mm plaster on both sides of walls
Use clean, fine river sand
Use clean water (not salty or muddy)
Homeowner Signature:__________________________________
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date: __________
Date: __________
Date: __________
Date: __________
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
MTPTC 69
MTPTC 69
MTPTC 69
MTPTC 72
Date
Photo #
Recommendation Implemented
MTPTC 73
MTPTC 73
MTPTC 73
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
MTPTC 75
Date
Comments:
Homeowner:___________________
BC Engineer:___________________
ID No:_____________
GPS: ________________
Address: _________________________
Planned?
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Planned?
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Done?
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Done?
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
STRONG WALL
CHECKLIST
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Made
Date
Photo #
Recommendation Implemented
Date
Photo #
Recommendation Implemented
Yes / No
Homeowner Signature:__________________________________
Date: __________
Date: __________
Date: __________
Date: __________
Comments: