Experience sheet of the Firm during Last Five Year

Project Name: Consultancy Assignment for Feasibility


Studies and Preparation of DPR for 500 Km. Length of
Rural Roads falling under Nawada District of Bihar under
RWD, Govt. of Bihar.

Country : India

Project location within country : State of Bihar


Name of Client: IL&FS Infrastructure Development
Corporation Ltd., New Delhi
Date of Start :
Date of Completion:
(Month/Year) : March
(Month/Year) : May 2010
2009

Professional Staff provided by TRANSTEK:


No. of Staffs : 12
No. of Man-Months : 246
Approximate Value of Services (in Lakhs Rs.) :
Rs.. 80.00 Lakhs (approx.)

Name of Associated Firm, If any : None

Number of Man-Month of professional staff provided


by associated firm : None

Senior Staff involved and function Performed :


1. Mr. P.D. S. Prasad: Senior Highway Engineer cum- Team Leader
2. S. M. Hussain : Highway cum Pavement Expert
3. Mr. P. Pandey : Bridges Specialist
4. Mr. S. Narain
: Geotechnical cum- Materials Engineer
5. Mr. B. Saravanan : Survey engineer
6. Mr. R. K. Sinha : Sr. Traffic cum CADD Expert

A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation works
(detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and
preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study
Report, Preliminary & Detailed Project Report, Tender Document.
Narrative Description of Project: This project Widening and Strengthening work including Geometric Improvement
of Single lane Rural Roads Section in the Bihar State includes Survey / Investigation, Feasibility Study, Preparation of
Detailed Engineering Report, Cost Estimate, Drawings Tender Document for the Project.
Description of Actual Service to be Provided by TRANSTEK:

Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work.
Borrow pit Soil and Material Survey.
Preparation Land Acquisition Plan and Report.
Pavement Investigations (Soil Investigation & Testing work).
Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Hydrological survey work for Bridges and preparation of Hydraulic Particulars
Geotechnical Investigation for Entire High Embankment Zone & Bridges.
Preparation of Feasibility Study Report.
Highway Geometric design and preparation of drawings
Detailed design & Preparation of drawing for bridges.
Preparation of Detailed Project Report & Tender document.
Obtaining Clearance of DPR from STA.

Transtek Engineers & Services Private Ltd

Experience sheet of the Firm during Last Five Year

Project Name: Preparation of Feasibility Study and Detailed


Project Report for Widening
to two lane including
Strengthening and Geometric
Improvement
of State
Highway No. 56, 62, 63: Package No. 11 (Araria, Kishanganj
and Katihar District) under RSVY Scheme Total 138 Km.

Country: India

Project location within Country: State of Bihar


Name of Client : CSO, CPWD, Nirman Bhawan, N. Delhi
& CPWD, Patna

Professional Staff provided by TRANSTEK:


No. of Staffs : 14
No. of Man-Months :64

Date of Start :
(Month/Year) :
December 2005

Date of Completion:
(Month/Year) : Oct. 2006

Name of Associated Firm, If any: None

Approximate Value of Services (in Lakhs Rs.) :


Rs.. 78.65 Lakhs.

Number of Man-Month of professional staff provided


by associated firm: None

Senior Staff involved and function Performed :


1. Mr. S.B. Pd. Sinha. : Senior Highway Engineer cum- Team Leader
2. Mr. S. M. Husaain : Highway cumPavement Specialist
3. Mr. S. Chatterjee : Bridges Specialist
4. Mr. Pankaj Pandey : Sr. Bridge Design Expert
5. Mr. S. Narain
: Geotechnical cum- Materials Engineer
6. Mr. B. Sarvanan : Survey engineer
7. Mr. R. K. Sinha
: Traffic engineer
8. Mr. M.V. Ramdas :
Transport Economist
9. Mrs. S. K. Srivastava : Social & R&R Expert
10. Mr. M. K. Sinha :
Environmental Expert
11. Mr. T. P. Sinha : Q/S cum Documentation Expert

A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation
works (detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and
preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study
Report, Preliminary & Detailed Project Report, Tender Document.
Narrative Description of Project : This project Widening and Strengthening work to Two Lane including
Geometric Improvement of Single lane State Highway Section in the Bihar State includes Survey / Investigation,
Feasibility Study, Preparation of Technical Appraisal Report , Detailed Engineering Report, Cost Estimate,
Construction Drawing and Tender Document.
Description of Actual Service to be Provided by TRANSTEK:

Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load
Survey. Entire
Pavement Condition Survey work.
Borrow pit Soil and Material Survey.
Detailed Environmental & Social Survey, Preparation of Environmental & Social Screening Report, EIA Report, SIA Report,
EMP & Rap Report.
Preparation Land Acquisition Plan and Report.
Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman Beam Deflection Study.
Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Hydrological survey work for Bridges and preparation of Hydraulic Particulars
Geotechnical Investigation for Entire High Embankment Zone & Bridges.
Preparation of Techno Economic Feasibility Study Report.
Highway Geometric design and preparation of drawings
Detailed design & Preparation of drawing for bridges.
Preparation of Preliminary Project Report.
Preparation of Detailed Project Report & Tender document.

Transtek Engineers & Services Private Ltd

Experience sheet of the Firm during Last Five Year

Project Name : Preparation of Feasibility Study and Detailed


Project Report for Widening
to two lane including
Strengthening and Geometric
Improvement
of State
Highway No.-19 & 22 : Package No. 14 (Banka District )
under RSVY Scheme Total 106 Km.
Project location within country : State of Bihar
Name of Client : CSO, CPWD, Nirman Bhawan, N. Delhi
& CPWD, Patna
Date of Start :
(Month/Year) :
December 2005

Date of Completion :
(Month/Year) : Oct. 2006

Country : India

Professional Staff provided by TRANSTEK :


No. of Staffs : 14
No. of Man-Months :66
Approximate Value of Services (in Lakhs Rs.) :
Rs.. 69.54 Lakhs.

Number of Man-Month of professional staff provided


by associated firm : None

Name of Associated Firm, If any : None

Senior Staff involved and function Performed :


1. Mr. P.. D. S. Pd.. : Senior Highway Engineer cum- Team Leader
2. Mr. Jaj Singh
: Highway cumPavement Specialist
3. Mr. B.B. Verma : Bridges Specialist
4. Mr. Pankaj Pandey : Sr. Bridge Design Expert
5. Mr. O. P. Banka : Geotechnical cum- Materials Engineer
6. Mr. Ranjeet Kumar : Survey engineer
7. Mr. A. K. Singh : Traffic Expert
8. Mr. M.V. Ramdas :
Transport Economist
9. Mrs. A. Khan : Social & R&R Expert
10. Mr. S. N. Pandey :
Environmental Expert
11. Mr. A.K. Singh : Q/S cum Documentation Expert

A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation
works (detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and
preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study
Report, Preliminary & Detailed Project Report, Tender Document.
Narrative Description of Project : This project Widening and Strengthening work to Two Lane including
Geometric Improvement of Single lane State Highway Section in the Bihar State includes Survey / Investigation,
Feasibility Study, Preparation of Technical Appraisal Report , Detailed Engineering Report, Cost Estimate,
Construction Drawing and Tender Document.
Description of Actual Service to be Provided by TRANSTEK:

Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load
Survey. Entire
Pavement Condition Survey work.
Borrow pit Soil and Material Survey.
Detailed Environmental & Social Survey, Preparation of Environmental & Social Screening Report, EIA Report, SIA Report,
EMP & Rap Report.
Preparation Land Acquisition Plan and Report.
Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman Beam Deflection Study.
Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Hydrological survey work for Bridges and preparation of Hydraulic Particulars
Geotechnical Investigation for Entire High Embankment Zone & Bridges.
Preparation of Techno Economic Feasibility Study Report.
Highway Geometric design and preparation of drawings
Detailed design & Preparation of drawing for bridges.
Preparation of Preliminary Project Report .
Preparation of Detailed Project Report & Tender document.

Transtek Engineers & Services Private Ltd

Experience sheet of the Firm during Last Five Year

Project Name : Preparation of Feasibility Study and Detailed


Project Report for Widening
to two lane including
Strengthening and Geometric
Improvement
of State
Highway No. 19, 24 & 25 of Length 95 km. under Package
No. 16 under RSVY Scheme

Country : India

Project location within Country: State of Bihar


Name of Client : CSO, CPWD, Nirman Bhawan, N. Delhi
& CPWD, Patna

Professional Staff provided by TRANSTEK:


No. of Staffs : 14
No. of Man-Months :64

Date of Start :
(Month/Year) : January
2006

Date of Completion :
(Month/Year) : Nov. 2006

Name of Associated Firm, If any : None

Approximate Value of Services (in Lakhs Rs.) :


Rs.. 66.56 Lakhs.

Number of Man-Month of professional staff provided


by associated firm : None

Senior Staff involved and function Performed :


1. Mr. V. K. Verma. : Senior Highway Engineer cum- Team Leader
2. Mr. K. Kumar : Highway cum Pavement Specialist
3. Mr. K. Prasad : Bridges Specialist
4. Mr. Pankaj Pandey : Sr. Bridge Design Expert
5. Mr. K. Vimal
: Geotechnical cum- Materials Engineer
6. Mr. S.C. Pd. Verma : Survey engineer
7. Mr. S. N. Singh : Traffic engineer
8. Mr. M.V. Ramdas :
Transport Economist
9. Mrs. D. Ghosh : Social & R&R Expert
10. Mr. B. K. Sinha :
Environmental Expert
11. Mr. R. Singh : Q/S cum Documentation Expert

A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation
works (detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and
preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study
Report, Preliminary & Detailed Project Report, Tender Document.
Narrative Description of Project : This project Widening and Strengthening work to Two Lane including
Geometric Improvement of Single lane State Highway Section in the Bihar State includes Survey / Investigation,
Feasibility Study, Preparation of Technical Appraisal Report , Detailed Engineering Report, Cost Estimate,
Construction Drawing and Tender Document.
Description of Actual Service to be Provided by TRANSTEK :

Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load
Survey. Entire
Pavement Condition Survey work.
Borrow pit Soil and Material Survey.
Detailed Environmental & Social Survey, Preparation of Environmental & Social Screening Report, EIA Report, SIA Report,
EMP & Rap Report.
Preparation Land Acquisition Plan and Report.
Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman Beam Deflection Study.
Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Hydrological survey work for Bridges and preparation of Hydraulic Particulars
Geotechnical Investigation for Entire High Embankment Zone & Bridges.
Preparation of Techno Economic Feasibility Study Report.
Highway Geometric design and preparation of drawings
Detailed design & Preparation of drawing for bridges.
Preparation of Preliminary Project Report .
Preparation of Detailed Project Report & Tender document.

Transtek Engineers & Services Private Ltd

Experience sheet of the Firm during Last Five Year

Project Name: Consultancy Assignment for Feasibility


Studies and Preparation of DPR for 500 Km. Length of
Rural Roads falling under Supaul District of Bihar under
RWD, Govt. of Bihar.

Country : India

Project location within country : State of Bihar


Name of Client: IL&FS Infrastructure Development
Corporation Ltd., New Delhi
Date of Completion:
Date of Start :
(Month/Year) : January 2009
(Month/Year) :
December 2007

Professional Staff provided by TRANSTEK:


No. of Staffs : 12
No. of Man-Months : 246
Approximate Value of Services (in Lakhs Rs.) :
Rs.. 80.00 Lakhs (approx.)

Name of Associated Firm, If any : None

Number of Man-Month of professional staff provided


by associated firm : None

Senior Staff involved and function Performed :


1. Mr. P.D. S. Prasad: Senior Highway Engineer cum- Team Leader
2. S. M. Hussain : Highway cum Pavement Expert
3. Mr. P. Pandey : Bridges Specialist
4. Mr. S. Narain
: Geotechnical cum- Materials Engineer
5. Mr. B. Saravanan : Survey engineer
6. Mr. R. K. Sinha : Sr. Traffic cum CADD Expert

A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation works
(detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and
preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study
Report, Preliminary & Detailed Project Report, Tender Document.
Narrative Description of Project: This project Widening and Strengthening work including Geometric Improvement
of Single lane Rural Roads Section in the Bihar State includes Survey / Investigation, Feasibility Study, Preparation of
Detailed Engineering Report, Cost Estimate, Drawings Tender Document for the Project.
Description of Actual Service to be Provided by TRANSTEK:

Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work.
Borrow pit Soil and Material Survey.
Preparation Land Acquisition Plan and Report.
Pavement Investigations (Soil Investigation & Testing work).
Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Hydrological survey work for Bridges and preparation of Hydraulic Particulars
Geotechnical Investigation for Entire High Embankment Zone & Bridges.
Preparation of Feasibility Study Report.
Highway Geometric design and preparation of drawings
Detailed design & Preparation of drawing for bridges.
Preparation of Detailed Project Report & Tender document.
Obtaining Clearance of DPR from STA.

Transtek Engineers & Services Private Ltd

Experience sheet of the Firm during Last Five Year

Project Name: Preparation of Detailed Project Report for Upgrading and Strengthening work of Rural roads (Total = 373
Km. Length including Bridges), in East Champaran and
Gopalganj District of Bihar Funded by World Bank Funded as
Rural Road Project II PMGSY Scheme.

Country : India

Project location within country : State of Bihar


Name of Client: RWD, Govt of Bihar

Professional Staff provided by TRANSTEK:


No. of Staffs : 11
No. of Man-Months : 44
Approximate Value of Services (in Lakhs Rs.) :
Rs.. 89.65 Lakhs.

Date of Start :
(Month/Year) : March
2007

Date of Completion:
(Month/Year) : Nov. 2007

Name of Associated Firm, If any : None

Number of Man-Month of professional staff provided


by associated firm: None

Senior Staff involved and function Performed


1. Mr. S. B. Prasad : Senior Highway Engineer cum- Team Leader
2. Mr. P. Pandey : Bridges Specialist
3. Mr. S. Narain
: Geotechnical cum- Materials Engineer
4. Mr. P. R. Kumar : Survey engineer
5. Mr. R. K. Sinha : Sr. Traffic cum CADD Expert
6. Mr. Mukesh Kumar :
Environmental Expert
7. Mr. S. K. Srivastava : Social & R&R Expert
8. Mr. T. P. Sinha : Q/S cum Documentation Expert

A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation works
(detailed below), Detailed topographic survey, Feasibility Study, Geometric Design of Highway and preparation of
detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study Report, Preliminary
& Detailed Project Report, Tender Document.
Narrative Description of Project: This world Bank Funded project is upgrading and strengthening of existing Rural
Road to Single lane standards including Geometric Improvement which includes Survey / Investigation, Feasibility
Study, Preparation of Detailed Engineering Report, Cost Estimate, Drawings Tender Document for the Project.
Description of Actual Service to be Provided by TRANSTEK:

Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work.
Borrow pit Soil and Material Survey.
Pavement Investigations (Soil Investigation & Testing work).
Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Hydrological survey work for Bridges and preparation of Hydraulic Particulars
Geotechnical Investigation for Bridges.
Highway Geometric design and preparation of drawings
Detailed design & Preparation of drawing for bridges.
Preparation of Detailed Project Report & Tender document.
Obtaining Clearance of DPR from STA.

Transtek Engineers & Services Private Ltd

Experience sheet of the Firm during Last Five Year

Project Name: Preparation of Detailed Project Report for upgrading and strengthening work of Rural roads (Totall = 496
Km. Length) Baxaur, Bhabhua and Rohtas District of Bihar
under PMGSY Scheme, Executed by NPCC, Patna.

Country : India

Project location within country : State of Bihar


Name of Client: NPCC, 404-S, Udaygiri Apartments, Budha
Marg, Patna - 800 001

Professional Staff provided by TRANSTEK:


No. of Staffs : 9
No. of Man-Months : 46

Date of Start :
(Month/Year) : October
2004

Approximate Value of Services (in Lakhs Rs.) :


Rs.. 44.35 Lakhs.

Date of Completion:
(Month/Year) : Nov. 2005

Name of Associated Firm, If any : None

Number of Man-Month of professional staff provided


by associated firm : None

Senior Staff involved and function Performed :


1. Mr. V. K. Verma: Senior Highway Engineer cum- Team Leader
2. S. N. Singh : Highway cum Pavement Expert
3. Mr. P. Pandey : Bridges Specialist
4. Mr. S. Narain
: Geotechnical cum- Materials Engineer
5. Mr. B. Saravanan : Survey engineer
6. Mr. R. K. Sinha : Sr. Traffic cum CADD Expert

A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation works
(detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and
preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study
Report, Preliminary & Detailed Project Report, Tender Document.
Narrative Description of Project: This project Widening and Strengthening work including Geometric Improvement
of Single lane Rural Roads Section in the Bihar State includes Survey / Investigation, Feasibility Study, Preparation of
Detailed Engineering Report, Cost Estimate, Drawings Tender Document for the Project.
Description of Actual Service to be Provided by TRANSTEK:

Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work.
Borrow pit Soil and Material Survey.
Preparation Land Acquisition Plan and Report.
Pavement Investigations (Soil Investigation & Testing work).
Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Hydrological survey work for Bridges and preparation of Hydraulic Particulars
Geotechnical Investigation for Entire High Embankment Zone & Bridges.
Preparation of Feasibility Study Report.
Highway Geometric design and preparation of drawings
Detailed design & Preparation of drawing for bridges.
Preparation of Detailed Project Report & Tender document.
Obtaining Clearance of DPR from STA.

Transtek Engineers & Services Private Ltd

Experience sheet of the Firm during Last Five Year

Project Name : Widening and Strengthening to two Country : India


lane including Geometric Improvement of N.H.-23
(Kolebira Birmitrapur Section) from Km. 135 to Km.
211.200 (76.80 km. length) under N.H. Division, Gumla.

Project location within country:State of Jharkhand

Professional Staff provided by TRANSTEK :

No. of Staffs : 10
Name of Client : Engineer in Chief,
No. of Man-Months : 30
PWD (Roads), Jharkhand.
Date of Completion :
Date of Start :
Approximate Value of Services
(Month/Year) : August, 2002
(Month/Year) : Oct., 2001
(in Lakhs Rs.) :
Rs. 19.20 Lakhs.

Name of Associated Firm, If any : None

Number of Man-Month of professional staff


provided by associated firm : None

Senior Staff involved and function Performed :


1.
2.
2.
3.
4.
5.
6.
7.

Mr. B. L. Tikoo : Chief Advisor


Mr. S. B. Pd. Sinha. : Senior Highway Engineer cum- Team Leader
Mr. T. P. Singh : Pavement Specialist
Mr. B. B. Verma : Bridges Specialist
Mr. S. Narain : Geotechnical cum- Materials Engineer
Mr. B. Sarvanan : Survey engineer
Mr. R. K. Sinha : Traffic engineer
Mr. T. P. Sinha : QS cum Documentation Expert

Senior Staff involved and function Performed : A Team of Senior Level Expert was involved in this Project and the
functions performed by them includes, Study on alignment plans of the Project Stretch submitted by Department, Soil & material
Survey, Drainage Condition Survey, Pavement Condition Survey, Soil & Material Survey, Geotechnical investigation, Pavement
design, Design of Cross Drainage Structures, Feasibility Study, Preparation of Technical Appraisal and Detailed Project Report
for widening to two lane with strengthening including Geometric improvement of this National Highway.

Narrative Description of Project : This project Widening and Strengthening work to Two Lane including Geometric
Improvement of Single lane National Highway section of NH-23 is long awaited project under M/oRT&H, New Delhi for
Jharkhand State. The service provided includes Survey / Investigation, Feasibility Study, Preparation of Technical Appraisal Report ,
Detailed Engineering Report and Cost Estimate of this Project.
Description of Actual Service Provided by TRANSTEK :

Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load
Survey. Entire Pavement Condition Survey work.
Borrow pit Soil and Material Survey.
Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman
Beam Deflection Study etc.). Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Preparation of Techno Economic Feasibility Study Report.
Highway Geometric design and preparation of drawings
Preparation of Preliminary Project Report .
Preparation of Detailed Project Report & Tender document.

Transtek Engineers & Services Private Ltd

Experience sheet of the Firm during Last Five Year

Project Name : Widening and Strengthening to two


lane including Geometric Improvement of Bengabad
Chatro Road Section from Km. 0 to Km. 32.00 (32.00
km. length) under Road Division, Giridih.

Country : India

Project location within country: State of Jharkhand

Professional Staff provided by TRANSTEK :

No. of Staffs : 7
Name of Client : Engineer in Chief,
No. of Man-Months : 24
PWD (Roads), Jharkhand.
Date of Completion :
Date of Start :
Approximate Value of Services
(Month/Year) : July, 2002
(Month/Year) : Oct., 2001
(in Lakhs Rs.) :
Rs. 08.00 Lakhs.

Name of Associated Firm, If any : None

Number of Man-Month of professional staff


provided by associated firm : None

Senior Staff involved and function Performed :


1.
2.
2.
3.
4.
5.
6.
7.

Mr. B. L. Tikoo
Mr. P. D. S. Pd.
Mr. T. P. Sinha
Mr. K. Prasad
Mr. S. Ranjan
Mr. P.R. Kumar
Mr. A. K. Singh
Mr. S. K. Verma

:
.:
:
:
:
:

Chief Advisor
Senior Highway Engineer cum- Team Leader
Pavement Specialist
Bridges Specialist
Geotechnical cum- Materials Engineer
Survey engineer
: Traffic engineer
: QS cum Documentation Expert

A Team of Senior Level Expert was involved in this Project and the functions performed by them includes, Study on alignment
plans of the Project Stretch submitted by Department, Soil & material Survey, Drainage Condition Survey, Pavement Condition
Survey, Soil & Material Survey, Geotechnical investigation, Pavement design, Design of Cross Drainage Structures, Feasibility
Study, Preparation of Technical Appraisal and Detailed Project Report for widening to two lane with strengthening including
Geometric improvement of this National Highway.

Narrative Description of Project : This project Widening and Strengthening work to Two Lane including Geometric
Improvement of Single lane State Highway Section in the Jharkhand State. The service provided includes Survey / Investigation,
Feasibility Study, Preparation of Technical Appraisal Report , Detailed Engineering Report and Cost Estimate of this Project.
Description of Actual Service Provided by TRANSTEK :
The actual service provided by Trasntek Team are as follow :

Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load
Survey. Entire Pavement Condition Survey work.
Borrow pit Soil and Material Survey.
Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman
Beam Deflection Study etc.). Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Preparation of Techno Economic Feasibility Study Report.
Highway Geometric design and preparation of drawings
Preparation of Preliminary Project Report .
Preparation of Detailed Project Report & Tender document.

Transtek Engineers & Services Private Ltd

Experience sheet of the Firm during Last Five Year

Project Name : Widening and Strengthening to two


lane including Geometric Improvement of Sisai
Lapung - Dorma Section from Km. 01 to Km. 43.20
(43.20 km. length) under Road Division, Khunti.

Country : India

Project location within country:State of Jharkhand

Professional Staff provided by TRANSTEK :

No. of Staffs : 8
Name of Client : Engineer in - Chief,
No. of Man-Months : 26
PWD (Roads), Jharkhand.
Date of Completion :
Approximate Value of Services
Date of Start :
(Month/Year) : July 2002
(in Lakhs Rs.) :
(Month/Year) : Oct., 2001
Rs. 11.00 Lakhs.

Name of Associated Firm, If any : None

Number of Man-Month of professional staff


provided by associated firm : None

Senior Staff involved and function Performed :


1. Mr. B. L. Tikoo : Chief Advisor
2. Mr. P. D. S. Pd. . : Senior Highway Engineer cum- Team Leader
2. Mr. T. P. Singh : Pavement Specialist
3. Mr. K. Prasad
: Bridges Specialist
4. Mr. S. Narain
: Geotechnical cum- Materials Engineer
5. Mr. P. R. Kumar : Survey engineer
6. Mr. R. K. Sinha
: Traffic engineer
7. Mr. T. P. Sinha : QS cum Documentation Expert

A Team of Senior Level Expert was involved in this Project and the functions performed by them includes, Study on alignment
plans of the Project Stretch submitted by Department, Soil & material Survey, Drainage Condition Survey, Pavement Condition
Survey, Soil & Material Survey, Geotechnical investigation, Pavement design, Design of Cross Drainage Structures, Feasibility
Study, Preparation of Technical Appraisal and Detailed Project Report for widening to two lane with strengthening including
Geometric improvement of this National Highway.

Narrative Description of Project : This project Widening and Strengthening work to Two Lane including Geometric
Improvement of Single lane State Highway Section in the Jharkhand State. The service provided includes Survey / Investigation,
Feasibility Study, Preparation of Technical Appraisal Report , Detailed Engineering Report and Cost Estimate of this Project.
Description of Actual Service Provided by TRANSTEK :

Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load
Survey. Entire Pavement Condition Survey work.
Borrow pit Soil and Material Survey.
Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman
Beam Deflection Study etc.). Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Preparation of Techno Economic Feasibility Study Report.
Highway Geometric design and preparation of drawings
Preparation of Preliminary Project Report .
Preparation of Detailed Project Report & Tender document.

Transtek Engineers & Services Private Ltd

Experience sheet of the Firm during Last Five Year

Project Name : Widening and Strengthening to two Country : India


lane including Geometric Improvement of Domchach
- Dhab Section from Km. 0 to Km. 26.40 (26.40 km.
length) under Road Division, Koderma.

Project location within country:State of Jharkhand

Professional Staff provided by TRANSTEK :

No. of Staffs : 7
Name of Client : Engineer in Chief,
No. of Man-Months : 24
PWD (Roads), Jharkhand.
Date of Completion :
Date of Start :
Approximate Value of Services
(Month/Year) : July, 2002
(Month/Year) : Oct., 2001
(in Lakhs Rs.) :
Rs. 08.10 Lakhs.

Name of Associated Firm, If any : None

Number of Man-Month of professional staff


provided by associated firm : None

Senior Staff involved and function Performed :


1.
2.
2.
3.
4.
5.
6.
7.

Mr. B. L. Tikoo : Chief Advisor


Mr. P. D. S. Pd. . : Senior Highway Engineer cum- Team Leader
Mr. V. K. Verma : Pavement Specialist
Mr. K. Prasad
: Bridges Specialist
Mr. O. P. Banka
: Geotechnical cum- Materials Engineer
Mr. Ranjeet Kumar : Survey engineer
Mr. A. K. Singh : Traffic engineer
Mr. S. K. Verma : QS cum Documentation Expert

A Team of Senior Level Expert was involved in this Project and the functions performed by them includes, Study on alignment
plans of the Project Stretch submitted by Department, Soil & material Survey, Drainage Condition Survey, Pavement Condition
Survey, Soil & Material Survey, Geotechnical investigation, Pavement design, Design of Cross Drainage Structures, Feasibility
Study, Preparation of Technical Appraisal and Detailed Project Report for widening to two lane with strengthening including
Geometric improvement of this National Highway.

Narrative Description of Project : This project Widening and Strengthening work to Two Lane including Geometric
Improvement of Single lane State Highway Section in the Jharkhand State. The service provided includes Survey / Investigation,
Feasibility Study, Preparation of Technical Appraisal Report , Detailed Engineering Report and Cost Estimate of this Project.
Description of Actual Service Provided by TRANSTEK :

Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load
Survey. Entire Pavement Condition Survey work.
Borrow pit Soil and Material Survey.
Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman
Beam Deflection Study etc.). Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Preparation of Techno Economic Feasibility Study Report.
Highway Geometric design and preparation of drawings
Preparation of Preliminary Project Report .
Preparation of Detailed Project Report & Tender document.

Transtek Engineers & Services Private Ltd