Country : India
A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation works
(detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and
preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study
Report, Preliminary & Detailed Project Report, Tender Document.
Narrative Description of Project: This project Widening and Strengthening work including Geometric Improvement
of Single lane Rural Roads Section in the Bihar State includes Survey / Investigation, Feasibility Study, Preparation of
Detailed Engineering Report, Cost Estimate, Drawings Tender Document for the Project.
Description of Actual Service to be Provided by TRANSTEK:
Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work.
Borrow pit Soil and Material Survey.
Preparation Land Acquisition Plan and Report.
Pavement Investigations (Soil Investigation & Testing work).
Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Hydrological survey work for Bridges and preparation of Hydraulic Particulars
Geotechnical Investigation for Entire High Embankment Zone & Bridges.
Preparation of Feasibility Study Report.
Highway Geometric design and preparation of drawings
Detailed design & Preparation of drawing for bridges.
Preparation of Detailed Project Report & Tender document.
Obtaining Clearance of DPR from STA.
Country: India
Date of Start :
(Month/Year) :
December 2005
Date of Completion:
(Month/Year) : Oct. 2006
A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation
works (detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and
preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study
Report, Preliminary & Detailed Project Report, Tender Document.
Narrative Description of Project : This project Widening and Strengthening work to Two Lane including
Geometric Improvement of Single lane State Highway Section in the Bihar State includes Survey / Investigation,
Feasibility Study, Preparation of Technical Appraisal Report , Detailed Engineering Report, Cost Estimate,
Construction Drawing and Tender Document.
Description of Actual Service to be Provided by TRANSTEK:
Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load
Survey. Entire
Pavement Condition Survey work.
Borrow pit Soil and Material Survey.
Detailed Environmental & Social Survey, Preparation of Environmental & Social Screening Report, EIA Report, SIA Report,
EMP & Rap Report.
Preparation Land Acquisition Plan and Report.
Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman Beam Deflection Study.
Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Hydrological survey work for Bridges and preparation of Hydraulic Particulars
Geotechnical Investigation for Entire High Embankment Zone & Bridges.
Preparation of Techno Economic Feasibility Study Report.
Highway Geometric design and preparation of drawings
Detailed design & Preparation of drawing for bridges.
Preparation of Preliminary Project Report.
Preparation of Detailed Project Report & Tender document.
Date of Completion :
(Month/Year) : Oct. 2006
Country : India
A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation
works (detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and
preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study
Report, Preliminary & Detailed Project Report, Tender Document.
Narrative Description of Project : This project Widening and Strengthening work to Two Lane including
Geometric Improvement of Single lane State Highway Section in the Bihar State includes Survey / Investigation,
Feasibility Study, Preparation of Technical Appraisal Report , Detailed Engineering Report, Cost Estimate,
Construction Drawing and Tender Document.
Description of Actual Service to be Provided by TRANSTEK:
Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load
Survey. Entire
Pavement Condition Survey work.
Borrow pit Soil and Material Survey.
Detailed Environmental & Social Survey, Preparation of Environmental & Social Screening Report, EIA Report, SIA Report,
EMP & Rap Report.
Preparation Land Acquisition Plan and Report.
Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman Beam Deflection Study.
Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Hydrological survey work for Bridges and preparation of Hydraulic Particulars
Geotechnical Investigation for Entire High Embankment Zone & Bridges.
Preparation of Techno Economic Feasibility Study Report.
Highway Geometric design and preparation of drawings
Detailed design & Preparation of drawing for bridges.
Preparation of Preliminary Project Report .
Preparation of Detailed Project Report & Tender document.
Country : India
Date of Start :
(Month/Year) : January
2006
Date of Completion :
(Month/Year) : Nov. 2006
A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation
works (detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and
preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study
Report, Preliminary & Detailed Project Report, Tender Document.
Narrative Description of Project : This project Widening and Strengthening work to Two Lane including
Geometric Improvement of Single lane State Highway Section in the Bihar State includes Survey / Investigation,
Feasibility Study, Preparation of Technical Appraisal Report , Detailed Engineering Report, Cost Estimate,
Construction Drawing and Tender Document.
Description of Actual Service to be Provided by TRANSTEK :
Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load
Survey. Entire
Pavement Condition Survey work.
Borrow pit Soil and Material Survey.
Detailed Environmental & Social Survey, Preparation of Environmental & Social Screening Report, EIA Report, SIA Report,
EMP & Rap Report.
Preparation Land Acquisition Plan and Report.
Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman Beam Deflection Study.
Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Hydrological survey work for Bridges and preparation of Hydraulic Particulars
Geotechnical Investigation for Entire High Embankment Zone & Bridges.
Preparation of Techno Economic Feasibility Study Report.
Highway Geometric design and preparation of drawings
Detailed design & Preparation of drawing for bridges.
Preparation of Preliminary Project Report .
Preparation of Detailed Project Report & Tender document.
Country : India
A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation works
(detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and
preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study
Report, Preliminary & Detailed Project Report, Tender Document.
Narrative Description of Project: This project Widening and Strengthening work including Geometric Improvement
of Single lane Rural Roads Section in the Bihar State includes Survey / Investigation, Feasibility Study, Preparation of
Detailed Engineering Report, Cost Estimate, Drawings Tender Document for the Project.
Description of Actual Service to be Provided by TRANSTEK:
Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work.
Borrow pit Soil and Material Survey.
Preparation Land Acquisition Plan and Report.
Pavement Investigations (Soil Investigation & Testing work).
Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Hydrological survey work for Bridges and preparation of Hydraulic Particulars
Geotechnical Investigation for Entire High Embankment Zone & Bridges.
Preparation of Feasibility Study Report.
Highway Geometric design and preparation of drawings
Detailed design & Preparation of drawing for bridges.
Preparation of Detailed Project Report & Tender document.
Obtaining Clearance of DPR from STA.
Project Name: Preparation of Detailed Project Report for Upgrading and Strengthening work of Rural roads (Total = 373
Km. Length including Bridges), in East Champaran and
Gopalganj District of Bihar Funded by World Bank Funded as
Rural Road Project II PMGSY Scheme.
Country : India
Date of Start :
(Month/Year) : March
2007
Date of Completion:
(Month/Year) : Nov. 2007
A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation works
(detailed below), Detailed topographic survey, Feasibility Study, Geometric Design of Highway and preparation of
detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study Report, Preliminary
& Detailed Project Report, Tender Document.
Narrative Description of Project: This world Bank Funded project is upgrading and strengthening of existing Rural
Road to Single lane standards including Geometric Improvement which includes Survey / Investigation, Feasibility
Study, Preparation of Detailed Engineering Report, Cost Estimate, Drawings Tender Document for the Project.
Description of Actual Service to be Provided by TRANSTEK:
Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work.
Borrow pit Soil and Material Survey.
Pavement Investigations (Soil Investigation & Testing work).
Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Hydrological survey work for Bridges and preparation of Hydraulic Particulars
Geotechnical Investigation for Bridges.
Highway Geometric design and preparation of drawings
Detailed design & Preparation of drawing for bridges.
Preparation of Detailed Project Report & Tender document.
Obtaining Clearance of DPR from STA.
Project Name: Preparation of Detailed Project Report for upgrading and strengthening work of Rural roads (Totall = 496
Km. Length) Baxaur, Bhabhua and Rohtas District of Bihar
under PMGSY Scheme, Executed by NPCC, Patna.
Country : India
Date of Start :
(Month/Year) : October
2004
Date of Completion:
(Month/Year) : Nov. 2005
A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation works
(detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and
preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study
Report, Preliminary & Detailed Project Report, Tender Document.
Narrative Description of Project: This project Widening and Strengthening work including Geometric Improvement
of Single lane Rural Roads Section in the Bihar State includes Survey / Investigation, Feasibility Study, Preparation of
Detailed Engineering Report, Cost Estimate, Drawings Tender Document for the Project.
Description of Actual Service to be Provided by TRANSTEK:
Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work.
Borrow pit Soil and Material Survey.
Preparation Land Acquisition Plan and Report.
Pavement Investigations (Soil Investigation & Testing work).
Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Hydrological survey work for Bridges and preparation of Hydraulic Particulars
Geotechnical Investigation for Entire High Embankment Zone & Bridges.
Preparation of Feasibility Study Report.
Highway Geometric design and preparation of drawings
Detailed design & Preparation of drawing for bridges.
Preparation of Detailed Project Report & Tender document.
Obtaining Clearance of DPR from STA.
No. of Staffs : 10
Name of Client : Engineer in Chief,
No. of Man-Months : 30
PWD (Roads), Jharkhand.
Date of Completion :
Date of Start :
Approximate Value of Services
(Month/Year) : August, 2002
(Month/Year) : Oct., 2001
(in Lakhs Rs.) :
Rs. 19.20 Lakhs.
Senior Staff involved and function Performed : A Team of Senior Level Expert was involved in this Project and the
functions performed by them includes, Study on alignment plans of the Project Stretch submitted by Department, Soil & material
Survey, Drainage Condition Survey, Pavement Condition Survey, Soil & Material Survey, Geotechnical investigation, Pavement
design, Design of Cross Drainage Structures, Feasibility Study, Preparation of Technical Appraisal and Detailed Project Report
for widening to two lane with strengthening including Geometric improvement of this National Highway.
Narrative Description of Project : This project Widening and Strengthening work to Two Lane including Geometric
Improvement of Single lane National Highway section of NH-23 is long awaited project under M/oRT&H, New Delhi for
Jharkhand State. The service provided includes Survey / Investigation, Feasibility Study, Preparation of Technical Appraisal Report ,
Detailed Engineering Report and Cost Estimate of this Project.
Description of Actual Service Provided by TRANSTEK :
Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load
Survey. Entire Pavement Condition Survey work.
Borrow pit Soil and Material Survey.
Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman
Beam Deflection Study etc.). Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Preparation of Techno Economic Feasibility Study Report.
Highway Geometric design and preparation of drawings
Preparation of Preliminary Project Report .
Preparation of Detailed Project Report & Tender document.
Country : India
No. of Staffs : 7
Name of Client : Engineer in Chief,
No. of Man-Months : 24
PWD (Roads), Jharkhand.
Date of Completion :
Date of Start :
Approximate Value of Services
(Month/Year) : July, 2002
(Month/Year) : Oct., 2001
(in Lakhs Rs.) :
Rs. 08.00 Lakhs.
Mr. B. L. Tikoo
Mr. P. D. S. Pd.
Mr. T. P. Sinha
Mr. K. Prasad
Mr. S. Ranjan
Mr. P.R. Kumar
Mr. A. K. Singh
Mr. S. K. Verma
:
.:
:
:
:
:
Chief Advisor
Senior Highway Engineer cum- Team Leader
Pavement Specialist
Bridges Specialist
Geotechnical cum- Materials Engineer
Survey engineer
: Traffic engineer
: QS cum Documentation Expert
A Team of Senior Level Expert was involved in this Project and the functions performed by them includes, Study on alignment
plans of the Project Stretch submitted by Department, Soil & material Survey, Drainage Condition Survey, Pavement Condition
Survey, Soil & Material Survey, Geotechnical investigation, Pavement design, Design of Cross Drainage Structures, Feasibility
Study, Preparation of Technical Appraisal and Detailed Project Report for widening to two lane with strengthening including
Geometric improvement of this National Highway.
Narrative Description of Project : This project Widening and Strengthening work to Two Lane including Geometric
Improvement of Single lane State Highway Section in the Jharkhand State. The service provided includes Survey / Investigation,
Feasibility Study, Preparation of Technical Appraisal Report , Detailed Engineering Report and Cost Estimate of this Project.
Description of Actual Service Provided by TRANSTEK :
The actual service provided by Trasntek Team are as follow :
Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load
Survey. Entire Pavement Condition Survey work.
Borrow pit Soil and Material Survey.
Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman
Beam Deflection Study etc.). Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Preparation of Techno Economic Feasibility Study Report.
Highway Geometric design and preparation of drawings
Preparation of Preliminary Project Report .
Preparation of Detailed Project Report & Tender document.
Country : India
No. of Staffs : 8
Name of Client : Engineer in - Chief,
No. of Man-Months : 26
PWD (Roads), Jharkhand.
Date of Completion :
Approximate Value of Services
Date of Start :
(Month/Year) : July 2002
(in Lakhs Rs.) :
(Month/Year) : Oct., 2001
Rs. 11.00 Lakhs.
A Team of Senior Level Expert was involved in this Project and the functions performed by them includes, Study on alignment
plans of the Project Stretch submitted by Department, Soil & material Survey, Drainage Condition Survey, Pavement Condition
Survey, Soil & Material Survey, Geotechnical investigation, Pavement design, Design of Cross Drainage Structures, Feasibility
Study, Preparation of Technical Appraisal and Detailed Project Report for widening to two lane with strengthening including
Geometric improvement of this National Highway.
Narrative Description of Project : This project Widening and Strengthening work to Two Lane including Geometric
Improvement of Single lane State Highway Section in the Jharkhand State. The service provided includes Survey / Investigation,
Feasibility Study, Preparation of Technical Appraisal Report , Detailed Engineering Report and Cost Estimate of this Project.
Description of Actual Service Provided by TRANSTEK :
Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load
Survey. Entire Pavement Condition Survey work.
Borrow pit Soil and Material Survey.
Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman
Beam Deflection Study etc.). Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Preparation of Techno Economic Feasibility Study Report.
Highway Geometric design and preparation of drawings
Preparation of Preliminary Project Report .
Preparation of Detailed Project Report & Tender document.
No. of Staffs : 7
Name of Client : Engineer in Chief,
No. of Man-Months : 24
PWD (Roads), Jharkhand.
Date of Completion :
Date of Start :
Approximate Value of Services
(Month/Year) : July, 2002
(Month/Year) : Oct., 2001
(in Lakhs Rs.) :
Rs. 08.10 Lakhs.
A Team of Senior Level Expert was involved in this Project and the functions performed by them includes, Study on alignment
plans of the Project Stretch submitted by Department, Soil & material Survey, Drainage Condition Survey, Pavement Condition
Survey, Soil & Material Survey, Geotechnical investigation, Pavement design, Design of Cross Drainage Structures, Feasibility
Study, Preparation of Technical Appraisal and Detailed Project Report for widening to two lane with strengthening including
Geometric improvement of this National Highway.
Narrative Description of Project : This project Widening and Strengthening work to Two Lane including Geometric
Improvement of Single lane State Highway Section in the Jharkhand State. The service provided includes Survey / Investigation,
Feasibility Study, Preparation of Technical Appraisal Report , Detailed Engineering Report and Cost Estimate of this Project.
Description of Actual Service Provided by TRANSTEK :
Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load
Survey. Entire Pavement Condition Survey work.
Borrow pit Soil and Material Survey.
Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman
Beam Deflection Study etc.). Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Preparation of Techno Economic Feasibility Study Report.
Highway Geometric design and preparation of drawings
Preparation of Preliminary Project Report .
Preparation of Detailed Project Report & Tender document.