Experience sheet of the Firm during Last Ten Year

Project Name : Preparation of Feasibility Study and Detailed


Project Report for Four-laning and Strengthening of SH-01
from Km.-0.00 to Km.-40.00 (Sadikpur Pavera - Mashauri
Section), Under Patna City Road Division, RCD, Govt. of
Bihar

Country : India

Project location within country : State of Bihar


Name of Client : Executive Engineer, Patna City Road
Division, RCD, Govt. of Bihar

Professional Staff provided by TRANSTEK :


No. of Staffs : 14
No. of Man-Months : 75

Date of Start :
(Month/Year) : January
2009

Date of Completion :
(Month/Year) : Sept. 2009

Approximate Value of Services (in Lakhs Rs.) :


Rs..67.55 Lakhs.

Number of Man-Month of professional staff provided


by associated firm : None

Name of Associated Firm, If any : None

Senior Staff involved and function Performed :


1. Mr. S. B. Prasad : Senior Highway Engineer cum- Team Leader
2. S. M. Hussain : Highway cum Pavement Specialist
2. Mr. P. Pandey : Bridges Specialist
3. Mr. S. Narain
: Geotechnical cum- Materials Engineer
4. Mr. B. Saravanan : Sr. Survey engineer
5. Mr. R. K. Sinha : Sr. Traffic Expert
6. Mr. Brajesh Kumar : Financial Analyst
6. Mr. Mukesh Kumar :
Environmental Expert
7. Mr. S. K. Srivastava : Social & R&R Expert
8. Mr. T. P. Sinha : Q/S cum Documentation Expert

A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation
works (detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and
preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study
Report, Preliminary & Detailed Project Report, Tender Document.
Narrative Description of Project : This State Highway Four-Laning Project involves detailed engineering in respect
of strengthening and widening to Four-Lane of SH-01 Section from Km. 0.00 to Km. 40 (Patna Masauri Jn.)
including geometric improvements, existing pavement strengthening, provision of additional two lane cross drainage
structure, rehabilitation of existing Cross drainage structure etc.
Description of Actual Service to be Provided by TRANSTEK :

Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load
Survey. Entire
Pavement Condition Survey work.
Borrow pit Soil and Material Survey.
Detailed Environmental & Social Survey, Preparation of Environmental & Social Screening Report, EIA Report, SIA Report,
EMP & Rap Report.
Preparation Land Acquisition Plan and Report.
Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman Beam Deflection Study.
Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Hydrological survey work for Bridges and preparation of Hydraulic Particulars
Geotechnical Investigation for Entire High Embankment Zone & Bridges.
Preparation of Techno Economic Feasibility Study Report.
Highway Geometric design and preparation of drawings
Detailed design & Preparation of drawing for bridges.
Preparation of Preliminary Project Report .
Preparation of Detailed Project Report & Tender document.

Transtek Engineers & Services Private Ltd

Experience sheet of the Firm during Last Ten Year

Project Name : Preparation of Feasibility Study and Detailed


Project Report for Four-Laning and Strengthening work of
N.H.-57 Purnea Forbesganj Section from Km. 310 to Km.
230 (80 Km.) Package C-II/BR-1 under Phase -II Program of
North South & East West Corridors - National Highway
Authority of India, New Delhi.

Country : India

Project location within country : State of Bihar


Name of Client : National Highway Authority of India, New
Delhi.
Date of Completion :
Date of Start :
(Month/Year) : March 2005
(Month/Year) :
December 2003

Professional Staff provided by TRANSTEK :


No. of Staffs : 22
No. of Man-Months : 60
Approximate Value of Services (in Lakhs Rs.) :
Rs..70.120 Lakhs.

Name of Associated Firm, If any : None

Number of Man-Month of professional staff provided


by associated firm : None

Senior Staff involved and function Performed :


1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
10.
11.

PDS Prasad. : Senior Highway Engineer Cum Team Leader


V. K. verma : Sr. Highway Engineer
S. M. Hussain : Pavement specialist
P. Pandey : Bridge Specialist
A. K. Singh : Sr. Traffic Expert
R. K. Sinha : Traffic Engineer
S. Narain : Material Cum Geotech. Engineer
B. Sarvanan : Senior Survey Engineer
M.V. Ramdas : Transport Economist
M. K. Sinha : Environmental Expert
S. K. Srivastava : R& R Expert
Mr. T.P. Sinha : QS cum Documentation Expert

A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation
works (detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and
preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study
Report, Preliminary & Detailed Project Report, Tender Document.
Narrative Description of Project : This National Highway Four-Laning Project involves detailed engineering in
respect of strengthening and widening to Four-Lane of N.H.-57 Section from Km. 310 to Km. 230 (Purnea
Forbesganj Section) including geometric improvements, existing pavement strengthening, provision of additional two
lane cross drainage structure, rehabilitation of existing Cross drainage structure etc.
Description of Actual Service to be Provided by TRANSTEK :

Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load
Survey. Entire
Pavement Condition Survey work.
Borrow pit Soil and Material Survey.
Detailed Environmental & Social Survey, Preparation of Environmental & Social Screening Report, EIA Report, SIA Report,
EMP & Rap Report.
Preparation Land Acquisition Plan and Report.
Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman Beam Deflection Study.
Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Hydrological survey work for Bridges and preparation of Hydraulic Particulars
Geotechnical Investigation for Entire High Embankment Zone & Bridges.
Preparation of Techno Economic Feasibility Study Report.
Highway Geometric design and preparation of drawings
Detailed design & Preparation of drawing for bridges.
Preparation of Preliminary Project Report .
Preparation of Detailed Project Report & Tender document.

Transtek Engineers & Services Private Ltd

Experience sheet of the Firm during Last Ten Year

Project Name : Preparation of Feasibility Study and Detailed


Project Report Four-Laning and Strengthening work of N.H.01 Amritsar Wagah Section from Km. 456 to Km. 491
Package C-III/28.

Country : India

Project location within country : State of Punjab


Name of Client : National Highway Authority of India, New
Delhi.
Date of Completion :
Date of Start :
(Month/Year) : June 2005
(Month/Year) : March
2003

Professional Staff provided by TRANSTEK :


No. of Staffs : 22
No. of Man-Months : 60
Approximate Value of Services (in Lakhs Rs.) :
Rs. 65.10 Lakhs.

Name of Associated Firm, If any : None

Number of Man-Month of professional staff provided


by associated firm : None

Senior Staff involved and function Performed :


1. Mr. B. L. Tikoo
: Senior Highway Engineer cum- Team Leader
2. Mr. Jaj Singh
: Highway Engineer
3. Mr. B.S. Choudhary
: Pavement Specialist
4. Mr. D. S. Sharma
: Bridges Specialist
5. Mr. O. P. Banka
: Geotechnical cum- Materials Engineer
6. Mr. A. K. Singh
: Sr. Traffic Expert
7. Mr. M. V. Ramdas
: Transport Economist
8. Mr. P. R. Kumar
: Survey Engineer
9. Dr. Mrs. A . Kaur
: Environmental cum Resettlement Expert
10. Mr. Arup Khan
: R&R Expert
11. Mr. K. N. Singh
: QS cum Documentation Expert
12. Mr. Brajesh Kumar : Financial Analyst

A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation
works (detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and
preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study
Report, Preliminary & Detailed Project Report, Tender Document.
Narrative Description of Project : This National Highway Four-Laning Project involves detailed engineering in respect
of strengthening and widening to Four-Lane of N.H.-01 from Km.-456 to km.-491 including geometric improvements,
pavement strengthening etc. The service provided includes fixing of alignment, detailed geometric design, soil &
material investigations, sub-soil investigation for bridges, drainage studies, preparation of design report, tender
documents etc.
Description of Actual Service to be Provided by TRANSTEK :

Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load
Survey. Entire
Pavement Condition Survey work.
Borrow pit Soil and Material Survey.
Detailed Environmental & Social Survey, Preparation of Environmental & Social Screening Report, EIA Report, SIA Report,
EMP & Rap Report.
Preparation Land Acquisition Plan and Report.
Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman Beam Deflection Study.
Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Hydrological survey work for Bridges and preparation of Hydraulic Particulars
Geotechnical Investigation for Entire High Embankment Zone & Bridges.
Preparation of Techno Economic Feasibility Study Report.
Highway Geometric design and preparation of drawings
Detailed design & Preparation of drawing for bridges.
Preparation of Preliminary Project Report .
Preparation of Detailed Project Report & Tender document.

Transtek Engineers & Services Private Ltd

Experience sheet of the Firm during Last Ten Year

Project Name : Preparation of Feasibility Study and Detailed


Project Report for Four-laning and Strengthening of NH-28 from Km.-

Country : India

386.000 to Km.-520.000 (Gopalganj Muzaffarpur Section), Package CIII/1 under Phase-III programme for improvement of East- West Corridor
Project in India Under NHAI, World Bank Funded Project.

Project location within country : State of Bihar


Name of Client : National Highway Authority of India, New
Delhi.
Date of Completion :
(Month/Year) : Oct. 2004

Date of Start :
(Month/Year) :
September 2002

Total Professional Staff provided in this Project


:
No. of Staffs : 18
No. of Man-Months : 118
Approximate Value of Services (in Lakhs Rs.) :
Total : Rs. 162.00 Lakhs
Transtek Part: Rs. 63.20 Lakhs.

Main Consultants for This Project : CPCS Upham Corporation,


Canada JV Techno Point Consultants & Associates, Patna
Associate / Sub Consultants : Transtek Engineers & Services
Pvt. Ltd., Patna-23

Number of Man-Month of professional staff


provided by Transtek as Sub-Consultants
No. of Staffs : 9
No. of Man-Months : 49

Technical Staff / Key Expert Provided by Transtek for This Project as Sub-Consultants :
1. Mr. S. B. Prasad
2. Mr. S. C. Jha
3. Mr. K. Prasad
4. Mr. R. K. Sinha
5. Mr. M. K. Sinha
6. Mr. S. K. Srivastava
7. Mr. T.P. Singh
4. Mr. S. Narain

:
:
:
:
:
:

Sr. Highway Engineer


Pavement Specialist
Bridges Specialist
Traffic Engineer cum CADD Expert
Environmental (Sub-Professional Expert )
Social & R & R Expert (Sub-Professional Expert )
: QS cum Documentation Expert
: Geotechnical cum- Materials Engineer
(Sub-Professional)

A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation
works (detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and
preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study
Report, Preliminary & Detailed Project Report, Tender Document.
Narrative Description of Project: This National Highway World Bank Funded Four-Laning Project involves detailed
engineering in respect of strengthening and widening to Four-Lane of N.H.-28 from Km.-386 to km.-520 (Gopalganj to
Muzaffarpur in Bihar) which includes widening of existing two lane road to four lane including, geometric
improvements, pavement strengthening etc. The service provided includes fixing of alignment, detailed geometric
design, soil & material investigations, sub-soil investigation for bridges, drainage studies, preparation of design
report, tender documents etc.
Description of Actual Service to be Provided by TRANSTEK:
Apart from the service rendered by the Key Expert & Other expert of Transtek, other services provided by Transtek
includes :

Borrow pit Soil and Material Survey.


Preparation of Environmental & Social Screening Report, EIA Report, SIA Report, EMP & Rap Report.
Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman Beam Deflection Study.
Condition survey work on Bridges & Cross Drainage Structure
Geotechnical Investigation for All the Bridges, Under-Passes, ROBs, Fly-over and High Embankment Zone..
Participated in Preparation of Techno Economic Feasibility Study Report.
Participated in Highway Geometric design and preparation of drawings
Detailed design & Preparation of drawing for bridges.
Participated in Preparation of Preliminary Project Report .
Participated in Preparation of Detailed Project Report & Tender document.

Transtek Engineers & Services Private Ltd

Experience sheet of the Firm during Last Ten Year

Project Name : Preparation of Feasibility Study and Detailed


Project Report for Four-laning and Strengthening of NH-28 from Km.-

Country : India

279.800 to Km.-386.000 (Gorakhpur - Gopalganj Section), Package CIII/5 under Phase-III programme for improvement of East- West Corridor
Project in India Under NHAI, World Bank Funded Project.

Project location within country: State of Bihar


Name of Client : National Highway Authority of India, New
Delhi.
Date of Start:
Date of Completion :
(Month/Year) :
(Month/Year): Oct. 2004
September 2002

Total Professional Staff provided in this Project:


No. of Staffs : 16
No. of Man-Months : 118
Approximate Value of Services (in Lakhs Rs.):
Total : Rs. 149.20 Lakhs
Transtek Part: Rs. 57.540 Lakhs.

Main Consultants for This Project : CPCS Upham Corporation,


Canada JV Techno Point Consultants & Associates, Patna-23
Associate / Sub Consultants : Transtek Engineers & Services
Pvt. Ltd., Patna-23

Number of Man-Month of professional staff


provided by Transtek as Sub-Consultants
No. of Staffs : 9
No. of Man-Months : 43

Technical Staff / Key Expert Provided by Transtek for this Project as Sub-Consultants:
1. Mr. P.D.S. Pd.
2. Mr. V. K. Verma
3. Mr. B. B. Verma
4. Mr. O. P. Banka
5. Mr. B. Sarvanan

:
:
:
:
:

Senior Highway Engineer cum- Acting Team Leader


Sr. Highway Engineer
Bridges Specialist
Geotechnical cum- Materials Engineer
Survey Engineer
(Sub-Professional)

A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation works
(detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and
preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study
Report, Preliminary & Detailed Project Report, Tender Document.
Narrative Description of Project: This National Highway World Bank Funded Four-Laning Project involves detailed
engineering in respect of strengthening and widening to Four-Lane of N.H.-28 from Km.-279.800 to km.-386.000
(Gorakhpur - Gopalganj in Bihar) which includes widening of existing two lane road to four lane including, geometric
improvements, pavement strengthening etc. The service provided includes fixing of alignment, detailed geometric
design, soil & material investigations, sub-soil investigation for bridges, drainage studies, preparation of design report,
tender documents etc.
Description of Actual Service to be Provided by TRANSTEK:
Apart from the service rendered by the Key Expert & Other expert of Transtek, other services provided by Transtek
includes:

Borrow pit Soil and Material Survey.


Preparation of Environmental & Social Screening Report, EIA Report, SIA Report, EMP & Rap Report.
Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman Beam Deflection Study.
Condition survey work on Bridges & Cross Drainage Structure
Geotechnical Investigation for All the Bridges, Under-Passes, ROBs, Fly-over and High Embankment Zone..
Participated in Preparation of Techno Economic Feasibility Study Report.
Participated in Highway Geometric design and preparation of drawings
Detailed design & Preparation of drawing for bridges.
Participated in Preparation of Preliminary Project Report .
Participated in Preparation of Detailed Project Report & Tender document.

Transtek Engineers & Services Private Ltd

Experience sheet of the Firm during Last Ten Year

Project Name : Preparation of Feasibility Study and Country : India


Detailed Project Report Four-Laning and Strengthening
work of N.H.-31 Section from Km. 419 to Km. 447 (27
km. length). In addition also prepared detailed Project
Report construction of 1.50 Km. Long Four-Lane Fly
Over Bridge including it approach of 1.20 Km. Length in
Km. 473-475 N.H.-31 Section in Kishanganj Town.
Under Package EW-12/BR, NHAI.
Project location within country : State of Bihar
Professional Staff provided by TRANSTEK :
Name of Client : National Highway Authority of India,
No. of Staffs : 22
New Delhi.
No. of Man-Months : 80
Approximate Value of Services (in
Date of Completion :
Date of Start :
Lakhs Rs.) :
(Month/Year) : July 2001
(Month/Year) : April 2000
Rs. 86.00 Lakhs.
Name of Associated Firm, If any : None

Number of Man-Month of professional staff provided by


associated firm : None

Senior Staff involved and function Performed :


1. Mr. Bindeshwar Prasad
2. Mr. V.K. Verma
3. Mr. K. Roy
4. Mr. B.B. Verma
5. Mr. O. P. Banka
6. Mr. A. K. Singh
7. M. V. Ramdas
8. Mr. B. K. Singh
9. Mr. M. K. Sinha
10.. Mr. R. K. Sinha

:
:
:
:
:
:
:
:
:
:

Senior Highway Engineer cum- Team Leader


Sr. Highway Engineer
Pavement Specialist
Bridges Specialist
Geotechnical cum- Materials Engineer
Sr. Traffic Expert
Transport Economist
Senior Survey Engineer
Environmental cum Resettlement Expert
Traffic Engineer cum CADD Expert

A Team of Senior Level Expert is involved in this Project and they are performing various Survey / Investigation
works (detailed below), Detailed topographic survey, Feasibility Study, Geometric Design for Four Lane Highway and
preparation of detailed drawings, Design of Bridges and cross drainage structure, Preparation of Feasibility Study
Report, Preliminary & Detailed Project Report, Tender Document.
Narrative Description of Project : This National Highway Four-Laning Project involves detailed engineering in respect
of strengthening and widening to Four-Lane of N.H.-31 from Km.-420 to km.-447 including geometric
improvements, pavement strengthening etc. The service provided includes fixing of alignment, detailed geometric
design, soil & material investigations, sub-soil investigation for bridges, drainage studies, preparation of design
report, tender documents etc.
Description of Actual Service to be Provided by TRANSTEK :

Preliminary Survey Work. Detailed Topographic Survey. Entire Traffic survey work including Axle Load
Survey. Entire
Pavement Condition Survey work.
Borrow pit Soil and Material Survey.
Detailed Environmental & Social Survey, Preparation of Environmental & Social Screening Report, EIA Report, SIA Report,
EMP & Rap Report.
Preparation Land Acquisition Plan and Report.
Pavement Investigations (Soil Investigation & Testing work, Roughness Measurement, Benkelman Beam Deflection Study.
Drainage Study on entire project stretch
Condition survey work on Bridges & Cross Drainage Structure
Hydrological survey work for Bridges and preparation of Hydraulic Particulars
Geotechnical Investigation for Entire High Embankment Zone & Bridges.
Preparation of Techno Economic Feasibility Study Report.
Highway Geometric design and preparation of drawings
Detailed design & Preparation of drawing for bridges.
Preparation of Preliminary Project Report .
Preparation of Detailed Project Report & Tender document.

Transtek Engineers & Services Private Ltd

Experience sheet of the Firm during Last Ten Year

Project Name : Four-Laning and Strengthening work of N.H.-02


Section from Km. 180 to Km. 398.75 (220 km. length)
Aurangabad Dhanbad Section (Package-V) under NHAI, World
Bank III National Highway Project..
Project location within country : State of Bihar
Name of Client : National Highway Authority of India, New
Delhi.
Date of Start :
Date of Completion :
(Month/Year) : April, 1998
(Month/Year) : January
2000
Name of Associated Firm, If any :
Main Consultants : DORSCH CONSULT Ing. MbH,
GERMANY
Sub-Consultant 1 : GHERZI EASTERN LTD., MUMBAI.
Sub-Consultant 2 : Transtek, Patna-23

Country : India

Professional Staff provided by TRANSTEK :


No. of Staffs : 11
No. of Man-Months : 122 (As Sub Consultants)
Approximate Value of Services (in Lakhs Rs.) :
Rs. 125.00 Lakhs. (Transtek Part)
Total Contract Value Rs. 576 Lakhs
Number of Man-Month of professional staff
provided by Other firm :
1. DORSCH : 25 Man Month (International
Experts)
2. Gherzi : 420 Man Months

Technical Staff / Key Expert Provided by Transtek for this Project as Sub-Consultants:
1. Mr. B. Pd.

2. Mr. S. K. Verma
3. Mr. P. Pandey
4. Mr. S. Narain
5. Mr. Kumar Vimal
6. Mr. R. K. Sinha
7. Mr. M. V. Ramdas
8. Mr. P. R. Kumar
9. Mukesh Kumar Sinha

:
:
:
:
:
:
:
:
:

Bridge Expert
Pavement Engineer (Sub-Professional Staff)
Bridges Design Expert (35% Bridges 22 Nos.)
Geotechnical cum- Materials Engineer (Sub-Professional Staff)
Geotechnical cum- Materials Engineer (Sub-Professional Staff)
Traffic cum CADD Engineer (Sub-Professional Staff)
Jr. Transport Economist (Sub-Professional Staff)
Survey Engineer
Environmental Engineer (Sub-Professional Staff)

A Team of Senior Level Expert is involved in this Project from Transtek Side Such as Bridge Specialist,
Geotechnical Expert, Pavement Engineer, Highway Engineer and Fourteen 14 sub - professional staffs (Engineers)
and they are performing various Survey / Investigation works (detailed below), Geometric Design for Four Lane
Highway and preparation of detailed drawings, Design of 35% ie 22 Major/Minor Bridges and all the cross drainage
structure, Participated in preparation of Feasibility Study Report, Participated in preparation of Preliminary &
Detailed Project Report, Tender Document etc.
Narrative Description of Project : This World Bank III National Highway Four-Laning Project involves detailed
engineering in respect of strengthening and widening to Four-Lane of N.H.-02 including geometric improvements,
pavement strengthening etc. The service provided includes fixing of alignment, detailed geometric design, soil &
material investigations, sub-soil investigation for bridges, setting out new centre line with fixing reference points and
bench marks, drainage studies, preparation of design report, tender documents etc.
Description of Actual Service to be Provided by TRANSTEK as Sub-Consultants :

Entire Traffic survey work including Axle Load Survey .


Roughness Measurement on existing pavement .
Benkelman Beam Deflection Study as per I.R.C. 81 1997 .
Entire Sub-grade soil Investigation (including Laboratory test) & D.C.P. test work for Highway
Entire Pavement Condition Survey work
Preparation of Road Inventory & strip plans.
Drainage Study on entire project stretch
Condition survey work on entire Bridges (8 Major Bridges & 50 Minor Bridges) including 190 nos. of culverts
(Between Barhi to Aurangabad).
Hydrological survey work for Entire Bridges and preparation of Hydraulic Particulars
Geotechnical Investigation for Entire High Embankment Zone & 20 Nos. of Bridges (4 Major & 16 Minor
Bridges) including its approaches
Participated in Preparation of Feasibility Study Report
Participated in Preparation of Detailed Project Report and Tender Document
Participation in Detailed design & Preparation of drawing for 21 Bridges.
Participation in Highway Geometric design and preparation of drawings under Senior Highway Engineer.
Participation in Preparation of bill of quantity and tender document.

Transtek Engineers & Services Private Ltd

Experience sheet of the Firm during Last Ten Year

Project Name : Proof Consultancy for D.P.R. submitted by


M/S RITES
for the work of Four-Laning and
Strengthening of N.H.-02 from Km.-398.75 to Km.-441
(Barwadda-Barakar Section) under N.H. Circle,
Dhanbad..

Country : India

Project location within country : State of Bihar

Professional Staff provided by TRANSTEK :

No. of Staffs : 7
Name of Client : Chief Engineer, N.H. Wing Bihar,
No. of Man-Months : 32
Patna.
Approximate Value of Services (in
Date of Completion :
Date of Start :
Lakhs Rs.) :
(Month/Year) : April, 1995
(Month/Year) : Jan., 1995
Rs. 07.50 Lakhs.

Name of Associated Firm, If any : None

Number of Man-Month of professional staff provided by


associated firm : None

Senior Staff involved and function Performed :


1. Mr. S. M. Pd.
2. Mr. N. Kumar
3. Mr. A. K. Singh

: Team Leader & Bridge Expert


: Highway Engineer (Transtek Side)
: Traffic Engineer

4. P. Pandey
: Bridge Design Expert
A Team of Senior Level Expert was involved in this Project and the functions performed by them includes
Checking the Design of Bridges, Checking Detailed Project Report, Drawing, Tender Document and Furnishing
comments to the Chief Engineer, N.H. Wing, Bihar.
Narrative Description of Project : This project Four-Laning and Strengthening of N.H.-02 from Km.-398.75 to Km.441 (Barwadda-Barakar Section) was funded under ADB Scheme and the D.P.R. for this project was prepared by M/S
RITES. Proof consultancy has been taken up by TRANSTEK on D.P.R. submitted by M/S RITES.
Description of Actual Service Provided by TRANSTEK :
The actual service provided by Trasntek Team are as follow :

Checking The Design of Bridges & Detailed Drawings of Bridges.


Checking the Highway Geometric Design and Proposed Alignment Drawings of Highway and other details.
Checking the D.P.R.
Checking the Tender Document Submitted by RITES.
Furnishing comments on D.P.R. Drawings, Design & Tender Document on behalf of Chief Engineer.

Transtek Engineers & Services Private Ltd