AL HYDARIA P-NET FOLDERS - AVAILABLE TO TBC/ENKA

FOLDER No.

TITLE

8.03
8.11

Packing Lists

10

Drawing - Specs

10.01

Customer Document Reports

10.02
10.02.01
10.02.02
10.02.03
10.02.04
10.02.05
10.02.06
10.02.07
10.02.08
10.02.09
10.02.10
10.02.11

Equipment Drawings

10.03
10.03.01
10.03.02
10.03.03
10.03.04
10.03.05
10.03.06
10.03.07
10.03.07
10.03.08
10.03.09 000

Plant Design Drawings

11

Start-Up

11.01
11.02

Start-Up Spare Parts

11.03
11.03.01

Plant Testing Procedures

Shipping and Preservation

GT Vendor Drawings
Steam Turbine
Gas Turbine USA
ST Generator
GT Generator
Typical Drawings (Not for design)
Turbine Equipment - Europe
EU Declarations
CRN Documentation
STG Electrical MSD Drawings
GTG Electrical MSD Drawings

Architectural
Civil and Structural
Instrumentation and Controls
Electrical
Mechanical
Combined Cycle Systems
Environmental Health and Safety
Civil Work
Power Plant Functional Systems
Plant General Drawings

Draft Commissioning Procedures

Operational Test Procedures

11.04
11.04.01
11.04.02
11.04.03

Commissioning Procedures

11.05
11.05.01
11.05.02
11.05.03
11.05.04
11.05.05

Turnover Packages with Final Procedures

11.06

Administration

11.07
11.07.01
11.07.02

Performance-Emissions-Noise Procedures-Reports

11.08
11.08.01
11.08.02
11.08.03
11.08.04

Warranty

11.09

Commissioning Turnover Package Status

11.1

Punchlist Summary Report

17

EPC

17.01
17.01.01
17.01.02
17.01.02.01
17.01.02.02

Project Schedules and Progress Reports

17.02

Engineering

17.02.01
17.02.01.01
17.02.01.02
17.02.01.03
17.02.01.04

Design Base Document

Pre Commissioning Procedure


Commissioning Procedures
Major Evolution Check Sheet

Gas Turbine Turnover Packages


Electrical Turnover Packages
BOP Turnover Packages
Steam Turbine Turnover Packages
HRSG Turnover Packages

Performance Test Procedures


Performance Test Reports

Equipment Warranty
BOP Warranty General
BOP Warranty Claims
BOP Warranty Internal

Project Schedules and Progress Reports


Progress Reports
TBC/ENKA Home Office
TBC/ENKA Site Office

Submittal from TBC/ENKA


Return Comments from MoE to TBC/ENKA
Superseded
Final

17.02.02
17.02.02.01
17.02.02.02
17.02.02.03
17.02.02.04

Health, Safety and Environmental Plan

17.02.03
17.02.03.01
17.02.03.02
17.02.03.03
17.02.03.04
17.02.03.05
17.02.03.06
17.02.03.07
17.02.03.08

Quality Control Plan

17.02.04
17.02.04.01
17.02.04.02
17.02.04.03
17.02.04.04

Hazardous Area Classification (HAZ MAP)

17.02.05

Design Drawings, Lists, Calculations and Reports

17.02.05.01
17.02.05.01.01
17.02.05.01.02
17.02.05.01.03
17.02.05.01.04
17.02.05.01.05

General Arrangements and Plot Plans

17.02.05.02
17.02.05.02.01
17.02.05.02.02
17.02.05.02.03
17.02.05.02.04
17.02.05.02.05

Civil, Structural and Architectural

17.02.05.03
17.02.05.03.01
17.02.05.03.02
17.02.05.03.03
17.02.05.03.04
17.02.05.03.05

Mechanical

Submittal from TBC/ENKA


Return Comments from MoE to TBC/ENKA
Superseded
Final

Submittal from TBC/ENKA


Return Comments from MoE to TBC/ENKA
Superseded
Final
Test and Inspection Plans and Schedules
Test and Inspection Reports
Customer Inspection and Witnesses
Site Inspection and Witnesses

Submittal from TBC/ENKA


Return Comments from MoE to TBC/ENKA
Superseded
Final

Submittal from TBC/ENKA


Return Comments from MoE to TBC/ENKA
Superseded
Final
Site Redlined As Built Drawings

Submittal from TBC/ENKA


Return Comments from MoE to TBC/ENKA
Superseded
Final
Site Redlined As Built Drawings

Submittal from TBC/ENKA


Return Comments from MoE to TBC/ENKA
Superseded
Final
Site Redlined As Built Drawings

17.02.05.04
17.02.05.04.01
17.02.05.04.02
17.02.05.04.03
17.02.05.04.04
17.02.05.04.05

Electrical

17.02.05.05
17.02.05.05.01
17.02.05.05.02
17.02.05.05.03
17.02.05.05.04
17.02.05.05.05

Instrumentation and Controls

17.03

Equipment/System Specifications

17.03.01
17.03.01.01
17.03.01.02
17.03.01.03
17.03.01.04

Civil, Structural and Architectural

17.03.02
17.03.02.01
17.03.02.02
17.03.02.03
17.03.02.04

Mechanical

17.03.03
17.03.03.01
17.03.03.02
17.03.03.03
17.03.03.04

Electrical

17.03.04
17.03.04.01
17.03.04.02
17.03.04.03
17.03.04.04

Instrumentation and Controls

17.04
17.04.01
17.04.02
17.04.03
17.04.04

Shipping
Logistics Planning
Shipping Notices
Packing Lists
Pre-ship Inspection Reports and Certificates

Submittal from TBC/ENKA


Return Comments from MoE to TBC/ENKA
Superseded
Final
Site Redlined As Built Drawings

Submittal from TBC/ENKA


Return Comments from MoE to TBC/ENKA
Superseded
Final
Site Redlined As Built Drawings

Submittal from TBC/ENKA


Return Comments from MoE to TBC/ENKA
Superseded
Final

Submittal from TBC/ENKA


Return Comments from MoE to TBC/ENKA
Superseded
Final

Submittal from TBC/ENKA


Return Comments from ELC to SNC/IFC
Superseded
Final

Submittal from TBC/ENKA


Return Comments from ELC to SNC/IFC
Superseded
Final

17.04.05
17.04.06
17.04.07

Third Party Inspections


Material Safety Data Sheets
On Site Open Package Inspection Reports

17.05
17.05.01
17.05.02
17.05.03
17.05.04
17.05.04.01
17.05.04.02
17.05.04.03

Construction
Site Administration Procedures
Site Permits and Ordinances
Site EHS Records and Reports
Site Installation, Tests and Commissioning
Procedures
Reports
Turnover Packages

17.06
17.06.01
17.06.02

Correspondence
From MoE to TBC/ENKA
From TBC/ENKA to MoE

17.07
17.07.01
17.07.02
17.07.03

Minutes of Meetings
Home Office
Site Office
Action Items List

17.08

EPC Contract