You are on page 1of 12

Accredited Standards Committee C63

Electromagnetic Compatibility
Revised Draft Agenda for Meeting
Thursday, Mar. 8, 2001, 1-5 PM
Friday Mar. 9, 9-12 AM
Southwest Research Institute
6220 Culebra Road, San Antonio, TX 78238
Contact: Bill Scrivner, Tel: 210 522 2621; bscrivner@swri.org
---------------------------------------------------------------------------------------------------1.0 Call to Order
1.1 Announcements
1.2 Approval of agenda
1.32 Dates of future meetings
2.0

Consent Approval of Agenda


2.1 Consent Agenda

Note: Items 2.0 (actions related to the minutes) and 3.0 (Membership) on former
meeting agenda are on the Consent Agenda . Actions taken will be reviewed by the Steering
Committee and reported in documentation distributed in advance of the meeting or tabled at
the meeting. They will only be discussed in detail on request.
2.2

Balance of Agenda
2.2.1 Change in C63 Policies and Procedures - Hoolihan
2.2.2 Minutes of Meeting of Nov. 2, 2000 Hall

3.0 C63 Standards


3.1 C63.43.1.1 Editorial corrections
3.1.2 Status: Interim or ANSI Standard
3.1.2 Measurement uncertainty
[AI 00-11-02, Heirman]
3.2 C63.5

Resolution of negative ballot

3.3 C63.8

[Annotated bibliography]: new subcommittee?


[AI 00-11/03, Mertel]
3.4 C63.12 Next rev.
[A.I. 98 Mar-4, Hofmann]
3.5 C63.13 Power line filters - Discussion [AI 00-11/04, all members]
3.6 C63.15 Results of ballot

[AI 00-11/10, Pritchard]

3.7 C63.16 Resolution of copyright issue


3.8 C63.19

Publicity

3.9 Meas. below 30 Mhz

[Berger]
[AI 00-11/07, Hall, Windler, Schaefer, Lichtig, Hoffman]

3.10 Measurements greater than 60 GHz [AI 00-11/08, Hoolihan]

4.0 New Topics


4.1 C63XX Grounding

[AI 00-11/06, All C63 members]

4.2 PINS-C: Recommended Practice for On-Site Ad-Hoc Test method for Estimating
Radiated Immunity of Electronic Devices to Specific Radio Frequency Transmitters
4.3 Narrow Band -- Broadband Issues
4.3.1 Testing to comply with broadband limits
4.3.2 Are broadband limits needed? General discussion
4.4 Other Matters
5.0 FCC Related Matters (A. Wall)
5.1 Incorporation of C63.4 into the Rules
5.2 Winforum petition
5.3 Other matters
6.0 Subcommittee reports (please submit brief written reports based on Project Schedules)
6.1 SC1 Meas. and Inst. (Heirman)
[AI 00-11/01]
6.2 SC2 Definitions- upgrading of C63.14
Designations of SC representatives
6.3 SC3 International Standardization
Report of meeting, 03/05
6.4 SC6 Laboratory Accreditation
(D. Hoolihan)
6.5 SC7 Personal Communications Services (A. Light)
6.6 SC8 Medical Equipment Testing
(D. Hoolihan)
6.7 Pins for C63.8 - Mertel
7.0 Other Business
7.1
7.2
7.3
7.4
7.5
7.6
7.7
7.8
7.9
7.10
7.11

Status of adoption of international standards (Mertel)


Republication of IEC 61000-4-2 to 11 [AI 00-11/13, Pritchard]
Future Seminars (Heirman)
Workshops (Heirman)
Liaison (Doug Smith)
Review of C63 SC Memberships Chairs
Submittal of comments on C63 ballots- Schaefer
Proposal for Project on Measurements below 30 MHz Light
Review of C63 Membership Pritchard
Old Action Item 00-11/18 Hoolihan
New C63 Member Hoolihan
Old Action Item 00-11/16 Pritchard

8.0 Newsletter - Comments and proposals


9.0 Adjournment
Att. 3 Revised Agenda

DRAFT #2
CHANGE TO C63 PROCEDURES

Current wording in the procedures


A.6 Subgroups created by the committee
When one or more subgroups (subcommittees, working groups, technical subcommittees, writing
groups, etc.) are formed to expedite the work of the consensus body, their formation (and later
disbandment) requires approval by a majority vote of the consensus body and appropriate public
notice. The scope and duties delegated to the subgroup shall be approved at the time it is formed,
and subsequent changes in scope or duties shall also require approval by the consensus body. The
charge to the subgroup shall clearly state whether:

a. The subgroup is responsible for the definitive content of one or more standards and for
responding to views and objections thereon. Such subgroups shall maintain a
membership roster in accordance with A.5.5(a) through A.5.5(g) and shall
comply with
the provisions in A.5.4, A.7.1, and Clause A.8 as applied to voting on the
standard(s);
or
b. The subgroup is responsible for assisting the consensus body (e.g. drafting all or a
portion of a standard, drafting responses to comments, drafting positions on
international
standards, or other purely advisory functions).
A.6.1 Chairperson and members of subgroups
The chair and members of a subgroup shall be appointed by the chair of the consensus body and
confirmed by the consensus body. The scope, duties, and membership of all subgroups shall be
reviewed by the consensus body annually. The officers and members of a subgroup need not be
members of the consensus body.
A.6.2 Approval of standards
Draft standards and any substantive change (see Clause 1.2.9 of the ANSI Procedures) in the
content of a standard proposed by a subgroup shall be referred to the consensus body for
approval.

Proposed Changes to the Procedure


A.6 Subcommittees created by the committee
When one or more subcommittees are formed to expedite the work of the consensus body, their
formation (and later disbandment) requires approval by a majority vote of the consensus body and
appropriate public notice. The scope and duties delegated to the subcommittee shall be approved
at the time it is formed, and subsequent changes in scope or duties shall also require approval by
the consensus body. The charge to the subcommittee shall clearly state whether:

a. The subcommittee is responsible for the definitive content of one or more standards
responding to views and objections thereon. Such subcommittees shall maintain a
membership roster in accordance with A.5.5(a) through A.5.5(g) and shall
comply with
the provisions in A.5.4, A.7.1, and Clause A.8 as applied to voting on the
standard(s);
and for

or
b. The subcommittee is responsible for assisting the consensus body (e.g. drafting all or a
portion of a standard, drafting responses to comments, drafting positions on
international
standards, or other purely advisory functions).
A.6.1 Chairperson and members of subcommittees
The chair and members of a subcommittee shall be appointed by the chair of the consensus body
and confirmed by the consensus body. The scope, duties, and membership of all subcommittees
shall be reviewed by the consensus body annually. The officers and members of a subcommittee
need not be members of the consensus body.
A6.1.1 - Working Groups and Task Forces formed under Subcommittees will be
formed by the Subcommittee chairs and be approved by a vote by the Subcommittee.
The chairman of the Working Group or Task Force will be appointed by the chairman
of the Subcommittee. Membership of the Working Group or Task Force will be open
(members need not be members of the consensus body) and be approved by the
Subcommittee; their mission and timetable will also be approved by the
Subcommittee.
The membership of the Working Group or Task Force shall be reported to the
Consensus Body for informational purposes only.

A.6.2 Approval of standards


Draft standards and any substantive change (see Clause 1.2.9 of the ANSI Procedures) in the
content of a standard proposed by a subcommittee shall be referred to the consensus body for
approval.
A6.2.1- Draft standards and any substantive change (see Clause 1.2.9 of the ANSI
Procedures) in the content of a standard proposed by a Working Group or Task Force shall be
referred to the subcommittee for review before submittal to the consensus body for approval.
The submittal to the consensus body shall be based on a majority vote of the responsible
subcommittee.

February, 2001

Att. 4 Revision to C63 Procedures

Date: March 8, 2001 _________

ANSI Project Initiation Notification System (PINS) Form (Rev. 7/99)


This form may be faxed to 212-730-1346 or sent via E-mail to mweldon@ansi.org or psa@ansi.org
1.

Name of Accredited Standards Developer (include acronym if applicable): ANSI ASC 63 (EMC)

2.

Method and Date of Accreditation: ____________________________


Operating procedures (check one) [XX__] Have
[__] Have Not been revised since that date
These revisions (check one) [_XX_] Have
[__] Have Not been submitted to ANSI for
review.

3.

Designation of Project: ANSI C63.X

4.

Title of Project: Recommended Practice for On-Site ad-hoc Test Method for Estimating Radiated
Electromagnetic Immunity of Electronic Devices to Specific Radio-Frequency Transmitters

5.

Scope Summary or Abstract of Project : Requests have been made for testing of electromagnetic
compatibility between hand-held wireless transmitters (cell phones and radios) and electronic devices
used in manufacturing and industry. The size and limited availability of these devices often make
testing under controlled laboratory conditions unrealistic, and therefore an on-site and ad hoc test
protocol, similar to that drafted for medical-specific devices, is proposed

6.
7.

Check here if the standard covers a consumer product or service: [ ]


DEVELOPER MUST BE REGISTERED FORMALLY TO USE THIS OPTION: Check here if this
standard will be maintained using the Continuous Maintenance Option in accordance with clause 4.4.2
of the ANSI Procedures: [_]
8. Canvass developers: check here if you are also requesting the publication of an initiation of canvass
announcement: [__]
9. Units of measurement used in the standard (check one):
[X] International System of Units (SI)
[__] Inch/Pound [__] Both [__] Other [__] Not Measurement
Sensitive
9. Additional Keywords (not contained in title or scope summary/abstract)
Radio transmitters, Cellular telephones
11. Project Intent ( relates to the status of the standard in terms of ANSI only,
e.g., any standard that is not an approved ANS, is a new standard):
_X_Create a new American National Standard (ANS)

Supersedes: (relates to the currently approved


ANSI standard(s):
None

12. a. Expected Initiation of Project Development: July 2001 __________________________________


b. Expected Completion of Project (i.e., submittal of BSR-8): October 2001 _______________________
13. Contact (Staff person responsible for this technical area):
Name: ___________________________________

Title: __________________________________

Affiliation: _______________________________
Att. 5 PINS for Recommended Practice for On-Site Ad-Hoc Test method for Estimating Radiated
Immunity of Electronic Devices to Specific Radio Frequency Transmitters

Attach separate sheet if necessary.

Date: March 8, 2001 ______

ANSI Project Initiation Notification System (PINS) Form (Rev. 7/99)


This form may be faxed to 212-730-1346 or sent via E-mail to mweldon@ansi.org or psa@ansi.org
1.

Name of Accredited Standards Developer (include acronym if applicable): ANSI ASC 63 (EMC)

2.

Method and Date of Accreditation: ____________________________


Operating procedures (check one) [XX__] Have
[__] Have Not been revised since that date
These revisions (check one) [__] Have
[_XX_] Have Not been submitted to ANSI for
review.

3.

Designation of Project: ANSI C63.2

Title of Project: American National Standard for Measurement Instrumentation


Scope Summary or Abstract of Project :
This project will revise C63.2 into two parts:
a. Provide for a basic document replicating or referencing as appropriate measurement receiver
specifications in CISPR 16-1:1999.
b. Provide a US foreward which will include those aspects of C63.2 not covered in CISPR 16-1
which has applicability to US requirements
Check here if the standard covers a consumer product or service: [X]
1. DEVELOPER MUST BE REGISTERED FORMALLY TO USE THIS OPTION: Check here if this
standard will be maintained using the Continuous Maintenance Option in accordance with clause 4.4.2
of the ANSI Procedures: [_XX]
2. Canvass developers: check here if you are also requesting the publication of an initiation of canvass
announcement: [__]
3. Units of measurement used in the standard (check one):
[X] International System of Units (SI)
[__] Inch/Pound [__] Both [__] Other [__] Not Measurement
Sensitive
4.

Additional Keywords (not contained in title or scope summary/abstract)


Receivers, spectrum analyzers, detectors, bandwidth, immunity

11. Project Intent ( relates to the status of the standard in terms of ANSI only,
e.g., any standard that is not an approved ANS, is a new standard):
X_Revise current ANS:

Supersedes: (relates to the currently approved


ANSI standard(s):
ANSI C63.2

12. a. Expected Initiation of Project Development: April 2001__________________________________


b. Expected Completion of Project (i.e., submittal of BSR-8): December 2001 ______________________
13. Contact (Staff person responsible for this technical area):
Name: ___________________________________
Title: __________________________________
Affiliation: __________________________________________________________________________
Address:_____________________________________________________________________________
City: _________________________________________ State: _____________Zip: ____________
Telephone: ______________________ , ext ___________ Fax: ______________________________
E-mail: Signature:
Att. 6 PINS for Addition of a spectrum analyzer in a Revision of C63.2

Attach separate sheet if necessary.

Date: March 8, 2001 _________

ANSI Project Initiation Notification System (PINS) Form (Rev. 7/99)


This form may be faxed to 212-730-1346 or sent via E-mail to mweldon@ansi.org or psa@ansi.org
10. Name of Accredited Standards Developer (include acronym if applicable): ANSI ASC 63 (EMC)
11. Method and Date of Accreditation: ____________________________
Operating procedures (check one) [XX__] Have
[__] Have Not been revised since that date
These revisions (check one) [__] Have
[_XX_] Have Not been submitted to ANSI for
review.
12. Designation of Project: ANSI C63.X
13. Title of Project: American National Standard for Methods of Measurement of emissions and immunity
using reverberation chamber techniques
14. Scope Summary or Abstract of Project : This project proposes a new document on the use of the
reverberation chambers and method of measurements including emissions, immunity, shielding, and
other applications. The application to specific electronic devices will be addressed. In addition the
work will address for radiated emission testing the correlation between measured power in a
reverberation chamber and the resultant prediction of field strength at a distance over a conducting
ground plane
15. Check here if the standard covers a consumer product or service: [X]
16. DEVELOPER MUST BE REGISTERED FORMALLY TO USE THIS OPTION: Check here if this
standard will be maintained using the Continuous Maintenance Option in accordance with clause 4.4.2
of the ANSI Procedures: [_XX]
17. Canvass developers: check here if you are also requesting the publication of an initiation of canvass
announcement: [__]
18. Units of measurement used in the standard (check one):
[X] International System of Units (SI)
[__] Inch/Pound [__] Both [__] Other [__] Not Measurement
Sensitive
9. Additional Keywords (not contained in title or scope summary/abstract)
Statistical, mode-stirred, mode-tuned,
11. Project Intent ( relates to the status of the standard in terms of ANSI only,
e.g., any standard that is not an approved ANS, is a new standard):
_X_Create a new American National Standard (ANS)

Supersedes: (relates to the currently approved


ANSI standard(s):
None

14. a. Expected Initiation of Project Development: April 2001__________________________________


b. Expected Completion of Project (i.e., submittal of BSR-8): April 2003 __________________________
15. Contact (Staff person responsible for this technical area):
Name: ___________________________________
Title: __________________________________
Affiliation: __________________________________________________________________________
Att. 7 PINS for methods of measuring emissions and immunity using reverberation-chamber
techniques.

Attach separate sheet if necessary.

Date: March 8, 2001 ______

ANSI Project Initiation Notification System (PINS) Form (Rev. 7/99)


This form may be faxed to 212-730-1346 or sent via E-mail to mweldon@ansi.org or psa@ansi.org
1.

Name of Accredited Standards Developer (include acronym if applicable): ANSI ASC 63 (EMC)

2.

Method and Date of Accreditation: ____________________________


Operating procedures (check one) [XX__] Have
[__] Have Not been revised since that date
These revisions (check one) [__] Have
[_XX_] Have Not been submitted to ANSI for
review.

3.

Designation of Project: ANSI C63.4-2000 Revision

Title of Project: American National Standard for Methods of Measurement of Radio-Noise Emissions from
Low-Voltage Electrical and Electronic Equipment in the Range of 9 kHz to 40 GHz
4.

Scope Summary or Abstract of Project : This project proposes to revise ANSI C63.4. This revision
is to be limited to comments received but not included during the revision of the 2000 version of ANSI
C63.4. The comments will be reviewed, resolved and incorporated, as appropriate.

5.
6.

Check here if the standard covers a consumer product or service: [X]


DEVELOPER MUST BE REGISTERED FORMALLY TO USE THIS OPTION: Check here if this
standard will be maintained using the Continuous Maintenance Option in accordance with clause 4.4.2
of the ANSI Procedures: [_XX]
7. Canvass developers: check here if you are also requesting the publication of an initiation of canvass
announcement: [__]
8. Units of measurement used in the standard (check one):
[X] International System of Units (SI)
[__] Inch/Pound [__] Both [__] Other [__] Not Measurement
Sensitive
9.

Additional Keywords (not contained in title or scope summary/abstract)


conducted emissions testing, conducting ground plane, digital equipment, electric field measurement,
line impedance stabilization network, low-voltage electrical equipment, low-voltage electronic
equipment, magnetic field measurement, normalized site attenuation, radiated emission testing, radionoise emissions, radio-noise power, site attenuation, unintentional radiators

11. Project Intent ( relates to the status of the standard in terms of ANSI only,
e.g., any standard that is not an approved ANS, is a new standard):
X_Revise current ANS:

Supersedes: (relates to the currently approved


ANSI standard(s):
ANSI C63.4-2000

12. a. Expected Initiation of Project Development: April 2001__________________________________


b. Expected Completion of Project (i.e., submittal of BSR-8): April 2002 __________________________
13. Contact (Staff person responsible for this technical area):
Name: ___________________________________
Title: __________________________________
Affiliation: __________________________________________________________________________
Address:_____________________________________________________________________________
City: _________________________________________ State: _____________Zip: ____________
Telephone: ______________________ , ext ___________ Fax: ______________________________
E-mail: Signature:
Att. 8 PINS for Revision of C63.4

Attach separate sheet if necessary.

``

Accredited Standards Committee C63 Electromagnetic Compatibility


Accredited by the American National Standards Institute, Inc.
Secretariat: Institute of Electrical and Electronics Engineers, Inc.
Chair: Dr. Ralph M. Showers; 215 898 8123
Vice Chair: Edwin
L. Bronaugh; 512 258 6687
Staff Liaison: Patricia Gerdon: 732-562-3811, Fax: 732. 562. 1571

PINS-C FORM
(Project Initiation Notification System-Committee Level)
To: Dan Hoolihan
From: Michael W. Howard
Date: March 7, 2001
Designation of Project (ie C63.XX ask Tricia for number if it's a new project):
..C63.XX..........................................................................................................................................................
Title of Project:
Checklists and guidance for Assessors in the Assessment of Calibration Laboratories for EMC related
equipment and antennas.
Scope Summary:
This project will define a set of minimum guidance for assessors involved in the assessment of calibration
laboratories providing calibration services for EMC test labs. The results of this project would be a
checklist that would include a appropriate list of reference material (reference to applicable calibration
standards, accepted methods for determining Measurement Uncertainty and list major contributors of Muc
for Calibration) for the assessors use in the assessment of the calibration laboratory. The checklist will also
include a set of minimum items that the assessor will need to evaluate the technical competence of the lab.
Keywords:
Calibration Standards, Measurement Uncertainty, Checklists, Assessor References
Intent: NEW
Project Schedule: Expected initiation date: March 7, 2001
Committee Contact person for this project:

and completion date: July, 2002


Name: Michael W. Howard

Company: Liberty Labs, Inc.


Address: P.O. Box 230, 1346 Yellowwood Rd., Kimballton, IA 51543
Voice: 712-773-2199

Fax: 712-773-2299

Email: mhoward@liberty-labs.com
Chair Use Only:

Att. 9 PINS for Checklists and guidance for Assessors in the Assessment of Calibration
Laboratories for EMC related equipment and antennas.

Date: February 15, 2001 ____

ANSI Project Initiation Notification System (PINS) Form (Rev. 7/99)


This form may be faxed to 212-730-1346 or sent via E-mail to mweldon@ansi.org or psa@ansi.org
1.

Name of Accredited Standards Developer (include acronym if applicable): ANSI ASC 63 (EMC)

2.

Method and Date of Accreditation: ____________________________


Operating procedures (check one) [__] Have
[__] Have Not been revised since that date
These revisions (check one) [__] Have
[__] Have Not been submitted to ANSI for
review.

3.

Designation of Project: ANSI C63.19 Revision

Title of Project: American National Standard for Methods of Measurement of Compatibility between
Wireless Communications Devices and Hearing Aids
4. Scope Summary or Abstract of Project : This project proposes to revise ANSI C63.19 to address two
specific issues:
A. To determine whether to bring the GTEM immunity test method, currently contained in an Annex,
into the body of the standard as a normative, alternative test method.
B. To assure that the standard is prepared to address the new frequency bands proposed for use by 3rd
generation cellular telephones.
5.
6.

Check here if the standard covers a consumer product or service: [X]


DEVELOPER MUST BE REGISTERED FORMALLY TO USE THIS OPTION: Check here if this
standard will be maintained using the Continuous Maintenance Option in accordance with clause 4.4.2
of the ANSI Procedures: [__]
7. Canvass developers: check here if you are also requesting the publication of an initiation of canvass
announcement: [__]
8. Units of measurement used in the standard (check one):
[X] International System of Units (SI)
[__] Inch/Pound [__] Both [__] Other [__] Not Measurement
Sensitive
9.

Additional Keywords (not contained in title or scope summary/abstract)


hearing aid, hearing aid compatibility (HAC), wireless communications device, personal
communications service (PCS), American National Standard, electromagnetic compatibility, operational
compatibility, measurement methods

11. Project Intent ( relates to the status of the standard in terms of ANSI only,
e.g., any standard that is not an approved ANS, is a new standard):
X_Revise current ANS:

Supersedes: (relates to the currently approved


ANSI standard(s):
ANSI C63.19-2001

12. a. Expected Initiation of Project Development: April 2001__________________________________


b. Expected Completion of Project (i.e., submittal of BSR-8): April 2002 __________________________
13. Contact (Staff person responsible for this technical area):
Name: ___________________________________
Title: __________________________________
Affiliation: __________________________________________________________________________

Att. 10 PINS for Revision of C63.19

Attach separate sheet if necessary.

10

Date: MARCH 6, 2001

ANSI Project Initiation Notification System (PINS) Form (Rev. 7/99)


This form may be faxed to 212-730-1346 or sent via E-mail to mweldon@ansi.org or psa@ansi.org

1. Name of Accredited Standards Developer (include acronym if applicable):


Accredited Standards Committee, C63 on Electromagnetic Compatibility (EMC)
2.

Method and Date of Accreditation: ASC - August 1, 1985


Operating procedures (check one) [X] Have
[__] Have Not been revised since that date
These revisions (check one) [X] Have
[__] Have Not been submitted to ANSI for
review.

3.

Designation of Project: C63.8

4.

Title of Project: Prepare a reference document "Annotated Compendium of Electromagnetic


Compatibility (EMC) Standards Throughout the World". It will be a summary of EMC
standards in use throughout the World.

5.

Scope Summary or Abstract of Project : Prepare the document from the DoD Project Number:
0178 " "Comparisons of EMC Requirements of Major International EMC Standards" Annex B2
. The format will be: 1-Introduction, 2 -Environmental Standards, 3-Basic Standards, 4-Generic
Standards, Product Standards, 6-Communication Related Standards, 7 -System Standards, 8Lightning,EMP, ESD Standards, 9- Installation Standards

6. Check here if the standard covers a consumer product or service: [X]


7.

DEVELOPER MUST BE REGISTERED FORMALLY TO USE THIS OPTION: Check here if this
standard will be maintained using the Continuous Maintenance Option in accordance with clause 4.4.2
of the ANSI Procedures: [ ]
8. Canvass developers: check here if you are also requesting the publication of an initiation of canvass
announcement: [__]
9. Units of measurement used in the standard (check one):
[] International System of Units (SI)
[ ] Inch/Pound [ X_] Both [__] Other [__] Not Measurement
Sensitive
10. Additional Keywords (not contained in title or scope summary/abstract): Electromagnetic
Compatibility
11. Project Intent ( relates to the status of the standard in terms of ANSI only,
e.g., any standard that is not an approved ANS, is a new standard):
[X] Prepare a New ANS: C63.8 First Edition

Supersedes: (relates to the currently approved


ANSI standard(s):
New Standard

12. a. Expected Initiation of Project Development: March 10,2001_____________________________


b. Expected Completion of Project (i.e., submittal of BSR-8): August 1, 2003 ______________________
13. Contact (Staff person responsible for this technical area):
Name:

R. L. Pritchard___________________

Title: Secretary. ASC C63 _________________

Att. 11 PINS for Compendium of EMC Standards, Project C63.8

Attach separate sheet if necessary.

11

Accredited Standards Committee C63 - Electromagnetic Compatibility


Accredited by the American National Standards Institute, Inc.
Secretariat: Institute of Electrical and Electronics Engineers, Inc.
Chair
Dr. Ralph M. Showers
215 898 8123

Vice Chair
Edwin l. Bronaugh
512 258 6687

Secretary
Rosemary Tennis
732 562 3811

PINS-C FORM
(Project Initiation Notification System-Committee Level)
To:_Dr. R. M. Showers, Chair_________From:__A. H. Light _Date:_8 March 2001
Designation of Project (ie C63.XX)
N/A
Title of Project:
Measurement of Magnetic Waves at Frequencies Below 30 M Hz
Scope Summary:
The purpose of this effort is to develop procedures for the measurement of magnetic fields at frequencies
below 30 MHz. As appropriate this effort will either develop a procedure to be included in ANSI C63.4
clause 4 with the necessary appendices to describe the modified procedures necessary to perform these
measurements or develop a new ANSI C63 standard for this purpose and to be referenced in ANSI C63.4
clause 4. This effort will consider the use of the Van Veen loop in accordance with CISPR 16-1 and 2
for devices of less than 1.6 m on its largest dimension. For devices larger 1.6 m, the effort will develop a
near-field procedure which can be used to determine the actual magnetic field intensity which would
actually be observed at the required measurement distance by the FCC or other relevant authority.
Keywords:
Magnetic Fields
Van Veen Loops
< 30 MHz
Intent:

X New

O Revised

O Reaffirm

O Withdraw

O Adopt

O Discontinue

Expected initiation date:__9 March 2001________and completion date__8 March 2002____of this project.
Committee Contact person for this project:
Name: Arthur H. Light
Company: ITT Industries
Address: 1560 Huntington Avenue
Alexandria, VA 22303-1404
Voice: 703-329-3879

Fax: 703-960-0643 Email: art.light@iit.com


Att. 13 PINS-C for project on Measurements below 30 MHz

12

You might also like