BRIEF SUMMARY
The main concepts covered in this case are job design and work
measurement. Qualitative measurements were considered on job design
while basically quantitative on work measurements.
The case states that there were group of 10 workers held responsible
for assembling hotplates for hospital and medical laboratory use. With the
appropriate small tools, each worker assembles part of a hotplate and
through a moving belt, every partially completed hotplate is transferred to
different working stations until checked by an inspector then packed for
shipping.
The assembly line had been carefully balanced by industrial engineers.
However, work morale seemed to be low and controllable rejects-those
caused by the operator rather than by faulty materials-were running about
23 percent.
After discussing the situation, management decided to have their
workers build the hotplates individually. This made its productivity increased
to 84% higher and decreased controllable reject rates from 23% to 1%.
Resistant to Change
Disadvantages:
-
4. Alternative 1 and 2.
RECOMMENDATIONS
Alternative Course of Action no 1 and 2 will be the recommended
action
plan
to
improve
the
IMPLEMENTATION PLAN
companys
productivity
and
lessen
its
CONTINGENCY PLAN
If the two recommended alternative of course of action will not yield
into favorable result. The Company can employ a job rotation. With this it will
increase the workers individuality in terms of technical skills, and eliminates
boredom and dissatisfaction since one is required to learn the process in
their new area of assignment.