3D BIM ELECTRICAL SERVICES

FOR ELECTRICAL CONTRACTORS / CONSULTANTS

3D ELECTRICAL MODEL
DESIGN VALIDATION

SHOP DRAWING
CONSTRUCTION DRAWINGS
QUANTITY TAKE-OFF

www.pinnaclecad.com

COORDINATION AND CLASH RESOLUTION

COMMITMENT
We are committed to our core values and
corporate mission:
Maximizing client value by adopting
the latest technologies and
innovations.
Improving project efficiency by
streamlining workflow and providing
high quality services.
Saving time by using a large global
team to leverage time zone
advantages.
Reducing client costs by up to 30%
by harnessing a highly experienced
global work force.

INDEX
Revolutionizing Electrical
Construction

03

Benefits of Electrical Modeling

03

3D Modeling

04

Conduit Modeling and Fabrication

05

Electrical Fixture & Equipment Modeling

05

Electrical Coordination and Clash


Resolution

06

Constructability Analysis

06

Design Validation

07

Lumen Intensity Verification

08

Shop and Penetration Drawings

09

Quantity Take-off

10

Work Process

11

QC Process

12

Why Pinnacle?

13

Testimonials

14

Project Snap Shots

15

Revolutionizing Electrical Construction


Proper planning and coordination are the keys to the
successful execution of projects in the construction industry.
Advancements in 3D technology and the advent of Building
Information Modeling (BIM) have revolutionized the
Architectural, Engineering and Construction (AEC) industry.

association, has named Pinnacle among the Top IT


innovators 3 years in a row (2006, 2007, 2008) and again in
2011.
The successful completion of more than 4000 BIM projects in
30 countries has provided Pinnacle with a deep
understanding of international building codes and
procedures. Our global delivery system allows us to maintain
constant contact with our clients making geographical
separation meaningless.

BIM allows stakeholders to create and examine virtual


representations of the Mechanical, Electrical and Plumbing
(MEP) systems, and other utilities of their project. The virtual
construct can be used to generate accurate shop drawings
and address all constructability issues before construction
begins.
We recognize the importance of effective work process
management and regular communication when outsourcing
Pinnacle Infotech has been acknowledged as the global services. We have developed an ideal mix of infrastructure,
leader in providing innovative BIM solutions. We have experience, global presence and commitment to excellence
received several awards and recognition from both industry that has led to long-term relationships with more than 950
and government. NASSCOM, the leading IT trade
clients worldwide.

Benefits of Electrical Modeling


| COORDINATION: Streamlining communication through 3D visualization, enabling all stakeholders in quick
decision making during the design and preconstruction phase

| EFFICIENCY: Eliminating RFIs, work stoppages, and reworks by checking the accuracy and completeness of
drawings before starting construction on-site/off-site

| QUALITY: Improving quality by producing accurate Shop Drawings directly from the 3D BIM which can also be
used for prefabrication.

| SAVINGS: Preconstruction and prefabrication reviews mean better use of manpower, better quality of construction,
and reduced rework and wastage, all of which translate into lower costs.

| PROJECT MANAGEMENT: Detailed Material BOQ and Shop Drawings with 3D visualization enable a better look
at The Big Picture and aid in the review, scheduling, and monitoring of each project.
Our clients have reported cost savings up to 30% by successfully implementing BIM.

03

Electrical Modeling
Pinnacle specializes in the virtual construction of 3D BIM electrical models of conduits, cable trays, lighting fixtures,
fire alarms, and other electrical equipment based on contract drawings, manufacturer specifications and client standards.
We create detailed electrical room models showing electrical connections among the panels and transformers.
Value Engineering and Design Validations are also offered to clients to improve the efficiency of the
project and save costs.

Feeder Conduit

Branch Circuit Conduit Rack

Electrical Room

Conduit Rack

Overhead Conduit Rack

Substation

04

Conduit Modeling and Fabrication


We create virtual model of conduits arranged in a rack system based on detailed shop drawings and installation information.
Optimization of conduit layout reduces time, site conflict, and cost, thus increasing the efficiency of the project.

Feeder and Branch Circuit Conduits

LV & ELV Cable Tray

Input Documentation
We are adept at using different types of inputs to create
3D representations of individual systems and complete
buildings. Some of the input formats used are pdf,
*dwg, *dgn, Revit, hand sketches, etc.

Input hand sketch drawing (Underground)

Electrical Fixture and Equipment Modeling


We create 3D lighting fixture models from the manufacturer's 2D drawings and specifications. Also, we provide accurately
modeled electrical equipment and fixtures.

Circuit Breaker

Generators

Transformer

05

Electrical Coordination and Clash Resolution


We generate a coordinated BIM model after resolving the clashes among all the trades (Architecture, Structure,
Concrete, Mechanical, Electrical, Plumbing, Fire Protection, etc.). The coordinated electrical BIM model helps in
visualizing the complete project before construction starts, thus enabling better design review, project planning, and
construction management.

Before coordination process

After coordination process

Constructability Analysis
Virtual Construction of a project in BIM enables independent review of the construction plans and specifications.
This identifies discrepancies in drawings and all constructability issues at preconstruction stage. During the constructability
review, our BIM team generates a series of RFIs to help identify following type of constructability and operational issues:
Missing information / documents
Input inconsistencies
Conflicting data
Operation clearance issues
Maintenance access
BIM model is updated based on responses of RFIs. Status of all RFIs is maintained in a log and follow-up is done to
resolve them at preconstruction stage. This eliminates work stoppages and reworks during construction.

RFI Sample

RFI Sample

06

Design Validation
Load Validation
(CB Rating by REVIT MEP)

Validation of System Voltage


(120/208V, 277/408V and others)

Validation of connected loads is done by generating the


circuits in Revit MEP and the required CB Rating of each
circuit can be quantified to design an efficient
wiring system.

Voltage rating is checked and verified for components,


equipments and distribution system.

PP-1:
Locations:
Supply From:
Mounting: Surface
Enclosure:

Votls: 120/208 Wye


Phases: 3
Wires: 4

A.I.C. Rating:
Maints Type:
Maints Rating: 200A
MCB Rating: 200A

Notes:

CKT
1
3
5
7
9
11
13
15
17
19
21
23
25
27
29
31
33
35
37
39
41

Circuit Description

Trip

EX LTS.-FIRE TRUCK GARAGE


EXTERIOR BLODG LIGHTS
EX RECEPTS-MAIN STORAGE
.
MAINT. LTG ZONE 2
EX EF-1(3 POLE)
.
.
MAINT. LTG ZONE 3
RECEPTACLE FIRE GARAGE
GD SWITCH UNIT 2
.
.
AIR COMPRESSOR FIRE TRUNK
.
.
.
.
RECEPTACLE MAINT
FIRE TRUNK ZONE 2 LTG.
RECEPTACLE MAINT

20A
20A
20A

20A
20A

20A
20A
20A

30A

20A
20A
20A

Load Classification
Lighting
Other

Pole

1
78VA
182VA
1
1
1
1000VA
1
1
2
424VA
250VA

1
3
1440VA 2311VA

3
500VA
500VA

3
2666VA
500VA

3
1080VA
0VA

Total Load:
10931VA
Total Amps:
91A
Connected Load
4240VA
6100VA

700VA

720VA
720VA

1478VA

250VA

424VA

2311VA

500VA

540VA

424VA

250VA

1050VA

2311VA

500VA

500VA

500VA

2666VA

500VA
2666VA

500VA

5000VA
5000VA
1452VA

0VA
900VA
0VA
15362VA
128A

16502VA
138A

Demand Factor
125.00%
100.00%

Pole

Trip

Circuit Description

CKT

1
1
1
1
3

20A
20A
20A
20A
20A

45A

20A

20A

60A

LIGHTS MAINT STORAGE


EX RECEPTS-MAIN STORAGE
EX LTS.-FIRE TRUCK GARAGE
EX CEILING FAN
EX EF-2
.
.
EX HWH-2
.
.
GD SWITCH UNIT 1
.
.
GD SWITCH UNIT 3
.
.
SWITCH UNIT FOR EX MEDICAL BUILDING
.
Space
Space
Space

2
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42

Estimated Demand

Lighting fixture voltage is given 277


that differ from distribution voltage

Panel Totals
Total Conn. Load:
Total Est. Demand:
Total Conn:
Total Est. Demand:

10340VA
11400VA
29A
32A

Connected Load Validation

System Voltage Validation

Validation of Wire/Cable Sizes for Main and Branch circuits


After connecting the electrical loads in the panel, the wire size is reflected in the panels schedule and re-checked with design
drawings. Potential wire size problems can be identified.

USAGE:
208/120V DISTRIBUTION PONEL
LOCATION:
ELECTRICAL ROOM
PHASE/FREQUENCY:
3 60Hz
L-L VOLTS
208
L-G VOLTS
120
BUS APMS
200
FAULT CURRENT RATING:
65,000
MAIN CB AMPS:
200
AMBIENT TEMP. deg. C.:
40
PANEL NOTES:
EQUIPPED WITH GROUND BUS
EQUIPPED WITH FULL SIZE NEUTRAL BUS
*- INDICATES C.B. EQUIPPED WITH "LOCK-ON" DEVICE
**- INDICATES C.B.B IS GFCI TYPE 5mA FOR RECEPTACLE CIRCUITS, 30mA FOR TRACING CIRCUITS
CONDUIT SIZE VALID FOR WIRE WITH THHN INSULATION ONLY
CONDUIT
SIZE

PHASE &
NEURTRAL
SIZE

3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
.
.
3/4"
3/4"
3/4"
.
.
3/4"
.
.
3/4"
3/4"
3/4"
3/4"
3/4"

#12
#12
#12
#12
#12
#12
.
.
#12
#12
#12
.
.
#8
.
.
#12
#12
#12
#12
#12

EGE
SIZE
#12
#12
#12
#12
#12
#12
.
.
#12
#12
#12
.
.
#10
.
.
#12
#12
#12
#12
#12

PANEL TYPE:

CKT AMPS

LOAD DESCRIPTION

C.B.
POLES

6.67
7.50
6.67
8.33
13.33
3.53
3.53
3.53
9.17
13.50
4.17
4.17
4.17
22.22
22.22
22.22
4.17
8.33
9.00
12.75
9.00

EX LTS. FIRE TRUNK GARAGE


EX EXTERIOR BLDG LIGHTS
EX RECEPTS. MAINT STORAGE
EX UNIT HEATER
MAINT. LTG ZONE 2
EX EF-1 (3-POLE)
.
.
MAINT. LTG. ZONE 3
RECEPT. FIRE GARAGE
EX GARAGE ROOD GD-2
.
.
EX AIR COMPRESSOR
FIRE TRUNK
.
EX CO DETECTOR
EX CONTROL POWER HVAC
RECEPTACLE MAINT. FIRE TRUNK ZONE 2 LTG.
FIRE TRUNK ZONE 2 LTG
RECEPTACLE MAINT.

1
1
1
1
1
3

1
1
3

1
1
1
1
1

MOTOR KVA:
RECEPTACLE KVA:
HID LIGHTING KVA:
HEATING KVA
INCANDESCENT LIGHTING KVA:

Designed Panel Schedule

CIRCUIT
C.B. TRIP NUMBER C.B. TRIP
A B C
20
20
20
20
20
20

20

20

30

20
20
20
20
20
18.00
16.00
7.50
4.00
0.00

1A2
3B4
5C6
7A8
9 B 10
11 C 12
13 C 14
15 B 16
19 A 20
21 A 22
21 B 22
23 C 24
25 A 26
27 B 28
29 C 30
31 A 32
33 B 34
35 C 36
37 A 38
39 B 40
41 C 42
KVA
KVA
KVA
KVA
KVA

20
20
20
20
20

45

20

20

60

C.B.
POLES
1
1
1
1
3

SEE SPECIFICATIONS

LOAD DESCRIPTION

CKT AMPS

EX LIGHTS-MAINT. STORAGE
EX RECEPTS. MAINT STORAGE
EX RECEPTS.-FIRE TRUNK GARAGE
EX CEILING FAN
EF-2(3-POLE0

EX HWH-2 (3-POLE)

EX GARAGE ROOD DG-1

EX GARAGE ROOD DG-3

EX MEDICAL WASTE BUILDING

BLANK
BLANK
BLANK

13.33
6.67
5.00
8.33
2.08
2.08
2.08
33.33
0.00
0.00
4.17
4.17
4.17
4.17
4.17
4.17
41.67
41.67
0.00
0.00
0.00

PHASE A CONNECTED AMPS:


PHASE B CONNECTED AMPS:
PHASE C CONNECTED AMPS:

PHASE &
CONDUIT
NEURTRAL EGE SIZE
SIZE
SIZE
3/4"
3/4"
3/4"
3/4"
3/4"

3/4"

3/4"

3/4"

3/4"

#12
#12
#12
#12
#12

#12

#12

#12

#12

#12
#12
#12
#12
#12

#10

#12

#12

#10

99.5
159.8
120.2

Panel Schedule generated from Revit

07

Voltage Drop Validation for Main and Branch circuits


The voltage drop of each circuit is calculated and reflected in the panels schedule. Voltage drop is re-checked
using design and other drawings for validation.

Circuit
Number

Circuit
Description

Voltage
Drop

Trip

Poles

PP-1-/PP-1-1/

Lighting Space 20

0 V/120 V

20 A

PP-1-/PP-1-3/

EX EXTERIOR BLDG LIGHTS

2 V/120 V

20 A

PP-1-/PP-1-5/

EX RECEPTS- MAINT STORAGE

1 V/120 V

20 A

PP-1-/PP-1-7/

SWITCH UNIT FOR EXUNIT HEATER

1 V/120 V

20 A

PP-1-/PP-1-9/

MAINT. LTG ZONE 2

2 V/120 V

20 A

PP-1-/PP-1-11,13,15/

EX EF-1(3 POLE)

0 V/208 V

20 A

--

--

--

--

--

--

--

--

--

--

PP-1-/PP-1-17/

MAINT LTG ZONE 3

1 V/120 V

20 A

PP-1-/PP-1-19/

RECEPT. FIRE GARAGE

2 V/120 V

20 A

PP-1-/PP-1-21,23,25/

EX GARAGE DOOR GD SWITCH UNIT 2

1 V/208 V

20 A

--

--

--

--

--

--

--

--

--

--

PP-1-/PP-1-27,29,31/

AIR COMPRESSOR FIRE TRUCK

4 V/208 V

20 A

78 VA

182 VA
700 VA

720 VA
720 VA

1000 VA

1000 VA
1478 VA

250 VA
424 VA

424 VA

2311 VA
1050 VA

2311 VA

2311 VA
500 VA

500 VA
500 VA

500 VA

250 VA

250 VA
424 VA

1440 VA

540 VA

500 VA
2666 VA

500 VA

500 VA

Voltage
Drop

Circuit
Number

Circuit
Description

Poles

Trip

20 A

0 V/120 V

EX LIGHTS- MAINT. STORAGE

PP-1-/PP-1-2/

20 A

1 V/120 V

EX RECEPTS - MAINT STORAGE

PP-1-/PP-1-4/

20 A

1 V/120 V

EX RECEPTS- FIRE TRUCK GARAG

PP-1-/PP-1-6/

20 A

0 V/120 V

EX CEILING FAN

PP-1-/PP-1-8/

20 A

0 V/208 V

EX EF-2(3 POLE)

PP-1-/PP-1-10,12,14/

--

--

--

--

--

--

--

--

45 A

1 V/208 V

EX HWH-2

--

--

--

--

--

--

--

--

20 A

1 V/208 V

GD SWITCH UNIT 1

--

--

--

--

--

--

--

--

20 A

1 V/208 V

GD SWITCH UNIT 3

--PP-1-/PP-1-16,18,20/
--PP-1-/PP-1-22,24,26/
--PP-1-/PP-1-28,30,32/

Lumen Intensity Verification


The luminance of working plane is calculated by incorporating a proper photometric web file (.ies) into the lighting
fixture family.
The photometric report can be generated as per the design drawings and this report is used for designing the lighting
fixtures and its wattage rating.
The photometric report (luminance) of a room/space/building is extracted in *.pdf format and sent to the client for
the validation of design drawings.

Actual Lighting Load


260VA
130VA

Actual Lighting Load


2710W
1530W
700W

LIGHT SCHEDULE
Illuminance Average
Illuminance Maximum
241.27lx
275.88lx
15.51lx

424.11lx
389.75lx
42.05lx

Illuminance Minimum
51.16lx
163.67lx
1.73lx

Name
Space
Space
Space

Number
21
20
22

08

Electrical Shop Drawings


Shop Drawings are created on the basis of project standards and are useful to contractors, fabricators, suppliers, and
manufacturers during construction. BIM is highly useful for construction of any irregular or complex structures.
We generate a coordinated Electrical model before start of construction. These drawings can be directly downloaded
into GPS instruments for fast and accurate layout at site. These drawings are generated directly from coordinated
BIM models and are detailed enough for workshop fabrication.

Small Power Layout

Containment Layout

Lighting Layout

Speciality System

Structured Cabling System Layout

Fire Alarm System Layout

09

Electrical Penetration Drawings


Penetration Drawings are required by the contractors to create wall openings before the installation of electrical cable
trays and conduits. These drawings are developed from the coordinated Electrical model. All necessary views are shown
in Penetration Drawings with proper clearance so that they are easily comprehendible on construction site.

62
56

60

S4

S3

S4

59
FR

S4

ES

AI

51

LO

UV

ER

S3
55
S3

50

58

S3

S3
52
S3

54
S3

57
S3

49
S3
FRESH AIR

LOUVER

53
S3

48
S3

47
S3

46

Wall Penetration Section

Wall Penetration Layout

Quantity Take-Off
BIM model generates accurate quantity of all materials. These quantities are automatically updated with any changes
in the BIM model. Quantity Take-Off (QTO) reports can be formatted in MS Excel and exported to a database for detailed
analysis. Quantities can be generated for a specific time period or project area (4D/5D) to help manage material
procurement and save inventory costs.
Quantity Take-Off covers all conduits, cable trays, hangers, light fittings, switches, outlets and other electrical
equipments, fire alarm devices, security devices, communication devices, etc.

10

Work Process

CLIENT
General Contractors / MEP Contractors / Electrical Contractor

MARKETING
TEAM

ESTIMATES
TEAM

BIM
PROJECT
MANAGER

Project Specifications
Codes/Standards/Submittals

RFI / Clarifications

ELECTRICAL
TEAM
RFIs Generation
3D Model Creation
Constructability Review
Value Engineering
Quality Control
Design Validation

BIM COORDINATION WITH ARCH./STRUC./MECH./PLMB. TEAM


Combining of all the
Models of various
Trades/Discipline

Performing Clash
Detection

Coordination Meetings
to discuss unresolved
Clashes

Updating the
Model to resolve
Clashes

QUALITY
CHECKS

ELECTRICAL TEAM
4D Phasing
Quantity Take-Off
Shop Drawing
Coordination Drawings

DELIVERABLES
3D Models
Shop Drawing
Coordination Drawing
Quantity Take-Off
Presentation/4D Schedule

11

Quality Control Process


Our quality control (QC) process is ISO 9001:2008 certified and managed by an independent QC team. The main
objective of the QC process is to detect errors and rectify them.
Ensuring quality is a group effort and our QC team comprises experienced and dedicated members.
The entire QC process is handled in three phases:

QC 1
Plot checking
done by
Production Team

QC 2
Screen checking
done by QC
Department/Team

QC 3
Preshipment checking
performed by
Project Manager

DELIVERY
TO

CLIENT
100% Quality

QC Check Phase I
The model is plotted on paper and a preliminary grid-by-grid check is done by comparing with the original contract
documents. At least one member of the Project Management team assists in this process.
The project's Team Leader sends a status report to the QC Department to begin QC Phase II.

QC Check Phase II
The QC Team performs a more detailed comparison of the contract documents against the 3D BIM model. A specific
Checklist is prepared to review/check the deliverables. Its main objective is to review, identify and address
the following:
Missing data
Mismatches with the contract documents
Clashes (Old/New), elevation, routing, fittings, and other things
Construction point of view
No-Fly-Zones
Attribute checking (pressure class, pipe material etc.)
Location of equipments such as VAVs, Sleeves, Hangers, and Valves
Equipment connection details as per Schematic Drawings
Equipment models as per technical submittals
Annotations, dimensions, and aesthetic view
Miscellaneous issues
The QA/QC Team continuously interacts with the Project Lead and other team members to resolve all technical
issues related to the project.

QC Check Phase III


The Project Manager conducts the preshipment check before sending them to the client.

12

Why Pinnacle?

Multidisciplinary Team

Pinnacle is a global leader in providing innovative BIM services.


Our in-house team of more than 750 experienced architects,
engineers, and BIM professionals helps us to provide end-toend solutions to discerning clients around
the world.
Our 3,50,000 sq ft world-class production facility is equipped
with high-end workstations, advanced servers with real time
backup, and a high-speed data and voice network. Also there is
uninterrupted power supply and a 24 x 7 security system.

Fast Turnaround
Our skilled team of professionals can provide quick turnarounds
on complex projects. We have successfully completed several
large-scale projects across multiple verticals including health
care, hospitality, airports, university centers, data centers,
convention centers, and commercial and residential projects.

Technical Strengths
Our engineers use the latest BIM software: Revit Software
Suite (Revit, Revit MEP, Revit Architecture and Revit Structure),
Microstation, Ecotect Analysis, NavisWorks, Inventor, Civil 3D,
Plant Design Suite, Pro/Engineer, Tekla Structure, SolidWorks,
Autodesk Fabrication Suite, Quickpen, Cadpipe, SketchUp,
Bluebeam, and other software.
As we have a deep understanding of global and regional codes and standards, we have ensured that our Quality Management
System is as per ISO 9001:2008.

Global Presence
Pinnacle has offices around the world (USA, India-Durgapur
and Kolkata, UAE-Dubai and Italy) enabling us to serve our
clients around the clock.

Experienced in BIM Domain


Our global experience is of 17 years and we have successfully
collaborated with several leading contractors on BIM projects
for specialty hospitals, stadiums, universities, dams, apartment
complexes, hotels, casinos, large retail centers, high schools,
airports, commercial buildings, convention centers, highrise
towers, and industrial projects.

Communication
Pinnacle assigns an experienced Project Manager as the single point of contact for the entire project. The Project Manager
is responsible for planning, scheduling, monitoring, and controlling, close client interaction and successful completion of
the project. Clashes are resolved through WebEx meetings / sharing 3D clash snapshot.
Pinnacles Project Management team is available to clients through a number of communication channels including:
1. Global telephone networks for instant communication. 4. Video and teleconferencing for presentations and conversations.
2. FTP over a secured network for file transfers.
5. WebEx conferences with US-based phone systems.
3. Email for reports and interactions.
6. Newforma project information management system.

13

Testimonials
Very good at following up. This is our fist BIM project and also very early into the job. As of now everything looks good. Thank you."
Stryker Electric

"Very professional and timely work, all revisions were made quickly and correctly. Thank you for the great service".
Gephart Electric

"I was a littel apprehensive at first but was quickly and pleasantly surprised at the professionalism, communication and timely turn around of
the product requested. I look forward to work with you in the future."
Baker Electric

"Job went very well for this client. Client is happy.


Advantage Electric

Thank you for your cooperation and also for a job well done."
NJS Electrical Services Corp.

"Great response to our urgent needs. I will send more work to pinnacle shortly.
Kurtzon Lighting, Inc.

The project went very smoothly. I was given everything that I expected and with a quick response. Pinnacle is very helpful in getting everything
together, even when they did not have all of the appropriate information at the beginning. Overall this was a successful effort and I will be happy
to use Pinnacle in the future."
The Whiting-Turner Contracting Company

We are thrilled to have find a group like yours that service all our MEP drafting needs, and at record response. We truly feel like
you have met and exceeded everything we could have asked of your group. We look forward to a long and bright future together.
MCC Group

Pinnacle has revolutionized the BIM elements of our company. They are extremely professional and skilled at what they do and develop a personal
relationship with ease. Since our first project, we have used Pinnacle for over a dozen and will continue to do so consistently in the future.
C.W. Driver

Pinnacle delivers a great deal of value for a very reasonable price. They consistently deliver my expectations on-time.
Turner Construction

"Very good and helpful project manager, especially with the assistance in working the programs. Pushing on my end to have more projects go through
Pinnacle. Look forward to doing more business with Pinnacle in the future".
Hawaiian Dredging Construction Company, Inc.

"Pinnacle has been a pleasure to work with on this project. Pinnacle is always willing to do what it takes to get a job done. Even though the proposals
have been pushed out, Pinnacle met all deliverable dates and provided a quality product for the proposal phase of this project. I look forward to more
projects working with the pinnacle staff.
Harper Construction Company, Inc.

14

Project Snap Shots


SECTOR
LOCATION

CLIENT

PROJECT NAME
DETAILS

TIME
LINE

PROJECT AREA
MANPOWER

Hanger
Replacement
and office

Electrical
Contractor

P-114 MV-22 Double hanger Replacement


Pinnacle provided the electrical model of lighting, power,
telecom and fire alarm services and its shop drawing after
coordinating with MEPF services based on the weekly
coordination meeting. Thus all branch circuit and home
run conduits were model for quantity take as well as
the coordination.

August
2014

123,451 sq ft

California
USA

Office

July
BNSF Railway
2014
Pinnacle provided a coordinated detailed (LOD-400)
3D electrical model of lighting, power, fire alarm and telecom
services along with a final signed-off shop drawings based
on the weekly coordination meeting.

215,500 sq ft

May
The Kingdom Tower
2014
Pinnacle provided complete Electrical Modeling above
and below ceiling with clash coordination of MEP services
in Navis work for this super tall skyscraper. Created families
for all electrical items respect to technical cut sheets and
provided Electrical shop drawing includes Lighting, power,
fire alarm and containment services. Design review and value
engineering is provided for containment services.

4,928,159 sq ft

Main
Consultant

King Faisal Padiatric Hospital


Design Validation, Load Calculation, Layout Generation,
Technical Scheduling, Design Review, Modeling, Clash
Detection, 95% Tender and 50% Design Drawing Set
Creation, Quantity Take Off, Constructibility And Aesthetic
Review, Technical Documentation.

December
2013

1,151,738 sq ft

Electrical
Contractor

Sinai Residences CCRC


3D modeling of all the Electrical Components and Conduits;
Coordination with other trades through online meeting.

April
2014

600,000 sq ft

Electrical
Contractor

February
Le Bonheur Childrens Hospital
2015
3D Model, Coordination and shop drawing of all Electrical
Panels, Transformers, Main Distribution Board, etc. Equipment,
Ceiling Mounted Lighting Fixtures only, Conduits(feeders and
Home runs) as per sketch layout, Ceiling Mounted Fire Alarm
and other devices Only.

General
Contractor

Edmondson Hall General Repairs


Pinnacle provided the electrical model of lighting, power
and telecom services and shop drawings. The 3D electrical
model thus generated was used for MEP coordination.
Pinnacle was responsible for conducting the web based
weekly coordination meeting up to the project sign-off.

May
2012

New York University


Pinnacle provided the electrical coordinated model for
lighting, small power, fire alarm, security and telecom
services with modularization.

March
2012

Sinai Residences CCRC


Pinnacle was responsible to provide the electrical model
and coordination with other services. All the Conduits were
modelled from sketch layout and finally coordinated with
other services for construction.

May
2015

NEA Baptist Health System


Pinnacle created the model of lighting, power and telecom
systems for coordination purpose. The model was
coordinated with all MEP service.

May
2011-2012

Electrical
Contractor

Texas
USA
Mixed-Use

Engineering
Consultant

Jeddah
Saudi Arabia

Hospital
Riyadh
Saudi Arabia

Hospital and
Residential
Florida
USA
Hospital Office
and Parking
Tennessee
USA

Biological
Laboratory
Honolulu
Hawaii

Education
Center

MEP
Contractor

Saadiyat Island
Abu Dhabi
Residential and
Hospital Building

Electrical
Contractor

Boca Raton
Florida
Medical Center
Jonesboro
Arkansas

4 Electrical Engineers

Electrical
Contractor

4 Electrical
Engineers

12 Electrical
Engineers

18 Engineers
(35 at peak)

4 Electrical
Engineers

56,500 sq ft
2 Engineers

40,000 sq ft
4 Electrical Engineers

1,580,504 sq ft
10 Electrical Engineers

600,000 sq ft
6 Electrical Engineers

107,639 sq ft
15 Electrical Engineers

15

Lecco, Italy

Durgapur, India

Houston, TX, USA


Dubai, UAE

USA Office and Production Center

International Production Center

Pinnacle Infotech Inc.

Pinnacle Infotech Solutions

6161 Savoy Drive #1125,


Houston, TX 77036
Phone : 713 780 2135
Fax : 713 780 8784
Email : btodi@pinnaclecad.com

S.S.B. Sarani, Bidhannagar, Durgapur


West Bengal, India - 713212
Phone : +91 343 6602222 / 6602231 35
Fax : +91 343 6602230
Email : bpatwari@pinnaclecad.com

Biswanath Todi
Operations Manager
Cell : 832 283 6628

Bimal Patwari
President
Cell : 713 589 9125

UAE Office

Kolkata Office

Pinnacle Infotech Technologies FZ-LLC

Pinnacle Infotech Solutions

Office No 307, 3rd Floor, Building No. 7


PO Box - 345869, Dubai Outsource Zone
Dubai, UAE

Suite 530, SDF Building.


Salt Lake Sector V, Kolkata - 700091
Phone : +91 33 23576195
Email : cad@pinnaclecad.com

Bimal Patwari
Phone : +971504965954
Email : dubai@pinnaclecad.com

ITALY Office
Nunki di M.Brossa,
Via Calvi, 10 - 23801
Calolziocorte, LC - Italy
Phone : + 39 0341630070
Email : mbrossa@pinnaclecad.com

www.pinnaclecad.com

Kolkata, India

You might also like