Complete blue cells on this worksheet and on the Cost Breakdown worksheet.
EXECUTIVE SUMMARY
Floor Area
sq.m.
Project Address
Project Team
Client's Representative
Architectural
Engineering
Quantity Surveying
Other
Cost
Basic Building Cost (BBC) Direct
Indirect
SUBTOTAL
Cost/sq.m
Excluding VAT
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL
of which
Liable for VAT @ 23%
Liable for VAT @ 0% or exempt
Liable for VAT @ 13.5%
VAT
0
VAT Total
0
0
0
0
0
Summary of Costs
0
0
Floor Area
0 sq.m.
VAT exclusive
Cost
Cost/sq.m.
Basic Building Cost
19 Substructure
29 Structure
39 Structure Completions
49 Finishes
59 Services Piped & Ducted
69 Services Electrical
Building Indirect
% of total
Subtotal
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Subtotal
0
0
0
0
0
0
0
0
0
Subtotal
0
0
0
0
0
0
0
0
0
Subtotal
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
TOTAL
External Works
90 Site Direct
Site Indirect
Cost Breakdown
In each category, enter either a single all-inclusive cost (excl. VAT) or a breakdown of costs (excl. VAT).
Floor Area
0.00 sq.m.
Cost
VAT exclusive
Cost/sq.m.
0.00
29 Structure
2- Structure Generally
21 External Walls
22 Internal Walls, Partitions
23 Floors, Galleries
24 Stairs, Ramps
25 Reserved
26 Reserved
27 Roofs
28 Frames
Subtotal
0.00
39 Structure Completions
3- Structure Completions Generally
31 External Walls: Completions within Openings
32 Internal Walls: Completions within Openings
33 Floors, Galleries: Completions
34 Stairs, Ramps: Completions
35 Suspended Ceilings
36 Reserved
37 Roof: Completions
38 Reserved
Subtotal
0.00
49 Finishes
4- Finishes Generally
41 Wall Finishes Externally
42 Wall Finishes Internally
43 Floor Finshes
44 Stairs, Ramps: Finishes
45 Ceiling Finishes
46 Reserved
47 Roof Finishes
48 Reserved
Subtotal
0.00
0.00
69 Services Electrical
6- Services (Mainly Electrical) Generally
61 Electrical Supply and Main Distribution
62 Power
63 Lighting
64 Communications
65 Security and Protection
66 Transport
67 Reserved
68 Other Services (Mainly Electrical)
Subtotal
Project Indirect (Building part)
0.00
% of total
cost
0.00
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
0.00
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
0.00
0.00
0.00
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
0.00
0.00
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
0.00
0.00
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
0.00
0.00
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
0.00
0.00
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
0.00
0.00
0.00
0.00
Notes
0.00
0.00
0.00
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
Err:518
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Subtotal
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL
0.00
0.00
0.00
0.00
External Works
90 Site Direct
10 Prepared Site
20 Site Structures
30 Site Enclosures
40 Roads, Paths and Pavings
50 Site Services (Mainly Piped and Ducted)
60 Site Services (Mainly Electrical)
70 Site Fittings
80 Landscape play areas
Subtotal
0.00
Substructure
Work below the underside of the lowest screed, or, where no screed exists, below the top of the lowest floor.
Excluded is all work related to (10) PREPARED SITE.
Total Cost from Cost Breakdown:
Item
0.00
Notes
Structure
The primary structural carcass above the substructure, including all secondary items and finishes which are
integral with the structure.
Total Cost from Cost Breakdown:
Item
0.00
Notes
Structure Completions
Non-integral secondary items or work to the structure, including the completions of openings in the structure.
Total Cost from Cost Breakdown:
Item
0.00
Notes
Finishes
Applied finishes to a surface which is already in position including preparatory work, sub-layers and supports.
Total Cost from Cost Breakdown:
Item
0.00
Notes
0.00
Notes
0.00
Notes
0.00
Notes
0.00
Notes
0.00
Notes