You are on page 1of 8

ABSTRACT

Android is a software stack for mobile devices that includes an operating system,
middleware and key applications. This Project is an android based application. The main aim of
our project is to automatically insert all the data into database by scanning the receipt received
and automatically reduced items in database when the customer buys products. In previous
system the received receipt details are inserted manually into the database. In this paper we have
proposed a new technique where the receipts are scanned and the details are inserted
automatically into the database and automatically reduced items in database when the customer
buys products. This new technique is very helpful to restore the values into database and thus
reduces manual work. This technique is performed by scanning the receipt through an android
mobile.

OBJECTIVE/SCOPE:
Main objective of our project is given below,

The capital cold of our activity is to automatically admit all the abstracts into database by

scanning the receipt.


Automatically bargain items in database if the customer buys products.

INTRODUCTION:
In this project we proposed a new address area the receipts are scanned the user that data are
amid automatically into the database and if customer buy the product that account will be
automatically decreased in database. Here the user will upload all the product details that will be

saved in database automatically and if customer will buy the products that will changes the
database regarding to customer buying product.
PROBLEM FORMULATION:

In previous system the received datas details are inserted manually into the database.
It will take long time.
It may cause the error.

PROPOSED:

In this paper we have proposed a new technique where the receipts are scanned and the

details are inserted automatically into the database.


This new technique is very helpful to restore the values into database and thus reduces

manual work.
This technique is performed by scanning the datas through an android mobile.

REQUIRED SOFTWARE / HARDWARE:


HARDWARE REQUIREMENTS:

Android mobile

SOFTWARE REQUIREMENTS:

Eclipse
Android-sdk version 2.2

BLOCK DIAGRAM FOR PROPOSED:

Module design:

User module
Admin module
Customer module

1. User module:
User module contains following three main functionality,
User registration
User login
Upload datas
User registration:
In this module User will register their details like name, DOB, emailed, address, contact,
etc

User login:
After user registration the user will enter into the Login page to upload the medicine
details.
Upload datas:
In this module the user will upload the scanned medicine products datas (serial no,
medicine name, quantity, price etc...) into the app.
2. Admin module:
Admin is responsible for entire system functionality. Here the admin will have 3main
functionality,

User details
User documents
Final report

User details:
In this page admin will view all the user details (which is given in the registration page)
User documents:
In this page admin will view all the user uploaded documents (which is uploaded in uploaded
datas page).
Final Report:
Report module will contains the final report of product status (quantity) .
3. Customer module:

Customer module contains following three main functionality,


Customer registration
Customer login
Buy medicine
Customer registration:
In this module Customer will register their details like name, DOB, emailed, address,
contact, etc
Customer login:
After Customer registration the Customer will enter into the Login page to buy the
medicine.
Buy medicine:
In this module the Customer will enter into the app to buy the medicine products.

REQUIREMENTS:
PERSPECTIVE/SCOPE:
Main scope of our project is given below,

The main objective of our project is to automatically insert the medicine datas into

database by scanning the data.


Automatically decrease the datas in database when customer buy the products.

FEASIBILITY ANALYSIS:

Operational Feasibility
Technical Feasibility
Schedule Feasibility
Economic Feasibility

OPERATIONAL FEASIBILITY

Computerized examinations results management system for students


Monitor and categorized regularly
Predict the future performance
Provides flexibility
Suitably modified to manage and preserve academic records

TECHNICAL FEASIBILITY:

Possible in real time


More accessible
Reduces time consumption
Reduces manual calculations

SCHEDULE FEASIBILITY:

Schedule Feasibility
01/Feb/16

21/Feb/16

START DATE

ECONOMIC FEASIBILITY:

Less cost
Fast response
Flexible

DESIGN:
DFD0:

DFD1:

12/Mar/16

DURATION

01/Apr/16

21/Apr/16

DFD2:

You might also like