f p
f p p f f p
where
AV SS is the robot system steady availability
p
is the robot system preventative maintenance rate
Solution:
p
Robot down
for preventive
Robot
Operating
maintenance
Robot Failed
Po (t t ) Po (t )(1 f t )(1 p t ) P f (t ) f t Pp (t ) p t
P f (t t ) P f (t )(1 f t ) Po (t ) f t
Pp (t t ) Pp (t )(1 p t ) Po (t ) p t
Po (t t ) Po (t ) ( f p ) Po (t )t P f (t ) f t Pp (t ) p t
P (t t ) Po (t )
lim o
( f p ) Po (t ) P f (t ) f Pp (t ) p
t
t 0
dPo (t )
( f p ) Po (t ) P f (t ) f Pp (t ) p
dt
dPp (t )
dt
dP f (t )
p Pp (t ) Po (t ) p
f P f (t ) Po (t ) f
dt
At _ time _ t 0, Po (0) 1, Pp (0) P f (0) 0
f (t ) lim sf ( s )
Final value Theorem: tlim
0
s 0
sPo ( s ) Po ( s ) ( f p ) Po ( s ) Pp ( s ) p Pf ( s ) f
sPo ( s ) 1 ( f p ) Po ( s ) Pp ( s ) p Pf ( s ) f
sPp ( s ) p Pp ( s ) Po ( s ) p
Pp ( s )
Po ( s ) p
s p
sPf ( s ) f Pf ( s ) Po ( s ) f
Pf ( s )
Po ( s ) f
s f
( s f )( s p )
s s s( f p p f ) f p p f f p
2
A s 2 s( f p p f ) f p p f f p
Pp ( s )
Pf ( s )
f (s p )
sA
p (s f )
sA
f p
f p p f f p
2. (a) What are the four classifications of reliability cost? Discuss each category in
detail.
(b) List at least ten major responsibilities of a reliability engineering department.
Solutions:
(a) Reliability cost = PC+ AC + IFC + EFC
Prevention Cost:
- Redundancy
- Parts
- Hourly cost and overhead rates for design engineers, reliability engineers,
etc
Appraisal Cost:
(b)
(a)
-
(t)
Burn-in period
t
Has three time periods: burn-in period, useful life period, and wear out period.
(t ) kct c1 (1 k )bt b1 e t
output
inputs
The AND gate denotes that an output event occurs if and only if all the input events
occur.
OR Gate:
output
inputs
The OR gate denotes that an output event occurs if any one or more of the input events
occur.
Cumulative Distribution Function:
t
F (t )
f ( x)dx
0
R (t ) 1 F (t ) exp t
f (t )
(t )
R(t )
4. Prove that the mean time to failure of a parallel system is given by:
1
j 1 j
MTTF
is the mean time to failure of a unit with exponentially distributed failure times
n is the total number of units in the system
R p 1 1 exp t
MTTF p
1 1 exp t
R p (t )dt
dt
u 1 exp t
du exp t dt dt
du
du
exp t
1 u
t 0 u 0, t u 1
1
n
n
n
1 un
ui 1
1
MTTFp
du u i 1du |
0
1 u
i 1 i
i 1 i
0
0 i 1
where
is the constant failure rate of the system
is the constant repair rate of the system
Solution:
System operating
P0 t t P0 (t )1 t P1 (t ) t
P1 t t P1 (t )1 t P0 (t )t
s P0 ( s) 1 P1 ( s)
P0 ( s )
P1 ( s )
s s
sP1 ( s ) P1 (0) P1 ( s ) P0 ( s )
s P1 ( s) P0 ( s)
System failed
1
P1 ( s )
P0 ( s )
s
P0 ( s )
P0 ( s )
s s s
1
P0 ( s ) 1
s
s
s
P0 ( s )
2
s s s s
P1 ( s )
s s2 s s2 s
s 0
UAV ss
4. Obtain hazard rate expressions for the following failure probability density,
f(t), and reliability, R(t), functions:
(i) f (t ) e t
1
(ii) R (t ) e t
where t is time
Solution:
(i ) F (t ) 1 exp t
R (t ) 1 F (t ) exp t
(t )
f (t ) exp t
R (t )
exp t
(ii ) (t )
1 dR (t )
R (t ) dt
1
1
exp t
t
1
1
exp t
1
t