Start vacuum pulling by taking starting ejector in service
With steam pressure 6kg/cm2 and after 400mmHg take
main ejector in service & stop starting ejector.
(15)
4
(18)
(19)
(23)
(26)
(27)
(29)
(31)
Tube all the readings as per log sheet & see all equipments
are running normal.
(32)
8
(33)
(34)
At load 60 mw to 70 MW:
1. Put HP heaters in service, charge the HP heaters from
water side and steam side. Close the HP extraction drain
(35)
valve.
9
At Load 150 MW:1. Change over steam supply to dearator from 2nd to 3rd
extraction.
2. When condensate flow increase to 300t/hrs.
partly open
the bypass valves of main ejector, gland system cooler &
LPH-1
3. Change over HP heater 6 drip from dearator to heater-5
4. Similarly change LP heater-4 to dearator.
At low 210 mw:1. Set the point of HP by pass valves pressure control loop at 140
kg/cm2 with help of PB.
2. Change over the manual mode of pressure control loops of HP
by pass valves to auto with the help ofB.P.
3. Set the LP by pass valve pressure set point to 6.00 kg/cm2 at
temperature set point at 200 c
4. Change Over the LP by pass operation from manual mode to
auto mode with pressure controller loop.
(37)
(38)
10
Prepared by
Khan Habib Khan