JOB HAZARD ANALYSIS


Subject of JHA

LIFTING BUILDING
MATERIAL USING
CRANE

JOB HAZARD ANALYSIS (JHA)

SECL Discipline P/C

Discipline

SECL Site HSE Manager

Reviewed by

Sign.

Analyzed by

SECL Construction Manager


Sign.

Approved by

Date

Date

Date

IBS Construction Manager

IBS HSE Manager

IBS Site Manager

Agreed by

Sign.

Date
No
1

Approved by

Sign.

Date
Activity
Pre job planning
and preparation

Necessary tools
&
equipment available in
bad condition or not
functioning.
Heat stress if work
carried
out
during
summer.
Simultaneous/conflictin

Sign.

Approved by

Sign.

Date

Potential Hazards

Civil Arch Elec Mech


Other __Building_________

Preventative Measures

Responsib
ilities

Rem
ark

Site
Ensure that appropriate permit to work is in place
and work site thoroughly inspected, get familiar with Engineer &
Supervisor
other obstruction.
Conduct tool box meeting and explain expected
hazards and necessary precautions.
All necessary tools & equipment available must be in
good condition and proper functioning.
Maintain a comfortable distance from different work
1

P0-QA20-F-NNN
CRANE LIFTING

Setting
Crane
for
the load to
be lifted

g operation, condition
such loading/unloading,
rig working nearby
Grinding/Welding/Liftin
g/Cutting at work site.
Collision with workers
and
vehicles
in
boundaries.
Poor arrangement and
housekeeping
in
surroundings
Collapse
due
to
damaged
sill
of
outriggers
Hand Injury to the
rigger.
Failure of slings or Dshackles.
Collision of workers
working close to range
Falling objects hazard
due to lifting different
types of materials
Due to lifting heavy
materials such as
blocks, bricks or bags it
can break the pallet
and may fall on ground

activities, be more attentive make aware of your work


to other crew.
Maintain minimum distance of 4 meters from
overhead power line.
Check surrounding area, ground condition, wind
condition, overhead power lines.
Check lifting capacity of Crane and radius of
operation.
Ensure Crane is placed on hard, level ground,
outriggers fully extended, placed under timber mats
and must be in good condition.
Ensure the Crane is having spark arrester when
working in restricted area

Site
Keep hands out of pinch point while rigging, Use
Engineer &
hand gloves.
Supervisor
Ensure that the slings and shackles are inspected
and in good conditions.
Know the weight to be lifted and its configuration,
Check Weather condition ,
Wind speed(low, high)
Emphasis more to STOP WORK if they see anything
unsafe.
Do not use damaged pallets and do not overload the
pallets
Ensure the lifting of same size of materials to avoid
falling objects
Restrict the workers not to work near the boom range

P0-QA20-F-NNN
CRANE LIFTING
3

Lifting the
load

Lifted material falling.


Hitting people or
existing facility.
Crane losing balance.
While lifting any
material it can be
collide or cut the wire
rope and crane can be
collapse due to that
reasons

Barricade the area of Crane operation place warning. Site


Engineer &
Check rigging before lifting.
Supervisor
Ensure lifted load is properly balanced.
Stop lifting if wind is getting strong and poor visibility.
Refer to load chart and radius of operation.
Assign one man to give signal to crane operator.
Use tagline to control suspended load.
Use safety glasses, gloves. Keep other people clear
of immediate area.
Provide safe guards for sharp edges to avoid sling
cut.

.
4

Unloading
the load

Rolling/tilting of
material.
Damaging other
existing facility.
Hand injury to rigger.
Injury to personnel by
falling of material
Due to unload on
unstable condition of
ground or any place it
can collapse and hit
workers.
Due to pile of materials
more than 1.5m, it can
be collapse and hit

Assign one man to signal and this man controls


Site
movement of Crane -Know the weight to be lifted.
Engineer &
Ensure to place Wooden packing between load
Supervisor
Use proper slinging method to carry Site office at
work location
Position body out of line of loading and unloading.
Keep hands well away from (Load) site office ends.
Know the weight to be lifted.
Use tagline to control suspended load.
Position yourself to safer position for emergency exit
at workplace.
Ensure the site is thoroughly inspected for possible
obstruction in route and location of unloading.
Ensure their enough clearance for Crane movement
back and forth.
Use proper slinging method to (Load) Site office at
work location.
Do not over stack the materials.
Stack the material properly on firm ground.
3

P0-QA20-F-NNN
CRANE LIFTING

Clean work
site, Work
Completed,
final
thorough
check
up,
hand over

Incorrect placing

Correct missing item.


Remove all surplus supports, pipes, trashes.

Site
Engineer &
Supervisor