SECTION 012300 ALTERNATES

PART 1 - GENERAL

SCHEDULE 0 - SUMMARY
PRODUCT DATA SHEET 0 - Related Documents:
0.1
Drawings and general provisions of the Subcontract apply to this Section.
0.2
Review these documents for coordination with additional requirements and information that apply to work
under this Section.
PRODUCT DATA SHEET 1 - Section Includes:
1.1
This section identifies each Alternate and describes basic changes to Work only when that Alternate is made a
part of the Work by specific provision in the Subcontract
1.2
Base Bid and Alternates include costs of all supporting elements required, so that the combination of Base Bid
and any Alternates are complete.
1.3
The scope of work for Alternates shall be in accordance with applicable Drawings and Specifications.
PRODUCT DATA SHEET 2 - Related Sections:
2.1
Division 01 Section "General Requirements."
2.2
Division 01 Section "Special Procedures."
<Add sections where alternate work is described.>
PRODUCT DATA SHEET 3 - Except as otherwise indicated, complete work described in Alternates with no increase in
Subcontract Time.
PRODUCT DATA SHEET 4 - This section includes non-technical descriptions of Alternates. Refer to specific sections of
the Specifications and to Drawings for technical descriptions of Alternates.
PRODUCT DATA SHEET 5 - Coordinate related work and modify surrounding work as required to integrate Alternates into
the Work.
PRODUCT DATA SHEET 6 - Base Bid includes all work indicated, except work described as Alternates.
PRODUCT DATA SHEET 7 - University reserves the right to award none, any one, or more in any order, or all Alternates
in combination with work covered by Base Bid.
PRODUCT DATA SHEET 8 - Alternates will not be awarded without awarding Base Bid.
PRODUCT DATA SHEET 9 - University reserves the right to determine low bid as Base Bid alone or sum of Base Bid and
any combination of Alternates.
PRODUCT DATA SHEET 10 - Each Alternate is intended to cover all work required for a complete finished job.
PRODUCT DATA SHEET 11 - Alternates are [additive] [deductive] to the Base Bid. Provide costs in appropriate spaces
provided on Bid Form.
PRODUCT DATA SHEET 12 - Submit bids for Base Bid and all Alternates listed on Bid Form. Failure to quote an amount,
or insertion of the words "no bid," "none" or words of similar meaning, will be considered as not completing the proposal
and may constitute disqualification of entire bid, at University's discretion. When there is no change in base bid due to
using the Alternate, use the words "No Change". The words "No Change" will be interpreted to mean that work described
in the Alternate shall be completed at no adjustment or change in cost of Base Bid.
PRODUCT DATA SHEET 13 - Base Bid and Alternates are exclusive in their scope of work. There is no overlap between
or among Base Bid and Alternates. The cost of any item of work shall be included only once, in Base Bid or in Alternates.

LBNL Facilities Master Specifications


Alternates

012300-1

Revised
09/08

BUILDING NO.
PROJECT NAME

SC#

SCHEDULE 1 - DESCRIPTION OF [ADDITIVE] [DEDUCTIVE] ALTERNATES


<Here, briefly describe alternates, such as "Additive Alternate 1: Computerized water-jet cutting of resilient
flooring as specified in Division 07 Section "Above Grade Vapor Retarders" and shown on Drawing A2.">

PRODUCT DATA SHEET 0 - [Additive] [Deductive] Alternate 1:


PRODUCT DATA SHEET 1 - [Additive] [Deductive] Alternate 2:
PRODUCT DATA SHEET 2 - [Additive] [Deductive] Alternate 3:

PART 2 - PRODUCTS NOT USED

PART 3 - EXECUTION

NOT USED
END OF SECTION 012300