Professional Documents
Culture Documents
Pgina
S10
Presupuesto
Lugar
0103001
CONSTRUCCION DE PISTAS Y VEREDAS BARRIO SAN MARTIN ALTO PROVINCIA DE UTCUBAMBA-AMAZONAS
CONSTRUCCION DE PISTAS Y VEREDAS BARRIO SAN MARTIN ALTO
002
Costo al
MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA
AMAZONAS - UTCUBAMBA - BAGUA GRANDE
Item
Descripcin
01
OBRAS PROVISIONALES
01.01
1.00
1,871.95
01.02
mes
4.00
600.00
02
PAVIMENTOS
Presupuesto
Subpresupuesto
Cliente
Und.
Metrado
Precio S/.
30/05/2015
Parcial S/.
4,271.95
1,871.95
2,400.00
1,290,423.89
02.01
TRABAJOS PRELIMINARES
02.01.01
m2
6,007.37
4.99
02.01.02
m2
6,007.37
0.97
02.02
MOVIMIENTO DE TIERRAS
02.02.01
m3
7,282.14
4.60
33,497.84
02.02.02
m2
6,007.37
4.94
29,676.41
02.02.03
m2
6,007.37
13.75
82,601.34
02.02.04
m2
6,007.37
7.20
02.03
CONCRETO SIMPLE
02.03.01
m2
6,007.37
82.31
02.03.02
m3
263.26
268.37
70,651.09
02.03.03
m2
3,504.61
51.59
180,802.83
02.03.04
14.00
599.09
02.04
CURADO
02.04.01
02.05
JUNTAS
02.05.01
35,803.93
29,976.78
5,827.15
189,028.65
43,253.06
754,307.80
494,466.62
8,387.26
20,965.72
m2
6,007.37
3.49
20,965.72
2,292.49
1.75
4,011.86
02.05.02
254.40
34.07
8,667.41
02.05.03
418.62
16.01
6,702.11
02.05.04
1,902.45
20.74
39,456.81
58,838.19
02.06
ACERO LISO
02.06.01
1,372.80
18.16
24,930.05
02.06.02
919.69
5.72
5,260.63
02.07
SEALIZACION
02.07.01
SEAILZACION HORIZONTALES
02.07.01.01
02.07.02
SEALIZACION VERTICAL
02.07.02.01
02.08
02.08.01
03
VEREDAS
03.01
TRABAJOS PRELIMINARES
03.01.01
m2
2,741.67
03.01.02
m2
2,741.67
0.97
2,659.42
03.01.03
m2
945.16
15.50
14,649.98
03.01.04
m2
62.90
33.21
03.02
MOVIMIENTO DE TIERRAS
30,190.68
4,124.87
3,026.63
m2
441.20
6.86
3,026.63
16.00
68.64
1,098.24
9,102.68
21.66
197,164.05
1,098.24
u
197,164.05
m3
369,722.57
33,079.24
4.99
13,680.93
2,088.91
71,770.86
03.02.01
m3
1,100.78
26.60
29,280.75
03.02.02
m2
2,751.95
6.23
17,144.65
03.02.03
m2
2,751.95
9.21
03.03
CONCRETO SIMPLE
03.03.01
m2
2,562.10
54.99
140,889.88
03.03.02
m2
189.85
58.24
11,056.86
03.03.03
m2
1,970.10
17.63
34,732.86
03.04
JUNTAS Y BRUADO
03.04.01
625.20
10.49
6,558.35
03.04.02
Bruado De Veredas
5,503.00
4.66
25,643.98
03.04.03
Bruado De Rampas
890.40
5.19
03.05
CURADO
03.05.01
03.06
25,345.46
186,679.60
36,823.51
4,621.18
10,484.93
m2
2,751.95
3.81
10,484.93
8,531.74
Pgina
S10
Presupuesto
Lugar
0103001
CONSTRUCCION DE PISTAS Y VEREDAS BARRIO SAN MARTIN ALTO PROVINCIA DE UTCUBAMBA-AMAZONAS
CONSTRUCCION DE PISTAS Y VEREDAS BARRIO SAN MARTIN ALTO
002
Costo al
MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA
AMAZONAS - UTCUBAMBA - BAGUA GRANDE
Item
Descripcin
Und.
03.06.01
149.00
23.63
03.06.02
149.00
33.63
03.07
03.07.01
04
SARDINLES
04.01
TRABAJOS PRELIMINARES
04.01.01
m2
389.50
4.99
1,943.61
04.01.02
m2
389.50
0.97
377.82
04.02
MOVIMIENTO DE TIERRAS
04.02.01
m3
233.70
26.60
6,216.42
04.03
CONCRETO SIMPLE
04.03.01
m3
194.75
342.66
66,733.04
04.03.02
Encofrado y Desencofrado
m2
2,025.37
41.69
84,437.68
04.03.03
kg
6,006.39
4.71
28,290.10
04.03.04
130.25
7.99
1,040.70
04.03.05
m2
467.39
40.99
19,158.32
04.03.06
m2
623.19
3.84
2,393.05
04.04
04.04.01
m3
292.12
21.66
6,327.32
05
CUNETAS RECTANGULARES
05.01
TRABAJOS PRELIMINARES
05.01.01
m2
1,019.15
4.99
5,085.56
05.01.02
m2
1,019.15
0.97
988.58
05.02
MOVIMIENTO DE TIERRAS
05.03
m3
509.57
24.32
05.04
CONCRETO SIMPLE
05.04.01
m3
212.32
342.66
72,753.57
05.04.02
kg
4,871.44
4.71
22,944.48
05.04.03
Encofrado y Desencofrado
m2
2,038.30
41.69
84,976.73
05.04.04
m2
2,123.23
40.99
87,031.20
05.04.05
m2
2,972.52
3.81
11,325.30
05.04.06
m3
41.62
575.36
23,946.48
05.05
05.05.01
m3
636.97
21.66
13,796.77
06
MURO DE CONTENCION
06.01
TRABAJOS PRELIMINARES
06.01.01
m2
90.48
4.99
06.01.02
m2
90.48
0.97
06.02
MOVIMIENTO DE TIERRAS
06.02.01
m3
25.44
31.00
06.02.02
m3
9.05
59.17
06.03
CONCRETO SIMPLE
06.03.01
06.04
06.04.01
m2
56.55
47.53
06.04.02
kg
1,097.91
4.60
5,050.39
06.04.03
m3
20.36
513.74
10,459.75
06.05
JUNTAS
06.05.01
Juntas de Dilatacin en Muro y Losa Inferior con water stop 6" cada 9.00 m.
5.00
39.17
195.85
06.06
06.06.01
m3
21.80
21.66
472.19
07
AREAS VERDES
07.01
m2
2,504.15
5.71
14,298.70
07.02
m3
500.83
25.34
12,691.03
Presupuesto
Subpresupuesto
Cliente
Metrado
Precio S/.
30/05/2015
Parcial S/.
3,520.87
5,010.87
22,352.69
m3
1,031.98
21.66
22,352.69
216,918.06
2,321.43
6,216.42
202,052.89
6,327.32
335,241.41
6,074.14
12,392.74
302,977.76
13,796.77
21,934.59
539.27
451.50
87.77
1,324.13
788.64
535.49
1,205.19
m2
45.24
26.64
1,205.19
18,197.96
2,687.82
195.85
472.19
103,956.34
Pgina
S10
Presupuesto
Lugar
0103001
CONSTRUCCION DE PISTAS Y VEREDAS BARRIO SAN MARTIN ALTO PROVINCIA DE UTCUBAMBA-AMAZONAS
CONSTRUCCION DE PISTAS Y VEREDAS BARRIO SAN MARTIN ALTO
002
Costo al
MUNICIPALIDAD PROVINCIAL DE UTCUBAMBA
AMAZONAS - UTCUBAMBA - BAGUA GRANDE
Item
Descripcin
07.03
m2
2,504.15
13.59
34,031.40
07.04
Sembria De Gras
m2
2,504.15
9.40
23,539.01
07.05
227.00
25.71
5,836.17
07.06
m3
626.04
21.66
13,560.03
08
VARIOS
08.01
m2
12,226.44
0.76
9,292.09
Presupuesto
Subpresupuesto
Cliente
Und.
Metrado
Precio S/.
30/05/2015
Parcial S/.
9,292.09
COSTO DIRECTO
GASTOS GENERALES (10%)
UTILIDAD (5%)
2,351,760.90
235,176.09
117,588.05
=================
SUB TOTAL
IGV (18%)
2,704,525.04
486,814.51
2,351,760.90
3,191,339.55
=================
PRESUPUESTO TOTAL
SON :
TRES MILLONES CIENTONOVENTA Y UN MIL TRESCIENTOS TREINTA Y NUEVE Y 55/100 NUEVOS SOLES
3,191,339.55