Efciency improvements
Much has happened during the 22 years between the commissioning of Units 2 and 3. Using roughly the same quantity
of coal, electricity production and, in particular, district
heating capacity have improved radically.
171-metre stack
Take two Statues of Liberty and put them on top of each
other. That gives you approximately the same height as the
Unit 3 stack. Cast day and night, the stack took 831 hours to
complete, with a truck arriving every hour with concrete.
Technical specications
Unit 2
Unit 3
Gas turbine
Commissioned
1977
1998
1977
305 MW
411 MW
25 MW
42 MJ/s
420 MJ/s
105 t/h
118 t/h
Steam pressure
198 bars
289 bars
Steam temperature
535 C
582 C
into liquid form and returned to the boiler for another heating
process. This is a closed cycle. The steam is cooled with water
from the Liim Fiord.
Once cleaned (see next page), the ue gas is emitted through
the 171-metre-tall stack (6).
2
1
Kul
3A
4
7
8
7
and district heat also offers total fuel utilisation of as much as Suspended limestone supplied by the Aalborg Portland
91% of the energy burnt in the boiler. The high fuel utilisation cement factory is used for desulphurisation. The gypsum
efciency means less waste and, therefore, less pollution.
derived from this process is then returned to Portland for use
in the factorys cement production. The yash is also used in
Creative reuse
the cement and concrete industry.
In 1992 Nordjylland Power Station was awarded the international McGraw-Hills Prize in recognition of the worlds rst
Hence, Nordjylland Power Station manifests its consistent
SNOX plant. It cleans the ue gas of sulphur dioxide and
focus on the environment in its creative reuse policy of
nitrogen oxides and was built for Unit 2. A residual product
utilising residual products from operations as raw materials
from this cleaning process, almost pure sulphuric acid, is sold in other industrial contexts. In brief: An industrial symbiosis
to the fertiliser industry, among others.
with environmental and economic benets.
Unit 3 is equipped not only with an electro lter for collecting
yash, but also with an efcient desulphurisation plant.
NEW STRENGTH TO
DANISH ENERGY
Vattenfall is a relatively new player in the Danish market for heat and electricity generation. In addition
to Nordjylland Power Station, we own and operate Amager Power Station, Fyn Power Station as well as
small-scale CHP plants in Hillerd and Elsinore and a host of wind turbines in Jutland and on Funen. In
spite of our short period of operation in Denmark, we have already invested DKK 2.6 billion in a broad
spectrum of innovative projects, including multifuel plants at Amager Power Station and deNOX plants
and a straw-red plant at Fyn Power Station. In all their diversity, these projects also share a common
feature: The improved environmental impact on Danish heat and electricity generation.
A MAJOR EUROPEAN PLAYER
Vattenfall is Europes fourth-largest generator of electricity,
operating in Sweden, Finland, Germany, Poland and now also
Denmark. We are active at all stages of the electricity value
chain. That means generation, transmission, distribution and
sale. Vattenfall also generates, distributes and sells heat and
energy-related services. The Vattenfall group employs more
than 35,000 people, and the parent company, Vattenfall AB,
is wholly owned by the Swedish state.
Vattenfall in Denmark is part of Business Group Vattenfall
Nordic, which counts about 9,000 employees in Sweden,
12
Henning G. Jensen
Mayor
City of Aalborg
15
Vattenfall A/S
Generation Nordic, Thermal Power
Nordjylland Power Station
Nefovej 50
9310 Vodskov
Tel. +45 88 27 50 00