You are on page 1of 250

SYNOPSIS

1. Title of the Project:- Planning and Construction of Residential


Township Project with required amenities like Primary School,
Culverts , Surface Drain and Internal Roads.
2. Objective of the Project:- Presently I am working in the New Town
Kolkata Development Authority under Urban Development. In the
new Project it has been decided to accommodate 100 families
comprising of 5members in each family. As it is a township project it
has been felt necessary to provide amenities of various types like
Primary School Building, Culverts, Internal Roads, Surface Drains
etc.
3. Rationale of the Study:- This project of preparation of a township
for accommodation includes detailed study of site conditions,
detailed preparation of designs for framed buildings, detailed
preparation of drawings and estimates.
4. Detailed Methodology to be used for carrying out the
Project: Detailed study of purpose of project and facilities to be
provided.
Detailed study of Site Conditions determined by Geotechnical
investigations.
Detailed Study of facilities to be provided by a Municipal
Authority.
Detailed description of Building Bylaws to be followed and its
various principles.
Preparation of Detailed Site Plan maintaining the Bylaws
regulations.
Preparation of Architectural Plan for the Residential Building
and its detailed drawings and Quantity Estimates followed by
Abstract of Cost.
Preparation of Architectural Plan for the Framed Primary
School.
Preparation of Structural Design for the Primary School.
Preparation of Quantity Estimates for the Primary School
followed by the Abstract of cost.
Prepration of Design, Drawings and Estimates of Septic Tank,
Soak Pit, Internal Roads, Culverts etc.
5.

INTRODUCTION OF CIVIL PROJECT

It has been proposed to prepare a project report for a housing complex


for MIG. In one sentence it can be said that this project work is the
application of all the basic knowledge of what we have learn in our three
year diploma in Civil Engineering course. For this reason we have given a
project of residential complex of MIG. This complex is to be construction
for providing accommodation of 100 families and each family having 5
members.
The available land is in rectangular shape having dimensions 225m x
650m, whose frontage is along the National Highway. The existing G.L of
the land is 0.6m below the crest of 30m highway.
The covered area is within 40 - 45% of the open areas.
The brick masonry building is three storied and each storied consist of two
flats. It has two build up as per Municipality rules.
The complex has a primary school inside.
The main trunk road within the complex is 10 m wide and cross roads are
6m wide. The building entry roads are made of brick pavements having
2m wide.
At least one play ground having dimensions 30m x 60m have to be
provide for children of every 10 buildings, in addition to that there will be
a library, a community centre, a shopping complex and a Hospital.
The jobs undertaken by us of our GROUP A are as follows1. We have prepared a site plan showing location of all building units,
School building, Community centre, Library, Roads, Hospital & Water
supply schemes e.g.
2. We have made sectional plans of flat buildings & school buildings
Ground floor
Typical floor
Door & Window schedule
Sanitary & Plumbing arrangement with fixtures
Septic tank
3. Front & Side elevation of buildings.
4. Two sections (through stair & other through toilets).
5. Choice of specification.

6. Structural design of foundation, slabs, beams, columns with footing,


stairs e.g. with detail reports by computer printout & necessary sketches.
7. Detail drawing of RCC elements with all reinforcement on drawing
sheet marking ammonia print or by Auto CAD.
8. Overall specification of all items.
9. Detailed estimate of school building with latest PWD rates.
10. Estimate of road project.
11. Complete the whole project by the bar chart which shows the time
duration of all item of work.
All these jobs have been handled by us & we completed the whole
project within the schedule time.

INFORMATION ABOUT THE PROJECT


SITE
1.
2.
3.
4.

Topography- Flat land with depression in certain places.


Water Logging Tendency- Moderate
Approximate Depth of Filling Required 0.6 m
Nature of Structure of Adjoining Land- Load bearing masonry &

Frame structure.
5. Source of Water Supply- Overhead reservoir & Municipal water
supply.
6. Source of Electricity- West Bengal State Electricity Board
7. Existing Drainage System- Surface drains are present
8. Direction of Wind in Summer- South to North
9. Availability of Material- Good
10. Approximate Safe Bearing Capacity of Soil- 10 ton / m2
11. Angle of Repose- 30
12. Unit weight of Soil- 1.9 ton /m3

FACILITIES OFFERED BY MUNICIPALITIES


The following services are to be provided by the local municipalities.

1 DRAINAGE SYSTEM :

The layout and design of entire drainage system & sewage arrangement is
such that there is no chance of water logging and storm water can be
discharge into the corporation drain to be finally displaced into the river
after proper treatment in sewage treatment plant.
Hence, there is no danger of public health.

2 GARBAGE & WASTE CLEANING :


The municipality works regularly to collect the garbage & dry waste
products from the different part of the locality. Garbage is collection in the
mornings deposited in a dumping ground away from the locality for final
disposal. Thus the locality is kept neat & clean.

3 FILTERED WATER SUPPLY :


Filtered water is supplied to all residential through well-laid networking or
pipelines. The supply of water is for few hours for daily so there is no need
for shrinkage tube well for the inpatients. However an overhead reservoir
have to be constructed to store water temporarily through pumping before
supplying it to all buildings.

4 ROAD MAINTENANCE :
The municipality maintained the road regularly to keep them in good
riding condition throughout the year.

5 ELECTRIC SERVICES :
West Bengal state electricity board provides adequate arrangement
through overhead wires for supplying electrical energy to all the in
habitants. W.B.S.E.B. also provides lighting arrangement for the
pedestrian and automobiles during night travels on the road.

6 MEDICAL AND HOSPITAL FACILITIES :


The municipality runs a modern hospital in this complex to provide people
with necessary medical treatment; well-stocked pharmacies are situated
in the complex.

7 MARKET FACILITIES :
A market has been setup by the municipality having shops, stocking all
goods in required quantities day leaving.

8 PLANTATION :
The municipality and other local development organization promote
plantation of trees in the locality to check environmental pollution and
also to beautiful the landscape.

BUILDING BYLAWS FOR RESIDENTIAL


AREA OF A TYPICAL TOWN PLANNING
SCHEME

The building by laws are framed with legal phraseology and it is not
intended here to give complete description of all the bylaws. The brief
descriptions of all the possible building by laws to be friend for residential
area of a typical town planning scheme are mentioned below.

1) PERMISSIBLE SIZE OF PLOTS: The minimum size of plots required


for each family unit shall be as follows:

100 sq-m to 200 sq-m for b1 family unit.


300 sq-m for two semi detached family unit.
665 sq-m for ownership flats.

2) BUILT UP AREA: The F.S.I shall be 1.00 with maximum utilization up


to 0.40 on ground floor.

3) MARGINS: The margins on roadside and adjacent properties shall be


respectively 4.50m and 3.0m. For plots having areas less than 300
sq-m, they shall be respectively 3m and 2m.

4) 4) AREA OF ROOM:

MINIMUM

AREAS

FOR ROOMS

NO
1.

2.
3.

4.

USE OF ROOM

MINIMUM
AREA

Living
room,
bed
room, 9 sq-m
drawing room, sitting room,
ladies room, dining room,
study room
Store room, kitchen
5.40 sq-m
Bath room, dressing room, Minimum
pump room, water room,
sq-m
Coal room
maximum
sq-m
W.C. urinal
0.81 sq-m

REMARKS
No side to be
less than 2.40m

No
less
1.35 No
and less
4.50

side
than
side
than

to be
1.80m
to be
90cm

No side to be
less than 90cm

5) PLINTH HEIGHT: It shall be 45cm above road level or plot level


whichever is higher.

6) HEIHGT OF FLOOR: The minimum height is as shown here under


1. 10 m bath room , W.C. pump room ,coal room, & water room
2. 70 m floor height on each floor.

The maximum height of floors shall not be more than 1.25 times the
minimum height.

7) LOFT: Provision of loft shall be permitted in kitchen & store. The


maximum height of loft shall be 1/3 rd the width of that direction. The
max height of loft shall be 1.50 m & bottom of loft shall be at a min
height of 2.10 m from floor level.
8) VENTILATION: All rooms except store room, garage shall have at
least one side adjacent to open space. The area of windows &
ventilators excluding frames shall be at least 1/10 th of the floor area
of room.
9) STAIR: The min width of stair shall be 90cm & it shall be made of
fireproof construction. The pitch of stair shall be within 30 to 45the
stair cabin shall not exceed 11 sq.m. in area.
10) MINIMUM REQUIREMENT: One family unit shall be provided with
the min requirement of one living room, one kitchen, one bath room
& one W.C.
11) WATER SUPPLY: For buildings having 2nd floor , the over head
tank of 1800 liters & underground tank with pumping set shall be
provided.
12) DRAINAGE: The longitudinal section of sewer having dia. 15cm or
more shall be given & the feasibility on drainage connection with
public drainage line shall be ascertained where no public drainage
line exists, the soak pit & septic walls shall be allowed.
13) SPECIFICATION FOR MATERIALS & WORKMANSHIP: The
construction work shall be carried out with materials of good quality
& superior workmanship & undertaking to execute the work with
standard materials & good workmanship shall be given by the owner
& by engineer.

PRINCIPLES UNDERLYING BYLAWS:


1. Classifying the building with unit as a family & mentioning the
requirements accordingly.

2. Classifying the rooms accounting to use & then maintaining


minimum standard of each room with respect to size, height, floor
area ratio, ventilation & light.
3.
Controlling the height of compound wall & location of
compound gates.
4. Controlling the height of structure & footing max. Limit of height in
certain zone.
5. Controlling the area of projection in the marginal space.
6.

Insisting suitable F.S.I.

7. Insisting upon suitable arrangement with respect to drainage


&water supply.
8. Making compulsory the appointment of a licensed architect of
engineer for works of the specified nature & magnitude.
9. Making compulsory to construct the buildings with the materials &
the workmanship as per standard specification.
10.

Mentioning the light plane, setbacks & marginal spaces.

11.
etc.

Mention the min. Size of plots, their dimensions & frontages

LIGHT PLANE:
In city area it becomes necessary to check that the height of one
building does not obstruct ventilation of the property on the other
side of the road. For this purpose, a light plane is marked at a
suitable.
Angle from the edge of road on other side & the buildings is curtailed
of to allow the light plane to pass the angle of light plane is 45 or
63.5.

FLOOR SPACE INDEX:


The ratio of total floor area inclusive of walls of all the floors to the
area of land on which the building stands is known as the floor space
index.

FLOOR SPACE INDEX

NO

AREA

F.S.

REMARKS

Residential

Scheme

I
1

Max. allowed on G.F. 0.40

2.

Residential

area
City area

Facing street of more than 12m.

3.

Residential

City area

With
Facing street of less than 12m.

.
1.

4.
5.

USE

Industrial

Scheme

1.50

With
Max. allowed on G.F. 0.50

Commercial

area
Scheme

1.33

Max. allowed on G.F. 0.40

area
All of these minimum requirements are kept in mind at the time of town
planning.

THE PRICIPLES & THE FACILITIES OF THIS TOWN


PLANNING:
1. GREEN BELT: The provision of a green belt on the periphery of town
results in the limitation of its size so that the environment be fresh &
pollution free.
2. HOUSING: Extreme care is taken to provide housing accommodation
to 100 families & there is an also empty suitable land available to
provide housing for sufficient future population. Each residential flat
contains large area having separate bath & W.C., master bed, loft, airy
verandah & no common wall.
3. PUBLIC BUILDING: There is a well-balanced distribution of public
buildings throughout the town.
4. RECREATION CENTRE: Depending upon the size of town enough
space is reserved for the recreation centre such as market with
shopping mall, cinema hall, library & swimming pool also.
5. ROAD SYSTEM: A nicely designed road system will put a great
impression in the minds of people, especially the visitors. It will take
shortest time to go even in the farthest corner.

6. EDUCATION SYSTEM: The town contains a well-designed RCC


structure primary school with a huge campus & play ground for having
primary education in healthy environment.
7. HOSPITAL: The town also contains a hospital for inside & outsiders.
8. WATER SUPPLY SYSTEM: It has a well-designed water supply system
with an overhead tank to provide sufficient amount of water for all the
users of the town.
9. DRAINAGE SYSTEM: There is a well-planned drainage system to left
off the sewage water produced by all the buildings & the swimming
pool also.
10. ZONING: The town is divided into suitable zones such as
commercial zone, industrial zone, education, recreation zone, parking
zone, and traffic island & park. A suitable regulation should be formed
for the development of the zone.

MIG

FLAT
BUILDING
S

GROUND FLOOR PLAN

TYPICAL FLOOR PLAN

ROOF PLAN

FRONT ELEVATION

BACKSIDE ELEVATION

RIGHT SIDE ELEVATION

SECTION ABCD

SECTION EFGH

ESTIMATE OF MIG FLAT

Sl.
No.

Description of Items

I. Substructure
1. Surface
Dressing to an
Average Depth
(i.) Deductions For
Offset at the
Backside
(ii.) Deductions For
Offset at the
Backside beside
Toilet
(iii. Deductions For
) Offset at the
Frontside

Total
Quantity

No.

Length

Breadth

Height

Quantity

19.25
0

14.450

278.16
3

m2

4.735

4.250

20.124

m2

2.250

1.030

2.318

m2

6.500

3.950

25.675

m2
230.04
6

2.

Antitermide

(i.)

Deductions For
Offset at the
Backside
Deductions For
Offset at the
Backside beside
Toilet

(ii.)

(iii.
)

Deductions For
Offset at the
Frontside

(i.)
(ii.)
(iii.
)
4.

5.
(i.)
(ii.)

Earthwork in
Excavation
250mm Th. Main
Walls
125mm Th.
Dwarf Walls for
Verandah
Toe Foundation

Earthwork in
Filling
by earthwork in
foundation
trenches.
Single Brick
Flat Soling
250mm Th. Main
Walls
125mm Th.
Dwarf Walls for
Verandah

Explainator
y
Notes

m2

19.25
0

14.450

278.16
3

m2

4.735

4.250

20.124

m2

2.250

1.030

2.318

m2

6.500

3.950

25.675

m2
230.04
6

3.

Units

m2

137.0
00

1.000

137.00
0

m3

153 - 32 X
1.0/2

14.65
0

0.750

10.988

m3

15.65 - 2
X 1.0/2

1.325

0.800

1.060

m3

1/5th of Excavated Earth

149.04
8

m3

29.810

m3

137.0
00

1.000

0.075

10.275

m3

153 - 32 X
1.0/2

14.65
0

0.750

0.075

0.824

m3

15.65 - 2
X 1.0/2

(iii.
)

Toe Foundation

1.325

0.800

0.075

m3

0.080
11.179

6.

(i.)
(ii.)
(iii.
)

Cement
Concrete In
Foundation
With M-20
Grade Concrete
250mm Th. Main
Walls
125mm Th.
Dwarf Walls for
Verandah
Toe Foundation

137.0
00

1.000

0.150

20.550

m3

153 - 32 X
1.0/2

14.65
0

0.750

0.150

1.648

m3

15.65 - 2
X 1.0/2

1.325

0.800

0.150

0.159

m3
22.357

7.

(i.)

1 Class
Brickwork in
Cement Mortar
(1:4) in
Foundation and
Plinth
Main Walls:875mm Thick

625mm Thick
500mm Thick
375 mm Thick
Deduction for
Door of Stair
Room (D2) 1.2m
wide
Dwarf Walls for
Verandah:625mm Thick
500mm Thick
375mm Thick
250mm Thick
(iii.
)

1
1
1
1
1
1

1
1
1
1

139.0
00
141.0
00
143.0
00
145.0
00
147.0
00
1.200

15.02
5
15.15
0
15.27
5
15.40
0

0.875

0.150

18.244

m3

0.750

0.150

15.863

m3

0.625

0.150

13.406

m3

0.500

0.150

10.875

m3

0.375

0.675

37.209

m3

0.375

0.675

0.304

m3

0.625

0.150

1.409

m3

0.500

0.150

1.136

m3

0.375

0.150

0.859

m3

0.250

0.675

2.599

m3

0.500
0.375
0.250

0.150
0.150
0.600

0.099
0.075
0.199

m3
m3
m3

Toe Foundation:500mm Thick


375mm Thick
250mm Thick

1
1
1

1.325
1.325
1.325

101.66
9
8.

m3

st

750mm Thick

(ii.)

m3

Sand Filling for


Plinth
Bed Room

3.500

3.750

0.385

10.106

m3

m3

153 - 32 X
0.875/2
153 - 32 X
0.750/2
153 - 32 X
0.625/2
153 - 32 X
0.500/2
153 - 32 X
0.375/2

15.65 - 2
X 0.625/2
15.65 - 2
X 0.500/2
15.65 - 2
X 0.375/2
15.65 - 2
X 0.250/2

W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I)
(Part II)
Staircase

2
2
2
2
2
2

0.950
0.950
3.750
0.950
3.750
3.750

0.950
2.250
2.250
1.250
3.500
4.750

0.385
0.385
0.385
0.385
0.385
0.385

0.695
1.646
6.497
0.914
10.106
13.716

m3
m3
m3
m3
m3
m3

2
2

1.300
1.000

0.950
1.575

0.385
0.385

0.951
1.213

m3
m3

2
2
1

1.250
3.825
2.250

3.250
1.250
1.150

0.385
0.385
0.385

3.128
3.682
0.996

m3
m3
m3
53.650

9.
(i.)
(ii.)
(iii.
)
(a.
)

2.5 cm Thick
D.P.C.
250mm Th. Main
Walls
125mm Th.
Dwarf Walls for
Verandah
Toe Foundation
Deduction for
Doors
1.0m wide Doors
(D1)
1.2m wide Doors
(D2)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)

m3

149.0
00

0.250

37.250

m2

153 - 32 X
0.250/2

15.52
5

0.125

1.941

m2

15.65 0.125

1.325

0.250

0.331

m2

10

1.000

0.250

2.500

m2

1.200

0.250

0.300

m2

0.900

0.250

0.900

m2

1.100

0.250

0.550

m2

0.800

0.250

0.400

m2
34.872

m2

Sl.
No.

Description of Items

II. Superstructure
1. Brickwork
I. Ground Floor
(i.) 250 mm Th. Main
Walls
(ii.) 125mm Th.
Dwarf Walls for
Verandah
Below Lintel
Above Lintel
(iii.)

(a.)

(b.)

75mm Th. Brick


Flat Soling
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I)
(Part II)
Staircase
Deduction for
Doors
1.0m wide Doors
(D1)
1.2m wide Doors
(D2)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)
Deduction for

No.

Length

Breadth

Height

Quantity

149.0
00

0.250

3.000

111.75
0

1
1

15.52
5
15.52
5

Total
Quantity

Units

Explainatory
Notes

m3

153 - 32 X
0.250/2

m3

15.65 0.125

0.125

0.600

1.164

m3

0.125

0.900

1.747

m3

2
2
2
2
2
2
2

3.500
0.950
0.950
3.750
0.950
3.750
3.750

3.750
0.950
2.250
2.250
1.250
3.500
4.750

0.075
0.075
0.075
0.075
0.075
0.075
0.075

1.969
0.135
0.321
1.266
0.178
1.969
2.672

m3
m3
m3
m3
m3
m3
m3

2
2

1.300
1.000

0.950
1.575

0.075
0.075

0.185
0.236

m3
m3

2
2
1

1.250
3.825
2.250

3.250
1.250
4.800

0.075
0.075
0.075

0.609
0.717
0.810

m3
m3
m3

10

1.000

0.250

2.100

5.250

m3

1.200

0.250

1.425

0.428

m3

0.900

0.250

2.100

1.890

m3

1.100

0.250

2.100

1.155

m3

0.800

0.250

2.100

0.840

m3

Windows

(c.)

1.0m wide
Windows (W1)
1.5m wide
Windows (W2)
0.6m wide
Windows (W3)
Deduction for
Lintel
Over 250mm Th.
Wall

24

1.000

0.250

1.200

7.200

m3

1.500

0.250

1.200

0.450

m3

0.600

0.250

0.400

0.360

m3

0.250

0.150

5.588

m3

0.125

0.150

0.291

m3

0.250

0.125

5.059

m3

1
1

(d.)
(e.)
(f.)

Deduction for
R.C.C. Slab
Deductions for
Landing of Stairs
Stairs For Plinth
Level

149.0
00
15.52
5
161.9
00

2.750

0.250

0.125

0.086

m3

0.375

1.200

0.600

0.810

m3
98.639

II. 1st Floor


(i.) 250 mm Th. Main
Walls
(ii.) 125mm Th.
Dwarf Walls for
Verandah
Below Lintel
Above Lintel
(a.)

(b.)

(c.)

Deduction for
Doors
1.0m wide Doors
(D1)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)
Deduction for
Windows
1.0m wide
Windows (W1)
1.5m wide
Windows (W2)
0.6m wide
Windows (W3)
Deduction for
Lintel
Over 250mm Th.
Wall
Over 125mm Th.
Wall

149.0
00

0.250

3.000

111.75
0

m3
m3

153 - 32 X
0.250/2
15.65 0.125

1
1

15.52
5
15.52
5

0.125

0.600

1.164

m3

0.125

0.900

1.747

m3
m3

10

1.000

0.250

2.100

5.250

m3

0.900

0.250

2.100

1.890

m3

1.100

0.250

2.100

1.155

m3

0.800

0.250

2.100

0.840

m3
m3

24

1.000

0.250

1.200

7.200

m3

1.500

0.250

1.200

0.900

m3

0.600

0.250

0.400

0.360

m3
m3

1
1

149.0
00
15.52
5

0.250

0.150

5.588

m3

0.125

0.150

0.291

m3

(d.)
(e.)

Deduction for
R.C.C. Slab
Deductions for
Landing of Stairs

161.9
00

0.250

0.125

5.059

m3

2.750

0.250

0.125

0.086

m3
86.042

III. 2nd Floor


(i.) 250 mm Th. Main
Walls
(ii.) 125mm Th.
Dwarf Walls for
Verandah
Below Lintel
Above Lintel
(a.)

(b.)

(c.)

(d.)
(e.)

Deduction for
Doors
1.0m wide Doors
(D1)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)
Deduction for
Windows
1.0m wide
Windows (W1)
1.5m wide
Windows (W2)
0.6m wide
Windows (W3)
Deduction for
Lintel
Over 250mm Th.
Wall
Over 125mm Th.
Wall
Deduction for
R.C.C. Slab
Deductions for
Landing of Stairs

149.0
00

0.250

3.000

111.75
0

m3

(a.)
(b.)
(c.)

Deduction for
Door (D3)
Deduction for
Lintel
Deduction for
R.C.C. Slab

153 - 32 X
0.250/2
15.65 0.125

1
1

15.52
5
15.52
5

0.125

0.600

1.164

m3

0.125

0.900

1.747

m3

10

1.000

0.250

2.100

5.250

m3

0.900

0.250

2.100

1.890

m3

1.100

0.250

2.100

1.155

m3

0.800

0.250

2.100

0.840

m3
m3

24

1.000

0.250

1.200

7.200

m3

1.500

0.250

1.200

0.900

m3

0.600

0.250

0.400

0.360

m3
m3

1
1
1
1

149.0
00
15.52
5
161.9
00
2.750

0.250

0.150

5.588

m3

0.125

0.150

0.291

m3

0.250

0.125

5.059

m3

0.250

0.125

0.086

m3
86.042

IV. Mumty Room

m3

m3

15.60
0

0.250

2.400

9.360

m3

0.900

0.250

2.100

0.473

m3

15.60
0

0.250

0.150

0.585

m3

15.60
0

0.250

0.125

0.488

m3

7.815
IV. Parapet Wall
(a.)

Addition For
Brick Columns

74.96
5

0.125

0.600

5.622

m3

30

0.250

0.125

0.600

0.563

m3
6.185

Total Brickwork in Superstructure


2. Concrete Work
I. Ground Floor
(i.)
Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
100mm Th. P.P.C.
Bed Room
W.C.
Toilet
Kitchen

(ii.)

Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I)
(Part II)
Staircase
Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Roof Slabs.
Over Bed Room
Over W.C. and
Passage
Over Toilet
Over Kitchen
Over Toilet
Over Bed Room
Over Dining
Room
Verandah
(Part I)
(Part II)

m3

284.72
3

m3
m3

2
2

3.500
0.950

3.750
0.950

0.100
0.100

2.625
0.181

m3
m3

2
2

0.950
3.750

2.250
2.250

0.100
0.100

0.428
1.688

m3
m3

2
2
2

0.950
3.750
3.750

1.250
3.500
4.750

0.100
0.100
0.100

0.238
2.625
3.563

m3
m3
m3

2
2

1.300
1.000

0.950
1.575

0.100
0.100

0.247
0.315

m3
m3

2
2
1

1.250
3.825
2.250

3.250
1.250
4.800

0.100
0.100
0.100

0.813
0.956
1.080

m3
m3
m3

4.375

4.125

0.150

5.414

m3

4.375

1.450

0.150

1.903

m3

2
2
2
2

2.875
2.875
2.250
4.500

1.450
3.125
1.875
4.375

0.150
0.150
0.150
0.150

1.251
2.695
1.266
5.906

m3
m3
m3
m3

5.500

4.500

0.150

7.425

m3

2
2

2.125
1.875

5.575
1.875

0.150
0.150

3.554
1.055

m3
m3

(iii.)

(iv.)

Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Lintel
Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Chajja
Over 1.2m wide
Door (D2)
Over 1.0m wide
Window (W1)
Over 1.5m wide
Window(W2)

161.9
00

0.250

0.150

6.071

m3

1.450

0.450

0.700

0.457

m3

20

1.250

0.450

0.700

7.875

m3

1.750

0.450

0.700

1.103

m3
60.731

II. 1st Floor


(i.) Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Roof Slabs.
Over Bed Room

(ii.)

(iii.)

Over W.C. and


Passage
Over Toilet
Over Kitchen
Over Toilet
Over Bed Room
Over Dining
Room
Verandah
(Part I)
(Part II)
Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Lintel
Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Chajja
Over 1.0m wide
Window (W1)
Over 1.5m wide
Window(W2)

m3

4.375

4.125

0.150

5.414

m3

4.375

1.450

0.150

1.903

m3

2
2
2
2

2.875
2.875
2.250
4.500

1.450
3.125
1.875
4.375

0.150
0.150
0.150
0.150

1.251
2.695
1.266
5.906

m3
m3
m3
m3

5.500

4.500

0.150

7.425

m3

2
2

2.125
1.875

5.575
1.875

0.150
0.150

3.554
1.055

m3
m3

161.9
00

0.250

0.150

6.071

m3

20

1.250

0.450

0.700

7.875

m3

1.750

0.450

0.700

1.103

m3
45.518

m3

III. 2nd Floor


(i.) Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Roof Slabs.
Over Bed Room
Over W.C. and
Passage
Over Toilet
Over Kitchen
Over Toilet
Over Bed Room
Over Dining
Room
Verandah
(Part I)
(Part II)
(ii.)

(iii.)

Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Lintel
Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Chajja
Over 1.0m wide
Window (W1)
Over 1.5m wide
Window(W2)

4.375

4.125

0.150

5.414

m3

4.375

1.450

0.150

1.903

m3

2
2
2
2

2.875
2.875
2.250
4.500

1.450
3.125
1.875
4.375

0.150
0.150
0.150
0.150

1.251
2.695
1.266
5.906

m3
m3
m3
m3

5.500

4.500

0.150

7.425

m3

2
2

2.125
1.875

5.575
1.875

0.150
0.150

3.554
1.055

m3
m3

161.9
00

0.250

0.150

6.071

m3

20

1.250

0.450

0.700

7.875

m3

1.750

0.450

0.700

1.103

m3
45.518

IV. Mumty Room


(i.) Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Roof Slabs.
(ii.) Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Chajja of 0.9m
Wide Door (D3)

2.500

5.425

0.150

2.034

m3

1.150

0.450

0.700

0.725

m3

2.759
V. Stairs

m3

m3

(i.)

(ii.)

(iii.)

Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Landings.
Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Waist Slabs.
Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Steps.

1.275

1.2

0.125

1.148

m3

2.630

1.200

0.125

2.367

m3

54

0.250

1.200

0.075

1.215

m3

Total Concrete Work in Superstructure


3. Wood Work
(i.) Salwood work for
frames
(a.) Of Doors:1.0m wide Doors
(D1)
1.2m wide Doors
(D2)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)
(b.) Of Windows:1.0m wide
Windows (W1)

4.730
159.25
4

35mm Thick
Solid Flush Type
Single Leaf Door
Shutters.
1.0m wide Doors
(D1)
1.2m wide Doors
(D2)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)

m3

30

5.300

0.100

0.075

1.193

m3

5.500

0.100

0.075

0.041

m3

12

5.200

0.100

0.075

0.468

m3

5.400

0.100

0.075

0.324

m3

5.100

0.100

0.075

0.230

m3

72

3.500

0.100

0.075

1.890

m3
4.145

(ii.)

m3

2.1 + 0.05
2.15 X 2
1.0
2.15 X 2
1.20
2.15 X 2
1.10
2.15 X 2
0.8

+
+
+
+

m3

30

0.880

2.050

54.120

m2

1.080

2.050

2.214

m2

12

0.780

2.050

19.188

m2

0.980

2.050

16.072

m2

2.10 0.075 +
(0.015 X 2)
= 2.05
1.0 - (2 X
0.075) + 2
X 0.015 =
0.88
1.2 - (2 X
0.075) + 2
X 0.015 =
0.88
0.9 - (2 X
0.075) + 2
X 0.015 =
0.88
1.1 - (2 X
0.075) + 2

0.8m wide Doors


(D5)

0.680

2.050

m2

8.364
99.958

(iii.)

35mm Thick
Glazed Window
Shutters
1.0m wide
Windows (W1)

60

0.880

1.150

m2

60.720
60.720

(iv.)

(a.)

Providing
Annodised
Alluminium Butt
Hinges
125 X 75 X 4 mm
Size For:1.0m wide Doors
(D1)
1.2m wide Doors
(D2)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
100 X 63 X3.2
mm Size For:0.8m wide Doors
(D5)
1.0m wide
Windows (W1)

90

No.

3X1

No.

3X1
2

36

No.

3X8

24

No.

Providing and
Fixing Tower Bolt
300mm long X
12mm dia.
For All Doors (D1,
D2, D3, D4, D5)
For 1.0m wide
Window (W1)

18

No.

3X7
2

216

No.

1X5
7
1X7
2

Providing And
Fixing
Aldrop(Sliding
Bolt) 250mm X
18mm dia bolt
1.0m wide Doors
(D1)
1.2m wide Doors
(D2)
1.1m wide Doors
(D4)

No.

57

No.

72

No.
129

(vi.)

No.

3X6

234
(v.)

m2

3X3
0

153
(b.)

m2

No.

1X3
0

30

No.

1X1

No.

1X8

No.
39

No.

X 0.015 =
0.88
0.8 - (2 X
0.075) + 2
X 0.015 =
0.88

(vii.
)

Providing
Anodised
Aluminium Grip
Handle without
Base Plate
450mm grip X
25mm dia rod
For All Doors (D1,
D2, D3, D4, D5)
For 1.0m wide
Window (W1)

1X5
7
1X7
2

57

No.

72

No.
129

(vii.
)

Providing Godrej
Mortice Lock For
Bedrooms and
Drawing Rooms
(D1, D4)

1X3
0

30

No.

30
(ix.)

Providing
Anodised
Aluminium Floor
Door Stopper For
All Doors D1, D2,
D3, D4, D5)

1X5
7

57

Providing 150mm
Long Catch Lock
with Eyes For
Windows (W1)

4. Steel and Iron


Work
(i.) Tor Steel
Reinforcement
Bars in R.C.C.
Works.
(ii.)

(iii.)

(iv.)

(v.)

M.S. Grills for


Steel Windows in
Stair Room (W2)
M.S. Grills for
Steel Windows in
Bath Rooms and
Toilets (W3)
M,S. Ornamental
Grills
1.0m wide
Windows (W1)
1.5m wide
Windows (W2)
0.6m wide
Windows (W3)
M,S. Ornamental
Grills For
Ballustrade

1X7
2

(0.8%) of Volume of Concrete


159.255 X 0.8/100 X 78.5

No.

No.

57
(x.)

No.

72

No.
No.

72

No.

100.01
2

kg

100.01
2

4.600

0.050

1.150

m2

18

1.500

0.050

1.350

m2

72

0.850

1.050

64.260

m2

1.400

1.400

9.800

m2

18

0.500

0.300

2.700

m2

2.630

0.600

9.468

88.728
5.Plastering and
Pointing
A.Inside Plastering
I. Ground Floor
(i.) 12cm Thick
Cement Plaster
(1:6) to wall.
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I - 3m

(a.)

(b.)

Height Wall)
(Part II 1.5m
Height Wall)
Deduction For
Doors
1.0m wide Doors
(D1)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)
Deduction for
Windows
1.0m wide
Windows (W1)
0.6m wide
Windows (W3)

2
2
2
2
2
2
2

15.60
0
4.800
3.800
6.500
2.700
15.60
0
18.25
0

2.700

84.240

m2

0.900
0.900
2.700
0.900

8.640
6.840
35.100
4.860

m2
m2
m2
m2

2.700

84.240

m2

2.700

98.550

m2

2
2

3.800
2.450

2.700
2.700

20.520
13.230

m2
m2

9.200

2.700

49.680

m2

7.825

1.200

18.780

m2

10
X1

1.000

1.800

18.000

m2

4X1
/2

0.900

1.800

3.240

m2

2X
1

1.100

1.800

3.600

m2

2X1
/2

0.800

1.800

1.440

m2

1.000

1.200

28.800

m2

0.600

0.400

1.440

m2

24
X1
6X
1

369.60
0
(ii.)

6cm Thick
Cement Plaster
(1:4) to Ceiling
Bed Room
W.C.
Toilet
Kitchen

m2

2
2
2
2

4.000
1.200
2.500
2.500

3.750
1.200
1.200
4.000

30.000
2.880
6.000
20.000

m2

m2
m2
m2
m2

Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I )
(Part II )

2
2
2

1.500
3.700
5.000

1.200
4.000
4.000

3.600
29.600
40.000

m2
m2
m2

2
2

0.950
1.000

1.200
1.450

2.280
2.900

m2
m2

2
2

1.625
3.500

4.075
1.500

13.244
10.500

m2
m2
161.00
4

II. 1st Floor


(i.) 12cm Thick
Cement Plaster
(1:6) to wall.
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I - 3m

(a.)

(b.)

Height Wall)
(Part II 1.5m
Height Wall)
Deduction For
Doors
1.0m wide Doors
(D1)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)
Deduction for
Windows
1.0m wide
Windows (W1)
0.6m wide
Windows (W3)

2
2
2
2
2
2
2

15.60
0
4.800
3.800
6.500
2.700
15.60
0
18.25
0

m2

2.700

84.240

m2

0.900
0.900
2.700
0.900

8.640
6.840
35.100
4.860

m2
m2
m2
m2

2.700

84.240

m2

2.700

98.550

m2

2
2

3.800
2.450

2.700
2.700

20.520
13.230

m2
m2

9.200

2.700

49.680

m2

7.825

1.200

18.780

m2

10
X1

1.000

1.800

18.000

m2

4X1
/2

0.900

1.800

3.240

m2

2X
1

1.100

1.800

3.600

m2

2X1
/2

0.800

1.800

1.440

m2

1.000

1.200

28.800

m2

0.600

0.400

1.440

m2

24
X1
6X
1

369.60
0

m2

(ii.)

6cm Thick
Cement Plaster
(1:4) to Ceiling
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I )
(Part II )

2
2
2
2
2
2
2

4.000
1.200
2.500
2.500
1.500
3.700
5.000

3.750
1.200
1.200
4.000
1.200
4.000
4.000

30.000
2.880
6.000
20.000
3.600
29.600
40.000

m2
m2
m2
m2
m2
m2
m2

2
2

0.950
1.000

1.200
1.450

2.280
2.900

m2
m2

2
2

1.625
3.500

4.075
1.500

13.244
10.500

m2
m2
161.00
4

III. 2nd Floor


(i.) 12cm Thick
Cement Plaster
(1:6) to wall.
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I - 3m

(a.)

Height Wall)
(Part II 1.5m
Height Wall)
Deduction For
Doors
1.0m wide Doors
(D1)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)

2
2
2
2
2
2
2

15.60
0
4.800
3.800
6.500
2.700
15.60
0
18.25
0

m2

2.700

84.240

m2

0.900
0.900
2.700
0.900

8.640
6.840
35.100
4.860

m2
m2
m2
m2

2.700

84.240

m2

2.700

98.550

m2

2
2

3.800
2.450

2.700
2.700

20.520
13.230

m2
m2

9.200

2.700

49.680

m2

7.825

1.200

18.780

m2

10
X1

1.000

1.800

18.000

m2

4X1
/2

0.900

1.800

3.240

m2

2X
1

1.100

1.800

3.600

m2

2X1
/2

0.800

1.800

1.440

m2

(b.)

Deduction for
Windows
1.0m wide
Windows (W1)
0.6m wide
Windows (W3)

24
X1
6X
1

1.000

1.200

28.800

m2

0.600

0.400

1.440

m2
369.60
0

(ii.)

6cm Thick
Cement Plaster
(1:4) to Ceiling
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I )
(Part II )

2
2
2
2
2
2
2

4.000
1.200
2.500
2.500
1.500
3.700
5.000

3.750
1.200
1.200
4.000
1.200
4.000
4.000

30.000
2.880
6.000
20.000
3.600
29.600
40.000

m2
m2
m2
m2
m2
m2
m2

2
2

0.950
1.000

1.200
1.450

2.280
2.900

m2
m2

2
2

1.625
3.500

4.075
1.500

13.244
10.500

m2
m2
161.00
4

IV. Stair Room


(i.) 12cm Thick
Cement Plaster
(1:6) to wall.
Deduction for
0.9m Wide
Door(D3)
Deduction for
1.2m Wide
Door(D2)
6cm Thick
Cement Plaster
(1:4) to:
Under Waist Slab
Under
Intermediate
Landings
Under End
Landings
Under Ceiling of
Mumty Room

14.60
0

11.70
0

170.82
0

m2

0.900

1.800

3.240

m2

1.200

1.800

2.160

m2
m2

2.630

1.200

18.936

m2

1.275

2.500

9.563

m2

1.275

1.200

4.590

m2

4.800

2.500

12.000

m2
45.089

V. Parapet Wall

m2

176.22
0
(ii.)

m2

m2

(a.)
(i.)
(ii.)

12cm Thick
Cement Plaster
(1:6) to wall.
Parapet over 2nd
Floor Roof
Parapet over
Mumty Room
Roof

85.20
0

0.600

51.120

m2

14.60
0

0.600

8.760

m2
59.880

B. Outside
Plastering
(i.) 12cm Thick
Cement Plaster
(1:6) on Outside
walls.
(a.) From Plinth to
Parapet Level.
Deduction for
opening in
Verandah.
(b.) From Roof to
Parapet Level of
Mumty Room.

85.20
0

10.20
0

869.04
0

m2

7.425

1.000

22.275

m2

15.60
0

2.400

37.440

m2

Total Cement Plaster Work in Superstructure


6.Flooring
I. Ground Floor
(i.) 20mm Thick
Terrazo Work for
Skirting 30cm
High.
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining

(a.)

Passage
(Part I)
(Part II)
Verandah
(Part I )
(Part II )
Deduction For
Doors
1.0m wide Doors
(D1)

m2

2
2
2
2
2
2
2

15.60
0
4.800
3.700
6.500
2.700
15.60
0
18.25
0

928.75
5
2801.7
55

m2
m2

31.200

r.m

9.600
7.400
13.000
5.400

r.m
r.m
r.m
r.m

31.200

r.m

36.500

r.m

2
2

3.800
2.450

7.600
4.900

r.m
r.m

2
2

9.200
7.825

18.400
15.650

r.m
r.m

10
X1

1.000

10.000

r.m

0.9m wide Doors


(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)

4X
1/2
2X
1
2X
1/2

0.900

1.800

r.m

1.100

2.200

r.m

0.800

0.800

r.m
166.05
0

(ii.)

75mm Thick
Terrazo Flooring
in lime Concrete
(11/2:2:7)
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I )
(Part II )

2
2
2
2

4.000
1.200
2.500
2.500

3.750
1.200
1.200
4.000

30.000
2.880
6.000
20.000

m2
m2
m2
m2

2
2
2

1.500
3.750
5.000

1.200
4.000
4.000

3.600
30.000
40.000

m2
m2
m2

2
2

0.950
1.000

1.200
1.450

2.280
2.900

m2
m2

2
2

1.650
3.500

4.075
1.500

13.448
10.500

m2
m2
161.60
8

(iii.)

25mm Thick
Terrazo Work
Cast in situ in
floor.
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I )
(Part II )

Supplying, fitting
and fixing
Porcelain
coloured tiles for
Dado in:

m2

2
2
2
2
2
2
2

4.000
1.200
2.500
2.500
1.500
3.750
5.000

3.750
1.200
1.200
4.000
1.200
4.000
4.000

30.000
2.880
6.000
20.000
3.600
30.000
40.000

m2
m2
m2
m2
m2
m2
m2

2
2

0.950
1.000

1.200
1.450

2.280
2.900

m2
m2

2
2

1.650
3.500

4.075
1.500

13.448
10.500

m2
m2
161.60
8

(iv.)

r.m

m2

(a.) Toilet
(b.) W.C.
(c.) Toilet

2
2
2

2.700
4.800
3.700

1.800
1.800
1.800

9.720
17.280
13.320
40.320

II. 1st Floor


(i.) 20mm Thick
Terrazo Work for
Skirting 30cm
High.
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining

2
2
2
2
2
2
2

Passage

(a.)

(Part I)
(Part II)
Verandah
(Part I )
(Part II )
Deduction For
Doors
1.0m wide Doors
(D1)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)

15.60
0
4.800
3.700
6.500
2.700
15.60
0
18.25
0

31.200

r.m

9.600
7.400
13.000
5.400

r.m
r.m
r.m
r.m

31.200

r.m

36.500

r.m

2
2

3.800
2.450

7.600
4.900

r.m
r.m

2
2

9.200
7.825

18.400
15.650

r.m
r.m

1.000

10.000

r.m

0.900

1.800

r.m

1.100

2.200

r.m

0.800

0.800

r.m

10
X1
4X
1/2
2X
1
2X
1/2

166.05
0
(ii.)

75mm Thick
Terrazo Flooring
in lime Concrete
(11/2:2:7)
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)

m2
m2
m2
m2

r.m

2
2
2
2
2
2
2

4.000
1.200
2.500
2.500
1.500
3.750
5.000

3.750
1.200
1.200
4.000
1.200
4.000
4.000

30.000
2.880
6.000
20.000
3.600
30.000
40.000

m2
m2
m2
m2
m2
m2
m2

2
2

0.950
1.000

1.200
1.450

2.280
2.900

m2
m2

Verandah
(Part I )
(Part II )

2
2

1.650
3.500

4.075
1.500

m2
m2

13.448
10.500
161.60
8

(iii.)

25mm Thick
Terrazo Work
Cast in situ in
floor.
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I )
(Part II )

2
2
2
2
2
2
2

4.000
1.200
2.500
2.500
1.500
3.750
5.000

3.750
1.200
1.200
4.000
1.200
4.000
4.000

30.000
2.880
6.000
20.000
3.600
30.000
40.000

m2
m2
m2
m2
m2
m2
m2

2
2

0.950
1.000

1.200
1.450

2.280
2.900

m2
m2

2
2

1.650
3.500

4.075
1.500

13.448
10.500

m2
m2
161.60
8

(iv.)

Supplying, fitting
and fixing
Porcelain
coloured tiles for
Dado in:
(a.) Toilet
(b.) W.C.
(c.) Toilet

2
2
2

2.700
4.800
3.700

1.800
1.800
1.800

W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)

2
2
2
2
2
2
2
2
2

15.60
0
4.800
3.700
6.500
2.700
15.60
0
18.25
0
3.800
2.450

m2

m2
m2
m2

9.720
17.280
13.320
40.320

III. 2nd Floor


(i.) 20mm Thick
Terrazo Work for
Skirting 30cm
High.
Bed Room

m2

m2

31.200

r.m

9.600
7.400
13.000
5.400

r.m
r.m
r.m
r.m

31.200

r.m

36.500

r.m

7.600
4.900

r.m
r.m

(a.)

Verandah
(Part I )
(Part II )
Deduction For
Doors
1.0m wide Doors
(D1)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)

2
2

10
X1
4X
1/2
2X
1
2X
1/2

9.200
7.825

18.400
15.650

r.m
r.m

1.000

10.000

r.m

0.900

1.800

r.m

1.100

2.200

r.m

0.800

0.800

r.m
166.05
0

(ii.)

75mm Thick
Terrazo Flooring
in lime Concrete
(11/2:2:7)
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I )
(Part II )

2
2
2
2
2
2
2

4.000
1.200
2.500
2.500
1.500
3.750
5.000

3.750
1.200
1.200
4.000
1.200
4.000
4.000

30.000
2.880
6.000
20.000
3.600
30.000
40.000

m2
m2
m2
m2
m2
m2
m2

0.950

1.200

2.280

m2

1.000

1.450

2.900

m2

2
2

1.650
3.500

4.075
1.500

13.448
10.500

m2
m2
161.60
8

(iii.)

25mm Thick
Terrazo Work
Cast in situ in
floor.
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I )

r.m

m2

2
2
2
2
2
2
2

4.000
1.200
2.500
2.500
1.500
3.750
5.000

3.750
1.200
1.200
4.000
1.200
4.000
4.000

30.000
2.880
6.000
20.000
3.600
30.000
40.000

m2
m2
m2
m2
m2
m2
m2

2
2

0.950
1.000

1.200
1.450

2.280
2.900

m2
m2

1.650

4.075

13.448

m2

(Part II )

3.500

1.500

m2

10.500
161.60
8

(iv.)

Supplying, fitting
and fixing
Porcelain
coloured tiles for
Dado in:
(a.) Toilet
(b.) W.C.
(c.) Toilet

2
2
2

2.700
4.800
3.700

1.800
1.800
1.800

m2
m2
m2

9.720
17.280
13.320
40.320

IV. Stair Room


(a.) 12mm Thick
Terazzo Work for
Skirting 30cm
heigh
Deduction for
1.1m wide Doors
(D4)
(b.) 25mm Thick
Terrazo Work
cast in situ in
floor.
Landings
Steps:
Treads
Riser

14.60
0

0.300

4.380

m2

1.100

0.300

0.330

m2

2.500

1.275

19.125

54
60

1.200
1.200

0.250
0.150

16.200
10.800

m2
m2
m2
m2
m2

17.20
0

13.500

232.20
0

m2

17.20
0

13.500

232.20
0

m2

74.50
0

0.300

22.350

m2
486.75
0

VI. Neat Cement


Plaster
7. Painting
I. Painting on Timber
Surface
(a.) Of Doors:1.0m wide Doors
(D1)
1.2m wide Doors
(D2)

m2

50.835
V. Roof
(i.) 40cm Thick
Terrazo Flooring
in lime Concrete
(11/2:2:7)
(ii.) 20mm Thick
Terrazo Work
cast in situ in
floor.
(iii.) 20mm Thick
Terrazo Work for
Skirting 30cm
High.

m2

m2

85.20
0

0.750

63.900

m2

30

2.000

2.100

126.00
0

m2

2.400

2.100

5.040

m2

(b.)

0.9m wide Doors


(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)
Of Windows:1.0m wide
Windows (W1)

12

1.800

2.100

45.360

m2

2.200

2.100

36.960

m2

1.600

2.100

20.160

m2

72

2.000

1.200

172.80
0

m2
406.32
0

II. Painting on Steel


Surface
(a.) Ornamental
Window Grill and
Steel Windows
1.0m wide
Windows (W1)
1.5m wide
Windows (W2)
0.6m wide
Windows (W3)
(b.) Painting on
Ballustrade of
Stairs

72

0.850

1.050

64.260

m2

1.400

1.400

9.800

m2

18

0.500

0.300

2.700

m2

2.630

0.060

0.947

m2

Total Paints Required=


8.White and Colour
Washing
(i.) Decorative
Cement based
paint two coats
for outside
(a.) From Plinth to
Parapet Level.
Deduction for
opening in
Verandah.
(b.) From Roof to
Parapet Level of
Mumty Room.

77.707
484.02
7

A.
(a.)

Plastic Emulsion
Paint two coats
on walls and
ceilings.
Inside all Flats of
all Floors
To walls.
Bed Room
W.C.
Toilet

m2
m2

85.20
0

10.20
0

869.04
0

m2

7.425

1.000

22.275

m2

15.60
0

2.400

37.440

m2
928.75
5

(ii.)

m2

6
6
6

15.60
0
4.800
3.800

2.700

0.900
0.900

252.72
0
25.920
20.520

m2

m2
m2
m2

Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I - 3m

(i.)

(ii.)

(b.)

Height Wall)
(Part II 1.5m
Height Wall)
Deduction For
Doors
1.0m wide Doors
(D1)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)
Deduction for
Windows
1.0m wide
Windows (W1)
0.6m wide
Windows (W3)
To Ceiling
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I )

B.
(a.)

(Part II )
Inside the
Common Stair
Room
To wall.

105.30
0
14.580
252.72
0
295.65
0

m2

6.500

2.700

2.700
15.60
0
18.25
0

0.900

2.700

2.700

6
6

3.800
2.450

2.700
2.700

61.560
39.690

m2
m2

9.200

2.700

149.04
0

m2

7.825

1.200

56.340

m2

30

1.000

1.800

18.000

m2

12

0.900

1.800

3.240

m2

1.100

1.800

3.600

m2

0.800

1.800

1.440

m2

72

1.000

1.200

28.800

m2

18

0.600

0.400

1.440

m2

6
6
6
6
6
6

4.000
1.200
2.500
2.500
1.500
3.700

3.750
1.200
1.200
4.000
1.200
4.000

m2
m2
m2
m2
m2
m2

5.000

4.000

90.000
8.640
18.000
60.000
10.800
88.800
120.00
0

6
6

0.950
1.000

1.200
1.450

6.840
8.700

m2
m2

1.625

4.075

39.731

m2

3.500

1.500

31.500

m2

14.60
0

11.70

170.82
0

m2

6
6

m2
m2
m2

m2

(b.)
(c.)

(c.)
(c.)

Deduction for
0.9m Wide
Door(D3)
Deduction for
1.2m Wide
Door(D2)
To the Under
surface of Waist
Slab
To the Under
surface of
Intermediate
Landings
To the Under
surface of End
Landings
To Under Ceiling
of Mumty Room

0.900

1.800

3.240

m2

1.200

1.800

2.160

m2

2.630

1.200

18.936

m2

1.275

2.500

9.563

m2

1.275

1.200

4.590

m2

4.800

2.500

12.000

m2

Total White and Color Wash Required=

1911.0
40

m2

ABSTRACT OF ESTIMATE OF MIG FLAT


BUILDING
SL
.
N
O.

DESCRIPTION OF ITEMS

UNI
T

QUANTI
TY

RATE

AMOUNT

I. Earthwork
1.

Surface Dressing To an average Depth of


12cm and setting out foundation plan.

Sq.
m

230.046

32.00

7361.472

2.

Earthwork in excavation of trenches in any


kind of soil including
trimming the side of trenches, leveling,
dressing and ramming the bottom and
bailing out normal seepage water.

Cu
m

149.048

41.87

6240.640

Cu
m

29.810

26.00

775.060

Cu
m

53.650

224.76

12058.374

Cu
m

22.357

3011.0
0

67316.927

3.

4.

Earthwork in filling in foundation trenches,


plinth, pits, etc. with good soil in layer not
exceeding 150mm including watering,
ramming etc. layer complete (Payment to
be made on basis of measurement of
finished quantity of work.) with soil obtained
from excavation of foundation.
Providing and filling cleaning silver sand to
sides of carriage, in layers not exceeding
150mm including watering, ramming etc.
layer by layer complete in all respect as per
direction. (Payment to be made on
measurement of finished quantity).

II. Concrete Work


1.

(a.
)

Cement concrete with or without


reinforcement with graded clean coarse
aggregate nominal size 20 mm down mixed
with coarse clean sand conforming Zone I or
Zone II of IS-383 of latest edition both of
approved quality control, sampling, testing,
etc. vibrating with vibrator, curing as
directed. All complete with all labour and
materials but excluding cost of shuttering
and reinforcement as detailed in the
specifications and as directed by the
Engineer-in- Charge. Complete (Thickness
and shape as per drawing). To lintel, chajja,
apron, footing, R.W. walls column shaft, lift
wall, floor and roof beams and slab, parapet
wall, overlaying and coarse, stair waist and
landing slab, steps, projections, weather
board, folded plate etc. as per drawing and
direction from Foundation to Parapet for all
levels.
M20 grade concrete (cement not less than
390 kg/cum of concrete).

(b.
)

M15 grade concrete for P.C.C.

III. REINFORCEMENT
1. I.S. Specified steel reinforcement(for all
types of reinforced concrete work) including
main and straightening of coil bars, binder
etc. and removal of loose rust including
applying a coat of cement wash (if
necessary) cutting to requisite length,
hooking, bending to correct shape, placing
in proper position and binding with 20guage
black annealed wire at every
intersection(including every cost of binding
wire) complete as per drawing and direction
with all labour and materials in all floors
including steel for fan hooks(M.S.) High
strength deformed bars and wires Fe415 or
M.S. bar.

Cu
m

159.254

2691.0
0

428552.5

kg

100.012

32.00

3200.384

Sq.
m

11.179

114.00

1274.406

Sq.
m

11.179

11.50

128.559

Cu
m

101.669

2076.0
0

211064.8

Cu
m

284.723

1959.0
0

557772.3

Sq.
m

484.824

143.00

69329.832

Sq.
m

484.824

983.00

476581.99

Sq.
m

29.622

94.00

IV. Brickwork
1.

2.

3.

4.

Single brick flat soling with pricked jhama


bricks in steps etc. including ramming and
dressing bed to proper level and filling joints
with local sand complete in all respects.
Labour for laying brick flat soling with
pricked jhama bricks in steps etc. including
ramming and dressing bed to proper level
and filling joints with local sand complete in
all respects.
Brickwork in cement mortar 1:6 (1 in
Cement and 6 medium sand) with 1st class
brick wetted for 24 hours in poundings,
having crushing strength not less than
70Kg/Sq.m. including cut bricks etc.
complete in all respects in foundation and
plinth.
250mm Thick Brick mortar in cement mortar
1:4 (1in Cement and 4 medium sand) with
1st class brick wetted for 24 hours in
poundings, having crushing strength not
less than 70Kg/Sq.m. including cut bricks
etc. complete in all respects in
superstructure.

V. Flooring
1.
2.

3.

75mm thick Terraced flooring of lime


concrete with jhama khoa,surki and stone
lime (1.5:2:7)
25mm thick (finished) terrazo work, cast in
situ in floor and 20mm thick (finished) in
dado, skirting, staircase, etc. laid in panels
or pattern as directed and necessary terrazo
topping.
25mm thick D.P.C. with cement concrete
with stone chips (4:2:1) and admixture of
waterproofing compound as per
manufacturers specification.

2784.468

4.

5.

20mm thick terrazo work for Skirting with


cement concrete with stone chips (4:2:1)
and admixture of waterproofing compound
as per manufacturers specification.
Supplying fitting and fixing 1st class quality
porcelain tiles of any size in walls & floors
including borders to match with existing
work.

r.m.

166.065

31.50

Sq.
m

120.96

905.00

5231.0475

109468.8

VI. Plastering and Finishing


1.

2.

3.

Plaster (To wall, floor, ceiling etc.) both


inside and outside with sand and cement
mortar including round of chamfering
corners and extra thickness of mortar due to
inequalities of brickwork or concrete surface
as directed and raking out joints or roughing
of concrete surface including throating,
nosing, drip course where necessary in all
floors.
(a.)12mm thick plaster With Cement mortar
(1:6)

Sq.
m

2273.655

40.00

90946.200

(b.) 6mm thick plaster With Cement mortar


(1:4)

Sq.
m

528.101

24.00

12674.424

1911.040

12.00

22932.480

Sq.
m

77.707

29.00

2253.503

Sq.
m

406.320

24.00

9751.680

Providing and applying of two coats of


emulsion paint of approved quantity and
shade including a coat of cement primer of
approved quality as per manufacturer's
specifications on wall, columns, beams,
ceilings, etc. including preparation of
surface work and all necessary scaffolding,
stagging. Complete with all labour and
material in all floors.
Painting of two coats on all exposed areas
with approved best quality synthetic enamel
paint/ready mixed oil bound including
smoothening surface by sand papering etc.
on the surface if necessary at all floors to
the full satisfaction of Engineer-in-Charge.
Complete with material and labour in all
floors.
(a.) On steel grill or frame or any other
metal surface (Higloss) Two coats(approved
shade).
(b.) On timber or plastered surface two
coats of approved shade.

VII. Steelwork

1.

VIII.
1.
2.

3.

4.

Supplying of M.S. or W.I. ornamental grill of


approved design joints continuously welded
with M.S./W.I. flats and bars for window,
railing, fencing, grating etc. fitted and fixed
with necessary screws and lugs, with or
without welding as necessary in all floor.
50mm dia height equal to be grouted with
R.S. Slab/beam. Complete with one coat of
primer. Grills are to be fixed through clamps
of M.S. flats to the floor. All labour and
material included. Grill weighing above
14kg/Sqm upto 16kg/Sqm.
Woodwork
Woodwork in door and window frame fitted
and fixed complete including a protective
coat of painting at the contact surface the
frame with local Sal wood.
Panel shutters of doors with 12mm thick
particle board panel finished with
commercial veneers on both side (style and
top rails100mm, lock rail 200mm, and
bottom rail 150mm wide) including fitting
and fixing the same in position but
excluding the cost of hinges and other
fittings (panel consisting of a single board
without joint) for 35mm thick shutters with
1st class Indian Teak.
Shutters of 2/3 panel and 1/3 glazed of
window as per design (Each panel
consisting of a single plank without joint and
ordinary glass of 7.4kg/sq.m or 3mm thick)
fitted with putty bed and teak wood beads
and nails including fitting shutters in
position but excluding the cost of hinges
and other fittings (panel consisting of a
single board without joint) for 35mm thick
shutters with 1st class Indian Teak.
Supplying, fitting and fixing of Anodised
aluminium butt hinges
(a.) 125 x 75 x 4.0 mm
(b.) 100 x 63 x 3.2 mm

5.

6.

7.

8.

kg

88.73

40.00

3549.12

Cu
m

41.453

37720.
00

1563607.16
0

99.958

1474.0
0

147338.092

60.720

1474.0
0

89501.280

153.000

84.00

12852.000

234.000

53.00

12402.000

Sq.
m

Sq.
m

eac
h
eac
h

Supplying, fitting and fixing of Anodised


aluminium tower bolt 150 mm long x 12 mm
dia bolt with necessary screws etc.
complete.

eac
h

129.000

65.00

8385.000

Supplying, fitting and fixing of Anodised


aluminium aldrop 250mm x 19 mm dia bolt
with necessary screws etc. complete.

eac
h

39.000

198.00

7722.000

eac
h

129.000

413.00

53277.000

eac
h

30.000

780.00

23400.000

Supplying, fitting and fixing of Anodised


aluminium grip handle without base plate
450mm grip x 25 dia rod with necessary
screws etc. complete.
Supplying, fitting and fixing of "GODREJ"
mortise lock with keys, 5 lever including
fitting and fixing complete.

9.
10.

Supplying, fitting and fixing of Anodised


floor door stopper with necessary screws
etc. complete.
Supplying, fitting and fixing of 150mm thick
long catch lock with eyes with necessary
screws etc. complete.

eac
h

57.000

78.00

4446.000

eac
h

72.000

7.00

504.000

TOTAL = Rs.
40,49,065.00
ADDING 10% FOR SANITARY = Rs.
404,906.5
ADDING 15% FOR ELECTRIFICATION = Rs.
607,360.00
TOTAL COST = 50,61,330.00

[*The Detailed Estimate has been prepared as per Architectural


Drawing and is subjected to change within the permissible
allowance of 5% when prepared according to the Structural
Drawing]

Water
Supply

System

OVERHEA
D
TANK
DESIGN OF OVERHEAD TANK
FOR DESIGN THE OVER HEAD TANK FOLLOWING VALUES HAVE TO
BE CONSIDERED
Time in
Hour

Hourly
Demand

Cumulati
ve Hourly
Demand

Hourly
Pumping

Cumulati
ve Hourly
Pumping

24 - 4
4 - 5

0.2a
0.4a

0.8a
1.2a

0
0

0
0

Cumulati
ve
Surplus
(+)
& Deficit
(-) 0.8a
(-) 1.2a

5
6
7
8
9
10
11
12
13
14
15
16
17
19
20
22
23

6
7
8
9
10
11
12
13
14
15
16
17
18
20
22
23
24

0.8a
2.25a
2.25a
2.25a
2.25a
a
a
0.6a
2.25a
0.7a
0.7a
0.7a
2.25a
0.9a
0.7a
0.4a
0.2a

2.0a
4.25a
6.50a
8.75a
11.00a
12.00a
13.00a
13.6a
15.85a
16.55a
17.25a
17.95a
20.20a
22.0a
23.4a
23.8a
24.0a

0
3a
3a
3a
3a
0
0
0
0
3a
3a
3a
3a
0
0
0
0

0
3a
6a
9a
12a
12a
12a
12a
12a
15a
18a
21a
24a
24a
24a
24a
24a

(-) 2.0a
(-) 1.25a
(-) 0.5a
(+) 0.25a
(+) 1.0a
(+) 0
(-)a
(-) 1.6a
(-) 3.85a
(-) 1.55a
(+) 0.75a
(+) 3.05a
(+) 3.80a
(+) 2.0a
(+) 0.6a
(+) 0.2a
(+) 0

As the rate of withdrawal from the tank of the rate of demand of sanitary
fixtures depends on the habits of the population of buildings and hourly
pattern or demand is assume to work out the theoretical capacity of over
Head Storage Tank.
Therefore, storage = Maximum Deficit + Maximum Surplus
= (3.85a +3.8a) = 7.65a
Otherwise, maximum storage in Over Head Reservoir = (7.65 Avg.
Water supply)
= (7.65 168.75) lit
= 1290.94 lit (I)
The storage capacity on the basic of population of the residential building
= (No. Of population 70) lit
= (30 * 70) lit
= 2100 lit. (II)

Storage needed for the W.C. = 270 No. Of W.C.


= (270 12) = 3240 (III)

Check for minimum storage is

1
2

of the daily capacity = (1/2 4050)

= 2050 lit. (IV)

Now, the various result as calculated in (I) to (IV) is, 1290.24 lit ; 2100 lit ;
3240 and 2050 lit.
So, the storage needed for the ground level reservoir of shall be a
minimum of 50% of 3240 lit.
3240 50% = 1620 lit.
Which is less than that was calculated earlier = 2025 lit.
However, a day supply may be provided in the ground level reservoir
=4050lit. to be on the save size.

SIZE OF THE OVER HEAD TANK:Capacity = 3240lit. (Say)


Assuming the total depth = 1 m.
And, effective depth = 0.85 m.
Area of the section = (3240 x 1000)/85 = 38117.65 cm2
Assuming, a square section, b X b = 38117.65
b = 195.23 cm.~200 cm.
So, Length = 2.0m;
Breadth = 2.0 m. &
Depth = 1.0 m.

OVERHEAD TANK

ESTIMATE OF OVERHEAD WATER TANK


Sl.
No
.
1

Description of
item
R.C.C. Slab
( 1:1.5:3 )
i. Top & Bottom
ii. Sides
Deduction for
manhole cover

Centering &
Shutterings
i. Bottom Slab
Deduction for brick
pillar
ii. Sides
a) Inside
b) Outside
iii. Top Slab
a) Under Surface
b) Edge of
manhole
cover

Brickwork in Pillars
with
cement mortar
( 1:6 )
12mm thick
plastering
with cement
mortar ( 1:6 )
i.Bottom Slab
a) Inside
b)Outside
ii. Sides
a) Inside
b)Outside
iii. Top Slab
a) Inside
b)Outside
iv. Edge of
Manhole
v. Brick Pilars
Deduction for
Manhole
Brick Pillars

N
o.

Leng
th
m

Bread
th
m

Heig
ht
m

Quanti
ty

Uni
t

1.52

1.52

0.125

0.5776

m3

5.58

0.125

0.6975

m3

0.125

0.0198

m3

1.2553

m3

0.159

1.52

1.52

-----

2.3104

m2

0.25

0.25

-----

0.25

m2

1
1

5.08
6.08

---------

1
1.25

5.08
7.6

m2
m2

1.27

1.27

-----

1.6129

m2

1.414

-----

0.125

0.1768

m2

16.530
1

m2

0.25

0.25

0.6

0.15

m3

1
1

1.27
1.52

1.27
1.52

---------

1.6129
2.3104

m2
m2

4
4

1.27
1.52

---------

1
1.25

5.08
7.6

m2
m2

1
1

1.27
1.52

1.27
1.52

---------

1.6129
2.3104

m2
m2

1.414

-----

0.125

0.1768

m2

-----

0.6

2.4

m2

0.159
0.25
0.25

---------

0.318
0.25

m2
m2

2
4

Remarks

1.27 + 0.25 = 1.52


4x (1.27 + 0.125)
= 5.58
x 0.452/4 = 0.159

1.27 x 4 = 5.08
1.52 x 4 = 6.08
1 + (0.125 x 2 ) =
1.25

x 0.45 =1.414

4 x 0.25 = 1

22.535
4

m2

ABSTACT OF OVERHEAD WATER TANK


SL
.
N
O
1

DESCRIPTION OF ITEMS
Cement concrete with or without
reinforcement with graded clean
coarse aggresate nominal size 20 mm
down mixed with coarse clean sand
conforming Zone I or Zone II of IS-383
of latest edition both of approved
quality control, sampling, testing, etc.
vibrating with vibrator, curing as
directed. all compleate with all labour
and materials but excluding cost of
shuttering and reinforcement as
detailed in the specifications and as
directed by the Engineer-in- Charge.
compleate(Thickness and shape as
per drawing). To lintel, chajja, apron,
footing, R.W. walls column shaft, lift
wall, floor and roof beams and slab,
parapet wall, overlaying and coarse,
stair waist and landing slab, steps,
projections, weather board, folded
plate etc. as per drawing and
direction from Foundation to Parapet
for all levels.
a) M20 grade concrete (cement not
less than 390 kg/cum of concrete).
Hire and labour charges for shuttering
with centering
and necessary staging upto 4m using
approved stout
props and thick hard wood planks of
approved
thickness with required bracing for
concrete slabs,
beams, cilumns,lintels curved or
straight including
fitting, fixing and striking out after
completion of works
( upto roof of ground floor )

UNI
T

QUANTI
TY

Cum

1.2553

RATE

3011.0
0

AMOUN
T

3779.71

a)25 mm to 30 mm thick wooden


shuttering as per
decision & direction of engineer in
charge
Brickwork in cement mortar 1:6 (1in
Cement and 6 medium sand) with 1st
class brick wetted for 24 hours in
poundings, having crushing strength
not less than 70Kg/Sq.m. including
cut bricks etc.compleate in all
respects in foundation and plinth.
Plaster (To wall, floor, ceiling etc.)
both inside and outside with sand and
cement mortar including round of of
chamfering corners and extra
thickness of mortar due to
inequalities of brickwork or concrete
surface as directed and raking out
joints or roughing of concrete surface
including throating, nosing, drip
course where necessary in all floors.
(a.)12mm thick plaster With Cement
mortar (1:6)

Sqm

16.5301

144.00

2380.33

Cum

0.15

2076.0
0

311.40

Sqm

22.5354

40.00

901.42

TOTAL = Rs. 7372.86


CONTINGENCY @5% = Rs.
368.64
W.C. ESTABLISHMENT @ 2.5% = Rs.
184.32
TOTAL COST = Rs.
7925.82

UNDERGRO
UND

RESERVOI
R

DESIGN OF UNDERGROUND RESERVOIR


Ground level tank receiving water from municipality or Corporation
municipal main (Capacity as well as size). According to NBC (National
Building Code) Part IV per capita consumption is 135 lit/person/day.
So, water consumption per building = (5 2 3 135) lit/day = 4050 lit/day
Assuming, the water supply is available in the street main all through 24
hours.
And average rate of supply =0.4050 lit/hour.
Assuming pumping hours, 8hours/day. That is 6am to 10-am, then 2pm to 6pm.

Pumping rate = 4050/8 = 506.25 lit/hour.


Let, a be the average hourly demand.
So, a = (Total daily demand/24) lit/hour.

=(4050/24) = 168.75 lit/hour.


The total daily supply is pumping in 8 hours that is rate of pumping is 4050/8 =
506.25 lit/hour.
Therefore, Hourly rate of pumping = (506.25/168.75) = 3.
(So, Hourly deamnd is 1/3 rd of average hourly supply)

Time in
Hour

Hourly
Demand

Cumulati
ve Hourly
Demand

Hourly
Pumping

Cumulati
ve
Pumping

24 - 6
6 - 7
7 - 8
8 - 9
9 - 10
10 - 11
11 - 12
12 - 13
13 - 14
14 - 15
15 - 16
16 - 17
17 - 18
18 - 24

a
a
a
a
a
a
a
a
a
a
a
a
a
a

6a
7a
8a
9a
10a
11a
12a
13a
14a
15a
16a
17a
18a
24a

0
3a
3a
3a
3a
0
0
0
0
3a
3a
3a
3a
0

0
3a
6a
9a
12a
12a
12a
12a
12a
15a
18a
21a
24a
24a

Cumulati
ve
Surplus
(+)
& Deficit
6a
4a
2a
0
-2a
-a
0
a
2a
0
-2a
-4a
-6a
0

Based only of these two rates a and 3a at the pattern of pumping, that is for 4
hours, 6am to 10 am and 4 hours from 2pm to 6 pm.
So, storage needed for ground level tank = maximim surplus + maximum deficit.
= 6a + 6a = 12a
= 12a average hourly system or a daily supply.
The tank will be full at 6 am that when pumping starts that day.
The tank will become empty at 6 pm that is when the pumping stopped at 6 pm
for the day.
Storage needed in ground level reservoir = = 2050 lit/day
The maximum storage in at ground level reservoir is also 50% of storage in
overhead reservoir.
So, the actual storage to be provided in this case will be decided after the
storage capacity of the overhead reservoir.

UNDERGROUND RESERVOIR

Breadt
h

Height
(m)

Quantit
y

3.11

3.11

1.22
5

11.84
8

Earthwork in excavation
Brick flat soling
Cement concrete
(1:2:4) in
foundation
1st class brickwork in
cement
mortar (1:4)

3.11

3.11

-----

9.672

3.11

3.11

0.2

1.934

40 cm wall

9.64

0.40

0.32
5

1.253

30 cm wall

9.24

0.30

0.5

1.386

20 cm wall

8.84

0.20

0.2

0.354

1
2
3
4

Unit

N
o.

Description of item

(m)

Sl.
No.

Length
(m)

ESTIMATE OF UNDERGROUND
RESERVOIR

m
m
3

m
m
m

Remarks

2.01 + (2x0.4) +
(2x0.15)
= 3.11
0.1 + 0.2 + 0.325 +
0.5 + 0.2 - 0.1 =
1.225

4 x (2.01+0.4) =
9.64
4 x (2.01+0.3) =
9.24
4 x (2.01+0.2) =
8.84

m
2.993
5
6

2.5 cm thick artificial


stone
floor (1:2:4)
12 mm thick cement
plaster
(1:6) finished smooth
with
neat cement
Floor

2.01

2.01

-----

4.040

2.01

2.01

-----

4.040

m
2

Long walls

2.01

-----

4.020

Short walls

2.01

-----

4.020
12.08
0

m
2

1.225 + 0.1 - 0.1 0.2 - 0.025


=1

m
2

m
2

6 mm thick cement
plaster
(1:4)
On top of wall
Long walls

m
2

2.41

0.20

-----

0.964

2.01

0.20

-----

0.804

Long walls

2.41

-----

0.60

2.892

Short walls

2.41

-----

0.60

2.892

Short walls
Outside up to 10 cm
below
G.L.

m
2

m
m

2.01 + (2x0.2) =
2.41

m
7.552

ABSTRACT OF ESTIMATE OF
UNDERGROUND RESERVOIR
SL
.
N
O.
1

DESCRIPTION OF ITEMS
Earthwork in excavation of trenches in any
kind of soil including
trimming the side of trenches, levelling,
dressing and ramming the bottom and
bailing out normal seepage water.
Single brick flat soling with pricked jhama
bricks in steps etc. including ramming and
dressing bed to proper level and filling
joints with local sand complete in all
respects.
Labor for laying brick flat soling with
pricked jhama bricks in steps etc.
including ramming and dressing bed to
proper level and filling joints with local
sand complete in all respects.
Cement concrete with or without
reinforcement with graded clean coarse
aggregate nominal size 20 mm down
mixed with coarse clean sand conforming
Zone I or Zone II of IS-383 of latest edition
both of approved quality control,
sampling, testing, etc. vibrating with
vibrator, curing as directed. all complete
with all labor and materials but excluding
cost of shuttering and reinforcement as
detailed in the specifications and as
directed by the Engineer-in- Charge.
complete(Thickness and shape as per
drawing). To lintel, chajja, apron, footing,
R.W. walls column shaft, lift wall, floor and
roof beams and slab, parapet wall,
overlaying and coarse, stair waist and
landing slab, steps, projections, weather
board, folded plate etc. as per drawing
and direction from Foundation to Parapet

UNI
T

QUANTI
TY

RATE

AMOUN
T

Cum

11.848

41.87

496.08

Sqm

9.6721

114.00

1102.62

Sqm

9.6721

11.50

111.23

for all levels.

a) M15 grade concrete for P.C.C.


5

250mm Thick Brick mortar in cement


mortar 1:4 (1in Cement and 4medium
sand) with 1st class brick wetted for 24
hours in poundings, having crushing
strength not less than 70Kg/Sq.m.
including cut bricks etc. complete in all
respects in superstructure.
Artificial stone in floor, dado, staircase etc.
with cement conc. ( 1:2:4 ) with stone
chips laid in panels as directed with
topping made with ordinary or white
cement ( as necessary ) and marble dust
in proportion ( 2:1 ) including smooth
finishing and rounding off corners and
including application of cement slurry
before flooring works using cement @ 1.75
Kg/Sqm all complete including all
materials and labour
i. 25 mm thick
Plaster (To wall, floor, ceiling etc.) both
inside and outside with sand and cement
mortar including round of of chamfering
corners and extra thickness of mortar due
to inequalities of brickwork or concrete
surface as directed and raking out joints or
roughing of concrete surface including
throating, nosing, drip course where
necessary in all floors.
(a.)12mm thick plaster With Cement
mortar (1:6)
(b.) 6mm thick plaster With Cement
mortar (1:4)

Cum

1.9344

2691.0
0

5205.47

Cum

2.993

1959.0
0

5862.90

Sqm

4.0401

119.00

480.7

Sqm

12.08

40.00

483.20

Sqm

7.552

24.00

181.25

TOTAL = Rs.
13822.37
CONTINGENCY @5% = Rs.
691.11

W.C. ESTABLISHMENT @ 2.5% = Rs.


345.5
TOTAL COST = Rs.
14858.98

SEPTIC
TANK

DESIGN OF SEPTIC TANK


TO DESIGN THE SEPTIC TANK FOLLOWING ARE THE REQUIRED FIXTURE
UNIT.

SL.
NO.

FACILITY

EQUIVALENT FIXTURES
UNIT

01.
02.
03.
04.
05.
06.
07.
08.
09.
10.
11.
12.
13.

SL.
NO.

W.C.
BATH
WASH BASIN/KITCHEN SINK
URINAL (AUTO FLUSH)
URINAL (WITHOUT AUTO FLUSH)
SLOPE SINK
LABORATORY SINK
COMBINATION SINK
SHOWER BATH
DRINKING FOUNDRY
ABLUTION TAB
DISH WATER
BATH TOP

FACILITY

01.

KITCHEN
A) KITCHEN SINK
B) WASH BASIN

02.

TOILET (ATTACHED)
A) WASH BASIN
B) FLUSHING CISTERN
C) ABLUTION TAB
D) SHOWER
E) TAB

03.

W.C.
A) ABLUTION TAB
B) FLUSHING CISTERN

04.

BATH
A) SHOWER
B) TAB
C) WASH BASIN

1
2
1
1

NO.

EQUIVALENT
FIXTURES UNIT

FOR 5 NOS. OF PEOPLE = 8 x 2 x 3 = 51


1 CUBIC FEET / MINUTE = O.O2836 m3 / MIN. = 28.36 LIT / MINUTE.
1 FIXTURE UNIT = 28.36 LIT / MINUTE.
= 1 CUBIC FEET / MINUTE
TYPICAL DESIGN OF A SEPTIC TANK INSTALLATION WITH SOIL
ABSORPTION
SYSTEM FOR THREE STORIED BLOCK OF RESIDENTIAL
APARTMENT.

The fixtures unit for each apartment is 5 persons = 8.5 units


Total fixtures unit in the three storied block = 3 x 2 x 8.5 = 51 unit for
30 persons

NO. OF FIXTURES UNIT

UNIT RATE OF FLOW

20
40
60
80
100
120
140
For (60-40) = 20, difference (4.3-3.3) = 1.0

11

2
3.3
4.3
5.1
5.7
6.4
7.1
= 1.0/20
= 1.0/20 x 11
= 0.55

unit rate of flow = (3.3+0.55) lit. / minute.


= 3.85 lit. / minute.
For 51 unit peak discharge for 30 persons at 3.85 rate of flow
= (3.85 x 28.316)
= 109.02 lit./minute

TANK CAPACITY :FOR SEDIMENTATION:-

SURFACE AREA OF TANK REQUIRED 0.92 m2 / 10 LPM. PEAK FLOW


(0.92 x 109.02) / 10
= 10.03 m2
ASSUMING, 0.3 M DEPTH.
VOLUME REQUIRED FOR SEDIMENTATION PURPOSE = (10.03 x 0.3)
= 3.01 m2

FOR SLUDGE DIGESTION AT AVERAGE TEMPERATURE OF


25C:CAPACITY REQUIRED FOR SLUDGE DIGESTION 0.032 m3 /CAPITA.
VOLUME REQUIRED FOR SLUDGE DIGESTION FOR 30 PERSONS =
(0.032 x 30)
= 0.96 m3

FOR SLUDGE STORAGE:-

Assuming, cleaning once in two years,

volume required for sludge digestion storage at volume of digested


sludge = (0.0002 x 30 x 365 x 2)
= 4.38 m3

for seed sludge:-

For seed sludge increase the volume 10% which is provided for sludge
storage = (4.38 x 10%) m3
= 0.438 m3

Free board:-

Assuming the free board is 30 cm.


volume of free board = (10.03 x 0.3)
= 3.94 m3

Total capacity and dimensions:Total capacity = 3.01 + 0.96 + 4.38 + 0.438 + 3.01 = 11.798 m3
Area of tank = 10.03

m3

depth of the tank = (11.798 / 10.03)


= 1.18 m.
~ 1.2 m.
Adopting the length and width ratio = 2:1
Let, breadth = b and length = l
(2b x b) = 10.03
b = 2.24 m. ~ 2 m.
and, l = (2 x b)
= (2 x 2.24)
= 4.48 m. ~ 5 m.
SO, LENGTH = 5 m.

BREADTH = 2 m.
DEPTH = 1.2 m.

3.6

1.7

2. Cement concrete in foundation (1:3:6)

6.2

3.6

0.2 4.464 4.464

m3

(i.) 40cm thick Layer

5.9

0.4

0.5

2.36

m3

(ii.) 30cm thick Layer

5.7

0.3

0.5

1.71

m3

(iii.) 20cm thick Layer

5.5

0.2

0.5

1.1

m3

(i.) 40cm thick Layer

2.5

0.4

0.5

m3

(ii.) 30cm thick Layer

2.5

0.3

0.5

0.75

m3

(iii.) 20cm thick Layer

2.5

0.2

0.5

0.5

m3

UNIT

HEIGTH(M
)

6.2

NO
.

TOTAL
QUANTITY

BREDTH(
M)

1. Earth work in excavation in any kind of


soil
1

DESCRIPTION OF ITEM

QUANTITY

LENGTH
(M)

SL. NO.

ESTIMATE OF SEPTIC TANK


REMARKS

37.94
4
37.944 m3

3. First class brick work with cement


mortar (1:4)
For long wall

For short wall

7.42

m3

4. 10cm thick brick work in baffle wall


with cement mortar (1:3)

2.5

1.3

3.25

3.25

m3

5. Cement concrete in floor 5cm thick

2.5

12.5

12.5

m3 Diameter of
manhole is
450mm

5.5

2.9

6. R.C.C. work (1:2:4) with shuttering


(i.)Roof slab

m3

0.1 1.595

(3.14/4 ) x 4.52
Deduction for manhole cover

2 x 0.1

(ii.)5cm thick board

2.5

m3

0.03
0.1

m3

0.5 0.125
1.69

m3

7. 20cm thick cement plaster (1:2) with


waterproofing at inside
For long wall

1.5

15

m3

For short wall

2.5

1.5

7.5

m3

Sides of baffle wall

2.5

1.28

6.4

m3

Top of the baffle wall

2.5

0.1

m3

0.25
29.15

m3

ABSTRACT OF ESTIMATE OF SEPTIC


TANK
SL
NO

DESCRIPTION OF ITEMS

1. Earthwork in excavation
Earthwork in excavation of trenches in any kind
of soil including trimming the sides of trenches,
leveling, dressing and ramming the bottom and
bailing out normal seepage of water.
2. Cement concrete in
foundation(1:3:6)
Cement concrete with or without
reinforcement with graded clean
coarse aggregate nominal size 20 mm
down mixed with coarse clean sand
conforming Zone I or Zone II of IS-383
of latest edition both of approved
quality as necessary including
preparation of design mix and cost for
quality control, sampling, testing etc.
Vibrating with vibrator, curing as
directed. All complete with all labour
and matirials but excluding cost of
shuttering and reinforcements as
detailed in the specifications and as
directed by the Engineer-in-charge.
Complete (Thickness and shape as per
drawing). To lintel, chajja, apron,
footing, R.walls column shaft, lift wall,
floor and roof beams & slabs, parapet
wall, over laying & course, stair waist
and landing slab, steps, projections,
weather board, folded plate etc. as per
drawing & directions from Foundation
to parapet for all levels.
(a. M20 grade of concrete (cement not less than 390
) Kg. Cu. M. of concrete
(b.
M 15 grade concrete for P.C.C.
)

UNIT

QUANTITY

RATE
(Rs)

AMOUNT
(RS)

Cum

37.944

41.87

1588.71

Cum

4.464

3011.00

13441.00

Cum

12.5

2691.
00

33637.50

3. Hire and labour , charges for centering and


shuttering may be straight or curve may have
any cross section, with sufficiently rigid steel
shuttering plate for building works including
rigid steel/required diameter hardwood bullies /
bracings, etc. with bolts and nuts, tension
devices, jigs etc. as per drawing, fitting, fixing
and striking out after completion of work with
all labour and materials ( Only the area in
contact with concrete surface to be measured and
paid).Both with and without prop. Side
shuttering may be of seasoned ply board.
Unseasoned ply is not permissible for side
shuttering. For all items of all floors from
foundation up to roof levels all inclusive.
4. 1st class brickwork in cement
mortar 1:4 Brickwork in cement
mortar 1:4 ( 1 cement and 4 medium
sand) with 1st class brick wetted for
24 hours in pounding, having crushing
strength not less than 70 Kg./Sq. cm.
including cut bricks etc. complete in all
respects as per.
5. 10 cm thick brickwork for buffle
wall
Brick work in cement mortar 1:4 ( 1
cement and 4 medium sand) with 1st
class brick wetted for 24 hours in
pounding, having crushing strength
not less than 70 Kg./Sq. cm. including
cut bricks etc. complete in all respects
as per.
6. Reinforcement
I.S. specified steel reinforcement ( For
all types of reinforced concrete work)
including main and straightening of
coil bars, binder etc. and removal of
loose rust including applying a coat of
cement wash( If necessary) cutting to
required length, hooking, bending to
correct shape, placing on proper
position and binding with 20 gauge
black annealed wire at every
intersection ( Including every cost of
binding wire) complete as per drawing
and direction with all labour and
materials in all floors including steel
for fan hooks ( M.S.)High strength
deformed bars and wires Fe 415 or
M.S. bar.ReinforcementI.S. specified
steel reinforcement ( For all types of
reinforced concrete work) including
main and straightening of coil bars,
binder etc. and removal of loose rust

Sq.m

144.0
0

144.00

Cum

7.42

1959.
00

14535.00

Sq.
m

3.25

219.0
0

711.75

Kg

1.69

32.00

54.08

including applying a coat of cement


wash( If necessary) cutting to required
length, hooking, bending to correct
shape, placing on proper position and
binding with 20 gauge black annealed
wire at every intersection ( Including
every cost of binding wire) complete
as per drawing and direction with all
labour and materials in all floors
including steel for fan hooks
( M.S.)High strength deformed bars
and wires Fe 415 or M.S.
bar.ReinforcementI.S. specified steel
reinforcement ( For all types of
reinforced concrete work) including
main and straightening of coil bars,
binder etc. and removal of loose rust
including applying a coat of cement
wash( If necessary) cutting to required
length, hooking, bending to correct
shape, placing on proper position and
binding with 20 gauge black annealed
wire at every intersection ( Including
every cost of binding wire) complete
as per drawing and direction with all
labour and materials in all floors
including steel for fan hooks
( M.S.)High strength deformed bars
and wires Fe 415 or M.S. bar.
7. Plastering & finishing:
Plaster (To wall, floor, ceiling etc.) both
inside and outside with sand and
cement mortar including rounding off
or chamfering corners and extra
thickness of mortar due to inequalities
of brick work or concrete surface as
directed and raking out joints or
roughing of concrete surface including
throating, nosing, drip course where
necessary in all floors.
i) 20 mm thick plaster with 1:6 cement
mortar.

Sq.
m

29.15

53.00

1544.95

TOTAL COST = Rs.


65656.99
CONTINGENCY @5% = Rs.
3282.84
W.C. ESTABLISHMENT @ 2.5% = Rs.
1641.42

TOTAL COST = Rs.


70581.25

SOAK PIT

DESIGN OF SOAK PIT

ALLOWABLE DEPTH OF EFFLUENT APPLICATION TO SOIL


ABSORPTION SYSTEM
PERCOLATION RATE
APPLICATION
(MINUTE)
Less than 1
2
3
4
5
10
15
30
45
60

MAXIMUM RATE OF EFFLUENT


(L/M 2/DAY)
204
143
118
102
90
65
52
32
33
26

NOTE: - if the percolation rate exceeds 30 minute the soil is not suitable
for soak pit. If the percolation rate exceeds 60 minutes the soil is not
suitable for any soil absorption system.
Taking septic tank effluents to be 30(L/M2/DAY) effluent entering in the
soak pit =900 liter.
Assuming, percolation rate of local soil 10 minutes. Considering to 10
minutes using table IS: 2470 (Part ii) 1985.
Allowable maximum rate of effluents application capacity of soil=65
L/M2/DAY
Therefore effective side of wall area =900/65=13.85 M2 .
Assume depth of soak pit=2M
Therefore absorption area soak pit =DH
Where D= Dia. Of soak pit
H=Height of soak
pit
So, DH=13.85
So, D=2.2M

LENGTH
(M)

BREADTH
(M)

HEIGHT(M)

UNIT

QUANTITY.

ESTIMATE OF SOAK PIT

REMARKS

Earth work in
excavation

Area
=

6.38
M2

1.55

m3

9.89

Area=
/4(2.25+.3*2)2

30 cm thk. Outer
casing with coarse
sand

Area
=

2.4M2

m3

2.40

Area=
/4(2.852-2.252)

1st class brick


work with cement
morter(1:4)

Area
=

2.4M2

m3

2.40

Area=
/4(2.852-2.252)

Gravel

Area
=

3.98
M2

m3

7.96

Area=
/4x2.252

Deduction for inlet


pipe coming from
septic tank

12.5

0.125

0.3

m3

0.47

TOTAL

7.49

SL.N
O

DESCRIPTION OF
ITEM

Plastering(1:4)
a)Outside surface
of soak pit
b)inside of inlet

NO
.

0.55

m3

4.95

12

0.3

m3

3.60

Total

8.55

Neat cement finish

0.55

m2

4.95

Slab of soak pit of


10 cm thk.

Area
=

6.38
M2

0.1

m3

0.64

deduction for
cover

Area
=

0.16
M2

0.1

m3

0.16

Total

0.48

9=perimeter=x2.8
5

Area=
/4x0.452

ABSTRACT OF ESTIMATE OF SOAK PIT


SL
N
DESCRIPTION OF ITEM
O
1. Earthwork in excavation
Earthwork in excavation of trenches
in any kind of soil including trimming
the sides of trenches, leveling,
dressing and ramming the bottom
and bailing out normal seepage of
water.
2. Outer casing of coarse sand
Providing and filling clean coarse
sand, in layers not exceeding 150 mm
including watering, ramming etc.
layer by layer complete in all respect
as per direction. (Payment to be
made on measurement of finished
quantity.)
3. 1st class brickwork
Brick work in cement mortar 1:4 ( 1
cement and 4 medium sand) with 1st
class brick wetted for 24 hours in
pounding, having crushing strength
not less than 70 Kg./Sq. cm. including
cut bricks etc. complete in all
respects as per.
4. Gravel packing
5. Plastering & finishing:
Plaster (To wall, floor, ceiling etc.)
both inside and outside with sand and
cement mortar including rounding off
or chamfering corners and extra
thickness of mortar due to
inequalities of brick work or concrete
surface as directed and raking out
joints or roughing of concrete surface
including throating, nosing, drip
course where necessary in all floors.
6. Neat cement finish

UNI
T

QUANTI
TY

RATE
(Rs)

AMOUN
T
(RS)

cum
.

9.890

41.87

401.53

cum
.

2.400

224.76

539.42

cum
.

2.400

1959.0
0

4701.00

cum
.

7.490

Sqm
.

8.550

53.00

453.15

Sqm
.

4.950

983.00

4865.85

7. 10cm thick P.C.C slabCement


concrete without reinforcement with
graded clean coarse aggregate
nominal size 20 mm down mixed with
coarse clean sand conforming Zone I
or Zone II of IS-383 of latest edition
both of approved quality as necessary
including preparation of design mix
and cost for quality control, sampling,
testing etc. Vibrating with vibrator,
curing as directed. All complete with
all labour and matirials but excluding
cost of shuttering and reinforcements
as detailed in the specifications and
as directed by the Engineer-in-charge.
Complete (Thickness and shape as
per drawing). To lintel, chajja, apron,
footing, R.walls column shaft, lift wall,
floor and roof beams & slabs, parapet
wall, over laying & course, stair waist
and landing slab, steps, projections,
weather board, folded plate etc. as
per drawing & directions from
Foundation to parapet for all levels.a)
M 15 grade concrete for P.C.C.
8. Labour
Hire and labour , charges for
centering and shuttering may be
straight or curve may have any cross
section, with sufficiently rigid steel
shuttering plate for building works
including rigid steel/required
diameter hardwood bullies / bracings,
etc. with bolts and nuts, tension
devices, jigs etc. as per drawing,
fitting, fixing and striking out after
completion of work with all labour
and materials ( Only the area in
contact with concrete surface to be
measured and paid).Both with and
without prop. Side shuttering may be
of seasoned ply board. Unseasoned
ply is not permissible for side
shuttering. For all items of all floors
from foundation up to roof levels all
inclusive.

cum
.

Sqm
.

0.480

2691.0
0

1291.68

144.00

144.00

TOTAL = Rs.
12396.63

CONTINGENCY @5% = Rs.


619.83

W.C. ESTABLISHMENT @ 2.5% = Rs.


309.91
TOTAL COST = Rs.
13326.37

PRIMARY
SCHOOL

BUILDIN
G

FRONT ELEVATION

BACKSIDE ELEVATION

SIDE ELEVATION

SECTION ABCD

SECTION EFGH

ESTIMATE OF SCHOOL BUILDING

Length

70.00
0

30.000

2100
.0

16.625

Breadth

Total
Quantity

Units

No.

Quantity

Description of
Items

Height

Sl.
No.

Explainatory
Notes

I. Substructure
1.

2.
(i.)
(ii.
)

Surface
Dressing to an
Average
Depth
Antitermide
Main Building
Assembly Hall

1
1

23.25
0
12.25
0

30.250

2100.0

386.
53
370.
56

(i.)
(ii.
)
(iii.
)
(iv.
)
(v.
)

Earthwork in
Excavation
350 X 250 mm
column for Main
Building
350 X 250 mm
column for
Assembly Hall
250 X 250 mm
Column for Main
Building
Foundation
Trench for Tie
Beam
Foundation
Trench for
Dwarf Wall
beside
Assembly Hall
Corridor

5.
(i.)
(ii.
)
(iii.
)
(iv.
)

3.550

2.550

1.20
0

184.
67

14

3.550

2.550

1.20
0

152.
08

2.250

2.250

1.20
0

48.6
0

239.7
5

0.375

0.25
0

22.4
8

30.25
0

0.600

0.52
5

9.53

Earthwork in
Filling
by earthwork in
1/5th of Excavated Earth
foundation
trenches.
Single Brick Flat
Soling
350 X 250 mm
column for Main
Building
350 X 250 mm
column for
Assembly Hall
250 X 250 mm
Column for Main
Building
Foundation
Trench for Tie

17

3.550

2.550

153.
89

14

3.550

2.550

126.
74

2.250

2.250

40.5
0

239.7
5

0.375

89.9
1

0.350 + 0.025
= 0.375

83.472

17

3.50 + 0.025 X
2
= 3.55
2.50 + 0.025 X
2
= 2.55
2.20 + 0.025 X
2
= 2.25

417.35
8
4.

Total Land
Required
for
construction.

757.09
4
3.

m
3

m
3

1/5 X 417.358

Beam
(v.
)

Foundation
Trench for
Dwarf Wall
beside
Assembly Hall
Corridor

30.25
0

0.600

18.1
5
429.18
4

6.

Plain Cement Concrete In Foundation With


M-20 Grade Concrete

(i.)

Foundation
Below 350 X
250
Foundation
Below 250 X
250
Foundation
under Floor

(ii.
)
(iii.
)

31

3.550

2.250

0.10
0

24.7
6

2.250

2.250

0.10
0

4.05

220.50
0

0.10
0

22.0
5

Total Area
=

m
3

m
3

(ii.
)

m
3

st

1 Class
Brickwork in
Cement
239.7
0.42 38.2
Mortar (1:4)
1
0.375
38.210
5
5
1
250 mm thick
from G.L to
P.L
8. Cement Concrete In Foundation With M-20 Grade Concrete
(i.)

50.861
7.

For Tie Beam


For Column
Footing
(a.) Main
Column of
350 X 250 mm
Lower
Rectangular
Portion
Lower Chamfer
Portion
Pedestral
(b.) Corridor
Column of
250 X 250 mm
Lower
Rectangular
Portion
Lower Chamfer
Portion
Pedestral

m
3

239.7
5

0.250

0.35
0

20.9
8

31

3.350

2.050

0.20
0

42.5
8

31

area
=

3.480

16.1
8

31

0.700

0.500

0.15
0
0.50
0

2.050

2.050

area
=

2.130

0.500

0.500

0.20
0
0.15
0
0.50
0

5.43

6.72

2.56

1.00

m
95.444
9. Mild Steel Reinforcement for Foundation and Plinth

II. Superstructure
1. Brickwork
A. Main Building
I. Ground Floor
(i.) 250 mm Thick Brick
Wall
(ii.) 125 mm Thick Brick
Wall
(a. Deduction for Doors
)
1.2 mm Wide Doors
(D2)
1.0 mm Wide Doors
(D3)
(b. Deduction for Windows
)
1.2 mm Wide Windows
(W2)
1.5 mm Wide Windows
(W3)
0.6 mm Wide Windows
(W4)
(c.) Deduction for Lintel

101.00

27.250

1.200

1.000

21

1.200

1.500

0.600

81.750

2.95
0
1.35
0

74.4
9

m3

4.60

m3

3.15

m3

1.58

m3

7.56

m3

0.75

m3

0.12

m3

5.11

m3

0.25
0
0.12
5
0.25
0
0.25
0

2.10
0
2.10
0

0.25
0
0.25
0
0.25
0
0.25
0

1.20
0
2.00
0
0.40
0
0.25
0

60.82
2
II. First Floor
(i.) 250 mm Thick Brick
Wall
(ii.) 125 mm Thick Brick
Wall
(a. Deduction for Doors
)
1.2 mm Wide Doors
(D2)
1.0 mm Wide Doors
(D3)
(b. Deduction for Windows
)

101.00

27.250

1.200

1.000

0.25
0
0.12
5

2.95
0
1.35
0

0.25
0
0.25
0

2.10
0
2.10
0

Units

Length

K
g
K
g

Total
Quantity

No.

160 X 74.46

2307.8
00
11913.
600

Quantity

Description of Items

110 X
20.978

Height

Sl.
No.

110 kg/m3 of
concrete =
160 kg/m3 of
concrete =

Breadth

(a.) For Tie


Beam
(b.) For Column
Footing

m3

74.4
9

m3

4.60

m3

4.41

m3

1.05

m3

Explainatory
Notes

(c.)

1.2 mm Wide Windows


(W2)
1.5 mm Wide Windows
(W3)
0.6 mm Wide Windows
(W4)
Deduction for Lintel

21

1.200

1.500

0.600

81.750

0.25
0
0.25
0
0.25
0
0.25
0

1.20
0
2.00
0
0.40
0
0.25
0

7.56

m3

0.75

m3

0.12

m3

5.11

m3
60.08
7

III. Second Floor


(i.) 250 mm Thick Brick
Wall
(ii.) 125 mm Thick Brick
Wall
(a. Deduction for Doors
)
1.2 mm Wide Doors
(D2)
1.0 mm Wide Doors
(D3)
(b. Deduction for Windows
)
1.2 mm Wide Windows
(W2)
1.5 mm Wide Windows
(W3)
0.6 mm Wide Windows
(W4)
(c.) Deduction for Lintel

101.00

27.250

1.200

1.000

13

1.200

1.500

0.600

81.750

0.25
0
0.12
5

2.95
0
1.35
0

0.25
0
0.25
0

2.10
0
2.10
0

0.25
0
0.25
0
0.25
0
0.25
0

1.20
0
2.00
0
0.40
0
0.25
0

74.4
9

m3

4.60

m3

3.15

m3

1.05

m3

4.68

m3

0.75

m3

0.12

m3

5.11

m3
64.22
7

IV. Mumty Room


Deduction For 1.0 m
Wide Door (D3)
Deduction For Lintel

18.000

1.000

18.000

0.25
0
0.25
0
0.25
0

2.40
0
2.10
0
0.25
0

10.8
0
0.53

B. Assembly Hall
(i.) 250 mm Thick Brick
Wall
(ii.) 125 mm Thick Brick
Wall
(a. Deduction for Lintel
)
(b. Deduction For 1.50 mm
) Wide Doors (D1)
(c.) Deduction For 1.0 mm
Wide Windows (W1)

83.850

81.000

30.250

81.000

1.500

16

1.000

Total Brick Work in Superstructure =

0.12
5

0.75
0

m3

1.13

0.25
0
0.12
5
0.25
0
0.25
0
0.25
0

5.90
0
0.75
0
0.25
0
2.10
0
1.20
0

7.86

m3
m3

m3
9.150

V. Parapet Wall

m3

7.861

m3
m3

119.
48

m3

2.84

m3

5.06

m3

4.73

m3

4.80

m3
107.7
23
309.8
69

m3
m3

2. Concrete Work
A. Main Building
I. Ground Floor
(i.)

(ii.)

(iii.
)

(iv.
)

(v.)

Cement Concrete M15


Excluding
Reinforcement but
Including Shuttering for
Column.
For 350 X 250 mm
Column
For 250 X 250 mm
Column
Cement Concrete M15
Excluding
Reinforcement but
Including Shuttering for
Beam.
For 350 X 250 mm
Beams
For 250 X 250 mm
Beams
For 250 X 250 mm
Beams in Corridor at
Lintel level
Cement Concrete M15
Excluding
Reinforcement but
Including Shuttering for
Lintel.
Cement Concrete M15
Excluding
Reinforcement but
Including Shuttering for
Slabs.
Cement Concrete M15
Excluding
Reinforcement but
Including Shuttering for
Stairs.
Waist Slab
Landing
Steps

(vi.
)

0.25
0
0.25
0

3.30
0
3.30
0

0.25
0
0.25
0

0.35
0
0.25
0

27.250

0.25
0

81.750

0.25
0

Area = 156.5
m2

17

0.350

0.250

101.00

57.750

2.500

3.000

20

1.45
0
1.20
0

4.91

m3

1.65

m3

8.84

m3

3.61

m3

0.25
0

1.70

m3

0.25
0

5.11

m3

0.12
5

19.5
6

m3

1.09

m3

1.08

m3

4.50

m3

0.97

m3

0.07

m3

0.15
0
0.15
0

Volume of each
Step=0.225 m3

239.75-8157.75=101
239.75-81101= 57.75
From
Column C4
to H9
46.5 +
35.25 =
81.75

Cement Concrete M15


Excluding
Reinforcement but
Including Shuttering for
Chajja.
1.2 mm Wide Windows
(W2)
1.5 mm Wide Windows
(W3)

17

1.450

1.750

0.45
0
0.45
0

0.08
75
0.08
75

1.2 + .125
X 2 = 1.45
1.5 + .125
X 2 = 1.75

0.6 mm Wide Windows


(W4)

0.850

0.45
0

0.08
75

m3

0.07
53.15
5

0.6 + .125
X 2 = 0.85

m3

II. First Floor


(i.) Cement Concrete M15
Excluding
Reinforcement but
Including Shuttering for
Column.

(ii.)

(iii.
)

(iv.
)

(v.)

For 350 X 250 mm


Column
For 250 X 250 mm
Column
Cement Concrete M15
Excluding
Reinforcement but
Including Shuttering for
Beam.
For 350 X 250 mm
Beams
For 250 X 250 mm
Beams
For 250 X 250 mm
Beams in Corridor at
Lintel level
Cement Concrete M15
Excluding
Reinforcement but
Including Shuttering for
Lintel.
Cement Concrete M15
Excluding
Reinforcement but
Including Shuttering for
Slabs.
Cement Concrete M15
Excluding
Reinforcement but
Including Shuttering for
Stairs.
Waist Slab
Landing

Steps
(vi.
)

0.25
0
0.25
0

3.30
0
3.30
0

0.25
0
0.25
0

0.35
0
0.25
0

27.250

0.25
0

81.750

0.25
0

Area = 156.5
m2

17

0.350

0.250

101.00

57.750

2.500

3.000

20

1.45
0
1.20
0

4.91

m3

1.65

m3

8.84

m3

3.61

m3

0.25
0

1.70

m3

0.25
0

5.11

m3

0.12
5

19.5
6

m3

1.09

m3

1.08

m3

4.50

m3

0.97

m3

0.15
0
0.15
0

Volume of each
Step=0.225 m3

239.75-8157.75=101
239.75-81101= 57.75
From
Column C4
to H9
46.5 +
35.25 =
81.75

Cement Concrete M15


Excluding
Reinforcement but
Including Shuttering for
Chajja.
1.2 mm Wide Windows
(W2)

17

1.450

0.45
0

0.08
7

1.2 + .125
X 2 = 1.45

1.5 mm Wide Windows


(W3)
0.6 mm Wide Windows
(W4)

1.750

0.850

0.45
0
0.45
0

0.08
7
0.08
7

0.07

m3

0.07

m3
53.15
5

1.5 + .125
X 2 = 1.75
0.6 + .125
X 2 = 0.85

m3

III. Second Floor


(i.) Cement Concrete M15
Excluding
Reinforcement but
Including Shuttering for
Column.

(ii.)

(iii.
)

(iv.
)

(v.)

For 350 X 250 mm


Column
For 250 X 250 mm
Column
Cement Concrete M15
Excluding
Reinforcement but
Including Shuttering for
Beam.
For 350 X 250 mm
Beams
For 250 X 250 mm
Beams
For 250 X 250 mm
Beams in Corridor at
Lintel level
Cement Concrete M15
Excluding
Reinforcement but
Including Shuttering for
Lintel.
Cement Concrete M15
Excluding
Reinforcement but
Including Shuttering for
Slabs.

4.50
0
4.50
0

0.25
0
0.25
0

0.35
0
0.25
0

18.000

0.25
0

0.25
0

60.000

0.25
0

Area = 156.5
m2

0.350

0.250

101.00

57.750

6.69

m3

2.25

m3

8.84

m3

3.61

m3

1.13

m3

0.25
0

3.75

0.12
5

19.5
6

m3

1.09

m3

1.08

m3

4.50

m3

Cement Concrete M15


Excluding
Reinforcement but
Including Shuttering for
Stairs.
Waist Slab
Landing
Steps

(vi.
)

0.25
0
0.25
0

17

Cement Concrete M15


Excluding
Reinforcement but
Including Shuttering for
Chajja.

2
2
20

1.45
0.15
0
0
1.20
0.15
3.000
0
0
Volume of each Step
= 0.225m3
2.500

3.3 + 0.75
= 4.05
3.3 + 0.75
= 4.05

239.75-8157.75=101
239.75-81101= 57.75
From
Column C4
to F4
46.5 +
35.2521.75
=60.0

1.2 mm Wide Windows


(W2)
1.5 mm Wide Windows
(W3)
0.6 mm Wide Windows
(W4)

11

1.450

1.750

0.850

0.45
0
0.45
0
0.45
0

0.08
75
0.08
75
0.08
75

0.63

m3

0.07

m3

0.07

m3
53.26
0

IV. Mumty Room


(i.) Cement Concrete M15
Excluding
Reinforcement but
Including Shuttering for
Column.
(ii.)

(iii.
)

0.350

0.25
0

2.40
0

0.63

m3

Cement Concrete M15


Excluding
Reinforcement but
Including Shuttering for
Beam.

18.000

0.25
0

0.35
0

1.58

m3

Cement Concrete M15


Excluding
Reinforcement but
Including Shuttering for
Lintel.

1.250

0.25
0

0.25
0

0.08

m3

B. Assembly Hall
(i.) Cement Concrete M15
Excluding
Reinforcement but
Including Shuttering for
350 X 250 mm Column.
(ii.)

(iii.
)

Cement Concrete M15


Excluding
Reinforcement but
Including Shuttering for
350 X 250 mm Beam.
Cement Concrete M15
Excluding
Reinforcement but
Including Shuttering for
250 X 250 mm Lintel.

0.350

0.25
0

6.60
0

8.09

m3

81.000

0.25
0

0.35
0

14.1
8

m3

81.000

0.25
0

0.25
0

5.06

m3

3. Wood Work

(a.
)

Salwood work for


frames
Of Doors:-

27.32
3
189.1
74

1.0 + 2 X
1.25 = 1.25

m3

14

Total Volume Of Concrete required in Superstructure =

(i.)

m3

2.283

1.2 + .125
X 2 = 1.45
1.5 + .125
X 2 = 1.75
0.6 + .125
X 2 = 0.85

m3
m3

30.25 X 2 +
10.25 X 2
=81

(b.
)

1.5m wide Doors (D1)

5.800

0.10
0

0.07
5

0.26

1.2m wide Doors (D2)

17

5.500

0.10
0

0.07
5

0.70

m3

1.0m wide Doors (D3)

5.300

0.10
0

0.07
5

0.32

m3

0.07
5

0.42

0.07
5

1.50

Of Windows:1.0m wide Windows


(W1)

16

3.500

0.10
0

1.2 m wide Windows


(W2)

54

3.700

0.10
0

3.199
(ii.)
(a.
)

(b.
)

2.1 + 0.05
=
2.15 X 2 +
1.5 = 5.80
2.1 + 0.05
=
2.15 X 2 +
1.2 = 5.50
2.1 + 0.05
=
2.15 X 2 +
1.0 = 5.30
1.2 + 0.05
=
1.25 X 2 +
1.0 =3.50
1.2 + 0.05
=
1.25 X 2 +
1.20 =3.70

m3

35mm Thick Flush Type


Door and Window
Shutters.
Of Doors:1.5m wide Doors (D1)

1.2m wide Doors (D2)

17

1.0m wide Doors (D3)

16

54

1.38
0
1.08
0
0.88
0

2.05
5
2.05
5
2.05
5

17.0
2
37.7
3
14.4
7

0.88
0
1.08
0

1.15
5
1.15
5

16.2
6
67.3
6

m2
m2
m2

Of Windows:1.0m wide Windows


(W1)
1.2 m wide Windows
(W2)

m2
m2
60.72
0

(iii.
)

Providing Annodised
Alluminium Butt Hinges

(a.
)

125 X 75 X 4 mm Size
For:1.5m wide Doors (D1)
1.2m wide Doors (D2)
1.0m wide Doors (D3)

6X
3
17
X3
8X
3

100 X 63 X3.2 mm Size


For:-

m2

18

No.

51

No.

24

No.
93.00
0

(b.
)

No
.

2.1 -0.075
+ (0.015 X
2)
=2.055
For D1 :
1.5 - (2 X
0.075) +(2
X 0.015) =
1.380
1.2 -0.075
+
(0.015 X
2)= 1.155

1.0m wide Windows


(W1)
1.2 m wide Windows
(W2)

16
X3
54
X3

48

No.

162

No.
210.0
00

(iv.
)

Providing and Fixing


Tower Bolt 300mm long
X 12mm dia.
For All Doors (D1, D2,
D3)
For All Windows (W1,
W2)

1X3
1
1X7
0

31

No.

70

No.
101.0
00

(v.)

1.2m wide Doors (D2)


1.0m wide Doors (D3)

6X
1
17
X1
8X
1

No.

17

No.

No.
31.00
0

1X3
1

31

No.

1X7
0

70

No.
101.0
00

Providing Anodised
Aluminium Floor Door
Stopper For All Doors
D1, D2, D3,)

1X3
1

31

Providing 150mm Long


Catch Lock with Eyes
For Windows (W1, W2)

1X7
0

70

No
.
No.

70.00
0
4. Steel and Iron Work

No
.
No.

31.00
0
(vii
)

No
.

Providing Anodised
Aluminium Grip Handle
without Base Plate
450mm grip X 25mm
dia rod
For All Doors (D1, D2,
D3)
For All Windows (W1,
W2)

(vii
)

No
.

Providing And Fixing


Aldrop(Sliding Bolt)
250mm X 18mm dia
bolt
1.5m wide Doors (D1)

(vi.
)

No
.

No
.

(i.)

Tor Steel Reinforcement


Bars in R.C.C. Works.

(90%) of Volume of
Concrete
189.07 X 90/100

170.
1
170.1
63

(ii.)

(iii.
)

(iv.
)

(v.)

M.S. Grills for Steel


Windows in Stair Room
(W3)
M.S. Grills for Steel
Windows in Bath
Rooms and Toilets (W4)

7.00
0

0.05
0

1.05

m2

(1.50 X 2)
+ (2.0 X 2)
= 6.5

2.00
0

0.05
0

1.35

m2

(0.6 X 2) +
(0.4 X 2) =
2.0

16

54

0.85
0
1.40
0
0.50
0
0.50
0
2.63
0

1.05
0
1.40
0
0.30
0
0.30
0
0.60
0

M.S. Ornamental Grills


1.0m wide Windows
(W1)
1.2m wide Windows
(W2)
1.5m wide Windows
(W3)
0.6m wide Windows
(W4)
M.S. Ornamental Grills
For Ballustrade

14.2
8
105.
84

m2
m2

0.45

m2

0.90

m2

9.47
132.4
38

5.Plastering and Pointing


I. Main Building
A.Inside Plastering
I. Ground Floor
(i.) 12cm Thick Cement
Plaster (1:6) to wall.
Toilet
Enquiry Room
Headmaster's Room
Store Room
Waiting Room
Play Room

Corridor
(a.
)

kg

4.000

14.000

18.000

22.000

22.000

3.15
0
3.15
0
3.15
0
3.15
0
3.15
0

25.2
0
44.1
0
56.7
0
69.3
0
69.3
0

m2

m2
m2
m2
m2
m2

26.000

3.15
0

81.9
0

m2

50.000

3.15
0

157.
50

m2

1.200

2.10
0

12.6
0

m2

Deduction for Doors


1.2 mm Wide Doors
(D2)

3.3 - 0.15 =
3.15

(27.25 X 2
+ 2.25 0.75
- 6.00) =
50.00

(b.
)

(c.)

1.0 mm Wide Doors


(D3)
Deduction for Windows

1.000

1.2 mm Wide Windows


(W2)
1.5 mm Wide Windows
(W3)
0.6 mm Wide Windows
(W4)

21

1.200

1.500

0.600

Open Space at Corridor

27.250

2.10
0

6.30

m2

1.20
0
2.00
0
0.40
0

30.2
4
3.00

m2

0.48

m2

1.80
0

49.0
5

m2

m2

402.3
30
(ii.)

6cm Thick Cement


Plaster (1:4) to Ceiling
Toilet
Enquiry Room
Headmaster's Room
Store Room
Waiting Room
Play Room
Corridor
Panel S3
Panel S5
Panel S8
Panel S10
Panel S11
Panel S13
Panel S4

2.000

2.000

4.000

6.000

6.000

8.000

4.250

6.000

5.000

3.000

4.000

4.000

6.000

2.00
0
5.00
0
5.00
0
5.00
0
5.00
0
5.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
5.00
0

Class Room
Library

4.000

22.000

26.000

m2

m2

8.00
10.0
0
20.0
0
30.0
0
30.0
0
40.0
0

m2
m2
m2
m2
m2

m2

8.50
12.0
0
10.0
0

m2
m2

6.00

m2

8.00

m2

8.00

m2

30.0
0

m2
220.5
00

II. 1st Floor


(i.) 12cm Thick Cement
Plaster (1:6) to wall.
Toilet

3.15
0
3.15
0

25.2
0
207.
90

3.15
0

81.9
0

(3.3 - 0.15 1.35) =


1.80

m2

m2

3.3 - 0.15 =
3.15

m2

m2

(27.25 X 2
+ 2.25 0.75
- 6.00) =
50.00

Corridor
(a.
)

(b.
)

(c.)

50.000

1.200

1.000

1.2 mm Wide Windows


(W2)
1.5 mm Wide Windows
(W3)
0.6 mm Wide Windows
(W4)

21

1.200

1.500

0.600

Open Space at Corridor

27.250

Deduction for Doors


1.2 mm Wide Doors
(D2)
1.0 mm Wide Doors
(D3)
Deduction for Windows

3.15
0

157.
50

m2

2.10
0
2.10
0

17.6
4

m2

4.20

m2

1.20
0
2.00
0
0.40
0

30.2
4
3.00

m2

0.48

m2

1.80
0

49.0
5

m2

m2

367.8
90
(ii.)

6cm Thick Cement


Plaster (1:4) to Ceiling
Toilet
Class Room
Library
Corridor
Panel S3
Panel S5
Panel S8
Panel S10
Panel S11
Panel S13
Panel S4

2.000

6.000

8.000

4.250

6.000

5.000

3.000

4.000

4.000

6.000

2.00
0
5.00
0
5.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
5.00
0

Class Room
Corridor
(a.
)

Deduction for Doors

4.000

22.000

50.000

m2

m2

8.00
90.0
0
40.0
0

m2
m2

m2

8.50
12.0
0
10.0
0

m2
m2

6.00

m2

8.00

m2

8.00

m2

30.0
0

m2
220.5
00

III. 2nd Floor


(i.) 12cm Thick Cement
Plaster (1:6) to wall.
Toilet

3.15
0
3.15
0
3.15
0

25.2
0
207.
90
157.
50

(3.3 - 0.15 1.35) =


1.80

m2

m2
m2
m2

3.3 - 0.15 =
3.15

(b.
)

(c.)

1.2 mm Wide Doors


(D2)
1.0 mm Wide Doors
(D3)
Deduction for Windows

1.200

1.000

1.2 mm Wide Windows


(W2)
1.5 mm Wide Windows
(W3)
0.6 mm Wide Windows
(W4)

13

1.200

1.500

0.600

Open Space at Corridor

16.500

2.10
0
2.10
0

12.6
0

m2

4.20

m2

1.20
0
2.00
0
0.40
0

18.7
2
3.00

m2

0.48

m2

1.80
0

29.7
0

m2

m2

321.9
00
(ii.)

6cm Thick Cement


Plaster (1:4) to Ceiling
Toilet
Class Room
Corridor
Panel S3
Panel S5
Panel S8
Panel S10
Panel S4

2.000

6.000

4.250

6.000

5.000

3.000

6.000

2.00
0
5.00
0
2.00
0
2.00
0
2.00
0
2.00
0
5.00
0

8.00

m2

90.0
0

m2

8.50

m2

12.0
0
10.0
0

m2
m2

6.00

m2

30.0
0

m2
164.5
00

IV. Stair Room


(i.) 12cm Thick Cement
Plaster (1:6) to wall.
Deduction for 1.0m
Wide Door(D3)

13.000

11.7
00

0.900

1.80
0

6cm Thick Cement


Plaster (1:4) to:
Roof
Under Intermediate
Landings
Under End Landings
Under Ceiling of Mumty
Room

5.000

1.200

1.200

5.000

3.00
0
3.00
0
3.00
0
3.00
0

m2

152.
10

m2

1.62

m2
150.4
80

(ii.)

m2

(3.3 - 0.15 1.35) =


1.80
(4.5 + 6 +
5 + 1) =
16.5

15.0
0
10.8
0
10.8
0
15.0
0

m2

m2
m2
m2
51.60

m2

(3.3 + 3.3
+ 3.3 +
2.4)
= 12.3

0
B. Outside Plastering
(i.) 12cm Thick Cement
Plaster (1:6) on Outside
walls.
(a. From G.L to 2nd Floor
) Level
(b. From 2nd Floor to Roof
) Level
(c.) From 2nd Floor to
Mumty Room Level

(d.
)

Parapet Wall

(e.
)

Chajja
1.2 mm Wide Windows
(W2)
1.5 mm Wide Windows
(W3)
0.6 mm Wide Windows
(W4)

(a.
)

(b.
)

(c.)

Side Faces of all the


Chajja
Deduction for Doors
1.2 mm Wide Doors
(D2)
1.0 mm Wide Doors
(D3)
Deduction for Windows
1.2 mm Wide Windows
(W2)
1.5 mm Wide Windows
(W3)
0.6 mm Wide Windows
(W4)
Open Space at Corridor

92.000

75.500

6.60
0
3.30
0

607.
20
249.
15

m2
m2

16.000

3.15
0

50.4
0

m2

1
X
2

99.500

0.75
0

149.
25

m2

1.450

0.45
0

58.7
3

1.750

0.45
0

4.73

0.850

0.45
0

4.59

0.450

0.08
5

4.13

1.200

1.000

13

1.200

1.500

0.600

16.500

45
X
2
3
X
2
6
X
2
10
8

2.10
0
2.10
0

12.6
0

m2

4.20

m2

1.20
0
2.00
0
0.40
0
1.80
0

18.7
2
3.00

m2

0.48

m2

29.7
0

m2

m2

1059.
47

m2

II. Assembly Hall


A.Inside Plastering
(i.) 12cm Thick Cement
Plaster (1:6) to wall.
(a. Deduction For 1.5 m
) Wide Door (D1)
(b. Deduction For 1.0 m
) Wide Window (W1)

40.000

1.500

16

1.000

6.60
0
2.10
0
1.20
0

264.
00
18.9
0
19.2
0

m2
m2
m2

2 times for
both faces
of the
parapet
Wall

225.9
00
B. Outside Plastering
(i.) 12cm Thick Cement
Plaster (1:6) to wall of
Main Assembly Hall
Building.
(a.
)
(b.
)
(ii.)

Deduction For 1.5 m


Wide Door (D1)
Deduction For 1.0 m
Wide Window (W1)
12cm Thick Cement
Plaster (1:6) to Dwarf
Wall beside Assembly
Hall.

41.000

1.500

16

1.000

1
X
2

30.250

6.60
0

270.
60

2.10
0
1.20
0

18.9
0
19.2
0

0.75
0

45.3
8

m2

m2
m2

m2
277.8
75

Total Cement Plaster Work in Superstructure =


6.Flooring
A. Main Building
1. Internal Surface
I. Ground Floor
(i.) 20mm Thick Terrazo
Work for Skirting 30 cm
High.
Toilet
Enquiry Room
Headmaster's Room
Store Room
Waiting Room
Play Room
Corridor
(a.
)

4.000

14.000

18.000

22.000

22.000

26.000

50.000

Deduction for Doors


1.2 mm Wide Doors
(D2)
1.0 mm Wide Doors
(D3)

3060.
61

m2
m2

8.00
14.0
0
18.0
0
22.0
0
22.0
0
26.0
0
50.0
0

r.m
r.m
r.m
r.m
r.m
r.m
r.m

1.200

6.00

r.m

1.000

3.00

r.m
151.0
00

(ii.)

m2

r.m

75mm Thick Terrazo


Flooring in lime
Concrete (11/2:2:7)
Toilet
Enquiry Room

2.000

2.000

2.00
0
5.00
0

8.00

m2

10.0
0

m2

Headmaster's Room
Store Room
Waiting Room
Play Room
Corridor
Panel S3
Panel S5
Panel S8
Panel S10
Panel S11
Panel S13
Panel S4

4.000

6.000

6.000

8.000

4.250

6.000

5.000

3.000

4.000

4.000

6.000

5.00
0
5.00
0
5.00
0
5.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
5.00
0

20.0
0
30.0
0
30.0
0
40.0
0

m2
m2
m2
m2

m2

8.50
12.0
0
10.0
0

m2
m2

6.00

m2

8.00

m2

8.00

m2

30.0
0

m2
220.5
00

(iii.
)

25mm Thick Terrazo


Work Cast in situ in
floor.
Toilet
Enquiry Room
Headmaster's Room
Store Room
Waiting Room
Play Room
Corridor
Panel S3
Panel S5
Panel S8
Panel S10
Panel S11
Panel S13
Panel S4

2.000

2.000

4.000

6.000

6.000

8.000

4.250

6.000

5.000

3.000

4.000

4.000

6.000

2.00
0
5.00
0
5.00
0
5.00
0
5.00
0
5.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
5.00
0

m2

m2

8.00
10.0
0
20.0
0
30.0
0
30.0
0
40.0
0

m2
m2
m2
m2
m2

m2

8.50
12.0
0
10.0
0

m2
m2

6.00

m2

8.00

m2

8.00

m2

30.0
0

m2
220.5
00

m2

(iv.
)

Supplying, fitting and


fixing Porcelain
coloured tiles for Dado
in:
(a.) Toilet

8.000

1.80
0

28.8
0

m2
201.3
00

II. 1st Floor


(i.) 20mm Thick Terrazo
Work for Skirting 30cm
High.
Toilet
Class Room
Library
Corridor
(a.
)

4.000

22.000

26.000

50.000

Deduction for Doors


1.2 mm Wide Doors
(D2)
1.0 mm Wide Doors
(D3)

8.00
66.0
0
26.0
0
50.0
0

r.m
r.m
r.m
r.m

r.m

1.200

8.40

1.000

2.00

r.m
139.6
00

(ii.)

r.m

75mm Thick Terrazo


Flooring in lime
Concrete (11/2:2:7)
Toilet
Class Room
Library
Corridor
Panel S3
Panel S5
Panel S8
Panel S10
Panel S11
Panel S13
Panel S4

2.000

6.000

8.000

2.00
0
5.00
0
5.00
0

m2

8.00
90.0
0
40.0
0

m2
m2
m2

4.250

6.000

5.000

3.000

4.000

4.000

6.000

2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
5.00
0

m2

8.50
12.0
0
10.0
0

m2

6.00

m2

8.00

m2

8.00

m2

30.0
0

m2
220.5
00

(iii.
)

m2

25mm Thick Terrazo


Work Cast in situ in
floor.

m2

Toilet
Class Room
Library
Corridor
Panel S3
Panel S5
Panel S8
Panel S10
Panel S11
Panel S13
Panel S4

2.000

6.000

8.000

2.00
0
5.00
0
5.00
0

m2

8.00
90.0
0
40.0
0

m2
m2
m2

4.250

6.000

5.000

3.000

4.000

4.000

6.000

2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
5.00
0

m2

8.50
12.0
0
10.0
0

m2

6.00

m2

8.00

m2

8.00

m2

30.0
0

m2
220.5
00

(iv.
)

Supplying, fitting and


fixing Porcelain
coloured tiles for Dado
in:
(a.) Toilet

8.000

1.80
0

28.8
0

m2
239.3
00

III. 2nd Floor


(i.) 20mm Thick Terrazo
Work for Skirting 30cm
High.
Toilet
Class Room
Corridor
(a.
)

4.000

22.000

50.000

Deduction for Doors


1.2 mm Wide Doors
(D2)
1.0 mm Wide Doors
(D3)

8.00
66.0
0
50.0
0

m2

r.m
r.m
r.m

r.m

1.200

6.00

r.m

1.000

2.00

r.m
116.0
00

(ii.)

m2

r.m

75mm Thick Terrazo


Flooring in lime
Concrete (11/2:2:7)
Toilet
Class Room
Corridor

2.000

6.000

2.00
0
5.00
0

8.00

m2

90.0
0

m2

Panel S3
Panel S5
Panel S8
Panel S10
Panel S4

4.250

6.000

5.000

3.000

6.000

2.00
0
2.00
0
2.00
0
2.00
0
5.00
0

m2

8.50
12.0
0
10.0
0

m2
m2

6.00

m2

30.0
0

m2
164.5
00

(iii.
)

25mm Thick Terrazo


Work Cast in situ in
floor.
Toilet
Class Room
Corridor
Panel S3
Panel S5
Panel S8
Panel S10
Panel S4

2.000

6.000

4.250

6.000

5.000

3.000

6.000

2.00
0
5.00
0
2.00
0
2.00
0
2.00
0
2.00
0
5.00
0

8.00

m2

90.0
0

m2

8.50

m2

12.0
0
10.0
0

m2
m2

6.00

m2

30.0
0

m2
164.5
00

(iv.
)

m2

m2

Supplying, fitting and


fixing Porcelain
coloured tiles for Dado
in:
(a.) Toilet

8.000

1.80
0

28.8
0

m2
214.8
00

m2

IV. Stair Room


(a.
)

12mm Thick Terazzo


Work for Skirting 30cm
heigh
Deduction for 1.0 m
wide Doors (D3)

13.000

13.0
0

m2

0.900

0.90

m2
12.10
0

(b.
)

25mm Thick Terrazo


Work cast in situ in
floor.
Landings

m2
6

1.200

Steps:

3.00
0

21.6
0

m2
m2

Treads

54

1.450

0.25
0

19.5
8

m2

Riser

60

1.450

0.15
0

13.0
5
54.22
5

V. Roof
(i.) 40cm Thick Terrazo
Flooring in lime
Concrete (11/2:2:7)
(ii.) 20mm Thick Terrazo
Work cast in situ in
floor.
(iii. 20mm Thick Terrazo
) Work for Skirting 30cm
High.

Area = 662.94

662.
94

m2

Area = 662.94

662.
94

m2

117.50

0.30
0

35.2
5

m2

1361.
13
2. External Surface
(i.) Neat Cement Punning
to a height of 700 mm

92.000

0.70
0

64.4
0

Around Dwarf wall of


Assembly Hall

m2

m2

40.000

0.30
0

12.0
0

m2

1.500

0.30
0

2.70

m2

30.000

10.0
00

300.
00

m2
309.3
0

2. External Surface
(i.) 20mm Thick Terrazo
Work for Skirting 30cm
High.
(ii.) 20mm Thick Terrazo
Work cast in situ in
floor.
(iii. Neat Cement Punning
) to a height of 700 mm
Around Main Assembly
Hall

m2

34.000

0.75
0

25.5
0

m2

30.000

2.00
0

60.0
0

m2

82.000

0.75
0

61.5
0

m2

35.500

0.75
0

26.6
3

m2

Total Flooring Work Required in Superstructure =

Area of
Antitermide

m2
64.4

II. Assembly Hall


1. Internal Surface
(i.) 20mm Thick Terrazo
Work for Skirting 30cm
High.
(a. Deduction For 1.5 m
) Wide Door (D1)
(ii.) 20mm Thick Terrazo
Work cast in situ in
floor.

m2

173.6
2
7669.
0

(30 + 2 +
2) = 34

((30.5 +
10.5) X 2)
= 82
(30.5 + 2.5
+ 2.5) =
35.5

m2
m2

7. Painting
I. Painting on Timber Surface
6 X 2 =12
(as painting

has to b
done on
both the
faces of the
Door)
(a.
)

(b.
)

Of Doors:1.5m wide Doors (D1)

12

1.500

1.2m wide Doors (D2)

34

1.200

1.0m wide Doors (D3)

16

1.000

Of Windows:-

2.10
0
2.10
0
2.10
0

37.8
0
85.6
8
33.6
0

m2
m2
m2

1.0m wide Windows


(W1)

32

1.000

1.20
0

38.4
0

m2

1.2 m wide Windows


(W2)

10
8

1.200

1.20
0

155.
52

m2
351.0
00

II. Painting on Steel Surface


(a. M.S. Ornamental Grills
)
1.0m wide Windows
16
(W1)
1.2m wide Windows
54
(W2)
1.5m wide Windows
3
(W3)
0.6m wide Windows
6
(W4)
(b. M.S. Ornamental Grills
6
) For Ballustrade

0.85
0
1.40
0
0.50
0
0.50
0
2.63
0

1.05
0
1.40
0
0.30
0
0.30
0
0.60
0

14.2
8
105.
84

54 X 2
=108 (as
painting
has to b
done on
both the
faces of the
Window)

m2

m2
m2

0.45

m2

0.90

m2

9.47

m2
130.9
38

m2

8. White and Colour Washing


I. Main Building
A.Inside Surface
I. Ground Floor
(i.) Plastic Emulsion Paint
two coats on inner
walls and ceilings.
Walls
Toilet
Enquiry Room
Headmaster's Room

4.000

14.000

18.000

3.15
0
3.15
0
3.15
0

25.2
0
44.1
0
56.7
0

m2
m2
m2

3.3 - 0.15 =
3.15

Store Room
Waiting Room

22.000

22.000

Play Room

(b.
)

(c.)

69.3
0
69.3
0

m2
m2

26.000

3.15
0

81.9
0

m2

50.000

3.15
0

157.
50

m2

1.200

12.6
0

m2

1.000

2.10
0
2.10
0

6.30

m2

1.2 mm Wide Windows


(W2)
1.5 mm Wide Windows
(W3)
0.6 mm Wide Windows
(W4)

21

1.200

1.500

30.2
4
3.00

m2

1
2

0.600

1.20
0
2.00
0
0.40
0

0.48

m2

Open Space at Corridor

27.250

1.80
0

49.0
5

m2

Corridor
(a.
)

3.15
0
3.15
0

(27.25 X 2
+ 2.25 0.75
- 6.00) =
50.00

Deduction for Doors


1.2 mm Wide Doors
(D2)
1.0 mm Wide Doors
(D3)
Deduction for Windows

m2

402.3
30

m2

Ceilings
Toilet
Enquiry Room
Headmaster's Room
Store Room
Waiting Room
Play Room
Corridor
Panel S3
Panel S5
Panel S8
Panel S10
Panel S11
Panel S13
Panel S4

2.000

2.000

4.000

6.000

6.000

8.000

4.250

6.000

5.000

3.000

4.000

4.000

6.000

2.00
0
5.00
0
5.00
0
5.00
0
5.00
0
5.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
5.00
0

8.00
10.0
0
20.0
0
30.0
0
30.0
0
40.0
0
8.50
12.0
0
10.0
0

m2
m2
m2
m2
m2
m2

m2
m2
m2

6.00

m2

8.00

m2

8.00

m2

30.0
0

m2

(3.3 - 0.15 1.35) =


1.80

220.5
00
II. 1st Floor
(i.) Plastic Emulsion Paint
two coats on inner
walls and ceilings.
Walls
Toilet
Class Room

4.000

22.000

Library

(b.
)

(c.)

25.2
0
207.
90

m2

3.3 - 0.15 =
3.15

m2

26.000

3.15
0

81.9
0

m2

50.000

3.15
0

157.
50

m2

1.200

17.6
4

m2

1.000

2.10
0
2.10
0

4.20

m2

1.2 mm Wide Windows


(W2)
1.5 mm Wide Windows
(W3)
0.6 mm Wide Windows
(W4)

21

1.200

1.500

30.2
4
3.00

m2

1
2

0.600

1.20
0
2.00
0
0.40
0

0.48

m2

Open Space at Corridor

27.250

1.80
0

49.0
5

m2

Corridor
(a.
)

3.15
0
3.15
0

m2

(27.25 X 2
+ 2.25 0.75
- 6.00) =
50.00

Deduction for Doors


1.2 mm Wide Doors
(D2)
1.0 mm Wide Doors
(D3)
Deduction for Windows

m2

367.8
90
Ceilings
Toilet
Class Room
Library
Corridor
Panel S3
Panel S5
Panel S8
Panel S10
Panel S11
Panel S13

2.000

6.000

8.000

4.250

6.000

5.000

3.000

4.000

4.000

2.00
0
5.00
0
5.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0

8.00
90.0
0
40.0
0
8.50
12.0
0
10.0
0

m2

m2
m2
m2

m2
m2
m2

6.00

m2

8.00

m2

8.00

m2

(3.3 - 0.15 1.35) =


1.80

Panel S4

6.000

5.00
0

30.0
0

m2
220.5
00

III. 2nd Floor


(i.) Plastic Emulsion Paint
two coats on inner
walls and ceilings.
Walls
Toilet

4.000

22.000

50.000

1.200

1.000

1.2 mm Wide Windows


(W2)
1.5 mm Wide Windows
(W3)
0.6 mm Wide Windows
(W4)

13

1.200

1.500

0.600

Open Space at Corridor

16.500

Class Room
Corridor
(a.
)

(b.
)

(c.)

Deduction for Doors


1.2 mm Wide Doors
(D2)
1.0 mm Wide Doors
(D3)
Deduction for Windows

3.15
0
3.15
0
3.15
0

25.2
0
207.
90
157.
50

2.10
0
2.10
0

12.6
0

m2

4.20

m2

1.20
0
2.00
0
0.40
0

18.7
2
3.00

m2

0.48

m2

1.80
0

29.7
0

m2

m2

Class Room
Corridor
Panel S3
Panel S5
Panel S8
Panel S10
Panel S4

2.000

6.000

4.250

6.000

5.000

3.000

6.000

2.00
0
5.00
0
2.00
0
2.00
0
2.00
0
2.00
0
5.00
0

m2

m2

8.00

m2

90.0
0

m2

8.50

m2

12.0
0
10.0
0

m2
m2

6.00

m2

30.0
0

m2
164.5
00

IV. Stair Room


(i.) Plastic Emulsion Paint
two coats on inner
walls and ceilings.

13.000

11.7
00

152.
10

(3.3 - 0.15 1.35) =


1.80
(4.5 + 6 +
5 + 1) =
16.5

m2

3.3 - 0.15 =
3.15

m2

321.9
00
Ceilings
Toilet

m2

m2

m2

(3.3 + 3.3
+ 3.3 +
2.4)

= 12.3
Deduction for 1.0m
Wide Door(D3)

0.900

1.80
0

m2

1.62
150.4
80

Roof
Under Intermediate
Landings
Under End Landings
Under Ceiling of Mumty
Room

5.000

1.200

1.200

5.000

3.00
0
3.00
0
3.00
0
3.00
0

15.0
0
10.8
0
10.8
0
15.0
0

m2
m2
m2
51.60
0

B. Outside Surface
(i.) Decorative Cement
based paint two coats
for outside
(a. From G.L to 2nd Floor
) Level
(b. From 2nd Floor to Roof
) Level
(c.) From 2nd Floor to
Mumty Room Level

(d.
)

Parapet Wall

(e.
)

Chajja
1.2 mm Wide Windows
(W2)
1.5 mm Wide Windows
(W3)
0.6 mm Wide Windows
(W4)

(a.
)

(b.
)

Side Faces of all the


Chajja
Deduction for Doors
1.2 mm Wide Doors
(D2)
1.0 mm Wide Doors
(D3)
Deduction for Windows
1.2 mm Wide Windows
(W2)

92.000

75.500

6.60
0
3.30
0

607.
20
249.
15

m2

m2

m2
m2

16.000

3.15
0

50.4
0

m2

1
X
2

99.500

0.75
0

149.
25

m2

1.450

0.45
0

58.7
3

1.750

0.45
0

4.73

0.850

0.45
0

4.59

0.450

0.08
5

4.13

1.200

1.000

13

1.200

45
X
2
3
X
2
6
X
2
10
8

2.10
0
2.10
0

12.6
0

m2

4.20

m2

1.20
0

18.7
2

m2

2 times for
both faces
of the
parapet
Wall

(c.)

1.5 mm Wide Windows


(W3)
0.6 mm Wide Windows
(W4)
Open Space at Corridor

1.500

0.600

16.500

2.00
0
0.40
0
1.80
0

3.00

m2

0.48

m2

29.7
0

m2

1059.
471
II. Assembly Hall
A.Inside Surface
(i.) Plastic Emulsion Paint
two coats on inner
walls and ceilings.
(a. Deduction For 1.5 m
) Wide Door (D1)
(b. Deduction For 1.0 m
) Wide Window (W1)

40.000

1.500

16

1.000

6.60
0

264.
00

2.10
0
1.20
0

18.9
0
19.2
0

m2
m2
m2
225.9
00

B. Outside Surface
(i.) Decorative Cement
based paint two coats
for outside
(a. Deduction For 1.5 m
) Wide Door (D1)
(b. Deduction For 1.0 m
) Wide Window (W1)
(i.) Decorative Cement
based paint two coats
for outside

41.000

1.500

16

1.000

1
X
2

30.250

6.60
0

270.
60

2.10
0
1.20
0

18.9
0
19.2
0

0.75
0

45.3
8

m2

m2

m2
m2
m2
m2
277.8
75

m2

ABSTRACT OF ESTIMATE OF SCHOOL


BUILDING
UNIT

SL
DESCRIPTION OF ITEMS
NO
.
1. Antitermite treatment to the top
surface of the cosolidated each with in
plinth walls with chemical emulsion by
admixing chloropyrefos emulsifiable
concentrates (1% concentration) with
water by weigh at the rate of 5 litres
per sqm of the surface before sand
bed or sub grade is laid.Holes upto
50mm to 75 mm deep at 150 mm
sq.
centre to centre both ways shall be
m.
made with 12 mm dia mild steel rod
on the surface to facililate saturation
of the soil with the chemical
emulsion.The work shall be carried out
as per specification described in para
6.4 of IS 6313 (Part II)-1981. (Mode of
measurement will be per sqm of plan
area of plinth treated)
2. Earth work in excavation of foundation
trenches or drums in all sorts of soils
(including mixed soil but excluding
lateritic or sand stone) including
removing spreading or stacking the
cum
spits with in a lead of 75 m as
.
directed. The item includes necessary
ramming the side of trenches leveling,
dressing and ramming the bottom
bailing out water as required.
3. Earthwork in filling in foundation
trenches, plinth, pits etc. with good
soil in layer not exceeding 150 mm
cum
including watering, ramming etc. layer
.
complete (Payment to be made on
basis of measurement of finished
quantity of work.) with soil obtained

QUANTIT
Y

RATE

AMOUN
T

757.094

78.00

59053.3
3

417.358

72.35

30195.8
5

83.472

45.00

3756.24

from excavation of foundation.

4. Providing and filling cleaning silver


sand to sides of carriage, in layers not
exceeding
150
mm
including
cum
watering, ramming etc. layer by layer
.
complete in all respect as per
direction. (Payment to be made on
measurement of finished quantity.)
5. Single brick flat soling with picked
jhama bricks in steps etc. including
ramming and dressing bed to proper sq.
level and filling joints with local sand m.
complete in all respects with all labour
and materials
6. Cement concrete with or without
reinforcement with graded clean
coarse aggregate nominal size 20 mm
down mixed with coarse clean sand
conforming Zone I or Zone II of IS-383
of latest edition both of approved
quality
as
necessary
including
preparation of design mix and cost for
quality control, sampling, testing etc.
Vibrating with vibrator, curing as
directed. All complete with all labour
and matirials but excluding cost of
shuttering and reinforcements as
detailed in the specifications and as
directed by the Engineer-in-charge.
Complete (Thickness and shape as per
drawing). To lintel, chajja, apron,
footing, R.walls column shaft, lift wall,
floor and roof beams & slabs, parapet
wall, over laying & course, stair waist
and landing slab, steps, projections,
weather board, folded plate etc. as
per drawing & directions from
Foundation to parapet for all levels.
a. M20 grade of concrete (cement not cum
less than 390 Kg. Cu. M. of concrete
.
b. M 15 grade concrete for P.C.C.
cum
.
8. Brick work in cement mortar 1:6 ( 1
cement and 6 medium sand) with 1st
class brick wetted for 24 hours in cum
pounding, having crushing strength
.
not less than 70 Kg./Sq. cm. including
cut bricks etc. complete in all respects

205.74

388.80

79991.7
1

429.182

313.00

134333.
97

3011.0
0
2691.0
0

67085.0
0
329217.
00

1959.0
0

557395.
00

146.30
189.17

38.21

as per.

9. Brick work with first class bricks in


cement
mortar(1:4) in foundation & plinth
10. Reinforcement for reinforced concrete
work in the all sorts of structure
including distribution bars, srirups,
binders etc including supplying of rods
initial, straining and removal of loose
must (if necessary) cutting ensure
length, hooking and binding to correct
shape, placing in proper position and
binding with 16 gauge black annealed
wire at every intersection, complete
as per direction
For works in
foundation basement & upto roof of
GF
11. Plaster (To wall, floor, ceiling etc.) both
inside and outside with sand and
cement mortar including rounding off
or chamfering corners and extra
thickness of mortar due to inequalities
of brick work or concrete surface as
directed and raking out joints or
roughing of concrete surface including
throating, nosing, drip course where
necessary in all floors.
i) 12 mm thick plaster with 1:4 cement
mortar.
ii) 6 mm thick plaster with 1:4 cement
mortar.
12. Cement plaster (1:4) with neat
cement punning about plinth wall
(plaster and punning)
13. Flooring :
a. 20 mm thick terrazzo work cast in situ
in floor skirting , stair case etc. laid in
panels or pattern as directed and
necessary terrazzo topping.
b. 75 mm thick grey artificial stone floor
with cement concrete (1:2:4) with
stone chips including 6 mm thick
skinning and smooth finishing to 3
mm thick at top made up with cement
and rounding off corners in ground
floor.

cum
.

309.87

2076.0
0

208929.
00

kg

170.163

70400.
00

1197947
5.2

2805.65

42.00

657.10

29.00

sq.
m.

152.50

45.00

2805.00

sq.
m

456.20

983.00

448444.
60

sq.
m.

1593.94

421.00

223635.
00

sq.
m.
sq.
m.

135423.
00
13797.0
0

c. 25 mm thick grey artificial stone floor


with cement concrete (1:2:4) with
stone chips including 6 mm thick
skinning and smooth finishing to 3
mm thick at top made up with cement
and rounding off corners in ground
floor.
14. Wood work in door & window frames
in curvature or straight supplied, fitted
and fixed in position including a
protective coat of priming at contact
surface of the frame. Knot & through
cracks free, seasoned wood shall be
supplied. Complete in all respect. All
labour and material included.
15. Supplying solid flush type doors of
deluxe decorative (Both side) quality,
confirming to I.S.-2202 timber frame
consisting of top, bottom, lock rail and
styled of well-seasoned timber 65 mm
wide each and the entire frame fitted
with 27.5 mm battens placed both
ways in order to made the door of
solid core and internal lapping with
teak, mahogany or rose wood of
decorative veneers using phenol for
maldehyde as glue etc. complete,
fitting, fixing the shutters in position
but excluding the cost hinge and other
in all floors.
a) 35 mm thick shutters. (Single
left)
16. Glazed shutters of windows fitted with
putty bed & Teak wood bead and nails
including fitting and fixing Shutter in
position but excluding the cost of
hinges and other fittings in floor.
a) 35 mm thick shutters
17. Supplying of M.S or W.I ornamental
grill of approved design joints
continuously welded with M.S/W.I flats
and bars for window, railing, fencing,
grating, etc. fitted and fixed with
necessary screws and lugs, with or
without welding as necessary in all
floor. 50 mm dia height equal to be
grouted with R.C slab/beam. Complete
with one coat of primer. Grills are to
be fixed through clamps of M.S flats to
the floors. All labour & material
included. Grill weighing above 14
Kg/Sq.M. up to 16 Kg/Sq.M.

sq.
m.

876.78

421.00

223635.
00

3.93

39147.
00

153848.
00

sq.
m.

69.22

1474.0
0

230814.
00

sq.
m.

83.62

1776.0
0

13817.0
0

sq.
m.

132.44

40.00

45483.0
0

cum
.

18. Providing and applying of two coats of


plastic emulsion paint of approved
shade and quality including a coat of
cement primer of approved quality
and quantity as per manufactures
specifications on wall, column, beams,
ceilings, etc. including preparation of
surface work and all necessary
scaffolding, staging. Complete with all
labour and materials in all floors.
19. Decorative cement based paint two
coats for
outside.
20. Painting of two coats on all exposed
areas with approved best quality
synthetic enamel paint / ready mixed
oil bound including smoothening
surface by sand papering etc. on the
surface if necessary at all floors to the
full satisfaction of Engineer-in-Charge.
Complete with material & labour in all
floors.
i) For new work:
a) On steel grill or frame or any other
metal surface (Highloss) Two coats
(Approved shade).
b) On timber or plastered surface two
coats of approved shade.

sq.
m.

2125.50

42.00

97333.0
0

sq.
m.

1337.38

32.00

25835.0
0

Sq.
m.

130.94

29.00

3422.00

Sq.
m.

351.0.

24.00

11097.0
0

TOTAL =
Rs.1,50,78,820.00
ADDING 10% FOR SANITARY =
Rs.15,07,882.00
ADDING 15% FOR ELECTRIFICATION =
Rs.22,61,823.00
TOTAL COST =
Rs.1,88,48,525.00

[*The Detailed Estimate has been prepared as per Architectural


Drawing and is subjected to change within the permissible
allowance of 5% when prepared according to the Structural
Drawing]

R.c.c
Design

SLAB
Design

DESIGN OF TWO WAY SLAB


For slab S6 AND S9

lx = 5.101 m , ly = 6.93 m
l y 5.101
=
=1.395
l x 6.93

ly
<2
lx

So, the slab is Two-way Slab.


Considering 125 mm overall depth of the slab.
Effective Span:
Overall depth, D =125 mm
Assuming 20 mm clear cover & 8 mm dia. of reinforcement to be used.
Effective depth along shorter direction (dx) = 125-20-(8/2) = 101 mm.
Effective depth along longer direction (dy) = 125-20-(8/2)-8 = 93 mm.
Effective span along shorter direction is smallest of the following
(i)Clear span + dx = 5.0 + 0.101 =
5.101 m
(ii) c/c distance between support =
5.0 + 0.25 = 5.25 m
So, lx = 5.101 m
Effective span along longer direction is smallest of the following
(i)Clear span + dy = 6 + 0.093 =
5.093 m
(ii)c/c distance between support
= 5 + 0.25 = 5.25 m
So, ly = 6.093 m
Design load:
(i)Dead weight of slab = (1x1x0.125x25) = 3.125 KN/m 2
(ii) Dead weight of floor finish = 1KN/m 2
(iii)Live load = 4 KN/m2

.. Total load = 8.125 KN/m2, Design load = (1.5x8.125) = 12.19 KN/m 2


Design moment:
According to Annex D, D-1.1,
Mx = xwlx2, My = ywlx2
Mx- = xw(lx,-)2 , My- = yw(lx,-)2
For end condition and

l y 6.093
=
=1.194 we have taken the value of & from
x
y
l x 5.101

I.S: 456 2000.


x = 0.0513 & y = 0.035

x=0.0707

&

y=0.047

Mx = 0.0513 x 12.19 x (5.101)2 = 16.27 KN m = 16.27 x 106 N mm,


My = 0.035 x 12.19 x (5.101)2 = 11.1 KN m = 11.1 x 106 N mm,
Mx- = 0.0707 x 12.19 x (5.101)2 = 22.4 KN-m = 22.4 X 106 N mm,
My- = 0.047 x 12.19 x (5.101)2 = 14.9 KN-m = 14.9 X 106 N mm,

Depth required :
Mx =

RU b d2x

.. dx =

MX
RU b

16.27 10
2.76 1000

= 76.78 mm.

[Ru = 0.138 fck =

0.138x20 = 2.76]
dx

provided

= 101 mm.

So, the section will be designed as under reinforced section.


Calculation of tensile reinforcement:

dx

2
fck X b b(dx )
4.6 Mx
1

1
0.5 fck
Astx =

fy

0.5 20
4.6 16.27 10
1 1
1000 101
2
=
415
20 1000 101
= 497.12 mm2

Asty=

0.5 fck
4.6 My
1 1
b( dy)
fy
fck X b (dy )2

0.5 20
4.6 11.1 106
1 1
2
415
20 1000 93

= 359.57 mm2
dx

2
fck X b b (dx )
M
4.6 x
1
1
0.5 fck
stx=

fy
A

0.5 20
4.6 22.4 10
1 1
1000 101
2
=
415
20 1000 101
= 722.33 mm2

14.6

M y

fck X b(dy)2
1

0.5 fck
sty=

fy
A

0.5 20
4.6 14.9 106
1 1
415
20 1000 932

= 499.9 mm2
(i)Reinforcement along X direction:
Width of middle strip = (3/4) x ly = (3/4) x 6.093 = 4.56 m
For 8 mm. bar (A) = 50.27 mm2
Spacing =

(1000 X 50.27)
497.12

131.1 mm

Check for minimum reinforcement

0.12 bd 0.12 x 1000 x 125


=
=150 mm2
100
100

Check for spacing


Maximum spacing = 3x101 = 303 mm
Spacing provided = 131.1 mm, Hence O.K.
So, provide 8 mm dia. bar @ 125 mm c/c along shorter direction for
middle strip.
(ii)Reinforcement along Y direction:
Asty = 92.0 mm2,
Width of middle strip = (3/4) x lx = (3/4) x 5.101 = 3.825 m

A = 50.27 mm2
Spacing =

(1000 X 50.27)
359.57

139.80 mm

So, provide 8mm dia. @ 125 mm c/c for the middle strip.
(iii)Reinforcement for edge strips:
Minimum reinforcement = 150 mm2
Spacing =

(1000 X 50.27)
150

= 335.13 mm

Provide 8 mm dia. @ 275 mm c/c for the edge strip of shorter and longer
direction.
1
2

Width of edge strip along shorter direction =

x (5.093 3.819) = 0.64

m.
Width of edge strip along longer direction =

1
2

x (2.976 2.232) =

0.744 m.
Torsional reinforcement at corners:
Mesh size = lx/5 = 2.976/5 = 0.595 m = 595 mm. 600 mm.
Area of torsional reinforcement =

3 Astx
4

A = 50.27 mm2
Spacing =

(1000 X 50.27)
108.46

= 463.5 mm.

So, provide 8mm dia. @ 275 mm c/c in a mesh.

3 144.61
4

= 108.46 mm2

DESIGN OF ONE WAY SLAB


For slab S8
lx = 2m , ly = 5m
ly/lx = (5/2) = 2.5, .. ly/lx 2,
The slab is one way slab.
Considering 125 mm overall depth of the slab.
Effective span:
Overall depth, D =125 mm
Assuming 20 mm clear cover & 8 mm dia. of reinforcement to be used.
Effective depth along shorter direction = 125 20 (8/2) = 101 mm = d
Effective span
(i)Clear span + dx = 2.101 m
(ii)c/c distance between support = 2.25 m
So, effective span = 2.101 m
Design load:
(i)Dead weight of slab = (1x1x0.125x25) = 3.125 KN/m2
(ii) Dead weight of floor finish = 1KN/m2
(iii)Live load = 4 KN/m2
.. Total load = 8.125 KN/m2, Design load = (1.5x8.125) = 12.19 KN/m2
Design moment:
Design bending moment, Mu =

Wu X l
10

= 5.38 KN - m

Wu X l
2

Design shear force (Vu) =

12.19 X 2
2

= 12.19 KN

Depth required:
Mu =

RU b d2

.. d =

MX
RU b

5.38 106
2.76 1000

= 44.15 mm.

[Ru = 0.138 fck =

0.138x20 = 2.76]
dx

provided

= 101 mm.

So, the section will be designed as under reinforced section.


Calculation of tensile reinforcement:
Ast=

0.5 fck
4.6 Mu
1 1
bd
fy
fckb d 2
=

0.5 20
4.6 5.38 106
1 1
1000 101
415
20 1000 1012
= 152.38 mm2
For 8 mm. bar (A) = 50.27 mm2
Spacing =

(1000 X 50.27)
152.38

329.9 mm

Check for spacing


Maximum spacing = 3x101 = 303 mm
Spacing provided = 300 mm, Hence O.K.
So, provide 8 mm dia. bar @ 250 mm c/c in the shorter direction.
Check for minimum reinforcement
(0.12/100) x 1000 x 125 = 150 mm2

But Ast provided =

(1000 X 50.27)
250

201.08 mm2

Hence O.K.
Distribution reinforcement:
Provide minimum reinforcement as distribution reinforcement in longer
direction, i.e., 150 mm2
Considering 6 mm bar,
For 6 mm. bar (A) = 28.3 mm2
so the spacing of reinforcement =

(1000 X 28.3)
150

188.6 mm 180 mm

So, provide 6 mm dia. distribution bar @ 180 mm c/c distance.

ONE WAY SLAB SCHEDULE:


PANEL
MARK

S3, S8,
S11,
S14

lx
(m)

2.0

ly
(m)

5.0

ly/lx

2.5

DESIG
N
LOAD
(Wu)
KN/m2

MOME
NT
(Mu)
KN - m

DEPT
H
deff
(mm.)

12.19

5.38

101

Ast
(mm2)

152.3
8

SPACIN
G
(mm)

250

REINFORCEMENT:
PANEL
MARK

MAIN
REINFORCEMENT

DISTRIBUTION
REINFORCEMENT

S8

8 mm bar @ 250 mm c/c

6 mm bar @ 180 mm c/c

BEAM
Design

Beam Design (Span BF7H7 and BH7I7)


Load Calculation:For BF7H7
Design Dead Load of Beam = (0.25 x 0.25 x 1 x 25) x 1.5
= (1.5 x 1.5625) KN
= 2.34 KN
wl x
3
Design Load Due to Slab (S11, S13) =
Unit Weight of Slab (Wu) = 12.187 KN
12.87 x 2.101
3
=
= 8.53 KN
Total Load on the Beam = (2.34 + 2 X 8.53) KN
= 19.40 KN
For BH7I7
Design Dead Load of Beam = (0.25 x 0.40 x 1 x 25) x 1.5
= 3.2815 KN
l y 6.093
wu xlx
1
1

2
2
3
l x 5.101
Design Load Due to Slab (S12, S14) =
, (where =
)

12.187 x 4.101
1
1

2
2
3 x(1.24)

12.187 x 4.101
x 0.7832
2

=
= 19.56 KN
Total Load = (3.28 + 19.56 x 2) KN
= 42.4 KN

Analysis of the Span (BF7H7 and BH7I7)

Stiffness Factor

For Beam BF7H7 =

For Beam BH7I7 =

3EI
1.33EI
3 EI
= 2.25
L
3EI
0.57 EI
3 EI
= 5.25
L

Distribution Factor

For Beam BF7H7 =

1.33EI
0.66
(1.33 0.57) EI

0.57 EI
0.34
(1.33 0.57) EI
For Beam BH7I7 =

Fixed End Moments


F BF 7 H 7 =0 KN, as it is a simply support
F BH 7 F 7=

F BH 7 I 7=

+Wl2
12

W l 2
12

F BI 7 H 7=

=+

19.4 X 2.252
12
42.4 X 5.252
12

= 8.18 KN

= -97.385 KN

0 KN, as it is a simply support

Joint
Member
Distribution Factor
Fixed End Moment
Balance
Final Moment

F7
B F7H7
0
0
0
0

H7
BH7F7
0.66
(+) 8.18
(+) 58.85
(+) 67.03

BH7I7
0.34
(-) 97.385
(+) 30.317
(-) 67.06

I7
BI7H7
0
0
0
0

As the Maximum Bending Moment will be acting on the Beam of larger span, so calculating
the Maximum Bending Moment of the Beam BH7I7

Taking Moment about I7


5.252
R H 7 X 5.25=42.4 X
+67.06
2
, R H 7=124.07 KN

R H 7 + R I 7=42.4 X 5.25
R I 7= { ( 42.4 X 5.25 ) 124.70 }
, R I 7 =98.53 KN

Maximum Bending Moment ( M x ) =68.87 x


And,
Or,

47.27 X x 2
28.07
2

d Mx
=RH 7 42.4 x=0
dx
x=

124.07
=2.92
42.4

42.4 X x 2
M x =R H 7 X x
67.06
2
2

, M x =124.07 X 2.92

42.4 X 2.92
67.06
2

, M x =114.46 KNm
M x =114.46 KNm
u lim =0.138 f ck bd 2
M
2

u lim =0.138 X 20 X 250 X 400


M
u lim =110.46 KNm
M
M x > M u lim

the beam must be designed as a T-Beam.

Design of T-Beam
Distance between points of Zero Moment in the beam.
l o=0.7 X 5.25=3.675 m
Effective Width of Flange
l
b f = o + bw +6 X Df
6
3

bf =

3.675 X 10
+250+ 6 X 125
6

b f =1612.5 mm
Moment of Resistance of the Beam
M uR=0.36 f ck X Df X ( d0.42 X D ) X b f
M uR=0.36 X 20 X 125 X ( 3650.42 X 125 ) X 1612.5
M uR=453.5 X 106 Nmm
M uR > M u
the beam must be designed as singly reinforced
0.5 f ck
4.6 M u
A st =
1 1
bd
fy
f ck bd 2

A st =

0.5 X 20
4.6 X 114.4 X 10
1 1
1612.5 X 365
2
415
20 X 1612.5 X 365

A st =893.7 mm

Provide 20mm rod as reinforcement


2
x 20
A =
=314 mm2
4
No. of Bars =

A st 893.7
=
=2.84 3 Nos .
A 314

Hence provide 3Nos. 20mm bars.


Design shear force (VU) =

42.40 X 6.25
2

= 132.50 KN

Nominal shear stress (

VU
bd

)=

132.50 x 10 3
250 x 400

= 1.325 N/mm2
Ast = 3 x

x 20 2
4

= 942.47 mm2

Percentage of tensile reinforcement,


=

Pt =

A st
942.47
x 100 =
x 100
bxd
250 x 400
= 0.94%

Now, considering to Pt=0.94% and M20 concrete we have design shear strength of concrete
from Table-19 of I.S: 456-2000.
c =0.56+

0.620.56
x ( 0.940.75 )
1.00.75

= 0.605 N/mm2
For M20 concrete,
c

c max
<

= 2.8 N/mm2
<

c max

So, shear reinforcement shall be provided.


Taking 8mm bar for two legged vertical stirrup.
x 82
x 2 = 100.5 mm2
4

Asv =
V US=

0.87 x f y x A sv x d
Sv

V us=V u c bd

= 132.50 x 103 (0.605 x 250 x 400)


= 71550 KN

Sv=

0.87 x 415 x 100.5 x 400


71550 x 103

= 202.85 203mm

Check for maximum spacing,


S v =

0.75 x d = 0.75 x 400 = 300.0mm

And

Sv

is not greater than 300mm.

Minimum shear reinforcement,


A SV
0.4

b x s v 0.87 x f y
SV

A SV x 0.87 x f y 100.5 x 0.87 x 415


=
0.4 x b
0.4 x 250

S V 362 mm
So, provide 8mm two legged stirrup @ 200 mm C/C for 1/3 length of beam from the support
and @ 300mm C/C for middle 1/3 length.

For negative moment,


MX = 67.06 X 106 N-mm
Ast =

0.5 x 20
4.6 x 67.06 x 10 6
1 1
x 250 x 400 = 518.69 mm2
2
415
20 x 250 x 400

Using, 16 mm bar
A = 201 mm2
No of bar =

518.69
201

= 2.58 3

Provide 3 Nos. 16 mm bar.

Beam Design (Span BC3D3 and BD3E3)


Load Calculation:For BC3D3
Design Dead Load of Beam = (0.35 x 0.25 x 1 x 25) x 1.5
= (1.5 x 2.1875) KN
= 3.28125 KN
Design Dead Load due to Brick Wall = (19 x 0.25 x 2.95 x 1)
= (1.5 x 14.01) KN
= 21.015 KN
Unit Weight of Slab (Wu) = 12.187 KN

Design Load Due to Slab (S1, S2) =

wl x
3

12.87 x 2.101
3

= 8.534 KN

Design Load Due to Slab (S3) =

wl x
2
12.87 x 2.101
2

= 12.80 KN

Total Load on the Beam = (3.28125 + 21.015 + 8.534 X 2 + 12.80) KN


= 54.163 KN
A point load of 20.6815 KN due to the Secondary Beam BC2D2 C3D3 acts on the beam at
the center of the beam.

For BD3E3
Design Dead Load of Beam = (0.35 x 0.25 x 1 x 25) x 1.5
= (1.5 x 2.1875) KN
= 3.28125 KN
Design Dead Load due to Brick Wall = (19 x 0.25 x 2.95 x 1)
= (1.5 x 14.01) KN
= 21.015 KN
Unit Weight of Slab (Wu) = 12.187 KN

Design Load Due to Slab (S6) =

Design Load Due to Slab (S5) =

wl x
3
12.87 x5.101
3

= 23.80 KN

wl x
2
12.87 x 2.101
2

= 12.80 KN

Total Load on the Beam = (3.28125 + 21.015 + 23.80 + 12.80) KN


= 60.895 KN

Analysis of the Span (BC3D3 and BD3E3)

Stiffness Factor

For Beam BC3D3 =

For Beam BD3E3 =

3 EI
=
L

3EI
0.66 EI
4.5

4 EI
0.64 EI
4 EI
= 6.25
L

Distribution Factor

For Beam BC3D3=

0.66 EI
0.50
(0.66 0.64) EI
0.64 EI
0.49
(0.66 0.64) EI

For Beam BD3E3 =

Fixed End Moments


F BC3 D3=0 KN, as it is a simply support

F BD 3 C 3=+

F BD 3E3 =

Wl2 W l 3
+ 2
12
l

W l 2
12

F BE 3 D 3 =

+W l
12

=+

61 X 6.252
12

+61.0 X 6.25
12

Joint
Member

55.0 X 4.252 21 X 4.52


+
12
4.52

= 95.4375 KN

= -198.5 KN
2

= + 198.5 KN

C3
B C3D3

D3
BD3C3

BD3E3

E3
BE3D3

Distribution Factor
0
0.50
0.49
0
Fixed End Moment
0
(+) 95.45
(-) 198.5 (+) 198.5
Balance
0
(+) 51.5
(+) 50.4
Carryover
(+) 25.20
Balance
0
(+) 0.55
(+) 0.53
Carryover
(+) 0.26
Balance
0
(+) 0.01
(+) 0.0098
Carryover
(+) 0.0049
Final End Moment
0
(+) 147.49 (-) 147.56 (+) 223.96
As the Maximum Bending Moment will be acting on the Beam of larger span, so calculating
the Maximum Bending Moment of the Beam BD3E3

Taking Moment about D3


R D 3 X 6.25+ 22.96=61 X

6.252
+147.56
2

, R D 3=178.40 KN
R E 3+ R D 3=42.4 X 5.25
R E 3= { ( 61 X 6.25 )178.40 }
, R E 3 =202.85 KN
2

Maximum Bending Moment ( M x ) =202.85 x


And,
Or,

d Mx
=RE 361 x =0
dx
x=

202.85
=3.30 m
61

M x =R E 3 X x

61 X x2
223.96
2

61 X x
223.96
2

, M x =202.85 X 3.3

61 X 3.30
223.96
2

, M x =113.30 KNm
M x =113.30 KNm
u lim =0.138 f ck bd 2
M
u lim =0.138 X 20 X 250 X 4002
M
u lim =110.46 KNm
M
M x > M u lim
the beam must be designed as a T-Beam

Design of T-Beam
Distance between points of Zero Moment in the beam.
l o=0.7 X 6.25=4.375 m
Effective Width of Flange
l
b f = o + bw +6 X Df
6
bf =

4.375 X 103
+ 250+6 X 125
6

b f =1729.16 mm
Moment of Resistance of the Beam
M uR=0.36 f ck X Df X ( d0.42 X D ) X b f
M uR=0.36 X 20 X 125 X ( 3650.42 X 125 ) X 1729.16
M uR=486.32 X 106 Nmm
M uR > M u

the beam must be designed as singly reinforced


0.5 f ck
4.6 M u
A st =
1 1
bd
fy
f ck bd 2

0.5 X 20
4.6 X 113.3 X 106
A st =
1 1
1729.16 X 365
415
20 X 1729.16 X 3652
A st =882.5 mm

Provide 20mm rod as reinforcement


x 202
A =
=314 mm2
4
A st 883.5
=
=2.84 3 Nos .
A 314

No. of Bars =

Hence provide 3Nos. 20mm bars.


Design shear force (VU) =

Nominal shear stress (

61 X 6.25
2

)=

VU
bd

= 190.625 KN

190.625 x 10 3
250 x 400

= 1.90 N/mm2
Ast = 3 x

x 20 2
4

= 942.47 mm2

Percentage of tensile reinforcement,


=

Pt =

A st
942.47
x 100 =
x 100
bxd
250 x 400
= 0.94%

Now, considering to Pt=0.94% and M20 concrete we have design shear strength of concrete
from Table-19 of I.S: 456-2000.
c =0.56+

0.620.56
x ( 0.940.75 )
1.00.75

= 0.605 N/mm2
For M20 concrete,
c

c max
<

= 2.8 N/mm2
<

c max

So, shear reinforcement shall be provided.


Taking 8mm bar for two legged vertical stirrup.
x 82
x 2 = 100.5 mm2
4

Asv =
V US=

0.87 x f y x A sv x d
Sv

V us=V u c bd

= 190.625 x 103 (0.605 x 250 x 400)


= 130125 KN

Sv=

0.87 x 415 x 100.5 x 400


130125 x 103

= 128.5 129mm

Check for maximum spacing,


S v =
And

Sv

0.75 x d = 0.75 x 400 = 300.0mm


is not greater than 300mm.

Minimum shear reinforcement,


A SV
0.4

b x s v 0.87 x f y
SV

A SV x 0.87 x f y 100.5 x 0.87 x 415


=
0.4 x b
0.4 x 250

S V 362 mm
So, provide 8mm two legged stirrup @ 125 mm C/C for 1/3 length of beam from the support
and @ 300mm C/C for middle 1/3 length.
Provide 2 Nos. 10mm anchor bars.
For negative moment,
MX = 147.56 X 106 N-mm
u lim =0.138 f ck bd 2
M

u lim =0.138 X 20 X 250 X 4002


M
u lim =110.46 KNm
M
M x > M u lim
Thus for the Support Reinforcement we need to Design an over reinforced Section.
Area of Tensile Reinforcement
A st 1 =

Ast1 =

0.5 f ck
4.6 M u
1 1
bd
fy
f ck bd 2

0.5 x 20
4.6 x 110.46 x 10
1 1
x 250 x 400 = 950.32 mm2
415
20 x 250 x 4002

u lim =( 146.56110.46 ) x 106 Nmm


M u 2=M u M
6

M u 2=36.04 x 10 Nmm

A st 2 =

0.5 f ck
4.6 M u
1 1
bd
fy
f ck bd 2

0.5 x 20
4.6 x 36.04 x 10
A st 2 =
1 1
250 x 400=263.09 mm2
2
415
20 x 250 x 400
2

A st = Ast 1 + A st 2=950.32+236.09 mm
A st =1213.41 mm2
Provide 20mm rod as reinforcement
x 202
A =
=314 mm2
4
No. of Bars =

A st 1213.41
=
=3.86 4 Nos .
A
314

Hence provide 4Nos. 20mm bars.


Area of Compression Steel

A sc =
A sc =

M u2
f sc ( dd ' )
36.04 x 106
343.6(36550)

= 332.98 mm2

Provide 20mm rod as reinforcement


x 202
A =
=314 mm2
4
No. of Bars =

A st 332.98
=
=1.06 1 Nos .
A
314

As we are providing 3Nos. 20mm bars as Tensile Reinforcement in T-Beam without any
curtailment it will be sufficient to withstand the compressive force due to the negative
moment, so we need not provide any bars for compression.

Beam Design (Span BH9H7 and BH7H5)


Load Calculation:For BH9H7
Design Dead Load of Beam = (0.35 x 0.25 x 1 x 25) x 1.5
= (1.5 x 2.1875) KN
= 3.28125 KN
Design Dead Load due to Brick Wall = (19 x 0.25 x 2.95 x 1)
= (1.5 x 14.01) KN
= 21.015 KN
Unit Weight of Slab (Wu) = 12.187 KN

Design Load Due to Slab (S12) =

Design Load Due to Slab (S11) =

wl x
3
12.87 x 4.101
3

= 16.65 KN

wl x
2
12.87 x 4.101
2

= 12.80 KN

Total Load on the Beam = (3.28125 + 21.015 + 16.65 + 12.80) KN


= 53.74 KN
For BH7H5
Design Dead Load of Beam = (0.35 x 0.25 x 1 x 25) x 1.5
= (1.5 x 2.1875) KN
= 3.28125 KN
Design Dead Load due to Brick Wall = (19 x 0.25 x 2.95 x 1)

= (1.5 x 14.01) KN
= 21.015 KN
Unit Weight of Slab (Wu) = 12.187 KN

Design Load Due to Slab (S14) =

Design Load Due to Slab (S13) =

wl x
3
12.87 x 4.101
3

= 16.65 KN

wl x
2
12.87 x 4.101
2

= 12.80 KN

Total Load on the Beam = (3.28125 + 21.015 + 16.65 + 12.80) KN


= 53.74 KN

Analysis of the Span (BH9H7 and BH7H5)

Stiffness Factor

For Beam BH9H7 =

For Beam BH7H5 =

Distribution Factor

3EI
3 EI
0.70 EI
= 2.25
L
4 EI
1.0 EI
4 EI
= 5.25
L

0.70 EI
0.41
(0.70 1.0) EI

For Beam BH9H7=

1.0 EI
0.58
(0.70 1.0) EI
For Beam BH7H5 =

Fixed End Moments


F BH 9 H 7=0 KN, as it is a simply support
F BH 7 H 9=

+ Wl2
12

W l 2
F BH 7 H 5=
12
F BH 5 H 7=

+W l
12

=+

53.79 X 4.252
12

53.79 X 4.002
12

+53.79 X 4.00
12

Joint
Member
Distribution Factor
Fixed End Moment
Balance
Carryover
Balance
Carryover
Balance
Carryover
Balance
Carryover
Final End Moment

= 80.96 KN

= -71.72 KN

= + 71.72 KN

H9
B H9H7
0
0
0

H7
BH7H9
0.43
(+) 80.96
(-) 3.88

BH7H5
0.57
(-) 71.72
(-) 5.27

H5
BH57H7
0
(+)71.72
(-) 2.635

(-) 0.58

(-) 0.82
(-) 0.41

(-) 0.10

(-) 0.13

(-) 0.01

(-) 0.01

(+) 76.95

(-) 76.95

(-) 0.065
(-) 0.005
(+) 68.605

As the Maximum Bending Moment will be acting on the Beam of larger span, so calculating
the Maximum Bending Moment of the Beam BH9H7

Taking Moment about H7


R H 9 x 4.25+76.95=53.79 X

4.25
2

, R H 9=96.18 KN
R H 9 + R H 7=53.79 X 4.25
R H 7= {( 53.79 X 4.25 )96.18 }
, R H 7=132.42 KN

Maximum Bending Moment ( M x ) =96.18 x


And,
Or,

d Mx
=RH 9 53.79 x=0
dx
x=

96.18
=1.78 m
53.79

M x =R H 9 X x

53.79 X x 2
2

, M x =96.18 X 1.78

53.79 X 1.782
2

, M x =85.8 KNm
M x =85.8 KNm
u lim =0.138 f ck bd 2
M
u lim =0.138 X 20 X 250 X 4002
M

53.79 X x 2
2

u lim =110.46 KNm


M
M x < M u lim
the section can be design as Under Reinforced section.
.

Design of Singly Reinforced Beam


Area of Steel Reinforcement:0.5 f ck
4.6 M u
A st =
1 1
bd
2
fy
f ck bd

0.5 x 20
4.6 x 85.8 x 10 6
A st =
1 1
250 x 400
415
20 x 250 x 400 2
A st =694.4 mm

Use 16mm bar


A = 201 mm2
No of bar =

694.40
201

= 3.45 4

Provide 4 Nos. 16mm bars as tensile reinforcement.


Design shear force (VU) =

Nominal shear stress (

53.79 X 4.25
2

)=

VU
bd

= 1.140 N/mm2
Ast = 4 x

x 16 2
4

= 804.24 mm2

Percentage of tensile reinforcement,


=

Pt =

A st
804.24
x 100 =
x 100
bxd
250 x 400
= 0.80%

= 114.30 KN
114.30
250 x 400

Now, considering to Pt=0.80% and M20 concrete we have design shear strength of concrete
from Table-19 of I.S: 456-2000.
c =0.56+

0.620.56
x ( 0.800.75 )
1.00.75

= 0.61 N/mm2
For M20 concrete,
c

c max
<

= 2.8 N/mm2
<

c max

So, shear reinforcement shall be provided.


Taking 8mm bar for two legged vertical stirrup.
2

x8
x 2 = 100.5 mm2
4

Asv =
V US=

0.87 x f y x A sv x d
Sv

V us=V u c bd

= 114.30 x 103 (0.61 x 250 x 400)


= 53300 KN

Sv=

0.87 x 415 x 100.5 x 400


3
53300 x 10

= 204.23 205mm

Check for maximum spacing,


S v =
And

Sv

0.75 x d = 0.75 x 400 = 300.0mm


is not greater than 300mm.

Minimum shear reinforcement,


A SV
0.4

b x s v 0.87 x f y
SV

A SV x 0.87 x f y 100.5 x 0.87 x 415


=
0.4 x b
0.4 x 250

S V 362 mm
So, provide 8mm two legged stirrup @ 200 mm C/C for 1/3 length of beam from the support
and @ 300mm C/C for middle 1/3 length.

For negative moment,


MX = 76.95 X 106 N-mm
Ast =

0.5 x 20
4.6 x 76.95 x 106
1 1
x 250 x 400 = 607.95 mm2
2
415
20 x 250 x 400

Using, 16mm bar


A = 201 mm2
No of bar =

607.95
201

= 3.02 3

Provide 3 Nos. 20mm bar.

COLUMN
Design

Column Design
For Column E3
Load Calculation

For load of slab acting on column for four floors:-

([ 5.252 + 2.252 ) x ( 6.252 + 6.252 ) x 0.125 x 1 x 25 ] x 4

= (3.75 x 6.25 x 0.125 x 1 x 25 x 4) = 252.9KN ........ (i)

Dead load of the beam :-

[(

)]

5.25
6.25
2.25
x 0.35 x 0.25 x 25 +
x 0.35 x 0.25 x 25 x 2 +
x 0.35 x 0.25 x 25 x 5
2
2
2

)(

)(

= (5.74 + 13.67 + 2.46) x 5 = 99.35 KN .. (ii)

Floor finish load on column :

([ 5.252 + 2.252 ) x ( 6.252 + 6.252 ) x 1] x 4

= 83.75
KN.............................................................................................. (iii)

Brick wall load on column :-

[{(

} {( )

6.25 6.25
5.25
+
x 0.25 x 19 x 2.95 +
x 0.125 x 19 x 19 x 2.95 { ( 1.2 x 2.1 x 0.25 x 19 ) x 2 } { ( 1.2 x 1.2
2
2
2

= [87.5 +18.39 23.94 6.84] x 4 = 270.44


KN........................................ (iv)

Total live load on column :-

[{(

) }

] [(

5.25 2.25
6.25 6.25
5.25 3.25
6.25 6.25
+
x
+
x 4 x3 +
+
x
+
x 1.5
2
2
2
2
2
2
2
2

)(

)(

= (251.25 + 19.17) = 270.42


KN................................................................ (v)
Total Load = (252.9 + 99.35 + 83.75 + 270.44 + 270.42) = 976.31 KN
Design load (Pu) = 976.31 x 1.5 = 1464.00 KN

Adding approx, 10% for moment,


PU = [1464.00 + (1464.00 x 0.10)]
= 1610.53 1611 KN
Design of Longitudinal Reinforcement
PU = [0.4 x fck x Ac + 0.67 x fy x Asc]
or, 1611 x 103 = [0.4 x fck x (Ag Asc) + 0.67 x fy x Asc]
= 250 x 350 = 87500 mm2]
or, 1611 x 103 = 0.92 x [0.4 x 20 x (87500 Asc) + 0.67 x 415 x Asc]
or, 1611 x 103 = 263.166 Asc + 644000
or, Asc = 3674.74 3675 mm2

Let us using, 25 mm bars.


A = 490.8 mm2
No of bars =

3675.0
=7.48 Nos
490.8

8 Nos

Provide 8 Nos. 25 mm bars.


Design of Lateral Ties

Diameter : The diameter of Lateral Ties should be more than :


(i.)
6 mm

[Ag

(ii.)

1
x 25=6.25 mm
4
Provide 6mm lateral ties.

Pitch: The pitch of lateral ties should be least of the following:


(i.)
Least Lateral Dimension = 250 mm
(ii.)
300 mm

Provide 6 mm bars @ 250mm c/c as lateral ties.

Column Design
For Column G1
Load Calculation

For load of slab acting on column for four floors:-

[(

6.25 6.25
5.25
+
x
x 0.125 x 1 x 25 x 4
2
2
2

)( )

= 205.0 KN .................................................................. (i)

Dead load of the beam :-

[(

)]

5.25
6.25
x 0.35 x 0.25 x 25 +
x 0.35 x 0.25 x 25 x 2 x 5
2
2

)(

= (5.74 + 27.34) x 5 = 165.4 KN ................ (ii)

Floor finish load on column :-

[(

6.25 6.25
5.25
+
x
x1 x 4
2
2
2

)( )

= 65.625
KN............................................................................................ (iii)

Brick wall load on column :-

([{ 6.252 + 6.252 ) x 0.25 x 19 x 2.95 }+{( 5.252 ) x 0.125 x 19 x 19 x 2.95}{( 1.2 x 2.1 x 0.25 x 19) x 6 }] x 4
= [87.5 +18.39 41.04] x 4 = 259.44
KN.................................................. (iv)

Total live load on column :-

[{(

) }

] [(

5.25
6.25 6.25
5.25
6.25 6.25
x
+
x 4 x3 +
x
+
x 1.5
2
2
2
2
2
2

)(

)(

= (196.875 + 24.6) = 221.48


KN................................................................. (v)
Total Load = (205.0 + 165.4 + 65.625 + 259.4 + 221.48) = 916.905
KN
Design load (Pu) = 916.905 x 1.5 = 1375.35 KN

Adding approx, 15% for moment,


PU = [1375.35 + (1464.00 x 0.15)]
= 1581.60 1582 KN
Design of Longitudinal Reinforcement
PU = [0.4 x fck x Ac + 0.67 x fy x Asc]
or, 1582 x 103 = [0.4 x fck x (Ag Asc) + 0.67 x fy x Asc]
= 250 x 350 = 87500 mm2]
or, 1582 x 103 = 0.92 x [0.4 x 20 x (87500 Asc) + 0.67 x 415 x Asc]
or, 1582 x 103 = 263.166 Asc + 644000

[Ag

or, Asc = 3564.74 3565 mm2

Let us using, 25 mm bars.


A = 490.8 mm2
No of bars =

3565.0
=7.26 Nos
490.8
8 Nos

Provide 8 Nos. 25 mm bars.


Design of Lateral Ties

Diameter : The diameter of Lateral Ties should be more than :


i 6 mm
1
x 25=6.25 mm
ii
4
Provide 6mm lateral ties.

Pitch: The pitch of lateral ties should be least of the following:


i Least Lateral Dimension = 250 mm
ii 300 mm

Provide 6 mm bars @ 250mm c/c as lateral ties.

Column Design
For Column I1
Load Calculation

For load of slab acting on column for four floors:-

[(

5.25 6.25
x
x 0.125 x 1 x 25 x 4
2
2

= 102.5 KN ................................................................. (i)

Dead load of the beam :-

([ 5.252 x 0.35 x 0.25 x 25)+( 6.252 x 0.35 x 0.25 x 25)] x 5

= (5.74 + 6.885) x 5 = 62.875 KN .... (ii)

Floor finish load on column :

[(

6.25 5.25
x
x 1 x4
2
2

= 32.8125
KN.............................................................................................. (iii)

Brick wall load on column :-

([{ 6.252 ) x 0.25 x 19 x 2.95}+{( 5.252 ) x 0.25 x 19 x 19 x 2.95} {( 1.2 x 2.1 x 0.25 x 19) x 6}] x 4
= [43.78 + 36.78 41.04] x 4 = 158.08 KN........................................
(iv)

Total live load on column :-

[{(

) }

] [(

6.25 5.25
6.25 5.25
x
x4 x3 +
x
x 1.5
2
2
2
2

= (98.43 + 12.30) = 110.70


KN................................................................ (v)
Total Load = (102.5 + 62.875 + 32.8125 + 158.08 + 110.7) = 466.99
KN
Design load (Pu) = 466.96 x 1.5 = 700.40 KN

Adding approx, 33% for moment,


PU = [700.40 + (700.40 x 0.33)]
= 931.6 932 KN
Design of Longitudinal Reinforcement
PU = [0.4 x fck x Ac + 0.67 x fy x Asc]
or, 932 x 103 = [0.4 x fck x (Ag Asc) + 0.67 x fy x Asc]
250 x 350 = 87500 mm2]
or, 932 x 103 = 0.92 x [0.4 x 20 x (87500 Asc) + 0.67 x 415 x Asc]
or, 932 x 103 = 263.166 Asc + 644000
or, Asc = 1094.36 1095 mm2

Let us using, 20 mm bars.


A = 314 mm2
No of bars =

1095.0
=3.48 Nos
314
4 Nos

Provide 4 Nos. 20 mm bars.


Design of Lateral Ties

Diameter : The diameter of Lateral Ties should be more than :


iii 6 mm
1
x 20=5 mm
iv
4
Provide 6mm lateral ties.

Pitch: The pitch of lateral ties should be least of the following:


iii Least Lateral Dimension = 250 mm
iv
300 mm

Provide 6 mm bars @ 250mm c/c as lateral ties.

[Ag =

Column Design
For Column E4
Load Calculation

For load of slab acting on column for four floors:-

[(

] [ {(

5.25 2.25
6.25 6.25
+
x
+
x 0.125 x 1 x 25 +
2
2
2
2

)(

} ]

6.25 5.25
2.25
+
x
x 0.125 x 1 x 25 x 3
2
2
2

)( )

= (67.375 + 60.64) = 128.0 KN ................................ (i)

Dead load of the beam :-

[{(

)} (

5.25
6.25
2.25
5.25
x 0.25 x 0.25 x 25 +
x 0.25 x 0.25 x 25 +
x 0.25 x 0.25 x 25 x 5+
x 0.25 x 0.25 x 25
2
2
2
2

)(

)(

= {(4.10 + 4.8 + 1.75) x 5 + 4.10} = 57.35 KN .. (ii)

Floor finish load on column :

[{(

) } {(

)( ) }

5.25 6.25
5.25 2.25
5.25 6.25
2.25
+
x
+
x1 +
+
x
x1 x4
2
2
2
2
2
2
2

)(

[ ( 5.75 x 1 x 3.75 ) +{( 5.75 x 1.125 x 1 ) x 4 }]


= 47.43
KN.............................................................................................. (iii)

Brick wall load on column :-

{(

6.25 5.25
+
x 0.125 x 19 x 1.60 x 4
2
2

= 87.40 KN........................................ (iv)

Total live load on column :-

([ { 5.252 + 2.252 ) x ( 6.252 + 6.252 ) x 4}+{( 5.252 + 6.252 ) x 2.252 x 4 }x 2+{( 5.252 + 6.252 ) x 2.252 x 1.5}]
= (86.25 + 51.75 + 97) = 147.7
KN................................................................ (v)
Total Load = (128.0 + 57.35 + 47.43 + 87.40) = 467.88 KN
Design load (Pu) = 467.88 x 1.5 = 701.82 KN
Adding approx, 10% for moment,
PU = [701.8 + (701.8 x 0.10)]
= 771.98 772 KN
Design of Longitudinal Reinforcement
PU = [0.4 x fck x Ac + 0.67 x fy x Asc]
or, 772 x 103 = [0.4 x fck x (Ag Asc) + 0.67 x fy x Asc]
250 x 250 = 62500 mm2]
or, 772 x 103 = 0.92 x [0.4 x 20 x (62500 Asc) + 0.67 x 415 x Asc]
or, 772 x 103 = 248.446 Asc + 460000
or, Asc = 1255.86 1256 mm2

Let us use, 20 mm bars.


A = 314 mm2
No of bars =

1256.0
=4 Nos
314

Provide 4 Nos. 20 mm bars.


Design of Lateral Ties

[Ag =

Diameter : The diameter of Lateral Ties should be more than :


v
6 mm
1
x 20=5 mm
vi
4
Provide 6mm lateral ties.

Pitch: The pitch of lateral ties should be least of the following:


v
Least Lateral Dimension = 250 mm
vi 300 mm

Provide 6 mm bars @ 250mm c/c as lateral ties.

COLUMN SCHEDULE

COLUMN
TYPE
Biaxially
loaded
column
Unaxially
loaded
column
Axially
loaded
column
Unaxially
loaded
column

COLUMN
MARK
C4, D4, E4, F4,
F7, F9, D7, E7

COLUM
N SIZE
(m.m.)

REINFORCEME
NT

LINK

250X250

4 Nos. 20mm
bar

6mm
links @
250mm c/c
6mm links @
250mm c/c

D2, E1, G1, I7,


I5, I3, H9, C3

250X350

8 Nos. 25mm bar

D3, E3, G3,


H5, H7

250X350

8 Nos. 25mm bar

6mm links @
250mm c/c

I9, I1, D1, C2

250X350

4 Nos. 20mm bar

6mm links @
250mm c/c

FOOTING
Design

Footing Design
For Footing Below The Column G1
Safe Bearing Capacity of the Soil (qu) = 120 KN/m2
Load Calculation:Load of Column on the Footing (Wc) = 916.605 KN
Self-weight of Footing (Wf) = 10% of Wc = 91.6905 KN
Total Weight on the Footing (Wc + Wf) = (916.905 + 91.6905) KN = 1008.5 KN
Area of Footing:A = (Wc + Wf) / qu
= 1008.5 / 120 = 8.4 m2
Side of Square Footing = 8.4 = 2.89 m 3.0 m
Factored Soil Pressure due to Column Load only (Pu) =

1.5 X 916.905
3.0 X 3.0

= 152.8175 KN/m2
Depth of Footing By One Way Shear Criterion:Critical section shall be at a distance d from the face of the column.
Shear force due to factored soil pressure at critical section.
3.00.25
3.0 X
d X 152.8175
=
2

= 458.45 X (1.375 d) (i)


Assuming 0.2% Steel, c = 0.32 N/mm2
Sheer Force resisted by the section = c x d
0.32 X 106
X 3.0 X d
=
103
= 960d.. (ii)
Equating equations (i) and (ii)
458.45 (1.375 d) = 960d
or, 650.36 = (960 + 458.45)d
or, d = 0.458m = 458mm
Depth of Footing by Two way Sheer Criterion:Consideration critical section is at d/2 from the face of the column.
Perimeter of Critical Section = 4(0.25 +d) (1.0 + 4d)
Shear Force at critical section = 152.8175 x (3.0 X 3.0 (0.25 + d)2)
= 1375.35 152.8175 (0.0625 + 0.5d + d2)
=1375.35 9.55 76.4d 152.8175d2
= 1365.8 76.4d 152.8175d2 .(iii)

Shear Force resisted by the critical section


Maximum allowable Shear = 0.25 f ck
= 0.25 20
= 1.118 KN/m2 = 1118 N/mm2
Shear Force resisted = 1118(1.0 + 4d) x d = 1118d + 4472d2(iv)
Equating Equation (iii) and (iv)
1365.8 76.4d 152.8175d2 = 1118d + 4472d2
or, 4624.8d2 + 1194.4d 1365.8 = 0
1194.4 (1194.4)24 x 4624.8 x (1365.8)
or, d=
2 x 4624.8
or, d = 0.429m 429 mm
Depth of Footing By Bending Moment Criterion :Critical Section at the face of Column.
Bending Moment at the Critical Section
3.00.25
3.00.25
M u=152.8175 x 3.0 x
x(
)
2
4

= 433.3 KN-m = 433.3 x 106 N-mm


Moment of Resistance at critical section:
x u max
=0.48 and Ru = 2.76 for M20 concrete and Fe 415 steel
d
u lim =Ru x b d 2=2.76 x 3000 x d 2=8280 d 2
........(vi)
M
Equating (v) and (vi) we get
433.30 x 106 = 8280 d2
or, d = 0.228m = 228mm
Out of the three, the highest value of d obtained is 0.458m.
Let, assume d = 458mm
Overall Depth (D) = (458 + 6 + 50)
= 514 mm

520 mm

Area of Steel Reinforcement :0.5 f ck


4.6 M u
A st =
1 1
bd
fy
f ck bd 2

or,

A st =

0.5 x 20
4.6 433.3 x 10
1 1
3000 x 458
2
415
20 x 3000 x 458
2

or, A st =2723.6 mm

Check for Minimum Reinforcement =


=
Using 16 bars,
Spacing =

A =

0.12bd
100
0.12 x 3000 x 458
100

= 1648.8 mm2

2
2
x 12
= 113.09 mm
4

113.09 x 3000
=124.5 mm 125mm
2723.6

Check for Development Length:0.87 f y


ld =
4 bd
2

[ bd =1.92 N /mm for M 20 Fe 415 ]

or,

ld =

0.87 x 415 x 12
4 x 1.92

or, ld = 564.14 mm
Available Length of Bar =

As,

ld

30000.25
x 1000
= 1499.875 mm
2

Available Length of Bar

564.14 mm
Hence OK

1499.875 mm

So provide 16mm

bars @ 125 c/c distance.

Footing Design
For Footing Below The Column E3
Safe Bearing Capacity of the Soil (qu) = 120 KN/m2
Load Calculation:Load of Column on the Footing (Wc) = 1096.86 KN
Self-weight of Footing (Wf) = 10% of Wc = 109.686 KN
Total Weight on the Footing (Wc + Wf) = (1096.86+109.686) KN = 1206.5 KN
Area of Footing:(W c +W f )
A=
qu

1206.5
120

= 8.4 m2

Considering Length to Width ratio same as that of the column =


Let, y = 1.4x
2
Area of Footing = x x y = 1.4x2 = 10 m

350
=1.4
250

, x=

10
1.4

= 2.6m

So , y =1.4 x=1.4 x 2.6=3.64 m 3.6 m

Factored Soil Pressure due to Column Load only (Pu) =

1.5 X 1206.5
2.6 x 3.6

= 193.34 KN/m2
Depth of Footing by One Way Shear Criterion:Critical section is at d from the face of the column.
Shear Force in longer direction =

193.34 x 3.6 x

d )
( 2.600.25
2

= 817.8 696.024d
Shear Force in shorter direction =

193.34 x 2.6 x

d )
( 3.60.35
2

= 817.8 502.684d

(i)

Shear Force in shorter direction is more.


Shear Force resisted by the concrete = c x X x d
[c = 0.32 for 0.2% steel
reinforcement]
3
= 0.32 x 10 x 3 x d = 960d ... (ii)
Equating (i) and (ii),
817.8 502.684d = 960d
or, d = 0.559 m 0.560m
Depth of Footing by Two Way Sheer Criterion:Critical section is at

d
2

from the face of column.

Shear Force at critical section due to shaded area


= 193.34 x {3.6 x 2.6 (0.25+d) x (0.35+d)}
= 1792.66 116.04d 193.34d2 . (iii)
Punching shear resisted by section = cxA
Where, c = 0.25 x f ck = 0.25 x 20 = 1118 KN/m2
A = Area of critical section = perimeter x d
=2 x [{(0.25 + d) + (0.35 + d)} x d] = 1.2d + 4d2

Shear Force resisted = 1118 x (1.2d + 4d2)


= 1341.6d + 4472d2

.... (iv)

Equating (iii) and (iv),


1792.66 116.04d 193.34d2 = 1341.6d + 4472d2
4464.34d2 + 1457.64d 1792.66 = 0
(1457.64) ( 1457.64 ) 4 x 4464.34 x (1792.66)
d=
2 x 4464.34
2

= 0.491m
Depth of Footing By Bending Moment Criterion:Critical section is at the face of the column.
Bending Moment in longer direction =

193.34 x 2.6 x 1.625 x

( 1.625
2 )

= 611.5 KN-m .. (v)


1.175
193.34 x 3.6 x 1.175 x
Bending Moment in shorter direction =
2

= 480.37 KN-m
Hence Bending Moment in longer direction is more.
Moment of resistance in longer directionMr = 0.138 x fck x bd2
[For Fe-415]
= 0.138 x 20 x 2600 x d2 = 7176d2 N-mm .. (vi)
Equating (v) and (vi),
611.5 x106 = 8280d2
or, d = 291mm 0.291m
Out of the three, the highest value of d obtained is 0.560m.
Let, assume d = 560mm
Overall Depth (D) = (560 + 8 + 50)
= 618 mm

620 mm

Area of Reinforcement:For longer direction,


Ast =

0.5 x 20
4.6 x 611.5 x 106
1 1
x 2600 x 560
2
415
20 x 2600 x 560

= 3156.37 mm2
Using 16mm bars, spacing =

201 x 2600
3156.37

= 165.5 mm

Provide 16mm bars @ 165mm c/c


For shorter direction,
Ast =

0.5 x 20
4.6 x 440.37 x 106
1 1
x 3600 x 560
415
20 x 3600 x 560 2

= 2746.6 mm2
Minimum reinforcement @ 0.12% =

0.12
x 3600 x 560
100

= 2419.2 mm2 2746.60 mm2


As per I.S code provisions,
Reinforcement in central band/Total reinforcement in shorter direction =
Where,

y
x

3.6
2.6

= 1.4

Reinforcement in central band/2746.60 =

2
1.4 +1

= 0.83

Reinforcement in central band = 2308.06 mm2


This reinforcement shall be distributed in central 2.6 m band width.
Using 16mm bars, spacing =

201 x 2600
2308.06

= 226.3 mm 225 mm

Provide 16mm bars @ 225mm c/c in central band


Balance area of steel to be distributed in outer bands,
= 2746.6 2308.6 = 438.54 mm2
Using 12mm bars, spacing =

113 x 1000
438.54

= 257 mm 250mm

Maximum spacing allowed = 300 mm or d (920) whichever is less


Provide 16mm bars @ 250mm c/c for the outer bands
Check for Development Length:-

2
+1

Ld =

0.87 x f y x
4 x bd

0.87 x 415 x 16
4 x 1.92
[bd = 1.92 N/mm2 for M20 and Fe 415]

= 752.2 mm

Available length in shorter direction, beyond column face


=

2600250
2

= 1175 mm > 752.2 mm

Hence, the design is OK.

Footing Design
For Footing Below The Column E4
Safe Bearing Capacity of the Soil (qu) = 120 KN/m2
Load Calculation:Load of Column on the Footing (Wc) = 467.88 KN
Self-weight of Footing (Wf) = 10% of Wc = 46.78 KN
Total Weight on the Footing (Wc + Wf) = (467.88 + 46.78) KN = 514.66 KN
Area of Footing:A=

(W c +W f )
qu
514.66
120

= 4.2 m2

Considering Length to Width ratio same as that of the column =

350
=1.4
2
250

Let, y = 2x
Area of Footing = x x y = 2x2 = 4.2 m
, x=

4.2
2

= 1.4m

So , y =2 x=2 x 1.4=2.8 m

Factored Soil Pressure due to Column Load only (Pu) =

1.5 X 514.66
1.4 x 2.8

= 196.6 KN/m2
Depth of Footing by One Way Shear Criterion:Critical section is at d from the face of the column.
Shear Force in longer direction =

196.6 x 2.8 x

d )
( 1.400.25
2

= 357.00 551.32d

Shear Force in shorter direction =

196.6 x 1.4 x

d )
( 2.80.25
2

= 357.00 350.93d

(i)

Shear Force in longer direction is more.


Shear Force resisted by the concrete = c x X x d
[c = 0.32 for 0.2% steel
reinforcement]
3
= 0.32 x 10 x 3 x d = 960d ... (ii)
Equating (i) and (ii),
357.00 551.32d = 960d
or, d = 0.310 m 0.350m
Depth of Footing by Two Way Sheer Criterion:Critical section is at

d
2

from the face of column.

Shear Force at critical section due to shaded area


= 196.60 x {2.8 x 1.4 (0.25+d) x (0.25+d)}
= 758.3 98.45d 196.6d2 . (iii)
Punching shear resisted by section = cxA
Where, c = 0.25 x f ck = 0.25 x 20 = 1118 KN/m2
A = Area of critical section = perimeter x d
=2 x [{(0.25 + d) + (0.25 + d)} x d] = d + 4d2
Shear Force resisted = 1118 x (d + 4d2)
= 1118d + 4472d2

.... (iv)

Equating (iii) and (iv),


758.3 98.45d 196.6d2 = 1118d + 4472d2
4668.6d2 + 1216.45d 758.3 = 0
(1216.45) ( 1216.45 ) 4 x 4668.6 x (758.3)
2 x 4668.6
2

d=

= 0.286m
Depth of Footing By Bending Moment Criterion:Critical section is at the face of the column.
Bending Moment in longer direction =

196.6 x 1.4 x 1.275 x

( 1.275
2 )

= 223.7 KN-m

.. (v)
0.575
196.6 x 2.8 x 0.575 x
2

Bending Moment in shorter direction =

= 91.00 KN-m
Hence Bending Moment in longer direction is more.
Moment of resistance in longer directionMr = 0.138 x fck x bd2
[For Fe-415]
= 0.138 x 20 x 1400 x d2 = 3864d2 N-mm .. (vi)
Equating (v) and (vi),
223.7 x106 = 3864d2
or, d = 240mm
Out of the three, the highest value of d obtained is 0.350m.
Let, assume d = 350mm
Overall Depth (D) = (350 + 8 + 50)
= 408 mm

400 mm

Area of Reinforcement:For longer direction,


Ast =

0.5 x 20
4.6 x 223.7 x 10
1 1
x 1400 x 400
2
415
20 x 1400 x 400

= 1644.0 mm2
Using 16mm bars, spacing =

201 x 1400
1644.0

= 171.5 mm

Provide 16mm bars @ 165mm c/c


For shorter direction,
Ast =

0.5 x 20
4.6 x 91 x 106
1 1
x 2800 x 400
2
415
20 x 2800 x 400

= 742.8 mm2
Minimum reinforcement @ 0.12% =

0.12
x 2800 x 400
100

= 1344 mm2 742.8mm2


As per I.S code provisions,

Reinforcement in central band/Total reinforcement in shorter direction =


Where,

y
x

2.8
1.4

2
+1

=2

Reinforcement in central band/1344 =

2
2+1

= 0.66

Reinforcement in central band = 896.00 mm2


This reinforcement shall be distributed in central 1.84 m band width.
Using 10mm bars, spacing =

78.5 x 1840
896

= 167.2 mm 165 mm

Provide 16mm bars @ 165mm c/c in central band


Balance area of steel to be distributed in outer bands,
= 1344 896 = 448.00 mm2
Using 10mm bars, spacing =

78.5 x 960
448.00

= 168.2 mm 165mm

Maximum spacing allowed = 300 mm or d (920) whichever is less


Provide 10mm bars @ 165mm c/c for the outer bands
Check for Development Length:-

Ld =

0.87 x f y x
4 x bd

= 470.11 mm

0.87 x 415 x 10
4 x 1.92
[bd = 1.92 N/mm2 for M20 and Fe 415]

Available length in shorter direction, beyond column face


=

1400250
2

= 575 mm > 470.11 mm

Hence, the design is OK.

FOOTING SCHEDULE
FOOTI
NGMAR
K

F1

COLU
MNMA
RK

D1, E1,
G1, I1,
I3, I5,
I7, I9

REINFORCEMENT
FOOTIN
GSIZE
(m)
3.0 X
3.0

LONGER
DIRECTIO
N
16 bar
@ 125
mm c/c

SHORTER DIRECTION
CENTRAL
BAND

OUTER
BAND

16 bar @
125 mm c/c

16 bar @
125 mm c/c

F2

C2, C3,
D2, D3,
E3, G3,
H5, H7,
H9

2.6 X
3.6

16 bar
@ 165
mm c/c

16 bar @
225 mm c/c

16 bar @
250 mm c/c

F3

C4, D4,
E4, F4,
F7, F9,
D7, E7

1.4 x
2.8

16 bar
@ 165
mm c/c

16 bar @
165 mm c/c

10 bar @
165 mm c/c

STAIR
Design

STAIR DESIGN
Given,
Room = 3.0 m x 5.0 m
Floor to floor height = 3.3 m
Thickness of brick wall = 250 mm
Using, M20 grade concrete and Fe 415 grade steel
Available width of stair case = 3.0 m
Considering two flights of Dog-legged staircase,

Let us assume width of each flight as 1.35 m


Space between two flights = 3.0 (2*1.35) = 0.30 m
As, there will be two flights, each flight will have a height of = (3.30/2) =
1.65 m
Assuming height of risers as 150 mm as it is a School Buiding.
No of Risers = (1650/150) = 11 Nos
No of Treads required = No of Risers 1
= 11 1 = 10 Nos
Let, width of each tread = 250 mm
Total going = (250*10) = 2500 mm = 2.50 m
Total length available = 5 m
Width of each landing = (5 2.5)/2 = 1.25 m = 1250 mm

Let, the thickness of the waist slab is 225 m (D)


Considering, 12mm of reinforcement to be used.
Let, clear cover = 15 mm
204 mm (d)

Effective Depth = 225 15 (12/2) =

Effective span = 5500 + 204 = 5704 mm = 5.704 m

LOADS:(i)

Weight of waist slab in plan (Per metre width of flight)


= D*[{1 + (R2/T2)}]*25
= 0.225*[{1 + (1502/2502)}]*25
= 6.55 KN/m

(ii)

Weight of steps (Per metre width of flight)


= 25RT/2T

= (25*0.15*0.25)/(2*0.25)
= 1.875 KN/m
Total dead load = 6.55 + 1.875 = 8.425 KN/m
Live load = 5 KN/m2
= 5 KN/m (Per meter width of staircase)
Total Dead load + Live load (w) = 8.425 + 5 = 13.425 KN/m
Factored load (wu) = 1.5*13.425 = 20.13 KN/m
For landing,
Dead load = 0.225*25*10 = 5.625 KN/m
Live load = 1*5.0 KN/m2 5.0 KN/m (Per meter width of landing)
Total Dead load + Live load (w) = 5.625 + 5 = 10.625 KN/m
Factored load (wu) = 1.5*10.625 = 15.93 KN/m

DESIGN MOMENT :Reaction at supports, RA = RB = [(2*15.93*1.375) + (20.13*2.5)]/2


= 47.06 KN
Bending Moment at mid span(MU)= [47.06*(5.25/2)] [15.93*1.375*{(1.375+2.5)/2}] +
[20.13*(2.5/2)*(2.5/4)]
= 123.53 42.43 15.72
MU = 65.38 KN-m

Maximum bending moment allowed for a singly reinforced section,


Mu lim = 0.138*fck*bd2
= 0.138*20*1000*2042
= 114.86 KN/m
MU < Mu lim.
Hence, the section can be design as a singly reinforced section.

AREA OF REINFORCEMENT :Ast = (0.5*20)/415[1-{1-(4.6*65.38*106)/(20*1000*2042)}]*1000*204


= 884.55 mm2
A = 113.09 mm2
Spacing = (1000*113.09)/884.55
= 127.90 mm 125 mm
Provide, 12mm bar @ 125 mm c/c as main reinforcement

DISTRIBUTION STEEL:Distribution steel = 0.12% of area


= (0.12*1000*204)/100 = 270 mm2
Considering, 8mm bar
A = 50.4 mm2
Spacing = (1000*50.4)/270 = 186.66 175 mm
Provide, 8mm bar @ 175 mm c/c as distribution reinforcement

DEVELOPMENT LENGTH:Ld = (0.87*fy*)/(4* bd)


= (0.87*415*12)/(4*1.92)
and Fe 415]

[bd = 1.92 N/mm2 for M20

= 564.14 mm
Provide, 800 mm length of bars at points where Ld is required

OTHER

INFRASTRUCTUR
ES
OF THE
PROJECT

CULVERT

ESTIMATE OF CULVERT
Sl
No.
1

Description of item

No.

Length
(m)

Breadth
(m)

Height
(m)

Quantity

Unit

Earth work in
excavatoin
Depth not exceding 1.5 m
Abutments

11.3

1.5

1.5

50.85

m3

Wing Walls
Curtain Wall
Floor(between abutments)

4
2
1

3.2
2.3
9.6

1.5
0.8
2.3

1.5
1.3
0.4

28.8
4.78
8.83
93.26

m3
m3
m3
m3

2
2
1
1

11.3
3.2
2.3
10

1.5
1.5
0.8
3

0.5
0.5
0.3
0.2

16.95
4.8
0.55
6
28.3

m3
m3
m3
m3
m3

Cement Concrete in
foundation(1:3:6)
Abutments
Wing Walls
Curtain Wall
Floor(between abutments)

1st. Class brick work in


cement morter(1:4)

Remarks

11.30=10+2x(0.40+
0.05+0.20)
2.30=32x(.05+.1+.2)
9.6=10-2x(.05+0.15)

Abutments
1st footing
2nd fotting
3rd footing
4th footing
5th footing
6th footing
Top wall
Deduct the bearing of
slab
Wing wall
1st footing
2nd fotting
3rd footing
4th footing
5th footing
6th footing
Top wall
parapet wall bottom
parapet wall top
Curtain wall
1st footing
top
4

5
6

Cement Concrete M-15


for
R.C.C. work
Shuttering and staging

10.9
10.9
10.9
10.9
10.9
10.9
10.9

1.1
1
0.9
0.8
0.7
0.6
0.5

0.6
0.4
0.6
0.6
0.6
0.6
0.6

14.39
8.72
11.77
10.46
9.16
7.85
6.54

m3
m3
m3
m3
m3
m3
m3

10.9

0.4

0.5

4.36

m3

4
4
4
4
4
4
4
2
2

3.2
3.2
3.25
3.35
3.45
3.55
3.65
11.3
11.3

1.1
1
0.9
0.8
0.7
0.6
0.5
0.5
0.4

0.6
0.4
0.6
0.6
0.6
0.6
0.6
0.4
0.4

8.45
5.12
7.02
6.43
5.80
5.11
4.38
4.52
3.62

m3
m3
m3
m3
m3
m3
m3
m3
m3

3.20=3.2-0.20+0.20
1st and 2nd footing
join with vertical
faceof abutment

1
1

2.7
2.8

0.5
0.4

0.6
0.4

0.81
0.45
116.24

m3
m3
m3

2.7=2.3(as for conc.


+2x.02)

1
1

11
11

3.8
3

0.5
-

20.9
33

m3
m2

112

3.91

56

4.25

@ 1.58
kg/m
kg

kg

1,068

kg

136
1204
= 0.12 MT

kg
kg

11.5

m2

Tor steel bar including


supplying bending, and
placing in position.
16mm dia top and
bottom nos=2(112x0.04/0.2+1) =2x55.6
say 112 nos.
16mm bottom cranked
bars

675.92
8mm dia distribution @
25cm c/c top & bottom
nos=2(3.8-2x0.04/0.25+1)
=2x15.58 say 32 nos

100mm Thk. Cement


concrete(1:2:4)coping
finished with cement
plaster(1:3)

10.90=11.30(as
earth
work)-2x.2
(concrete offsets)

2
2
2
2
2
2
2

32

10.9
348.8

11.5

@ 0.39 kg/m

0.5

11.3=2(3.65+.5+1.5)

Rule pointing with


cement morter(1:3)
Abutment inner sides
Face wall including
outside of paraper
Innerside of parapet
Edges of parapet
Edges of parapet
Deduct area of culvert
opening
Double layer brick flat
flooring with break joint in
cement morter(1:6)

11

66

m2

2
2
4

11.3
11.3
0.5
0.4

3.8
0.9
0.4
0.4

85.88
20.34
0.8
0.64

m2
m2

2.4

7.2
166.46

m2
m2

10

30

m2

m2

ABSTRACT OF ESTIMATE OF CULVERT


SL
N
O.
1

DESCRIPTION OF ITEM
Earthwork in excavation of foundation trenches
of all shorts of soils including removing
spreading or stacking the spoils within a lead of
150 m as directed and including traiming the
sides of trenches levelling dressing and
ramming the bottom bailing or pumping etc.As
reqired complete depth of excavation.Exceding
1 m not exceding 2m below avarage bed level at
the side of excavation
Providing cement concrete (1:3:6) without
reinforcement in any part of abutment and wing
walls with approved stone metal of approved
type 45 mm to 22.4 mm size,screening and
cleaning of aggregate and sand as
necessary.curing in water with cost and carriage
of material but excluding cost of labour and
material of form work and reinforcement

UNI
T

QUANTI
TY

RATE

AMOUN
T

m3

93.26

95.6

8915.7

m3

28.3

4200

118860

First Class brick work in cement sand morter


(1:4) in straining of wall pier abutment in
wall,parapet,cross drain,guard wall etc.including
curing,scaff folding ,racking,out joint
etc.Conclude and cost and carriage of material
Providing and lying cement concrete (1:2:4) with
reinforcement steining of abutment and super
stucture of culverts with graded stonechips of
appropieat normal sizes inluding screening
cleaning of coarse and fine aggregate,curing in
water with cost and carriage of all materials but
excluding cost and carriage of materials for from
work and reinforcement
Providing shuttering and stagging including
material and labour charges.Form work should
be smooth so that the finished suface remain
smooth.Form work for portion upto 3m
Supplying bending and binding and lying in
position steel reinforcement of different
dimensions in cement concrete work in super
structure including initial straitning of coil bars
removal of lost rust cutting to requisite length
bending bindingwith annealed wire not lsss than
1mm in size
Cement concrete in coping with out
reinforcement (1:2:4) with grade stone chips of
appropieat normal size in cluding cleaning and
screening .Curing with water with cost and
carriage of all material and labour and finished
with cement plaster(1:4)
Rule pointing with cement morter (1:3) providing
screening and cleaning of sand and includig cost
and carriage of material and labour

Double laer 1st class brick flat soling including


break joint with cement moter,including
curing.conclude cost and carriage of material
and labour

m3

116.24

6132

712783.6
8

m3

20.9

5240

109516

m2

33

548

18084

0.12

90900

10908

m2

11.5

340

3910

m2

166.4

100

16640

m2

30

640

19200

1018817.
3

Total
Amount

TOTAL = Rs.
1018817.3

CONTINGENCY @5% = Rs.


50940.865
W.C. ESTABLISHMENT @ 2.5% = Rs.
25470.43

TOTAL COST = Rs.


1095228.5

BOUNDAR
Y WALL

2
3

EARTHWORK IN
EXCAVATION IN
FOUNDATION
(A) Long wall

650

0.5

(b) short wall


Deduction for gate
opening

223.2

0.5

10

0.5

Earth work in filling


1st class brick flat soiling
in foundation
(A) Long wall
(b) short wall
Deduction for gate
opening

UNIT

QUANTIT
Y
422.5

m3

145.08

m3

3.125

564.46

m3
m3

112.891

m3

112.89
1

2
2

650
223.2

0.5
0.5

650
223.2

m2
m2

10

0.5

m2
m2

868.2

(A) Long wall

650

0.5

(b) short wall


Deduction for gate
opening

223.2

0.5

10

0.5

(A) Long wall

(b) short wall


2nd footing
(A) Long wall
(b) short wall
Deduction for gate
opening
Deduction for gate
opening

650
224.2
5

0.37
5
0.37
5

2
2

650
224.5

1
1

1st class brick work in


foundation
1st footing

pillers
125mm th panels

0.6
5
0.6
5
0.6
5

1/5 of the excavation

Cement concrete in
foundation(1:4:8)

1st class brick work in


super struture

HEIGHT

N
O

QUANTITTOTAL
Y

DESCRIPTION OF
ITEM

BREADTH

SL

LENGTH

ESTIMATE OF BOUNDARY WALL

69
6
1

0.1
5
0.1
5
0.1
5

97.5

m3

33.48

m3

0.75

m3
m3

130.23

0.2

97.5

m3

0.2

33.64

m3

0.2
0.2

65
22.45

m3
m3

10

0.25
0.25
0.37
5

0.2

0.75

m3

10

0.25

0.2

0.5
217.34

m3
m3

3399

m3
m3
m3

0.25
1565

0.25
-

2
2

87
3312

REMAR
KS

cement plastering
pillars
panels both faces
gate pillers portions not in
contact with panels

69
6
2

1565

0.75
0.12
5

2
2

1044
1650

m3
m3

0.5

m3
m3

2694.5

ABSTRACT OF ESTIMATE OF BOUNDARY


WALL
SL
NO
1

DESCRIPTION OF ITEM

Earthwork in filling in foundation trenches,


plinth, piles etc. with good soil in layer not
exceeding 150mm including watering
ramming
etc. Layer complete ( payment to be made
on
basis of measurement of finished quality
of
work) with soil obtained from excavation
of
foundation.

RATE
(RS)

AMOUN
T
(RS)

cu.
m

564.33

67

37810.1
1

cu.
m

56.11

41.6

2334.17
6

sq.
m

868.2

Single brick flat soling with picked jhama


bricks
in steps etc. including ramming, dressing
bed to proper level and filling and joint
with local
Sand complete in all respects with labor
and material

QUANTIT
Y

Earthwork in excavation of trenches in any


kind
of soil including trimming the sides of
trenches.
levelling, dressing and ramming the
bottom and
bailing out normal seepage of water

UNI
T

Cement concrete with or without


reinforcement
with graded clean coarse aggregate
nominal
size 20 mm down mixed with coarse clean

115.00

99843

sand
conforming zone I or II of IS- 383 of latest
edition both of approved quality as
necessary
including preparation of dressing mix and
cost for
quality control, sampling testing etc.
Vibrating
with vibrator, curing as directed. All
complete
with all labour and material bur excluding
cost
of shuttring and reinforcement as detailed
in
the specification and reinforcement as
detail in
the engineering- in - charge. Complete
( thickness
and shape as per drawing). Lintel, chajja,
apron,
footing, r-walls columnshaft, lift wall, floor
and
roof beams @ slab, parapet wall, over
laying and
coarse, stair waist and landing slab, steps,
projections weather board folded plate
etc. as
per drawing and directing from foundation
to
parepet for all levels.
M15 grade concrete for PCC
5

130.23

5516.6

718420.
3065

cu.
m

245.84

4800.4

1180130
.336

sq.
m

3312

627

2076624

Brickwork with first class brick in cement


morter
(1 : 4)

cu.
m

125mm thick brick work with first class


brick in
cement morter (1:4)
Plastering ( to wall, floor, celling etc. )
both inside
and outside with sand and cement mortar
including rounding off or chemfering
corners
and extra thickness of morter due to
inequalities of brick work or concrete
surface as
directed and raking out joints or roughing
of
concrete surface including throationg,

noising,
drip course where necessary in all floors.
15mm thick plaster with( 1: 6 ) cement
morter

sq.
m

2703.5

92.25

TOTAL = Rs.
4264716.8

CONTINGENCY @5% = Rs.


213235.84
W.C. ESTABLISHMENT @ 2.5% = Rs.
106617.92
TOTAL COST = Rs.
4584570.56

249397.
875

ROADS

10 m WIDE ROAD

ESTIMATE OF 10m WIDE ROAD

SL.
NO

DESCRIPTION
OF ITEM

N
o.

LENGT
H
(m)

BREADT
H
(m)

HEIGHT
(m)

QUANTIT
Y

UNI
T

REMARK
S

1.

2.

Box cutting in
road cust, and
consolidating
and dressing the
sub-grade depth
above..
150 mm and up
to 300 mm

Edging:

904.5

7.7

------

6964.65

m2

10 - (2
x1.25)+
0.1x2
= 7.7

1x
2

904.5

-----

-----

1809

mm

Brick on-end
edging
overbrunt brick
laid
true to line and
level

3.

Base
cource:

904.5

7.7

----

6964.65

m2

(a)Supplying
and laying
double brick flat
soling with
overbrunt bricks
..

to
100mm

(b)Bottom
layer:(i)Supplying
overbrunt brick
metal 50
to 65 mm size
stacked at road
side at
regular intervals

(ii)Labour for
spreading and
consolidating
of brick metal

m3
1

904.5

7.5

0.15

1017.5625

904.5

7.5

0.15

1017.5625

( c) Top
layer:(i)Supplying 40
to 25 mm size
trap stone
metal and
stacked at road
side at regular
intervals
(ii)Labour for

150 mm
loose
compacte
d

904.5

7.5

0.112

759.78

m3

904.5

7.5

0.112

759.78

m3

75 mm
compacte
d when
loose
75+0.5x7
5sq m =
112sq m

spreading and
consolidation
of stone
metal
4.

Wearing
Cost:(i) Supplying
bitumen
(asphalt 80/100)
delivered and
stacked at site
. .
(ii)Supplying
trap stone chips
12 to 6.3 mm
size
delivered at site
(iii) Premixing,
laying the primix
uniformly
on W.B.M.
surface applying
tack coat
and
consolidating 25
mm thick carpet

904.5

904.5

904.5

7.5

7.5

7.5

280kg/1
00 m2
5427

kg

67.83

m3

6783.75

m2

m3/100
m2

----

ABSTRACT OF ESTIMATEOF 10 m ROAD


SL
NO.
1.

2.
3.
(a.)

(b.)

UNIT

QUANTITY

RATE
(Rs)

AMOUNT
(RS)

m2

6964.65

1.40

9750.51

r.m.

1809.00

10.00

18090

m3

6964.65

50.00

348232.5

(i)Supplying overburnt brick metal


50 to 65 mm size stacked at road
side at regular intervals

m3

1017.56

150.00

152634

(ii)Labour for spreading and


consolidation of brick metal
thickness above 110mm in layers

m3

1017.56

26.00

26456.56

m3

759.78

130.00

98771.4

m3

759.78

30.00

22793.4

5427.00

4000.0
0

21708000

m3

67.83

210.00

14244.3

m2

6783.75

2.50

16959.375

DESCRIPTION of items
Box cutting in road crust,and
consolidating
and dressing the sub- grade depth
above
150mm and upto 300mm . .
Brick on- end edging with
overburnt bricks
laid true to line and level . .
Supplying and laying double brick
flat soling with overburnt bricks
and packed with local sand . .

(i)Supplying 40 to 25mm size trap


stone metal and stacked at road
side
(ii)Labour for spreading and
consolidation of stone metal
thickness above 100mm (loose) in
layers . .
4. (i)Supplying Bitumen ( asphalt
80/100 )
(ii)Supplying trap stone chips
12mm down

(c.)

(iii)Labour for Premixing ,laying


and consolidating 25mm thick
carpet on W.B.M. surface.

tons

TOTAL = Rs.
467171.73

CONTINGENCY @5% = Rs.


23358.58
W.C. ESTABLISHMENT @ 2.5% = Rs.
11679.29
TOTAL COST = Rs.
502209.60

6 m WIDE ROAD

ESTIMATE OF 6 m WIDE ROAD

Box cutting in road cust, and


consolidating
and dressing the sub-grade
depth above..
150 mm and up to 300 mm

1449

m2

REMARKS

UNIT

QUANTIT
Y

4.2

HEIGHT
(m)

345

6 - (2
x1)+
0.1x2
= 4.2
4.20.1x2
=4

Edging:
Brick on-end edging overbrunt
brick laid
true to line and level

N
o

(m)BREADTH

DESCRIPTION OF ITEM

(m)LENGTH

SL
.
N
O

1x
2

345

----

345

4.2

345

----

690

rm

----

1449

m2

0.15

207

m3

345

0.15

207

m3

345

0.11

155

m3

345

0.11

155

m3

345

Base cource:
(a)Supplying and laying double
brick flat
soling with overbrunt bricks
..

150 mm
loose
compact
ed

(b)Bottom layer:(i)Supplying overbrunt brick


metal 50
to 65 mm size stacked at road
side at
regular intervals

(ii)Labour for spreading and


consolidating
of brick metal

( c) Top layer:(i)Supplying 40 to 25 mm size


trap stone
metal and stacked at road side
at regular
intervals
(ii)Labour for spreading and
consolidation
of stone metal
4

Wearing Cost:(i) Supplying bitumen (asphalt


80/100)
delivered and stacked at site
(ii)Supplying trap stone chips
12 to 6.3 mm
size delivered at site

345

280kg/100
m2
3864
0.338m3 /
100m2

kg

4.66

m3

75 mm
compact
ed when
loose

(iii) Premixing, laying the


primix uniformly
on W.B.M. surface applying
tack coat
and consolidating 25 mm thick
carpet

345

----

1380

m2

ABSTRACT OF ESTIMATE OF 6 m ROAD

SL
NO
.

DESCRIPTION of items

1. Box cutting in road crust, and


consolidating and dressing
the sub- grade depth above
150mm and upto 300mm .
.
2. Brick on- end edging with
overburnt bricks laid true to
line and level . .
3. Supplying and laying double
(a.) brick flat soling with
overburnt bricks and packed
with local sand . .
(b.) (i)Supplying overburnt brick
metal 50 to 65 mm size
stacked at road side at
regular intervals
(ii)Labor for spreading and
consolidation of brick metal
thickness above 110mm in
layers
(c.) (i)Supplying 40 to 25mm size
trap stone metal and stacked
at road side
(ii)Labor for spreading and
consolidation of stone metal
thickness above 100mm
(loose) in layers . .
4. (i)Supplying Bitumen
( asphalt 80/100 )
(ii)Supplying trap stone chips
12mm down
(iii)Labor for Premixing
,laying and consolidating
25mm thick carpet on W.B.M.
surface.

UNI
T

QUANTI
TY

RATE
(Rs)

AMOUN
T (RS)

m2

1449.00

1.40

2028.60

r.m.

690.00

10.00

6900.00

m3

1449.00

50.00

72450.00

m3

207.00

150.0
0

31050.00

m3

207.00

26.00

5382.00

m3

154.56

130.0
0

20092.80

m3

154.56

30.00

4636.80

4000.
00
210.0
0

15456000
.00

2.50

3450.00

tons

3864.00

m3

4.66

m2

1380.00

979.44

TOTAL = Rs.
254130.54

CONTINGENCY @5% = Rs.


12706.52
W.C. ESTABLISHMENT @ 2.5% = Rs.
6353.26
TOTAL COST = Rs.
273190.32

2 m WIDE ROAD

EST

IMATE OF A 2m WIDE ROAD

61
9

-----

1238

1
x
2

61
9

-----

-----

1238

61
9

-----

1238

61
9

1.8

0.15

167.13

61
9

1.8

0.15

167.13

m
2

Edging :Brick on-end edging


overbrunt
brick laid true to line
and level

REMARKS

QUANTITY

Silver sand filling and


consolidating and
dressing
the sub grade depth
above
150 mm and up to 300
mm

UNIT

(m)HEIGHT

N
O.

(m)BREADTH

DESCRIPTION OF
ITEM

LENGTH (m)

SL
.
N
O.

r
m

Base Course :a)Supplying and laying


double
brick flat soling with
overbrunt bricks

m
2

b) Bottom layer :(i)Supplying over burnt


brick
metal 50 to 65 mm
size stacked at road
side at regular
intervals
(ii)Labour for
spreading and
consolidating of brick
metal
c) Top layer :(i)Supplying 40 to 25
mm size
trap stone metal and
stacked at road side at
regular intervals

61
9

1.8

0.11
2

124.79
04

m
3

150 mm
loose
compacte
d to
100 mm

m
3

m
3

75
compacte
d
when
loose
75+1/2x75
m2
=112 mm

(ii)Labour for
spreading and
consolidation of stone
metal
4

61
9

124.79
04

61
9

1.80@
280 kg
per 100
sqm

3119.7
6

k
g

61
9

1.80@ .
338 cum
per 100
sqm

3.765

61
9

1.8

1.8

0.11
2

Wearing Coat :(i)Supplying concrete


delivered and stacked
at site
(ii)Supplying trap
stone chips 12 to
6.3mm size delivered
at site
(iii) Premixing, laying
the
primix uniformly on
W.B.M. surface
applying tack coat and
consolidating 25 mm
thick carpet

-----

1114.2

m
3

m
2

ABSTRACT OF ESTIMATE OF 2m WIDE


ROAD
SL
NO
.

DESCRIPTION of items

1. Box cutting in road crust,and


consolidating
and dressing the sub- grade
depth above 150mm and
upto 300mm . .
Brick on- end edging with
2.
overburnt bricks
laid true to line and level .
.
Supplying and laying double
3.
brick flat soling with
(a.) overburnt bricks and packed
with local sand . .
(i)Supplying overburnt brick
(b.) metal 50 to 65 mm size
stacked at road side at
regular intervals
(ii)Labour for spreading and
consolidation of brick metal
thickness above 110mm in
layers
(i)Supplying 40 to 25mm size
(c.)
trap stone metal and stacked
at road side
(ii)Labour for spreading and
consolidation of stone metal
thickness above 100mm
(loose) in layers . .
4. (i)Supplying Bitumen
( asphalt 80/100 )
(ii)Supplying trap stone chips
12mm down
(iii)Labour for Premixing
,laying and consolidating
25mm thick carpet on W.B.M.
surface.

UNI
T

QUANTI
TY

RATE
(Rs)

AMOUNT
(RS)

m2

1238.00

1.40

1733.20

r.m.

1238.00

10.00

12380.00

m3

1238.00

50.00

61900.00

m3

167.13

150.00

25069.50

m3

167.13

26.00

4345.38

m3

124.79

130.00

16222.70

m3

124.79

30.00

3743.70

3119.76

4000.0
0

12479040.
00

m3

3.77

210.00

790.65

m2

1114.20

2.50

2785.50

tons

TOTAL = Rs.
226066.92

CONTINGENCY @5% = Rs.


11303.34
W.C. ESTABLISHMENT @ 2.5% = Rs.
5651.67
TOTAL COST = Rs.
243021.93

SURFACE
DRAIN

DESIGN OF SURFACE DRAIN


The volume of the reclaimed area = (650 x 225 x 0.600) m2
Area to be drained off or Catchments area = (650 x 225 x 10-4) hector
= 14.625 hector
The drain should be designed for

This discharge =

1
36

1
2

x k x Pc x A =

x (650 x 225 x 10-4) = 7.313 hector


1
36

X 1.55 X 4 X 7.313 = 0.447

cumec.
(Where, PC = Critical design rainfall intensity = 4cm/hour (assume) & k =
0.55 (assume)
According to N.B.C if the discharge is <15 cumec. Then, Y = 0.5 x B

[Where, Y = depth of the Surface Drain and


B = width of the Surface Drain.]
When, QP <15 cumec.
Where, Qp = maximum discharge
Let, B = 0.4 m.

Y = 0.5 X 0.4 = 0.32 m.


0.35 m.
Area of the the Surface Drain = (0.4 x 0.35) m2
For cement concrete lined drain, permissible velocity = 2 to 2.5 m/sec.
From, Meanings formula,
2

We know that, V = (

kR sR
n

For concrete surface, n = 0.015

R (m)

0.217

1 in 600

0.98 m/sec

2 to 2.5 m/sec

0.337

1 in 600

1.32 m/sec

Do

0.480

1 in 600

1.66 m/sec

Do

Section size of the Surface Drain is


B = 0.8 m; Y = 0.45 m.
And depth of the Surface Drain including Free Board = (0.45 + 0.40) m.
= 0.85 m.

DESCRIPTION
OF ITEM

N
O

LENGT
H

BREADT
H

HEIGH
T

QUANTIT
Y

TOTAL
QUANTIT
Y

UNIT

SL
.
N
O

Earthwork in
1. excavation in
foundation in
any kind of
soil

5658.7
4

1.1

0.7

4357.23

4357.23

m3

1.1

6224.61

6224.61

m3

1.1

0.125

778.08

778.08

m3

0.25

0.5

707.34

707.34

m3

0.5

2829.37

m3

0.25

1414.69

m3

2. S.B.F.S
Cement
3. Concrete

4. 250mm thick
Brickwork

5. Plastering
(a.) Inner
surface
(b.) Outer
surface

1
1

5658.7
4
5658.7
4
5658.7
4

5658.7
4
5658.7
4

4244.06

m3

REMARKS

ESTIMATE OF SURFACE DRAIN

ABSTRACT OF ESTIMATE OF SURFACE


DRAIN
SL
N
O.

DESCRIPTION OF ITEMS

1. Earthwork in excavation
Earthwork in excavation of
trenches in any kind of soil
including trimming the sides of
trenches, leveling, dressing and
ramming the bottom and bailing
out normal seepage of water.
2. Single layer brick flat soling
Single brick flat soling with picked
jhama bricks in steps etc.
including ramming and dressing
bed to proper level and filling
joints with local sand complete in
all respects with all labour and
materials.
3. Cement concrete in
foundation(1:3:6)
Cement concrete with or without
reinforcement with graded clean
coarse aggregate nominal size 20
mm down mixed with coarse
clean sand conforming Zone I or
Zone II of IS-383 of latest edition
both of approved quality as
necessary including preparation
of design mix and cost for quality
control, sampling, testing etc.
Vibrating with vibrator, curing as
directed. All complete with all
labour and matirials but
excluding cost of shuttering and
reinforcements as detailed in the
specifications and as directed by
the Engineer-in-charge. Complete
(Thickness and shape as per
drawing). To lintel, chajja, apron,
footing, R.walls column shaft, lift
wall, floor and roof beams &
slabs, parapet wall, over laying &
course, stair waist and landing
slab, steps, projections, weather
board, folded plate etc. as per
drawing & directions from
Foundation to parapet for all
levels.

UNI
T

QUANTI
TY

RATE
(Rs)

AMOUN
T (RS)

Cum

4357.229
8

41.87

182437.2
1

Sq.
m

6224.614

105.00

653584.4
7

(a.) M20 grade of concrete (cement


not less than 390 Kg/ Cum. of
concrete)
4. 1st class brickwork in cement
morter 1:4
Brick work in cement mortar 1:4 (
1 cement and 4 medium sand)
with 1st class brick wetted for 24
hours in pounding, having
crushing strength not less than
70 Kg./Sq. cm. including cut
bricks etc. complete in all
respects as per.
5. Plastering & finishing20 mm
thick plaster with 1:6 cement
mortar(To wall, floor, ceiling etc.)
both inside and outside with sand
and cement mortar including
rounding off or chamfering
corners and extra thickness of
mortar due to inequalities of brick
work or concrete surface as
directed and raking out joints or
roughing of concrete surface
including throating, nosing, drip
course where necessary in all
floors.

Cum

778.0767
5

3011

2342789.
09

Cum

707.3425

1959.0
0

1385683.
96

Sq.
m

4244.055

53.00

224934.9
2

TOTAL = Rs.
4789429.65

CONTINGENCY @5% = Rs.


239462.48
W.C. ESTABLISHMENT @ 2.5% = Rs.
119731.24
TOTAL COST = Rs.
5148623.37

SPECIFICATION
(1) FIRST CLASS BRICK
Brick should be made from good earth; free from all traces of salt
patriot other salts. They should be uniform deep red, cherry or copper
color, toughly burnt without being verified. They should be hard, sound
and uniform size and shape having each two adjacent plane surfaces at
true right angels. The brick should be free from cracks, chips, flaws, or
humps of any kind. They should not show any signs of efflorescence either
in dry state or after soaking in water.

(2) CEMENT
The cement used for reinforced concrete works shall be ordinary
Portland cement conforming to I.S. 269 up-to-date or blast furnace slag
cement conforming to I.S. 455-1962.The minimum compressive strength
of ordinary Portland cement as per I.S.269 should be 175kg/cm 2 after 7
days should be 25 kg/cm2. The initial setting time should not be less than
30 minutes and the final setting time should not be more than 10 hours.

(3) SAND
The fine aggregate (sand) shall confirm to either I.S. 383-1963 I.S. 515
up-to-date. It shall be clean, sharp, heavy and gritty to touch. Sand should
be free from clay, mica vegetable and organic matter. River and pit sand
should be used as this does not contain common salt in large quantities.
Sand must be cleaned by screening before its use.

(4) WATER
In concrete works the water used for both mixing and curing shall be
free from injurious amounts of deleterious materials. Potable water is
generally considered satisfactory for mixing and curing concrete.

(5) REINFORCEMENT
The reinforcement shall be of mild steel and medium tensile wire,
confirming to I.S. 432-1960 or cold twisted bars conforming i.s.1786-1961
or deformed steel bars confirming to I.S. with up-to-date modification.
All reinforcement shall be clean and free form loose mill scales,
duets, and coats of paints ,oil or other coatings which may destroy or
reduce bond . Welded joints in reinforcement may be used but in cases of
important connection.

(6) COARSE AGGREGATE


(As per I.S. -383):- aggregate most of which is retained on 4.75 mm I.S.
sieve and containing only so much finer material as it permitted for the
various type described.
(a)

QUALITY OF AGGREGATE

Aggregate shall consist of gravel or stone, crushed or uncrushed, or a


combination there of it shall be hard, strong, dense, durable, clean and
free from adherent coating. As far as
I.S SIEVE
DESIGNATION
(MM)

20 MM NOMINAL SIZE

80(MM)

ALL IN AGGREGATE
GRADING
PERCENTAGE
PASSING 40mm
NOMINAL SIZE
100

40

90-100

100

20

45-75

95-100

4.75

25-45

30-50

600

8-30

10-35

150

0-6

0-6

----

Possible flaky, scoriaceous and elongated pieces should be avoided. It


shall be obtained from approved query.
(b)
MECHANICAL
PROPERTIES
OF
AGGREGATE:
The
aggregate crushing value 30 percent for concrete for wearing

surface such as runways , roads and value , when determined in


accordance with I.S. 2386 (part -iv)
(c)
SIZE AND GRADING OF AGGREGATE: When coarse
aggregate brought to the site is ungraded, single size aggregates of
different nominal sizes confirming to the requirements wise, table
given above shall mixed at site.

(7) EARTHWORK
TRENCHES :

IN

EXCAVATION

OF

FOUNDATION

A) Before the earthwork is started the whole area where the work to
be done shall be cleaned or grass, roots of trees and other organic
matter.
B) The excavation shall be carried out exactly in accordance with the
dimensions shown on the drawing.
C) Sides of the trenches shall be vertical and its bottom shall be
perfectly leveled, both longitudinally and transversely.
D) If the excavation is in earth, the bottom of the trenches shall be
sprinkled with a little water and rammed. Any excess digging or
any portion of bad soil or hollows shall be removed by planning
concrete.

(8) EARTHWORK IN FILLING:


Earth use for filling shall be loose, free from brick bat, stone
boulders, not larger than 75mm in any direction, salt organic or other
foreign matter. Normally excavated earth from the same area shall be
used for filling.

(9) BRICK FLAT SOLING IN FOUNDATION TRENCHES:


A)
Second class brick in dry condition shall be laid on the
foundation.
B)
earth.

All brick gap shall be filled up with local fine sand or dry loose
C) Bricks bat have to provide in brick joints, shall be placed at the
edge of the trenches.
D) The finished surface shall be leveled both longitudinally and
transversely.

(10) LIME CONCRETE IN FOUNDATION:


a)

COARSE AGGREGATE: As specified in articles no. 6

b) PROPORTIONING:
Proportion of cement, sand and coarse
aggregate shall be 1:2:4 or as specified.
c) HAND MIXING: The mixing shall be done on clean water tight
platform sand and cement mixing together with spade turning the mixture
over and over again. The material shall be mixed in a drum for a period of
not less than 2 minutes and until a uniform color and consistency are
obtained.
The quantity of water to be used for each mixed of 50 kg.
Cement to give the required consistency shall not be more than 34
liters for 1:3:6 mix, 30 liters for 1:2:4 mix, 27 liters for 1:1.5:3 mix.
and 25 liters for 1:1:2.
d) LAYING: The entire concrete used in work shall be laid gently
in layers not exceeding 15cm and shall be thoroughly vibrated by
means of mechanical vibrators, still a dense concrete is obtained.

(11) CEMENT CONCRETE:


Coarse aggregates shall be crushed or broken from hard stone
obtained from query. It shall be hard, strong and durable, shall be
roughly cubical in shape. Coarse aggregate may be gravel, may either
be river bed single of pit gravel. It shall be sound, hard, clean, and
suitable graded in size. The size of the coarse aggregate shall be
20mm graded down.
Sand as fine aggregate shall be coarse, consisting of sharp, angular
grain and be of standard specification.
Cement shall be fresh Portland cement and conform to I.S. 269
modifications.
Water used shall be cleaned and reasonably free from injurious
quantities of deleterious materials.
Proportion of cement, sand and coarse aggregate shall be 1:2:4 or as
specified. Coarse aggregate &sand shall be measured by measuring
box of 30x30x38 cm or of suitable size equivalent to the content of
one bag of cement of 0.0354 cu.m. cement shall be by bag weighing
50kg. Sand shall be measured on the basis of its dry volume. In case
of damp sand, the bulkage shall be determined at site & the extra
quantity of sand so determined shall be added.

(12) REINFORCED CEMENT CONCRETE


A) FORMWORK: Formwork shall be including all forms or moulds
required for forming the concrete which in cast-in-situ together with
all the temporary construction required for their support.
B) MATERIALS FOR FORMWORK:
Formwork shall be plywood or
steel approved by the engineer in charge. Timber used for from
work shall be easily workable with rails without splitting and of light
weight. It shall be stiff and strong enough to avoid deflection with
loaded and not enable to work when exposed to sun and rain or
wetted during casting of concrete.
PROPPING AND CENTERING
Propped used for centering shall be steel, timber, posts, bellies of any
other materials approved by the engineers in-charge.in case when
bellies are used none shall be less than 100 mm.
SHUTTERING
The shuttering shall be approved dressed timber of well seasoned
wooden board to give a smooth and even surface and joints shall not
permit leakage of cement grout. The timber shall be free from loose
knots, projected nails, splits, adhering grout or other defects that may
occur the cement surface of concrete.
REMOVAL OF FORM WORK
The form work shall be removed avoiding shock and vibration that may
cause any damage to concrete in a slab or beam construction, sides of
beam and costly the underside of the beam.

C)

REINFORCEMENT: Mild steel bars shall confirm to the I.S.


specification free from dust, loose mill scales, coals of paints, oil or
other coatings which may destroy or deduce bond. It shall be stored
in such a way so as to avoid distortion and to prevent corrosion.

D) PLACING OF CONCRETE
MATERIALS FOR CONCRETE: Same as cement concrete except
the size of coarse aggregate shall be 20 mm. Unless specifies
mentioned in the type of work.
PROPORTINING OF CONCRETE: Same as cement concrete.

MIXING: Concrete shall be mixed by mechanical mixture except for


small quantity when engineer in charge permits otherwise. Same as
cement concrete.
E) COMPACTION: Concrete shall be compacted in a dense mass
immediately after placing by means of mechanical vibrators
designed for continuous operation during the whole period occupied
for placing of concrete.
F) CURING: Same as cement concrete.

(13) FIRST CLASS BRICKWORK:


A) MATERIAL: Brick shall be first class of standard specification,
regular in shape and size with sharp edges and corners. They shall
emit a clear ringing sound when struck. They shall be of uniformly
deep red or copper colors. They shall free from cracks, chips,
efflorescence, flaws and lumps of any kind. Dry brick shall not
absorb more than 20% of their weight when immersed in water for
24 hours. Brick shall have an average compressive strength of not
less than 100kg. per sq. cm.
For cement mortar, cement shall be fresh Portland cement of
standard quality. Sand shall be medium coarse sand, clean, sharp
and free from clay, mica or organic matter. For lime mortar, lime
shall be slaked and fresh stone - lime screened at work site.
Water used shall be clean and reasonably free from oils, acids, salts
and vegetable growth, generally potable water shall be used.
B) MORTAR: The brickwork shall be done with the specified mortar
( cement or lime) the ingredients in the specified proportion. In the
case of cement mortar the unit of measurement for cement shall be
a bag of cement and this shall be taken as 0.03cu.m. sand is
specified proportion shall be measured in boxes of suitable size
35cm x 25 cm x 40cm. Sand shall be measured on basis of its dry
volume. In case of damp of sand its quality shall be increased
suitable to allow for bulkage.
C) CURING: Brickwork shall be protected from rain by suitable
covering when the mortar is green. Masonry work in the cement
mortar shall be kept constantly most on all faces for a minimum
period of 7 days.
D) SCAFFOLDING: for all exposed brick work, double scaffolding
having two sets of vertical supports shall be sound and strong, tied
together with horizontal pieces over which scaffolding planks shall
be fixed. For all other brickwork in building, single scaffolding should
be permitted.

(14) HALF BRICK THICK PARTITION WALL IN CEMENT


MORTER:
(A) BRICK WORK: Bricks shall be of first class and proportion of
cement mortar shall be- 1:3. The brick work shall be done in a same
manner as brick work in cement mortar.

(15) DAMP PROOF COURSE


D.P.C. of cement concrete should have a mix of 1:2:4 or 1: 1.5: 3.
Usual thickness of 2.5cm to 4cm.
A) MATERIALS: Coarse aggregate shall be of clean, hard and dense
stone chips 12 mm down and shall be washed before use. Sand shall
be clean, sharp and screened before use. Cement shall be fresh
portable cement. All the materials in use including water proofing
compound shall be of their respective standard specified.
B) MIXING: Coarse aggregate shall be measured by volume with gauge
boxes and cement by bag having a weight of 50 kg. Or volume of
0.0347 cu.m. some sample tests of cement bags shall be made at
worksite to ensure the specified weight and volume. The mixing shall
be done on a clean flat platform.
C) LAYING: Damp proof course may be laid to the full width of the
plinth or of super-structure as specified in the drawing or specially
mentioned. It shall be laid to the specific thickness (2.5 cm or 4 cm)
over the plinth wall flush with the floor surface and shall not be
carried across the doorways or other openings.
D) CURING: D.P.C. shall be kept wetted for at least seven days after
lying, if the brickwork is not ready to process further. But in any case
no brickwork shall be commenced on the freshly laid damp proof
course unless the D.P.C. has been flooded with water for at least 48
hours.

(16) ARTIFICIAL STONE FLOORING:The ingredients are cement sand and stone chips in the proportion
1:2:4 or as specified. (This is also known as patent stone flooring
when crushed blast surface slag is used as coarse aggregate).
(A)
MATERIALS:- Coarse aggregate shall be stone chips, well
graded from 12mm down, free from dust, dirt etc. Hard and rough

sand shall be coarse 5mm.maximum size, clean free from dirt etc.
Cement shall be fresh Portland cement. All the materials as stated
above and water shall completely with their respective standard
specification.
(B)
SUBGRADE:- The subgrade shall be provided with the slopes
required from the flooring. Flooring in the verandah, kitchen, baths,
W.C. and courtyards shall invariably be provided with suitable slope
to drain off waste rain water. Plinth masonry offset shall be
depressed so as to allow the subgrade concrete to rest on it.
(C)
PROPORTIONING AND MIXING:- Usual proportion of
cement, sand and coarse aggregate shall be 1:2:4 or as specially
mentioned. Mixing of concrete shall be done by hand or by
mechanical mixture. In case of hand mixing the cement and sand
shall be mixed at first in dry mixture and further be mixed with dry
coarse aggregate still the coarse aggregate is well coated with dry
mix. Of cement and sand.
(D)
LAYING: - Flooring of specified thickness shall be laid in the
pattern as given in the drawing or as directed by engineer-in
charge. The panel shall be of uniform size and no dimension of
panel shall exceed 2m and the area of panels shall be more than
2sq.m. the whole operation of laying in one panel shall be
completed within 30 minutes.
(E)
SHUTTERING:- The panels shall be bounded by wooded
battens. The battens shall have the same depth as the concrete
flooring. These shall be fixed in position, with their top at proper
level, giving required slopes. The surface of the battens that come
in contact with concrete shall be oiled with raw linseed oil or a coat
of soap solution may be applied before casting the concrete.
(F)
CASTING OF CONCRETE:- the concrete shall be placed
gently and
evenly spread within the panel and thoroughly
compacted with wooden thapiesto the required thickness. The
surface shall then be removed on the next day of the laying of
cement concrete. The ends thus exposed shall be repaired, if
damaged, with cement mortar 1:2 and allowed to set for a
minimum period of 24 hours.
(G)
FINISHING: - the surface shall be left for some time, still
moisture disappears from it. Excessive trowelling shall be avoided.
Use of dry cement or cement and sand mixture sprinkled on the
surface to stiffen the concrete or absorbed excessive moisture,

shall not be permitted. Fresh quantity of cement at 2.0 kg. Of


cement shall be mixed with water to form thick slurry and spread
over an area of one sq.m. of flooring while the concrete is still
green. The cement slurry shall then be properly pressed and
finished smooth. The engaged in finishing operation shall be
provided with raised wooden platform to sit on, so as to prevent
damage to new work.
(H)
CURING:-The curing shall be done for a minimum period of
ten days. Curing shall not be commenced until the top layer has
hardened. Covering with empty cement gunnies shall be avoided,
as the colour is likely to be bleached with the reminants of cement
matter from bag.

(17) WOOD WORKS FOR DOOR AND WINDOW FRAME


A) MATERIALS:- Timber shall be of teak, sal, and deoder etc. As
mentioned, well seasoned, dry, free from sap, knots, crack or any
other defects or disease. It shall be sawn in the direction of grains.
Sawing shall be truly straight and square. The scantling, shall be
planned, smooth and accurate to the full dimensions, rebates,
rounding and moulding as shown in the drawing made, before
assembling, patching or plugging of any kind shall not permitted
except as provided.
B) JOINTS:-These shall be mortise and tenon type, simple and strong.
Mortise and tenon joints shall fit in fully and accurately without
wedging or filling. The joints shall be glued not less than 10 mm dia.
After frames are put together pressed in position by means of a
press.
C) SURFACE TREATMENT:- Wood work shall not be painted, oiled or
otherwise treated before it has been approved by the engineer-incharge. All portions of timber abutting against masonry or concrete
or embedded in ground shall be painted with approved wood prineer
or with boiling coalter.
D) GLUING OF JOINTS :-The concrete surface of mortise and tenon
joints shall be treated before putting together with bulk type
synthetic resin adhesive of a make approved by the engineer-incharge.
E) FIXING AND POSITION: - the frame shall be placed in position
truly vertical before the masonry reaches half the highest of the

opening with iron clamps or as directed by the engineer in charge.


In case of door frames without sills while being placed in position,
shall be suitably strutted and waged in order to prevent wrapping
during construction. The frame shall also be protected from damage
during construction.

(18) WOOD WORKS FOR DOOR AND WINDOW SHUTTERS


A) MATERIALS:- Specified timber shall be used and it shall be well
seasoned, dry, free from sap, knots, crack or any other defects or
desease patching or plugging of any kind shall not be permitted
except as provided.
B) JOINERY WORK:- All pieces shall be accurately cut and planned
smooth to the full dimension. All members of the shutters shall be
straight without any wrap and bow and shall have smooth, well
planed faces at right angle to each other. In case of paneled
shutters the corners and edges of panels shall be finished as shown
in drawings, and these shall be feather tongued into styles and rails.
The panels shall framed into the groovers of 1.5 mm. And faces shall
be closely fitted to the sides of groove. In cases of glazed shutter,
such bars shall have mitered joints with style. Styles and rails shall
be properly and accurately mortise and tenoned rails and which are
more than 180 mm. In width shall have two tenons styles and rails
of shutter shall be made out of one piece only. The tenon shall pass
through styles for at least % th of the width of the style. When
assembling a leaf, style shall be left projecting as a horn. The style
and rails shall have 12 mm. Groove in paneled portion for panel to
fit in.
C) GLUING OF JOINTS FOR PANNELLED OR GLAZED SHUTTER :The contact surfaces of tenon and mortise joints shall be treated
before putting together with bulk type synthetic resin adhesive of an
make approved by the engineer in charge.
D) FITTING: - Details of fitting to be provided shall be as per the
schedule of fitting supplied be the engineer in charge in each case.
The coast of the providing and fixing shutter shall include the coast
of hinges and necessary screws for fixing the same. All other fixing
shall be enumerated and paid for separately.

(19) LIME TERRACING

A) MATERIALS:
1) Coarse aggregate shall be of well brunt first class brick balllestof
uniform deep cherry or copper colours. It shall be homogeneous in
texture and roughly cubical in shape. It must not be pours or with
any sign of saltprtre. It shall be free from dust , dirty , or other
vegetable matters and shall pass through 25mm dia, ring but retain
on 6mm.squares mesh screen. It shall be well graded.
2) Fine aggregate shall be of surki grounded form new first class bricks
and shall pass through a screen 25 meshes per sq.m. surki shall be
of uniform colour, free form dirt, vegetable or other foreign matters.
3) Lime shall be freshly brunt stoke lime and shall be free form ash ,
unburnt stone specifications. Paricles or other foreign matters.lime
shall be screened at site of work through a sieve of work 3 meshes
per sq.cm. Besides these , all the material including water shall be
of standard.
B) PROPORTIONING: - The proportion of ingredients shall be 35cm x
25cm x 40cm. Wheel measuring aggregate shaking, ramming or
heaping may be done. The proportion may be 2 parts lime 2 parts
course aggregate or as specified.
C) MIXING:- The mixing shall be done on a clear solid platform. Brick
aggregate shall be well soaked with clean water for not less than 3
hours before mixing and it shall be stacked evenly on the platform.
D) LAYING:- The R.C.C roof slab over which lime-tracing is to be laid
shall be at least 28 days old. The surface of R.C. shall be cleaned
and shall be moisture by soaking clear water before laying concrete.
Concrete shall than be laid (not thrown) on the roof slab in a single
layer about 20% thicker than specified for consolidation with slope
(minimum 1in 50) towards gutter.
E) FINISHING:- The surface shall be softened by sprinkling pure water
and the mortar which is brought to the surface by beating shall
then be render smooth and finished off with lime rubbed with the
face a trowel. On no account plastering shall be used on the surface
with lime putty which prepared form lime and surki (1:1) may be
used if the mortar is found insufficient to the surface pores.
F) CURING:- The roof shall be kept wet for at least 10 days. Inter
mittently spraying water not some intervals on straw or old gunny
badges or fine sand laid on the roof.

(20) WHITE WASHING:


A) SCAFFOLDING: Wherever scaffolding is necessary it shall be
erected on double supports tied together by horizontal pieces, over
which scaffolding planks shall rest on or touch the surface which is
being while washed. Where ladders are used pipes of old gunny
bags shall be tied on their tops to avoid damage or scratches to
walls. For white-washing the ceiling proper stage scaffolding shall be
erected.
B) PREPARATION OF SURFACE: Before new work is white washed,
the surface shall be thoroughly brushed free from mortar dropping
and foreign matters. In case of old work all loose pieces and scales
shall be scraped off and holes in plaster as well as patches of less
than 50 sq.m. Area shall be field up with mortar of the same mix.
C) PREPARATION OF LIME-WASH: The washed shall be prepared
from fresh stone white lime. The lime shall be thoroughly slaked on
the spot, mixed and stirred with sufficient water to make a thin
cream. This shall be allowed to stand for a period of 24 hours and
then shall be screened through clean course cloth. 40 gms of gum
dissolved in hot water, shall be added to each 10cu.decimeter of the
cream.
D) PROTECTIVE MEASURES: Doors, windows, floors, articles of
furniture etc. And other parts of the building not to be white-washed
shall be protected from being splashed upon, splashing and
droppings if any shall be removed and the surface cleaned and no
payment for such cleaning shall be made separately.
E) COLOUR WASHING: The same as white washing except that the
mineral colours, not affected by lime, shall be added to white wash.
Indigo shall be however, not be added. No colour wash shall done
until a sample of the colour wash of the required shade has been got
approved from the engineer-in charge. The colour shall be even
shade over the whole-surface. For the new work, the priming coat
shall be of white wash with time or with whiting as specified. For old
work, a coat of colour wash shall be applied over the patches and
repairs. The colour washed surface shall present a uniform finish.

MARKACTIVITY

EVENT
MARK

PROJECT PLANNING
ACTIVITY

1-2

LAND DEVELPOMENT FOR PROJECT

2-3

PROJECT MOBILIZATION

3-4

COMPLETION OF BOUNDARY WALL

4-5

COMPLETION OF CULVERT

5-8

COMPLETION OF MIG FLATS (6 NO)

5-6

6-7

8-9

LAYING OUT WATER SUPPLY LINE


COMPLETION OF SUB-BASE, BASE
COURSE OF ROAD (10m, 6m, 2m)
ELECTRIFICATION, PLUMBING, SANITARY
OF THE COMPLETED MIG FLATS

8-11

COMPLETION OF SCHOOL BUILDING

7-9

9-10

COMPLETION OF COMMUNITY HALL


ELECTRIFICATION, PLUMBING, SANITARY
OF THE COMPLETED MIG FLATS

STARTIN
G
DATE

ENDING
DATE

TIME
PERIO
D

02.05.20
11
15.05.20
11
12.06.20
11
10.07.20
11
31.07.20
11
31.07.20
11
01.09.20
11
01.02.20
12
01.02.20
11
24.11.20
11
23.02.20
12

15.05.20
11
12.06.20
11
10.07.20
11
31.07.20
11
01.02.20
12
01.09.20
11
24.11.20
11
23.02.20
11
20.06.20
12
23.02.20
12
15.03.20
12

2
Weeks
4
Weeks
4
Weeks
3
Weeks
24
Weeks
5
Weeks
3
Weeks
3
Weeks
20
Weeks
13
Weeks
3
Weeks

10-11

11-12

COMPLETION OF MIG FLATS (2NO.)


ELECTRIFICATION, PLUMBING, SANITARY
OF THE SCHOOL BUILDING

12-13

PLAYGROUND DEVELOPMENT

13-14

COMPLETION OF LIBRARY

14-15

12-14

COMPLETION OF MARKET
ELECTRIFICATION, PLUMBING, SANITARY
OF COMPLETED LIBRARY

15-16

16-17

COMPLETION OF OVERHEAD TANK


COMPLETION OF UNDERGROUND
RESERRVOIR

17-18

COMPLETION OF ROAD FOR USE

14-18

COMPLETION OF MIG (3NO.)

18-20

COMPLETION OF SECURITY ROOM

20-21

ELECTRIFICATION OF SECURITY ROOM

16-19

19-22

COMPLETION OF MIG (6 NO.)


ELECTRIFICATION, PLUMBING, SANITARY
OF COMPLETED MIG

22-23

CLEANING

15.03.20
12
20.06.20
12
11.07.20
12
17.07.20
12
30.08.20
12
11.07.20
12
18.10.20
12
01.11.20
12
15.11.20
12
30.08.20
12
15.12.20
12
31.12.20
12
01.11.20
12
11.04.20
13
25.04.20
13

20.06.20
12
11.07.20
12
17.07.20
12
30.08.20
12
18.10.20
12
30.08.20
12
01.11.20
12
15.11.20
12
15.12.20
12
15.12.20
12
31.12.20
12
06.01.20
13
11.04.20
13
25.04.20
13
28.04.20
13

14
Weeks
4
Weeks
1 Week
6
Weeks
7
Weeks
7
Weeks
2
Weeks
2
Weeks
4
Weeks
15
Weeks
2
Weeks
1
Weeks
23
Weeks
2
Weeks
2 Days

STARTING DATE = 02.05.2011


ENDING DATE = 28.04.2013
TOTAL TIME REQUIRED = 103 WEEKS

CPM ANALYSIS
PATH
NO.
1.
2.
3.
4.
5.

CHAIN

TIME SCHEDULE
(WEEKS)

1-2-3-4-5-8-9-10-11-12-13-14-1516-19-22-23
1-2-3-4-5-6-7-9-10-11-12-13-14-1516-17-18-20-21
1-2-3-4-5-8-11-12-13-14-15-16-1718-19-20-21
1-2-3-4-5-8-9-10-11-12-14-15-1617-18-19-20-21
1-2-3-4-5-8-9-10-11-12-13-14-1820-21

2+4+4+3+24+3+3+14+4+7+7+2+2
3+2+1
2+4+4+3+5+3+13+3+14+4+1+6+7
+2+2+4+2+1
2+4+4+3+24+20+4+1+6+7+2+2+4
+2+1
2+4+4+3+24+3+3+14+4+7+7+2+2
+4+2+1
2+4+4+3+24+3+3+14+4+1+6+15+
2+1

TOTAL
TIME
(WEEKS)
103
80
86
86
86

6.
7.
8.
9.
10.
11.
12.

1-2-3-4-5-6-7-9-10-11-12-14-18-2021
1-2-3-4-5-6-7-9-10-11-12-14-15-1617-18-19-20-21
1-2-3-4-5-8-11-12-13-14-15-16-1922-23
1-2-3-4-5-8-9-10-11-12-14-15-1619-22-23
1-2-3-4-5-8-11-12-14-15-16-19-2223
1-2-3-4-5-6-7-9-10-11-12-13-14-1516-19-22-23
1-2-3-4-5-6-7-9-10-11-12-14-15-1619-22-23

2+4+4+3+5+3+13+3+14+4+7+15+
2+1
2+4+4+3+5+3+13+3+14+4+7+7+2
+2+4+2+1
2+4+4+3+24+20+4+1+6+7+2+23+
2+1
2+4+4+3+24+3+3+14+4+7+7+2+2
3+2+1
2+4+4+3+24+20+4+7+7+2+23+2+
1
2+4+4+3+5+3+13+3+14+4+1+6+7
+2+23+2+1
2+4+4+3+5+3+13+3+14+4+7+7+2
+23+2+1

80
80
103
103
103
97
97

The least total time required to complete all the works that fall on path
(3,4,5) is 86 weeks and path (2,6,7) is 80 weeks and path (11,12) is 97
weeks. But works of other routes cannot be completed in 97 weeks which
is the maximum time required among these paths. The maximum total
duration for path (1), (8), (9) and (10) is 103 weeks.
In 103 weeks all the works which fall along any other paths can be
completed. Hence total project time is 103 weeks which has a maximum
duration among all other paths.
Therefore, the total project time may be defined as the maximum time
among all the paths required for passing from initial starting point or
event up to the completion point or event.

BIBLIOGRAPHY
REFERENCE BOOKS: In order complete the project we have used the
following books IS 456:2000; SP-34 detailing; IS-875:1987 (Part 1&2); SP16; R.C.C.Design (S.Rammamurtham, Menon & Pillai), Costing & estimate
& drawing M.Chakraborty.
METHOD OF DESIGN: We have design the beam, column, slab, footing
etc. in LIMIT STATE METHOD.

GRADING OF CONCRETE & STEEL: In order to design the school


building we have used M20 grade of concrete & Fe 415 Steel.
SYMBOLS USED:
SYMBOL

MEANING

AREA

BREADTH OF BEAM OR SHORTER DIM OF A


R.C.C COLUMN

OVERALL DEPTH OF BEAM OR SLAB

DL

DEAD LOAD

EFFECTIVE DEPTH OF BEAM OR SLAB

DEPTH OF COMP R/F FROM THE HIGHLY


COMPRESSED FACE

ES

MODULAS OF ELASTICITY OF STEEL

FCK

CHARACTERISTICS
CUBE
STRENGTH OF CONCRETE

FY

CHARACTERISTICS STRENGTH OF STEEL

STIFFNESS OF THE MEMBER

LL

LIVE LOAD OR IMPOSED LOAD

LENGTH OF THE COLUMN OR BEAM

LEFF
COLUMN

EFFECTIVE

LX

LENGTH OF SHORTER DIRECTION OF SLAB

LY

LENGTH OF LONGER DIRECTION OF SLAB

AXIAL LOAD OF COMPRESSION NUMBER

TOTAL LOAD

MODULAS OF SECTION

RR

PARTIAL LOAD FACTOR OF LOAD

sc

PARTIAL STRESS IN STEEL IN COMPRESSION

BD

DESIGN OF BOND STRESS

BENDING MOMENT

TENSIONAL MOMENT

SPAN

OF

COMPRESSIVE

BEAM,

SLAB

OR

SHEAR FORCE

DISTRIBUTION LOAD

ANGLE

SHEAR STRESS IN STEEL

DIAMETER OF HYSD BAR

ACKNOWLEDGEMENT
An attempt has been made to prepare a Civil
Engineering Project report which will explain briefl y about the MIG
building, School building & also an overall Township including
playground, roads, water reservoir, community hall, surface drain,
with all necessary drawing, detailing & estimate with abstract
wherever is necessary & according to syllabus. The unique feature

of this project report is that it gives a complete concept with


proper details as per requirement.
I am (Anirban Dey) highly grateful to Swami Tattwajnanananda
(Principal of Ramakrishna Mission Shilpamandira) for
stretching a helpful hand to us. He has not only inspired us but
also helped us a lot when we needed, and gave us crystal clear
idea about Architectural aspects.
I thank sincerely Shri Sayan Kundu for his special attention and
guidance to us. This project is only complete and successful with
his inspiring hard work and untiring guidance.
I am also greatful to Shri Sabyasachi Dey (Lecturer and
H.O.D. of Civil Engineering Dept. of RKMS) and all our
teachers of Civil Engineering department, who took keen interest
in all aspects to help us prepare this project report.
Iam also greatful to Shri Subhrakanti Ghosh for giving us the
idea of Road Estimate & preparing the Abstract of Estimate,
wherever necessary and also in preparing the Bar Chart.
The proposed land & unavailable measurements are taken in this
project are fi ctitious.

__________

______________

[PRINCIPAL]
TEACHER]

[GUIDE