Frame structure.
5. Source of Water Supply- Overhead reservoir & Municipal water
supply.
6. Source of Electricity- West Bengal State Electricity Board
7. Existing Drainage System- Surface drains are present
8. Direction of Wind in Summer- South to North
9. Availability of Material- Good
10. Approximate Safe Bearing Capacity of Soil- 10 ton / m2
11. Angle of Repose- 30
12. Unit weight of Soil- 1.9 ton /m3
1 DRAINAGE SYSTEM :
The layout and design of entire drainage system & sewage arrangement is
such that there is no chance of water logging and storm water can be
discharge into the corporation drain to be finally displaced into the river
after proper treatment in sewage treatment plant.
Hence, there is no danger of public health.
4 ROAD MAINTENANCE :
The municipality maintained the road regularly to keep them in good
riding condition throughout the year.
5 ELECTRIC SERVICES :
West Bengal state electricity board provides adequate arrangement
through overhead wires for supplying electrical energy to all the in
habitants. W.B.S.E.B. also provides lighting arrangement for the
pedestrian and automobiles during night travels on the road.
7 MARKET FACILITIES :
A market has been setup by the municipality having shops, stocking all
goods in required quantities day leaving.
8 PLANTATION :
The municipality and other local development organization promote
plantation of trees in the locality to check environmental pollution and
also to beautiful the landscape.
The building by laws are framed with legal phraseology and it is not
intended here to give complete description of all the bylaws. The brief
descriptions of all the possible building by laws to be friend for residential
area of a typical town planning scheme are mentioned below.
4) 4) AREA OF ROOM:
MINIMUM
AREAS
FOR ROOMS
NO
1.
2.
3.
4.
USE OF ROOM
MINIMUM
AREA
Living
room,
bed
room, 9 sq-m
drawing room, sitting room,
ladies room, dining room,
study room
Store room, kitchen
5.40 sq-m
Bath room, dressing room, Minimum
pump room, water room,
sq-m
Coal room
maximum
sq-m
W.C. urinal
0.81 sq-m
REMARKS
No side to be
less than 2.40m
No
less
1.35 No
and less
4.50
side
than
side
than
to be
1.80m
to be
90cm
No side to be
less than 90cm
The maximum height of floors shall not be more than 1.25 times the
minimum height.
11.
etc.
LIGHT PLANE:
In city area it becomes necessary to check that the height of one
building does not obstruct ventilation of the property on the other
side of the road. For this purpose, a light plane is marked at a
suitable.
Angle from the edge of road on other side & the buildings is curtailed
of to allow the light plane to pass the angle of light plane is 45 or
63.5.
NO
AREA
F.S.
REMARKS
Residential
Scheme
I
1
2.
Residential
area
City area
3.
Residential
City area
With
Facing street of less than 12m.
.
1.
4.
5.
USE
Industrial
Scheme
1.50
With
Max. allowed on G.F. 0.50
Commercial
area
Scheme
1.33
area
All of these minimum requirements are kept in mind at the time of town
planning.
MIG
FLAT
BUILDING
S
ROOF PLAN
FRONT ELEVATION
BACKSIDE ELEVATION
SECTION ABCD
SECTION EFGH
Sl.
No.
Description of Items
I. Substructure
1. Surface
Dressing to an
Average Depth
(i.) Deductions For
Offset at the
Backside
(ii.) Deductions For
Offset at the
Backside beside
Toilet
(iii. Deductions For
) Offset at the
Frontside
Total
Quantity
No.
Length
Breadth
Height
Quantity
19.25
0
14.450
278.16
3
m2
4.735
4.250
20.124
m2
2.250
1.030
2.318
m2
6.500
3.950
25.675
m2
230.04
6
2.
Antitermide
(i.)
Deductions For
Offset at the
Backside
Deductions For
Offset at the
Backside beside
Toilet
(ii.)
(iii.
)
Deductions For
Offset at the
Frontside
(i.)
(ii.)
(iii.
)
4.
5.
(i.)
(ii.)
Earthwork in
Excavation
250mm Th. Main
Walls
125mm Th.
Dwarf Walls for
Verandah
Toe Foundation
Earthwork in
Filling
by earthwork in
foundation
trenches.
Single Brick
Flat Soling
250mm Th. Main
Walls
125mm Th.
Dwarf Walls for
Verandah
Explainator
y
Notes
m2
19.25
0
14.450
278.16
3
m2
4.735
4.250
20.124
m2
2.250
1.030
2.318
m2
6.500
3.950
25.675
m2
230.04
6
3.
Units
m2
137.0
00
1.000
137.00
0
m3
153 - 32 X
1.0/2
14.65
0
0.750
10.988
m3
15.65 - 2
X 1.0/2
1.325
0.800
1.060
m3
149.04
8
m3
29.810
m3
137.0
00
1.000
0.075
10.275
m3
153 - 32 X
1.0/2
14.65
0
0.750
0.075
0.824
m3
15.65 - 2
X 1.0/2
(iii.
)
Toe Foundation
1.325
0.800
0.075
m3
0.080
11.179
6.
(i.)
(ii.)
(iii.
)
Cement
Concrete In
Foundation
With M-20
Grade Concrete
250mm Th. Main
Walls
125mm Th.
Dwarf Walls for
Verandah
Toe Foundation
137.0
00
1.000
0.150
20.550
m3
153 - 32 X
1.0/2
14.65
0
0.750
0.150
1.648
m3
15.65 - 2
X 1.0/2
1.325
0.800
0.150
0.159
m3
22.357
7.
(i.)
1 Class
Brickwork in
Cement Mortar
(1:4) in
Foundation and
Plinth
Main Walls:875mm Thick
625mm Thick
500mm Thick
375 mm Thick
Deduction for
Door of Stair
Room (D2) 1.2m
wide
Dwarf Walls for
Verandah:625mm Thick
500mm Thick
375mm Thick
250mm Thick
(iii.
)
1
1
1
1
1
1
1
1
1
1
139.0
00
141.0
00
143.0
00
145.0
00
147.0
00
1.200
15.02
5
15.15
0
15.27
5
15.40
0
0.875
0.150
18.244
m3
0.750
0.150
15.863
m3
0.625
0.150
13.406
m3
0.500
0.150
10.875
m3
0.375
0.675
37.209
m3
0.375
0.675
0.304
m3
0.625
0.150
1.409
m3
0.500
0.150
1.136
m3
0.375
0.150
0.859
m3
0.250
0.675
2.599
m3
0.500
0.375
0.250
0.150
0.150
0.600
0.099
0.075
0.199
m3
m3
m3
1
1
1
1.325
1.325
1.325
101.66
9
8.
m3
st
750mm Thick
(ii.)
m3
3.500
3.750
0.385
10.106
m3
m3
153 - 32 X
0.875/2
153 - 32 X
0.750/2
153 - 32 X
0.625/2
153 - 32 X
0.500/2
153 - 32 X
0.375/2
15.65 - 2
X 0.625/2
15.65 - 2
X 0.500/2
15.65 - 2
X 0.375/2
15.65 - 2
X 0.250/2
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I)
(Part II)
Staircase
2
2
2
2
2
2
0.950
0.950
3.750
0.950
3.750
3.750
0.950
2.250
2.250
1.250
3.500
4.750
0.385
0.385
0.385
0.385
0.385
0.385
0.695
1.646
6.497
0.914
10.106
13.716
m3
m3
m3
m3
m3
m3
2
2
1.300
1.000
0.950
1.575
0.385
0.385
0.951
1.213
m3
m3
2
2
1
1.250
3.825
2.250
3.250
1.250
1.150
0.385
0.385
0.385
3.128
3.682
0.996
m3
m3
m3
53.650
9.
(i.)
(ii.)
(iii.
)
(a.
)
2.5 cm Thick
D.P.C.
250mm Th. Main
Walls
125mm Th.
Dwarf Walls for
Verandah
Toe Foundation
Deduction for
Doors
1.0m wide Doors
(D1)
1.2m wide Doors
(D2)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)
m3
149.0
00
0.250
37.250
m2
153 - 32 X
0.250/2
15.52
5
0.125
1.941
m2
15.65 0.125
1.325
0.250
0.331
m2
10
1.000
0.250
2.500
m2
1.200
0.250
0.300
m2
0.900
0.250
0.900
m2
1.100
0.250
0.550
m2
0.800
0.250
0.400
m2
34.872
m2
Sl.
No.
Description of Items
II. Superstructure
1. Brickwork
I. Ground Floor
(i.) 250 mm Th. Main
Walls
(ii.) 125mm Th.
Dwarf Walls for
Verandah
Below Lintel
Above Lintel
(iii.)
(a.)
(b.)
No.
Length
Breadth
Height
Quantity
149.0
00
0.250
3.000
111.75
0
1
1
15.52
5
15.52
5
Total
Quantity
Units
Explainatory
Notes
m3
153 - 32 X
0.250/2
m3
15.65 0.125
0.125
0.600
1.164
m3
0.125
0.900
1.747
m3
2
2
2
2
2
2
2
3.500
0.950
0.950
3.750
0.950
3.750
3.750
3.750
0.950
2.250
2.250
1.250
3.500
4.750
0.075
0.075
0.075
0.075
0.075
0.075
0.075
1.969
0.135
0.321
1.266
0.178
1.969
2.672
m3
m3
m3
m3
m3
m3
m3
2
2
1.300
1.000
0.950
1.575
0.075
0.075
0.185
0.236
m3
m3
2
2
1
1.250
3.825
2.250
3.250
1.250
4.800
0.075
0.075
0.075
0.609
0.717
0.810
m3
m3
m3
10
1.000
0.250
2.100
5.250
m3
1.200
0.250
1.425
0.428
m3
0.900
0.250
2.100
1.890
m3
1.100
0.250
2.100
1.155
m3
0.800
0.250
2.100
0.840
m3
Windows
(c.)
1.0m wide
Windows (W1)
1.5m wide
Windows (W2)
0.6m wide
Windows (W3)
Deduction for
Lintel
Over 250mm Th.
Wall
24
1.000
0.250
1.200
7.200
m3
1.500
0.250
1.200
0.450
m3
0.600
0.250
0.400
0.360
m3
0.250
0.150
5.588
m3
0.125
0.150
0.291
m3
0.250
0.125
5.059
m3
1
1
(d.)
(e.)
(f.)
Deduction for
R.C.C. Slab
Deductions for
Landing of Stairs
Stairs For Plinth
Level
149.0
00
15.52
5
161.9
00
2.750
0.250
0.125
0.086
m3
0.375
1.200
0.600
0.810
m3
98.639
(b.)
(c.)
Deduction for
Doors
1.0m wide Doors
(D1)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)
Deduction for
Windows
1.0m wide
Windows (W1)
1.5m wide
Windows (W2)
0.6m wide
Windows (W3)
Deduction for
Lintel
Over 250mm Th.
Wall
Over 125mm Th.
Wall
149.0
00
0.250
3.000
111.75
0
m3
m3
153 - 32 X
0.250/2
15.65 0.125
1
1
15.52
5
15.52
5
0.125
0.600
1.164
m3
0.125
0.900
1.747
m3
m3
10
1.000
0.250
2.100
5.250
m3
0.900
0.250
2.100
1.890
m3
1.100
0.250
2.100
1.155
m3
0.800
0.250
2.100
0.840
m3
m3
24
1.000
0.250
1.200
7.200
m3
1.500
0.250
1.200
0.900
m3
0.600
0.250
0.400
0.360
m3
m3
1
1
149.0
00
15.52
5
0.250
0.150
5.588
m3
0.125
0.150
0.291
m3
(d.)
(e.)
Deduction for
R.C.C. Slab
Deductions for
Landing of Stairs
161.9
00
0.250
0.125
5.059
m3
2.750
0.250
0.125
0.086
m3
86.042
(b.)
(c.)
(d.)
(e.)
Deduction for
Doors
1.0m wide Doors
(D1)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)
Deduction for
Windows
1.0m wide
Windows (W1)
1.5m wide
Windows (W2)
0.6m wide
Windows (W3)
Deduction for
Lintel
Over 250mm Th.
Wall
Over 125mm Th.
Wall
Deduction for
R.C.C. Slab
Deductions for
Landing of Stairs
149.0
00
0.250
3.000
111.75
0
m3
(a.)
(b.)
(c.)
Deduction for
Door (D3)
Deduction for
Lintel
Deduction for
R.C.C. Slab
153 - 32 X
0.250/2
15.65 0.125
1
1
15.52
5
15.52
5
0.125
0.600
1.164
m3
0.125
0.900
1.747
m3
10
1.000
0.250
2.100
5.250
m3
0.900
0.250
2.100
1.890
m3
1.100
0.250
2.100
1.155
m3
0.800
0.250
2.100
0.840
m3
m3
24
1.000
0.250
1.200
7.200
m3
1.500
0.250
1.200
0.900
m3
0.600
0.250
0.400
0.360
m3
m3
1
1
1
1
149.0
00
15.52
5
161.9
00
2.750
0.250
0.150
5.588
m3
0.125
0.150
0.291
m3
0.250
0.125
5.059
m3
0.250
0.125
0.086
m3
86.042
m3
m3
15.60
0
0.250
2.400
9.360
m3
0.900
0.250
2.100
0.473
m3
15.60
0
0.250
0.150
0.585
m3
15.60
0
0.250
0.125
0.488
m3
7.815
IV. Parapet Wall
(a.)
Addition For
Brick Columns
74.96
5
0.125
0.600
5.622
m3
30
0.250
0.125
0.600
0.563
m3
6.185
(ii.)
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I)
(Part II)
Staircase
Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Roof Slabs.
Over Bed Room
Over W.C. and
Passage
Over Toilet
Over Kitchen
Over Toilet
Over Bed Room
Over Dining
Room
Verandah
(Part I)
(Part II)
m3
284.72
3
m3
m3
2
2
3.500
0.950
3.750
0.950
0.100
0.100
2.625
0.181
m3
m3
2
2
0.950
3.750
2.250
2.250
0.100
0.100
0.428
1.688
m3
m3
2
2
2
0.950
3.750
3.750
1.250
3.500
4.750
0.100
0.100
0.100
0.238
2.625
3.563
m3
m3
m3
2
2
1.300
1.000
0.950
1.575
0.100
0.100
0.247
0.315
m3
m3
2
2
1
1.250
3.825
2.250
3.250
1.250
4.800
0.100
0.100
0.100
0.813
0.956
1.080
m3
m3
m3
4.375
4.125
0.150
5.414
m3
4.375
1.450
0.150
1.903
m3
2
2
2
2
2.875
2.875
2.250
4.500
1.450
3.125
1.875
4.375
0.150
0.150
0.150
0.150
1.251
2.695
1.266
5.906
m3
m3
m3
m3
5.500
4.500
0.150
7.425
m3
2
2
2.125
1.875
5.575
1.875
0.150
0.150
3.554
1.055
m3
m3
(iii.)
(iv.)
Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Lintel
Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Chajja
Over 1.2m wide
Door (D2)
Over 1.0m wide
Window (W1)
Over 1.5m wide
Window(W2)
161.9
00
0.250
0.150
6.071
m3
1.450
0.450
0.700
0.457
m3
20
1.250
0.450
0.700
7.875
m3
1.750
0.450
0.700
1.103
m3
60.731
(ii.)
(iii.)
m3
4.375
4.125
0.150
5.414
m3
4.375
1.450
0.150
1.903
m3
2
2
2
2
2.875
2.875
2.250
4.500
1.450
3.125
1.875
4.375
0.150
0.150
0.150
0.150
1.251
2.695
1.266
5.906
m3
m3
m3
m3
5.500
4.500
0.150
7.425
m3
2
2
2.125
1.875
5.575
1.875
0.150
0.150
3.554
1.055
m3
m3
161.9
00
0.250
0.150
6.071
m3
20
1.250
0.450
0.700
7.875
m3
1.750
0.450
0.700
1.103
m3
45.518
m3
(iii.)
Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Lintel
Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Chajja
Over 1.0m wide
Window (W1)
Over 1.5m wide
Window(W2)
4.375
4.125
0.150
5.414
m3
4.375
1.450
0.150
1.903
m3
2
2
2
2
2.875
2.875
2.250
4.500
1.450
3.125
1.875
4.375
0.150
0.150
0.150
0.150
1.251
2.695
1.266
5.906
m3
m3
m3
m3
5.500
4.500
0.150
7.425
m3
2
2
2.125
1.875
5.575
1.875
0.150
0.150
3.554
1.055
m3
m3
161.9
00
0.250
0.150
6.071
m3
20
1.250
0.450
0.700
7.875
m3
1.750
0.450
0.700
1.103
m3
45.518
2.500
5.425
0.150
2.034
m3
1.150
0.450
0.700
0.725
m3
2.759
V. Stairs
m3
m3
(i.)
(ii.)
(iii.)
Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Landings.
Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Waist Slabs.
Cement Concrete
M-15 excluding
Reinforcement
but including
Shuttering for
Steps.
1.275
1.2
0.125
1.148
m3
2.630
1.200
0.125
2.367
m3
54
0.250
1.200
0.075
1.215
m3
4.730
159.25
4
35mm Thick
Solid Flush Type
Single Leaf Door
Shutters.
1.0m wide Doors
(D1)
1.2m wide Doors
(D2)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
m3
30
5.300
0.100
0.075
1.193
m3
5.500
0.100
0.075
0.041
m3
12
5.200
0.100
0.075
0.468
m3
5.400
0.100
0.075
0.324
m3
5.100
0.100
0.075
0.230
m3
72
3.500
0.100
0.075
1.890
m3
4.145
(ii.)
m3
2.1 + 0.05
2.15 X 2
1.0
2.15 X 2
1.20
2.15 X 2
1.10
2.15 X 2
0.8
+
+
+
+
m3
30
0.880
2.050
54.120
m2
1.080
2.050
2.214
m2
12
0.780
2.050
19.188
m2
0.980
2.050
16.072
m2
2.10 0.075 +
(0.015 X 2)
= 2.05
1.0 - (2 X
0.075) + 2
X 0.015 =
0.88
1.2 - (2 X
0.075) + 2
X 0.015 =
0.88
0.9 - (2 X
0.075) + 2
X 0.015 =
0.88
1.1 - (2 X
0.075) + 2
0.680
2.050
m2
8.364
99.958
(iii.)
35mm Thick
Glazed Window
Shutters
1.0m wide
Windows (W1)
60
0.880
1.150
m2
60.720
60.720
(iv.)
(a.)
Providing
Annodised
Alluminium Butt
Hinges
125 X 75 X 4 mm
Size For:1.0m wide Doors
(D1)
1.2m wide Doors
(D2)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
100 X 63 X3.2
mm Size For:0.8m wide Doors
(D5)
1.0m wide
Windows (W1)
90
No.
3X1
No.
3X1
2
36
No.
3X8
24
No.
Providing and
Fixing Tower Bolt
300mm long X
12mm dia.
For All Doors (D1,
D2, D3, D4, D5)
For 1.0m wide
Window (W1)
18
No.
3X7
2
216
No.
1X5
7
1X7
2
Providing And
Fixing
Aldrop(Sliding
Bolt) 250mm X
18mm dia bolt
1.0m wide Doors
(D1)
1.2m wide Doors
(D2)
1.1m wide Doors
(D4)
No.
57
No.
72
No.
129
(vi.)
No.
3X6
234
(v.)
m2
3X3
0
153
(b.)
m2
No.
1X3
0
30
No.
1X1
No.
1X8
No.
39
No.
X 0.015 =
0.88
0.8 - (2 X
0.075) + 2
X 0.015 =
0.88
(vii.
)
Providing
Anodised
Aluminium Grip
Handle without
Base Plate
450mm grip X
25mm dia rod
For All Doors (D1,
D2, D3, D4, D5)
For 1.0m wide
Window (W1)
1X5
7
1X7
2
57
No.
72
No.
129
(vii.
)
Providing Godrej
Mortice Lock For
Bedrooms and
Drawing Rooms
(D1, D4)
1X3
0
30
No.
30
(ix.)
Providing
Anodised
Aluminium Floor
Door Stopper For
All Doors D1, D2,
D3, D4, D5)
1X5
7
57
Providing 150mm
Long Catch Lock
with Eyes For
Windows (W1)
(iii.)
(iv.)
(v.)
1X7
2
No.
No.
57
(x.)
No.
72
No.
No.
72
No.
100.01
2
kg
100.01
2
4.600
0.050
1.150
m2
18
1.500
0.050
1.350
m2
72
0.850
1.050
64.260
m2
1.400
1.400
9.800
m2
18
0.500
0.300
2.700
m2
2.630
0.600
9.468
88.728
5.Plastering and
Pointing
A.Inside Plastering
I. Ground Floor
(i.) 12cm Thick
Cement Plaster
(1:6) to wall.
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I - 3m
(a.)
(b.)
Height Wall)
(Part II 1.5m
Height Wall)
Deduction For
Doors
1.0m wide Doors
(D1)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)
Deduction for
Windows
1.0m wide
Windows (W1)
0.6m wide
Windows (W3)
2
2
2
2
2
2
2
15.60
0
4.800
3.800
6.500
2.700
15.60
0
18.25
0
2.700
84.240
m2
0.900
0.900
2.700
0.900
8.640
6.840
35.100
4.860
m2
m2
m2
m2
2.700
84.240
m2
2.700
98.550
m2
2
2
3.800
2.450
2.700
2.700
20.520
13.230
m2
m2
9.200
2.700
49.680
m2
7.825
1.200
18.780
m2
10
X1
1.000
1.800
18.000
m2
4X1
/2
0.900
1.800
3.240
m2
2X
1
1.100
1.800
3.600
m2
2X1
/2
0.800
1.800
1.440
m2
1.000
1.200
28.800
m2
0.600
0.400
1.440
m2
24
X1
6X
1
369.60
0
(ii.)
6cm Thick
Cement Plaster
(1:4) to Ceiling
Bed Room
W.C.
Toilet
Kitchen
m2
2
2
2
2
4.000
1.200
2.500
2.500
3.750
1.200
1.200
4.000
30.000
2.880
6.000
20.000
m2
m2
m2
m2
m2
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I )
(Part II )
2
2
2
1.500
3.700
5.000
1.200
4.000
4.000
3.600
29.600
40.000
m2
m2
m2
2
2
0.950
1.000
1.200
1.450
2.280
2.900
m2
m2
2
2
1.625
3.500
4.075
1.500
13.244
10.500
m2
m2
161.00
4
(a.)
(b.)
Height Wall)
(Part II 1.5m
Height Wall)
Deduction For
Doors
1.0m wide Doors
(D1)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)
Deduction for
Windows
1.0m wide
Windows (W1)
0.6m wide
Windows (W3)
2
2
2
2
2
2
2
15.60
0
4.800
3.800
6.500
2.700
15.60
0
18.25
0
m2
2.700
84.240
m2
0.900
0.900
2.700
0.900
8.640
6.840
35.100
4.860
m2
m2
m2
m2
2.700
84.240
m2
2.700
98.550
m2
2
2
3.800
2.450
2.700
2.700
20.520
13.230
m2
m2
9.200
2.700
49.680
m2
7.825
1.200
18.780
m2
10
X1
1.000
1.800
18.000
m2
4X1
/2
0.900
1.800
3.240
m2
2X
1
1.100
1.800
3.600
m2
2X1
/2
0.800
1.800
1.440
m2
1.000
1.200
28.800
m2
0.600
0.400
1.440
m2
24
X1
6X
1
369.60
0
m2
(ii.)
6cm Thick
Cement Plaster
(1:4) to Ceiling
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I )
(Part II )
2
2
2
2
2
2
2
4.000
1.200
2.500
2.500
1.500
3.700
5.000
3.750
1.200
1.200
4.000
1.200
4.000
4.000
30.000
2.880
6.000
20.000
3.600
29.600
40.000
m2
m2
m2
m2
m2
m2
m2
2
2
0.950
1.000
1.200
1.450
2.280
2.900
m2
m2
2
2
1.625
3.500
4.075
1.500
13.244
10.500
m2
m2
161.00
4
(a.)
Height Wall)
(Part II 1.5m
Height Wall)
Deduction For
Doors
1.0m wide Doors
(D1)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)
2
2
2
2
2
2
2
15.60
0
4.800
3.800
6.500
2.700
15.60
0
18.25
0
m2
2.700
84.240
m2
0.900
0.900
2.700
0.900
8.640
6.840
35.100
4.860
m2
m2
m2
m2
2.700
84.240
m2
2.700
98.550
m2
2
2
3.800
2.450
2.700
2.700
20.520
13.230
m2
m2
9.200
2.700
49.680
m2
7.825
1.200
18.780
m2
10
X1
1.000
1.800
18.000
m2
4X1
/2
0.900
1.800
3.240
m2
2X
1
1.100
1.800
3.600
m2
2X1
/2
0.800
1.800
1.440
m2
(b.)
Deduction for
Windows
1.0m wide
Windows (W1)
0.6m wide
Windows (W3)
24
X1
6X
1
1.000
1.200
28.800
m2
0.600
0.400
1.440
m2
369.60
0
(ii.)
6cm Thick
Cement Plaster
(1:4) to Ceiling
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I )
(Part II )
2
2
2
2
2
2
2
4.000
1.200
2.500
2.500
1.500
3.700
5.000
3.750
1.200
1.200
4.000
1.200
4.000
4.000
30.000
2.880
6.000
20.000
3.600
29.600
40.000
m2
m2
m2
m2
m2
m2
m2
2
2
0.950
1.000
1.200
1.450
2.280
2.900
m2
m2
2
2
1.625
3.500
4.075
1.500
13.244
10.500
m2
m2
161.00
4
14.60
0
11.70
0
170.82
0
m2
0.900
1.800
3.240
m2
1.200
1.800
2.160
m2
m2
2.630
1.200
18.936
m2
1.275
2.500
9.563
m2
1.275
1.200
4.590
m2
4.800
2.500
12.000
m2
45.089
V. Parapet Wall
m2
176.22
0
(ii.)
m2
m2
(a.)
(i.)
(ii.)
12cm Thick
Cement Plaster
(1:6) to wall.
Parapet over 2nd
Floor Roof
Parapet over
Mumty Room
Roof
85.20
0
0.600
51.120
m2
14.60
0
0.600
8.760
m2
59.880
B. Outside
Plastering
(i.) 12cm Thick
Cement Plaster
(1:6) on Outside
walls.
(a.) From Plinth to
Parapet Level.
Deduction for
opening in
Verandah.
(b.) From Roof to
Parapet Level of
Mumty Room.
85.20
0
10.20
0
869.04
0
m2
7.425
1.000
22.275
m2
15.60
0
2.400
37.440
m2
(a.)
Passage
(Part I)
(Part II)
Verandah
(Part I )
(Part II )
Deduction For
Doors
1.0m wide Doors
(D1)
m2
2
2
2
2
2
2
2
15.60
0
4.800
3.700
6.500
2.700
15.60
0
18.25
0
928.75
5
2801.7
55
m2
m2
31.200
r.m
9.600
7.400
13.000
5.400
r.m
r.m
r.m
r.m
31.200
r.m
36.500
r.m
2
2
3.800
2.450
7.600
4.900
r.m
r.m
2
2
9.200
7.825
18.400
15.650
r.m
r.m
10
X1
1.000
10.000
r.m
4X
1/2
2X
1
2X
1/2
0.900
1.800
r.m
1.100
2.200
r.m
0.800
0.800
r.m
166.05
0
(ii.)
75mm Thick
Terrazo Flooring
in lime Concrete
(11/2:2:7)
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I )
(Part II )
2
2
2
2
4.000
1.200
2.500
2.500
3.750
1.200
1.200
4.000
30.000
2.880
6.000
20.000
m2
m2
m2
m2
2
2
2
1.500
3.750
5.000
1.200
4.000
4.000
3.600
30.000
40.000
m2
m2
m2
2
2
0.950
1.000
1.200
1.450
2.280
2.900
m2
m2
2
2
1.650
3.500
4.075
1.500
13.448
10.500
m2
m2
161.60
8
(iii.)
25mm Thick
Terrazo Work
Cast in situ in
floor.
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I )
(Part II )
Supplying, fitting
and fixing
Porcelain
coloured tiles for
Dado in:
m2
2
2
2
2
2
2
2
4.000
1.200
2.500
2.500
1.500
3.750
5.000
3.750
1.200
1.200
4.000
1.200
4.000
4.000
30.000
2.880
6.000
20.000
3.600
30.000
40.000
m2
m2
m2
m2
m2
m2
m2
2
2
0.950
1.000
1.200
1.450
2.280
2.900
m2
m2
2
2
1.650
3.500
4.075
1.500
13.448
10.500
m2
m2
161.60
8
(iv.)
r.m
m2
(a.) Toilet
(b.) W.C.
(c.) Toilet
2
2
2
2.700
4.800
3.700
1.800
1.800
1.800
9.720
17.280
13.320
40.320
2
2
2
2
2
2
2
Passage
(a.)
(Part I)
(Part II)
Verandah
(Part I )
(Part II )
Deduction For
Doors
1.0m wide Doors
(D1)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)
15.60
0
4.800
3.700
6.500
2.700
15.60
0
18.25
0
31.200
r.m
9.600
7.400
13.000
5.400
r.m
r.m
r.m
r.m
31.200
r.m
36.500
r.m
2
2
3.800
2.450
7.600
4.900
r.m
r.m
2
2
9.200
7.825
18.400
15.650
r.m
r.m
1.000
10.000
r.m
0.900
1.800
r.m
1.100
2.200
r.m
0.800
0.800
r.m
10
X1
4X
1/2
2X
1
2X
1/2
166.05
0
(ii.)
75mm Thick
Terrazo Flooring
in lime Concrete
(11/2:2:7)
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
m2
m2
m2
m2
r.m
2
2
2
2
2
2
2
4.000
1.200
2.500
2.500
1.500
3.750
5.000
3.750
1.200
1.200
4.000
1.200
4.000
4.000
30.000
2.880
6.000
20.000
3.600
30.000
40.000
m2
m2
m2
m2
m2
m2
m2
2
2
0.950
1.000
1.200
1.450
2.280
2.900
m2
m2
Verandah
(Part I )
(Part II )
2
2
1.650
3.500
4.075
1.500
m2
m2
13.448
10.500
161.60
8
(iii.)
25mm Thick
Terrazo Work
Cast in situ in
floor.
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I )
(Part II )
2
2
2
2
2
2
2
4.000
1.200
2.500
2.500
1.500
3.750
5.000
3.750
1.200
1.200
4.000
1.200
4.000
4.000
30.000
2.880
6.000
20.000
3.600
30.000
40.000
m2
m2
m2
m2
m2
m2
m2
2
2
0.950
1.000
1.200
1.450
2.280
2.900
m2
m2
2
2
1.650
3.500
4.075
1.500
13.448
10.500
m2
m2
161.60
8
(iv.)
Supplying, fitting
and fixing
Porcelain
coloured tiles for
Dado in:
(a.) Toilet
(b.) W.C.
(c.) Toilet
2
2
2
2.700
4.800
3.700
1.800
1.800
1.800
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
2
2
2
2
2
2
2
2
2
15.60
0
4.800
3.700
6.500
2.700
15.60
0
18.25
0
3.800
2.450
m2
m2
m2
m2
9.720
17.280
13.320
40.320
m2
m2
31.200
r.m
9.600
7.400
13.000
5.400
r.m
r.m
r.m
r.m
31.200
r.m
36.500
r.m
7.600
4.900
r.m
r.m
(a.)
Verandah
(Part I )
(Part II )
Deduction For
Doors
1.0m wide Doors
(D1)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)
2
2
10
X1
4X
1/2
2X
1
2X
1/2
9.200
7.825
18.400
15.650
r.m
r.m
1.000
10.000
r.m
0.900
1.800
r.m
1.100
2.200
r.m
0.800
0.800
r.m
166.05
0
(ii.)
75mm Thick
Terrazo Flooring
in lime Concrete
(11/2:2:7)
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I )
(Part II )
2
2
2
2
2
2
2
4.000
1.200
2.500
2.500
1.500
3.750
5.000
3.750
1.200
1.200
4.000
1.200
4.000
4.000
30.000
2.880
6.000
20.000
3.600
30.000
40.000
m2
m2
m2
m2
m2
m2
m2
0.950
1.200
2.280
m2
1.000
1.450
2.900
m2
2
2
1.650
3.500
4.075
1.500
13.448
10.500
m2
m2
161.60
8
(iii.)
25mm Thick
Terrazo Work
Cast in situ in
floor.
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I )
r.m
m2
2
2
2
2
2
2
2
4.000
1.200
2.500
2.500
1.500
3.750
5.000
3.750
1.200
1.200
4.000
1.200
4.000
4.000
30.000
2.880
6.000
20.000
3.600
30.000
40.000
m2
m2
m2
m2
m2
m2
m2
2
2
0.950
1.000
1.200
1.450
2.280
2.900
m2
m2
1.650
4.075
13.448
m2
(Part II )
3.500
1.500
m2
10.500
161.60
8
(iv.)
Supplying, fitting
and fixing
Porcelain
coloured tiles for
Dado in:
(a.) Toilet
(b.) W.C.
(c.) Toilet
2
2
2
2.700
4.800
3.700
1.800
1.800
1.800
m2
m2
m2
9.720
17.280
13.320
40.320
14.60
0
0.300
4.380
m2
1.100
0.300
0.330
m2
2.500
1.275
19.125
54
60
1.200
1.200
0.250
0.150
16.200
10.800
m2
m2
m2
m2
m2
17.20
0
13.500
232.20
0
m2
17.20
0
13.500
232.20
0
m2
74.50
0
0.300
22.350
m2
486.75
0
m2
50.835
V. Roof
(i.) 40cm Thick
Terrazo Flooring
in lime Concrete
(11/2:2:7)
(ii.) 20mm Thick
Terrazo Work
cast in situ in
floor.
(iii.) 20mm Thick
Terrazo Work for
Skirting 30cm
High.
m2
m2
85.20
0
0.750
63.900
m2
30
2.000
2.100
126.00
0
m2
2.400
2.100
5.040
m2
(b.)
12
1.800
2.100
45.360
m2
2.200
2.100
36.960
m2
1.600
2.100
20.160
m2
72
2.000
1.200
172.80
0
m2
406.32
0
72
0.850
1.050
64.260
m2
1.400
1.400
9.800
m2
18
0.500
0.300
2.700
m2
2.630
0.060
0.947
m2
77.707
484.02
7
A.
(a.)
Plastic Emulsion
Paint two coats
on walls and
ceilings.
Inside all Flats of
all Floors
To walls.
Bed Room
W.C.
Toilet
m2
m2
85.20
0
10.20
0
869.04
0
m2
7.425
1.000
22.275
m2
15.60
0
2.400
37.440
m2
928.75
5
(ii.)
m2
6
6
6
15.60
0
4.800
3.800
2.700
0.900
0.900
252.72
0
25.920
20.520
m2
m2
m2
m2
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I - 3m
(i.)
(ii.)
(b.)
Height Wall)
(Part II 1.5m
Height Wall)
Deduction For
Doors
1.0m wide Doors
(D1)
0.9m wide Doors
(D3)
1.1m wide Doors
(D4)
0.8m wide Doors
(D5)
Deduction for
Windows
1.0m wide
Windows (W1)
0.6m wide
Windows (W3)
To Ceiling
Bed Room
W.C.
Toilet
Kitchen
Toilet
Bed Room
Dining
Passage
(Part I)
(Part II)
Verandah
(Part I )
B.
(a.)
(Part II )
Inside the
Common Stair
Room
To wall.
105.30
0
14.580
252.72
0
295.65
0
m2
6.500
2.700
2.700
15.60
0
18.25
0
0.900
2.700
2.700
6
6
3.800
2.450
2.700
2.700
61.560
39.690
m2
m2
9.200
2.700
149.04
0
m2
7.825
1.200
56.340
m2
30
1.000
1.800
18.000
m2
12
0.900
1.800
3.240
m2
1.100
1.800
3.600
m2
0.800
1.800
1.440
m2
72
1.000
1.200
28.800
m2
18
0.600
0.400
1.440
m2
6
6
6
6
6
6
4.000
1.200
2.500
2.500
1.500
3.700
3.750
1.200
1.200
4.000
1.200
4.000
m2
m2
m2
m2
m2
m2
5.000
4.000
90.000
8.640
18.000
60.000
10.800
88.800
120.00
0
6
6
0.950
1.000
1.200
1.450
6.840
8.700
m2
m2
1.625
4.075
39.731
m2
3.500
1.500
31.500
m2
14.60
0
11.70
170.82
0
m2
6
6
m2
m2
m2
m2
(b.)
(c.)
(c.)
(c.)
Deduction for
0.9m Wide
Door(D3)
Deduction for
1.2m Wide
Door(D2)
To the Under
surface of Waist
Slab
To the Under
surface of
Intermediate
Landings
To the Under
surface of End
Landings
To Under Ceiling
of Mumty Room
0.900
1.800
3.240
m2
1.200
1.800
2.160
m2
2.630
1.200
18.936
m2
1.275
2.500
9.563
m2
1.275
1.200
4.590
m2
4.800
2.500
12.000
m2
1911.0
40
m2
DESCRIPTION OF ITEMS
UNI
T
QUANTI
TY
RATE
AMOUNT
I. Earthwork
1.
Sq.
m
230.046
32.00
7361.472
2.
Cu
m
149.048
41.87
6240.640
Cu
m
29.810
26.00
775.060
Cu
m
53.650
224.76
12058.374
Cu
m
22.357
3011.0
0
67316.927
3.
4.
(a.
)
(b.
)
III. REINFORCEMENT
1. I.S. Specified steel reinforcement(for all
types of reinforced concrete work) including
main and straightening of coil bars, binder
etc. and removal of loose rust including
applying a coat of cement wash (if
necessary) cutting to requisite length,
hooking, bending to correct shape, placing
in proper position and binding with 20guage
black annealed wire at every
intersection(including every cost of binding
wire) complete as per drawing and direction
with all labour and materials in all floors
including steel for fan hooks(M.S.) High
strength deformed bars and wires Fe415 or
M.S. bar.
Cu
m
159.254
2691.0
0
428552.5
kg
100.012
32.00
3200.384
Sq.
m
11.179
114.00
1274.406
Sq.
m
11.179
11.50
128.559
Cu
m
101.669
2076.0
0
211064.8
Cu
m
284.723
1959.0
0
557772.3
Sq.
m
484.824
143.00
69329.832
Sq.
m
484.824
983.00
476581.99
Sq.
m
29.622
94.00
IV. Brickwork
1.
2.
3.
4.
V. Flooring
1.
2.
3.
2784.468
4.
5.
r.m.
166.065
31.50
Sq.
m
120.96
905.00
5231.0475
109468.8
2.
3.
Sq.
m
2273.655
40.00
90946.200
Sq.
m
528.101
24.00
12674.424
1911.040
12.00
22932.480
Sq.
m
77.707
29.00
2253.503
Sq.
m
406.320
24.00
9751.680
VII. Steelwork
1.
VIII.
1.
2.
3.
4.
5.
6.
7.
8.
kg
88.73
40.00
3549.12
Cu
m
41.453
37720.
00
1563607.16
0
99.958
1474.0
0
147338.092
60.720
1474.0
0
89501.280
153.000
84.00
12852.000
234.000
53.00
12402.000
Sq.
m
Sq.
m
eac
h
eac
h
eac
h
129.000
65.00
8385.000
eac
h
39.000
198.00
7722.000
eac
h
129.000
413.00
53277.000
eac
h
30.000
780.00
23400.000
9.
10.
eac
h
57.000
78.00
4446.000
eac
h
72.000
7.00
504.000
TOTAL = Rs.
40,49,065.00
ADDING 10% FOR SANITARY = Rs.
404,906.5
ADDING 15% FOR ELECTRIFICATION = Rs.
607,360.00
TOTAL COST = 50,61,330.00
Water
Supply
System
OVERHEA
D
TANK
DESIGN OF OVERHEAD TANK
FOR DESIGN THE OVER HEAD TANK FOLLOWING VALUES HAVE TO
BE CONSIDERED
Time in
Hour
Hourly
Demand
Cumulati
ve Hourly
Demand
Hourly
Pumping
Cumulati
ve Hourly
Pumping
24 - 4
4 - 5
0.2a
0.4a
0.8a
1.2a
0
0
0
0
Cumulati
ve
Surplus
(+)
& Deficit
(-) 0.8a
(-) 1.2a
5
6
7
8
9
10
11
12
13
14
15
16
17
19
20
22
23
6
7
8
9
10
11
12
13
14
15
16
17
18
20
22
23
24
0.8a
2.25a
2.25a
2.25a
2.25a
a
a
0.6a
2.25a
0.7a
0.7a
0.7a
2.25a
0.9a
0.7a
0.4a
0.2a
2.0a
4.25a
6.50a
8.75a
11.00a
12.00a
13.00a
13.6a
15.85a
16.55a
17.25a
17.95a
20.20a
22.0a
23.4a
23.8a
24.0a
0
3a
3a
3a
3a
0
0
0
0
3a
3a
3a
3a
0
0
0
0
0
3a
6a
9a
12a
12a
12a
12a
12a
15a
18a
21a
24a
24a
24a
24a
24a
(-) 2.0a
(-) 1.25a
(-) 0.5a
(+) 0.25a
(+) 1.0a
(+) 0
(-)a
(-) 1.6a
(-) 3.85a
(-) 1.55a
(+) 0.75a
(+) 3.05a
(+) 3.80a
(+) 2.0a
(+) 0.6a
(+) 0.2a
(+) 0
As the rate of withdrawal from the tank of the rate of demand of sanitary
fixtures depends on the habits of the population of buildings and hourly
pattern or demand is assume to work out the theoretical capacity of over
Head Storage Tank.
Therefore, storage = Maximum Deficit + Maximum Surplus
= (3.85a +3.8a) = 7.65a
Otherwise, maximum storage in Over Head Reservoir = (7.65 Avg.
Water supply)
= (7.65 168.75) lit
= 1290.94 lit (I)
The storage capacity on the basic of population of the residential building
= (No. Of population 70) lit
= (30 * 70) lit
= 2100 lit. (II)
1
2
Now, the various result as calculated in (I) to (IV) is, 1290.24 lit ; 2100 lit ;
3240 and 2050 lit.
So, the storage needed for the ground level reservoir of shall be a
minimum of 50% of 3240 lit.
3240 50% = 1620 lit.
Which is less than that was calculated earlier = 2025 lit.
However, a day supply may be provided in the ground level reservoir
=4050lit. to be on the save size.
OVERHEAD TANK
Description of
item
R.C.C. Slab
( 1:1.5:3 )
i. Top & Bottom
ii. Sides
Deduction for
manhole cover
Centering &
Shutterings
i. Bottom Slab
Deduction for brick
pillar
ii. Sides
a) Inside
b) Outside
iii. Top Slab
a) Under Surface
b) Edge of
manhole
cover
Brickwork in Pillars
with
cement mortar
( 1:6 )
12mm thick
plastering
with cement
mortar ( 1:6 )
i.Bottom Slab
a) Inside
b)Outside
ii. Sides
a) Inside
b)Outside
iii. Top Slab
a) Inside
b)Outside
iv. Edge of
Manhole
v. Brick Pilars
Deduction for
Manhole
Brick Pillars
N
o.
Leng
th
m
Bread
th
m
Heig
ht
m
Quanti
ty
Uni
t
1.52
1.52
0.125
0.5776
m3
5.58
0.125
0.6975
m3
0.125
0.0198
m3
1.2553
m3
0.159
1.52
1.52
-----
2.3104
m2
0.25
0.25
-----
0.25
m2
1
1
5.08
6.08
---------
1
1.25
5.08
7.6
m2
m2
1.27
1.27
-----
1.6129
m2
1.414
-----
0.125
0.1768
m2
16.530
1
m2
0.25
0.25
0.6
0.15
m3
1
1
1.27
1.52
1.27
1.52
---------
1.6129
2.3104
m2
m2
4
4
1.27
1.52
---------
1
1.25
5.08
7.6
m2
m2
1
1
1.27
1.52
1.27
1.52
---------
1.6129
2.3104
m2
m2
1.414
-----
0.125
0.1768
m2
-----
0.6
2.4
m2
0.159
0.25
0.25
---------
0.318
0.25
m2
m2
2
4
Remarks
1.27 x 4 = 5.08
1.52 x 4 = 6.08
1 + (0.125 x 2 ) =
1.25
x 0.45 =1.414
4 x 0.25 = 1
22.535
4
m2
DESCRIPTION OF ITEMS
Cement concrete with or without
reinforcement with graded clean
coarse aggresate nominal size 20 mm
down mixed with coarse clean sand
conforming Zone I or Zone II of IS-383
of latest edition both of approved
quality control, sampling, testing, etc.
vibrating with vibrator, curing as
directed. all compleate with all labour
and materials but excluding cost of
shuttering and reinforcement as
detailed in the specifications and as
directed by the Engineer-in- Charge.
compleate(Thickness and shape as
per drawing). To lintel, chajja, apron,
footing, R.W. walls column shaft, lift
wall, floor and roof beams and slab,
parapet wall, overlaying and coarse,
stair waist and landing slab, steps,
projections, weather board, folded
plate etc. as per drawing and
direction from Foundation to Parapet
for all levels.
a) M20 grade concrete (cement not
less than 390 kg/cum of concrete).
Hire and labour charges for shuttering
with centering
and necessary staging upto 4m using
approved stout
props and thick hard wood planks of
approved
thickness with required bracing for
concrete slabs,
beams, cilumns,lintels curved or
straight including
fitting, fixing and striking out after
completion of works
( upto roof of ground floor )
UNI
T
QUANTI
TY
Cum
1.2553
RATE
3011.0
0
AMOUN
T
3779.71
Sqm
16.5301
144.00
2380.33
Cum
0.15
2076.0
0
311.40
Sqm
22.5354
40.00
901.42
UNDERGRO
UND
RESERVOI
R
Time in
Hour
Hourly
Demand
Cumulati
ve Hourly
Demand
Hourly
Pumping
Cumulati
ve
Pumping
24 - 6
6 - 7
7 - 8
8 - 9
9 - 10
10 - 11
11 - 12
12 - 13
13 - 14
14 - 15
15 - 16
16 - 17
17 - 18
18 - 24
a
a
a
a
a
a
a
a
a
a
a
a
a
a
6a
7a
8a
9a
10a
11a
12a
13a
14a
15a
16a
17a
18a
24a
0
3a
3a
3a
3a
0
0
0
0
3a
3a
3a
3a
0
0
3a
6a
9a
12a
12a
12a
12a
12a
15a
18a
21a
24a
24a
Cumulati
ve
Surplus
(+)
& Deficit
6a
4a
2a
0
-2a
-a
0
a
2a
0
-2a
-4a
-6a
0
Based only of these two rates a and 3a at the pattern of pumping, that is for 4
hours, 6am to 10 am and 4 hours from 2pm to 6 pm.
So, storage needed for ground level tank = maximim surplus + maximum deficit.
= 6a + 6a = 12a
= 12a average hourly system or a daily supply.
The tank will be full at 6 am that when pumping starts that day.
The tank will become empty at 6 pm that is when the pumping stopped at 6 pm
for the day.
Storage needed in ground level reservoir = = 2050 lit/day
The maximum storage in at ground level reservoir is also 50% of storage in
overhead reservoir.
So, the actual storage to be provided in this case will be decided after the
storage capacity of the overhead reservoir.
UNDERGROUND RESERVOIR
Breadt
h
Height
(m)
Quantit
y
3.11
3.11
1.22
5
11.84
8
Earthwork in excavation
Brick flat soling
Cement concrete
(1:2:4) in
foundation
1st class brickwork in
cement
mortar (1:4)
3.11
3.11
-----
9.672
3.11
3.11
0.2
1.934
40 cm wall
9.64
0.40
0.32
5
1.253
30 cm wall
9.24
0.30
0.5
1.386
20 cm wall
8.84
0.20
0.2
0.354
1
2
3
4
Unit
N
o.
Description of item
(m)
Sl.
No.
Length
(m)
ESTIMATE OF UNDERGROUND
RESERVOIR
m
m
3
m
m
m
Remarks
2.01 + (2x0.4) +
(2x0.15)
= 3.11
0.1 + 0.2 + 0.325 +
0.5 + 0.2 - 0.1 =
1.225
4 x (2.01+0.4) =
9.64
4 x (2.01+0.3) =
9.24
4 x (2.01+0.2) =
8.84
m
2.993
5
6
2.01
2.01
-----
4.040
2.01
2.01
-----
4.040
m
2
Long walls
2.01
-----
4.020
Short walls
2.01
-----
4.020
12.08
0
m
2
m
2
m
2
6 mm thick cement
plaster
(1:4)
On top of wall
Long walls
m
2
2.41
0.20
-----
0.964
2.01
0.20
-----
0.804
Long walls
2.41
-----
0.60
2.892
Short walls
2.41
-----
0.60
2.892
Short walls
Outside up to 10 cm
below
G.L.
m
2
m
m
2.01 + (2x0.2) =
2.41
m
7.552
ABSTRACT OF ESTIMATE OF
UNDERGROUND RESERVOIR
SL
.
N
O.
1
DESCRIPTION OF ITEMS
Earthwork in excavation of trenches in any
kind of soil including
trimming the side of trenches, levelling,
dressing and ramming the bottom and
bailing out normal seepage water.
Single brick flat soling with pricked jhama
bricks in steps etc. including ramming and
dressing bed to proper level and filling
joints with local sand complete in all
respects.
Labor for laying brick flat soling with
pricked jhama bricks in steps etc.
including ramming and dressing bed to
proper level and filling joints with local
sand complete in all respects.
Cement concrete with or without
reinforcement with graded clean coarse
aggregate nominal size 20 mm down
mixed with coarse clean sand conforming
Zone I or Zone II of IS-383 of latest edition
both of approved quality control,
sampling, testing, etc. vibrating with
vibrator, curing as directed. all complete
with all labor and materials but excluding
cost of shuttering and reinforcement as
detailed in the specifications and as
directed by the Engineer-in- Charge.
complete(Thickness and shape as per
drawing). To lintel, chajja, apron, footing,
R.W. walls column shaft, lift wall, floor and
roof beams and slab, parapet wall,
overlaying and coarse, stair waist and
landing slab, steps, projections, weather
board, folded plate etc. as per drawing
and direction from Foundation to Parapet
UNI
T
QUANTI
TY
RATE
AMOUN
T
Cum
11.848
41.87
496.08
Sqm
9.6721
114.00
1102.62
Sqm
9.6721
11.50
111.23
Cum
1.9344
2691.0
0
5205.47
Cum
2.993
1959.0
0
5862.90
Sqm
4.0401
119.00
480.7
Sqm
12.08
40.00
483.20
Sqm
7.552
24.00
181.25
TOTAL = Rs.
13822.37
CONTINGENCY @5% = Rs.
691.11
SEPTIC
TANK
SL.
NO.
FACILITY
EQUIVALENT FIXTURES
UNIT
01.
02.
03.
04.
05.
06.
07.
08.
09.
10.
11.
12.
13.
SL.
NO.
W.C.
BATH
WASH BASIN/KITCHEN SINK
URINAL (AUTO FLUSH)
URINAL (WITHOUT AUTO FLUSH)
SLOPE SINK
LABORATORY SINK
COMBINATION SINK
SHOWER BATH
DRINKING FOUNDRY
ABLUTION TAB
DISH WATER
BATH TOP
FACILITY
01.
KITCHEN
A) KITCHEN SINK
B) WASH BASIN
02.
TOILET (ATTACHED)
A) WASH BASIN
B) FLUSHING CISTERN
C) ABLUTION TAB
D) SHOWER
E) TAB
03.
W.C.
A) ABLUTION TAB
B) FLUSHING CISTERN
04.
BATH
A) SHOWER
B) TAB
C) WASH BASIN
1
2
1
1
NO.
EQUIVALENT
FIXTURES UNIT
20
40
60
80
100
120
140
For (60-40) = 20, difference (4.3-3.3) = 1.0
11
2
3.3
4.3
5.1
5.7
6.4
7.1
= 1.0/20
= 1.0/20 x 11
= 0.55
For seed sludge increase the volume 10% which is provided for sludge
storage = (4.38 x 10%) m3
= 0.438 m3
Free board:-
Total capacity and dimensions:Total capacity = 3.01 + 0.96 + 4.38 + 0.438 + 3.01 = 11.798 m3
Area of tank = 10.03
m3
BREADTH = 2 m.
DEPTH = 1.2 m.
3.6
1.7
6.2
3.6
m3
5.9
0.4
0.5
2.36
m3
5.7
0.3
0.5
1.71
m3
5.5
0.2
0.5
1.1
m3
2.5
0.4
0.5
m3
2.5
0.3
0.5
0.75
m3
2.5
0.2
0.5
0.5
m3
UNIT
HEIGTH(M
)
6.2
NO
.
TOTAL
QUANTITY
BREDTH(
M)
DESCRIPTION OF ITEM
QUANTITY
LENGTH
(M)
SL. NO.
37.94
4
37.944 m3
7.42
m3
2.5
1.3
3.25
3.25
m3
2.5
12.5
12.5
m3 Diameter of
manhole is
450mm
5.5
2.9
m3
0.1 1.595
(3.14/4 ) x 4.52
Deduction for manhole cover
2 x 0.1
2.5
m3
0.03
0.1
m3
0.5 0.125
1.69
m3
1.5
15
m3
2.5
1.5
7.5
m3
2.5
1.28
6.4
m3
2.5
0.1
m3
0.25
29.15
m3
DESCRIPTION OF ITEMS
1. Earthwork in excavation
Earthwork in excavation of trenches in any kind
of soil including trimming the sides of trenches,
leveling, dressing and ramming the bottom and
bailing out normal seepage of water.
2. Cement concrete in
foundation(1:3:6)
Cement concrete with or without
reinforcement with graded clean
coarse aggregate nominal size 20 mm
down mixed with coarse clean sand
conforming Zone I or Zone II of IS-383
of latest edition both of approved
quality as necessary including
preparation of design mix and cost for
quality control, sampling, testing etc.
Vibrating with vibrator, curing as
directed. All complete with all labour
and matirials but excluding cost of
shuttering and reinforcements as
detailed in the specifications and as
directed by the Engineer-in-charge.
Complete (Thickness and shape as per
drawing). To lintel, chajja, apron,
footing, R.walls column shaft, lift wall,
floor and roof beams & slabs, parapet
wall, over laying & course, stair waist
and landing slab, steps, projections,
weather board, folded plate etc. as per
drawing & directions from Foundation
to parapet for all levels.
(a. M20 grade of concrete (cement not less than 390
) Kg. Cu. M. of concrete
(b.
M 15 grade concrete for P.C.C.
)
UNIT
QUANTITY
RATE
(Rs)
AMOUNT
(RS)
Cum
37.944
41.87
1588.71
Cum
4.464
3011.00
13441.00
Cum
12.5
2691.
00
33637.50
Sq.m
144.0
0
144.00
Cum
7.42
1959.
00
14535.00
Sq.
m
3.25
219.0
0
711.75
Kg
1.69
32.00
54.08
Sq.
m
29.15
53.00
1544.95
SOAK PIT
NOTE: - if the percolation rate exceeds 30 minute the soil is not suitable
for soak pit. If the percolation rate exceeds 60 minutes the soil is not
suitable for any soil absorption system.
Taking septic tank effluents to be 30(L/M2/DAY) effluent entering in the
soak pit =900 liter.
Assuming, percolation rate of local soil 10 minutes. Considering to 10
minutes using table IS: 2470 (Part ii) 1985.
Allowable maximum rate of effluents application capacity of soil=65
L/M2/DAY
Therefore effective side of wall area =900/65=13.85 M2 .
Assume depth of soak pit=2M
Therefore absorption area soak pit =DH
Where D= Dia. Of soak pit
H=Height of soak
pit
So, DH=13.85
So, D=2.2M
LENGTH
(M)
BREADTH
(M)
HEIGHT(M)
UNIT
QUANTITY.
REMARKS
Earth work in
excavation
Area
=
6.38
M2
1.55
m3
9.89
Area=
/4(2.25+.3*2)2
30 cm thk. Outer
casing with coarse
sand
Area
=
2.4M2
m3
2.40
Area=
/4(2.852-2.252)
Area
=
2.4M2
m3
2.40
Area=
/4(2.852-2.252)
Gravel
Area
=
3.98
M2
m3
7.96
Area=
/4x2.252
12.5
0.125
0.3
m3
0.47
TOTAL
7.49
SL.N
O
DESCRIPTION OF
ITEM
Plastering(1:4)
a)Outside surface
of soak pit
b)inside of inlet
NO
.
0.55
m3
4.95
12
0.3
m3
3.60
Total
8.55
0.55
m2
4.95
Area
=
6.38
M2
0.1
m3
0.64
deduction for
cover
Area
=
0.16
M2
0.1
m3
0.16
Total
0.48
9=perimeter=x2.8
5
Area=
/4x0.452
UNI
T
QUANTI
TY
RATE
(Rs)
AMOUN
T
(RS)
cum
.
9.890
41.87
401.53
cum
.
2.400
224.76
539.42
cum
.
2.400
1959.0
0
4701.00
cum
.
7.490
Sqm
.
8.550
53.00
453.15
Sqm
.
4.950
983.00
4865.85
cum
.
Sqm
.
0.480
2691.0
0
1291.68
144.00
144.00
TOTAL = Rs.
12396.63
PRIMARY
SCHOOL
BUILDIN
G
FRONT ELEVATION
BACKSIDE ELEVATION
SIDE ELEVATION
SECTION ABCD
SECTION EFGH
Length
70.00
0
30.000
2100
.0
16.625
Breadth
Total
Quantity
Units
No.
Quantity
Description of
Items
Height
Sl.
No.
Explainatory
Notes
I. Substructure
1.
2.
(i.)
(ii.
)
Surface
Dressing to an
Average
Depth
Antitermide
Main Building
Assembly Hall
1
1
23.25
0
12.25
0
30.250
2100.0
386.
53
370.
56
(i.)
(ii.
)
(iii.
)
(iv.
)
(v.
)
Earthwork in
Excavation
350 X 250 mm
column for Main
Building
350 X 250 mm
column for
Assembly Hall
250 X 250 mm
Column for Main
Building
Foundation
Trench for Tie
Beam
Foundation
Trench for
Dwarf Wall
beside
Assembly Hall
Corridor
5.
(i.)
(ii.
)
(iii.
)
(iv.
)
3.550
2.550
1.20
0
184.
67
14
3.550
2.550
1.20
0
152.
08
2.250
2.250
1.20
0
48.6
0
239.7
5
0.375
0.25
0
22.4
8
30.25
0
0.600
0.52
5
9.53
Earthwork in
Filling
by earthwork in
1/5th of Excavated Earth
foundation
trenches.
Single Brick Flat
Soling
350 X 250 mm
column for Main
Building
350 X 250 mm
column for
Assembly Hall
250 X 250 mm
Column for Main
Building
Foundation
Trench for Tie
17
3.550
2.550
153.
89
14
3.550
2.550
126.
74
2.250
2.250
40.5
0
239.7
5
0.375
89.9
1
0.350 + 0.025
= 0.375
83.472
17
3.50 + 0.025 X
2
= 3.55
2.50 + 0.025 X
2
= 2.55
2.20 + 0.025 X
2
= 2.25
417.35
8
4.
Total Land
Required
for
construction.
757.09
4
3.
m
3
m
3
1/5 X 417.358
Beam
(v.
)
Foundation
Trench for
Dwarf Wall
beside
Assembly Hall
Corridor
30.25
0
0.600
18.1
5
429.18
4
6.
(i.)
Foundation
Below 350 X
250
Foundation
Below 250 X
250
Foundation
under Floor
(ii.
)
(iii.
)
31
3.550
2.250
0.10
0
24.7
6
2.250
2.250
0.10
0
4.05
220.50
0
0.10
0
22.0
5
Total Area
=
m
3
m
3
(ii.
)
m
3
st
1 Class
Brickwork in
Cement
239.7
0.42 38.2
Mortar (1:4)
1
0.375
38.210
5
5
1
250 mm thick
from G.L to
P.L
8. Cement Concrete In Foundation With M-20 Grade Concrete
(i.)
50.861
7.
m
3
239.7
5
0.250
0.35
0
20.9
8
31
3.350
2.050
0.20
0
42.5
8
31
area
=
3.480
16.1
8
31
0.700
0.500
0.15
0
0.50
0
2.050
2.050
area
=
2.130
0.500
0.500
0.20
0
0.15
0
0.50
0
5.43
6.72
2.56
1.00
m
95.444
9. Mild Steel Reinforcement for Foundation and Plinth
II. Superstructure
1. Brickwork
A. Main Building
I. Ground Floor
(i.) 250 mm Thick Brick
Wall
(ii.) 125 mm Thick Brick
Wall
(a. Deduction for Doors
)
1.2 mm Wide Doors
(D2)
1.0 mm Wide Doors
(D3)
(b. Deduction for Windows
)
1.2 mm Wide Windows
(W2)
1.5 mm Wide Windows
(W3)
0.6 mm Wide Windows
(W4)
(c.) Deduction for Lintel
101.00
27.250
1.200
1.000
21
1.200
1.500
0.600
81.750
2.95
0
1.35
0
74.4
9
m3
4.60
m3
3.15
m3
1.58
m3
7.56
m3
0.75
m3
0.12
m3
5.11
m3
0.25
0
0.12
5
0.25
0
0.25
0
2.10
0
2.10
0
0.25
0
0.25
0
0.25
0
0.25
0
1.20
0
2.00
0
0.40
0
0.25
0
60.82
2
II. First Floor
(i.) 250 mm Thick Brick
Wall
(ii.) 125 mm Thick Brick
Wall
(a. Deduction for Doors
)
1.2 mm Wide Doors
(D2)
1.0 mm Wide Doors
(D3)
(b. Deduction for Windows
)
101.00
27.250
1.200
1.000
0.25
0
0.12
5
2.95
0
1.35
0
0.25
0
0.25
0
2.10
0
2.10
0
Units
Length
K
g
K
g
Total
Quantity
No.
160 X 74.46
2307.8
00
11913.
600
Quantity
Description of Items
110 X
20.978
Height
Sl.
No.
110 kg/m3 of
concrete =
160 kg/m3 of
concrete =
Breadth
m3
74.4
9
m3
4.60
m3
4.41
m3
1.05
m3
Explainatory
Notes
(c.)
21
1.200
1.500
0.600
81.750
0.25
0
0.25
0
0.25
0
0.25
0
1.20
0
2.00
0
0.40
0
0.25
0
7.56
m3
0.75
m3
0.12
m3
5.11
m3
60.08
7
101.00
27.250
1.200
1.000
13
1.200
1.500
0.600
81.750
0.25
0
0.12
5
2.95
0
1.35
0
0.25
0
0.25
0
2.10
0
2.10
0
0.25
0
0.25
0
0.25
0
0.25
0
1.20
0
2.00
0
0.40
0
0.25
0
74.4
9
m3
4.60
m3
3.15
m3
1.05
m3
4.68
m3
0.75
m3
0.12
m3
5.11
m3
64.22
7
18.000
1.000
18.000
0.25
0
0.25
0
0.25
0
2.40
0
2.10
0
0.25
0
10.8
0
0.53
B. Assembly Hall
(i.) 250 mm Thick Brick
Wall
(ii.) 125 mm Thick Brick
Wall
(a. Deduction for Lintel
)
(b. Deduction For 1.50 mm
) Wide Doors (D1)
(c.) Deduction For 1.0 mm
Wide Windows (W1)
83.850
81.000
30.250
81.000
1.500
16
1.000
0.12
5
0.75
0
m3
1.13
0.25
0
0.12
5
0.25
0
0.25
0
0.25
0
5.90
0
0.75
0
0.25
0
2.10
0
1.20
0
7.86
m3
m3
m3
9.150
V. Parapet Wall
m3
7.861
m3
m3
119.
48
m3
2.84
m3
5.06
m3
4.73
m3
4.80
m3
107.7
23
309.8
69
m3
m3
2. Concrete Work
A. Main Building
I. Ground Floor
(i.)
(ii.)
(iii.
)
(iv.
)
(v.)
(vi.
)
0.25
0
0.25
0
3.30
0
3.30
0
0.25
0
0.25
0
0.35
0
0.25
0
27.250
0.25
0
81.750
0.25
0
Area = 156.5
m2
17
0.350
0.250
101.00
57.750
2.500
3.000
20
1.45
0
1.20
0
4.91
m3
1.65
m3
8.84
m3
3.61
m3
0.25
0
1.70
m3
0.25
0
5.11
m3
0.12
5
19.5
6
m3
1.09
m3
1.08
m3
4.50
m3
0.97
m3
0.07
m3
0.15
0
0.15
0
Volume of each
Step=0.225 m3
239.75-8157.75=101
239.75-81101= 57.75
From
Column C4
to H9
46.5 +
35.25 =
81.75
17
1.450
1.750
0.45
0
0.45
0
0.08
75
0.08
75
1.2 + .125
X 2 = 1.45
1.5 + .125
X 2 = 1.75
0.850
0.45
0
0.08
75
m3
0.07
53.15
5
0.6 + .125
X 2 = 0.85
m3
(ii.)
(iii.
)
(iv.
)
(v.)
Steps
(vi.
)
0.25
0
0.25
0
3.30
0
3.30
0
0.25
0
0.25
0
0.35
0
0.25
0
27.250
0.25
0
81.750
0.25
0
Area = 156.5
m2
17
0.350
0.250
101.00
57.750
2.500
3.000
20
1.45
0
1.20
0
4.91
m3
1.65
m3
8.84
m3
3.61
m3
0.25
0
1.70
m3
0.25
0
5.11
m3
0.12
5
19.5
6
m3
1.09
m3
1.08
m3
4.50
m3
0.97
m3
0.15
0
0.15
0
Volume of each
Step=0.225 m3
239.75-8157.75=101
239.75-81101= 57.75
From
Column C4
to H9
46.5 +
35.25 =
81.75
17
1.450
0.45
0
0.08
7
1.2 + .125
X 2 = 1.45
1.750
0.850
0.45
0
0.45
0
0.08
7
0.08
7
0.07
m3
0.07
m3
53.15
5
1.5 + .125
X 2 = 1.75
0.6 + .125
X 2 = 0.85
m3
(ii.)
(iii.
)
(iv.
)
(v.)
4.50
0
4.50
0
0.25
0
0.25
0
0.35
0
0.25
0
18.000
0.25
0
0.25
0
60.000
0.25
0
Area = 156.5
m2
0.350
0.250
101.00
57.750
6.69
m3
2.25
m3
8.84
m3
3.61
m3
1.13
m3
0.25
0
3.75
0.12
5
19.5
6
m3
1.09
m3
1.08
m3
4.50
m3
(vi.
)
0.25
0
0.25
0
17
2
2
20
1.45
0.15
0
0
1.20
0.15
3.000
0
0
Volume of each Step
= 0.225m3
2.500
3.3 + 0.75
= 4.05
3.3 + 0.75
= 4.05
239.75-8157.75=101
239.75-81101= 57.75
From
Column C4
to F4
46.5 +
35.2521.75
=60.0
11
1.450
1.750
0.850
0.45
0
0.45
0
0.45
0
0.08
75
0.08
75
0.08
75
0.63
m3
0.07
m3
0.07
m3
53.26
0
(iii.
)
0.350
0.25
0
2.40
0
0.63
m3
18.000
0.25
0
0.35
0
1.58
m3
1.250
0.25
0
0.25
0
0.08
m3
B. Assembly Hall
(i.) Cement Concrete M15
Excluding
Reinforcement but
Including Shuttering for
350 X 250 mm Column.
(ii.)
(iii.
)
0.350
0.25
0
6.60
0
8.09
m3
81.000
0.25
0
0.35
0
14.1
8
m3
81.000
0.25
0
0.25
0
5.06
m3
3. Wood Work
(a.
)
27.32
3
189.1
74
1.0 + 2 X
1.25 = 1.25
m3
14
(i.)
m3
2.283
1.2 + .125
X 2 = 1.45
1.5 + .125
X 2 = 1.75
0.6 + .125
X 2 = 0.85
m3
m3
30.25 X 2 +
10.25 X 2
=81
(b.
)
5.800
0.10
0
0.07
5
0.26
17
5.500
0.10
0
0.07
5
0.70
m3
5.300
0.10
0
0.07
5
0.32
m3
0.07
5
0.42
0.07
5
1.50
16
3.500
0.10
0
54
3.700
0.10
0
3.199
(ii.)
(a.
)
(b.
)
2.1 + 0.05
=
2.15 X 2 +
1.5 = 5.80
2.1 + 0.05
=
2.15 X 2 +
1.2 = 5.50
2.1 + 0.05
=
2.15 X 2 +
1.0 = 5.30
1.2 + 0.05
=
1.25 X 2 +
1.0 =3.50
1.2 + 0.05
=
1.25 X 2 +
1.20 =3.70
m3
17
16
54
1.38
0
1.08
0
0.88
0
2.05
5
2.05
5
2.05
5
17.0
2
37.7
3
14.4
7
0.88
0
1.08
0
1.15
5
1.15
5
16.2
6
67.3
6
m2
m2
m2
m2
m2
60.72
0
(iii.
)
Providing Annodised
Alluminium Butt Hinges
(a.
)
125 X 75 X 4 mm Size
For:1.5m wide Doors (D1)
1.2m wide Doors (D2)
1.0m wide Doors (D3)
6X
3
17
X3
8X
3
m2
18
No.
51
No.
24
No.
93.00
0
(b.
)
No
.
2.1 -0.075
+ (0.015 X
2)
=2.055
For D1 :
1.5 - (2 X
0.075) +(2
X 0.015) =
1.380
1.2 -0.075
+
(0.015 X
2)= 1.155
16
X3
54
X3
48
No.
162
No.
210.0
00
(iv.
)
1X3
1
1X7
0
31
No.
70
No.
101.0
00
(v.)
6X
1
17
X1
8X
1
No.
17
No.
No.
31.00
0
1X3
1
31
No.
1X7
0
70
No.
101.0
00
Providing Anodised
Aluminium Floor Door
Stopper For All Doors
D1, D2, D3,)
1X3
1
31
1X7
0
70
No
.
No.
70.00
0
4. Steel and Iron Work
No
.
No.
31.00
0
(vii
)
No
.
Providing Anodised
Aluminium Grip Handle
without Base Plate
450mm grip X 25mm
dia rod
For All Doors (D1, D2,
D3)
For All Windows (W1,
W2)
(vii
)
No
.
(vi.
)
No
.
No
.
(i.)
(90%) of Volume of
Concrete
189.07 X 90/100
170.
1
170.1
63
(ii.)
(iii.
)
(iv.
)
(v.)
7.00
0
0.05
0
1.05
m2
(1.50 X 2)
+ (2.0 X 2)
= 6.5
2.00
0
0.05
0
1.35
m2
(0.6 X 2) +
(0.4 X 2) =
2.0
16
54
0.85
0
1.40
0
0.50
0
0.50
0
2.63
0
1.05
0
1.40
0
0.30
0
0.30
0
0.60
0
14.2
8
105.
84
m2
m2
0.45
m2
0.90
m2
9.47
132.4
38
Corridor
(a.
)
kg
4.000
14.000
18.000
22.000
22.000
3.15
0
3.15
0
3.15
0
3.15
0
3.15
0
25.2
0
44.1
0
56.7
0
69.3
0
69.3
0
m2
m2
m2
m2
m2
m2
26.000
3.15
0
81.9
0
m2
50.000
3.15
0
157.
50
m2
1.200
2.10
0
12.6
0
m2
3.3 - 0.15 =
3.15
(27.25 X 2
+ 2.25 0.75
- 6.00) =
50.00
(b.
)
(c.)
1.000
21
1.200
1.500
0.600
27.250
2.10
0
6.30
m2
1.20
0
2.00
0
0.40
0
30.2
4
3.00
m2
0.48
m2
1.80
0
49.0
5
m2
m2
402.3
30
(ii.)
2.000
2.000
4.000
6.000
6.000
8.000
4.250
6.000
5.000
3.000
4.000
4.000
6.000
2.00
0
5.00
0
5.00
0
5.00
0
5.00
0
5.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
5.00
0
Class Room
Library
4.000
22.000
26.000
m2
m2
8.00
10.0
0
20.0
0
30.0
0
30.0
0
40.0
0
m2
m2
m2
m2
m2
m2
8.50
12.0
0
10.0
0
m2
m2
6.00
m2
8.00
m2
8.00
m2
30.0
0
m2
220.5
00
3.15
0
3.15
0
25.2
0
207.
90
3.15
0
81.9
0
m2
m2
3.3 - 0.15 =
3.15
m2
m2
(27.25 X 2
+ 2.25 0.75
- 6.00) =
50.00
Corridor
(a.
)
(b.
)
(c.)
50.000
1.200
1.000
21
1.200
1.500
0.600
27.250
3.15
0
157.
50
m2
2.10
0
2.10
0
17.6
4
m2
4.20
m2
1.20
0
2.00
0
0.40
0
30.2
4
3.00
m2
0.48
m2
1.80
0
49.0
5
m2
m2
367.8
90
(ii.)
2.000
6.000
8.000
4.250
6.000
5.000
3.000
4.000
4.000
6.000
2.00
0
5.00
0
5.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
5.00
0
Class Room
Corridor
(a.
)
4.000
22.000
50.000
m2
m2
8.00
90.0
0
40.0
0
m2
m2
m2
8.50
12.0
0
10.0
0
m2
m2
6.00
m2
8.00
m2
8.00
m2
30.0
0
m2
220.5
00
3.15
0
3.15
0
3.15
0
25.2
0
207.
90
157.
50
m2
m2
m2
m2
3.3 - 0.15 =
3.15
(b.
)
(c.)
1.200
1.000
13
1.200
1.500
0.600
16.500
2.10
0
2.10
0
12.6
0
m2
4.20
m2
1.20
0
2.00
0
0.40
0
18.7
2
3.00
m2
0.48
m2
1.80
0
29.7
0
m2
m2
321.9
00
(ii.)
2.000
6.000
4.250
6.000
5.000
3.000
6.000
2.00
0
5.00
0
2.00
0
2.00
0
2.00
0
2.00
0
5.00
0
8.00
m2
90.0
0
m2
8.50
m2
12.0
0
10.0
0
m2
m2
6.00
m2
30.0
0
m2
164.5
00
13.000
11.7
00
0.900
1.80
0
5.000
1.200
1.200
5.000
3.00
0
3.00
0
3.00
0
3.00
0
m2
152.
10
m2
1.62
m2
150.4
80
(ii.)
m2
15.0
0
10.8
0
10.8
0
15.0
0
m2
m2
m2
m2
51.60
m2
(3.3 + 3.3
+ 3.3 +
2.4)
= 12.3
0
B. Outside Plastering
(i.) 12cm Thick Cement
Plaster (1:6) on Outside
walls.
(a. From G.L to 2nd Floor
) Level
(b. From 2nd Floor to Roof
) Level
(c.) From 2nd Floor to
Mumty Room Level
(d.
)
Parapet Wall
(e.
)
Chajja
1.2 mm Wide Windows
(W2)
1.5 mm Wide Windows
(W3)
0.6 mm Wide Windows
(W4)
(a.
)
(b.
)
(c.)
92.000
75.500
6.60
0
3.30
0
607.
20
249.
15
m2
m2
16.000
3.15
0
50.4
0
m2
1
X
2
99.500
0.75
0
149.
25
m2
1.450
0.45
0
58.7
3
1.750
0.45
0
4.73
0.850
0.45
0
4.59
0.450
0.08
5
4.13
1.200
1.000
13
1.200
1.500
0.600
16.500
45
X
2
3
X
2
6
X
2
10
8
2.10
0
2.10
0
12.6
0
m2
4.20
m2
1.20
0
2.00
0
0.40
0
1.80
0
18.7
2
3.00
m2
0.48
m2
29.7
0
m2
m2
1059.
47
m2
40.000
1.500
16
1.000
6.60
0
2.10
0
1.20
0
264.
00
18.9
0
19.2
0
m2
m2
m2
2 times for
both faces
of the
parapet
Wall
225.9
00
B. Outside Plastering
(i.) 12cm Thick Cement
Plaster (1:6) to wall of
Main Assembly Hall
Building.
(a.
)
(b.
)
(ii.)
41.000
1.500
16
1.000
1
X
2
30.250
6.60
0
270.
60
2.10
0
1.20
0
18.9
0
19.2
0
0.75
0
45.3
8
m2
m2
m2
m2
277.8
75
4.000
14.000
18.000
22.000
22.000
26.000
50.000
3060.
61
m2
m2
8.00
14.0
0
18.0
0
22.0
0
22.0
0
26.0
0
50.0
0
r.m
r.m
r.m
r.m
r.m
r.m
r.m
1.200
6.00
r.m
1.000
3.00
r.m
151.0
00
(ii.)
m2
r.m
2.000
2.000
2.00
0
5.00
0
8.00
m2
10.0
0
m2
Headmaster's Room
Store Room
Waiting Room
Play Room
Corridor
Panel S3
Panel S5
Panel S8
Panel S10
Panel S11
Panel S13
Panel S4
4.000
6.000
6.000
8.000
4.250
6.000
5.000
3.000
4.000
4.000
6.000
5.00
0
5.00
0
5.00
0
5.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
5.00
0
20.0
0
30.0
0
30.0
0
40.0
0
m2
m2
m2
m2
m2
8.50
12.0
0
10.0
0
m2
m2
6.00
m2
8.00
m2
8.00
m2
30.0
0
m2
220.5
00
(iii.
)
2.000
2.000
4.000
6.000
6.000
8.000
4.250
6.000
5.000
3.000
4.000
4.000
6.000
2.00
0
5.00
0
5.00
0
5.00
0
5.00
0
5.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
5.00
0
m2
m2
8.00
10.0
0
20.0
0
30.0
0
30.0
0
40.0
0
m2
m2
m2
m2
m2
m2
8.50
12.0
0
10.0
0
m2
m2
6.00
m2
8.00
m2
8.00
m2
30.0
0
m2
220.5
00
m2
(iv.
)
8.000
1.80
0
28.8
0
m2
201.3
00
4.000
22.000
26.000
50.000
8.00
66.0
0
26.0
0
50.0
0
r.m
r.m
r.m
r.m
r.m
1.200
8.40
1.000
2.00
r.m
139.6
00
(ii.)
r.m
2.000
6.000
8.000
2.00
0
5.00
0
5.00
0
m2
8.00
90.0
0
40.0
0
m2
m2
m2
4.250
6.000
5.000
3.000
4.000
4.000
6.000
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
5.00
0
m2
8.50
12.0
0
10.0
0
m2
6.00
m2
8.00
m2
8.00
m2
30.0
0
m2
220.5
00
(iii.
)
m2
m2
Toilet
Class Room
Library
Corridor
Panel S3
Panel S5
Panel S8
Panel S10
Panel S11
Panel S13
Panel S4
2.000
6.000
8.000
2.00
0
5.00
0
5.00
0
m2
8.00
90.0
0
40.0
0
m2
m2
m2
4.250
6.000
5.000
3.000
4.000
4.000
6.000
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
5.00
0
m2
8.50
12.0
0
10.0
0
m2
6.00
m2
8.00
m2
8.00
m2
30.0
0
m2
220.5
00
(iv.
)
8.000
1.80
0
28.8
0
m2
239.3
00
4.000
22.000
50.000
8.00
66.0
0
50.0
0
m2
r.m
r.m
r.m
r.m
1.200
6.00
r.m
1.000
2.00
r.m
116.0
00
(ii.)
m2
r.m
2.000
6.000
2.00
0
5.00
0
8.00
m2
90.0
0
m2
Panel S3
Panel S5
Panel S8
Panel S10
Panel S4
4.250
6.000
5.000
3.000
6.000
2.00
0
2.00
0
2.00
0
2.00
0
5.00
0
m2
8.50
12.0
0
10.0
0
m2
m2
6.00
m2
30.0
0
m2
164.5
00
(iii.
)
2.000
6.000
4.250
6.000
5.000
3.000
6.000
2.00
0
5.00
0
2.00
0
2.00
0
2.00
0
2.00
0
5.00
0
8.00
m2
90.0
0
m2
8.50
m2
12.0
0
10.0
0
m2
m2
6.00
m2
30.0
0
m2
164.5
00
(iv.
)
m2
m2
8.000
1.80
0
28.8
0
m2
214.8
00
m2
13.000
13.0
0
m2
0.900
0.90
m2
12.10
0
(b.
)
m2
6
1.200
Steps:
3.00
0
21.6
0
m2
m2
Treads
54
1.450
0.25
0
19.5
8
m2
Riser
60
1.450
0.15
0
13.0
5
54.22
5
V. Roof
(i.) 40cm Thick Terrazo
Flooring in lime
Concrete (11/2:2:7)
(ii.) 20mm Thick Terrazo
Work cast in situ in
floor.
(iii. 20mm Thick Terrazo
) Work for Skirting 30cm
High.
Area = 662.94
662.
94
m2
Area = 662.94
662.
94
m2
117.50
0.30
0
35.2
5
m2
1361.
13
2. External Surface
(i.) Neat Cement Punning
to a height of 700 mm
92.000
0.70
0
64.4
0
m2
m2
40.000
0.30
0
12.0
0
m2
1.500
0.30
0
2.70
m2
30.000
10.0
00
300.
00
m2
309.3
0
2. External Surface
(i.) 20mm Thick Terrazo
Work for Skirting 30cm
High.
(ii.) 20mm Thick Terrazo
Work cast in situ in
floor.
(iii. Neat Cement Punning
) to a height of 700 mm
Around Main Assembly
Hall
m2
34.000
0.75
0
25.5
0
m2
30.000
2.00
0
60.0
0
m2
82.000
0.75
0
61.5
0
m2
35.500
0.75
0
26.6
3
m2
Area of
Antitermide
m2
64.4
m2
173.6
2
7669.
0
(30 + 2 +
2) = 34
((30.5 +
10.5) X 2)
= 82
(30.5 + 2.5
+ 2.5) =
35.5
m2
m2
7. Painting
I. Painting on Timber Surface
6 X 2 =12
(as painting
has to b
done on
both the
faces of the
Door)
(a.
)
(b.
)
12
1.500
34
1.200
16
1.000
Of Windows:-
2.10
0
2.10
0
2.10
0
37.8
0
85.6
8
33.6
0
m2
m2
m2
32
1.000
1.20
0
38.4
0
m2
10
8
1.200
1.20
0
155.
52
m2
351.0
00
0.85
0
1.40
0
0.50
0
0.50
0
2.63
0
1.05
0
1.40
0
0.30
0
0.30
0
0.60
0
14.2
8
105.
84
54 X 2
=108 (as
painting
has to b
done on
both the
faces of the
Window)
m2
m2
m2
0.45
m2
0.90
m2
9.47
m2
130.9
38
m2
4.000
14.000
18.000
3.15
0
3.15
0
3.15
0
25.2
0
44.1
0
56.7
0
m2
m2
m2
3.3 - 0.15 =
3.15
Store Room
Waiting Room
22.000
22.000
Play Room
(b.
)
(c.)
69.3
0
69.3
0
m2
m2
26.000
3.15
0
81.9
0
m2
50.000
3.15
0
157.
50
m2
1.200
12.6
0
m2
1.000
2.10
0
2.10
0
6.30
m2
21
1.200
1.500
30.2
4
3.00
m2
1
2
0.600
1.20
0
2.00
0
0.40
0
0.48
m2
27.250
1.80
0
49.0
5
m2
Corridor
(a.
)
3.15
0
3.15
0
(27.25 X 2
+ 2.25 0.75
- 6.00) =
50.00
m2
402.3
30
m2
Ceilings
Toilet
Enquiry Room
Headmaster's Room
Store Room
Waiting Room
Play Room
Corridor
Panel S3
Panel S5
Panel S8
Panel S10
Panel S11
Panel S13
Panel S4
2.000
2.000
4.000
6.000
6.000
8.000
4.250
6.000
5.000
3.000
4.000
4.000
6.000
2.00
0
5.00
0
5.00
0
5.00
0
5.00
0
5.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
5.00
0
8.00
10.0
0
20.0
0
30.0
0
30.0
0
40.0
0
8.50
12.0
0
10.0
0
m2
m2
m2
m2
m2
m2
m2
m2
m2
6.00
m2
8.00
m2
8.00
m2
30.0
0
m2
220.5
00
II. 1st Floor
(i.) Plastic Emulsion Paint
two coats on inner
walls and ceilings.
Walls
Toilet
Class Room
4.000
22.000
Library
(b.
)
(c.)
25.2
0
207.
90
m2
3.3 - 0.15 =
3.15
m2
26.000
3.15
0
81.9
0
m2
50.000
3.15
0
157.
50
m2
1.200
17.6
4
m2
1.000
2.10
0
2.10
0
4.20
m2
21
1.200
1.500
30.2
4
3.00
m2
1
2
0.600
1.20
0
2.00
0
0.40
0
0.48
m2
27.250
1.80
0
49.0
5
m2
Corridor
(a.
)
3.15
0
3.15
0
m2
(27.25 X 2
+ 2.25 0.75
- 6.00) =
50.00
m2
367.8
90
Ceilings
Toilet
Class Room
Library
Corridor
Panel S3
Panel S5
Panel S8
Panel S10
Panel S11
Panel S13
2.000
6.000
8.000
4.250
6.000
5.000
3.000
4.000
4.000
2.00
0
5.00
0
5.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
2.00
0
8.00
90.0
0
40.0
0
8.50
12.0
0
10.0
0
m2
m2
m2
m2
m2
m2
m2
6.00
m2
8.00
m2
8.00
m2
Panel S4
6.000
5.00
0
30.0
0
m2
220.5
00
4.000
22.000
50.000
1.200
1.000
13
1.200
1.500
0.600
16.500
Class Room
Corridor
(a.
)
(b.
)
(c.)
3.15
0
3.15
0
3.15
0
25.2
0
207.
90
157.
50
2.10
0
2.10
0
12.6
0
m2
4.20
m2
1.20
0
2.00
0
0.40
0
18.7
2
3.00
m2
0.48
m2
1.80
0
29.7
0
m2
m2
Class Room
Corridor
Panel S3
Panel S5
Panel S8
Panel S10
Panel S4
2.000
6.000
4.250
6.000
5.000
3.000
6.000
2.00
0
5.00
0
2.00
0
2.00
0
2.00
0
2.00
0
5.00
0
m2
m2
8.00
m2
90.0
0
m2
8.50
m2
12.0
0
10.0
0
m2
m2
6.00
m2
30.0
0
m2
164.5
00
13.000
11.7
00
152.
10
m2
3.3 - 0.15 =
3.15
m2
321.9
00
Ceilings
Toilet
m2
m2
m2
(3.3 + 3.3
+ 3.3 +
2.4)
= 12.3
Deduction for 1.0m
Wide Door(D3)
0.900
1.80
0
m2
1.62
150.4
80
Roof
Under Intermediate
Landings
Under End Landings
Under Ceiling of Mumty
Room
5.000
1.200
1.200
5.000
3.00
0
3.00
0
3.00
0
3.00
0
15.0
0
10.8
0
10.8
0
15.0
0
m2
m2
m2
51.60
0
B. Outside Surface
(i.) Decorative Cement
based paint two coats
for outside
(a. From G.L to 2nd Floor
) Level
(b. From 2nd Floor to Roof
) Level
(c.) From 2nd Floor to
Mumty Room Level
(d.
)
Parapet Wall
(e.
)
Chajja
1.2 mm Wide Windows
(W2)
1.5 mm Wide Windows
(W3)
0.6 mm Wide Windows
(W4)
(a.
)
(b.
)
92.000
75.500
6.60
0
3.30
0
607.
20
249.
15
m2
m2
m2
m2
16.000
3.15
0
50.4
0
m2
1
X
2
99.500
0.75
0
149.
25
m2
1.450
0.45
0
58.7
3
1.750
0.45
0
4.73
0.850
0.45
0
4.59
0.450
0.08
5
4.13
1.200
1.000
13
1.200
45
X
2
3
X
2
6
X
2
10
8
2.10
0
2.10
0
12.6
0
m2
4.20
m2
1.20
0
18.7
2
m2
2 times for
both faces
of the
parapet
Wall
(c.)
1.500
0.600
16.500
2.00
0
0.40
0
1.80
0
3.00
m2
0.48
m2
29.7
0
m2
1059.
471
II. Assembly Hall
A.Inside Surface
(i.) Plastic Emulsion Paint
two coats on inner
walls and ceilings.
(a. Deduction For 1.5 m
) Wide Door (D1)
(b. Deduction For 1.0 m
) Wide Window (W1)
40.000
1.500
16
1.000
6.60
0
264.
00
2.10
0
1.20
0
18.9
0
19.2
0
m2
m2
m2
225.9
00
B. Outside Surface
(i.) Decorative Cement
based paint two coats
for outside
(a. Deduction For 1.5 m
) Wide Door (D1)
(b. Deduction For 1.0 m
) Wide Window (W1)
(i.) Decorative Cement
based paint two coats
for outside
41.000
1.500
16
1.000
1
X
2
30.250
6.60
0
270.
60
2.10
0
1.20
0
18.9
0
19.2
0
0.75
0
45.3
8
m2
m2
m2
m2
m2
m2
277.8
75
m2
SL
DESCRIPTION OF ITEMS
NO
.
1. Antitermite treatment to the top
surface of the cosolidated each with in
plinth walls with chemical emulsion by
admixing chloropyrefos emulsifiable
concentrates (1% concentration) with
water by weigh at the rate of 5 litres
per sqm of the surface before sand
bed or sub grade is laid.Holes upto
50mm to 75 mm deep at 150 mm
sq.
centre to centre both ways shall be
m.
made with 12 mm dia mild steel rod
on the surface to facililate saturation
of the soil with the chemical
emulsion.The work shall be carried out
as per specification described in para
6.4 of IS 6313 (Part II)-1981. (Mode of
measurement will be per sqm of plan
area of plinth treated)
2. Earth work in excavation of foundation
trenches or drums in all sorts of soils
(including mixed soil but excluding
lateritic or sand stone) including
removing spreading or stacking the
cum
spits with in a lead of 75 m as
.
directed. The item includes necessary
ramming the side of trenches leveling,
dressing and ramming the bottom
bailing out water as required.
3. Earthwork in filling in foundation
trenches, plinth, pits etc. with good
soil in layer not exceeding 150 mm
cum
including watering, ramming etc. layer
.
complete (Payment to be made on
basis of measurement of finished
quantity of work.) with soil obtained
QUANTIT
Y
RATE
AMOUN
T
757.094
78.00
59053.3
3
417.358
72.35
30195.8
5
83.472
45.00
3756.24
205.74
388.80
79991.7
1
429.182
313.00
134333.
97
3011.0
0
2691.0
0
67085.0
0
329217.
00
1959.0
0
557395.
00
146.30
189.17
38.21
as per.
cum
.
309.87
2076.0
0
208929.
00
kg
170.163
70400.
00
1197947
5.2
2805.65
42.00
657.10
29.00
sq.
m.
152.50
45.00
2805.00
sq.
m
456.20
983.00
448444.
60
sq.
m.
1593.94
421.00
223635.
00
sq.
m.
sq.
m.
135423.
00
13797.0
0
sq.
m.
876.78
421.00
223635.
00
3.93
39147.
00
153848.
00
sq.
m.
69.22
1474.0
0
230814.
00
sq.
m.
83.62
1776.0
0
13817.0
0
sq.
m.
132.44
40.00
45483.0
0
cum
.
sq.
m.
2125.50
42.00
97333.0
0
sq.
m.
1337.38
32.00
25835.0
0
Sq.
m.
130.94
29.00
3422.00
Sq.
m.
351.0.
24.00
11097.0
0
TOTAL =
Rs.1,50,78,820.00
ADDING 10% FOR SANITARY =
Rs.15,07,882.00
ADDING 15% FOR ELECTRIFICATION =
Rs.22,61,823.00
TOTAL COST =
Rs.1,88,48,525.00
R.c.c
Design
SLAB
Design
lx = 5.101 m , ly = 6.93 m
l y 5.101
=
=1.395
l x 6.93
ly
<2
lx
l y 6.093
=
=1.194 we have taken the value of & from
x
y
l x 5.101
x=0.0707
&
y=0.047
Depth required :
Mx =
RU b d2x
.. dx =
MX
RU b
16.27 10
2.76 1000
= 76.78 mm.
0.138x20 = 2.76]
dx
provided
= 101 mm.
dx
2
fck X b b(dx )
4.6 Mx
1
1
0.5 fck
Astx =
fy
0.5 20
4.6 16.27 10
1 1
1000 101
2
=
415
20 1000 101
= 497.12 mm2
Asty=
0.5 fck
4.6 My
1 1
b( dy)
fy
fck X b (dy )2
0.5 20
4.6 11.1 106
1 1
2
415
20 1000 93
= 359.57 mm2
dx
2
fck X b b (dx )
M
4.6 x
1
1
0.5 fck
stx=
fy
A
0.5 20
4.6 22.4 10
1 1
1000 101
2
=
415
20 1000 101
= 722.33 mm2
14.6
M y
fck X b(dy)2
1
0.5 fck
sty=
fy
A
0.5 20
4.6 14.9 106
1 1
415
20 1000 932
= 499.9 mm2
(i)Reinforcement along X direction:
Width of middle strip = (3/4) x ly = (3/4) x 6.093 = 4.56 m
For 8 mm. bar (A) = 50.27 mm2
Spacing =
(1000 X 50.27)
497.12
131.1 mm
A = 50.27 mm2
Spacing =
(1000 X 50.27)
359.57
139.80 mm
So, provide 8mm dia. @ 125 mm c/c for the middle strip.
(iii)Reinforcement for edge strips:
Minimum reinforcement = 150 mm2
Spacing =
(1000 X 50.27)
150
= 335.13 mm
Provide 8 mm dia. @ 275 mm c/c for the edge strip of shorter and longer
direction.
1
2
m.
Width of edge strip along longer direction =
1
2
x (2.976 2.232) =
0.744 m.
Torsional reinforcement at corners:
Mesh size = lx/5 = 2.976/5 = 0.595 m = 595 mm. 600 mm.
Area of torsional reinforcement =
3 Astx
4
A = 50.27 mm2
Spacing =
(1000 X 50.27)
108.46
= 463.5 mm.
3 144.61
4
= 108.46 mm2
Wu X l
10
= 5.38 KN - m
Wu X l
2
12.19 X 2
2
= 12.19 KN
Depth required:
Mu =
RU b d2
.. d =
MX
RU b
5.38 106
2.76 1000
= 44.15 mm.
0.138x20 = 2.76]
dx
provided
= 101 mm.
0.5 fck
4.6 Mu
1 1
bd
fy
fckb d 2
=
0.5 20
4.6 5.38 106
1 1
1000 101
415
20 1000 1012
= 152.38 mm2
For 8 mm. bar (A) = 50.27 mm2
Spacing =
(1000 X 50.27)
152.38
329.9 mm
(1000 X 50.27)
250
201.08 mm2
Hence O.K.
Distribution reinforcement:
Provide minimum reinforcement as distribution reinforcement in longer
direction, i.e., 150 mm2
Considering 6 mm bar,
For 6 mm. bar (A) = 28.3 mm2
so the spacing of reinforcement =
(1000 X 28.3)
150
188.6 mm 180 mm
S3, S8,
S11,
S14
lx
(m)
2.0
ly
(m)
5.0
ly/lx
2.5
DESIG
N
LOAD
(Wu)
KN/m2
MOME
NT
(Mu)
KN - m
DEPT
H
deff
(mm.)
12.19
5.38
101
Ast
(mm2)
152.3
8
SPACIN
G
(mm)
250
REINFORCEMENT:
PANEL
MARK
MAIN
REINFORCEMENT
DISTRIBUTION
REINFORCEMENT
S8
BEAM
Design
2
2
3
l x 5.101
Design Load Due to Slab (S12, S14) =
, (where =
)
12.187 x 4.101
1
1
2
2
3 x(1.24)
12.187 x 4.101
x 0.7832
2
=
= 19.56 KN
Total Load = (3.28 + 19.56 x 2) KN
= 42.4 KN
Stiffness Factor
3EI
1.33EI
3 EI
= 2.25
L
3EI
0.57 EI
3 EI
= 5.25
L
Distribution Factor
1.33EI
0.66
(1.33 0.57) EI
0.57 EI
0.34
(1.33 0.57) EI
For Beam BH7I7 =
F BH 7 I 7=
+Wl2
12
W l 2
12
F BI 7 H 7=
=+
19.4 X 2.252
12
42.4 X 5.252
12
= 8.18 KN
= -97.385 KN
Joint
Member
Distribution Factor
Fixed End Moment
Balance
Final Moment
F7
B F7H7
0
0
0
0
H7
BH7F7
0.66
(+) 8.18
(+) 58.85
(+) 67.03
BH7I7
0.34
(-) 97.385
(+) 30.317
(-) 67.06
I7
BI7H7
0
0
0
0
As the Maximum Bending Moment will be acting on the Beam of larger span, so calculating
the Maximum Bending Moment of the Beam BH7I7
R H 7 + R I 7=42.4 X 5.25
R I 7= { ( 42.4 X 5.25 ) 124.70 }
, R I 7 =98.53 KN
47.27 X x 2
28.07
2
d Mx
=RH 7 42.4 x=0
dx
x=
124.07
=2.92
42.4
42.4 X x 2
M x =R H 7 X x
67.06
2
2
, M x =124.07 X 2.92
42.4 X 2.92
67.06
2
, M x =114.46 KNm
M x =114.46 KNm
u lim =0.138 f ck bd 2
M
2
Design of T-Beam
Distance between points of Zero Moment in the beam.
l o=0.7 X 5.25=3.675 m
Effective Width of Flange
l
b f = o + bw +6 X Df
6
3
bf =
3.675 X 10
+250+ 6 X 125
6
b f =1612.5 mm
Moment of Resistance of the Beam
M uR=0.36 f ck X Df X ( d0.42 X D ) X b f
M uR=0.36 X 20 X 125 X ( 3650.42 X 125 ) X 1612.5
M uR=453.5 X 106 Nmm
M uR > M u
the beam must be designed as singly reinforced
0.5 f ck
4.6 M u
A st =
1 1
bd
fy
f ck bd 2
A st =
0.5 X 20
4.6 X 114.4 X 10
1 1
1612.5 X 365
2
415
20 X 1612.5 X 365
A st =893.7 mm
A st 893.7
=
=2.84 3 Nos .
A 314
42.40 X 6.25
2
= 132.50 KN
VU
bd
)=
132.50 x 10 3
250 x 400
= 1.325 N/mm2
Ast = 3 x
x 20 2
4
= 942.47 mm2
Pt =
A st
942.47
x 100 =
x 100
bxd
250 x 400
= 0.94%
Now, considering to Pt=0.94% and M20 concrete we have design shear strength of concrete
from Table-19 of I.S: 456-2000.
c =0.56+
0.620.56
x ( 0.940.75 )
1.00.75
= 0.605 N/mm2
For M20 concrete,
c
c max
<
= 2.8 N/mm2
<
c max
Asv =
V US=
0.87 x f y x A sv x d
Sv
V us=V u c bd
Sv=
= 202.85 203mm
And
Sv
b x s v 0.87 x f y
SV
S V 362 mm
So, provide 8mm two legged stirrup @ 200 mm C/C for 1/3 length of beam from the support
and @ 300mm C/C for middle 1/3 length.
0.5 x 20
4.6 x 67.06 x 10 6
1 1
x 250 x 400 = 518.69 mm2
2
415
20 x 250 x 400
Using, 16 mm bar
A = 201 mm2
No of bar =
518.69
201
= 2.58 3
wl x
3
12.87 x 2.101
3
= 8.534 KN
wl x
2
12.87 x 2.101
2
= 12.80 KN
For BD3E3
Design Dead Load of Beam = (0.35 x 0.25 x 1 x 25) x 1.5
= (1.5 x 2.1875) KN
= 3.28125 KN
Design Dead Load due to Brick Wall = (19 x 0.25 x 2.95 x 1)
= (1.5 x 14.01) KN
= 21.015 KN
Unit Weight of Slab (Wu) = 12.187 KN
wl x
3
12.87 x5.101
3
= 23.80 KN
wl x
2
12.87 x 2.101
2
= 12.80 KN
Stiffness Factor
3 EI
=
L
3EI
0.66 EI
4.5
4 EI
0.64 EI
4 EI
= 6.25
L
Distribution Factor
0.66 EI
0.50
(0.66 0.64) EI
0.64 EI
0.49
(0.66 0.64) EI
F BD 3 C 3=+
F BD 3E3 =
Wl2 W l 3
+ 2
12
l
W l 2
12
F BE 3 D 3 =
+W l
12
=+
61 X 6.252
12
+61.0 X 6.25
12
Joint
Member
= 95.4375 KN
= -198.5 KN
2
= + 198.5 KN
C3
B C3D3
D3
BD3C3
BD3E3
E3
BE3D3
Distribution Factor
0
0.50
0.49
0
Fixed End Moment
0
(+) 95.45
(-) 198.5 (+) 198.5
Balance
0
(+) 51.5
(+) 50.4
Carryover
(+) 25.20
Balance
0
(+) 0.55
(+) 0.53
Carryover
(+) 0.26
Balance
0
(+) 0.01
(+) 0.0098
Carryover
(+) 0.0049
Final End Moment
0
(+) 147.49 (-) 147.56 (+) 223.96
As the Maximum Bending Moment will be acting on the Beam of larger span, so calculating
the Maximum Bending Moment of the Beam BD3E3
6.252
+147.56
2
, R D 3=178.40 KN
R E 3+ R D 3=42.4 X 5.25
R E 3= { ( 61 X 6.25 )178.40 }
, R E 3 =202.85 KN
2
d Mx
=RE 361 x =0
dx
x=
202.85
=3.30 m
61
M x =R E 3 X x
61 X x2
223.96
2
61 X x
223.96
2
, M x =202.85 X 3.3
61 X 3.30
223.96
2
, M x =113.30 KNm
M x =113.30 KNm
u lim =0.138 f ck bd 2
M
u lim =0.138 X 20 X 250 X 4002
M
u lim =110.46 KNm
M
M x > M u lim
the beam must be designed as a T-Beam
Design of T-Beam
Distance between points of Zero Moment in the beam.
l o=0.7 X 6.25=4.375 m
Effective Width of Flange
l
b f = o + bw +6 X Df
6
bf =
4.375 X 103
+ 250+6 X 125
6
b f =1729.16 mm
Moment of Resistance of the Beam
M uR=0.36 f ck X Df X ( d0.42 X D ) X b f
M uR=0.36 X 20 X 125 X ( 3650.42 X 125 ) X 1729.16
M uR=486.32 X 106 Nmm
M uR > M u
0.5 X 20
4.6 X 113.3 X 106
A st =
1 1
1729.16 X 365
415
20 X 1729.16 X 3652
A st =882.5 mm
No. of Bars =
61 X 6.25
2
)=
VU
bd
= 190.625 KN
190.625 x 10 3
250 x 400
= 1.90 N/mm2
Ast = 3 x
x 20 2
4
= 942.47 mm2
Pt =
A st
942.47
x 100 =
x 100
bxd
250 x 400
= 0.94%
Now, considering to Pt=0.94% and M20 concrete we have design shear strength of concrete
from Table-19 of I.S: 456-2000.
c =0.56+
0.620.56
x ( 0.940.75 )
1.00.75
= 0.605 N/mm2
For M20 concrete,
c
c max
<
= 2.8 N/mm2
<
c max
Asv =
V US=
0.87 x f y x A sv x d
Sv
V us=V u c bd
Sv=
= 128.5 129mm
Sv
b x s v 0.87 x f y
SV
S V 362 mm
So, provide 8mm two legged stirrup @ 125 mm C/C for 1/3 length of beam from the support
and @ 300mm C/C for middle 1/3 length.
Provide 2 Nos. 10mm anchor bars.
For negative moment,
MX = 147.56 X 106 N-mm
u lim =0.138 f ck bd 2
M
Ast1 =
0.5 f ck
4.6 M u
1 1
bd
fy
f ck bd 2
0.5 x 20
4.6 x 110.46 x 10
1 1
x 250 x 400 = 950.32 mm2
415
20 x 250 x 4002
M u 2=36.04 x 10 Nmm
A st 2 =
0.5 f ck
4.6 M u
1 1
bd
fy
f ck bd 2
0.5 x 20
4.6 x 36.04 x 10
A st 2 =
1 1
250 x 400=263.09 mm2
2
415
20 x 250 x 400
2
A st = Ast 1 + A st 2=950.32+236.09 mm
A st =1213.41 mm2
Provide 20mm rod as reinforcement
x 202
A =
=314 mm2
4
No. of Bars =
A st 1213.41
=
=3.86 4 Nos .
A
314
A sc =
A sc =
M u2
f sc ( dd ' )
36.04 x 106
343.6(36550)
= 332.98 mm2
A st 332.98
=
=1.06 1 Nos .
A
314
As we are providing 3Nos. 20mm bars as Tensile Reinforcement in T-Beam without any
curtailment it will be sufficient to withstand the compressive force due to the negative
moment, so we need not provide any bars for compression.
wl x
3
12.87 x 4.101
3
= 16.65 KN
wl x
2
12.87 x 4.101
2
= 12.80 KN
= (1.5 x 14.01) KN
= 21.015 KN
Unit Weight of Slab (Wu) = 12.187 KN
wl x
3
12.87 x 4.101
3
= 16.65 KN
wl x
2
12.87 x 4.101
2
= 12.80 KN
Stiffness Factor
Distribution Factor
3EI
3 EI
0.70 EI
= 2.25
L
4 EI
1.0 EI
4 EI
= 5.25
L
0.70 EI
0.41
(0.70 1.0) EI
1.0 EI
0.58
(0.70 1.0) EI
For Beam BH7H5 =
+ Wl2
12
W l 2
F BH 7 H 5=
12
F BH 5 H 7=
+W l
12
=+
53.79 X 4.252
12
53.79 X 4.002
12
+53.79 X 4.00
12
Joint
Member
Distribution Factor
Fixed End Moment
Balance
Carryover
Balance
Carryover
Balance
Carryover
Balance
Carryover
Final End Moment
= 80.96 KN
= -71.72 KN
= + 71.72 KN
H9
B H9H7
0
0
0
H7
BH7H9
0.43
(+) 80.96
(-) 3.88
BH7H5
0.57
(-) 71.72
(-) 5.27
H5
BH57H7
0
(+)71.72
(-) 2.635
(-) 0.58
(-) 0.82
(-) 0.41
(-) 0.10
(-) 0.13
(-) 0.01
(-) 0.01
(+) 76.95
(-) 76.95
(-) 0.065
(-) 0.005
(+) 68.605
As the Maximum Bending Moment will be acting on the Beam of larger span, so calculating
the Maximum Bending Moment of the Beam BH9H7
4.25
2
, R H 9=96.18 KN
R H 9 + R H 7=53.79 X 4.25
R H 7= {( 53.79 X 4.25 )96.18 }
, R H 7=132.42 KN
d Mx
=RH 9 53.79 x=0
dx
x=
96.18
=1.78 m
53.79
M x =R H 9 X x
53.79 X x 2
2
, M x =96.18 X 1.78
53.79 X 1.782
2
, M x =85.8 KNm
M x =85.8 KNm
u lim =0.138 f ck bd 2
M
u lim =0.138 X 20 X 250 X 4002
M
53.79 X x 2
2
0.5 x 20
4.6 x 85.8 x 10 6
A st =
1 1
250 x 400
415
20 x 250 x 400 2
A st =694.4 mm
694.40
201
= 3.45 4
53.79 X 4.25
2
)=
VU
bd
= 1.140 N/mm2
Ast = 4 x
x 16 2
4
= 804.24 mm2
Pt =
A st
804.24
x 100 =
x 100
bxd
250 x 400
= 0.80%
= 114.30 KN
114.30
250 x 400
Now, considering to Pt=0.80% and M20 concrete we have design shear strength of concrete
from Table-19 of I.S: 456-2000.
c =0.56+
0.620.56
x ( 0.800.75 )
1.00.75
= 0.61 N/mm2
For M20 concrete,
c
c max
<
= 2.8 N/mm2
<
c max
x8
x 2 = 100.5 mm2
4
Asv =
V US=
0.87 x f y x A sv x d
Sv
V us=V u c bd
Sv=
= 204.23 205mm
Sv
b x s v 0.87 x f y
SV
S V 362 mm
So, provide 8mm two legged stirrup @ 200 mm C/C for 1/3 length of beam from the support
and @ 300mm C/C for middle 1/3 length.
0.5 x 20
4.6 x 76.95 x 106
1 1
x 250 x 400 = 607.95 mm2
2
415
20 x 250 x 400
607.95
201
= 3.02 3
COLUMN
Design
Column Design
For Column E3
Load Calculation
[(
)]
5.25
6.25
2.25
x 0.35 x 0.25 x 25 +
x 0.35 x 0.25 x 25 x 2 +
x 0.35 x 0.25 x 25 x 5
2
2
2
)(
)(
= 83.75
KN.............................................................................................. (iii)
[{(
} {( )
6.25 6.25
5.25
+
x 0.25 x 19 x 2.95 +
x 0.125 x 19 x 19 x 2.95 { ( 1.2 x 2.1 x 0.25 x 19 ) x 2 } { ( 1.2 x 1.2
2
2
2
[{(
) }
] [(
5.25 2.25
6.25 6.25
5.25 3.25
6.25 6.25
+
x
+
x 4 x3 +
+
x
+
x 1.5
2
2
2
2
2
2
2
2
)(
)(
3675.0
=7.48 Nos
490.8
8 Nos
[Ag
(ii.)
1
x 25=6.25 mm
4
Provide 6mm lateral ties.
Column Design
For Column G1
Load Calculation
[(
6.25 6.25
5.25
+
x
x 0.125 x 1 x 25 x 4
2
2
2
)( )
[(
)]
5.25
6.25
x 0.35 x 0.25 x 25 +
x 0.35 x 0.25 x 25 x 2 x 5
2
2
)(
[(
6.25 6.25
5.25
+
x
x1 x 4
2
2
2
)( )
= 65.625
KN............................................................................................ (iii)
([{ 6.252 + 6.252 ) x 0.25 x 19 x 2.95 }+{( 5.252 ) x 0.125 x 19 x 19 x 2.95}{( 1.2 x 2.1 x 0.25 x 19) x 6 }] x 4
= [87.5 +18.39 41.04] x 4 = 259.44
KN.................................................. (iv)
[{(
) }
] [(
5.25
6.25 6.25
5.25
6.25 6.25
x
+
x 4 x3 +
x
+
x 1.5
2
2
2
2
2
2
)(
)(
[Ag
3565.0
=7.26 Nos
490.8
8 Nos
Column Design
For Column I1
Load Calculation
[(
5.25 6.25
x
x 0.125 x 1 x 25 x 4
2
2
[(
6.25 5.25
x
x 1 x4
2
2
= 32.8125
KN.............................................................................................. (iii)
([{ 6.252 ) x 0.25 x 19 x 2.95}+{( 5.252 ) x 0.25 x 19 x 19 x 2.95} {( 1.2 x 2.1 x 0.25 x 19) x 6}] x 4
= [43.78 + 36.78 41.04] x 4 = 158.08 KN........................................
(iv)
[{(
) }
] [(
6.25 5.25
6.25 5.25
x
x4 x3 +
x
x 1.5
2
2
2
2
1095.0
=3.48 Nos
314
4 Nos
[Ag =
Column Design
For Column E4
Load Calculation
[(
] [ {(
5.25 2.25
6.25 6.25
+
x
+
x 0.125 x 1 x 25 +
2
2
2
2
)(
} ]
6.25 5.25
2.25
+
x
x 0.125 x 1 x 25 x 3
2
2
2
)( )
[{(
)} (
5.25
6.25
2.25
5.25
x 0.25 x 0.25 x 25 +
x 0.25 x 0.25 x 25 +
x 0.25 x 0.25 x 25 x 5+
x 0.25 x 0.25 x 25
2
2
2
2
)(
)(
[{(
) } {(
)( ) }
5.25 6.25
5.25 2.25
5.25 6.25
2.25
+
x
+
x1 +
+
x
x1 x4
2
2
2
2
2
2
2
)(
{(
6.25 5.25
+
x 0.125 x 19 x 1.60 x 4
2
2
([ { 5.252 + 2.252 ) x ( 6.252 + 6.252 ) x 4}+{( 5.252 + 6.252 ) x 2.252 x 4 }x 2+{( 5.252 + 6.252 ) x 2.252 x 1.5}]
= (86.25 + 51.75 + 97) = 147.7
KN................................................................ (v)
Total Load = (128.0 + 57.35 + 47.43 + 87.40) = 467.88 KN
Design load (Pu) = 467.88 x 1.5 = 701.82 KN
Adding approx, 10% for moment,
PU = [701.8 + (701.8 x 0.10)]
= 771.98 772 KN
Design of Longitudinal Reinforcement
PU = [0.4 x fck x Ac + 0.67 x fy x Asc]
or, 772 x 103 = [0.4 x fck x (Ag Asc) + 0.67 x fy x Asc]
250 x 250 = 62500 mm2]
or, 772 x 103 = 0.92 x [0.4 x 20 x (62500 Asc) + 0.67 x 415 x Asc]
or, 772 x 103 = 248.446 Asc + 460000
or, Asc = 1255.86 1256 mm2
1256.0
=4 Nos
314
[Ag =
COLUMN SCHEDULE
COLUMN
TYPE
Biaxially
loaded
column
Unaxially
loaded
column
Axially
loaded
column
Unaxially
loaded
column
COLUMN
MARK
C4, D4, E4, F4,
F7, F9, D7, E7
COLUM
N SIZE
(m.m.)
REINFORCEME
NT
LINK
250X250
4 Nos. 20mm
bar
6mm
links @
250mm c/c
6mm links @
250mm c/c
250X350
250X350
6mm links @
250mm c/c
250X350
6mm links @
250mm c/c
FOOTING
Design
Footing Design
For Footing Below The Column G1
Safe Bearing Capacity of the Soil (qu) = 120 KN/m2
Load Calculation:Load of Column on the Footing (Wc) = 916.605 KN
Self-weight of Footing (Wf) = 10% of Wc = 91.6905 KN
Total Weight on the Footing (Wc + Wf) = (916.905 + 91.6905) KN = 1008.5 KN
Area of Footing:A = (Wc + Wf) / qu
= 1008.5 / 120 = 8.4 m2
Side of Square Footing = 8.4 = 2.89 m 3.0 m
Factored Soil Pressure due to Column Load only (Pu) =
1.5 X 916.905
3.0 X 3.0
= 152.8175 KN/m2
Depth of Footing By One Way Shear Criterion:Critical section shall be at a distance d from the face of the column.
Shear force due to factored soil pressure at critical section.
3.00.25
3.0 X
d X 152.8175
=
2
520 mm
or,
A st =
0.5 x 20
4.6 433.3 x 10
1 1
3000 x 458
2
415
20 x 3000 x 458
2
or, A st =2723.6 mm
A =
0.12bd
100
0.12 x 3000 x 458
100
= 1648.8 mm2
2
2
x 12
= 113.09 mm
4
113.09 x 3000
=124.5 mm 125mm
2723.6
or,
ld =
0.87 x 415 x 12
4 x 1.92
or, ld = 564.14 mm
Available Length of Bar =
As,
ld
30000.25
x 1000
= 1499.875 mm
2
564.14 mm
Hence OK
1499.875 mm
So provide 16mm
Footing Design
For Footing Below The Column E3
Safe Bearing Capacity of the Soil (qu) = 120 KN/m2
Load Calculation:Load of Column on the Footing (Wc) = 1096.86 KN
Self-weight of Footing (Wf) = 10% of Wc = 109.686 KN
Total Weight on the Footing (Wc + Wf) = (1096.86+109.686) KN = 1206.5 KN
Area of Footing:(W c +W f )
A=
qu
1206.5
120
= 8.4 m2
350
=1.4
250
, x=
10
1.4
= 2.6m
1.5 X 1206.5
2.6 x 3.6
= 193.34 KN/m2
Depth of Footing by One Way Shear Criterion:Critical section is at d from the face of the column.
Shear Force in longer direction =
193.34 x 3.6 x
d )
( 2.600.25
2
= 817.8 696.024d
Shear Force in shorter direction =
193.34 x 2.6 x
d )
( 3.60.35
2
= 817.8 502.684d
(i)
d
2
.... (iv)
= 0.491m
Depth of Footing By Bending Moment Criterion:Critical section is at the face of the column.
Bending Moment in longer direction =
( 1.625
2 )
= 480.37 KN-m
Hence Bending Moment in longer direction is more.
Moment of resistance in longer directionMr = 0.138 x fck x bd2
[For Fe-415]
= 0.138 x 20 x 2600 x d2 = 7176d2 N-mm .. (vi)
Equating (v) and (vi),
611.5 x106 = 8280d2
or, d = 291mm 0.291m
Out of the three, the highest value of d obtained is 0.560m.
Let, assume d = 560mm
Overall Depth (D) = (560 + 8 + 50)
= 618 mm
620 mm
0.5 x 20
4.6 x 611.5 x 106
1 1
x 2600 x 560
2
415
20 x 2600 x 560
= 3156.37 mm2
Using 16mm bars, spacing =
201 x 2600
3156.37
= 165.5 mm
0.5 x 20
4.6 x 440.37 x 106
1 1
x 3600 x 560
415
20 x 3600 x 560 2
= 2746.6 mm2
Minimum reinforcement @ 0.12% =
0.12
x 3600 x 560
100
y
x
3.6
2.6
= 1.4
2
1.4 +1
= 0.83
201 x 2600
2308.06
= 226.3 mm 225 mm
113 x 1000
438.54
= 257 mm 250mm
2
+1
Ld =
0.87 x f y x
4 x bd
0.87 x 415 x 16
4 x 1.92
[bd = 1.92 N/mm2 for M20 and Fe 415]
= 752.2 mm
2600250
2
Footing Design
For Footing Below The Column E4
Safe Bearing Capacity of the Soil (qu) = 120 KN/m2
Load Calculation:Load of Column on the Footing (Wc) = 467.88 KN
Self-weight of Footing (Wf) = 10% of Wc = 46.78 KN
Total Weight on the Footing (Wc + Wf) = (467.88 + 46.78) KN = 514.66 KN
Area of Footing:A=
(W c +W f )
qu
514.66
120
= 4.2 m2
350
=1.4
2
250
Let, y = 2x
Area of Footing = x x y = 2x2 = 4.2 m
, x=
4.2
2
= 1.4m
So , y =2 x=2 x 1.4=2.8 m
1.5 X 514.66
1.4 x 2.8
= 196.6 KN/m2
Depth of Footing by One Way Shear Criterion:Critical section is at d from the face of the column.
Shear Force in longer direction =
196.6 x 2.8 x
d )
( 1.400.25
2
= 357.00 551.32d
196.6 x 1.4 x
d )
( 2.80.25
2
= 357.00 350.93d
(i)
d
2
.... (iv)
d=
= 0.286m
Depth of Footing By Bending Moment Criterion:Critical section is at the face of the column.
Bending Moment in longer direction =
( 1.275
2 )
= 223.7 KN-m
.. (v)
0.575
196.6 x 2.8 x 0.575 x
2
= 91.00 KN-m
Hence Bending Moment in longer direction is more.
Moment of resistance in longer directionMr = 0.138 x fck x bd2
[For Fe-415]
= 0.138 x 20 x 1400 x d2 = 3864d2 N-mm .. (vi)
Equating (v) and (vi),
223.7 x106 = 3864d2
or, d = 240mm
Out of the three, the highest value of d obtained is 0.350m.
Let, assume d = 350mm
Overall Depth (D) = (350 + 8 + 50)
= 408 mm
400 mm
0.5 x 20
4.6 x 223.7 x 10
1 1
x 1400 x 400
2
415
20 x 1400 x 400
= 1644.0 mm2
Using 16mm bars, spacing =
201 x 1400
1644.0
= 171.5 mm
0.5 x 20
4.6 x 91 x 106
1 1
x 2800 x 400
2
415
20 x 2800 x 400
= 742.8 mm2
Minimum reinforcement @ 0.12% =
0.12
x 2800 x 400
100
y
x
2.8
1.4
2
+1
=2
2
2+1
= 0.66
78.5 x 1840
896
= 167.2 mm 165 mm
78.5 x 960
448.00
= 168.2 mm 165mm
Ld =
0.87 x f y x
4 x bd
= 470.11 mm
0.87 x 415 x 10
4 x 1.92
[bd = 1.92 N/mm2 for M20 and Fe 415]
1400250
2
FOOTING SCHEDULE
FOOTI
NGMAR
K
F1
COLU
MNMA
RK
D1, E1,
G1, I1,
I3, I5,
I7, I9
REINFORCEMENT
FOOTIN
GSIZE
(m)
3.0 X
3.0
LONGER
DIRECTIO
N
16 bar
@ 125
mm c/c
SHORTER DIRECTION
CENTRAL
BAND
OUTER
BAND
16 bar @
125 mm c/c
16 bar @
125 mm c/c
F2
C2, C3,
D2, D3,
E3, G3,
H5, H7,
H9
2.6 X
3.6
16 bar
@ 165
mm c/c
16 bar @
225 mm c/c
16 bar @
250 mm c/c
F3
C4, D4,
E4, F4,
F7, F9,
D7, E7
1.4 x
2.8
16 bar
@ 165
mm c/c
16 bar @
165 mm c/c
10 bar @
165 mm c/c
STAIR
Design
STAIR DESIGN
Given,
Room = 3.0 m x 5.0 m
Floor to floor height = 3.3 m
Thickness of brick wall = 250 mm
Using, M20 grade concrete and Fe 415 grade steel
Available width of stair case = 3.0 m
Considering two flights of Dog-legged staircase,
LOADS:(i)
(ii)
= (25*0.15*0.25)/(2*0.25)
= 1.875 KN/m
Total dead load = 6.55 + 1.875 = 8.425 KN/m
Live load = 5 KN/m2
= 5 KN/m (Per meter width of staircase)
Total Dead load + Live load (w) = 8.425 + 5 = 13.425 KN/m
Factored load (wu) = 1.5*13.425 = 20.13 KN/m
For landing,
Dead load = 0.225*25*10 = 5.625 KN/m
Live load = 1*5.0 KN/m2 5.0 KN/m (Per meter width of landing)
Total Dead load + Live load (w) = 5.625 + 5 = 10.625 KN/m
Factored load (wu) = 1.5*10.625 = 15.93 KN/m
= 564.14 mm
Provide, 800 mm length of bars at points where Ld is required
OTHER
INFRASTRUCTUR
ES
OF THE
PROJECT
CULVERT
ESTIMATE OF CULVERT
Sl
No.
1
Description of item
No.
Length
(m)
Breadth
(m)
Height
(m)
Quantity
Unit
Earth work in
excavatoin
Depth not exceding 1.5 m
Abutments
11.3
1.5
1.5
50.85
m3
Wing Walls
Curtain Wall
Floor(between abutments)
4
2
1
3.2
2.3
9.6
1.5
0.8
2.3
1.5
1.3
0.4
28.8
4.78
8.83
93.26
m3
m3
m3
m3
2
2
1
1
11.3
3.2
2.3
10
1.5
1.5
0.8
3
0.5
0.5
0.3
0.2
16.95
4.8
0.55
6
28.3
m3
m3
m3
m3
m3
Cement Concrete in
foundation(1:3:6)
Abutments
Wing Walls
Curtain Wall
Floor(between abutments)
Remarks
11.30=10+2x(0.40+
0.05+0.20)
2.30=32x(.05+.1+.2)
9.6=10-2x(.05+0.15)
Abutments
1st footing
2nd fotting
3rd footing
4th footing
5th footing
6th footing
Top wall
Deduct the bearing of
slab
Wing wall
1st footing
2nd fotting
3rd footing
4th footing
5th footing
6th footing
Top wall
parapet wall bottom
parapet wall top
Curtain wall
1st footing
top
4
5
6
10.9
10.9
10.9
10.9
10.9
10.9
10.9
1.1
1
0.9
0.8
0.7
0.6
0.5
0.6
0.4
0.6
0.6
0.6
0.6
0.6
14.39
8.72
11.77
10.46
9.16
7.85
6.54
m3
m3
m3
m3
m3
m3
m3
10.9
0.4
0.5
4.36
m3
4
4
4
4
4
4
4
2
2
3.2
3.2
3.25
3.35
3.45
3.55
3.65
11.3
11.3
1.1
1
0.9
0.8
0.7
0.6
0.5
0.5
0.4
0.6
0.4
0.6
0.6
0.6
0.6
0.6
0.4
0.4
8.45
5.12
7.02
6.43
5.80
5.11
4.38
4.52
3.62
m3
m3
m3
m3
m3
m3
m3
m3
m3
3.20=3.2-0.20+0.20
1st and 2nd footing
join with vertical
faceof abutment
1
1
2.7
2.8
0.5
0.4
0.6
0.4
0.81
0.45
116.24
m3
m3
m3
1
1
11
11
3.8
3
0.5
-
20.9
33
m3
m2
112
3.91
56
4.25
@ 1.58
kg/m
kg
kg
1,068
kg
136
1204
= 0.12 MT
kg
kg
11.5
m2
675.92
8mm dia distribution @
25cm c/c top & bottom
nos=2(3.8-2x0.04/0.25+1)
=2x15.58 say 32 nos
10.90=11.30(as
earth
work)-2x.2
(concrete offsets)
2
2
2
2
2
2
2
32
10.9
348.8
11.5
@ 0.39 kg/m
0.5
11.3=2(3.65+.5+1.5)
11
66
m2
2
2
4
11.3
11.3
0.5
0.4
3.8
0.9
0.4
0.4
85.88
20.34
0.8
0.64
m2
m2
2.4
7.2
166.46
m2
m2
10
30
m2
m2
DESCRIPTION OF ITEM
Earthwork in excavation of foundation trenches
of all shorts of soils including removing
spreading or stacking the spoils within a lead of
150 m as directed and including traiming the
sides of trenches levelling dressing and
ramming the bottom bailing or pumping etc.As
reqired complete depth of excavation.Exceding
1 m not exceding 2m below avarage bed level at
the side of excavation
Providing cement concrete (1:3:6) without
reinforcement in any part of abutment and wing
walls with approved stone metal of approved
type 45 mm to 22.4 mm size,screening and
cleaning of aggregate and sand as
necessary.curing in water with cost and carriage
of material but excluding cost of labour and
material of form work and reinforcement
UNI
T
QUANTI
TY
RATE
AMOUN
T
m3
93.26
95.6
8915.7
m3
28.3
4200
118860
m3
116.24
6132
712783.6
8
m3
20.9
5240
109516
m2
33
548
18084
0.12
90900
10908
m2
11.5
340
3910
m2
166.4
100
16640
m2
30
640
19200
1018817.
3
Total
Amount
TOTAL = Rs.
1018817.3
BOUNDAR
Y WALL
2
3
EARTHWORK IN
EXCAVATION IN
FOUNDATION
(A) Long wall
650
0.5
223.2
0.5
10
0.5
UNIT
QUANTIT
Y
422.5
m3
145.08
m3
3.125
564.46
m3
m3
112.891
m3
112.89
1
2
2
650
223.2
0.5
0.5
650
223.2
m2
m2
10
0.5
m2
m2
868.2
650
0.5
223.2
0.5
10
0.5
650
224.2
5
0.37
5
0.37
5
2
2
650
224.5
1
1
pillers
125mm th panels
0.6
5
0.6
5
0.6
5
Cement concrete in
foundation(1:4:8)
HEIGHT
N
O
QUANTITTOTAL
Y
DESCRIPTION OF
ITEM
BREADTH
SL
LENGTH
69
6
1
0.1
5
0.1
5
0.1
5
97.5
m3
33.48
m3
0.75
m3
m3
130.23
0.2
97.5
m3
0.2
33.64
m3
0.2
0.2
65
22.45
m3
m3
10
0.25
0.25
0.37
5
0.2
0.75
m3
10
0.25
0.2
0.5
217.34
m3
m3
3399
m3
m3
m3
0.25
1565
0.25
-
2
2
87
3312
REMAR
KS
cement plastering
pillars
panels both faces
gate pillers portions not in
contact with panels
69
6
2
1565
0.75
0.12
5
2
2
1044
1650
m3
m3
0.5
m3
m3
2694.5
DESCRIPTION OF ITEM
RATE
(RS)
AMOUN
T
(RS)
cu.
m
564.33
67
37810.1
1
cu.
m
56.11
41.6
2334.17
6
sq.
m
868.2
QUANTIT
Y
UNI
T
115.00
99843
sand
conforming zone I or II of IS- 383 of latest
edition both of approved quality as
necessary
including preparation of dressing mix and
cost for
quality control, sampling testing etc.
Vibrating
with vibrator, curing as directed. All
complete
with all labour and material bur excluding
cost
of shuttring and reinforcement as detailed
in
the specification and reinforcement as
detail in
the engineering- in - charge. Complete
( thickness
and shape as per drawing). Lintel, chajja,
apron,
footing, r-walls columnshaft, lift wall, floor
and
roof beams @ slab, parapet wall, over
laying and
coarse, stair waist and landing slab, steps,
projections weather board folded plate
etc. as
per drawing and directing from foundation
to
parepet for all levels.
M15 grade concrete for PCC
5
130.23
5516.6
718420.
3065
cu.
m
245.84
4800.4
1180130
.336
sq.
m
3312
627
2076624
cu.
m
noising,
drip course where necessary in all floors.
15mm thick plaster with( 1: 6 ) cement
morter
sq.
m
2703.5
92.25
TOTAL = Rs.
4264716.8
249397.
875
ROADS
10 m WIDE ROAD
SL.
NO
DESCRIPTION
OF ITEM
N
o.
LENGT
H
(m)
BREADT
H
(m)
HEIGHT
(m)
QUANTIT
Y
UNI
T
REMARK
S
1.
2.
Box cutting in
road cust, and
consolidating
and dressing the
sub-grade depth
above..
150 mm and up
to 300 mm
Edging:
904.5
7.7
------
6964.65
m2
10 - (2
x1.25)+
0.1x2
= 7.7
1x
2
904.5
-----
-----
1809
mm
Brick on-end
edging
overbrunt brick
laid
true to line and
level
3.
Base
cource:
904.5
7.7
----
6964.65
m2
(a)Supplying
and laying
double brick flat
soling with
overbrunt bricks
..
to
100mm
(b)Bottom
layer:(i)Supplying
overbrunt brick
metal 50
to 65 mm size
stacked at road
side at
regular intervals
(ii)Labour for
spreading and
consolidating
of brick metal
m3
1
904.5
7.5
0.15
1017.5625
904.5
7.5
0.15
1017.5625
( c) Top
layer:(i)Supplying 40
to 25 mm size
trap stone
metal and
stacked at road
side at regular
intervals
(ii)Labour for
150 mm
loose
compacte
d
904.5
7.5
0.112
759.78
m3
904.5
7.5
0.112
759.78
m3
75 mm
compacte
d when
loose
75+0.5x7
5sq m =
112sq m
spreading and
consolidation
of stone
metal
4.
Wearing
Cost:(i) Supplying
bitumen
(asphalt 80/100)
delivered and
stacked at site
. .
(ii)Supplying
trap stone chips
12 to 6.3 mm
size
delivered at site
(iii) Premixing,
laying the primix
uniformly
on W.B.M.
surface applying
tack coat
and
consolidating 25
mm thick carpet
904.5
904.5
904.5
7.5
7.5
7.5
280kg/1
00 m2
5427
kg
67.83
m3
6783.75
m2
m3/100
m2
----
2.
3.
(a.)
(b.)
UNIT
QUANTITY
RATE
(Rs)
AMOUNT
(RS)
m2
6964.65
1.40
9750.51
r.m.
1809.00
10.00
18090
m3
6964.65
50.00
348232.5
m3
1017.56
150.00
152634
m3
1017.56
26.00
26456.56
m3
759.78
130.00
98771.4
m3
759.78
30.00
22793.4
5427.00
4000.0
0
21708000
m3
67.83
210.00
14244.3
m2
6783.75
2.50
16959.375
DESCRIPTION of items
Box cutting in road crust,and
consolidating
and dressing the sub- grade depth
above
150mm and upto 300mm . .
Brick on- end edging with
overburnt bricks
laid true to line and level . .
Supplying and laying double brick
flat soling with overburnt bricks
and packed with local sand . .
(c.)
tons
TOTAL = Rs.
467171.73
6 m WIDE ROAD
1449
m2
REMARKS
UNIT
QUANTIT
Y
4.2
HEIGHT
(m)
345
6 - (2
x1)+
0.1x2
= 4.2
4.20.1x2
=4
Edging:
Brick on-end edging overbrunt
brick laid
true to line and level
N
o
(m)BREADTH
DESCRIPTION OF ITEM
(m)LENGTH
SL
.
N
O
1x
2
345
----
345
4.2
345
----
690
rm
----
1449
m2
0.15
207
m3
345
0.15
207
m3
345
0.11
155
m3
345
0.11
155
m3
345
Base cource:
(a)Supplying and laying double
brick flat
soling with overbrunt bricks
..
150 mm
loose
compact
ed
345
280kg/100
m2
3864
0.338m3 /
100m2
kg
4.66
m3
75 mm
compact
ed when
loose
345
----
1380
m2
SL
NO
.
DESCRIPTION of items
UNI
T
QUANTI
TY
RATE
(Rs)
AMOUN
T (RS)
m2
1449.00
1.40
2028.60
r.m.
690.00
10.00
6900.00
m3
1449.00
50.00
72450.00
m3
207.00
150.0
0
31050.00
m3
207.00
26.00
5382.00
m3
154.56
130.0
0
20092.80
m3
154.56
30.00
4636.80
4000.
00
210.0
0
15456000
.00
2.50
3450.00
tons
3864.00
m3
4.66
m2
1380.00
979.44
TOTAL = Rs.
254130.54
2 m WIDE ROAD
EST
61
9
-----
1238
1
x
2
61
9
-----
-----
1238
61
9
-----
1238
61
9
1.8
0.15
167.13
61
9
1.8
0.15
167.13
m
2
REMARKS
QUANTITY
UNIT
(m)HEIGHT
N
O.
(m)BREADTH
DESCRIPTION OF
ITEM
LENGTH (m)
SL
.
N
O.
r
m
m
2
61
9
1.8
0.11
2
124.79
04
m
3
150 mm
loose
compacte
d to
100 mm
m
3
m
3
75
compacte
d
when
loose
75+1/2x75
m2
=112 mm
(ii)Labour for
spreading and
consolidation of stone
metal
4
61
9
124.79
04
61
9
1.80@
280 kg
per 100
sqm
3119.7
6
k
g
61
9
1.80@ .
338 cum
per 100
sqm
3.765
61
9
1.8
1.8
0.11
2
-----
1114.2
m
3
m
2
DESCRIPTION of items
UNI
T
QUANTI
TY
RATE
(Rs)
AMOUNT
(RS)
m2
1238.00
1.40
1733.20
r.m.
1238.00
10.00
12380.00
m3
1238.00
50.00
61900.00
m3
167.13
150.00
25069.50
m3
167.13
26.00
4345.38
m3
124.79
130.00
16222.70
m3
124.79
30.00
3743.70
3119.76
4000.0
0
12479040.
00
m3
3.77
210.00
790.65
m2
1114.20
2.50
2785.50
tons
TOTAL = Rs.
226066.92
SURFACE
DRAIN
This discharge =
1
36
1
2
x k x Pc x A =
cumec.
(Where, PC = Critical design rainfall intensity = 4cm/hour (assume) & k =
0.55 (assume)
According to N.B.C if the discharge is <15 cumec. Then, Y = 0.5 x B
We know that, V = (
kR sR
n
R (m)
0.217
1 in 600
0.98 m/sec
2 to 2.5 m/sec
0.337
1 in 600
1.32 m/sec
Do
0.480
1 in 600
1.66 m/sec
Do
DESCRIPTION
OF ITEM
N
O
LENGT
H
BREADT
H
HEIGH
T
QUANTIT
Y
TOTAL
QUANTIT
Y
UNIT
SL
.
N
O
Earthwork in
1. excavation in
foundation in
any kind of
soil
5658.7
4
1.1
0.7
4357.23
4357.23
m3
1.1
6224.61
6224.61
m3
1.1
0.125
778.08
778.08
m3
0.25
0.5
707.34
707.34
m3
0.5
2829.37
m3
0.25
1414.69
m3
2. S.B.F.S
Cement
3. Concrete
4. 250mm thick
Brickwork
5. Plastering
(a.) Inner
surface
(b.) Outer
surface
1
1
5658.7
4
5658.7
4
5658.7
4
5658.7
4
5658.7
4
4244.06
m3
REMARKS
DESCRIPTION OF ITEMS
1. Earthwork in excavation
Earthwork in excavation of
trenches in any kind of soil
including trimming the sides of
trenches, leveling, dressing and
ramming the bottom and bailing
out normal seepage of water.
2. Single layer brick flat soling
Single brick flat soling with picked
jhama bricks in steps etc.
including ramming and dressing
bed to proper level and filling
joints with local sand complete in
all respects with all labour and
materials.
3. Cement concrete in
foundation(1:3:6)
Cement concrete with or without
reinforcement with graded clean
coarse aggregate nominal size 20
mm down mixed with coarse
clean sand conforming Zone I or
Zone II of IS-383 of latest edition
both of approved quality as
necessary including preparation
of design mix and cost for quality
control, sampling, testing etc.
Vibrating with vibrator, curing as
directed. All complete with all
labour and matirials but
excluding cost of shuttering and
reinforcements as detailed in the
specifications and as directed by
the Engineer-in-charge. Complete
(Thickness and shape as per
drawing). To lintel, chajja, apron,
footing, R.walls column shaft, lift
wall, floor and roof beams &
slabs, parapet wall, over laying &
course, stair waist and landing
slab, steps, projections, weather
board, folded plate etc. as per
drawing & directions from
Foundation to parapet for all
levels.
UNI
T
QUANTI
TY
RATE
(Rs)
AMOUN
T (RS)
Cum
4357.229
8
41.87
182437.2
1
Sq.
m
6224.614
105.00
653584.4
7
Cum
778.0767
5
3011
2342789.
09
Cum
707.3425
1959.0
0
1385683.
96
Sq.
m
4244.055
53.00
224934.9
2
TOTAL = Rs.
4789429.65
SPECIFICATION
(1) FIRST CLASS BRICK
Brick should be made from good earth; free from all traces of salt
patriot other salts. They should be uniform deep red, cherry or copper
color, toughly burnt without being verified. They should be hard, sound
and uniform size and shape having each two adjacent plane surfaces at
true right angels. The brick should be free from cracks, chips, flaws, or
humps of any kind. They should not show any signs of efflorescence either
in dry state or after soaking in water.
(2) CEMENT
The cement used for reinforced concrete works shall be ordinary
Portland cement conforming to I.S. 269 up-to-date or blast furnace slag
cement conforming to I.S. 455-1962.The minimum compressive strength
of ordinary Portland cement as per I.S.269 should be 175kg/cm 2 after 7
days should be 25 kg/cm2. The initial setting time should not be less than
30 minutes and the final setting time should not be more than 10 hours.
(3) SAND
The fine aggregate (sand) shall confirm to either I.S. 383-1963 I.S. 515
up-to-date. It shall be clean, sharp, heavy and gritty to touch. Sand should
be free from clay, mica vegetable and organic matter. River and pit sand
should be used as this does not contain common salt in large quantities.
Sand must be cleaned by screening before its use.
(4) WATER
In concrete works the water used for both mixing and curing shall be
free from injurious amounts of deleterious materials. Potable water is
generally considered satisfactory for mixing and curing concrete.
(5) REINFORCEMENT
The reinforcement shall be of mild steel and medium tensile wire,
confirming to I.S. 432-1960 or cold twisted bars conforming i.s.1786-1961
or deformed steel bars confirming to I.S. with up-to-date modification.
All reinforcement shall be clean and free form loose mill scales,
duets, and coats of paints ,oil or other coatings which may destroy or
reduce bond . Welded joints in reinforcement may be used but in cases of
important connection.
QUALITY OF AGGREGATE
20 MM NOMINAL SIZE
80(MM)
ALL IN AGGREGATE
GRADING
PERCENTAGE
PASSING 40mm
NOMINAL SIZE
100
40
90-100
100
20
45-75
95-100
4.75
25-45
30-50
600
8-30
10-35
150
0-6
0-6
----
(7) EARTHWORK
TRENCHES :
IN
EXCAVATION
OF
FOUNDATION
A) Before the earthwork is started the whole area where the work to
be done shall be cleaned or grass, roots of trees and other organic
matter.
B) The excavation shall be carried out exactly in accordance with the
dimensions shown on the drawing.
C) Sides of the trenches shall be vertical and its bottom shall be
perfectly leveled, both longitudinally and transversely.
D) If the excavation is in earth, the bottom of the trenches shall be
sprinkled with a little water and rammed. Any excess digging or
any portion of bad soil or hollows shall be removed by planning
concrete.
All brick gap shall be filled up with local fine sand or dry loose
C) Bricks bat have to provide in brick joints, shall be placed at the
edge of the trenches.
D) The finished surface shall be leveled both longitudinally and
transversely.
b) PROPORTIONING:
Proportion of cement, sand and coarse
aggregate shall be 1:2:4 or as specified.
c) HAND MIXING: The mixing shall be done on clean water tight
platform sand and cement mixing together with spade turning the mixture
over and over again. The material shall be mixed in a drum for a period of
not less than 2 minutes and until a uniform color and consistency are
obtained.
The quantity of water to be used for each mixed of 50 kg.
Cement to give the required consistency shall not be more than 34
liters for 1:3:6 mix, 30 liters for 1:2:4 mix, 27 liters for 1:1.5:3 mix.
and 25 liters for 1:1:2.
d) LAYING: The entire concrete used in work shall be laid gently
in layers not exceeding 15cm and shall be thoroughly vibrated by
means of mechanical vibrators, still a dense concrete is obtained.
C)
D) PLACING OF CONCRETE
MATERIALS FOR CONCRETE: Same as cement concrete except
the size of coarse aggregate shall be 20 mm. Unless specifies
mentioned in the type of work.
PROPORTINING OF CONCRETE: Same as cement concrete.
(16) ARTIFICIAL STONE FLOORING:The ingredients are cement sand and stone chips in the proportion
1:2:4 or as specified. (This is also known as patent stone flooring
when crushed blast surface slag is used as coarse aggregate).
(A)
MATERIALS:- Coarse aggregate shall be stone chips, well
graded from 12mm down, free from dust, dirt etc. Hard and rough
sand shall be coarse 5mm.maximum size, clean free from dirt etc.
Cement shall be fresh Portland cement. All the materials as stated
above and water shall completely with their respective standard
specification.
(B)
SUBGRADE:- The subgrade shall be provided with the slopes
required from the flooring. Flooring in the verandah, kitchen, baths,
W.C. and courtyards shall invariably be provided with suitable slope
to drain off waste rain water. Plinth masonry offset shall be
depressed so as to allow the subgrade concrete to rest on it.
(C)
PROPORTIONING AND MIXING:- Usual proportion of
cement, sand and coarse aggregate shall be 1:2:4 or as specially
mentioned. Mixing of concrete shall be done by hand or by
mechanical mixture. In case of hand mixing the cement and sand
shall be mixed at first in dry mixture and further be mixed with dry
coarse aggregate still the coarse aggregate is well coated with dry
mix. Of cement and sand.
(D)
LAYING: - Flooring of specified thickness shall be laid in the
pattern as given in the drawing or as directed by engineer-in
charge. The panel shall be of uniform size and no dimension of
panel shall exceed 2m and the area of panels shall be more than
2sq.m. the whole operation of laying in one panel shall be
completed within 30 minutes.
(E)
SHUTTERING:- The panels shall be bounded by wooded
battens. The battens shall have the same depth as the concrete
flooring. These shall be fixed in position, with their top at proper
level, giving required slopes. The surface of the battens that come
in contact with concrete shall be oiled with raw linseed oil or a coat
of soap solution may be applied before casting the concrete.
(F)
CASTING OF CONCRETE:- the concrete shall be placed
gently and
evenly spread within the panel and thoroughly
compacted with wooden thapiesto the required thickness. The
surface shall then be removed on the next day of the laying of
cement concrete. The ends thus exposed shall be repaired, if
damaged, with cement mortar 1:2 and allowed to set for a
minimum period of 24 hours.
(G)
FINISHING: - the surface shall be left for some time, still
moisture disappears from it. Excessive trowelling shall be avoided.
Use of dry cement or cement and sand mixture sprinkled on the
surface to stiffen the concrete or absorbed excessive moisture,
A) MATERIALS:
1) Coarse aggregate shall be of well brunt first class brick balllestof
uniform deep cherry or copper colours. It shall be homogeneous in
texture and roughly cubical in shape. It must not be pours or with
any sign of saltprtre. It shall be free from dust , dirty , or other
vegetable matters and shall pass through 25mm dia, ring but retain
on 6mm.squares mesh screen. It shall be well graded.
2) Fine aggregate shall be of surki grounded form new first class bricks
and shall pass through a screen 25 meshes per sq.m. surki shall be
of uniform colour, free form dirt, vegetable or other foreign matters.
3) Lime shall be freshly brunt stoke lime and shall be free form ash ,
unburnt stone specifications. Paricles or other foreign matters.lime
shall be screened at site of work through a sieve of work 3 meshes
per sq.cm. Besides these , all the material including water shall be
of standard.
B) PROPORTIONING: - The proportion of ingredients shall be 35cm x
25cm x 40cm. Wheel measuring aggregate shaking, ramming or
heaping may be done. The proportion may be 2 parts lime 2 parts
course aggregate or as specified.
C) MIXING:- The mixing shall be done on a clear solid platform. Brick
aggregate shall be well soaked with clean water for not less than 3
hours before mixing and it shall be stacked evenly on the platform.
D) LAYING:- The R.C.C roof slab over which lime-tracing is to be laid
shall be at least 28 days old. The surface of R.C. shall be cleaned
and shall be moisture by soaking clear water before laying concrete.
Concrete shall than be laid (not thrown) on the roof slab in a single
layer about 20% thicker than specified for consolidation with slope
(minimum 1in 50) towards gutter.
E) FINISHING:- The surface shall be softened by sprinkling pure water
and the mortar which is brought to the surface by beating shall
then be render smooth and finished off with lime rubbed with the
face a trowel. On no account plastering shall be used on the surface
with lime putty which prepared form lime and surki (1:1) may be
used if the mortar is found insufficient to the surface pores.
F) CURING:- The roof shall be kept wet for at least 10 days. Inter
mittently spraying water not some intervals on straw or old gunny
badges or fine sand laid on the roof.
MARKACTIVITY
EVENT
MARK
PROJECT PLANNING
ACTIVITY
1-2
2-3
PROJECT MOBILIZATION
3-4
4-5
COMPLETION OF CULVERT
5-8
5-6
6-7
8-9
8-11
7-9
9-10
STARTIN
G
DATE
ENDING
DATE
TIME
PERIO
D
02.05.20
11
15.05.20
11
12.06.20
11
10.07.20
11
31.07.20
11
31.07.20
11
01.09.20
11
01.02.20
12
01.02.20
11
24.11.20
11
23.02.20
12
15.05.20
11
12.06.20
11
10.07.20
11
31.07.20
11
01.02.20
12
01.09.20
11
24.11.20
11
23.02.20
11
20.06.20
12
23.02.20
12
15.03.20
12
2
Weeks
4
Weeks
4
Weeks
3
Weeks
24
Weeks
5
Weeks
3
Weeks
3
Weeks
20
Weeks
13
Weeks
3
Weeks
10-11
11-12
12-13
PLAYGROUND DEVELOPMENT
13-14
COMPLETION OF LIBRARY
14-15
12-14
COMPLETION OF MARKET
ELECTRIFICATION, PLUMBING, SANITARY
OF COMPLETED LIBRARY
15-16
16-17
17-18
14-18
18-20
20-21
16-19
19-22
22-23
CLEANING
15.03.20
12
20.06.20
12
11.07.20
12
17.07.20
12
30.08.20
12
11.07.20
12
18.10.20
12
01.11.20
12
15.11.20
12
30.08.20
12
15.12.20
12
31.12.20
12
01.11.20
12
11.04.20
13
25.04.20
13
20.06.20
12
11.07.20
12
17.07.20
12
30.08.20
12
18.10.20
12
30.08.20
12
01.11.20
12
15.11.20
12
15.12.20
12
15.12.20
12
31.12.20
12
06.01.20
13
11.04.20
13
25.04.20
13
28.04.20
13
14
Weeks
4
Weeks
1 Week
6
Weeks
7
Weeks
7
Weeks
2
Weeks
2
Weeks
4
Weeks
15
Weeks
2
Weeks
1
Weeks
23
Weeks
2
Weeks
2 Days
CPM ANALYSIS
PATH
NO.
1.
2.
3.
4.
5.
CHAIN
TIME SCHEDULE
(WEEKS)
1-2-3-4-5-8-9-10-11-12-13-14-1516-19-22-23
1-2-3-4-5-6-7-9-10-11-12-13-14-1516-17-18-20-21
1-2-3-4-5-8-11-12-13-14-15-16-1718-19-20-21
1-2-3-4-5-8-9-10-11-12-14-15-1617-18-19-20-21
1-2-3-4-5-8-9-10-11-12-13-14-1820-21
2+4+4+3+24+3+3+14+4+7+7+2+2
3+2+1
2+4+4+3+5+3+13+3+14+4+1+6+7
+2+2+4+2+1
2+4+4+3+24+20+4+1+6+7+2+2+4
+2+1
2+4+4+3+24+3+3+14+4+7+7+2+2
+4+2+1
2+4+4+3+24+3+3+14+4+1+6+15+
2+1
TOTAL
TIME
(WEEKS)
103
80
86
86
86
6.
7.
8.
9.
10.
11.
12.
1-2-3-4-5-6-7-9-10-11-12-14-18-2021
1-2-3-4-5-6-7-9-10-11-12-14-15-1617-18-19-20-21
1-2-3-4-5-8-11-12-13-14-15-16-1922-23
1-2-3-4-5-8-9-10-11-12-14-15-1619-22-23
1-2-3-4-5-8-11-12-14-15-16-19-2223
1-2-3-4-5-6-7-9-10-11-12-13-14-1516-19-22-23
1-2-3-4-5-6-7-9-10-11-12-14-15-1619-22-23
2+4+4+3+5+3+13+3+14+4+7+15+
2+1
2+4+4+3+5+3+13+3+14+4+7+7+2
+2+4+2+1
2+4+4+3+24+20+4+1+6+7+2+23+
2+1
2+4+4+3+24+3+3+14+4+7+7+2+2
3+2+1
2+4+4+3+24+20+4+7+7+2+23+2+
1
2+4+4+3+5+3+13+3+14+4+1+6+7
+2+23+2+1
2+4+4+3+5+3+13+3+14+4+7+7+2
+23+2+1
80
80
103
103
103
97
97
The least total time required to complete all the works that fall on path
(3,4,5) is 86 weeks and path (2,6,7) is 80 weeks and path (11,12) is 97
weeks. But works of other routes cannot be completed in 97 weeks which
is the maximum time required among these paths. The maximum total
duration for path (1), (8), (9) and (10) is 103 weeks.
In 103 weeks all the works which fall along any other paths can be
completed. Hence total project time is 103 weeks which has a maximum
duration among all other paths.
Therefore, the total project time may be defined as the maximum time
among all the paths required for passing from initial starting point or
event up to the completion point or event.
BIBLIOGRAPHY
REFERENCE BOOKS: In order complete the project we have used the
following books IS 456:2000; SP-34 detailing; IS-875:1987 (Part 1&2); SP16; R.C.C.Design (S.Rammamurtham, Menon & Pillai), Costing & estimate
& drawing M.Chakraborty.
METHOD OF DESIGN: We have design the beam, column, slab, footing
etc. in LIMIT STATE METHOD.
MEANING
AREA
DL
DEAD LOAD
ES
FCK
CHARACTERISTICS
CUBE
STRENGTH OF CONCRETE
FY
LL
LEFF
COLUMN
EFFECTIVE
LX
LY
TOTAL LOAD
MODULAS OF SECTION
RR
sc
BD
BENDING MOMENT
TENSIONAL MOMENT
SPAN
OF
COMPRESSIVE
BEAM,
SLAB
OR
SHEAR FORCE
DISTRIBUTION LOAD
ANGLE
ACKNOWLEDGEMENT
An attempt has been made to prepare a Civil
Engineering Project report which will explain briefl y about the MIG
building, School building & also an overall Township including
playground, roads, water reservoir, community hall, surface drain,
with all necessary drawing, detailing & estimate with abstract
wherever is necessary & according to syllabus. The unique feature