Professional Documents
Culture Documents
Thickness
(M)
Rs
In
Lacs
30
7.5
2.50
2.85
Cum
1575.00
Curtain wall
30
2.50
1.00
0.55
Cum
41.25
Drop Wall
30
2.5
1.0
0.55
Cum
41.25
Catch Pit
30
1.5
1.50
Cum
135.00
Total
2
Amount
Np
1793.00
162.89
2.92
3656.41
5.91
30
7.50
1.30
0.10
cum
29.25
Cradle
30
7.50
2.20
0.15
cum
74.25
Catch Pit
30
5.40
2.0
0.15
cum
48.60
Parapet
30
1.0
(0.60+0.45)
2
0.60
cum
9.45
Total
Polygonal/ random rubble masonry uncoursed/ brought
to course in cement sand mortar 1:6 mix with quarry
stones in foundation and plinth including cost of bond
stones and leveling up at specified levels with M-5 grade
using stone aggregate 20mm nominal size.
161.55
Curtain Wall
30
2.50
Drop Wall
30
2.50
( 1.0+0.60)
2
( 1.0+0.60)
2
2.65
cum
159.00
2.65
cum
159.00
Total:
Providing & laying of Cement Concrete M-20 nominal
mix for coping .(40mm thick) Arch.
318.00
2876.18
9.15
268.32
0.40
47.05
0.19
679.50
300.00
2.04
Rm
225.00
6798.19
15.30
Cum
450.00
1161.3
5.23
Curtain Walll
30
2.50
Rm
Drop Wall
30
2.50
Rm
Total:
5
75.00
150.00
Curtain Walll
30
2.50
2.65
sqm
198.75
Drop Wall
30
2.50
2.65
sqm
198.75
Total
6
75.00
397.5
30 x 4
1.50
2.00
sqm
360.00
cradle
30x 2
7.50
0.55
sqm
247.50
parapet
30
1.0
2.40
sqm
72.00
Total:
Providing and laying of reinforeced cement concrete
pipes MP-3as per design in single row including fixing
collor with cement mortar 1:2 but excluding excavation
,protection works,backfilling, concrete masonary work in
head walls and parapets clause 1106.
a) 1000 mm dia
30
7.50
30
6.00
a)
2.50
1.00
b)
cum
147.07
43.27
0.06
10
a)
Surface road(50Kms)
Gravel Road(5.0Kms)
tkm
tkm
13236.30
b)
1323.60
4.03
4.85
0.53
0.06
total
Haulage of Sand from Johama for 70 Km Av Lead =
206.36 cum @ 1.60t/ cum = 330.17t
Cum
206.36
71.65
0.15
tkm
4.03
0.86
tkm
21461.44
1650.85
4.85
0.08
65.01
89.00
0.06
Tkm
8451.3
4.03
0.34
11
Gravel Road(5.0Kms)
12
13
14
Unloading of cement
Tkm
t
NO
325.05
4.85
0.02
65.01
89.00
0.06
90
59.54
0.05
29250.00
1125.00
4.03
4.85
1.18
0.05
90
284.29
0.26
Total
44.90
Tkm
Tkm
NO
Executive Engineer