Professional Documents
Culture Documents
Description Of Item
District: Bandipora
Block:Amount
Bandipora.
Unit
Quantity Rate/Unit
(Rs.In lacs)
Cum
2279.80
58.53
133436.69
Cum
1943.27
47.48
92266.46
Cum
742.50
749.47
556481.48
Cum
555.26
1330.45
738745.67
B Pavements:
1 Granular sub-base course with local material
(Table 400.13 )by, mix in place method
normal construction of granular sub base by
providing local material spreading in uniform
layers with motor grader on prepared surface
mixing by mix in place method , with rotavator
at OMC , and compacting with smooth wheel
roller
to achieve the desired density,
complete
as
per
Technical
.Specification.Clause 408. (Using naturally
occuring gravel)
2 Providing, laying, spreading , by manual
means & compacting stone aggregates of
specific sizes to water bound macadam
specification including spreading in uniform
thickness, hand packing, rolling with smooth
wheel roller 80-100 KN static roller in stages
to proper grade & camber, applying &
brooming, stone screening/binding materials
to fill up the interstices of coarse aggregate,
watering & compacting to the required density
Grading 2nd as per Technical Specification
Clause 405.
Page 2
Cum
1423.69
1390.95
1980281.61
Sqm
18982.50
31.57
599277.53
Cum
949.13
5461.60
5183768.41
Sqm
18982.50
9.37
177866.03
Sqm
18982.50
108.00
2050110.00
Page 3
18982.50
38.51
731016.08
Cum
742.50
43.27
32127.98
Cum
742.50
8.50
6311.25
Cum
1978.00
43.27
85588.06
Cum
1978.00
8.50
16813.00
Cum
494.48
43.27
21396.15
494.48
8.50
4203.08
157.92
22.42
3540.57
157.92
8.50
1342.32
14256.00
4.03
57451.68
48535.00
4.03
195596.05
12201.00
4.03
49170.03
3335.00
4.03
13440.05
1594.40
4.03
6425.43
164958.32
4.03
664782.03
341.60
86560.00
17768.00
4.03
4.03
4.03
1376.65
348836.80
71605.04
C Earthern Shoulders:
Page 4
Cum
1868.06
185.95
347365.76
Cum
Cum
1868.02
1868.02
22.42
8.50
41881.01
15878.17
Cum
574.28
162.89
93544.47
88.35
3656.41
323043.82
226.58
3712.44
841164.66
Cum
283.43
43.27
12264.02
Cum
283.43
8.50
2409.16
Cum
125.97
43.27
5450.72
Cum
MT
125.97
91.94
8.50
89.00
1070.75
8182.66
91.94
89.00
8182.66
MT
6972.44
4.03
28098.93
2317.85
4.03
9340.94
919.40
4.03
3705.18
Page 5
459.20
162.89
74799.09
57.40
3656.41
209877.93
506.97
2876.18
1458136.97
293.11
1938.18
568099.94
442.80
1010.54
447467.11
410.00
268.32
110011.20
Cum
Cum
800.07
800.07
43.27
8.50
34619.03
6800.60
Cum
73.80
43.27
3193.33
Cum
73.80
8.50
627.30
Cum
235.59
43.27
10193.98
Cum
MT
MT
235.59
69.11
69.11
8.50
89.00
89.00
2002.52
6150.79
6150.79
Tkm
24962.18
4.03
100597.59
Tkm
1815.48
4.03
7316.38
Page 6
4334.78
4.03
17469.16
691.10
4.03
2785.13
Cum
316.51
162.89
51556.31
5.04
793.33
3998.38
13.73
3656.41
50202.51
Cum
198.56
3712.44
737142.09
RM
58.48
5540.17
323989.14
184.42
1010.54
186363.79
189.46
43.27
8197.93
189.46
8.50
1610.41
Cum
191.06
43.27
8267.17
Cum
191.06
8.50
1624.01
Cum
84.92
43.27
3674.49
Cum
84.92
8.50
721.82
MT
66.56
89.00
5923.84
II
Cum
Page 7
66.56
89.00
5923.84
No.
24.00
35.72
857.28
No.
24.00
236.91
5685.84
3637.60
4.03
14659.53
4700.04
4.03
18941.16
1562.50
4.03
6296.88
656.60
4.03
2646.10
2730.00
4.03
11001.90
MT
79.08
162.89
12881.34
0.92
793.33
729.86
2.74
3656.41
10018.56
Cum
28.39
3712.44
105396.17
RM
7.31
6798.19
49694.77
Page 8
67.81
1010.54
68524.72
68.73
43.27
2973.95
68.73
8.50
584.21
Cum
28.00
43.27
1211.56
Cum
28.00
8.50
238.00
Cum
12.45
43.27
538.71
Cum
12.45
8.50
105.83
MT
9.68
89.00
861.52
MT
9.68
89.00
861.52
No.
3.00
35.72
107.16
No.
3.00
284.29
852.87
1319.60
4.03
5317.99
688.80
4.03
2775.86
229.06
4.03
923.11
96.80
4.03
390.10
441.00
4.03
1777.23
103.13
749.47
77292.84
Cum
Page 9
364.76
179.18
65357.70
Cum
24.62
749.47
18451.95
24.62
3656.41
90020.81
Cum
493.17
4204.23
2073400.11
Cum
48.03
5218.34
250636.87
7 Supply
fitting and placing HYSD
reinforcement (Fe 415)
in substructure
complete as per drawing and technical
specification Clause 1002,1005,1010 and
1202. .
Ton
14.41
48348.62
696703.61
220.00
1010.54
222318.80
Cum
509.24
43.27
22034.81
Cum
509.24
8.50
4328.54
Page 10
226.33
43.27
9793.30
Cum
MT
MT
MT
MT
226.33
231.99
231.99
14.41
14.41
8.50
89.00
89.00
95.06
95.06
1923.81
20647.11
20647.11
1369.81
1369.81
Cum
347.75
43.27
15047.14
347.75
8.50
2955.88
Tkm
6676.80
4.03
26907.50
Tkm
12527.28
4.03
50484.94
Tkm
4164.40
4.03
16782.53
2319.90
4.03
9349.20
Tkm
144.10
4.03
580.72
No
1.00
9189.74
9189.74
No
5.00
2685.61
13428.05
No
2.00
15000.00
30000.00
Road Furniture:
Page 11
No
98.00
370.05
36264.90
No
No
5.00
1.00
1373.11
2722.30
6865.55
2722.30
No
20.00
7452.57
149051.40
No.
20.00
2685.61
53712.20
GRAND TOTAL:
24346826.34
Page 12
G Routine maintenance after completion of Contractor to quote lump sum rate / amount for each year
construction works, for five years.
Ist
Description of item with brief specification and
reference to MOST / IRC Specification.
year
2nd Year
3rd year
4th. Year
5th. Year
1 Removal of slips from road surface and its
disposal
2 Maintenance of bitumen surface road and/or
gravel road and/ or WBM road including filling
of pot holes and patch repairs etc. as per
clause 1904,1905 and 1906 of the
specification.
3 Making up of Berms / shoulders , stooring
excess soil from the shoulder surface to
achieve the required level as per clause
1903. of the specification.
4 Restoration of berms,/ restoration of rain cuts
with soil mooram gravel etc as per clause
1902 of the specification.
5 White washing guard stones , refixing
displaced guard stones , clearance of CD
works and white wash parapets of CD works
as per clause 1911 of the specification
6 White washing and geroo painting of trunks of
trees cutting of branches of trees, clearing of
wild seasonal growth on berms etc. as per
clause 1914 of the specification.
7 Maintenance of drains as per clause 1907 of
the specification.
8 Maintenance of culverts and cause ways as
per clause 1908 and 1909 of the
specification.
9 Maintenance of road signs as per clause
1910 of te specification.
10 Maintenance of kilometer stones as per
clause 1912 of the specification.
11 Clearance of snow and providing adequate
passing places at the rate of four passes per
kilometer.
TOTAL AMOUNT FOR FIVE YEARS. (In Figures.) 7% of the Total Cost:(In
Words.)
TOTAL BID PRICE:- (In Figures.)
(In Words.)
Head Draftsman
1704277.84
26051104.18
Rs. Two hundred sixty lacs and fifty one
thousand one hundred and four only.
AEE
Executive Engineer
PMGSY Division
Page 13
Baramulla
Page 14
Description Of Item
District: Bandipora
Block: Hajin.
Unit
Quantity Rate/Unit
Amount
(Rs.
In lac)
Cum
1235.55
58.53
72316.74
Cum
988.44
47.48
46931.13
Cum
7246.34
199.29
1444123.10
Cum
7246.34
22.42
162462.94
Cum
7246.34
8.50
61593.89
Cum
520.00
1330.45
691834.00
B Pavements:
1 Providing, laying, spreading , by manual
means & compacting stone aggregates of
specific sizes to water bound macadam
specification including spreading in uniform
thickness, hand packing, rolling with smooth
wheel roller 80-100 KN static roller in stages
to proper grade & camber, applying &
brooming, stone screening/binding materials
to fill up the interstices of coarse aggregate,
watering & compacting to the required density
Grading 2nd as per Technical Specification
Clause 405.
Page 15
Cum
2115.91
1390.95
2943125.01
Sqm
28212.15
31.57
890657.58
Cum
1410.61
5461.60
7704187.58
Sqm
28212.15
9.37
264347.85
Sqm
28212.15
108.00
3046912.20
Page 16
Sqm
28212.15
38.51
1086449.90
Cum
2635.91
43.27
114055.83
Cum
2635.91
8.50
22405.24
Cum
665.00
43.27
28774.55
Cum
665.00
8.50
5652.50
Cum
210.00
22.42
4708.20
Cum
210.00
8.50
1785.00
Tkm
10216.76
4.03
41173.54
Tkm
52051.42
4.03
209767.22
Tkm
15740.00
4.03
63432.20
Tkm
3671.00
4.03
14794.13
Tkm
1481.14
4.03
5968.99
Tkm
152063.52
4.03
612816.00
Tkm
317.39
4.03
1279.08
Tkm
80404.63
4.03
324030.66
Tkm
16504.11
4.03
66511.56
Cum
2779.70
185.95
516885.22
C Earthern Shoulders:
1 Construction of sub grade and earthen
shoulders with approved material obtained
from barrow pits with all lifts and leads ,
transporting to site , spreding , grading to
required slope and compacted to meet
requirement of table 300.20. With lead upto
1000m as per technical speification
clause.303.1
Page 17
Cum
Cum
2779.70
2779.70
22.42
8.50
62320.87
23627.45
Page 18
Cum
503.75
162.89
82055.84
77.50
3656.41
283371.78
198.75
3712.44
737847.45
Cum
248.63
43.27
10758.22
Cum
248.63
8.50
2113.36
Cum
124.31
43.27
5378.89
Cum
MT
MT
124.31
89.00
8.50
89.00
1056.64
7921.00
89.00
89.00
7921.00
Tkm
6116
4.03
24647.48
Tkm
3659
4.03
14745.77
Tkm
322.60
4.03
1300.08
Works:
I Retaining Wall:(620 Mtr.)
Page 19
Cum
694.40
162.89
113110.82
86.80
3656.41
317376.39
767.80
2876.18
2208331.00
450.68
1938.18
873498.96
669.60
1010.54
676657.58
620.00
268.32
166358.40
Cum
ii)Unloading of stones by mechanical means. Cum
iii)Loading of stone agg. by mechanical
Cum
1218.47
43.27
52723.20
1218.47
8.50
10357.00
111.60
43.27
4828.93
Cum
111.60
8.50
948.60
Cum
1026.32
43.27
44408.87
Cum
1026.32
8.50
8723.72
means.
iv)Unloading of stone agg by mechanical
means.
MT
107.32
89.00
9551.48
MT
107.32
89.00
9551.48
b) Haulage of Stones,Stone
aggregate,Sand and Cement.
i) Stone from Sadrakote for an av. Lead of 8
Km.
Tkm
25344.27
4.03
102137.41
Tkm
2745.36
4.03
11063.80
20786.85
4.03
83771.01
Page 20
Tkm
429.29
4.03
1730.04
Page 21
791.20
162.89
128878.57
12.60
793.33
9995.96
34.40
3656.41
125780.50
Cum
276.00
3712.44
1024633.44
RM
146.20
5540.17
809972.85
681.60
1010.54
688784.06
694.20
43.27
30038.03
694.20
8.50
5900.70
279.40
43.27
12089.64
279.40
8.50
2374.90
124.20
43.27
5374.13
Cum
MT
MT
124.20
8.50
1055.70
96.00
89.00
8544.00
96.00
89.00
8544.00
No.
60.00
35.72
2143.20
Page 22
No.
60.00
236.91
14214.60
10662.40
4.03
42969.47
6873.60
4.03
27700.61
Tkm
3657.60
4.03
14740.13
Tkm
384.00
4.03
1547.52
Tkm
4880.00
4.03
19666.40
Cum
632.64
162.89
103050.73
7.36
793.33
5838.91
21.92
3656.41
80148.51
Cum
227.12
3712.44
843169.37
RM
58.48
6798.19
397558.15
542.48
1010.54
548197.74
Page 23
549.84
43.27
23791.58
549.84
8.50
4673.64
224.00
43.27
9692.48
224.00
8.50
1904.00
99.60
43.27
4309.69
Cum
MT
MT
99.60
8.50
846.60
77.44
89.00
6892.16
77.44
89.00
6892.16
No.
24.00
35.72
857.28
No.
24.00
284.29
6822.96
8445.44
4.03
34035.12
6124.40
4.03
24681.33
Tkm
2932.24
4.03
11816.93
Tkm
309.76
4.03
1248.33
Tkm
2520.00
4.03
10155.60
Cum
82.50
749.47
61831.28
Page 24
291.81
179.18
52286.52
19.70
3656.41
72031.28
Cum
394.52
4204.23
1658652.82
Cum
38.44
5218.34
200592.99
11.52
48348.62
556976.10
176.00
1010.54
177855.04
407.36
43.27
17626.47
407.36
8.50
3462.56
181.04
43.27
7833.60
Cum
MT
MT
MT
MT
181.04
185.56
185.56
11.52
11.52
8.50
89.00
89.00
95.06
95.06
1538.84
16514.84
16514.84
1095.09
1095.09
Cum
258.50
43.27
11185.30
Page 25
258.50
8.50
2197.25
3970.00
4.03
15999.10
Tkm
11134.96
4.03
44873.89
Tkm
3997.36
4.03
16109.36
Tkm
742.24
4.03
2991.23
Tkm
46.08
4.03
185.70
No
1.00
9189.74
9189.74
No
8.00
2685.61
21484.88
No
2.00
15000.00
30000.00
No
146.00
370.05
54027.30
F Road Furniture:
1
Page 26
No
No
8.00
2.00
1373.11
2722.30
10984.88
5444.60
No
30.00
7452.57
223577.10
No.
30.00
2685.61
80568.30
34895434.00
GRAND TOTAL:
G Routine maintenance after completion of Contractor to quote lump sum rate / amount for each
construction works, for five years.
year
Description of item with brief specification and
reference to MOST / IRC Specification.
Ist year
2nd Year
3rd year
4th. Year
Page 27
2442680.38
37338114.38
(In Words.)
Signature of the
Firm/Contractor
Head Draftsman
AEE
Executive Engineer
PMGSY Division
Baramulla
Page 28
District: Baramulla
Block: Wagoora
Package No. JK03WB02
S.No
Description Of Item
Unit
A. Pavements:
1 Scarifying Existing Bituminous road Surface to a
Depth of 150 mm and disposal of scarified
material with a lift upto 3 m and laed upto 1000
m as per Technical Specification Clause 301.4.
Sqm
Quantity
Rate/Unit
Amount
(Rs. In
lac)
6562.50
8.99
58996.88
Cum
4659.41
749.47
3492088.01
Cum
1670.06
1390.95
2322969.96
22267.50
31.57
702984.98
1113.38
5461.6
6080836.21
Cum
Page 29
22267.50
9.37
208646.48
22267.50
108.00
2404890.00
22267.50
38.51
857521.43
Cum
4659.41
43.27
Cum
4659.41
8.5
201612.67
39604.99
Tkm
171459.00
4.03
690979.77
Cum
Cum
1670.06
1670.06
43.27
8.5
72263.50
14195.51
Cum
445.00
43.27
19255.15
Cum
445.00
8.5
3782.50
Cum
133.00
22.42
2981.86
Cum
133.00
8.5
1130.50
Tkm
74455.60
4.03
300056.07
Cum
1113.38
43.27
48175.95
Cum
1113.38
8.5
9463.73
36875.21
4.03
148607.10
Sqm
Tkm
Page 30
Cum
601.22
43.27
26014.79
Cum
601.22
8.5
5110.37
Tkm
26549.82
4.03
106995.77
Cum
Cum
133.60
133.60
43.27
8.5
5780.87
1135.60
Tkm
2351.36
4.03
9475.98
116.00
116.00
105.56
97.55
12244.96
11315.80
5684.00
4.03
22906.52
Cum
1504.80
185.95
279817.56
No.
760.00
325.00
247000.00
Cum
428.00
162.89
69716.92
Cum
50.00
3656.41
182820.50
866.00
2876.18
2490771.88
MT
i)Loading
MT
ii)Unloading
b)Haulageof Tar /Asphat from Pampora to site
for an av. Lead of 49 Km surfaced road.(116 Mt) Tkm
B. Earthen Shoulders:
1 Construction of sub grade and earthen shoulders
C Retaining Wall:
1 Earth work in excavation in ordinary soil for
foundation of structures upto 3m depth as per
drawing and technical specifications clause
305.1.including setting out , construction of
shoring and bracing , removal of stumps and
other deleterious matter , dressing of sides and
bottom and back filling in trenches with
excavated suitable material .
Page 31
470.00
1938.18
910944.60
RM
400.00
268.32
107328.00
800.00
47.06
37644.80
Cum
Cum
53.64
53.64
43.27
8.5
2321.00
455.94
Tkm
1776.52
4.03
7159.38
Cum
Cum
1336
1336
43.27
8.5
57808.72
Tkm
58995
4.03
237749.85
Cum
Cum
328.52
328.52
43.27
8.5
14215.06
Tkm
5781.82
4.03
23300.73
MT
95
89
8455.00
MT
95
89
8455.00
4655
4.03
18759.65
1092.38
162.89
177937.78
Cum
102.60
3656.41
375147.67
190.80
2876.18
548775.14
11356.00
2792.42
Page 32
RM
90.00
268.32
24148.80
238.50
47.06
11222.86
135.00
6798.19
917755.65
270.00
1161.30
313551.00
Cum
Cum
Cum
190.8
190.8
94.28
43.27
8255.92
1621.80
4079.50
Cum
Cum
8.50
43.27
MT
MT
94.28
114.88
114.88
37.45
37.45
No.
54.00
59.40
3207.60
No.
54.00
284.29
15351.66
Cum
270.00
22.42
6053.40
Cum
270.00
8.50
2295.00
Tkm
9128.01
4.03
36785.88
Tkm
3122.71
4.03
12584.52
Tkm
1819.62
4.03
7333.07
Tkm
1835.05
4.03
7395.25
Tkm
6615.00
4.03
26658.45
Tkm
9439.00
4.03
38039.17
Cum
43.27
8.50
801.38
4970.86
8.50
976.48
89.00
89.00
3333.05
3333.05
Page 33
Cum
6298.50
162.89
1025962.67
Cum
42.50
3656.41
155397.43
67.50
3712.44
250589.70
Cum
Cum
Cum
Cum
MT
MT
99.00
99.00
49.50
49.50
31.00
31.00
43.27
8.50
43.27
8.50
43.27
8.50
4283.73
841.50
2141.87
420.75
1341.37
263.50
Tkm
3288.00
4.03
13250.64
Tkm
871.08
4.03
3510.45
Tkm
1512.60
4.03
6095.78
No
8.00
9189.74
73517.92
No
600.00
44.00
26400.00
G
1
Page 34
7.00
1631.14
11417.98
No
114.00
430.24
49047.36
No
600.00
150.00
90000.00
No
2.00
15000.00
30000.00
26896994.46
GRAND TOTAL:
Contractor to quote lump sum rate / amount for each year
Ist year
2nd Year
3rd year
4th. Year
5th Year.
Page 35
1882789.61
28779784.07
(In Words.)
Head Draftsman
AEE
Executive Engineer
PMGSY Division
Baramulla
Page 36 of 59
Description Of Item
Unit
District: Baramulla
Block: Sopore / Rohama.
Quantity Rate/Unit
Amount
(Rs. In
lac)
A SITE CLEARANCE:
1 Removal of Telephone / Electric poles with
wires including excavation and dismantling of
foundation concrete and lines under thye
supervision of
concerned
department,
disposal with all lifts upto a lead of 1000m
and
stacking
the
serviceable
and
unserviceable material separately as per
technical specification Clause 202.
2 Dismantling of Barbed Wire fencing / wire
meshfencing including posts , foundation
concrete back filling of pit by manual means
including disposal of dismatled material with
all lifts and upto a lead of 1000m , stacking
serviceable material and unserviceable
material separately as per technical
specification Clause 202.
No.
110.00
105.30
11583.00
RM
7000.00
30.50
213500.00
Cum
7921.64
185.95
1473028.96
No.
667.00
375.00
250125.00
12000.00
8.99
107880.00
B. Earthen Shoulders:
1 Construction of sub grade and earthen
shoulders with approved material obtained
from barrow pits with all lifts and leads ,
transporting to site , spreding , grading to
required slope and compacted to meet
requirement of table 300.20. With lead upto
1000m as per technical speification
clause.303.1
2 Providing fixing of empty Tar barrels for side
protection / road side beautification including
filling of earth inside barrels applying lime
chat on the out side periphery of drum and
fixing of cyprus plants inside the drums.
(Complete Job) as per direction of Engineer
incharge at site.
C Pavements:
1 Scarifying Existing Bituminous road Surface
to a Depth of 150 mm and disposal of
scarified material with a lift upto 3 m and laed
upto 1000 m as per Technical Specification
Clause 301.4.
Sqm
Page 37 of 59
3962.50
749.47
2969774.88
Cum
2062.50
1330.45
2744053.13
Cum
2062.50
1390.95
2868834.38
Sqm
27500.00
31.57
868175.00
Page 38 of 59
Cum
1375.00
5461.60
7509700.00
Sqm
27500.00
9.37
257675.00
Sqm
27500.00
108.00
2970000.00
Sqm
27500.00
38.51
1059025.00
Cum
3962.50
43.27
171457.38
Cum
3962.50
8.50
33681.25
111680.00
4.03
450070.40
Cum
2062.50
43.27
89244.38
Cum
2062.50
8.50
17531.25
Page 39 of 59
Cum
2062.50
43.27
89244.38
Cum
2062.50
8.50
17531.25
Cum
1375.00
43.27
59496.25
Cum
1375.00
8.50
11687.50
Cum
165.00
43.27
7139.55
Cum
165.00
8.50
1402.50
Cum
1127.50
43.27
48786.93
1127.50
8.50
9583.75
330.00
43.27
14279.10
Cum
330.00
8.50
2805.00
MT
162.08
105.56
17109.16
162.08
97.55
15810.90
118800.00
4.03
478764.00
4755.00
4.03
19162.65
9724.80
4.03
39190.94
Cum
5525.00
162.89
899967.25
97.75
3656.41
357414.08
Page 40 of 59
155.25
3712.44
576356.31
Cum
227.7
43.27
9852.58
Cum
227.7
8.50
1935.45
Cum
113.85
43.27
4926.29
Cum
MT
MT
113.85
71.18
8.50
89.00
967.73
6335.02
71.18
89.00
6335.02
4918.2
4.03
19820.35
2732.4
4.03
11011.57
Tkm
4270.8
4.03
17211.32
Cum
290.13
162.89
47259.28
Cum
33.24
4015.86
133487.19
266.07
4547.84
1210043.79
Page 41 of 59
Cum
5 Supply
fitting and placing HYSD
reinforcement (Fe 415)
in substructure
complete as per drawing and technical
specification Clause 1002,1005,1010 and
1202. .
Ton
55.11
5218.34
287582.72
5.31 52184.73
277100.92
101.25
1161.31
117582.64
99.90
793.33
79253.67
Cum
27.00
1092.62
29500.74
RM
54.00
2076.57
112134.78
6.00
5613.50
33681.00
12.00
367.06
4404.72
50.61
202.40
10243.46
Cum
Page 42 of 59
16.20
686.70
11124.54
228.15
43.27
9872.05
228.15
8.50
1939.28
159.48
43.27
6900.70
Cum
159.48
8.50
1355.58
MT
138.54
89.00
12330.06
MT
138.54
89.00
12330.06
MT
5.31
95.06
504.77
MT
5.31
95.06
504.77
Tkm
7118.1
4.03
28685.94
6889.53
4.03
27764.81
3827.4
4.03
15424.42
Tkm
8304
4.03
33465.12
Tkm
318.6
4.03
1283.96
Cum
491.68
162.89
80089.76
Page 43 of 59
Cum
21.68
4015.86
87063.84
195.84
2876.18
563271.09
Cum
50.08
4547.84
227755.83
80.64
793.00
63947.52
RM
60.00
6798.19
407891.40
39.68
268.38
10649.32
Sqm
59.52
47.05
2800.42
Cum
Cum
Cum
Cum
276.48
43.27
11963.29
276.48
8.50
2350.08
65.84
43.27
2848.90
65.84
8.50
559.64
Cum
98.48
43.27
4261.23
Cum
MT
98.48
8.50
837.08
5.22
89.00
464.58
Page 44 of 59
MT
5.22
89.00
464.58
Tkm
8626.05
4.03
34762.98
1422
4.03
5730.66
2363.4
4.03
9524.50
2505.6
4.03
10097.57
Cum
61.61
162.89
10035.65
15.4
3656.41
56308.71
113.43
2876.18
326245.10
75.64
1938.18
146603.94
66.01
793.33
52367.71
92.41
1092.62
100969.01
Retaining Wall:
Cum
Page 45 of 59
147
268.32
39443.04
Cum
347.49
43.27
15035.89
Cum
Cum
347.49
8.50
2953.67
17.03
43.27
736.89
Cum
17.03
8.50
144.76
Cum
45.94
43.27
1987.82
Cum
45.94
8.50
390.49
MT
9.72
89.00
865.08
MT
9.72
89.00
865.08
10841.75
4.03
43692.25
367.71
4.03
1481.87
1102.49
4.03
4443.03
583.06
4.03
2349.73
Tkm
Tkm
H Road Furniture:
Page 46 of 59
No
2.00
9189.74
18379.48
No
500.00
44.00
22000.00
No
6.00
1631.14
9786.84
No
97.00
430.24
41733.28
No
500.00
150.00
75000.00
No
2.00 15000.00
30000.00
31834797.34
GRAND TOTAL:
Contractor to quote lump sum rate / amount for each
year
Ist year
2nd Year
3rd year
4th. Year
5th Year.
Page 47 of 59
(In Figures.)
(In Words.)
2228435.81
34063233.16
(In Words.)
Head Draftsman
AEE
Executive Engineer
PMGSY Division
Baramulla
Page 48 of 59
Page 49 of 59
Page 50 of 59
Page 51 of 59
Page 52 of 59
Page 53 of 59
Page 54 of 59
Page 55 of 59
Page 56 of 59
Page 57 of 59
Page 58 of 59
5th Year.