AT CANYON VIEWS DHA PHASE-II (EXT) ISLAMABAD
Project Start Date:
Project Finish Date:
Date: 30/06/2012
Weekly Report - 5
Plex
Description
date
47-52
Unplanned*
12.57%
63-68
34.78%
95%
Summary
Till-date performance by Activity(Avg)
Variance
Remarks
-10%
1
2
3
4
5
6
7
8
9
10
Description
Block Work in Progress
Backfilling In Progress
Reinforced Cement Concrete
Termite Treatment
PCC/Lean
Plumbing Pipes
Bitumen Coating In progress
Painting(Primer+Wall Puttty)
Electric Wiring
Formwork in Progress
Planned
66.7%
62.0%
63.64%
2.5%
30.0%
11.43%
17.4%
Unplanned*
Unplanned*
15.28%
Actual
40.4%
71.3%
9.7%
42.4%
70.3%
10.0%
53.8%
23.0%
10.0%
54.2%
11
Plaster Work
70.0%
15.0%
Remarks
Remarks
PROJECT BRIEF
Project Organization:
Design Master Architect:
Project Consultant:
Supervision Consutant:
Contractor:
Mazen N.
Abdul Ra
EA Consu
Tijaarat
KEY MILESTONES
Mobilization
Issue of
Construction
Drawings
Completion of
Submittals for
Mockup Units
Completion of
Procurement for
Mockup Units
Completion of
Mockup Units
Activity
Contract Date
Commencement
Date
Planned Finish
Date
16-Apr-12
24-Apr-12
18-Apr-12
17-Apr-12
15-Aug-12
10-Oct-12
15-Oct-12
Actual Date/
Status
Completed
Completed
Completed
Completed
In Progress
In Progress
In Progress
PROGRESS OVERVIEW
PROGRESS BY BUILDINGS
PROGRESS BY TRADE
Villa No.
Planned
Actual
Variance
7-12
23.62%
7.61%
-16.01%
47-52
26.96%
8.51%
-18.45%
53-58
10.94%
3.47%
-7.47%
63-68
6.57%
8.42%
1.85%
69-74
0.41%
0.200%
-0.21%
173-176
17.32%
0.000%
-17.32%
177-180
7.62%
0.00%
-7.62%
181-186
0.83%
0.000%
-0.83%
187-190
0.46%
3.760%
3.30%
191-194
0.38%
2.34%
1.96%
195-196
31.26%
7%
-24.18%
197-200
0.43%
1%
0.46%
8.72%
4.52%
-4.20%
ECT BRIEF
PROGRESS CURVE
EXECUTIV
Progre
Plex-7-12
Backfilling is Completed
Lintel in progress
Plex-47-52
Slab on Grade in Progress
Piping & Electric conduiting in Progress
Ternite Treatment for SOG completed
Block work in Progress
Plex-63-68
Backfilling in Progress
Bitumen coating in Progress
Plex-69-74
Backfilling in Progress
Plex-191-194
Formwork & Steel Fixing for Ground Floor
Backfilling in Progress
Plex-53-58
Block work Repair work in progress
Lintel in progress
Plex-197-200
Plaster work in Progress
Electric wiring & Back boxes on progress
Completion of
Structural Works
Completion of
Architectural
Works
28-Sep-12
15-Oct-12
1-Oct-12
In Progress
In Progress
In Progress
SS OVERVIEW
PROCUREMENT STATUS
RESOURCES ON SITE
Activity
Planned
Status
Description
Planned (Avg)
Actual (Avg)
Structural items
24-May-12
Management
Clay Tile
1-Jun-12
Lamination Sheet
6-Jun-12
Engineer
G.I Pipes
6-Jun-12
Contractor
PPR Pipes
8-Jun-12
Sub-Contractor
BBJ Pipes
27-Jun-12
Robin Pipes
27-Jun-12
Man power
Skilled Labor
64
Un-Skilled Labor
49
EQUIPMENT
Mixer Machine
Loader
Plate Compactor
Lift Machine
Viberator
Generator HD
Generator
Light Vehicle
MATERIAL DELIVERED
Reinforced Bar
Cement
Sand
25
38 ton
0.9 ton
0.8 ton
7000 cft
5500 cft
EXECUTIVE SUMMARY
Progress Highlights
Plex-7-12
Backfilling is Completed
Lintel in progress
Plex-47-52
Slab on Grade in Progress
Piping & Electric conduiting in Progress
Ternite Treatment for SOG completed
Block work in Progress
Plex-63-68
Backfilling in Progress
Bitumen coating in Progress
Formwork for Ground Floor in Progress
Plex-69-74
Backfilling in Progress
Plex-191-194
Formwork & Steel Fixing for Ground Floor slab in Progress & ready for Concrete Pour
Backfilling in Progress
Plex-53-58
Block work Repair work in progress
Lintel in progress
Plex-197-200
Plaster work in Progress
Electric wiring & Back boxes on progress
CRITICAL ISSUES
Progress Issues
TD is increasing Labor
Emaar & Engineer has showed big concern regarding grey structure i.e Villa 63-74
BOQ From P6
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
Backfilling
Termite Treatment
PCC /DPC
Formwork i.e Stai+,Parapet & SOG
Steel i.e Stai+,Parapet & SOG
Reinforced Cement Concrete(All)
Block Masonry
Plaster Work
Bitumen Coating WP
Water Proofing
Foam Concrete
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+Glass
False Ceiling
Painting
Handover
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver
Plumbing Fixtures
Sainitary i.e Manhole etc
Circuit wiring(Conduting+Wiring)
Switch & Socket Back Box/Communication
PVC-Insulated Cable
Light fixture
Original
Duration
50
90
70
20
20
22
69
40
10
10
7
20
25
20
20
24
0
35
30
20
20
10
42
35
12
10
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
Backfilling
Termite Treatment
PCC /DPC
Formwork i.e Stai+,Parapet & SOG
Steel i.e Stai+,Parapet & SOG
Reinforced Cement Concrete(All)
Block Masonry
Plaster Work
Bitumen Coating WP
Water Proofing
Foam Concrete
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+Glass
False Ceiling
Painting
Handover
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver
Plumbing Fixtures
50
90
70
20
20
22
69
40
10
10
7
20
25
20
20
19
0
35
30
20
20
Activity ID
Activity Name
Quantity
7428
9944.9
4956.74
14872.14
15.22
13340
16299.18
49279.68
13890.6
2491.2
7.2
27264.49
836.25
63.45
3615.75
48600
0
8249.55
846.6
8334.75
117
0.9
457.8
475.5
1877.64
300
7428
9944.9
4956.74
14872.14
15.22
13340
16299.18
49279.68
13890.6
2491.2
7.2
27264.49
836.25
63.45
3615.75
48600
0
8249.55
846.6
8334.75
117
47-52
47-52
47-52
47-52
47-52
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
10
42
35
12
10
0.9
457.8
475.5
1877.64
300
Backfilling
Termite Treatment
PCC /DPC
Formwork i.e Stai+,Parapet & SOG
Steel i.e Stai+,Parapet & SOG
Reinforced Cement Concrete(All)
Block Masonry
Plaster Work
Bitumen Coating WP
Water Proofing
Foam Concrete
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+Glass
False Ceiling
Painting
Handover
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver
Plumbing Fixtures
Sainitary i.e Manhole etc
Circuit wiring(Conduting+Wiring)
Switch & Socket Back Box/Communication
PVC-Insulated Cable
Light fixture
48
81
78
8
8
7
23
15
10
10
7
20
20
18
20
12
0
15
20
20
20
10
25
16
12
10
4952
6629.93
3304.5
9914.76
10.15
8893.33
10866.12
32853.12
9260.4
1660.8
4.8
18176.32
557.5
42.3
2410.5
32400
0
5499.7
564.4
5556.5
78
0.6
305.2
317
1251.76
200
Backfilling
Termite Treatment
PCC /DPC
Formwork
Steel
Reinforced Cement Concrete
Block Masonry
Plaster Work
Bitumen Coating WP
Water Proofing
Foam Concrete/Approved
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+ & Glass
False Ceiling
Painting
Handover
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver
62
110
80
72
52
80
60
91
115
32
52
50
74
52
60
37
0
62
42
52
14856
19889.8
9913.49
29744.29
30.44
26680
32598.36
98559.36
27781.2
4982.4
14.4
54528.97
1672.5
126.9
7231.5
97200
0
16499.1
1693.2
16669.5
63-68
63-68
63-68
63-68
63-68
63-68
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
177-180
177-180
Plumbing Fixtures
Sainitary i.e Manhole etc
Circuit wiring(Conduting+Wiring)
Switch & Socket Back Box/Communication
PVC-Insulated Cable
Light fixture
47
22
52
52
37
22
234
1.8
915.6
951
3755.28
600
Backfilling
Termite Treatment
PCC /DPC
Formwork
Steel
Reinforced Cement Concrete
Block Masonry
Plaster Work
Bitumen Coating WP
Water Proofing
Foam Concrete/Approved
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+ & Glass
False Ceiling
Painting
Handover
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver
Plumbing Fixtures
Sainitary i.e Manhole etc
Circuit wiring(Conduting+Wiring)
Switch & Socket Back Box/Communication
PVC-Insulated Cable
Light fixture
62
110
65
72
52
80
60
80
115
32
52
50
74
52
60
37
0
62
42
52
47
22
52
52
37
22
Termite Treatment
PCC (Including Re-Do slope)
Plaster Work (Minor)
Tilling,Marble,skirting (Minor Repair)
Wood work, kitchen,doo+ (Repair & Polish)
UPVC Windows,Doo+ (Repair)
False Ceiling (Repair)
Painting (Final Coat)
Handover
PPR/Upvc/G I (Minor Repai+)
Plumbing Fitting (Minor)
Plumbing Fixtures (Minor)
Sainitary i.e Manhole etc
Circuit wiring i.e Minor Work
Switch & Sockets etc (Minor Work)
PVC-Insulated Cable (Very Minor)
Light fixture ( Minor )
55
45
10
9
10
10
10
12
0
10
8
8
8
8
10
8
8
2340
86.6
166.4
2501.78
47.6
7.8
354.2
6737.5
0
204.03
43.54
14.2
1
19.8
9.4
40
51.2
Termite Treatment
39
9360
14856
19889.8
9913.49
29744.29
30.44
26680
32598.36
98559.36
27781.2
4982.4
14.4
54528.97
1672.5
126.9
7231.5
97200
0
16499.1
1693.2
16669.5
234
1.8
915.6
951
3755.28
600
177-180
177-180
177-180
177-180
177-180
177-180
177-180
177-180
177-180
177-180
177-180
177-180
177-180
177-180
177-180
177-180
177-180
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
45
15
15
15
12
10
15
0
15
8
10
8
8
15
15
10
8
346.4
665.6
10007.11
190.4
31.2
1416.8
6737.5
0
816.12
174.16
3953.67
56.8
4
79.2
37.6
160
204.8
Termite Treatment
Bitumen Coating
Block Masonary
Plaster Work
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+ & Glass
False Ceiling
Painting
Handover
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver
Plumbing Fixtures
Sainitary i.e Manhole etc
Circuit wiring(Conduting+Wiring)
Switch , Socket & DB'S
PVC-Insulated Cable
Light fixture
85
70
20
21
25
25
11
15
10
0
13
7
11
10
5
10
15
8
5
4050.46
438.5
819.55
6276.77
20728.67
2262.65
93
7178.64
39372.9
0
1135
410
7560
154
5.52
115
439
865
374
Backfilling
Termite Treatment
PCC /DPC
Formwork
Steel
Reinforced Cement Concrete
Block Masonry
Plaster Work
Bitumen Coating WP
Water Proofing
Foam Concrete
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+ & Glass
False Ceiling
20
116
95
28
24
21
29
41
10
20
11
33
41
21
29
0
8287.25
1231.25
5861.83
5.88
3773.75
5838.02
22559.27
0
0
0
43442.25
754.77
39.75
2223.75
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
Painting
Handover
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver
Plumbing Fixtures
Sainitary i.e Manhole etc
Circuit wiring(Conduting+Wiring)
Switch & Socket Back Box/Communication
PVC-Insulated Cable
Light fixture
10
0
25
10
22
16
9
26
21
15
8
18524.86
0
4294.25
464.25
5563.13
74.25
1.5
270.5
277.75
1597
198.75
Backfilling
Termite Treatment
PCC /DPC
Formwork
Steel
Reinforced Cement Concrete
Block Masonry
Plaster Work
Bitumen Coating
Water Proofing
Foam Concrete/Approved
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+ & Glass
False Ceiling
Painting
Handover
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver
Plumbing Fixtures
Sainitary i.e Manhole etc
Circuit wiring(Conduting+Wiring)
Switch & Socket Back Box/Communication
PVC-Insulated Cable
Light fixture
62
110
90
72
52
82
60
80
30
32
52
65
74
52
60
44
0
62
42
52
47
22
52
52
37
22
7224
16574.5
2462.5
11723.65
11.75
7547.5
11676.03
45118.54
0
0
0
86884.5
1509.54
79.5
4447.5
37049.71
0
8588.5
928.5
11126.26
148.5
3
541
555.5
3194
397.5
Backfilling
Termite Treatment
PCC /DPC
Formwork (All)
Steel (Not in BOQ)
Reinforced Cement Concrete (Minor)
Block Masonry
Plaster Work (All)
Bitumen Coating
Water Proofing
Foam Concrete
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+ & Glass
20
70
77
10
5
6
30
70
10
20
16
20
17
8
67.4
5850
56.05
458.52
0
175
3820.27
22682.5
4078
7068
420
10150.45
398
43
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
False Ceiling
Painting
Handover
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver
Plumbing Fixtures
Sainitary i.e Manhole etc
Circuit wiring(Conduting+Wiring)
Switch, Socket,DB'S etc
PVC-Insulated Cable
Light fixture
Backfilling
Termite Treatment
PCC /DPC
Formwork
Steel
Reinforced Cement Concrete
Block Masonry
Plaster Work
Bitumen Coating WP
Water Proofing
Foam Concrete
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+ & Glass
False Ceiling
Painting
Handover
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver
Plumbing Fixtures
Sainitary i.e Manhole etc
Circuit wiring(Conduting+Wiring)
Switch & Socket Back Box/Communication
PVC-Insulated Cable
Light fixture
10
20
0
6
7
10
6
7
10
14
6
5
40
116
90
29
25
23
60
41
30
40
5
33
41
21
29
29
0
25
10
22
17
9
25
21
15
10
1619.5
21600
0
2899.9
300
3725
49
2
185
193
497.7
134
0
8287.25
1231.25
5861.83
5.88
3773.75
5838.02
22559.27
0
0
0
43442.25
754.77
39.75
2223.75
18524.86
0
4294.25
464.25
5563.13
74.25
1.5
270.5
277.75
1597
198.75
2291074.31
Cleaning
Summary Sheet
Sr NO
Description
1
Backfilling
2
Termite Treatment
3
PCC /DPC
4
Formwork
5
Steel
6
Reinforced Cement Concrete
7
Block Masonry
Quantity Cost
56811.4
1351415
121048.79
996785
38459.01
2342578
123053.45
6995780
124.98
13586308
104203.33
22564412
136653.09
14066189
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Plaster Work
Bitumen Coating
Water Proofing
Foam Concrete
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+ & Glass
False Ceiling
Painting
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver
Plumbing Fixtures
Sainitary i.e Manhole etc
Circuit wiring(Conduting+Wiring)
Switch & Socket Back Box/Communication
PVC-Insulated Cable
Light fixture
Total
Balance
excavation
448559.55
97120.5
23676
468
398920.25
11492.73
757
43569.14
472547.33
77229.05
8428.7
93056.19
1351
24.52
4533
4960
20468.3
3559
13530753
5173875
1934564
158806
47796720
30470024
9913329
3534670
10070932
18599662
31181163
6924429
26479956
70027
22120240
7693484
4620754
6642557
2291074.31
0
3907
308819412
0
WEEKLY-2
Start
Finish
27-May-12
16-Jul-12
1-Jun-12 30-Aug-12
3-Jun-12 12-Aug-12
5-Jun-12 25-Jun-12
10-Jun-12 30-Jun-12
10-Jun-12
2-Jul-12
1-May-12
9-Jul-12
2-Jul-12 11-Aug-12
7-Jul-12
17-Jul-12
12-Jul-12
22-Jul-12
17-Jul-12
24-Jul-12
26-Jul-12 15-Aug-12
5-Aug-12 30-Aug-12
18-Aug-12
7-Sep-12
2-Sep-12 22-Sep-12
20-Sep-12 14-Oct-12
14-Oct-12
14-Jun-12
19-Jul-12
22-Jun-12
22-Jul-12
23-Aug-12 12-Sep-12
2-Sep-12 22-Sep-12
10-Sep-12 20-Sep-12
30-May-12
11-Jul-12
9-Jun-12
14-Jul-12
20-Jul-12
1-Aug-12
15-Sep-12 25-Sep-12
%Age Completion
123.37%
Planned
68%
Cleaning
0.93
39.80
3,482.63
506.25
9.69%
0.21
0.01
63.64%
81.16%
59%
Unplanned* Has to enter
38.86%
70.93%
490
3166.00
3486
0.07
0.32
0.7032848203
60%
27%
30%
7271.01
0.45
69.57%
1746
0.13
821.12
0.10
Actual
27-May-12
1-Jun-12
3-Jun-12
5-Jun-12
10-Jun-12
10-Jun-12
7-May-12
8-Jul-12
13-Jul-12
18-Jul-12
23-Jul-12
1-Aug-12
11-Aug-12
24-Aug-12
8-Sep-12
26-Sep-12
20-Jun-12
28-Jun-12
29-Aug-12
8-Sep-12
16-Jul-12
30-Aug-12
12-Aug-12
25-Jun-12
30-Jun-12
2-Jul-12
15-Jul-12
17-Aug-12
23-Jul-12
28-Jul-12
30-Jul-12
21-Aug-12
5-Sep-12
13-Sep-12
28-Sep-12
15-Oct-12
15-Oct-12
25-Jul-12
28-Jul-12
18-Sep-12
28-Sep-12
92%
Plaster
Unplanned* Chiping
Plaster
11.43%
16-Sep-12
5-Jun-12
15-Jun-12
26-Jul-12
21-Sep-12
26-Sep-12
17-Jul-12
20-Jul-12
7-Aug-12
1-Oct-12
11-May-12
29-May-12
29-May-12
21-Jun-12
24-Jun-12
27-Jun-12
1-Jul-12
28-Jul-12
2-Aug-12
7-Aug-12
12-Aug-12
21-Aug-12
31-Aug-12
8-Sep-12
21-Sep-12
3-Oct-12
28-Jun-12
18-Aug-12
15-Aug-12
29-Jun-12
2-Jul-12
4-Jul-12
24-Jul-12
12-Aug-12
12-Aug-12
17-Aug-12
19-Aug-12
10-Sep-12
20-Sep-12
26-Sep-12
11-Oct-12
15-Oct-12
15-Oct-12
25-Jul-12
7-Aug-12
1-Oct-12
11-Oct-12
9-Oct-12
24-Jul-12
24-Jul-12
27-Aug-12
11-Oct-12
10-Jul-12
18-Jul-12
11-Sep-12
21-Sep-12
29-Sep-12
29-Jun-12
8-Jul-12
15-Aug-12
1-Oct-12
11-May-12
12-Jul-12
12-Jun-12 30-Sep-12
16-Jun-12
4-Sep-12
6-Jun-12 17-Aug-12
8-Jun-12
30-Jul-12
10-Jun-12 29-Aug-12
10-Jun-12
9-Aug-12
28-Jun-12 27-Sep-12
15-May-12
7-Sep-12
28-Jul-12 29-Aug-12
30-Jul-12 20-Sep-12
24-Jul-12 12-Sep-12
29-Jul-12 11-Oct-12
12-Aug-12
3-Oct-12
16-Aug-12 15-Oct-12
6-Sep-12 13-Oct-12
13-Oct-12
24-Jun-12 25-Aug-12
26-Jun-12
7-Aug-12
14-Aug-12
5-Oct-12
4151.03
0.84
87.50%
1272.94
0.12
Unplanned*
29850.06
2100
0.75
0.11
67.74%
12.73%
Not include
27589.55
0.99
34.78%
95
85%
21-Aug-12
7-Oct-12
23-Aug-12 14-Sep-12
20-Jun-12 11-Aug-12
22-Jun-12 13-Aug-12
1-Aug-12
7-Sep-12
25-Aug-12 16-Sep-12
7-Jun-12
8-Aug-12
19-Jun-12
7-Oct-12
13-Jul-12 16-Sep-12
5-Jul-12 15-Sep-12
7-Jul-12 28-Aug-12
9-Jul-12 27-Sep-12
9-Jul-12
7-Sep-12
27-Jun-12 15-Sep-12
7-Jun-12 30-Sep-12
27-Jul-12 28-Aug-12
29-Jul-12 19-Sep-12
23-Jul-12 11-Sep-12
28-Jul-12 10-Oct-12
11-Aug-12
2-Oct-12
15-Aug-12 14-Oct-12
5-Sep-12 12-Oct-12
12-Oct-12
23-Jul-12 23-Sep-12
25-Jul-12
5-Sep-12
13-Aug-12
4-Oct-12
20-Aug-12
6-Oct-12
22-Aug-12 13-Sep-12
19-Jul-12
9-Sep-12
21-Jul-12 11-Sep-12
31-Jul-12
6-Sep-12
24-Aug-12 15-Sep-12
2-Jun-12
27-Jul-12
6-Jun-12
21-Jul-12
5-Jul-12
15-Jul-12
15-Jul-12
24-Jul-12
19-Jul-12
29-Jul-12
25-Jul-12
4-Aug-12
31-Jul-12 10-Aug-12
19-Aug-12 31-Aug-12
31-Aug-12
22-Jun-12
2-Jul-12
27-Jun-12
5-Jul-12
5-Aug-12 13-Aug-12
10-Aug-12 18-Aug-12
12-Jun-12 20-Jun-12
20-Jun-12 30-Jun-12
10-Jul-12
18-Jul-12
15-Aug-12 23-Aug-12
2-Jun-12
11-Jul-12
1200
0.08
27.42%
7000
0.25
14.78%
5-Jun-12
20-Jul-12
6-Jul-12
21-Jul-12
14-Jul-12
29-Jul-12
19-Jul-12
3-Aug-12
24-Jul-12
5-Aug-12
2-Aug-12 12-Aug-12
20-Aug-12
4-Sep-12
4-Sep-12
27-Jun-12
12-Jul-12
2-Jul-12
10-Jul-12
28-Jul-12
7-Aug-12
7-Aug-12 15-Aug-12
12-Aug-12 20-Aug-12
19-Jun-12
4-Jul-12
22-Jun-12
7-Jul-12
11-Jul-12
21-Jul-12
17-Aug-12 25-Aug-12
2-Jun-12
7-Jun-12
11-Jun-12
12-Jul-12
23-Jul-12
2-Aug-12
11-Aug-12
22-Aug-12
30-Aug-12
9-Sep-12
3-Jul-12
8-Jul-12
17-Aug-12
22-Aug-12
25-Aug-12
21-Jun-12
26-Jun-12
18-Jul-12
27-Aug-12
26-Aug-12
16-Aug-12
1-Jul-12
2-Aug-12
17-Aug-12
27-Aug-12
22-Aug-12
6-Sep-12
9-Sep-12
16-Jul-12
15-Jul-12
28-Aug-12
1-Sep-12
30-Aug-12
1-Jul-12
11-Jul-12
26-Jul-12
1-Sep-12
2-Jun-12 22-Jun-12
4-Jun-12 28-Sep-12
6-Jun-12
9-Sep-12
26-Jun-12
24-Jul-12
4-Jul-12
28-Jul-12
8-Jul-12
29-Jul-12
11-Jul-12
9-Aug-12
2-Aug-12 12-Sep-12
5-Aug-12 15-Aug-12
8-Aug-12 28-Aug-12
18-Aug-12 29-Aug-12
1-Sep-12
4-Oct-12
4-Sep-12 15-Oct-12
7-Sep-12 28-Sep-12
14-Sep-12 13-Oct-12
8778
7415
7573
897.75
0.02
Unplanned* Painting
Wall Putty &
Coat
Cleaning
4984
24-Sep-12
4-Oct-12
4-Oct-12
21-Aug-12
9-Aug-12
2-Oct-12
4-Oct-12
30-Sep-12
10-Aug-12
13-Aug-12
11-Sep-12
1-Oct-12
3473.41125
0.19
130
0.03
Unplanned*
1300
0.1
Unplanned*
7547.82
1.04
61.29%
6359
7
55
0.54
0.60
0.01
15.28%
21.15%
7.32%
10-Jul-12
12-Jul-12
9-Aug-12
16-Aug-12
18-Aug-12
6-Jul-12
8-Jul-12
27-Jul-12
20-Aug-12
16-Jul-12
4-Oct-12
18-Sep-12
31-Aug-12
13-Aug-12
14-Sep-12
25-Aug-12
2-Oct-12
14-Aug-12
24-Aug-12
15-Sep-12
22-Sep-12
6-Oct-12
28-Sep-12
10-Oct-12
15-Oct-12
15-Oct-12
10-Sep-12
23-Aug-12
30-Sep-12
2-Oct-12
9-Sep-12
27-Aug-12
29-Aug-12
2-Sep-12
11-Sep-12
7-Jun-12
12-Jun-12
13-Jun-12
13-Jun-12
16-Jun-12
18-Jun-12
14-May-12
6-May-12
30-Jun-12
3-Jul-12
8-Jul-12
6-Aug-12
11-Aug-12
18-Aug-12
27-Jun-12
21-Aug-12
29-Aug-12
23-Jun-12
21-Jun-12
24-Jun-12
13-Jun-12
15-Jul-12
10-Jul-12
23-Jul-12
24-Jul-12
26-Aug-12
28-Aug-12
26-Aug-12
90
2331.61
0.80
0.10
100.00%
70.00%
27-Jul-12
30-Jul-12
10-Sep-12
18-Sep-12
21-Sep-12
15-Jul-12
23-Jul-12
27-Aug-12
23-Sep-12
15-May-12
16-Jun-12
20-Jun-12
20-Jun-12
22-Jun-12
24-Jun-12
26-Jun-12
14-Jul-12
15-Jul-12
23-Jul-12
25-Jul-12
19-Jul-12
24-Jul-12
7-Aug-12
11-Aug-12
1-Sep-12
Cleaning
change
change
26-Aug-12
5-Sep-12
20-Jun-12
22-Jun-12
21-Aug-12
29-Aug-12
31-Aug-12
6-Jun-12
11-Jun-12
27-Jul-12
3-Sep-12
2-Jun-12
2-Jun-12
10-Jun-12
25-Jun-12
4-Jul-12
9-Jul-12
18-May-12
16-Jul-12
19-Jul-12
22-Jul-12
24-Jul-12
1-Aug-12
4-Aug-12
7-Aug-12
14-Aug-12
2-Sep-12
10-Jul-12
13-Jul-12
10-Aug-12
18-Aug-12
22-Aug-12
29-Jun-12
6-Jul-12
27-Jul-12
28-Aug-12
%Age Progress
92.24%
4.35%
5.17%
9.49%
5-Sep-12
25-Sep-12
25-Sep-12
26-Jun-12
29-Jun-12
31-Aug-12
4-Sep-12
7-Sep-12
16-Jun-12
25-Jun-12
2-Aug-12
8-Sep-12
12-Jul-12
26-Sep-12
8-Sep-12
24-Jul-12
29-Jul-12
1-Aug-12
17-Jul-12
26-Aug-12
18-Aug-12
31-Aug-12
29-Jul-12
3-Sep-12
14-Sep-12
28-Aug-12
12-Sep-12
1-Oct-12
1-Oct-12
4-Aug-12
23-Jul-12
1-Sep-12
4-Sep-12
31-Aug-12
24-Jul-12
27-Jul-12
11-Aug-12
7-Sep-12
900
73.10%
32.22%
855.97
2498.91
0.13
11.08%
48.33%
70.73%
1054.81%
48.03%
Has to Include
37.41%
0.93%
350
Has to enter
Reviced
Quantity Till Date
20%
1746
349.2
80%
Reviced
Visual Observation
Cleaning
1992.48
25%
75%
Qty Tilldate
3591
1500
897.75
0
Cleaning
1500
4631.215
36050
Need to Review
1380 BFIL75%
30%
Formwork
Termite
Termite
Revision in Both
2337 191-194
1050 63-65
3166 47-48
1st June
1st June
8494
Has to Include
Revision in Both
7-12,47-52,53-58,63-68,69-74
187-190, H#191-194 & 197-200
Unit
Date
63
63
63
63
63
63
63
63
63
63
64
63
64
63
64
63
64
63
64
65
63
65
66
64
65
63
66
63
64
65
66
67
68
68
68
64
64
64
65
68
63
68
64
65
64
68
63
63
7-May-12
8-May-12
9-May-12
10-May-12
11-May-12
12-May-12
13-May-12
14-May-12
15-May-12
15-May-12
16-May-12
17-May-12
17-May-12
18-May-12
18-May-12
19-May-12
19-May-12
21-May-12
21-May-12
21-May-12
23-May-12
23-May-12
23-May-12
23-May-12
23-May-12
24-May-12
24-May-12
25-May-12
25-May-12
26-May-12
25-May-12
26-May-12
27-May-12
28-May-12
29-May-12
30-May-12
31-May-12
1-Jun-12
1-Jun-12
2-Jun-12
2-Jun-12
3-Jun-12
3-Jun-12
3-Jun-12
5-Jun-12
5-Jun-12
5-Jun-12
6-Jun-12
64
65
64
64
64
65
65
66
64
65
66
67
66
68
68
66
67
68
67
68
7-Jun-12
7-Jun-12
8-Jun-12
9-Jun-12
10-Jun-12
10-Jun-12
11-Jun-12
12-Jun-12
13-Jun-12
14-Jun-12
16-Jun-12
17-Jun-12
17-Jun-12
21-Jun-12
22-Jun-12
23-Jun-12
25-Jun-12
27-Jun-12
28-Jun-12
29-Jun-12
2-Jun-12
Description
Unit
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
cft
sft
sft
sft
sft
cft
sft
cft
sft
sft
sft
sft
sft
sft
sft
cft
cft
cft
cft
sft
cft
sft
cft
cft
cft
sft
cft
cft
Quantity
525
485
160
120
200
168
220
240
153.5
731.85
332
4725
216.55
550
236
610.78
392.12
456
270.14
486.94
550
200
624.3
1500
1750
538.12
882.5
481.82
3692
853.7836
500
1341.86
434.98
800
295
684.5
100
337.5
271.16
1750
921
1750
252.21
348.46
315.85
1750
941.2
941.2
Area Incharge
Backfilling in Progress
Backfilling in Progress
Cleaning
Backfilling in Progress
Backfilling
Backfilling
Backfilling
Backfilling
Back Filling
Back Filling
Back Filling
Back Filling
Back Filling
back filling
Back filling
Back filing
Back filing
Back filling
Back filling
Back filling
cft
cft
sft
cft
cft
cft
cft
cft
cft
cft
cft
cft
cft
Cft
cft
Cft
cft
cft
cft
cft
99
884
1047
65
429
682.95
694
333
1431.89
1431.9
1431.9
1431.9
400
1431
1431
1908
1050
1150
1450
1450
Block Masonary
sft
Block Masonary
sft
325.19884058