CONSTRUCTION OF MEDITERRANEAN TOWN HOUSES ALMA-1 (58

-UNITS)
AT CANYON VIEWS DHA PHASE-II (EXT) ISLAMABAD
Project Start Date:
Project Finish Date:

16th April 2012


15th oct ,2012

Date: 30/06/2012

Weekly Report - 5
Plex

%Age Planned till-

Description

date

%Age Progress tilldate

47-52

Bitumen Coating In progress

Unplanned*

12.57%

63-68

Bitumen Coating In progress

34.78%

95%

Summary
Till-date performance by Activity(Avg)

%Age Planned till- %Age


Progress tilldate
48% date
38%

Variance

Remarks

-10%

Unplanned* = Activities are planned latar in Shcedule

Average %age Completion


Sr No

1
2
3
4
5
6
7
8
9
10

Description
Block Work in Progress
Backfilling In Progress
Reinforced Cement Concrete
Termite Treatment
PCC/Lean
Plumbing Pipes
Bitumen Coating In progress
Painting(Primer+Wall Puttty)
Electric Wiring
Formwork in Progress

Planned
66.7%
62.0%
63.64%
2.5%
30.0%
11.43%
17.4%
Unplanned*
Unplanned*
15.28%

Actual
40.4%
71.3%
9.7%
42.4%
70.3%
10.0%
53.8%
23.0%
10.0%
54.2%

11

Plaster Work

70.0%

15.0%

Remarks

Remarks

CONSTRUCTION OF REMAINING WORKS


FOR

PROJECT BRIEF

Project Name:Mediterranean Town House (58 Uni


Product: Canyon Views Islamabad

Project Organization:
Design Master Architect:
Project Consultant:
Supervision Consutant:
Contractor:

Mazen N.
Abdul Ra
EA Consu
Tijaarat

KEY MILESTONES

Mobilization

Issue of
Construction
Drawings

Completion of
Submittals for
Mockup Units

Completion of
Procurement for
Mockup Units

Completion of
Mockup Units

Activity

Contract Date

Commencement
Date

Planned Finish
Date

16-Apr-12

24-Apr-12

18-Apr-12

17-Apr-12

15-Aug-12

10-Oct-12

15-Oct-12

Actual Date/
Status

Completed

Completed

Completed

Completed

In Progress

In Progress

In Progress

PROGRESS OVERVIEW
PROGRESS BY BUILDINGS

PROGRESS BY TRADE

Villa No.

Planned

Actual

Variance

7-12

23.62%

7.61%

-16.01%

47-52

26.96%

8.51%

-18.45%

53-58

10.94%

3.47%

-7.47%

63-68

6.57%

8.42%

1.85%

69-74

0.41%

0.200%

-0.21%

173-176

17.32%

0.000%

-17.32%

177-180

7.62%

0.00%

-7.62%

181-186

0.83%

0.000%

-0.83%

187-190

0.46%

3.760%

3.30%

191-194

0.38%

2.34%

1.96%

195-196

31.26%

7%

-24.18%

197-200

0.43%

1%

0.46%

Over all Project

8.72%

4.52%

-4.20%

For Details Please consult enclosed sheet i.e Resource Control


Summary

EMAINING WORKS AT CANYON VIEWS EMAAR DHA PHASE-II EXTENSION ISLAMABAD


FORTNIGHTLY PROGRESS REPORT

ECT BRIEF

PROGRESS CURVE

EXECUTIV

Progre

own House (58 Units)


bad

Plex-7-12
Backfilling is Completed
Lintel in progress
Plex-47-52
Slab on Grade in Progress
Piping & Electric conduiting in Progress
Ternite Treatment for SOG completed
Block work in Progress
Plex-63-68
Backfilling in Progress
Bitumen coating in Progress

Mazen N. Issa, AIA


Abdul Razzak Associates
EA Consulting (Pvt.) Ltd.
Tijaarat Developers

Formwork for Ground Floor in Progress

Plex-69-74
Backfilling in Progress
Plex-191-194
Formwork & Steel Fixing for Ground Floor
Backfilling in Progress
Plex-53-58
Block work Repair work in progress
Lintel in progress
Plex-197-200
Plaster work in Progress
Electric wiring & Back boxes on progress

30th June 2012

Completion of
Structural Works

Completion of
Architectural
Works

Delivery of all Procurement Items

28-Sep-12

15-Oct-12

1-Oct-12

In Progress

In Progress

In Progress

SS OVERVIEW
PROCUREMENT STATUS

RESOURCES ON SITE

Activity

Planned

Status

Description

Planned (Avg)

Actual (Avg)

Structural items

24-May-12

Approved & delivery starts

Management

Clay Tile

1-Jun-12

Approved & delivery starts

Emaar site office

Lamination Sheet

6-Jun-12

Submitted for approval

Engineer

G.I Pipes

6-Jun-12

Approved & delivery starts

Contractor

PPR Pipes

8-Jun-12

Approved & delivery starts

Sub-Contractor

BBJ Pipes

27-Jun-12

Approved & delivery starts

Robin Pipes

27-Jun-12

Approved & delivery starts

Man power
Skilled Labor

64

Un-Skilled Labor

49

EQUIPMENT
Mixer Machine

Loader

Plate Compactor

Lift Machine

Viberator

Generator HD

Generator

Light Vehicle

MATERIAL DELIVERED
Reinforced Bar
Cement
Sand

25

38 ton

0.9 ton

0.8 ton

7000 cft

5500 cft

EXECUTIVE SUMMARY
Progress Highlights
Plex-7-12
Backfilling is Completed
Lintel in progress
Plex-47-52
Slab on Grade in Progress
Piping & Electric conduiting in Progress
Ternite Treatment for SOG completed
Block work in Progress
Plex-63-68
Backfilling in Progress
Bitumen coating in Progress
Formwork for Ground Floor in Progress

Plex-69-74
Backfilling in Progress
Plex-191-194
Formwork & Steel Fixing for Ground Floor slab in Progress & ready for Concrete Pour
Backfilling in Progress
Plex-53-58
Block work Repair work in progress
Lintel in progress
Plex-197-200
Plaster work in Progress
Electric wiring & Back boxes on progress

CRITICAL ISSUES

Progress Issues

Tijaarat Developers are behind the shedule in remaining work

TD is increasing Labor

Strictly focusing on Quality control

Emaar & Engineer has showed big concern regarding grey structure i.e Villa 63-74

Accessibility Issues at site

Expediting material submittal for Engineer's Approval

BOQ From P6

7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12
7-12

Backfilling
Termite Treatment
PCC /DPC
Formwork i.e Stai+,Parapet & SOG
Steel i.e Stai+,Parapet & SOG
Reinforced Cement Concrete(All)
Block Masonry
Plaster Work
Bitumen Coating WP
Water Proofing
Foam Concrete
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+Glass
False Ceiling
Painting
Handover
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver
Plumbing Fixtures
Sainitary i.e Manhole etc
Circuit wiring(Conduting+Wiring)
Switch & Socket Back Box/Communication
PVC-Insulated Cable
Light fixture

Original
Duration
50
90
70
20
20
22
69
40
10
10
7
20
25
20
20
24
0
35
30
20
20
10
42
35
12
10

47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52
47-52

Backfilling
Termite Treatment
PCC /DPC
Formwork i.e Stai+,Parapet & SOG
Steel i.e Stai+,Parapet & SOG
Reinforced Cement Concrete(All)
Block Masonry
Plaster Work
Bitumen Coating WP
Water Proofing
Foam Concrete
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+Glass
False Ceiling
Painting
Handover
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver
Plumbing Fixtures

50
90
70
20
20
22
69
40
10
10
7
20
25
20
20
19
0
35
30
20
20

Activity ID

Activity Name

Quantity
7428
9944.9
4956.74
14872.14
15.22
13340
16299.18
49279.68
13890.6
2491.2
7.2
27264.49
836.25
63.45
3615.75
48600
0
8249.55
846.6
8334.75
117
0.9
457.8
475.5
1877.64
300

7428
9944.9
4956.74
14872.14
15.22
13340
16299.18
49279.68
13890.6
2491.2
7.2
27264.49
836.25
63.45
3615.75
48600
0
8249.55
846.6
8334.75
117

47-52
47-52
47-52
47-52
47-52
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
53-58
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68
63-68

Sainitary i.e Manhole etc


Circuit wiring(Conduting+Wiring)
Switch & Socket Back Box/Communication
PVC-Insulated Cable
Light fixture

10
42
35
12
10

0.9
457.8
475.5
1877.64
300

Backfilling
Termite Treatment
PCC /DPC
Formwork i.e Stai+,Parapet & SOG
Steel i.e Stai+,Parapet & SOG
Reinforced Cement Concrete(All)
Block Masonry
Plaster Work
Bitumen Coating WP
Water Proofing
Foam Concrete
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+Glass
False Ceiling
Painting
Handover
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver
Plumbing Fixtures
Sainitary i.e Manhole etc
Circuit wiring(Conduting+Wiring)
Switch & Socket Back Box/Communication
PVC-Insulated Cable
Light fixture

48
81
78
8
8
7
23
15
10
10
7
20
20
18
20
12
0
15
20
20
20
10
25
16
12
10

4952
6629.93
3304.5
9914.76
10.15
8893.33
10866.12
32853.12
9260.4
1660.8
4.8
18176.32
557.5
42.3
2410.5
32400
0
5499.7
564.4
5556.5
78
0.6
305.2
317
1251.76
200

Backfilling
Termite Treatment
PCC /DPC
Formwork
Steel
Reinforced Cement Concrete
Block Masonry
Plaster Work
Bitumen Coating WP
Water Proofing
Foam Concrete/Approved
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+ & Glass
False Ceiling
Painting
Handover
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver

62
110
80
72
52
80
60
91
115
32
52
50
74
52
60
37
0
62
42
52

14856
19889.8
9913.49
29744.29
30.44
26680
32598.36
98559.36
27781.2
4982.4
14.4
54528.97
1672.5
126.9
7231.5
97200
0
16499.1
1693.2
16669.5

63-68
63-68
63-68
63-68
63-68
63-68
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
69-74
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
173-176
177-180
177-180

Plumbing Fixtures
Sainitary i.e Manhole etc
Circuit wiring(Conduting+Wiring)
Switch & Socket Back Box/Communication
PVC-Insulated Cable
Light fixture

47
22
52
52
37
22

234
1.8
915.6
951
3755.28
600

Backfilling
Termite Treatment
PCC /DPC
Formwork
Steel
Reinforced Cement Concrete
Block Masonry
Plaster Work
Bitumen Coating WP
Water Proofing
Foam Concrete/Approved
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+ & Glass
False Ceiling
Painting
Handover
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver
Plumbing Fixtures
Sainitary i.e Manhole etc
Circuit wiring(Conduting+Wiring)
Switch & Socket Back Box/Communication
PVC-Insulated Cable
Light fixture

62
110
65
72
52
80
60
80
115
32
52
50
74
52
60
37
0
62
42
52
47
22
52
52
37
22

Termite Treatment
PCC (Including Re-Do slope)
Plaster Work (Minor)
Tilling,Marble,skirting (Minor Repair)
Wood work, kitchen,doo+ (Repair & Polish)
UPVC Windows,Doo+ (Repair)
False Ceiling (Repair)
Painting (Final Coat)
Handover
PPR/Upvc/G I (Minor Repai+)
Plumbing Fitting (Minor)
Plumbing Fixtures (Minor)
Sainitary i.e Manhole etc
Circuit wiring i.e Minor Work
Switch & Sockets etc (Minor Work)
PVC-Insulated Cable (Very Minor)
Light fixture ( Minor )

55
45
10
9
10
10
10
12
0
10
8
8
8
8
10
8
8

2340
86.6
166.4
2501.78
47.6
7.8
354.2
6737.5
0
204.03
43.54
14.2
1
19.8
9.4
40
51.2

Termite Treatment

39

9360

14856
19889.8
9913.49
29744.29
30.44
26680
32598.36
98559.36
27781.2
4982.4
14.4
54528.97
1672.5
126.9
7231.5
97200
0
16499.1
1693.2
16669.5
234
1.8
915.6
951
3755.28
600

177-180
177-180
177-180
177-180
177-180
177-180
177-180
177-180
177-180
177-180
177-180
177-180
177-180
177-180
177-180
177-180
177-180
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
181-186
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190

PCC (Including Re-Do slope)


Plaster Work (Minor & Repair)
Tilling,Marble,skirting (Repair)
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo++ Glass
False Ceiling (Repairing)
Painting
Handover
PPR/Upvc/G I (Minor Repair)
Plumbing Fitting (Minor)
Exaust/Air louver (Repair if Required)
Plumbing Fixtures
Sainitary i.e Manhole etc
Circuit wiring(Conduting+Wiring)
Switch,Socket, DB's etc (minor)
PVC-Insulated Cable (Repair if Required)
Light fixture

45
15
15
15
12
10
15
0
15
8
10
8
8
15
15
10
8

346.4
665.6
10007.11
190.4
31.2
1416.8
6737.5
0
816.12
174.16
3953.67
56.8
4
79.2
37.6
160
204.8

Termite Treatment
Bitumen Coating
Block Masonary
Plaster Work
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+ & Glass
False Ceiling
Painting
Handover
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver
Plumbing Fixtures
Sainitary i.e Manhole etc
Circuit wiring(Conduting+Wiring)
Switch , Socket & DB'S
PVC-Insulated Cable
Light fixture

85
70
20
21
25
25
11
15
10
0
13
7
11
10
5
10
15
8
5

4050.46
438.5
819.55
6276.77
20728.67
2262.65
93
7178.64
39372.9
0
1135
410
7560
154
5.52
115
439
865
374

Backfilling
Termite Treatment
PCC /DPC
Formwork
Steel
Reinforced Cement Concrete
Block Masonry
Plaster Work
Bitumen Coating WP
Water Proofing
Foam Concrete
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+ & Glass
False Ceiling

20
116
95
28
24
21
29
41
10
20
11
33
41
21
29

0
8287.25
1231.25
5861.83
5.88
3773.75
5838.02
22559.27
0
0
0
43442.25
754.77
39.75
2223.75

187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
187-190
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
191-194
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196

Painting
Handover
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver
Plumbing Fixtures
Sainitary i.e Manhole etc
Circuit wiring(Conduting+Wiring)
Switch & Socket Back Box/Communication
PVC-Insulated Cable
Light fixture

10
0
25
10
22
16
9
26
21
15
8

18524.86
0
4294.25
464.25
5563.13
74.25
1.5
270.5
277.75
1597
198.75

Backfilling
Termite Treatment
PCC /DPC
Formwork
Steel
Reinforced Cement Concrete
Block Masonry
Plaster Work
Bitumen Coating
Water Proofing
Foam Concrete/Approved
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+ & Glass
False Ceiling
Painting
Handover
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver
Plumbing Fixtures
Sainitary i.e Manhole etc
Circuit wiring(Conduting+Wiring)
Switch & Socket Back Box/Communication
PVC-Insulated Cable
Light fixture

62
110
90
72
52
82
60
80
30
32
52
65
74
52
60
44
0
62
42
52
47
22
52
52
37
22

7224
16574.5
2462.5
11723.65
11.75
7547.5
11676.03
45118.54
0
0
0
86884.5
1509.54
79.5
4447.5
37049.71
0
8588.5
928.5
11126.26
148.5
3
541
555.5
3194
397.5

Backfilling
Termite Treatment
PCC /DPC
Formwork (All)
Steel (Not in BOQ)
Reinforced Cement Concrete (Minor)
Block Masonry
Plaster Work (All)
Bitumen Coating
Water Proofing
Foam Concrete
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+ & Glass

20
70
77
10
5
6
30
70
10
20
16
20
17
8

67.4
5850
56.05
458.52
0
175
3820.27
22682.5
4078
7068
420
10150.45
398
43

195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
195-196
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200
197-200

False Ceiling
Painting
Handover
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver
Plumbing Fixtures
Sainitary i.e Manhole etc
Circuit wiring(Conduting+Wiring)
Switch, Socket,DB'S etc
PVC-Insulated Cable
Light fixture
Backfilling
Termite Treatment
PCC /DPC
Formwork
Steel
Reinforced Cement Concrete
Block Masonry
Plaster Work
Bitumen Coating WP
Water Proofing
Foam Concrete
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+ & Glass
False Ceiling
Painting
Handover
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver
Plumbing Fixtures
Sainitary i.e Manhole etc
Circuit wiring(Conduting+Wiring)
Switch & Socket Back Box/Communication
PVC-Insulated Cable
Light fixture

10
20
0
6
7
10
6
7
10
14
6
5
40
116
90
29
25
23
60
41
30
40
5
33
41
21
29
29
0
25
10
22
17
9
25
21
15
10

1619.5
21600
0
2899.9
300
3725
49
2
185
193
497.7
134
0
8287.25
1231.25
5861.83
5.88
3773.75
5838.02
22559.27
0
0
0
43442.25
754.77
39.75
2223.75
18524.86
0
4294.25
464.25
5563.13
74.25
1.5
270.5
277.75
1597
198.75
2291074.31

Cleaning
Summary Sheet
Sr NO
Description
1
Backfilling
2
Termite Treatment
3
PCC /DPC
4
Formwork
5
Steel
6
Reinforced Cement Concrete
7
Block Masonry

Quantity Cost
56811.4
1351415
121048.79
996785
38459.01
2342578
123053.45
6995780
124.98
13586308
104203.33
22564412
136653.09
14066189

8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

Plaster Work
Bitumen Coating
Water Proofing
Foam Concrete
Tilling,Marble,skirting etc
Wooden Doo+/Wardrobe, Kitchen Cabinet
UPVC Windows , Doo+ & Glass
False Ceiling
Painting
PPR/Upvc/G I
Plumbing Fitting
Exaust/Air louver
Plumbing Fixtures
Sainitary i.e Manhole etc
Circuit wiring(Conduting+Wiring)
Switch & Socket Back Box/Communication
PVC-Insulated Cable
Light fixture

Total
Balance
excavation

448559.55
97120.5
23676
468
398920.25
11492.73
757
43569.14
472547.33
77229.05
8428.7
93056.19
1351
24.52
4533
4960
20468.3
3559

13530753
5173875
1934564
158806
47796720
30470024
9913329
3534670
10070932
18599662
31181163
6924429
26479956
70027
22120240
7693484
4620754
6642557

2291074.31
0
3907

308819412
0

WEEKLY-2
Start

Finish
27-May-12
16-Jul-12
1-Jun-12 30-Aug-12
3-Jun-12 12-Aug-12
5-Jun-12 25-Jun-12
10-Jun-12 30-Jun-12
10-Jun-12
2-Jul-12
1-May-12
9-Jul-12
2-Jul-12 11-Aug-12
7-Jul-12
17-Jul-12
12-Jul-12
22-Jul-12
17-Jul-12
24-Jul-12
26-Jul-12 15-Aug-12
5-Aug-12 30-Aug-12
18-Aug-12
7-Sep-12
2-Sep-12 22-Sep-12
20-Sep-12 14-Oct-12
14-Oct-12
14-Jun-12
19-Jul-12
22-Jun-12
22-Jul-12
23-Aug-12 12-Sep-12
2-Sep-12 22-Sep-12
10-Sep-12 20-Sep-12
30-May-12
11-Jul-12
9-Jun-12
14-Jul-12
20-Jul-12
1-Aug-12
15-Sep-12 25-Sep-12

1st May-24 June


9164

%Age Completion
123.37%

Planned
68%

Cleaning
0.93

39.80
3,482.63
506.25

9.69%
0.21
0.01

63.64%
81.16%
59%
Unplanned* Has to enter

38.86%

70.93%

490
3166.00
3486

0.07
0.32
0.7032848203

60%
27%
30%

7271.01

0.45

69.57%

1746

0.13

821.12

0.10

Actual
27-May-12
1-Jun-12
3-Jun-12
5-Jun-12
10-Jun-12
10-Jun-12
7-May-12
8-Jul-12
13-Jul-12
18-Jul-12
23-Jul-12
1-Aug-12
11-Aug-12
24-Aug-12
8-Sep-12
26-Sep-12
20-Jun-12
28-Jun-12
29-Aug-12
8-Sep-12

16-Jul-12
30-Aug-12
12-Aug-12
25-Jun-12
30-Jun-12
2-Jul-12
15-Jul-12
17-Aug-12
23-Jul-12
28-Jul-12
30-Jul-12
21-Aug-12
5-Sep-12
13-Sep-12
28-Sep-12
15-Oct-12
15-Oct-12
25-Jul-12
28-Jul-12
18-Sep-12
28-Sep-12

92%

Plaster
Unplanned* Chiping
Plaster

11.43%

16-Sep-12
5-Jun-12
15-Jun-12
26-Jul-12
21-Sep-12

26-Sep-12
17-Jul-12
20-Jul-12
7-Aug-12
1-Oct-12

11-May-12
29-May-12
29-May-12
21-Jun-12
24-Jun-12
27-Jun-12
1-Jul-12
28-Jul-12
2-Aug-12
7-Aug-12
12-Aug-12
21-Aug-12
31-Aug-12
8-Sep-12
21-Sep-12
3-Oct-12

28-Jun-12
18-Aug-12
15-Aug-12
29-Jun-12
2-Jul-12
4-Jul-12
24-Jul-12
12-Aug-12
12-Aug-12
17-Aug-12
19-Aug-12
10-Sep-12
20-Sep-12
26-Sep-12
11-Oct-12
15-Oct-12
15-Oct-12
25-Jul-12
7-Aug-12
1-Oct-12
11-Oct-12
9-Oct-12
24-Jul-12
24-Jul-12
27-Aug-12
11-Oct-12

10-Jul-12
18-Jul-12
11-Sep-12
21-Sep-12
29-Sep-12
29-Jun-12
8-Jul-12
15-Aug-12
1-Oct-12

11-May-12
12-Jul-12
12-Jun-12 30-Sep-12
16-Jun-12
4-Sep-12
6-Jun-12 17-Aug-12
8-Jun-12
30-Jul-12
10-Jun-12 29-Aug-12
10-Jun-12
9-Aug-12
28-Jun-12 27-Sep-12
15-May-12
7-Sep-12
28-Jul-12 29-Aug-12
30-Jul-12 20-Sep-12
24-Jul-12 12-Sep-12
29-Jul-12 11-Oct-12
12-Aug-12
3-Oct-12
16-Aug-12 15-Oct-12
6-Sep-12 13-Oct-12
13-Oct-12
24-Jun-12 25-Aug-12
26-Jun-12
7-Aug-12
14-Aug-12
5-Oct-12

4151.03

0.84

87.50%

1272.94

0.12

Unplanned*

29850.06
2100

0.75
0.11

67.74%
12.73%

Not include

27589.55

0.99

34.78%

95

85%

21-Aug-12
7-Oct-12
23-Aug-12 14-Sep-12
20-Jun-12 11-Aug-12
22-Jun-12 13-Aug-12
1-Aug-12
7-Sep-12
25-Aug-12 16-Sep-12
7-Jun-12
8-Aug-12
19-Jun-12
7-Oct-12
13-Jul-12 16-Sep-12
5-Jul-12 15-Sep-12
7-Jul-12 28-Aug-12
9-Jul-12 27-Sep-12
9-Jul-12
7-Sep-12
27-Jun-12 15-Sep-12
7-Jun-12 30-Sep-12
27-Jul-12 28-Aug-12
29-Jul-12 19-Sep-12
23-Jul-12 11-Sep-12
28-Jul-12 10-Oct-12
11-Aug-12
2-Oct-12
15-Aug-12 14-Oct-12
5-Sep-12 12-Oct-12
12-Oct-12
23-Jul-12 23-Sep-12
25-Jul-12
5-Sep-12
13-Aug-12
4-Oct-12
20-Aug-12
6-Oct-12
22-Aug-12 13-Sep-12
19-Jul-12
9-Sep-12
21-Jul-12 11-Sep-12
31-Jul-12
6-Sep-12
24-Aug-12 15-Sep-12
2-Jun-12
27-Jul-12
6-Jun-12
21-Jul-12
5-Jul-12
15-Jul-12
15-Jul-12
24-Jul-12
19-Jul-12
29-Jul-12
25-Jul-12
4-Aug-12
31-Jul-12 10-Aug-12
19-Aug-12 31-Aug-12
31-Aug-12
22-Jun-12
2-Jul-12
27-Jun-12
5-Jul-12
5-Aug-12 13-Aug-12
10-Aug-12 18-Aug-12
12-Jun-12 20-Jun-12
20-Jun-12 30-Jun-12
10-Jul-12
18-Jul-12
15-Aug-12 23-Aug-12
2-Jun-12

11-Jul-12

1200

0.08

27.42%

7000

0.25

14.78%

Has to include in Prog

5-Jun-12
20-Jul-12
6-Jul-12
21-Jul-12
14-Jul-12
29-Jul-12
19-Jul-12
3-Aug-12
24-Jul-12
5-Aug-12
2-Aug-12 12-Aug-12
20-Aug-12
4-Sep-12
4-Sep-12
27-Jun-12
12-Jul-12
2-Jul-12
10-Jul-12
28-Jul-12
7-Aug-12
7-Aug-12 15-Aug-12
12-Aug-12 20-Aug-12
19-Jun-12
4-Jul-12
22-Jun-12
7-Jul-12
11-Jul-12
21-Jul-12
17-Aug-12 25-Aug-12
2-Jun-12
7-Jun-12
11-Jun-12
12-Jul-12
23-Jul-12
2-Aug-12
11-Aug-12
22-Aug-12
30-Aug-12
9-Sep-12
3-Jul-12
8-Jul-12
17-Aug-12
22-Aug-12
25-Aug-12
21-Jun-12
26-Jun-12
18-Jul-12
27-Aug-12

26-Aug-12
16-Aug-12
1-Jul-12
2-Aug-12
17-Aug-12
27-Aug-12
22-Aug-12
6-Sep-12
9-Sep-12
16-Jul-12
15-Jul-12
28-Aug-12
1-Sep-12
30-Aug-12
1-Jul-12
11-Jul-12
26-Jul-12
1-Sep-12

2-Jun-12 22-Jun-12
4-Jun-12 28-Sep-12
6-Jun-12
9-Sep-12
26-Jun-12
24-Jul-12
4-Jul-12
28-Jul-12
8-Jul-12
29-Jul-12
11-Jul-12
9-Aug-12
2-Aug-12 12-Sep-12
5-Aug-12 15-Aug-12
8-Aug-12 28-Aug-12
18-Aug-12 29-Aug-12
1-Sep-12
4-Oct-12
4-Sep-12 15-Oct-12
7-Sep-12 28-Sep-12
14-Sep-12 13-Oct-12

8778
7415
7573

897.75

0.02

Unplanned* Painting
Wall Putty &
Coat

Cleaning

4984

24-Sep-12

4-Oct-12
4-Oct-12
21-Aug-12
9-Aug-12
2-Oct-12
4-Oct-12
30-Sep-12
10-Aug-12
13-Aug-12
11-Sep-12
1-Oct-12

3473.41125

0.19

Unplanned* Need to Review

130

0.03

Unplanned*

1300

0.1

Unplanned*

7547.82

1.04

61.29%

6359
7
55

0.54
0.60
0.01

15.28%
21.15%
7.32%

10-Jul-12
12-Jul-12
9-Aug-12
16-Aug-12
18-Aug-12
6-Jul-12
8-Jul-12
27-Jul-12
20-Aug-12

16-Jul-12
4-Oct-12
18-Sep-12
31-Aug-12
13-Aug-12
14-Sep-12
25-Aug-12
2-Oct-12
14-Aug-12
24-Aug-12
15-Sep-12
22-Sep-12
6-Oct-12
28-Sep-12
10-Oct-12
15-Oct-12
15-Oct-12
10-Sep-12
23-Aug-12
30-Sep-12
2-Oct-12
9-Sep-12
27-Aug-12
29-Aug-12
2-Sep-12
11-Sep-12

7-Jun-12
12-Jun-12
13-Jun-12
13-Jun-12
16-Jun-12
18-Jun-12
14-May-12
6-May-12
30-Jun-12
3-Jul-12
8-Jul-12
6-Aug-12
11-Aug-12
18-Aug-12

27-Jun-12
21-Aug-12
29-Aug-12
23-Jun-12
21-Jun-12
24-Jun-12
13-Jun-12
15-Jul-12
10-Jul-12
23-Jul-12
24-Jul-12
26-Aug-12
28-Aug-12
26-Aug-12

90
2331.61

0.80
0.10

100.00%
70.00%

27-Jul-12
30-Jul-12
10-Sep-12
18-Sep-12
21-Sep-12
15-Jul-12
23-Jul-12
27-Aug-12
23-Sep-12
15-May-12
16-Jun-12
20-Jun-12
20-Jun-12
22-Jun-12
24-Jun-12
26-Jun-12
14-Jul-12
15-Jul-12
23-Jul-12
25-Jul-12
19-Jul-12
24-Jul-12
7-Aug-12
11-Aug-12
1-Sep-12

Cleaning

change
change

26-Aug-12
5-Sep-12
20-Jun-12
22-Jun-12
21-Aug-12
29-Aug-12
31-Aug-12
6-Jun-12
11-Jun-12
27-Jul-12
3-Sep-12
2-Jun-12
2-Jun-12
10-Jun-12
25-Jun-12
4-Jul-12
9-Jul-12
18-May-12
16-Jul-12
19-Jul-12
22-Jul-12
24-Jul-12
1-Aug-12
4-Aug-12
7-Aug-12
14-Aug-12
2-Sep-12
10-Jul-12
13-Jul-12
10-Aug-12
18-Aug-12
22-Aug-12
29-Jun-12
6-Jul-12
27-Jul-12
28-Aug-12

%Age Progress
92.24%
4.35%
5.17%

9.49%

5-Sep-12
25-Sep-12
25-Sep-12
26-Jun-12
29-Jun-12
31-Aug-12
4-Sep-12
7-Sep-12
16-Jun-12
25-Jun-12
2-Aug-12
8-Sep-12
12-Jul-12
26-Sep-12
8-Sep-12
24-Jul-12
29-Jul-12
1-Aug-12
17-Jul-12
26-Aug-12
18-Aug-12
31-Aug-12
29-Jul-12
3-Sep-12
14-Sep-12
28-Aug-12
12-Sep-12
1-Oct-12
1-Oct-12
4-Aug-12
23-Jul-12
1-Sep-12
4-Sep-12
31-Aug-12
24-Jul-12
27-Jul-12
11-Aug-12
7-Sep-12

900

73.10%

32.22%

855.97
2498.91

0.13
11.08%

48.33%
70.73%

1054.81%

48.03%

Has to Include

37.41%

0.93%

350

Has to enter

Actual BOQ need to be calculate in order to avoid variation in quantities

Reviced
Quantity Till Date
20%
1746
349.2
80%

Reviced

Visual Observation

Cleaning

1992.48

Has to include in Progress Report

Chiping for Plaster


Chiping for Plaster
Chiping for Plaster

25%
75%

Qty Tilldate
3591

1500

897.75
0

Cleaning

1500

Chiping for Plasetr

4631.215
36050

TILL 3RD JUNE

Need to Review

25% is Wall Putty & Pri


3145
out of 25% 75% of villa is completed
4631.215
3473.4113
18524.86
4631.215 2315.6075
0.125
12.5

1380 BFIL75%

30%

462.76 Chiping for Plaster

Formwork
Termite
Termite

Revision in Both

2337 191-194
1050 63-65
3166 47-48

1st June
1st June

8494

Has to Include

Revision in Both

ILL 3RD JUNE

7-12,47-52,53-58,63-68,69-74
187-190, H#191-194 & 197-200

Unit

Date

63
63
63
63
63
63
63
63
63
63
64
63
64
63
64
63
64
63
64
65
63
65
66
64
65
63
66
63
64
65
66
67
68
68
68
64
64
64
65
68
63
68
64
65
64
68
63
63

7-May-12
8-May-12
9-May-12
10-May-12
11-May-12
12-May-12
13-May-12
14-May-12
15-May-12
15-May-12
16-May-12
17-May-12
17-May-12
18-May-12
18-May-12
19-May-12
19-May-12
21-May-12
21-May-12
21-May-12
23-May-12
23-May-12
23-May-12
23-May-12
23-May-12
24-May-12
24-May-12
25-May-12
25-May-12
26-May-12
25-May-12
26-May-12
27-May-12
28-May-12
29-May-12
30-May-12
31-May-12
1-Jun-12
1-Jun-12
2-Jun-12
2-Jun-12
3-Jun-12
3-Jun-12
3-Jun-12
5-Jun-12
5-Jun-12
5-Jun-12
6-Jun-12

64
65
64
64
64
65
65
66
64
65
66
67
66
68
68
66
67
68
67
68

7-Jun-12
7-Jun-12
8-Jun-12
9-Jun-12
10-Jun-12
10-Jun-12
11-Jun-12
12-Jun-12
13-Jun-12
14-Jun-12
16-Jun-12
17-Jun-12
17-Jun-12
21-Jun-12
22-Jun-12
23-Jun-12
25-Jun-12
27-Jun-12
28-Jun-12
29-Jun-12

2-Jun-12

Description

Unit

Cleaning for water proofing


Cleaning for water proofing(Int+Ext.)
Cleaning for water proofing(Int+Ext.)
Cleaning for water proofing strip Beam+Foundation
Cleaning for water proofing strip Beam+Foundation
Cleaning for water proofing strip Beam+Foundation
Cleaning for water proofing strip Beam+Foundation
Cleaning for water proofing strip Beam+Foundation
Cleaning
Bitumen Coating/Primer
Cleaning in Progress
Primer(bitumen)
Cleaning for water Proofing
Primer(bitumen)
Cleaning for water Proofing
Bitumen Coating/Primer
cleaning
Primer (Bitumen Coat)
Primer (Bitumen Coat)
Cleaning
Backfilling
Cleaning
Cleaning
Bitumen Coating/Primer
Bitumen Coating/Primer
Backfilling
Cleaning
Backfilling
Bitumen Coating/Primer
Bitumen Coating/Primer
Cleaning
Cleaning
Cleaning
Cleaning
Cleaning
Backfilling
Backfilling
backfilling
backfilling
Primer Coat
Backfilling
Bitumen Coating
Backfilling
Backfilling
Backfilling
Bitumen Coating
Backfilling
Backfilling in Progress

sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
cft
sft
sft
sft
sft
cft
sft
cft
sft
sft
sft
sft
sft
sft
sft
cft
cft
cft
cft
sft
cft
sft
cft
cft
cft
sft
cft
cft

Quantity
525
485
160
120
200
168
220
240
153.5
731.85
332
4725
216.55
550
236
610.78
392.12
456
270.14
486.94
550
200
624.3
1500
1750
538.12
882.5
481.82
3692
853.7836
500
1341.86
434.98
800
295
684.5
100
337.5
271.16
1750
921
1750
252.21
348.46
315.85
1750
941.2
941.2

Area Incharge

Backfilling in Progress
Backfilling in Progress
Cleaning
Backfilling in Progress
Backfilling
Backfilling
Backfilling
Backfilling
Back Filling
Back Filling
Back Filling
Back Filling
Back Filling
back filling
Back filling
Back filing
Back filing
Back filling
Back filling
Back filling

cft
cft
sft
cft
cft
cft
cft
cft
cft
cft
cft
cft
cft
Cft
cft
Cft
cft
cft
cft
cft

99
884
1047
65
429
682.95
694
333
1431.89
1431.9
1431.9
1431.9
400
1431
1431
1908
1050
1150
1450
1450

Block Masonary

sft

Block Masonary

sft

325.19884058