You are on page 1of 28

Bug Tracking System

ABSTRACT

The project Defect Tracking System is fully developed for the testing team of
Software Development Companies. This system provides all details about the project ,testing
details, Bug tracking details and produces various reports.
The system receives all requirements from the project and the tasks are assigned to the
developers and testers. The system stores all the details and the engineers can retrieve the details
easily. The system produces reports which helps the testers to analyse the defects and it improves
the software development process. The entire system is user friendly and interactive.

EXISTING SYSTEM:
The existing system is computerization with excel sheet. These systems are maintained
by Software testing total reports. Software testing is a complex process involving the
development and execution of thousands of tests. Often, tests are required for multiple hardware
platforms and software versions. Managing all aspects of the testing process can be timeconsuming and difficult
Once testing is completed testers generate metrics and make final reports on their test
effort. A test summary is made. It is difficult to find the daily bug report and project report.
Limitations:

Report creation is difficult

Finding a particular test case consumes more time

Less security

Any one can open and edit the test case.

PROPOSED SYSTEM:
Defect Tracking helps you maintain a project database of tests that cover all aspects
of your applications functionality.
To meet the various goals of a project, you organize the tests from your project
database into unique groups .With Defect Tracking, we can maintain a projecta database of
tests, from a project, we can build test setsgroups of tests executed to achieve a specific goal.
For example, you can create a test set that checks a new version of the software, or one
that checks a specific feature. As you execute tests, Test Director lets you report defects detected
in the software. Tables can also be shared in multiple systems for manipulating at the same time.
Advantages:
Easy to maintain and manipulate
Generate Reports easily
Generate information to user
Reduce manual errors

SYSTEM CONFIGURATION

HARDWARE REQUIREMENT

Processor

: Intel Pentium IV

Clock speed

: 1.8 GHz

RAM

: 256 MB

HDD

: 80 GB

FDD

: 1.44 MB

CD Drive

: 52x Reader

Pointing device

: Scroll Mouse

Keyboard

: 101 Standard Key-board

Peripherals

: Printer

SOFTWARE REQUIREMENT

System Architecture

: .Net

Core Language

: ASP.Net, Visual Basic.Net

Operating System

: Windows XP

Database

: SQL Server 2000

DATAFLOW DIAGRAM
DATA FLOW DIAGRAM
Level-0

Figure 3.1 DFD Level 0

Level-1

Figure 3.2 DFD Level 1

Level-2

System flow diagram

SCREEN SHOTS
HOME PAGE

ADMIN LOGIN PAGE

ADMIN LINK PAGE

10

EMPLOYEE REGISTRATION

11

PROJECT ASSIGNMENT

12

MODULE DETAILS

13

SCREEN DETAILS

14

DEVELOPER ASSIGN

15

TESTER ASSIGN

16

VIEW TESTER

17

VIEW DEVELOPER

18

DEVELOPER LOGIN

19

DEVELOPER LINK PAGE

20

DEVELOPER VIEW

21

DEVELOPER COMPLETE STATUS

22

TESTER LOGIN

23

TESTER LINK

24

TESTER VIEW

25

TEST DETAILS

26

BUG STATUS

27

28

You might also like