You are on page 1of 30

PHILIPPINE RED CROSS IN PARTNERSH

ILOILO CHAPT

WATER AND SANITATION IN S


PROGRAM OF WO
REGION

NAME OF SCHOOL

LANJAGAN PRIMARY SCHOOL


BUDGET ALLOCATION:

DIRECT COS

NO

DESCRIPTION

Expenses

1A

Insurances

1B

Bonds and Guarantees

2
2A
3

Mobilization
General Project Mobilisation/Demob, Safety & Health
Construction of Toilet Detached & Hand washing facilities

3A

Earthworks

3B

Concrete Works

3C

Steel Works

3D

Formworks

3E

Masonry Works

3F

Doors and Windows

3G

Roofing Works

3H

Carpentry Works

3I

Electrical Works

3J

Plumbing Works

3K

Sanitary Works

3L

Painting Works

3M

Tile Works

3N

Hardwares

Construction of Septic Vault

4A

Earthworks

4B

Concrete Works

4C

Steel Works

4D

Formworks

4E

Masonry Works

Provision/Rehabilitation of pipe connections

5A
6
6A

Installation of 3/4" PVC Pipe and water network


Water Source, water tank and electric pump
Provision of water tank, stand and electric pump

Direct Cost: SUBTOTAL


Indirect Cost (19% of total direct cost): SUBTOTAL
Tax (12%)
ESTIMATED TOTAL COST (PHP)

Prepared by:
Ardhe D. Sicad
Wash TPA

OSS IN PARTNERSHIP WITH BRITISH RED CROSS


ILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECT


PROGRAM OF WORKS
PROJECT TITLE
CONSTRUCTION OF 3-SEATER TOILET DETACHED WITH HANDWASHING FACILITIES
APPROVED BUDGET FOR CONTRACT:
DIRECT COST

cost): SUBTOTAL

OTAL COST (PHP)

UNIT

QTY

location

location

location

each

each

each

each

each

each

each

each

each

each

each

each

each

each

each

each

each

each

each

each

each

Noted by:

D CROSS

TITLE

ACHED WITH HANDWASHING FACILITIES


COMPLETION PERIOD: 2 MONTHS

TOTAL COST

TAX EXEMPT
-

Daphnie S. Dela Cruz


Field Operations Head

PHILIPPINE RED CROSS IN PARTNERSH

ILOILO CHAPT

WATER AND SANITATION IN S


PROGRAM OF WO
REGION

NAME OF SCHOOL

TAGUBANHAN ELEMENTARY SCHOOL


BUDGET ALLOCATION:

DIRECT COS

NO

DESCRIPTION

Expenses

1A

Insurances

1B

Bonds and Guarantees

2
2A
3

Mobilization
General Project Mobilisation/Demob, Safety & Health
Construction of Toilet Detached & Hand washing facilities

3A

Earthworks

3B

Concrete Works

3C

Steel Works

3D

Formworks

3E

Masonry Works

3F

Doors and Windows

3G

Roofing Works

3H

Carpentry Works

3I

Electrical Works

3J

Plumbing Works

3K

Sanitary Works

3L

Painting Works

3M

Tile Works

3N

Hardwares

Construction of Septic Vault

4A

Earthworks

4B

Concrete Works

4C

Steel Works

4D

Formworks

4E

Masonry Works

Provision/Rehabilitation of pipe connections

5A
6
6A

Installation of 3/4" PVC Pipe and water network


Water Source, water tank and electric pump
Provision of water tank, stand and electric pump

Direct Cost: SUBTOTAL


Indirect Cost (19% of total direct cost): SUBTOTAL
Tax (12%)
ESTIMATED TOTAL COST (PHP)

Prepared by:
Ardhe D. Sicad
Wash TPA

OSS IN PARTNERSHIP WITH BRITISH RED CROSS


ILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECT


PROGRAM OF WORKS
PROJECT TITLE
CONSTRUCTION OF 3-SEATER TOILET DETACHED WITH HANDWASHING FACILITIES
APPROVED BUDGET FOR CONTRACT:
DIRECT COST

cost): SUBTOTAL

OTAL COST (PHP)

UNIT

QTY

location

location

location

each

each

each

each

each

each

each

each

each

each

each

each

each

each

each

each

each

each

each

each

each

Noted by:

D CROSS

TITLE

ACHED WITH HANDWASHING FACILITIES


COMPLETION PERIOD: 2 MONTHS

TOTAL COST

TAX EXEMPT
-

Daphnie S. Dela Cruz


Field Operations Head

PHILIPPINE RED CROSS IN PARTNERSH

ILOILO CHAPT

WATER AND SANITATION IN S


PROGRAM OF WO
REGION

NAME OF SCHOOL

PINAY ESPINOSA ELEMENTARY SCHOOL


BUDGET ALLOCATION:

DIRECT COS

NO

DESCRIPTION

Expenses

1A

Insurances

1B

Bonds and Guarantees

2
2A
3

Mobilization
General Project Mobilisation/Demob, Safety & Health
Construction of Toilet Detached & Hand washing facilities

3A

Earthworks

3B

Concrete Works

3C

Steel Works

3D

Formworks

3E

Masonry Works

3F

Doors and Windows

3G

Roofing Works

3H

Carpentry Works

3I

Electrical Works

3J

Plumbing Works

3K

Sanitary Works

3L

Painting Works

3M

Tile Works

3N

Hardwares

Construction of Septic Vault

4A

Earthworks

4B

Concrete Works

4C

Steel Works

4D

Formworks

4E

Masonry Works

Provision/Rehabilitation of pipe connections

5A
6
6A

Installation of 3/4" PVC Pipe and water network


Water Source, water tank and electric pump
Provision of water tank, stand and electric pump

Direct Cost: SUBTOTAL


Indirect Cost (19% of total direct cost): SUBTOTAL
Tax (12%)
ESTIMATED TOTAL COST (PHP)

Prepared by:
Ardhe D. Sicad
Wash TPA

OSS IN PARTNERSHIP WITH BRITISH RED CROSS


ILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECT


PROGRAM OF WORKS
PROJECT TITLE
CONSTRUCTION OF 4-SEATER TOILET DETACHED WITH HANDWASHING FACILITIES
APPROVED BUDGET FOR CONTRACT:
DIRECT COST

cost): SUBTOTAL

OTAL COST (PHP)

UNIT

QTY

location

location

location

each

each

each

each

each

each

each

each

each

each

each

each

each

each

each

each

each

each

each

each

each

Noted by:

D CROSS

TITLE

ACHED WITH HANDWASHING FACILITIES


COMPLETION PERIOD: 2 MONTHS

TOTAL COST

TAX EXEMPT
-

Daphnie S. Dela Cruz


Field Operations Head

PHILIPPINE RED CROSS IN PARTNERSH

ILOILO CHAPT

WATER AND SANITATION IN S


PROGRAM OF WO
REGION

NAME OF SCHOOL

PINAY ESPINOSA ELEMENTARY SCHOOL


BUDGET ALLOCATION:

DIRECT COS

NO

DESCRIPTION

Expenses

1A

Insurances

1B

Bonds and Guarantees

2
2A
3

Mobilization
General Project Mobilisation/Demob, Safety & Health
Rehabiltation of Concrete Tank and WASH Facilities

3A

Earthworks

3B

Concrete Works

3C

Steel Works

3D

Formworks

3E

Masonry Works

3F

Doors and Windows

3G

Roofing Works

3H

Carpentry Works

3I

Electrical Works

3J

Plumbing Works

3K

Sanitary Works

3L

Painting Works

3M

Tile Works

3N

Hardwares

Direct Cost: SUBTOTAL


Indirect Cost (19% of total direct cost): SUBTOTAL
Tax (12%)
ESTIMATED TOTAL COST (PHP)
Prepared by:
Ardhe D. Sicad
Wash TPA

OSS IN PARTNERSHIP WITH BRITISH RED CROSS


ILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECT


PROGRAM OF WORKS
PROJECT TITLE
REHABILITATION OF SCHOOL WASH FACILITIES
APPROVED BUDGET FOR CONTRACT:
DIRECT COST

UNIT

QTY

location

location

location

each

each

each

each

each

each

each

each

each

each

each

each

each

each

cost): SUBTOTAL

OTAL COST (PHP)


Noted by:

D CROSS

TITLE

OOL WASH FACILITIES


COMPLETION PERIOD: 2 MONTHS

TOTAL COST

TAX EXEMPT
-

Daphnie S. Dela Cruz


Field Operations Head

PHILIPPINE RED CROSS IN PARTNERSH

ILOILO CHAPT

WATER AND SANITATION IN S


PROGRAM OF WO
REGION

NAME OF HEALTH UNIT

AJUY RURAL HEALTH UNIT


BUDGET ALLOCATION:

DIRECT COS

NO

DESCRIPTION

Expenses

1A

Insurances

1B

Bonds and Guarantees

2
2A
3

Mobilization
General Project Mobilisation/Demob, Safety & Health
Construction of Placenta Pit with Sharps and Rehabilitation of
WASH Faciliies

3A

Earthworks

3B

Concrete Works

3C

Steel Works

3D

Formworks

3E

Masonry Works

3F

Carpentry Works

3G

Plumbing Works

3H

Sanitary Works

3I

Painting Works

3J

Tile Works

3K

Hardwares

Provision/Rehabilitation of pipe connections

5A
4
5A

Installation of 3/4" PVC Pipe and water network


Water Source, water tank and electric pump
Provision of water tank, stand and electric pump

Direct Cost: SUBTOTAL


Indirect Cost (19% of total direct cost): SUBTOTAL
Tax (12%)
ESTIMATED TOTAL COST (PHP)
Prepared by:
Ardhe D. Sicad
Wash TPA

OSS IN PARTNERSHIP WITH BRITISH RED CROSS


ILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECT


PROGRAM OF WORKS
PROJECT TITLE

CONSTRUCTION OF PLACENTA PIT WITH SHARPS AND REHABILITATION OF WASH FACILI


APPROVED BUDGET FOR CONTRACT:
DIRECT COST

UNIT

QTY

location

location

location

each

each

each

each

each

each

each

each

each

each

each

each

each

cost): SUBTOTAL

OTAL COST (PHP)


Noted by:

D CROSS

TITLE

S AND REHABILITATION OF WASH FACILITIES


COMPLETION PERIOD: 2 MONTHS

TOTAL COST

TAX EXEMPT
-

Daphnie S. Dela Cruz


Field Operations Head

PHILIPPINE RED CROSS IN PARTNERSH

ILOILO CHAPT

WATER AND SANITATION IN S


PROGRAM OF WO
REGION

NAME OF HEALTH UNIT

BAY-ANG BARANGAY HEALTH CENTER


BUDGET ALLOCATION:

DIRECT COS

NO

DESCRIPTION

Expenses

1A

Insurances

1B

Bonds and Guarantees

2
2A
3

Mobilization
General Project Mobilisation/Demob, Safety & Health
Construction of Placenta Pit with Sharps and Rehabilitation of
WASH Faciliies

3A

Earthworks

3B

Concrete Works

3C

Steel Works

3D

Formworks

3E

Masonry Works

3F

Carpentry Works

3G

Plumbing Works

3H

Sanitary Works

3I

Painting Works

3J

Tile Works

3K

Hardwares

Provision/Rehabilitation of pipe connections

4A

Installation of 3/4" PVC Pipe and water network

Direct Cost: SUBTOTAL


Indirect Cost (19% of total direct cost): SUBTOTAL
Tax (12%)
ESTIMATED TOTAL COST (PHP)
Prepared by:
Ardhe D. Sicad
Wash TPA

OSS IN PARTNERSHIP WITH BRITISH RED CROSS


ILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECT


PROGRAM OF WORKS
PROJECT TITLE

CONSTRUCTION OF PLACENTA PIT WITH SHARPS AND REHABILITATION OF WASH FACILI


APPROVED BUDGET FOR CONTRACT:
DIRECT COST

UNIT

QTY

location

location

location

each

each

each

each

each

each

each

each

each

each

each

each

cost): SUBTOTAL

OTAL COST (PHP)


Noted by:

D CROSS

TITLE

S AND REHABILITATION OF WASH FACILITIES


COMPLETION PERIOD: 2 MONTHS

TOTAL COST

TAX EXEMPT
-

Daphnie S. Dela Cruz


Field Operations Head

PHILIPPINE RED CROSS IN PARTNERSH

ILOILO CHAPT

WATER AND SANITATION IN S


PROGRAM OF WO
REGION

NAME OF HEALTH UNIT

LANJAGAN BARANGAY HEALTH CENTER


BUDGET ALLOCATION:

DIRECT COS

NO

DESCRIPTION

Expenses

1A

Insurances

1B

Bonds and Guarantees

2
2A
3

Mobilization
General Project Mobilisation/Demob, Safety & Health
Construction of Placenta Pit with Sharps and Rehabilitation of
WASH Faciliies

3A

Earthworks

3B

Concrete Works

3C

Steel Works

3D

Formworks

3E

Masonry Works

3F

Carpentry Works

3G

Plumbing Works

3H

Sanitary Works

3I

Painting Works

3J

Tile Works

3K

Hardwares

Provision/Rehabilitation of pipe connections

4A
5
5A

Installation of 3/4" PVC Pipe and water network


Water Source, water tank and electric pump
Provision of water tank, stand and electric pump

Direct Cost: SUBTOTAL


Indirect Cost (19% of total direct cost): SUBTOTAL
Tax (12%)
ESTIMATED TOTAL COST (PHP)
Prepared by:
Ardhe D. Sicad
Wash TPA

OSS IN PARTNERSHIP WITH BRITISH RED CROSS


ILOILO CHAPTER

WATER AND SANITATION IN SCHOOL PROJECT


PROGRAM OF WORKS
PROJECT TITLE

CONSTRUCTION OF PLACENTA PIT WITH SHARPS AND REHABILITATION OF WASH FACILI


APPROVED BUDGET FOR CONTRACT:
DIRECT COST

UNIT

QTY

location

location

location

each

each

each

each

each

each

each

each

each

each

each

each

each

cost): SUBTOTAL

OTAL COST (PHP)


Noted by:

D CROSS

TITLE

S AND REHABILITATION OF WASH FACILITIES


COMPLETION PERIOD: 2 MONTHS

TOTAL COST

TAX EXEMPT
-

Daphnie S. Dela Cruz


Field Operations Head