Professional Documents
Culture Documents
PSS/SAS
RTU560
Revision: 4 Cities
ABB Oy
1-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
Contents:
1. INTRODUCTION...................................................................................................................................3
2. INSTALLATION....................................................................................................................................4
3. EXCEL IMPORT....................................................................................................................................6
3.1 PRECONDITION................................................................................................................................. 6
3.2 EDIT THE EXCEL FILE....................................................................................................................... 6
3.3 EDIT THE PATTERN FILE................................................................................................................... 8
...................................................................................................................................................................11
3.4 START EXCEL IMPORT.................................................................................................................... 14
3.5 BUILD RTU FILES........................................................................................................................... 22
4. RTU560 WEB SERVER.......................................................................................................................27
4.1 PRECONDITION............................................................................................................................... 27
4.2 ESTABLISH PPP- CONNECTION........................................................................................................ 27
4.3 START INTERNET EXPLORER WITH ADDRESS HTTP//10.0.10.50........................................................29
4.4 LOAD CONFIG.IOD (I/O DATA)....................................................................................................... 30
4.5 LOAD CONFIG.GCD (GENERAL CONFIGURATION DATA)...................................................................32
4.6 LOAD CONFIG.IOD (TEXTS FROM ARCHIV OR PRINTER)...................................................................34
4.7 RESTART RTU560.......................................................................................................................... 36
ABB Oy
2-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
1.
Introduction
This brief description does not replace the standard 560RTUtil NT Users Guide and
RTU560 Web Servers Users Guide. For details please refer to the manuals mentioned.
This description is made to show, how to change or add an item to an existing configuration
in the RTU, in case the user has not been working with the tool for a while, or to help a
newcomer to get easily started with the 560RTUtil NT.
This brief description handles:
Installation
The description for this installation procedure is complete different from the installation
procedure described in the UsersGuide. This way of installation is mainly based on field
experience.
Excel import
This Excel import procedure shows each step that has to be done if a change the RTU
configuration is required. The precondition is, that this steps have been carried out
before. This is the standard case when the RTU is delivered from the factory with the
appropriate configuration files and the customer make changes for example during
commissioning.
This guide advises you to keep the actual files which are in use in the RTU as
backup. If everything goes wrong during Excel-import, you will still have the
healthy GCD, IOD and PTX file which can be loaded to the RTU.
This steps seem more complicate as they really are. It is a matter of practice. The main
goal for Excel import is, if you have a large amaount of I/Os or IDEs. The Excel-import
helps to keep track of the parameters used in the RTU.
The output of this Excel-import chapter are the RTU-Files. The GCD-, IOD- and the
PTX File will be loaded to the CPU with the WEB Server Tool.
ABB Oy
3-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
2.
Installation
RTUtil NT is distributed as CD-ROM and is developed for the Windows NT 4.0 operating
system.
Copy the packed file RTUtilNT_xx_xx_xxx_00.exe into a directory with the release name
Wbtr xxx and unpack the file into the same directory. This will create the sub-directory Disk1
with additional subdirectories as shown below.
Keep this directory for future use, for example when you have to re-install the RTUtil NT
Double-click Setup.exe in the directory Disk1. The installation Process guides you through the
installation process.
ABB Oy
4-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
Follow the steps from the installation program and click through the following dialog sheets:
1. Acknowledge welcome page
2. Accept license agreements
3. Select the program path, where the files should be installed
ABB Oy
5-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
3.
Excel import
3.1
Precondition
RTUtil NT is installed and at least the Pattern and the Excel file(s) exist in the appropriate
directory.
ABB Oy
6-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
Make a copy of the ACTIVE xls file, change the date and remove the ACTIVE from the old
version to keep track of history.
ABB Oy
7-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
3.3
Make a copy of the ACTIVE TU file, change the date and remove the ACTIVE from the old
version to keep track of history.
ABB Oy
8-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
Start RTUtil from your work-directory or create a shortcut on your desktop or.
ABB Oy
9-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
RTUtil NT workspace offers to setup a new project. As we are editing an already existing
Project press Cancel!
ABB Oy
10-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
Your project specific pattern file with View Network Tree is now open.
ABB Oy
11-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
Check that your pattern file does not contain any signals in the View Signal Tree.
Check that your pattern file does not contain any signals in the View Signal Tree.
ABB Oy
12-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
Check so that your pattern file does not contain any signals in the View Hardware Tree.
Note:
If there are already any signals in the View Signal Tree or in the View Hardware Tree
They must be deleted, otherwise due to additive import will signals will be doubled, and will
cause an error message for each duplicated signals during RTU file generation.
ABB Oy
13-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
3.4
As the pattern file is already open, RTUtil NT suggests the open file as pattern file. Accept
with Next.
ABB Oy
14-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
Accept your RTU RHK. (In standard projects is normally only one RTU available. Accept
with Next.
Now select the Excel file that belongs to this project. Select Browse..
ABB Oy
15-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
Check that path and filename of the excel file is correct! Then select next!
ABB Oy
16-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
Now as the Excel file is selected, you have to define the sheet(s) within the excel file to be
imported. (The sheet for an IEC 870-5-103 Sub-Dev.Line is currently not used in this
example. Otherwise this sheet would have to be selected too.)
With the > or < button one single file is selected or deselected.
With the >> or << button all existing files are selected or deselected.
Select the Local IO sheet.
ABB Oy
17-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
Before the actual import RTUtil NT shows the selected files involved in the import procedure.
Scroll the window if necessary. Continue with Start!
The Excel file is automatically opened for the import procedure. A log file with the extension
log and an error file with the extension err are generated during this phase. If warnings or
errors appear during this phase, the cells in the Excel file will be marked yellow for warnings
and red for errors.
ABB Oy
18-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
Import has finished with 0 error(s) and 0 warning(s). The RTU file contains now the imported
signals and must be saved. Continue with Browse to check the file name and directory to
place the file.
ABB Oy
19-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
Check that the path and filename of the project file is correct! Then select Finish!
Check that your project file does contain the imported signals in the View Signal Tree.
ABB Oy
20-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
Check that your project file does contain the imported signals in the View Hardware Tree.
ABB Oy
21-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
3.5
Accept your RTU RHK. (In standard projects is normally only one RTU available.
Default name for the RTU file: RTU name.iod. Continue with Browse!
ABB Oy
22-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
Check that the path and filename of the RTU file is correct! Continue with Next!
ABB Oy
23-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
Ensure there are no Errors, Warnings or Informations. This requires that the RTU
configuration is build in a way that no plausibility messages is generated. Continue with
Generate File!
ABB Oy
24-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
Finally RTUtil NT reports RTU files are generated Continue with OK. The window will
close.
ABB Oy
25-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
ABB Oy
26-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
4.
4.1
Precondition
Refer to manual Users Guide to RTU560 Web Server Installation and Configuration
Release
Chapter: PPP Installation and RAS Configuration
Chapter: Establish PPP-Connection
4.2
Connection is establishing..
ABB Oy
27-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
ABB Oy
28-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
4.3
ABB Oy
29-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
4.4
Browse for the config.iod file in your project rtufile directory and select Open.
ABB Oy
30-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
Check for correct selected file. And continue with Load RTU.
ABB Oy
31-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
4.5
ABB Oy
32-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
Check for correct selected file. And continue with Load RTU.
ABB Oy
33-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
4.6
ABB Oy
34-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
Check for correct selected file. And continue with Load RTU.
ABB Oy
35-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
4.7
Restart RTU560
Reset RTU to activate the new configuration files. Continue with Reset.
ABB Oy
36-37
ABB Oy
PSS/SAS
RTU560
Revision: 4 Cities
Establish the web Server connection again and check the System Diagnostic for
possible errors. Check the new functionality of the RTU560 and make also spot
checks of the old functionality.
ABB Oy
37-37