You are on page 1of 9

Disouq Field - Dail

TO
CC
From
Subject

:
:
:
:

Date

O -1 , O-1D
O-50 , O-50D , O-30 , O-30D
O-90
Daily Production Report.
1/2/2016 ( From 06:00 AM

1/1/2016

to 06:00 AM o

1 - WELLS DATA :
No.Of Wells Available
RPF WELLS

WELLS

NWK 1-1

NWK 1-2

Flowing HRS

24

24

WHP (bar)

87

84

WHT ( C )

70

65

FLP ( barg)

80

80

FLT ( C )

58

59

Annulus Pres. (barg)

45

12.188

10.387

64

50

RPF

CTP

1381236

2905697.12

48.778

102.614

Condensate Production

46

620

Estimated Fuel Gas Consumption

1.07

1.55

Condensation (Shrinkage)

0.049

0.660

Well Production (MMSCF)


Well Gas Choke Opening (1/64")

2 - DISOUQ PRODUCTION FIGURE :

Sales Gas ( Flow Computer)

4 - CONDENSATE TANKS :
TANKS

RPF

CTP

T- 101A

T- 101B

T- 104

T- 4001 A

OPENING STOCK, BBLS

489

261

25

318

PORDUCED COND., BBLS

46

TRANSFERRING TO PPC

CLOSING STOCK, BBLS

535

261

25

318

5 - PRODUCED WATER :
RPF

CTP

Total

TANKS

T- 104

T- 4201 A

T- 4201 B

BBLS

OPENING STOCK, BBLS

434

1647

2136

4217

PRODUCED WATER, BBLS

64

95

159

TRUCKING, BBLS

315

315

498

1332

2231

4061

CLOSING STOCK, BBLS

6 - OUTSTANDING ITEMS :
Status
* LCV-5012 WATER OUTLET FROM SLUG CATCHER

Waiting for replacement

* LCV-5035 B CONDENSATE OUTLET FROM LTS -B

Needs to be replaced and


waiting spare parts

* Liquid Recovery pump 4302 of Recovery Gas Compressor


K-4301 malfunction
* Sales gas compressor K-5801 C

Waiting for Spare parts


Waiting for spare element filter of
discharge scrubber V-5802 C

* CONDENSATE LOADING PUMPS (P-4001A )

Waiting for Spare parts

* CONDENSATE LOADING PUMP (P-4001B )

Waiting for Spare parts

8 - PLANNED ACTIVITIES ( WILL AFFECT ON SALES GAS PRODUCTION) :

Item

Planned activities

9 - REMARKS :

* WELL NSG 1-2 TESTING :

Commenced 3rd following period at 05:00 hrs with the f


(CHK 42/64", Gas rate +/- 16 mmscf/d, WHP 1540 psi,

Flushed Expro desander found 80 kg sand/3 hrs, 20 kg/1

In order to protect the well and reduce sand production,

B/D gas CHK from 42/64" to 22/64" with the following

(CHK 22 /64", Gas rate +/- 8.1 mmscf/d, WHP 1740 psi
-

Flushed Expro desander 5 times as the follwing:200 gm

* SALES GAS COMPRESSOR :

Stopped both sales gas compressors K-5801 A/B due to

completed maintenance activates and kept compressor K


* WATER DISPOSAL :

Transferred 54 M of water disposal from CTP by petro

02

2
/
1
/0

01 6

- Daily Production Report

1/2/2016 ).

11 / 13

ELLS

CTP WELLS

NWK 1-3

NWK 1-4

NSG 1-1

NSG 1-2

NSG 2-1

NSG 2-3

NSG 4-1

24

24

24

24

24

24

24

91

86

128

105

171

82

197

72

71

65

62

58

57

74

80

80

83

83

74

75

80

62

66

54

55

34

53

48

24

20

15

25

16.302

11.022

20.846

8.879

14.371

11.475

25.696

64

62

40

38

29

54

38

3- LAB. ANALYSIS :
TOTAL

* GAS FEED & EXPORT COMPOSITION

4286933.12

SCM

Composition

Feed RPF

Export RPF

Feed CTP

151.392

MMSCF

N2

0.087

0.02

0.2228

666

BBLS

CO2

0.958

1.13

0.4921

C1

97.026

97.88

97.0656

2.62

MMSCF

C2

0.865

0.65

1.3709

0.709

MMSCF

C3

0.118

0.11

0.3964

IC4

0.044

0.04

0.1564

NC4

0.024

0.02

0.1069

T- 4001 B

Total,
bbls

IC5

0.026

0.01

0.0637

3850

4943

NC5

0.019

0.01

0.0412

620

666

C6+

0.852

0.13

0.084

Total

100

100

100

4470

5609

0.574

0.5993

*GAS PROPERTIES
SP.GR

0.597

MWT

17.25

16.62

17.121

Gross
Calorific
value

1054

1010.2

1031.7437

H.C Dew
Point

N/A

Water D.P

-11

Pressure

76

62

74

Temp.

44

37

31

RVP, PSI

SP.GR

API

* CONDENSATE ANALYSES

Action

Date

Maint.

5/27/2015

Maint.

9/8/2015

RPF

N/A

N/A

N/A

Maint.

10/27/2015

CTP

2.97

0.7665

53

DEA

10/30/2015

Maint.

11/12/2015

K-5801 A

K-5801 B

K-5801 C

Maint.

10/5/2015

Running HRS

23

18

Engine load %

71

Op. Mode

MAX

stand by

service

Outlet Pres.

73

7- SALES GAS COMRESSORS:

ctivities

th the following parameters:

40 psi, FLP 1240 psi, Avg liquid rate 000 bbl/d , Bs & w 90%, salinit

20 kg/1.5 hrs and 10 kg/1 hr (Avg. sand production 480 kg / d)

uction, Cairo PED requested decrease gas production to 8 mmscf/d.

owing parameters:

740 psi, FLP 1160 psi)

00 gm sand/2 hrs,150 gm/2 hrs, 1000 gm/4 hrs, 350 gm/4 hrs &100

due to install two bolts of exhaust pipe of compressor A , while comp

essor K-5801 B as standby due to decreasing production rate of NSG


petro safe company truck .

/
1
0
/
2
0
____________________
DSQ. Fields Gen. Mgr.
2015

LLS
NWSG1-1a

SSG 1-1

SSG 1-2

SSSE 3-1

24

24

185

N/A

87

45

55

75

74

23

50

20

7.937

15.622

17

64

Export CTP

SALES GAS
TO GASCO

0.2063

0.1463

0.4991

0.7024

97.1035

97.3537

1.342

1.1190

0.3765

0.2906

0.1494

0.1142

0.1019

0.0755

0.0573

0.0421

0.0358

0.0275

0.0455

0.0727

100

100

0.5789

0.5773

16.7849

16.7318

1025.675

1020.6890

-8

(0) Last sample


on 01/01/16

-20

N/A

67
32

WC %
N/A
0.0001

alinity 20000 ppm)

f/d.

100 gm/4 hrs.

compressor A started after

NSG 1-2 test.

Operation Gen. Mgr.