You are on page 1of 21

POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT

SOIL TESTING LABORATORY


Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project
Location

: Fasilitas Tambang Batubara


: Kalimatnan Timur

Check by
Date

: Sri W.
: Nov. 2006

No. Bor

: BH - 3

DIRECT SHEAR TEST


Sample :

Diametre (D) =
High =
Area (A) =

6.00 cm
2.00 cm
28.274 cm2
n ( kg/cm ) =
2

= D/D

menit

mm

(%)

0.00
0.50
1.00

0.00
0.03
0.06

1.50
2.00
2.50
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00

0.09
0.12
0.15
0.18
0.24
0.30
0.36
0.42
0.48
0.54
0.60

n ( kg/cm ) =
2

0.142

cm

div

0.0
0.5
1.0

28.274
28.134
27.994

1.5
2.0
2.5
3.0
4.0
5.0
6.0
7.0
8.0
9.0
10.0

27.856
27.720
27.585
27.451
27.187
26.928
26.674
26.425
26.180
25.940
25.704

kg/div
mm/mnt
11.50 - 12.00

UDS 2

n ( kg/cm2) =

0.283

Ring

Ph

kg

kg/cm

div

0
7
8.5

0
2.52
3.06

0
0.090
0.109

10
10.5
12
13
12.2

3.60
3.78
4.32
4.68
4.39

0.129
0.136
0.157
0.170
0.162

0.425

Ring

Ph

kg

kg/cm

div

kg

kg/cm2

0
9
13

0
3.24
4.68

0
0.115
0.167

0
8
13

0
2.88
4.68

0
0.102
0.167

15
16.5
18
18.5
20.3
21.5
22.2
23.5
23

5.40
5.94
6.48
6.66
7.31
7.74
7.992
8.46
8.28

0.194
0.214
0.235
0.243
0.269
0.287
0.300
0.320
0.316

15
15.2
18
18.5
20.5
22
23
24
23.5

5.40
5.47
6.48
6.66
7.38
7.92
8.28
8.64
8.46

0.194
0.197
0.235
0.243
0.271
0.294
0.310
0.327
0.323

max =

0.170

0.320

max =

0.327

0.500

0.600

Graph s vs t

Graph e vs t
0.400

0.36
1.00

D =

Ph

k=

Sample No./ Depth

Ring

max =

0.4

Proving Ring

0.35
0.3

0.350
0.300
0.250

0.25

0.200

0.2

0.150

0.15
sn ( kg/cm2) =
0.142

0.1

sn ( kg/cm2) =
0.283

0.05

0.100
0.050
0.000

0.000
0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0

0.100

0.200

0.300

0.400

0.142
sn ( kg/cm2) =
0.283

0.05
0

0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0

c=

0.12

kg/cm2

POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT

SOIL TESTING LABORATORY


Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project
Location

praktek
lapang polban

Check by
Date

kla 2 ta
okt

Bor location

bt-01

No. Bor

BH - 1

Dentsity ()
No. Sample

UDS 1

Depth :

2.60 - 300

No.

Wt of can (gr)

68.92

68.92

116.95

Wt of soil + can (gr)

210.71 207.82 229.44

Wt of soil (gr)

141.79 138.90 112.49

Vol of can (cm3)

86.19

86.19

69.03

1.645

1.612

1.630

Density (gr/cm3)
Ave of density (gr / cm )

1.629

Water content ()
No. Sample

UDS 1

Depth :

2.60 - 300

No.

Wt of can (gr)

15.76

15.60

15.49

Wt of wet soil + can (gr)

48.90

48.20

59.28

Wt of dry soil + can (gr)

43.30

42.45

Wt of moisture (gr)

5.60

5.75

Wt of dry soil (gr)

27.54

26.85

Water content (%)

20.33

21.42

Average (%)

20.87

No. Sample

UDS 1

Depth :

2.60 - 300

No.

10

26.94

29.99

28.47

Wt of picnometer + dry soil 32.31

35.80

34.36

Wt of picnometer + soil + w 80.34

83.12

81.27

Wt of picnometer + water

77.00

79.49

77.61

Wt of dry soil

5.37

5.81

5.89

Spasific of gravity

2.645

2.665

2.641

Wt of picnometer

Average
Temperature

2.651
25

Corection
Average of Gs

0.9983
2.646

POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT

SOIL TESTING LABORATORY


Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project

praktek

Check by

kla 2 ta

Location

lapang polban

Date

okt

Bor location

bt-01

No. Bor

BH - 1

Atterberg Limits
No. Sample :
Depth

UDS 1

2.60 - 300
Liquid Limit (LL)

Testing
No.

Plastic Limit (PL)

17

11

15

15.75

15.47

15.90

15.84

15.25

15.67

Wt of wet soil + can 29.45

25.48

28.09

25.37

24.76

23.85

Wt of dry soil + can 24.70

22.02

24.00

22.30

22.38

21.83

Wt of moisting

4.75

3.46

4.09

3.07

2.38

2.02

Wt. of dry soil

8.95

6.55

8.10

6.46

7.13

6.16

Water content

53.07

52.82

50.49

47.52

33.38

32.79

Wt of can

33.09

Average
Number of blow

12

18

25

40

LL = 51.00

Limit value

PL = 33.09

PI

Wate r co nte ntr [%]

Wate r con te n tr [%]

UDS 1 2.60 - 300

Flow Curve
55.00
53.00

Flow Curve
42
41
40

51.00

39
38

49.00

37
47.00

36

45.00

35
10

100

10
Num be r of Blow

Num ber of Blow

Plastic Limit (PL)

33.09

Liquid Limit (LL)

51.00

Plastic lndex (PI)

17.91

POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT

SOIL TESTING LABORATORY


Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project
Location

praktek
lapang polban

Check by
Date

okt

Bor location

bt-01

No. Bor

BH - 1

Grain Size Analysis


No. Sample :

UDS 1

200

Sieve No.

Diametre [mm]

Wt. retained [gram]

% Retained

% passing

4
10
20
40
60
100
200
pan

4.750
2.000
0.840
0.425
0.250
0.150
0.074

4.98
32.58
23.47
23.73
12.02
20.26
13.03

2.49
16.29
11.74
11.87
6.01
10.13
6.52

97.51
81.22
69.49
57.62
51.61
41.48
34.97

No. Sample :

UDS 1

Wd =

Hydrometre

1,50 -,200

gram

36.12

Time

Rh

Rh + C

Zr

N'

0.0

0.5
1
2
5
10
20
40
60
180
1140

12.0
11.0
9.0
6.0
1.0

0
25
25
25
25
25
25
25
25
25
25
25

0.0
0.0
11.0
10.0
8.0
5.0
0.0
0.0
0.0
0.0
0.0
0.0

17.004
17.004
14.144
14.404
14.924
15.704
17.004
17.004
17.004
17.004
17.004
17.004

0.01351
0.01351
0.01351
0.01351
0.01351
0.01351
0.01351
0.01351
0.01351
0.01351
0.01351
0.01351
0.0128

0.0000
#DIV/0!
0.0719
0.0513
0.0369
0.0239
0.0176
0.0125
0.0088
0.0072
0.0042
0.0016

0.00
0.00
48.96
44.50
35.60
22.25
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
17.12
15.56
12.45
7.78
0.00
0.00
0.00
0.00
0.00
0.00

-1
-1
-1
-1
-1

Sand

Clay

Silt
F

Gravel

Date

Wtotal :

Sieve

1,50 -,200

% Finer

100.00
90.00
80.00
70.00
60.00
50.00
40.00
30.00
20.00
10.00
0.00
0.000

0.001

0.010
Diametre
[mm]

0.100

1.000

10.000

30.00
20.00
10.00
0.00
0.000

0.001

0.010
Diametre
[mm]

0.100

1.000

10.000

POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT

SOIL TESTING LABORATORY


Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Check by
praktek
Date
3.8 cm
lapang polban
Dia
No. Bor
0.419 kg
bt-01
Kalibrasi 1Div =

Project
Location
Bor location

ks2b
okt

Unconfined Compression Test


Sample No. / Depth
Time

Strain

t (mnt)
0.00
0.25
0.50
1.00
1.50
2.00
2.50
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00

(%)
0.00
0.25
0.50
1.00
1.50
2.00
2.50
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00

Area
A1 (cm2)
11.341
11.370
11.398
11.456
11.514
11.573
11.632
11.692
11.814
11.938
12.065
12.195
12.327
12.463
12.601
12.743
12.888
13.036
13.187
13.343
13.501
13.664
13.831

Ring
0.0
0.0
38.0
78.0
107.0
141.0
178.0
208.0
255.0
272.0
278.0
274.0

Undisturbed
P (kg) (kg/cm2)
0
0.000
0.000
0.000
15.922
1.397
32.682
2.853
44.833
3.894
59.079
5.105
74.582
6.412
87.152
7.454
106.845
9.044
113.968
9.547
116.482
9.654
114.806
9.414

qu mak =

9.654

Ring
0.0
0.0
3.0
6.0
9.0
15.0
21.0
29.0
57.0
122.0
187.0
126.0

kg/cm2 q'u mak =

Remoulded
P (kg) (kg/cm2)
0.000
0.000
0.000
0.000
1.257
0.110
2.514
0.219
3.771
0.328
6.285
0.543
8.799
0.756
12.151
1.039
23.883
2.022
51.118
4.282
78.353
6.494
52.794
4.329

6.494

kg/cm2

Stress (s) - Strain (e) Curve


0

0.4

0.3

0.2

Undisturbe
d
Remoulded

0.1

Undisturbed
Remoulded

0
0.00 2.00 4.00 6.00 8.00
10.00 12.00 14.00 16.00 18.00 20.00

cu =

4.827

kg/cm2

S=

/' =

1.487

0.00

cu =

2.00

kg/cm2

6.00

4.00

S = /' =

8.00

10.00

POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT

SOIL TESTING LABORATORY


Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

Consolidation Test
Project
Location

initial Ht (H0) :

praktek
Bekasi

Diametere :

6.25

cm

Intial Water content (n)

cm

Water content (a)

Area (A) : 30.63 cm

Bor locatio bt-01

Weight (W) : 108.34 gr

No. Sample : BH - 1
Depth

2.20

Loads
()

dial read at
end

Change in
samp (H)

H total

ave H

kg/cm2

cm

cm

cm

cm

0.00400

0.000

2.200

0.25

0.01320

0.0172

0.017

2.183

0.0190

0.5

0.02180

0.0350

0.052

2.148

0.03700

0.0588

0.111

0.06220

0.0992

0.08380

47.28
Dry weight (Ws) = W / (1+a) 73.56
Ht of solids (Hs)=Ws/(A*Gs*w) 0.906
Initial void ratio (eo)=(Ho-Hs)/Hs 1.428

Gs : 2.650

: 2.60 - 300

t90

Cv

menit

cm2/menit

1.409

16.00

0.063

0.0576

1.370

11.56

0.085

2.089

0.1225

1.305

12.25

0.076

0.210

1.990

0.2319

1.196

10.89

0.077

0.1460

0.356

1.844

0.3931

1.035

6.25

0.115

0.11200

0.1958

0.552

1.648

0.6091

0.818

0.064

0.10080

0.0112

0.563

1.637

0.6215

0.806

0.25

0.09900

0.0018

0.565

1.635

0.6235

0.804

47.28

Note

1.428

Void Ratio (e)

7.994E-02

Log P [kg/cm2]

10

Log P [kg/cm2]

Cc = (e1 - e2) / (log p2 - log p1) =

10

0.027

POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT

SOIL TESTING LABORATORY


Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83

Triaxial - UU Test
Project
Location
Bor location
Check by

praktek
lapang polban
bt-01
ks 2b

Date

nop

Sample No.

Load ring
Strain Rate
Sample :

UDS 1

Time

Strain

t
mnt
0.00
0.25
0.50
1.00
1.50
2.00
2.50
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00

%
0.00
0.25
0.50
1.00
1.50
2.00
2.50
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00

Area
A1
cm2
11.341
11.370
11.398
11.456
11.514
11.573
11.632
11.692
11.814
11.938
12.065
12.195
12.327
12.463
12.601
12.743
12.888
13.036
13.187
13.343
13.501
13.664
13.831
14.001
14.176
14.356
14.540

Depth :
3=

Ring
div
0.0
0.0
41.5
64.0
86.0
111.5
137.0
163.5
214.0
256.0
283.0
300.5
304.0
293.5

P
kg
0.000
0.000
7.429
11.456
15.394
19.959
24.523
29.267
38.306
45.824
50.657
53.790
54.416
52.537

Max value =

0.50

kg/cm2
u
(kg/cm2

'

0.00
0.000
0.652
1.000
1.337
1.725
2.108
2.503
3.243
3.838
4.199
4.411
4.414
4.215

4.414

,100 - 1,50
3=
1.00

Ring
div
0.0
0.0
1.5
16.0
24.0
27.0
49.0
73.0
129.0
193.5
258.5
312.0
343.5
361.0
375.5
385.5
392.0
397.0
386.5

0.0
0.00

P
kg
0.000
0.000
0.269
2.864
4.296
4.833
8.771
13.067
23.091
34.637
46.272
55.848
61.487
64.619
67.215
69.005
70.168
71.063
69.184

Nilai mak =

A:

11.341

BH - 1

0.50 - 1.00

kg/cm2

'
u
(kg/cm2
0.000
1.30
0.000
0.024
0.250
0.373
0.418
0.754
1.118
1.955
2.901
3.835
4.580
4.988
5.185
5.334
5.415
5.445
5.451
5.246

5.451

0.00

Mohr's circle

Graphic stress strain

:
d:
h:

0.179
0.760
38.00
76.00

6.00
5.50
5.00
4.50
4.00
3.50
3.00
2.50
2.00
1.50
1.00
0.50
0.00

s 3 = 0.50 kg/cm 2
s 3 = 1.00 kg/cm 2

2.00
0.00

6.00
4.00

10.00
14.00
18.00
12.00
16.00
20.00

8.00

0.400 1.200 2.000 2.800 3.600 4.400 5.200 6.000 6.800 7.600
0.000 0.800 1.600 2.400 3.200 4.000 4.800 5.600 6.400 7.200 8.000

c=

kg/cm2

2.00
1.50
1.00
0.50
0.00

s 3 = 0.50 kg/cm 2
s 3 = 1.00 kg/cm 2

2.00
0.00

6.00
4.00

10.00

14.00
18.00
16.00
20.00

12.00

8.00

RTMENT

83

kg/div
mm/menit
mm
mm
cm2

0 5.200 6.000 6.800 7.600


4.800 5.600 6.400 7.200 8.000

POLITEKNIK NEGERI BANDUNG - CIVIL ENGINEERING DEPARTMENT

SOIL TESTING LABORATORY


Jl. Geger Kalong Hilir, Desa Ciwaruga Bandung, Telp. 022 - 201 45 83
Project
Location

praktek
lapang polban

Check
Check
by by
Date
Date

kla 2 ta
okt

Bor location

bt-01

No.No.
BorBor

BH - 1

Laboratory Test Resume


No. Sample

BM OI

Depth

1.00-1.50

Indek Properties

symbol

unit

1. Density

t/m3

1.629

2. Water content

20.87

3. Specific of gravity

Gs

2.65

Void ratio

0.96

Porosity

0.49

Degree of saturation

Sr

57.31

sat

t/m3

1.84

4. Plastic limit

PL

33.09

Liquid limit

LL

51.00

Plasticity index

PI

17.91

Gravel

2.490

Sand

62.545

Silt

26.97

Clay

Sat Density

5. Grainsize

8.00
100.00

Engineering properties
6. Unconfined
Compression Test

7. Triaxial - UU Test

8. Direct Shear Test

9. Consolidation Test

qu

kg\cm2

9.654

qu'

kg\cm2

6.494

St

1.487

cu

kg\cm

4.827

0.000

kg\cm2

0.000

#REF!

kg\cm2

#REF!

Cc

0.0000

3.00-3.50

4.50-5.00

12.00-12.50

16.50-17.00

Cv

7.99E-02

100.000
2.490
62.545
26.965
8.000
100.000

You might also like