You are on page 1of 5

A

TETHYS Oil

BLOCK 3 & 4 DEVELOPMENT


PROJECT (PHASE II) - OMAN

(Oman Branch)

TETHYS OIL AB

xxxxxxx

~ ~!~

JOB NR.

DOCUMENT NR.

JS1019

MR-PSD-15-035

TITTLE :

PROJECT

CC ENERGY DEVELOPMENT S.A.L

REV.

DATE

A1

29-Jan-2015

MR FOR Piping Valves

ATTACHMENT - 3
TECHNICAL CHECKLIST
(TO BE FILLED AND SUBMITTED WITH QUOTATION)

SHEET

A
~TETHYSOIL

BLOCK 3 & 4 DEVELOPMENT


PROJECT (PHASE II) - OMAN

(Oman Branch)

TETHYS OIL AB

xxxxxxx

~ ~!M!':

JOB NR.

DOCUMENT NR.

JS1019

MR-PSD-15-035

TITILE:

PROJ ECT

CC ENERGY DEVELOPMENT S.A.L

REV.

DATE

SHEET

A1

29.Jan-2015

MR FOR Piping Valves

TECHNICAL CHECK LIST

Vendor to ensure that the following minimum information is attached with their bid.
S. No.

DESCRIPTION

PLEASE REPLY
YES / NO

1.

Completely filled in Table of Compliance'.

2.

Deviations, if any, to the scope of work,


specifications, codes and standards attached/
referred to in this requisition with proper
reasoning.

3.

Completely filled in data sheets.

4.

General arrangement drawings showing the


overall dimensions, weights loading etc.

5.

Vendor's compliance with quality control


documents (viz. Manufacturing, inspection,
testing etc.) for the unit.

6.

Compliance that Delivery schedules and


vendor's detailed order execution schedule is
submitted.

7.

QA/QC documents as required with bid.

8.

Any additional documents I data as required


by bidder?
Whether the same is listed I highlighted?

Inspection Certification Type info.

A
TETHYS OIL

BLOCK 3 & 4 DEVELOPMENT


PROJECT (PHASE II) - OMAN

(Oman Branch)

TETHYS OIL AB

xxxxxxx

~ ~!.~~

JOB NR.

DOCUMENT NR.

JS1019

MR-PSD-15-035

TlTILE :

PROJECT

CC ENERGY DEVELOPMENT S.A.L

REV.

DATE

A1

29-Jan-2015

MR FOR Piping Valves

ATTACHMENT - 4
TABLE OF COMPLIANCE
(TO BE FILLED AND SUBMITTED WITH QUOTATION)

SHEET

A
TETHYS OIL

PROJECT

CC ENERGY DEVELOPMENT S.A.L

BLOCK 3 & 4 DEVELOPMENT


PROJECT (PHASE II) - OMAN

(Oman Branch)

TETHYS OIL AB

JOB NR.

DOCUMENT NR.

JS1019

MR-PSD-15--035

TITILE :

xxxxxxx

~ ~!~
REV.

DATE

A1

29-Jan-2015

SHEET

MR FOR Piping Valves

TABLE OF COMPLIANCE FOR Supply of Piping Valves


The Vendor shall confirm below the Sections of the Requisition I Specification that he has
complied with/ accepted or further clarifications are desired, or Vendor has taken a deviation
with reasons there to. Columns 2, 3, 4 and 5 must be answered and initiated.

Specification
No.
Section No.
Attachment -1

Attachment 2
Attachment 3
Attachment 4
Attachment 5
Spare Parts list to be
attached by
supplier

*Conforms
Yes I No

*Deviations
Yes I No

Noted
Yes /No

@Clarification or
Reasons
for Deviations

A
~

Tl!THYSOIL

BLOCK 3 & 4 DEVELOPMENT


PROJECT (PHASE II)- OMAN

(Oman Branch)

TETHYS OIL AB

xxxxxxx

-<$> ~_!.~

JOB NR.

DOCUMENT NR.

JS1019

MR-PSD-15-035

TITTLE :

PROJECT

CC ENERGY DEVELOPMENT S.A.L

REV.

DATE

A1

29.Jan-2015

MR FOR Piping Valves

ATTACHMENT-5
General Specification for Packing & Marking
JS1006-X-G02-0001

SHEET