Project Planner/Scheduler
SUMMARY
Goal directed professional with ten years of experience in oil and gas industry as project planner and scheduler with
focus on planning, scheduling, controlling, budgeting and cost control of EPCC projects; including project schedule
preparation, procedure development and supervision on execution and control/monitoring project activities, status
reviews, and progress reports.
Excellent analytical and organizational skills used in developing and creating presentations of project master plan,
work/cost breakdown structure (WBS, CBS), project schedule procedures, report templates, cost benefit analysis
and CPM; orally presented plans and reports in English to international executive team weekly.
Strong and effective communication skills to collaborate with and act as liaison for project team, client, vendors, and
sub-contractors with consideration principles of PMBOK.
Highly experienced in monthly cost reports generation, indicating EV, CV, SV, CPI, SPI, ETC, EAC, and project
documents list development with project engineering team-effort considering project scope of work.
Self-motivated with great interpersonal skills and fully proficient in Primavera (P6-Ver. 8.2) for development of time
schedule and work program budget of project, and risk analysis using Pertmaster software.
WORK EXPERIENCE
Senior Project Planner / Scheduler
China National Petroleum Corporation International (CNPCI)
Project: North Azadegan Oil Field Development
Finalized project schedule, cost, and its implementation throughout the project in Engineering, Procurement,
Construction, and Commissioning (EPCC) phases using P6 version 8.2 to consolidate the EPCC schedule.
Analyzed, commented, and approved the final schedule submitted by the contractors to optimize cost/timing and
identify discrepancies.
Analyzed project performance utilizing Earned Value Management System (EVMS).
Developed procedures/instructions for preparation and maintenance of project plans, master/detail schedules, and
activity coding structures such as CBS, OBS, and WBS.
Executed cost and scope control management processes including schedule, scope, risk, quality, issues and
integrated change controls.
Ensured the implementation of the cost control system during the initial phase.
Communicated with and acted as liaison for project team, sub-contractors, vendors and client.
Collected, consolidated, analyzed, and monitored the project scope, cost, and schedule control information to
ensure overall project status was assessed and to identify potential problems for corrective/preventive actions.
Developed and implemented project time schedule by P6, WBS and related procedures based on the contractual
obligations and company procedures.
Prepared and distributed the daily, bi-weekly, monthly, quarterly, and annual reports including S-curve, histograms,
tabular reports and schedules.
Recommended corrective and preventive actions in case of time or cost variance to bring project back in line with
the baseline schedule.
1
Roshanak Jalili
Project Planner/Scheduler
Identified potential risks/opportunities and generated mitigation strategies to ensure project success.
Allocated resources as per schedule and developed baseline progress curves, as well as early and late date curves.
Updated and maintained Progress Measurement System (PMS) file.
Represented the department and the organization as a key contact, arranged meetings and presentations with
planning and project control manager and client personnel on significant matters.
SOFTWARE PROGRAMS
Planning Software: Microsoft Project (MSP), Primavera P6 (Professional), Primavera Expedition
Microsoft Office Applications: Word, Excel, Power Point, Visio, Outlook, Access
Other Software: SQL Design & Implementation
ADDITIONAL INFORMATION
Work Status: Legal Canadian Permanent Resident
Languages: Fully Fluent & Literate in English and Farsi; Intermediate Literacy in French
Interests: Hiking, Swimming, Travelling, Reading, Gardening
REFERENCES AVAILABLE UPON REQUEST