Province of Cebu
Municipality of Tuburan
Barangay Montealegre
Location
Category
Public Good
0.900
km
Php
1,738,000.00
Physical Target
Total Sub-Project Cost
Mode of Implementation
PROJECT DESCRIPTION : To include site development, common excavation, aggregate base course, Sub-Project Duration
tire path concreting works at 0.75m width and installation of project billboard. Sitio San Roque: Section Equipment/ Tools Needed
1=40m. Sitio La Purisima: Section 2=100m, Section 3=50m, Section 4=50m. Sitio Proper: Section
5=50m, Section 6=35m, Section 7=90m, Section 8=150m, Section 9=50m, Section 10=150m, Section
Technical Personnel
11=50m, Section 12=70m.
The Sub-Project is located 13.113 Km from the municipal proper.
Item no.
Item 100
Item 102
Item 201
Item 311
SPL
No. of Labors
SITE CLEARING
COMMON EXCAVATION
AGGREGATE BASE COURSE
PORTLAND CEMENT CONCRETE PAVEMENT
PROJECT BILLBOARD
Total Direct Cost
KALAHI-CIDSS
NCDDP GRANT
Sub-Total ( A )
B. Indirect cost
Pre-Engineering
POW Preparation
Supervision and TA in Project Implementation
Material Testing
Administrative/Operating Cost
Hand Tools/PPE
Treasurer's Bond
Over Head Cost
Quantity
1.58%
2.15%
33.94%
61.54%
0.78%
100%
2,250.00
112.50
337.50
1,423.00
1.00
COMMUNITY CONTRIBUTION
Women
A. Direct Cost
Materials
Equipment Rental
Labor
1) Skilled
2) Unskilled
Handling/Hauling
% Wt.
BLGU
Cash
Men
969,320.00
86,000.00
36,300.00
230,000.00
187,146.00
6,900.00
16,100.00
1,508,766.00
6,900.00
16,100.00
1,000.00
10,000.00
38,159.00
10,000.00
31,500.00
Filing Cabinet
Environmental Mitigating Measure
Sub-Total (B)
Total (A & B)
Contingency
6,500.00
2,000.00
99,159.00
1,607,925.00
70,897.00
6,900.00
16,100.00
LCC - Cash
LCC - Cash
Cost Sharing
1,678,822.00
96.60%
1,678,822.00
6,900.00
16,100.00
1,678,822.00
6,900.00
16,100.00
Prepared by :
RAYMUNDITO P. LABANGON
PPT Chairperson
Checked & Reviewed by:
of the Philippines
ince of Cebu
pality of Tuburan
gay Montealegre
T PROGRAM OF WORKS
nal)
Unit Price
sq. m
cu.m
cu.m.
sq.m.
unit
Total Amount
10.76
293.33
1,540.36
662.47
12,000.00
24,200.00
33,000.00
519,870.00
942,696.00
12,000.00
1,531,766.00
Source of Fund
BLGU
MLGU
In-Kind
Cash
OTHERS
In-Kind
Cash
In-Kind
TOTAL
969,320.00
86,000.00
36,300.00
253,000.00
187,146.00
1,531,766.00
2,600.00
1,600.00
28,650.00
10,000.00
38,159.00
10,000.00
3,375.00
31,500.00
1,600.00
1,600.00
28,650.00
3,375.00
953.00
6,500.00
2,953.00
36,178.00
135,337.00
36,178.00
1,667,103.00
70,897.00
59,178.00
0.00
LCC - In-Kind
0.00%
LCC - In-Kind
3.40%
59,178.00
1,738,000.00
3.40%
100.00%
36,178.00
1,738,000.00
36,178.00
1,738,000.00
Approved by :
ARCELE M. REGALA
BSPMC Chairperson
Concurred by :
GEORGE S. ISULAT
unity Infrastructure Specialist
Location:
No. of Crew/
DESCRIPTION
QTY
UNIT
Total
Item 100
SITE CLEARING
A. Labor
Laborer
Men
Women
11.00
7.00
1.00
12.00
6.00
0.00
1.00
7.00
0.00
1.00
2,250.00 sq. m
8.00 days
Sub-total
Subtotal for Item 100
Item 102
COMMON EXCAVATION
Manual Cap. 1-Laborer = 1.00 cu.m./day
A. Labor
Laborer
Sub-total
Sub-total for Item 102
Item 201
AGGREGATE BASE COURSE
Shrinkage factor 15%
A. Materials
Base Course Materials
Sub-total
Equipment Capacity : Plate Compactor
B. Equipment
Plate Compactor
112.50
cu.m
10.00
days
337.50
cu.m.
389.00
cu.m.
50.00
m/day
8.00
days
1.00
4.00
20.00
days
days
1.00
20.00
Sub-total
C. Labor
L.E. Operator
Laborer
Sub-total
Subtotal for Item 200
Item 311
PORTLAND CEMENT CONCRETE PAVEMENT
Factor used for Class A Concrete
Cement x 9.00 bags/m
Sand x 0.50 m/m
1,350.00 sq.m.
135.00 cu.m.
72.36 sq.m.
Page 5
L
W
joint L
No. of Crew/
DESCRIPTION
QTY
UNIT
Total
Men
7.24 cu.m
Total AREA
Total VOLUME
Women
joint W
1,423.00 sq.m
143.00 cu.m
No. of Joints
400.00 lenghts
400.00 lenghts
1,287.00
72.00
143.00
67.00
1.00
2,667.00
1,334.00
100.00
4.00
1.00
6,435.00
1.00
39.00
39.00
bags
cu.m
cu.m
lengths
lengths
bd.ft.
bd.ft.
kg.
pcs.
liter
galloons
lot
days
days
39.00 days
39.00 days
39.00 days
1.00 unit
1.00
1.00
1.00
2.00
8.00
1.00
2.00
7.00
1.00
No. of Crew/
DESCRIPTION
QTY
UNIT
Total
MCT-Technical Facilitator
Reproduction of Plans and Specifications
2.00
1.00
PD
l.s.
2.00
PD
6.00
6.00
6.00
58.00
PD
PD
PD
PD
1.00
l.s.
1.00
1.00
1.00
1.00
1.00
1.00
l.s.
l.s.
l.s.
l.s.
l.s.
l.s.
4.00
15.00
15.00
15.00
15.00
pcs
pcs
pcs
pcs
sets
1.00
90.00
1.00
1.00
l.s.
days
lot
l.s.
Men
Sub-Total
POW Preparation
MCT-Technical Facilitator
Sub-Total
Supervision and TA in Project Implementation
1- MCT - Technical Facilitator
1- Municipal Driver
1- Vehicle (including Fuel, oil and other expenses)
2- Community Volunteers
Sub-Total
Material Testing
Sub-Total
Administrative Cost (see attached cost derivation)
TE for opening of BSPMC LBP Bank account of CV's
TE for procurement transactions for CV's
Project meetings
ACT-Initiated Meetings
Treasurer's Payroll Processing
Forms/Supplies and Reproduction
Sub-Total
Handtools and Protective Equipment (PPE)
Shovel w/ handle
Safety Boots
Hard Hat
Face Mask
Hand Gloves
Sub-Total
Treasurer's Bond
Over Head Cost
Filing Cabinet
Environmental Mitigating Measure
Contingency
TOTAL INDIRECT COST
ADD: O & M (Other Amenities)
TOTAL CONSTRUCTION COST
Prepared by :
RAYMUNDITO P. LABANGON
PPT Chairperson
Checked & Reviewed by:
1.00
1.00
Women
No. of Crew/
DESCRIPTION
QTY
UNIT
Total
ACT-TF
Recommending Approval:
Page 8
Men
Women
RATE PER
DAY/UNIT
COST
A=
Total for
Freight &
Freight &
Handling/
Handling/
Hauling
Hauling
900.00
TOTAL
RATE PER
DAY/UNIT
COST
Total
2.50
KALAHI
GRANT
COMMUNITY
CONTRIBUTION
2,250.00
275.00
3,025.00
24,200.00
24,200.00
24,200.00
22,000.00
22,000.00
22,000.00
2,200.00
2,200.00
2,200.00
275.00
3,300.00
33,000.00
33,000.00
33,000.00
30,000.00
30,000.00
30,000.00
3,000.00
3,000.00
3,000.00
V=
900.00
850.00
180.00
70,020.00
70,020.00
1,000.00
2.50
1,030.00
1,000.00
300.00
275.00
300.00
275.00
70,020.00
900.00 meters
1.50 meters
0.60 meters
0.10 meters
joint T
0.10 meters
Page 9
0.15
400,670.00
400,670.00
400,670.00
400,670.00
8,000.00
8,000.00
8,000.00
8,000.00
1,200.00
110,000.00
111,200.00
519,870.00
1,200.00
100,000.00
101,200.00
509,870.00
10,000.00
10,000.00
10,000.00
RATE PER
DAY/UNIT
COST
Total for
Freight &
Freight &
Handling/
Handling/
Hauling
Hauling
TOTAL
RATE PER
DAY/UNIT
COST
Total
KALAHI
GRANT
COMMUNITY
CONTRIBUTION
0.60 meters
201.00
250.00
850.00
900.00
200.00
450.00
20.00
20.00
120.00
1,000.00
150.00
35.00
180.00
180.00
18.00
5.00
45,045.00
12,960.00
25,740.00
1,206.00
32,175.00
5,000.00
285.00
1,030.00
1,080.00
218.00
450.00
20.00
20.00
120.00
1,000.00
150.00
5.00
5,000.00
366,795.00
74,160.00
154,440.00
14,606.00
450.00
53,340.00
26,680.00
12,000.00
4,000.00
150.00
32,175.00
5,000.00
743,796.00
366,795.00
74,160.00
154,440.00
14,606.00
450.00
53,340.00
26,680.00
12,000.00
4,000.00
150.00
32,175.00
5,000.00
743,796.00
39,000.00
39,000.00
78,000.00
39,000.00
39,000.00
78,000.00
300.00
300.00
275.00
11,700.00
23,400.00
85,800.00
120,900.00
942,696.00
11,700.00
23,400.00
78,000.00
113,100.00
934,896.00
12,000.00
12,000.00
12,000.00
12,000.00
12,000.00
12,000.00
12,000.00
969,320.00
969,320.00
36,300.00
253,000.00
86,000.00
187,146.00
1,531,766.00
36,300.00
230,000.00
86,000.00
187,146.00
1,508,766.00
117,126.00
1,000.00
1,000.00
1,000.00
1,000.00
300.00
300.00
275.00
117,126.00
12,000.00
Page 10
7,800.00
7,800.00
7,800.00
23,000.00
23,000.00
RATE PER
DAY/UNIT
COST
Total for
Freight &
Freight &
Handling/
Handling/
Hauling
Hauling
TOTAL
RATE PER
DAY/UNIT
COST
Total
KALAHI
GRANT
COMMUNITY
CONTRIBUTION
800.00
1,000.00
800.00
1,000.00
1,600.00
1,000.00
2,600.00
800.00
1,600.00
1,600.00
1,600.00
800.00
275.00
800.00
300.00
800.00
275.00
800.00
300.00
10,000.00
2,160.00
13,560.00
5,200.00
10,000.00
764.00
6,475.00
-
4,800.00
1,650.00
4,800.00
17,400.00
28,650.00
10,000.00
10,000.00
10,000.00
10,000.00
2,160.00
13,560.00
5,200.00
10,000.00
764.00
6,475.00
38,159.00
2,160.00
13,560.00
5,200.00
10,000.00
764.00
6,475.00
38,159.00
400.00
250.00
200.00
30.00
80.00
400.00
250.00
200.00
30.00
80.00
1,600.00
3,750.00
3,000.00
450.00
1,200.00
10,000.00
3,375.00
350.00
6,500.00
2,953.00
3,375.00
350.00
6,500.00
2,953.00
-
1,600.00
3,750.00
3,000.00
450.00
1,200.00
10,000.00
3,375.00
31,500.00
6,500.00
2,953.00
70,897.00
206,234.00
170,056.00
1,738,000.00
1,678,822.00
10,000.00
2,160.00
13,560.00
5,200.00
10,000.00
764.00
6,475.00
1,000.00
1,000.00
-
31,500.00
6,500.00
2,000.00
70,897.00
96.60%
793,877.00
Page 11
23,000.00
1.32%
RATE PER
DAY/UNIT
COST
Total for
Freight &
Freight &
Handling/
Handling/
Hauling
Hauling
TOTAL
RATE PER
DAY/UNIT
COST
Total
Page 12
KALAHI
GRANT
COMMUNITY
CONTRIBUTION
COST SHARING
BLGU
CASH
IN-KIND
MLGU
CASH
OTHERS
IN-KIND
CASH
IN-KIND
337.50
Page 13
COST SHARING
BLGU
CASH
IN-KIND
MLGU
CASH
OTHERS
IN-KIND
CASH
IN-KIND
Page 14
COST SHARING
BLGU
CASH
IN-KIND
MLGU
CASH
OTHERS
IN-KIND
CASH
IN-KIND
1,600.00
1,600.00
1,600.00
1,600.00
4,800.00
1,650.00
4,800.00
17,400.00
28,650.00
36,178.00
36,178.00
3,375.00
953.00
-
0.00%
0.00%
0.00%
2.08%
Approved by :
ARCELE M. REGALA
BSPMC Chairperson
Concurred by :
0.00%
0.00%
COST SHARING
BLGU
CASH
IN-KIND
MLGU
CASH
OTHERS
IN-KIND
Barangay Chairperson
Page 16
CASH
IN-KIND
Location:
Sub-project Acticities
Destination/Description
Initial Deposit
Fare/Allowance/
Unit Price
Quantity
Unit
1,000.00
1.00
400.00
2.00
persons
100.00
2.00
persons
Meals Toledo
80.00
2.00
persons
400.00
persons
80.00
persons
400.00
persons
Meals Poblacion
80.00
persons
Supplies
50.00
Snacks
20.00
15
persons
400.00
10
persons
100.00
10
persons
Sub-total
BSPMC Office - Poblacion
II Vice Versa
2. TE for procurement
transactions of CVs
(Serving of canvass and
P.O.'s)
Meals Poblacion
BSPMC Office - Poblacion
II Vice Versa
Sub-Total
3. Sub-project Meetings
Sub-Total
4. ACT Initiated Meetings BSPMC Office - ACT Office
Meals and Snacks
Sub-Total
5. TE for Treasurer's
Bond
400.00
1.00
persons
140.00
1.00
persons
8.00
1.00
persons
5. TE for Treasurer's
Bond
16.00
1.00
persons
70.00
1.00
persons
50.00
1.00
persons
Meals Toledo
80.00
1.00
persons
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
3
10
1500
1
1
1
1
1
1
4
1
4
1
1
40
1
1
2
1
1
1
reams
pcs
sheets
set
pc
pc
pc
pc
pc
boxes
pc
pcs
ps
pc
pcs
box
pc
pcs
box
pc
pc
Sub-Total
Bondpaper long
Ballpens
Reproduction
Petty cash box w/ padlock
Rubber Stamp
Stampad
Stamping Ink
Stapler with Remover
Stapler Remover
Staple Wire
Calculator
Columnar Book
Correction Tape
Paste/Glue
Folder long
Paper clip
Pentil pen
Log book
Fastener
Packaging Tape
Masking Tape
6. Forms/Supplies and
Reproduction
190.00
5.00
2.00
1,200.00
40.00
50.00
50.00
100.00
100.00
50.00
220.00
50.00
65.00
50.00
5.00
50.00
50.00
80.00
50.00
50.00
20.00
Sub-Total
Total for Administrative
Cost
Prepared by :
Approved by :
RAYMUNDITO P. LABANGON
ARCELE M. RE
PPT Chairperson
BSPMC Chairper
Concurred by :
HON. MATILDO T. PA
Barangay Chairp
Recommending Approval
HON. DEMOCRITO M
Municipal Ma
Noted by :
GEORGE S. ISULAT
Regional Community Infrastructure Specialist
No. of
Transaction
Amount
1,000.00
1.00
1,000.00
800.00
1.00
800.00
200.00
1.00
200.00
160.00
1.00
160.00
2,160.00
800
6.00
4,800.00
160
6.00
960.00
1200
2.00
2,400.00
160
2.00
320.00
13,560.00
1000
4.00
4,000.00
300
4.00
1,200.00
5,200.00
4000
2.00
8,000.00
1000
2.00
=
=
2,000.00
10,000.00
400.00
1.00
400.00
140.00
1.00
140.00
8.00
1.00
8.00
16.00
1.00
16.00
70.00
1.00
70.00
50.00
1.00
50.00
80.00
1.00
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
80.00
764.00
570.00
50.00
3,000.00
1,200.00
40.00
50.00
50.00
100.00
100.00
200.00
220.00
200.00
65.00
50.00
200.00
50.00
50.00
160.00
50.00
50.00
20.00
6,475.00
ARCELE M. REGALA
BSPMC Chairperson
38,159.00
UNIT
QTY
UNIT COST
TOTAL
A. Pre-Engineering
MCT-Technical Facilitator
PD
2.00
800.00
1,600.00
l.s.
1.00
1,000.00
1,000.00
Sub-total
2,600.00
PD
2.00
800.00
Sub-total
1,600.00
1,600.00
PD
PD
PD
PD
6.00
6.00
6.00
58.00
800.00
275.00
800.00
300.00
Sub-total
4,800.00
1,650.00
4,800.00
17,400.00
28,650.00
D. Material Testing
lot
1.00
10,000.00
Sub-total
10,000.00
10,000.00
ls
1.00
2,160.00
2,160.00
ls
1.00
13,560.00
13,560.00
Project meetings
ls
1.00
5,200.00
5,200.00
ACT-Initiated Meetings
ls
1.00
10,000.00
10,000.00
ls
1.00
764.00
764.00
ls
1.00
6,475.00
6,475.00
Sub-total
38,159.00
pcs
4.00
400.00
1,600.00
Safety Boots
pcs
15.00
250.00
3,750.00
Hard Hat
pcs
15.00
200.00
3,000.00
Face Mask
pcs
15.00
30.00
450.00
Hand Gloves
pcs
30.00
40.00
1,200.00
Sub-total
10,000.00
G.Treasurer's Bond
lot
Sub-total
H. Overhead Cost
1.00
3,375.00
3,375.00
3,375.00
CD
90.00
350.00
Sub-total
31,500.00
31,500.00
I. Filing Cabinet
lot
1.00
6,500.00
Sub-total
J. Environmental Mitigating Measure
ls
6,500.00
1.00
2,953.00
Sub-total
INDIRECT TOTAL COST
Prepared by:
RAYMUNDITO P. LABANGON
PPT
6,500.00
2,953.00
2,953.00
135,337.00
Checked by:
Regional Co
GRANT
0.00
BRGY
1,600.00
1,000.00
1,000.00
1,600.00
1,600.00
4,800.00
1,650.00
4,800.00
17,400.00
28,650.00
0.00
-
1,600.00
10,000.00
10,000.00
2,160.00
13,560.00
5,200.00
10,000.00
764.00
6,475.00
38,159.00
1,600.00
3,750.00
3,000.00
450.00
1,200.00
10,000.00
3,375.00
-
3,375.00
31,500.00
31,500.00
6,500.00
6,500.00
2,000.00
953.00
2,000.00
953.00
99,159.00
36,178.00
Reviewed by:
To include site development, common excavation, aggregate base course, tire path concreting works at
0.75m width and installation of project billboard.
Sitio San Roque, Sitio La Purisima, and Sitio Proper
1,738,000.00
1,678,822.00
36,178.00
0.00
23,000.00
1,738,000.00
Grant Proceeds :
Municipal LGU Equity :
Barangay LGU Equity :
Community Equity :
Php
Activities
Description
Mitigating
Estimated Cost
Measures
for Measures
Impact
100
Site Clearing
Php 738.25
102
Common Excavation
Php 738.25
201
Php 738.25
311
Php 738.25
SPL
Project Billboard
NONE
Prepared By:
Reviewed by:
RAYMUNDITO P. LABANGON
PPT Chairperson
Checked By:
Approved by:
ARCELE M. REGALA
BSPMC Chairperson
Republic of
Department of Social W
KALAHI CID
Provinc
Municipali
Barangay
SUB-PROJECT IM
BAR CH
SUB-PROJECT TITLE
LOCATION
:
:
ITEM
NO.
DESCRIPTION
QTY
UNIT
100
SITE CLEARING
2,250.00
sq. m
24,200.00
1.58%
102
COMMON EXCAVATION
112.50
cu.m
33,000.00
2.15%
201
337.50
cu.m.
519,870.00
33.94%
311
1,423.00
sq.m.
942,696.00
61.54%
SPL
PROJECT BILLBOARD
1.00
unit
12,000.00
0.78%
TOTAL
AMOUNT
1,531,766.00
WEEKLY PROGRESS
PHYSICAL
CUMMULATIVE
WEEKLY PROGRESS
FINANCIAL
CUMMULATIVE
Prepared by:
WEIGHT
100.00%
PHYSICAL
TARGET
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
PLANNED
ACTUAL
RAYMUNDITO P. LABANGON
PPT Chairperson
MONTH 2
W2
W3
1.08%
1.08%
W4
W5
W6
9.65%
9.65%
9.65%
W7
12.31%
0.78%
2.36%
1.08%
1.08%
9.65%
9.65%
9.65%
12.31%
2.36%
1.08%
1.08%
9.65%
9.65%
9.65%
12.31%
2.36%
3.44%
4.52%
14.16%
23.81%
33.46%
45.77%
36,200.00
16,500.00
16,500.00
147,760.57
147,760.57
147,760.57
188,539.20
36,200.00
52,700.00
69,200.00
216,960.57
364,721.13
512,481.70
701,020.90
Approved by:
Noted by:
MBERLY L. MENDREZ
CT-TF
ARCELE M. REGALA
BSPMC Chairperson
ENGR. GEOR
Regional Community
MONTH 2
W8
W9
W10
MONTH 3
W11
W12
5%
Noted by:
12.31%
12.31%
12.31%
12.31%
12.31%
12.31%
12.31%
12.31%
5.00%
12.31%
12.31%
12.31%
12.31%
5.00%
58.07%
70.38%
82.69%
95.00%
100.00%
188,539.20
188,539.20
188,539.20
188,539.20
76,588.30
889,560.10
1,078,099.30
1,266,638.50
1,455,177.70
1,531,766.00
Barangay:
Montealegre
Municipality :
Php
Community Project
Duration:
Type of Plan:
( x ) Initial
Tuburan
Date Prepared:
December 5, 2014
Province :
Cebu
1,738,000.00
Proposed Project Implementation Schedule: January - March 2015
( ) Actual
Items to be Procured
Quantity
Unit of Measure
Unit Cost
Total Cost
72.00
143.00
cu.m
cu.m
1,030.00
1,080.00
74,160.00
154,440.00
228,600.00
389.00
cu.m.
1,030.00
400,670.00
400,670.00
1,287.00
67.00
1.00
100.00
1.00
4.00
1.00
4.00
15.00
15.00
15.00
bags
lengths
lengths
kg.
liter
pcs.
lot
pcs
pcs
pcs
pcs
285.00
218.00
450.00
120.00
150.00
1,000.00
5,000.00
400.00
250.00
200.00
30.00
366,795.00
14,606.00
450.00
12,000.00
150.00
4,000.00
5,000.00
1,600.00
3,750.00
3,000.00
450.00
Procurement
Method
Schedule of
Procurement
CSG
FIRST TRANCHE
CSG
FIRST TRANCHE
CSG
FIRST TRANCHE
Package No. 1
Sub-Total
Package No. 2
Sub-Total
Package No. 3
Portland Cement
12mm x 6m RSB
2" x 2" x 6mm Angle Bar
Asphalt Joint Filler
Grease
Empty Drums
Laminated Sack (Trapal)
Shovel w/ handle
Safety Boots
Hard Hat
Face Mask
Comments/Remarks
Hand Gloves
Caution Tape
1/4 thk. 4'x8' Ordinary Plywood
Assorted CWN
Enamel Paint (White, Black, Yellow)
Paint Brush 2"
Paint Brush 4"
CSG
FIRST TRANCHE
CSG
FIRST TRANCHE
15.00
1.00
1.00
1.00
1.00
1.00
1.00
sets
lot
sht
kg.
l.s.
pc
pc.
80.00
415.00
400.00
65.00
1,000.00
40.00
80.00
1,200.00
415.00
400.00
65.00
1,000.00
40.00
80.00
415,001.00
2,667.00
1,334.00
bd.ft.
bd.ft.
20.00
20.00
53,340.00
26,680.00
80,020.00
6,435.00
galloons
5.00
32,175.00
32,175.00
CSG
FIRST TRANCHE
Filing Cabinet
1.00
lot
6,500.00
6,500.00
6,500.00
CSG
FIRST TRANCHE
Project Billboard
1.00
unit
12,000.00
12,000.00
12,000.00
CSG
FIRST TRANCHE
Plate Compactor
Concrete Mixer (1 bagger)
Concrete Vibrator
8.00
39.00
39.00
days
days
days
1,000.00
1,000.00
1,000.00
8,000.00
39,000.00
39,000.00
86,000.00
CSG
FIRST TRANCHE
Sub-Total
Package No. 4
161-2" x 4" x 10' Coco Lumber
161-2" x 2" x 10' Coco Lumber
Sub-Total
Package No. 5
Sub-Total
Package No. 6
Sub-Total
Package No. 7
Sub-Total
Package No. 8
Sub-Total
GRAND TOTAL
Prepared by:
BEVERLYN M. ARMECIN
1,260,966.00
Reviewed by:
Approved by:
ARCELE M. REGALA
ACT-TF
BSPMC Chairperson
a. Direct Cost
1,156,466.00
Materials
Cash
In-kind
Labor
289,300.00
Cash
In-kind
Equipment
86,000.00
Cash
In-kind
Sub-total
###
Cash
In-kind
b. Indirect Cost 135,337.00
Cash
In-kind
c. Contingency 70,897.00
GRAND TOTAL ###
Cash
In-kind
###
266,300.00
###
###
###
###
0.00
0.00
###
36,178.00
###
###
###
###
86,000.00
###
99,159.00
70,897.00
###
0.900
METERS
Cost
parame
ter:
Php
###
per
Men
1
1
1
Women
Mason
Laborer
2
18
Equipment Requirement/Sources:
1-bagger Concrete Mixer
Concrete Vibrator
Plate Compactor
Procurement Method/s to be Adopted:
Local Shopping for Goods and Community Force Account
ution (LCC)
Total LCC
###
###
###
###
meter
RETE PAVEMENT
OARD
Women
rce Account
PLAN
: 6/26/2014
: Balaas
: Manjuyod
: Negros Oriental
Mode of
Implementation :
PACKAGES
Date Prepared
Barangay
Municipality
Province
ITEM
ITEM DESCRIPTION
QUANTITY
UNIT
1,287.00
67.00
1.00
100.00
4.00
Err:509
1.00
Err:509
Err:509
Err:509
bags
lengths
lengths
kg.
pcs.
Err:509
liter
Err:509
Err:509
Err:509
Err:509
bags
2,667.00
Err:509
Err:509
bd.ft.
bd.ft.
bd.ft.
Err:509
Err:509
Err:509
cu.m.
cu.m.
cu.m.
389.00
cu.m.
Err:509
39.00
8.00
days
days
days
1.00
lot
1.00
unit
Packag Packag
e8
e7
Package 6
Packag
e5
Package 4
Package 3
Packag
e2
Package 1
Hardware
Portland Cement Type I
12mm x 6m RSB
2" x 2" x 6mm Angle Bar
Asphalt Joint Filler
Empty Drums
Err:509
Grease
Err:509
Err:509
Err:509
Subtotal for Package 1
Hardware-2
Portland Cement Type I
Subtotal for Package 2
Form Lumber
75 - 2" x 6" x 10' Coco Lumber
45 - 2" x 2" x 10' Coco Lumber
12 - 2" x 2" x 8' Coco Lumber
Subtotal for Package 3
Aggregates
Sand
Gravel
Boulders
Subtotal for Package 4
Aggregates (Base Aggregates)
Item 201
Subtotal for Package 5
Equipments
Concrete Mixer (1 bagger)
Concrete Vibrator
Plate Compactor
Subtotal for Package 6
Water for Mixing
Water for Mixing
Subtotal for Package 7
Project Billboard
Project Billboard
Subtotal for Package 9
Page 41
Package 10
PACKAGES
Package 11
Package 12
ITEM
ITEM DESCRIPTION
QUANTITY
UNIT
4.00
15.00
15.00
15.00
15.00
pcs
pcs
pcs
pcs
sets
1.00
1.00
1.00
1.00
90.00
1.00
l.s.
l.s.
l.s.
l.s.
days
l.s.
Labor
Skilled
Unskilled
Subtotal for Package 10
TOTAL DIRECT COST
Handtools and Protective Equipment (PPE)
Shovel w/ handle
Safety Boots
Hard Hat
Face Mask
Hand Gloves
Subtotal for Package 11
Supervision and TA in Project Implementation
Material Testing
Administrative Operating Cost (see attached cost derivation)
Treasurer's Bond
Over Head Cost
Environmental Mitigating Measure
Contingency
Subtotal for Package 12
TOTAL INDIRECT COST
TOTAL CONSTRUCTION COST
PRESCILA P. KABRISTANTE
PT Chairperson
Page 42
RAYMUNDITO P. LABANGON
PPT Chairperson
SOURCES OF FUNDS
DESCRIPTION
RATE PER
DAY/
UNIT
COST
250.00
218.00
450.00
120.00
1,000.00
Err:509
150.00
Err:509
Err:509
Err:509
Err:509
20.00
20.00
Err:509
KC Grant:
LCC:
Err:509
Err:509
107,698.75
Err:509
Err:509
Err:509
Err:509
Procurement
Method
Total
1,000.00
1,000.00
1,000.00
5.00
12,000.00
Err:509
Err:509
Err:509
1st TRANCHE
KC GRANT
321,750.00
14,606.00
450.00
12,000.00
4,000.00
Err:509
150.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
LSG
Err:509
2nd TRANCHE
LCC
366,795.00
14,606.00
450.00
12,000.00
4,000.00
Err:509
150.00
Err:509
Err:509
Err:509
Err:509
KC GRANT
(45,045.00)
Err:509
Err:509
Err:509
Err:509
Err:509
LCC
LSG
-
Err:509
Err:509
39,000.00
8,000.00
Err:509
Err:509
53,340.00
LSG
Err:509
LSG
Err:509
1,030.00
Err:509
128,907.80
TRANCHING SCHEDULE
53,340.00
1,030.00
1,080.00
Err:509
TO KC GRANT
Err:509
21,209.05
PERCENTAGE WEIGHT
TOTAL
400,670.00
400,670.00
Err:509
39,000.00
8,000.00
Err:509
5.00
5.00
12,000.00
12,000.00
LSG
LSG
LSG
LSG
Err:509
Err:509
Err:509
Err:509
400,670.00
400,670.00
32,175.00
32,175.00
12,000.00
12,000.00
Page 43
Err:509
Err:509
(32,170.00)
(32,170.00)
-
RATE PER
DAY/
UNIT
COST
TRANCHING SCHEDULE
Total
Err:509
Err:509
Err:509
Err:509
400.00
250.00
200.00
30.00
80.00
10,000.00
38,159.00
3,375.00
350.00
2,953.00
O P. LABANGON
rperson
1,600.00
3,750.00
3,000.00
450.00
1,200.00
10,000.00
10,000.00
38,159.00
3,375.00
31,500.00
2,953.00
70,897.00
156,884.00
166,884.00
Procurement
Method
Err:509
Err:509
1,600.00
3,750.00
3,000.00
450.00
1,200.00
10,000.00
LSG
10,000.00
26,324.48
Err:509
30,000.00
77,698.75
107,698.75
107,698.75
(1,126.79)
(21,209.05)
(22,335.84)
(22,335.84)
21,209.05
2,000.00
-
38,324.48
48,324.48
21,209.05
21,209.05
Err:509
Err:509
107,698.75
21,209.05
Err:509
Err:509
Err:509
Err:509
Checked by:
THEODORE C. AMAHIT
MCT-DAC
2nd TRANCHE
Err:509
CFA
Err:509
1st TRANCHE
Submitted by:
KIM G. CORTES
ACT-DAC
Page 44
ARCELE M. REGALA
BSMPC
AMOUNT
TO LCC CASH
KC GRANT
Err:509
Err:509
TOTAL LCC
59,177.99
LCC - In-kind
59,178.00
PERCENTAGE WEIGHT
LEGEND:
(PESO)
LCC - Cash
Err:509
(0.01)
TOTAL
Err:509
TOTAL
3rd TRANCHE
KC GRANT
LCC
Err:509
Err:509
PROPOSED
IMPLEMENTATION
MONTHS
1
Err:509
Err:509
53,340.00
Err:509
Err:509
Err:509
REMARKS
ANCHING SCHEDULE
321,750.00
14,606.00
450.00
12,000.00
4,000.00
Err:509
150.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
53,340.00
53,340.00
Err:509
Err:509
400,670.00
400,670.00
Err:509
39,000.00
8,000.00
Err:509
5.00
5.00
12,000.00
12,000.00
Page 45
TOTAL
3rd TRANCHE
REMARKS
ANCHING SCHEDULE
PROPOSED
IMPLEMENTATION
Err:509
Err:509
Err:509
11,834.52
1,126.79
70,897.00
82,731.52
82,731.52
1,126.79
1,126.79
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1,600.00
3,750.00
3,000.00
450.00
1,200.00
10,000.00
10,000.00
38,159.00
2,000.00
70,897.00
121,056.00
131,056.00
Err:509
Noted by:
ARCELE M. REGALA
ENGR. GEORGE S.
Regional Community Infra. Engineer
Page 46
MONTHS
Procurement Activities
June 25,2014
June 26,2014
August 20,2014
August 20,2014
December 6,2012
December 15-30,
Procurement Activities
Timeline to complete
the activity (Inclusive
Dates)
December 15-30,
2012
January 03,2013
Package 1: Item 102, Item 105, Item 200, Item 201, Item
311, Item 500 (1)
Procurement Activities
Package 1: Item 102, Item 105, Item 200, Item 201, Item
311, Item 500 (1)
Timeline to complete
the activity (Inclusive
Dates)
Package 1: Item 102, Item 105, Item 200, Item 201, Item
311, Item 500 (1)
February 1, 2013
February 1, 2013
Procurement Activities
Filling Cabinet
Timeline to complete
the activity (Inclusive
Dates)
February 1, 2013
February 5, 2013
February 5, 2013
February 5, 2013
February 5, 2013
February 5, 2013
February 6, 2013
February 6, 2013
Procurement Activities
Package 2: Project Billboard, Package 3 - Hand tools
and Protective Equipment, Filling Cabinet
Timeline to complete
the activity (Inclusive
Dates)
February 8, 2013
January 21,2013
January 22,2013
January 22,2013
January 28,2013
January 29,2013
January 29,2013
January 30-February
5,2013
Contractor
Prepared by:
PRESCILA P. KABRISTANTE
PT Chairperson
THEDORE C. AMAHIT
MCT-DAC
Name of Potential
Suppliers Contractors
Resources
Requirement
Expected outputs/
Remarks
POW/Detailed
Estimates
Draft PCPP
Final PCPP
Final PCPP
Conference Conducted
Office supplies
Minutes of Conference
Invitation to Bid/Bid
Documents
Invitation to Bid
Documents
Invitation to Bid
Published
Invitation to Bid
Documents
Contractor's : Uymatiao
Contructions, Philsouth,
VVER Construction, HLJ
Construction, Bigfoot
Construction, Jho James,
Double L Construction,
VESA Engineering, Uy
Provincial/Municipal/Baran
Construction and
gay Hall Billboards, KC
Development,
Earthworks
Billboards, MIAC/PIAC
Construction
and
Supply,
Offices, conspicuous
Kouken Construction,
places, offices of
NAKKA Construction,
contractors
Leymarc Construction
Brgy. Hall/BSPMC
Contractor's : Uymatiao
Contructions, Philsouth,
VVER Construction, HLJ
Construction, Bigfoot
Construction, Jho James,
Double L Construction,
Resources
Requirement
Expected outputs/
Remarks
Bidding Documents
Office Supplies
Minutes of Pre-Bid
Conference
Office Supplies
/Logbook
Received Bids
Submitted Bid
Documents
Minutes of Opening
Submitted Bid
Documents
Abstract of Bids
Submitted Bid
Documents
Filled-up Pass/Fail
Criteria sheet
Brgy. Hall/BSPMC
Office/Project
Site(proposed route)
Name of Potential
Suppliers Contractors
Contractor's : Uymatiao
Contructions, Philsouth,
VVER Construction, HLJ
Construction, Bigfoot
Construction, Jho James,
Double L Construction,
VESA Engineering, Uy
Construction and
Development, Earthworks
Construction and Supply,
Kouken Construction,
NAKKA Construction,
Leymarc Construction
Contractor's : Uymatiao
Contructions, Philsouth,
VVER Construction, HLJ
Construction, Bigfoot
Construction, Jho James,
Double L Construction,
VESA Engineering, Uy
Construction and
Development, Earthworks
Construction and Supply,
Kouken Construction,
NAKKA Construction,
Leymarc Construction
Resources
Requirement
Expected outputs/
Remarks
Submitted Bid
Documents
Filled-up Pass/Fail
Criteria sheet
Submitted Bid
Documents
Minutes of Evaluation of
Bids
Submitted Bid
Documents/Minutes
of Evaluation
Post Qualification
Conducted
Submitted Bid
Documents/Minutes
of Evaluation
Post Qualification
Evaluation Report
Post Qualification
Evaluation Report
Resolution to Award
Resolution to
Award/Post
Qualification Report
Draft Contract
Canvass
Form/Request for
Qoutation
Canvass Form/Request
for Qoutation Served
Canvass
Form/Request for
Qoutation
Canvass Form/Request
for Qoutation Served
Supplier's Office
Supplier's Office
Name of Potential
Suppliers Contractors
Resources
Requirement
Expected outputs/
Remarks
Canvass
Form/Request for
Qoutation
Canvass Form/Request
for Qoutation Served
Submitted Canvass
Form/Request for
Qoutation
Abstract of Canvass
Submitted Canvass
Form/Request for
Qoutation
Abstract of Canvass
Office Supplies
Minutes of Opening
Submitted Canvass
Form/Request for
Quotation
Minutes of Evaluation
Submitted Canvass
Form/Request for
Quotation
Abstract of Canvass
Abstract of Canvass
Purchased Order
Purchased Order
Approved Purchased
Order
Supplier's Office
Supplier's Office
Name of Potential
Suppliers Contractors
Supplier's: Jho James
Enterprises, Be Glad
Agrivet and Enterprises,
Ravs Enterprises,NDK
Hardware
Name of Potential
Suppliers Contractors
Supplier's Office
Resources
Requirement
Expected outputs/
Remarks
Project Site
Delivery
Receipt/Delivered
Goods
Goods Received
Kalahi Office
(ACT/RPMO/NPMO)
Compiled
procurement
documents
NOL issued
Resolution to Award
Notice of Award
Contractor's Office
Notice of Award
Acknowledgement
receict/Receive Copy of
Notice of Award
Contract
Contract Signed
Signed
Contract/Office
Supplies
Final Notice to
Commence
Contractor's Office
Final Notice to
Commence
Notice to Commence
Received by the
Contractor
Project Site
Notice to Commence
Mobilization Started
Approved by:
KIM G. CORTES
ACT-DAC
ARCELE M. REGALA
BSPMC Chairperson
Procurement Activities
December 5, 2012
December 5, 2012
December 5,2012
Procurement Activities
Timeline to complete
the activity (Inclusive
Dates)
January 11,2013
Timeline to complete
the activity (Inclusive
Dates)
February 1, 2013
Procurement Activities
Timeline to complete
the activity (Inclusive
Dates)
February 1, 2013
Filling Cabinet
February 1, 2013
February 5, 2013
February 5, 2013
February 5, 2013
February 5, 2013
Procurement Activities
Timeline to complete
the activity (Inclusive
Dates)
February 6, 2013
February 6, 2013
February 8, 2013
February 28,2013
March 1, 2013
March 2, 2013
March 7, 2013
March 8, 2013
Procurement Activities
Procurement Activities
Prepared by:
PRESCILA P. KABRISTANTE
PT Chairperson
Timeline to complete
the activity (Inclusive
Dates)
March 12-18,2013
Contractor
THEDORE C. AMAHIT
MCT-DAC
Name of Potential
Suppliers Contractors
Resources
Requirement
Expected outputs/
Remarks
POW/Detailed
Estimates
Draft PCPP
Final PCPP
Final PCPP
Conference Conducted
Office supplies
Minutes of Conference
Invitation to Bid/Bid
Documents
Invitation to Bid
Documents
Invitation to Bid
Published
Invitation to Bid
Documents
Contractor's : Uymatiao
Contructions, Philsouth,
VVER Construction, HLJ
Construction, Bigfoot
Construction, Jho James,
Double L Construction,
VESA Engineering, Uy
Provincial/Municipal/Baran
Construction and
gay Hall Billboards, KC
Development,
Earthworks
Billboards, MIAC/PIAC
Construction
and
Supply,
Offices, conspicuous
Kouken Construction,
places, offices of
NAKKA Construction,
contractors
Leymarc Construction
Name of Potential
Suppliers Contractors
Resources
Requirement
Expected outputs/
Remarks
Brgy. Hall/BSPMC
Office/Project
Site(proposed route)
Contractor's : Uymatiao
Contructions, Philsouth,
VVER Construction, HLJ
Construction, Bigfoot
Construction, Jho James,
Double L Construction,
VESA Engineering, Uy
Construction and
Development, Earthworks
Construction and Supply,
Kouken Construction,
NAKKA Construction,
Leymarc Construction
Bidding Documents
Contractor's : Uymatiao
Contructions, Philsouth,
VVER Construction, HLJ
Construction, Bigfoot
Construction, Jho James,
Double L Construction,
VESA Engineering, Uy
Construction and
Development, Earthworks
Construction and Supply,
Kouken Construction,
NAKKA Construction,
Leymarc Construction
Office Supplies
Minutes of Pre-Bid
Conference
Office Supplies
/Logbook
Received Bids
Submitted Bid
Documents
Minutes of Opening
Submitted Bid
Documents
Abstract of Bids
Resources
Requirement
Expected outputs/
Remarks
Submitted Bid
Documents
Filled-up Pass/Fail
Criteria sheet
Submitted Bid
Documents
Minutes of Evaluation of
Bids
Submitted Bid
Documents/Minutes
of Evaluation
Post Qualification
Conducted
Submitted Bid
Documents/Minutes
of Evaluation
Post Qualification
Evaluation Report
Post Qualification
Evaluation Report
Resolution to Award
Resolution to
Award/Post
Qualification Report
Draft Contract
Canvass
Form/Request for
Qoutation
Canvass Form/Request
for Qoutation Served
Supplier's Office
Name of Potential
Suppliers Contractors
Name of Potential
Suppliers Contractors
Resources
Requirement
Expected outputs/
Remarks
Supplier's Office
Canvass
Form/Request for
Qoutation
Canvass Form/Request
for Qoutation Served
Supplier's Office
Canvass
Form/Request for
Qoutation
Canvass Form/Request
for Qoutation Served
Submitted Canvass
Form/Request for
Qoutation
Abstract of Canvass
Office Supplies
Minutes of Opening
Submitted Canvass
Form/Request for
Quotation
Minutes of Evaluation
Submitted Canvass
Form/Request for
Quotation
Abstract of Canvass
Resources
Requirement
Expected outputs/
Remarks
Abstract of Canvass
Purchased Order
Purchased Order
Approved Purchased
Order
Supplier's Office
Name of Potential
Suppliers Contractors
Project Site
Delivery
Receipt/Delivered
Goods
Goods Received
Kalahi Office
(ACT/RPMO/NPMO)
Compiled
procurement
documents
NOL issued
Resolution to Award
Notice of Award
Contractor's Office
Notice of Award
Acknowledgement
receict/Receive Copy of
Notice of Award
Contract
Contract Signed
Signed
Contract/Office
Supplies
Final Notice to
Commence
Contractor's Office
Final Notice to
Commence
Notice to Commence
Received by the
Contractor
Name of Potential
Suppliers Contractors
Project Site
Resources
Requirement
Expected outputs/
Remarks
Notice to Commence
Mobilization Started
Approved by:
KIM G. CORTES
ACT-DAC
ARCELE M. REGALA
BSPMC Chairperson
:
:
:
:
WORK ITEM
PHYSICAL
SCOPE
lot
ACTIVITY TO BE UNDERTAKEN
lot
Tree planting
lot
RIC JIMENEZ
O & M Group
FREQUENCY
NO.
Excavation of drainage
canal
Prepared by:
LABOR
RATE
RESOURCES NEEDED
MATE
COST
QTY
monthly
14
150.00
2,100.00
ANA
14
200.00
2,800.00
ANA
14
150.00
2,100.00
Reviewed by:
SHIRLEY MAGLINAO
Punong Barangay
Recommending A
NEEDED
MATERIALS
PRICE
SOURCE OF FUND
TOTAL COST
COST
EXPECTED OUTPUT
BRGY
3,500.00
3,500.00
5,600.00
5,600.00
2,500.00
2,500.00
5,300.00
5,300.00
2,500.00
2,500.00
4,600.00
4,600.00
ommending Approval:
JOYCE V. HINAUT
MCT-DAC
MUN
REMARKS
PROV
Conduct O &
M frequently
-do-
-do-
Approved:
MELOJEAN B. ORQUILLAS
Municipal Mayor
BILL OF QUANTITIES
ITEM
NO.
ITEM DESCRIPTION
QUANTITY
UNIT
No. of Crew/
Labor
1,145.98 cu.m.
4.00
days
3.00
days
1.00
days
Sub-total
4.00
days
Sub-total
3.00
115.20
cu.m.
1.00
Sub-total
days
1.00
4.00
Sub-total
days
7.00
Page 71
RATE PER
DAY/
UNIT
COST
ITEM
NO.
ITEM DESCRIPTION
104(1) Embankment
RG-Equip.cap. 60% eff.=24 cu.m/hr.
RR-Equip.cap. 60% eff.=14.40 cmph
WT-Equip.cap. 60% eff.=600 sq.m./hr.
A. Equipment
Road Grader
Road Roller
QUANTITY
UNIT
296.94
cu.m.
1.00
1.00
M-days
M-days
No. of Crew/
Labor
Sub-total
B Labor
Laborer
2.00
M-days
Sub-total
2.00
B. Labor
Laborer
6,000.00
sq.m.
2.00
2.00
Sub-total
days
days
2.00
Sub-total
mdays
Page 72
2.00
RATE PER
DAY/
UNIT
COST
ITEM
NO.
ITEM DESCRIPTION
QUANTITY
UNIT
1,050.00
cu.m.
1,207.00
Sub-total
cu.m.
No. of Crew/
Labor
cu.m
C. Labor
labor
2.00
4.00
1.00
Sub-total
days
days
days
4.00
Sub-total
mdays
750.00
cu.m.
862.00
Sub-total
cu.m.
2.00
3.00
1.00
Sub-total
days
days
days
1.00
1.00
1.00
3.00
Sub-total
mdays
2.00
2.00
C. Labor
labor
Page 73
RATE PER
DAY/
UNIT
COST
ITEM
NO.
ITEM DESCRIPTION
QUANTITY
Asphalt kettle
towing truck/stake truck (elf)
UNIT
5.00
tonnes
5.00
Sub-total
tonnes
2,200.00
sq.m
No. of Crew/
Labor
2.00
1.00
Sub-total
C. Labor:
Sprayman
Asst. Sprayman
Laborer
2.0 days
2.0 days
2.0 days
Sub -total
1.00
1.00
4.00
5.00
5.00
tonnes
tonnes
2,200.00
sq.m
2.00
1.00
Sub-total
M-days
M-days
C. Labor:
Sprayman
Asst. Sprayman
Laborer
2.0 Days
2.0 Days
2.0 Days
Sub-total
70.00
tonnes
70.00
Sub-total
tonnes
1.00
1.00
Sub-total
Page 74
1.00
1.00
4.00
RATE PER
DAY/
UNIT
COST
ITEM
NO.
ITEM DESCRIPTION
C. Labor:
Laborer
QUANTITY
1.0
Sub -total
Page 75
UNIT
Days
No. of Crew/
Labor
6.00
RATE PER
DAY/
UNIT
COST
ITEM
NO.
ITEM DESCRIPTION
QUANTITY
64.00
64.00
32.00
3.00
3.00
2.00
1.00
24.00
Sub-total
UNIT
No. of Crew/
Labor
l.m.
l.m.
bags
cu.m.
cu.m.
sheets
kgs
bd.ft.
4.00
mdays
4.00
mdays
Sub-total
1.00
4.00
26.00
cu.m.
A. Materials
Portland Cement
Mountain Rocks
Sand (Approved Source)
Formworks
19.00
26.00
21.00
1.00
bags
cu.m.
cu.m.
lot
4.00
4.00
days
days
B. Labor
Crew: 2-Mason, and 10-Laborers
Capability Output: 7.5 cu.m. /day
Mason/Carpenter
Laborer
Page 76
2.00
10.00
RATE PER
DAY/
UNIT
COST
ITEM
NO.
ITEM DESCRIPTION
QUANTITY
UNIT
No. of Crew/
Labor
RATE PER
DAY/
UNIT
COST
Noted by :
LAWRENCE
Regional Community Infrastruc
Page 77
arket Road
uijor
Total
Page 78
Total
Page 79
Total
Page 80
Total
Page 81
Total
Page 82
Total
Page 83
Total
LAWRENCE B. UY
ommunity Infrastructure Engineer Specialist
Page 84
#REF!
#REF!
#REF!
Page 85
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Page 86
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Page 87
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Page 88
#REF!
#REF!
Page 89
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Page 90
E B. UY
ucture Engineer Specialist
Page 91
Page 92
Page 93
Page 94
Page 95
Page 96
Page 97
Page 98
Page 99
Page 100
Page 101
Page 102
Page 103
Page 104
Page 105
:
:
:
:
14-Nov-11
Bolot
Enrique Villanueva
Siquijor
Estim
By Contract
CFA
UNIT
Unskilled
1.00
lot
Err:509
Unskilled
1.00
lot
Err:509
Packages
P1
P2
QUANTITY
Mode of Implementation
ITEM DESCRIPTION
DIRECT COST
Pre-Engineering
POW Preparation
TA in Project Implementation
TOTAL INDIRECT COST
GRAND TOTAL
Total
Err:509
1.00
1.00
1.00
Workshop Output of :
lot
lot
lot
9,600.00
9,600.00
Err:509
Reviewed by:
LEONORA JUMALON
PT Head
JOYCE V. HINA
MCT-DAC
Page 106
1,738,000.00
90 Calendar Days (CD)
Err:509
Err:509
3,200.00
3,200.00
Procurement
1st TRANCHE 2nd Tranche
Method
In Kind
In Kind
3rd
TRANCHE
In Kind
TOTAL
LSW
Err:509
Err:509
CFA
Err:509
Err:509
V. HINAUT
T-DAC
Err:509
3,200.00
3,200.00
Err:509
3,200.00
3,200.00
3,200.00
###
3,200.00
3,200.00
Err:509
0.00
0.00
9,600.00
9,600.00
Err:509
Submitted by:
NORMA DALAGUETE
BSPMC Chair
Page 107
REMARKS
PROPOSED IMPLEMENTATION
MONTHS
1
Page 108
Page 109
ITEM
NO.
ITEM DESCRIPTION
QUANTITY
RATE PER
DAY/
UNIT
UNIT
COST
Total
VVERConstruction
Unit Cost
102(2) Surplus Common Excavation
1,695.70 cu.m.
105.92
179,612.00
Amount
150 C.D.
8.35
14,153.65
57.60
cu.m.
369.17
21,264.00
115.34
6,643.55
104(1) Embankment
350.20
cu.m.
85.78
30,040.00
255.53
89,485.73
5,880.00
sq.m.
10.12
59,480.00
6.40
37,608.27
882.00
cu.m.
376.01
331,644.60
282.51
249,171.84
201
630.00
cu.m.
531.92
335,111.40
463.36
291,916.25
301
4.20 tonnes
55,463.33
232,946.00
31,223.31
131,137.90
304
4.20 tonnes
60,463.33
253,946.00
57,998.33
243,592.98
1,462.79
86,012.00
2,251.85
132,408.84
2,562.00
102,480.00
2,848.31
113,932.52
58.80
40.00
tonnes
l.m.
Contractor's Profit
163,753.60
114,627.52
1,910,917.12
Page 110
69,244.80
1,379,296.33
Bid Security
Type
Amount
Cost Analysis
Within Budget
Percentage Cost
165,458.35
%
1,169.02
14,620.45
220.07
(59,445.73)
(66.43)
21,871.73
58.16
82,472.76
33.10
43,195.15
14.80
101,808.10
77.63
10,353.02
4.25
(46,396.84)
(35.04)
(11,452.52)
(10.05)
Remarks
1,465.50
Page 111
CAPABILITIES OF EQUIPMENT
ITEM
DESCRIPTION
Sub-grade Preparation
cu.m.
EQUIPMENT
USED
Err:509 1-Backhoe
sq.m
sq.m.
UNIT
QTY.
ENT
CAPABILITY OF
EQPT.
25 cu.m./hr.
300q.m./hr.
300 sq.m./hr.
NO. OF
DAYS
12.00
2.00
QUANTITY
UNIT
1145.98
cu.m.
1-IR
115.2
cu.m.
1-IR
200
1050
cu.m.
201
750
cu.m.
301
tonnes
1-Grading Test
1- Plasticity Test (LL,PL,PI)
1-CBR
3 - FDT
1-Grading Test
1- Plasticity Test (LL,PL,PI)
1-CBR
3 - FDT
3-Grading Test
1- Plasticity Test (LL,PL,PI)
1-CBR
43-FDT
2-Grading Test
1- Plasticity Test (LL,PL,PI)
31-FDT
1-IR
tonnes
1-IR
70
tonnes
1-IR
64
l.m.
1-IR
104(1) Embankment
304
Prepared by:
296.93
cu.m.
7000
cu.m.
Attested:
JOYCE V. HINAUT
Municipal Engineer
Approved:
BALANCE TEST
REMARKS
RONILO GAUMA
DAC
CYNTHIA P. SAYRE
BSPMC
DESCRIPTION
QUANTITY
MINIMUM TEST
REQUIRED
SUBMITTED
TEST
BALANCE
TEST
REMARKS
105(1)
200
201
301
304
304(1)
500(1)
1145.98
cu.m.
1-IR
Pipe Culvert and Drain
115.20 cu.m.
Excavation
1-IR
Embankment
296.93
1-Grading Test
cu.m.
1- Plasticity Test
(LL,PL,PI)
1-CBR
3 - FDT
7000 cu.m. 1-Grading Test
Subgrade Preparation
1- Plasticity Test
(LL,PL,PI)
1-CBR
3 - FDT
1050 cu.m. 3-Grading Test
Aggregate Sub-base Course
1- Plasticity Test
(LL,PL,PI)
1-CBR
43-FDT
750 cu.m.
Aggregate Base Course
2-Grading Test
1- Plasticity Test
(LL,PL,PI)
31-FDT
5 tonnes
Bituminous Prime Coat
1-IR
Bituminous Surface Treatment
1-IR
ST
5 tonnes
(Cover Aggregates) Aggregate
1-IR
Grading
70 tonnes
64 l.m.
Installation of Pipe Culverts
1-IR
Prepared by:
Attested:
JOYCE V. HINAUT
Municipal Engineer
RONILO GAUMA
DAC
Approved:
CYNTHIA P. SAYRE
BSPMC
GAUMA
C
P. SAYRE
MC
Package 1
PACKAGES
ITEM
ITEM DESCRIPTION
QUANTITY
UNIT
1,145.98
cu.m.
Err:509
cu.m.
104(1) Embankment
296.93
cu.m.
7,000.00
sq.m.
200
1,050.00
cu.m.
201
750.00
cu.m.
301
5.00
tonnes
304
5.00
tonnes
tonnes
Err:509
l.m.
19.00
240.00
21.00
26.00
800.00
500.00
1.00
500.00
ackage 7
70.00
RATE PER
DAY/
UNIT
COST
Skilled
Err:509
DIRECT COST
POW Preparation
Project Billboard
Material Testing
Administrative Operating Cost (see attached cost derivati
Treasurer's Bond
Over Head Cost
Filling Cabinet
Page 120
1.00
1.00
1.00
1.00
45.00
1.00
Unskilled
Err:509
l.s.
l.s.
days
unit
8,500.00
5,000.00
17,840.00
5,500.00
300.00
6,500.00
Package
PACKAGES
7
ITEM
ITEM DESCRIPTION
QUANTITY
1.00
UNIT
l.s.
RATE PER
DAY/
UNIT
COST
5,000.00
LEONORA JUMALON
Procurement Team Head
Page 121
NORMA DALAGUETE
BSPMC
PACKAGES
ITEM
ITEM DESCRIPTION
Page 122
QUANTITY
UNIT
RATE PER
DAY/
UNIT
COST
Total
Err:509
Err:509
Err:509
Err:509
Err:509
509,870.00
Err:509
Err:509
Err:509
Err:509
Err:509
4,560.00
4,560.00
16,800.00
13,000.00
29,800.00
500.00
500.00
Err:509
Err:509
Err:509
3,000.00
8,500.00
5,000.00
17,840.00
5,500.00
13,500.00
6,500.00
Page 123
Total
5,000.00
Err:509
188,565.70
188,564.21
88,282.10
Err:509
Err:509
LAGUETE
Page 124
Total
Page 125
Page 126
Page 127
Page 128
PACKAGES
ITEM
ITEM DESCRIPTION
115.20
cu.m.
7,000.00
sq.m.
1,050.00
cu.m.
750.00
cu.m.
70.00
tonnes
UNIT
1,145.98 cu.m.
Package 2
QUANTITY
RATE PER
DAY/
UNIT
COST
64.00
DIRECT COST
POW Preparation
Project Billboard
Material Testing
Administrative Operating Cost (see attached cost derivati
Treasurer's Bond
Over Head Cost
Filling Cabinet
Environmental Mitigating Measure
Tax (7% of DC)
Contractor's Profit (10% of DC)
Contingency (10% of DC)
Supervision
TOTAL INDIRECT COST
TOTAL CONSTRUCTION COST
1.00
1.00
1.00
1.00
45.00
1.00
1.00
l.m.
l.s.
l.s.
days
unit
l.s.
8,500.00
5,000.00
17,840.00
5,500.00
300.00
6,500.00
5,000.00
LEONORA JUMALON
Procurement Team Head
Page 129
NORMA DALAGUETE
BSPMC
Total
Err:509
Err:509
Err:509
Err:509
509,870.00
Err:509
Err:509
Err:509
3,000.00
8,500.00
5,000.00
17,840.00
5,500.00
13,500.00
6,500.00
5,000.00
Err:509
188,565.70
188,564.21
88,282.10
Err:509
Err:509
LAGUETE
Page 130
Page 131