This quarter led to the end of the 1st year of the main project. Although, the financial and physical progress of the
project has not been as per the plan, a significant work has been done in recruitment, training and capacity
building of staff, system setting; operationalization of field offices; procurement of infrastructure, and hiring of the
services of technical agencies. Setting up infrastructure and administrative systems at the field Offices, setting
up Grievance Redressal System, rolling out of HR manual and preparation of financial and administrative
manual, building strategic partnerships with COMPFED, ASA, PRADAN, SBI, SERP are some of the key
highlights of the 1st year.
Confidently, project would take benefit of these institutional and human infrastructures in the coming years.
During the last quarter, project sent half of its field staff to SERP, Andhra Pradesh for 18 days for village
immersion and exposure trip. Staff learnt about the nuances of institution building and required best practices for
the promotion of pro-poor community institutions. The staff of DPCUs and BPMs were also sent to Andhra
Pradesh for 2nd round of training on village organization. This was important as in most of the villages where
BRLP has enteredthe triggers for formation of village organization had started showing up. To strengthen the
village organization, further, six teams of senior CRPs along with Project resource professionals came from
Andhra Pradesh and provided handholding support to the BPIUs in promotion of model VOs, in each project
districts.
The project has so far promoted 2432 SHGs and 30 Village organizations (VOs). To increase the role of
community participation in the project-a policy document on Community Mobilizers (CMs) and internal CRPs
have been developed and finalized. 16513 (54%) SHG members out of total 30498 SHG members have been
identified as someone who could not sign. Out of these 7350 members have been trained to write/ink their name
/ signature. A new simplified, though comprehensive books of accounts for SHGs has been prepared. It was
crucial that all BRLP staff get training on the same before rolling it out in the field. All the field staff of BRLP
except from Purnia went through 7 days long training programme on new books of accounts, micro-planning
process and banking activities. Due to flood-training could not be organized in Purnia.
Mainstreaming of the groups promoted by JEEViKA, particularly, linking the groups with bank is one of the
important component under the project. Till now, 779 groups have opened their bank accounts and out of them
123 groups have been credit linked with a loan amount of Rs. 16.12 Lakhs. However, still there are 974 groups,
which are more than 3 months old but not have been able to open their bank account. The project is in
discussion with 3 of the RRBs to have MOUs with them to smoothen the account opening and linkage related
issues. The RRBs are more frequently present than any other bank in BRLP project districts. In addition to this
192 groups have been provided initial capitalization fund (ICF) amounting Rs. 17.89 Lakhs.
Under the livelihoods component, project scaled up the already piloted System for Rice Intensification (SRI) with
more than 5000 farmers in 173 villages of Gaya and Nalanda. The scaling up of SRI is being done with the help
of 81 Village Resource Persons (VRPs) trained and promoted by PRADAN. These VRPs are providing
handholding support to the SRI farmers, who are collectively following this methodology in 1359.95 acres. Along
with several other visitors, the Commissioner of Magadh Division and Senior Agriculture Consultant of Planning
Commission visited the SRI fields of BRLP. Another important methodological intervention being promoted by
BRLP is Participatory Varietal Selection & Promotion (PVSP) in summer Moong. Through this method, new seed
varieties are introduced in the farmers field in a participatory manner. This was piloted with 698 farmers in 18
villages of 3 blocks. Four nos. of composite varieties were identified namely K-851, HUM-1, PDM-139 and TM9937 to conduct trials. It was found that the best variety was TM-9937 about 66% farmers got yield more than 12
quintal per hectare, which is more than 4 times of local varieties (89% farmers of local variety got 2.1-2.8 quintal
per hectare).
There is no better livelihoods opportunity for the poor households other than getting a secured job. Regarding
this an agreement has been made with AeA for training and placement of 500 rural youths from Purnia district in
service sector. Similarly, discussion has been held with G4S to provide training and placement of project
beneficiaries in security service domain.
The devastating flood of Kosi River affected millions of people in 6 Districts of North Bihar, particularly. The
BRLPS responded to the needs of the hour and extended its support to the district administration in Madhepura,
Araria, Purnia and Saharsha District. BRLPS staff coordinated the rescue and relief operation and facilitated
formation of committees for managing different activities at Rehabilitation camps.
INTRODUCTION
The end of the 4th quarter marks the completion of 1st one year of the JEEViKA. During the first year of the project, it has
witnessed rapid expansion in terms of both its geographical coverage as well as manpower, particularly during the last two
quarters. Around 61 % of field staff joined the project towards the end of the second quarter, while 26 % during the last
quarter of the year-1. Around 6 % positions of the BPIU are still vacant.
The project intervention began in 12 new blocks in the month of February; however, it took more than 3 months in making
these units fully functional and operational. The newly joined staff had two weeks of field immersion, further two weeks class
room training subsequent to which training and exposure in Andhra Pradesh. Setting up offices, procurement of office
infrastructures and other facilities took its own time--altogether no less than 6 months. Therefore, the take away point from
this experience is that BPIU takes almost six months as incubation before they are ready to perform. Therefore,
preparations for the IInd phase of the main project should start well in advance so that by Oct, 09 the staff are on board and
BPIU is well equipped with systems in place.
PROJECT OUTREACH
Presently, the Project is being implemented in 285 villages from 132 Panchayat of 18 blocks. There are 168319 HHs in
these villages from which 74919 has been identified as target HHs, which constitutes 44% of the total. Out of these 285
villages 53 (19%) villages have been saturated i.e. more than 80 % of identified target HHs have been brought under the
fold of SHGs, and 25 of them have been handed over to CMs. About the size of the village, while the project started its
operation with smaller villages during the beginning of the year and moved towards the bigger villages. During the Q-1 the
average number of HHs in the entered villages were 287, which has gone up to 591 by the 4th Quarter. Also, the size of
villages in Khagaria and Muzaffarpur appears to be much bigger than particularly Gaya and Nalanda.
S.N.
NameDistricts
No. of
Blocks
No. of
Panchayats
No. of Villages
entered
Av. No. of
HHs/Village
% Targeting
1.
M.pur
27
57
66322
38%
M. bani
31
34
33553
1164
987
25065
2.
16081
48%
22751
734
6358
28%
12099
257
6518
53%
3.
4.
5.
Purnia
Nalanda
Gaya
6 Khagaria
Till 4th QTR
( July- Sep,08)
Till 3rd QTR
( April- June,08)
Till 2nd QTR
(Jan-Mar,08)
Till 1st QTR
(Oct-Dec,07)
3
3
21
19
31
47
26
104
19343
186
12768
66%
12
14251
1188
8129
58%
18
132
285
168319
591
74919
44%
18
132
269
111382
414
53349
47%
79
138
60619
439
34259
56%
24
53
15224
287
4421
29%
Q-4, 07
Q-1, 08
Q-2, 08
Q-3, 08
Up to Q-4,08
236
132
145
1381
538
2432
As it is evident from the table, a large number of the groups have been
formed during the Q-3 in the year 2008. Therefore, these groups are
less than 6 months old. There are only 513 groups, which are more
than six months old. Based on the socioeconomic condition, out of
2432 groups promoted, 1797 are homogenous in nature and 633 are
heterogeneous. Out of 283 groups graded so far 191 (67%) groups
turned out to be of A category.
Name of Districts
March-08
June-08
Sept-08
No.
No.
No.
Gaya
144
26
393
21
518
21
Nalanda
106
19
324
15
470
19
Muzaffarpur
76
14
220
12
369
15
Madhubani
100
18
274
17
391
16
Purnia
119
22
403
22
435
17
244
13
249
10
Khagaria
MEMBERS
PROFILE (%)
SC
2.
Purnia
Muz
2820
2800
ST
533
00
3.
BC
1845
705
4.
EBC
12
805
5.
535
650
6.
Total
5745
4960
Total
Nalanda
Mbani
Gaya
Kgaria
2199
1909
4048
1210
14986
49
01
00
00
00
534
1.7
1879
1368
2016
1267
9080
30
1099
1247
242
363
3768
12.3
162
450
206
127
2130
5340
4974
6512
2967
30498
100
VILLAGE ORGANISATION
The village organization is the first level federation of the SHGs. Once in a village / hamlet more than 8 SHGs are formed ,
the process of formation of next level institution starts. 8 -12 SHGs of a
village form Village Organisation (VO) in which 2-3 representatives of
each SHG form the Executive Committee of the VO, and all the
members of SHGs become part of the General Body . As in the last
Quarter , the focus of JEEViKA has been the formation of good quality
SHGs in large number , the VO formation could not get a momentum .
We formed 9 additional VOs during the last quarter. VO helps in
collectively manage community services, bulk purchasing and decision
making. During the various meetings and trainings the SHG members
are introduced about the importance, objectives and roles and
responsibilities of the VOs. Out of 34 VOs formed, 24 have opened
their Bank accounts and have mobilized around Rs. 59,020 as
membership fee and share capital.
PARTICULARS
GAYA
NALANDA
MUZAFF.
MBANI
PURNIA
11
34
54
73
114
51
78
370
24
672
874
1390
481
1052
4469
13870
10750
10320
6220
17860
59020
KHAGARIA BIHAR
In Andhra Pradesh they were divided into smaller groups and were placed in the SERP operational areas where
they interacted with the SHGs and Village Organizations. Main objective of the village immersion was to make
the new incumbents learn about the process of institution Building and its best practices. There they were sent to
Orvakal (a District where the oldest federation was formed) and were provided with the chance to interact with
the best Community Based Institutions and their staffs. Exposure visit for next Batch of 285 AC & CC is due in
the month of November 2008.
Training cum village Immersion of DPCU officials and BPMs on Village Organisation.
All DPCU and BPIU staffs are involved in forming quality SHG and nurturing them through trainings and
Exposure visits. To initiate the process of village organization all the DPCU officials including DPC, DTC, DTO
and the Block Project Mangers, altogether 23 staff, were sent to SERP from 13th Aug 08 to 29th Aug 08 to
undergo the training on the process of Village Organization formation and their nurturing. The main objectives of
the training cum village immersion were to equip the District Training Cell and Block level team with the
methodologies on the under mentioned areas, so that they can replicate the same training with the ACs/CCs and
the SHGs and VOs in effective and efficient manner.
1. Importance and process of Village Organization formation.
2. Understanding process of Conducting VO Meeting.
3. Importance of subcommittee formation and their roles and responsibilities.
4. Process of conducting appraisal by Village Organisation and importance of Book Keeping.
The entire training programme of 15 days incorporated field visits and interaction with the Village Organizations
and Mandal Samakhya of SERP.
External CRP Visit
6 teams of external CRPs from Andhra Pradesh visited JEEViKA to provide support to the field teams in establishing
the best practices in the Village Organizations. Each team was placed in the pilot blocks for 30 days and with the
Block team they were instrumental in nurturing the Village Organisation. The CRPs were involved in imparting training
related to VO concept and forming the Sub-Committees and making them aware about the roles and responsibilities
of the same.
CM Policy
Community Mobilizers (CM), preferably women, acts as facilitator for the self help groups. Their main responsibility is
to facilitate meetings of the associated SHGs and writing their books of records. These Community Mobilizes are from
the community itself, identified by the community and works for the community. To achieve scale in the project,
capacity building of Community Mobilizers becomes very important. Till Sep 08 the district wise CMs status is
enumerated below:
PARTICULARS
Number of Book
Keepers/CM identified
Number of Book
Keepers/CM trained
Trained book
keepers/CM providing
services to SHGs
No. of SHGs in which
BOA are updated by
CMs.
SHGs/CM
GAYA
NALANDA
MUZAFF.
MBANI
PURNIA
KHAGARIA
TOTAL
66
40
54
33
59
13
265
18
20
15
15
30
00
98
16
20
15
15
30
01
97
247
200
268
254
264
07
1240
15.4
10
17.86
17
8.8
12.78
A separate policy guideline for the Community Mobilizers has been framed depicting the selection processes, roles
and responsibilities, training and payment of honorarium. As mentioned above, CM participate in all the weekly
meeting of the assigned SHGs and facilitate the meeting process with the timely updation of all books of
accounts and both the activities are vital for graduating the SHGs towards strong institution. Hence, the
honorarium of CM is linked with the number of weekly meetings attended and weekly updation of all books of
record.
MICRO FINANCE
FINANCIAL MAINSTREAMING OF SHG
The fourth quarter has witnessed intensive staff trainings, where a significant amount of time were devoted in
capacity building of the staff. In addition, rigorous follow-ups were made with Bank officials and staff to coordinate the process of Bank Account opening and Bank Linkage process. An entire month was solely devoted
to Bank A/c opening of SHGs and Micro Plan preparation. As a result of this concerted effort more than 400
Bank Accounts have been opened during the last quarter.
Banking Activity (SHG):
No. of
Month
SHG
No. of SHGs
having
Bank a/c
Bank Linkage
No. of
groups
received CIF
CIF
Up to June
1841
352
75
78
22
145
1237900
Up to July
2210
490
68
94
19
158
1457000
Up to August
2363
647
58
111
17
178
1802400
Up to September
2432
779
41
123
15
191
2002200
No. of SHG
No. of SHGs
having Bank
A/C
Bank Linkage
No. of SHG
having
received CIF
Purnia
435
132
30
64
48
31
Khagaria
249
36
14
00
00
00
Muzaffarpur
369
187
50
16
08
56
Gaya
518
241
46
34
14
36
Nalanda
470
110
23
05
33
Madhubani
391
73
18
05
35
TOTAL
2432
779
123
191
Identity Proof
SHG-ISSUES
Bank Linkage
Others
Denial of linkage
due to presence of
defaulters in group.
Require residential
certificate of all the
members
Representatives of
the SHG are required
to be literate persons
or at least they
should know to sign.
Group should be in
existence for six
months for Bank A/c
opening process
Groups
performance
made criterion
for
opening
account of SHG
Non inclusion
due to service
area approach
Discrepancies
in
Voter Card common
issue (Name spelling
mistake etc)
Stamp duty of Rs
300.00 and 100.00
as documentation
charges was taken
for Linkage.
Sometimes more
than
40-50
signatures
are
required to get a
bank linkage.
To sort out the problem faced in carrying out banking activity a presentation of the problems were laid before the
State Level Bankers Committees (SLBC) meeting and rigorous follow-ups were done with Bank Official at
regional level as well as at the Branch level. In addition our staff have been given training on Know Your
Customer (KYC) guidelines which requires to be followed for opening of bank account.
Books of Record of SHG
The books of accounts of SHGs which were prepared in the previous quarter have been printed now, and are
ready to be rolled out by the end of September. A detailed roll out strategy had been framed, which entails
rigorous training to the staff of BRLPS. In turn these trained staff will provide training to Community Mobilizer and
Book Keepers. A detailed plan has been worked out with them.
Capacity Building of Staff on SHG Books of Record and Micro Planning
Books of account training has been organized for
the staff in three phases:
training was provided exclusively on Micro Planning Process. The training on Books of Accounts of SHG
was imparted by External Resource persons who were also involved in providing technical support in
preparation of Books of accounts.
b. Training of BPIU Staff: Two days training was organized at district level for the Area Coordinators and
Community Coordinators. This training was imparted by the training cell of each district. This training was
organized with the view to acquaint the staff with new books of accounts of SHGs and also to enhance the
capacity of training cell on the subject matter.
Seven days long training was organized for all the staff at district and block level. Training has been
organized in six batches, each constituting of 40- 45 participants. The training has been imparted by a group
of external resource persons on Books of Account and the training on Micro Planning was provided by
internal resource persons. Till now, training has been provided to all the staff of Gaya (70 participants),
Nalanda (43 participants), Khagaria (30 participants), Muzaffarpur (43 participants), Madhubani (45
participants) and only 7 staff of Purnia district.
In the seven days training, Len-Den Prapatra, General Ledger, Saving and Loan Ledger and Receipt and
Payment A/c preparation was taught to the staff . Further to make them well versed in recording aspect, 4
case studies were prepared and practical sessions were pressed in simultaneously. Besides, a detailed
rolling out process was discussed with the staff to smoothen the process of rolling out of new Books of
accounts of the SHG.
Together with the training on Books of Accounts, training on Micro Planning was taken up, in which the
entire planning process was discussed citing examples from field. The process of need identification,
investment plan and the processes involved in reaching to a solution at group level were also taken up
through simulation exercises. Through these training inputs we are expecting a significant progress, where
in all the staff will be in position to take up Micro Planning exercise of the groups and significant
disbursement of CIF will take place wherever there is credit need in the groups.
FINANCIAL TRANSACTIONS
S.
N.
1.
2.
3.
4.
6.
Purnia
Muzaff.
Nalanda
M bani
Gaya
Kgaria
C. Saving
(Rs. Lakhs)
Groups involved in
Inter-Loaning
1640601
825762
801230
1640601
114374
424619
370
317
423
347
466
216
2139
3163
1405
1985
3899
2349
1436
14237
2981288
870797
1091263
1644765
2357089
437945
9383147
84
93
93
87
85
94
Financial Heads
C. amount inter-loaned
(Rs Lakhs)
On time Re-payment
Rate (OTR)
Total
5447187
10
BANKING TRANSACTIONS:
CIF DETAILS
Amount (Rs. Lakhs)
Disbursed ICF
No. of Groups received
ICF
Av. ICF/Gr.
SHG members received
ICF
AV. CIF/Member(Rs.
thousand)
No. of Groups submitted
UC
UC submitted (Rs. lakhs)
GAYA
NALANDA
MUZAFF.
M, BANI
PURNIA
KHAGARIA
TOTAL
2.44
3.19
7.66
3.74
2.98
20.02
36
33
56
35
31
NA
191
6.78
9.67
13.68
10.38
9.61
9.32
92
66
170
187
73
NA
588
2.65
4.83
4.51
2.00
4.08
NA
3.33
29
26
48
20
35
NA
158
1.9
2.02
3.24
1.34
2.9
NA
10.98
Community investment fund is the amount of project money disbursed through micro-planning process. So far 145 groups
have gone through micro-planning process and have
received Rs. 12 lakhs as initial capitalization funds.
Around 600 members of these 145 groups have been
able to take benefit of this fund at the first instance.
Nonetheless, the members who took ICF at the first
instance have started paying back. The returned
amount is being ploughed back to other members of the
group, as well, both directly through SHGs and through
VOs.
The groups whose credit absorption capacity is more
than what they have received as CIF and internal saving
can be linked with Banks. Till now 78 groups have been
credit linked with Bank. The table below shows the
progress till June, 08.
S. N. BANK LINKAGES
1. Number of SHGs
formed
2. SHGs having Bank
A/C
3. SHGs Credit
Linked with Banks
4. Amount (Rs.
Lakhs) Loaned by
Banks
5. Av. Lending /group
PURNIA
MUZ
NALANDA
MBANI
GAYA
KHAGARIA TOTAL
435
369
470
391
518
248
2432
132
187
110
73
241
36
779
64
16
4.0
34
123
6.97
2.74
1.35
0.75
4.29
16.1
10.89
17.82
27
18.75
12.62
13.09
Though, the senior management of most of the banks has shown their willingness to give thrust to the SHG movement and
provide all kind of support; however, at the branch level it is not getting translated into action. Prima facie, this appears a
11
case of lack of sensitization of bankers to the issues of SHGs. Some of the issues mentioned below are the obstacles that
are coming in the way to which we have to make an attempt to find a solution.
Bankers are finding difficulty to open the account of the SHGs on the following pretext:
1.
2.
3.
Identity proof Most of the banks are reluctant to accept the endorsement of the Mukhiya as certificate of
identification.
Minimum Balance- Banks with core banking facility are asking for minimum opening balance of Rs.1000.
Age of the groups-- Banks is reluctant to open account of those groups which are less than six month old.
Reluctance of the bank to lend a group where any of the SHG member family is having outstanding loans to their
name.
Many bank branches having minimum man power prevents them to take up visits to groups and taking initiative on
their part.
12
LIVELIHOODS
Scaling up of SRI (System for Rice Intensification):
System of Rice Intensification (SRI) is one of the key livelihoods interventions, which was planned to scale up
with 2000 farmers. This was planned after the excellent performance of SRI during the pilot phase. During the
pilot, the average paddy yield with SRI methodology
was 10 tones per hectare against the 3.3 tones per
hectare of traditional practice.
During the last phase of season in 173 villages, SRI
was initiated with 5795 farmers comprising both SHG
and non-SHG farmers of Gaya and Nalanda districts.
The non SHG farmers are mainly from our target
communities and are from BRLP project blocks only
but have not been brought under the fold of SHG. In
Gaya, SRI has been practiced in 5 clusters of all 4
project blocks, while in Nalanda, it is in 4 clusters.
This scaling up of SRI would not have been possible
without the involvement of Village Resource Persons
(VRP). This follows the principle of farmer to farmer extension model and is one of the low cost methodology
through which technology is made available to the small & marginal land holders. Around 81 Rural Youths were
identified and were given 4 rounds of training on SRI methodology. Many of them belong to the families who did
SRI in their field during the pilot phase.
Different communication technologies like
audio-visuals, Flex, Fur and sharing of
experienced SRI farmers were used
extensively during the awareness campaigns.
The payment structure of VRP for providing
extension services was positively biased
towards farmers belonging to scheduled caste
and scheduled tribes and particularly towards
those who were taking land on lease or doing
share cropping e.g. Rs. 35/ Month/HHs for
SC/ST doing SRI on lease land/ share
cropping while Rs. 20 and 25 for general and
backward caste, respectively. Each VRP was
given the responsibilities to provide services
to 30 to 120 farmers based on their skills and
abilities. Extension officers of the govt. dept. and scientists of Krishi Vigyan Kendra further strengthen the
awareness process by visiting SRI villages during the campaigns.
13
No. of
VRP
No. of
Village
Total SRI
Farmers
SHG Farmers
(Area-Acres)
N-SHG
Farmers
(Area-Acres)
Total Acres
of SRI
Paddy
Net Acres of
SRI Paddy
GAYA
57
143
4441
1827 (485.23)
2614 (740.38)
1225.61
1225.61
NALANDA
24
30
1354
869 (171.92)
485 (31.238)
203.16
134.35
TOTAL
81
173
5795
2696 (47%)
(657.1) (48%)
3099 (771.62)
1428.76
1359.95
The average acreage of SRI per household is around 0.28 acres in Gaya, whereas in Nalanda it is 0.17 acres.
Due to flood water in Nalanda, around 285 farmers fields got inundated in water. However, efforts were made to
replenish the same through mobile nursery. A central nursery was prepared in relatively upland of Gaya, and it
was transported to Nalanda for transplantation. Presently, the average tillers in Nalanda & Gaya are around 4050, however the maximum tillers observed, so far, are 70-80 and minimum tillers observed are 25-30.
Considering the pilot success of SRI, many visitors including farmers from
different areas visited SRI fields and interacted with the farmers. The
Commissioner of Magadh Division, Senior Agriculture Consultant of
Planning Commission, Project Director of ATMA, Project Coordinator of
KVK, District Agriculture Officer, Plant Protection
Officer, Field Officers of concerned districts have
Visited the SRI fields. Non Government
Organizations and Private Companies such as ASA
and BASIX brought their farmers from Munger and
Gaya for exposure visit to the SRI fields in Gaya.
14
slightly late & both were heavily prone to Yellow Vein Mosaic Virus (YVMV). The maximum yield these two
varieties were around 5-7 quintal/Ha. Therefore the two varieties namely TM-9937 & HUM-1 have been
preferred by majority of the farmers. It is also discussed among the farmers to promote these two varieties in the
coming years.
15
16
SOCIAL DEVELOPMENT
1. Flood Relief Support Work
The devastating floods of Kosi River affected millions of people in 6 Districts of North Bihar. The CEO, BRLPS
was placed as Special District Magistrate in Madhepura for two weeks. Using that as an opportunity, the BRLPS
quickly responded to the affected families. The Staff of BRLPS extended their support to the district
administration in Madhepura, Araria, Purnia and Saharsha Districts.
a. Coordination work: With District administration BRLPS staff coordinated the rescue and relief work. The
team Facilitated formation of Committees for managing different activities at Rehabilitation camps. An
external assistance cell was set up at Madhepura to co-ordinate the activities of NGOs / external agencies
and also coordinated the relief material from the various agencies , companies & NGOs.
b. Website developed for separated families: A website with the help of SAFAL Solutions has been
developed to assist the SAMBAL Project of the Social Development, Govt of Bihar Project . The website
detail may be seen on www.vikasdwar.com/floodsmissing
c. Flood Affected Area : Purnia, the one of the 6 project districts of BRLP which is affected from Floods. All
three operating blocks of Purnia affected by this devastating floods. The total affected SHG is 200.
Following flood relief activity has been undertaken for affected SHG members of Purnia:
1. First Aid kit: All three BPIU teams have been given medicines, halogen tablets, and bleaching powder
to provide emergency health support to the affected needy members. Small training was organised on
uses of first aid medicines.
2. Water and Sanitation training and support : Community being made aware on uses of
Bleaching Powders, Halogen tablets and ORS . Around 5000 hand pumps has been made purified
(drinkable) water through use of the bleaching powder. Through Community participation it has been
ensured that more then 10000 halogen tablets were used properly and community also got benefited to
get ORS access by the SHGs members within their Villages.
Liasioning with UNICEF and District Health Society:
liasioning with the Unicef and DHS we got 13000 halogen tablets, 20 Bags Bleaching powder and 7000
ORS bags and IEC to utilise the material properly.
After educating the community and SHGs, BRLPS team distributed the material and ensured utilisation
of the material.
3. Flood Relief materials: The BRLPS had received flood relief materials from various agencies and
distributed it among the flood affected SHG members.
4. Emergency and rescue support given to the affected SHG members: Our field team has shown
sensitivity to help the community during emergency and rescue work done at village level. The team
provided moral support to keep patience during this critical period.
17
2.
Signature Campaign
To increase in number of making own signature instead of using thumb impression for all SHG members
became the focused activity during the quarter.
District
1056
1841
Khagaria
51
364
Muzaffarpur
558
1070
Gaya
580
1620
Nalanda
300
1062
Madhubani
94
1393
2639
7350
Purnia
Total
Districts
1.
Purnia (Dhamdaha)
375
98
2.
200
50
3.
Madhubani (Rajnagar)
173
82
Total
748
230
18
No. of VOs developed Action Plan on any social issues and got it
implemented.
VO Formed
VO have Action Plan
Purnia
93
Khagaria
33
Muzaffarpur
369
11
Gaya
40
Nalanda
220
Madhubani
58
Total
813
34
15
These are following issues on which these non negotiable norms have made by the SHG/VO:
1)
2)
3)
4)
5)
6)
7)
8)
19
Recruitment
On recruitment front, the HRD team has made the following progress.
SPMU
DPCU
23
26
BPIU
133
97
172
107
73
62
S. N.
Level
Total
% Achievement
25
During the quarter, two rounds of recruitment processes were conducted, through which 62% of the total
targeted vacancies have been filled up. Six additional posts of secretarial support positions at SPMU have been
created and approved by the EC taking into account the expansion of project work from 5 blocks to 18 blocks.
Furthermore, to strengthen DPCU, 6 positions of Accountant cum Office Assistant at DPCU level have also been
created. Out of remaining 65 vacant positions, advertisement has been floated for 9 positions at SPMU, 6
positions at DPCU and 6 positions at BPIU. The project plans to complete all the recruitments by the next
quarter.
During the last quarter 33 staffs have left the society. Out of this 31 individuals have left or have been terminated
from BPIUs, mainly CCs and ACs; whereas SPMU and DPCU has registered very low attrition rate i.e. 1 at each
level.
The vacant positions are largely from reserved category. The experiences suggest that getting the right person
from the reserve category for the management positions are very hard to find. So far the Society has completed
three rounds of recruitment for each of the positions, yet these positions are vacant. The society is seriously
thinking to bring in some required changes in the recruitment policy, wherever it is required. This becomes more
the important, considering the fact that recruitment process needs to be started at least six months before the
launch of the 2nd phase. A preliminary discussion has been held over this particular issue, and preparation for
the same would start from December 2008 onwards. It is expected that the coming quarter would come out with
the following.
Rolling out plan for conducting recruitment for various positions for existing positions and for 2nd phase of
the project.
20
B.
Committees at State and District level have been constituted for redressal of grievances of project
staffs. One such committee in each of the project districts and at SPMU has been formed. The
composition of these committees includes a female representative as well as representation from
ST/SC community. A sensitization training for the all committee members will be done in the coming
quarter.
For coverage of staff with Insurance benefit, an advertisement has been published seeking
expression of interest (EOI) from interested service provider agencies. It is expected that the process
will be completed in the coming quarter.
After introduction of the HRD manual and conducting HRD sensitization workshop in the last quarter,
certain feedbacks have been received. Based on it required addendum has been proposed and
discussed. The addendum is related to expanding mobility support to the field staff, clarifying local
conveyance entitlements and addition in transfer policy.
C.
CEO along with SPM-M&E, PM-HRD and PM-SD participated in Governance and Accountability
Action Plan Workshop (GAAP) at New Delhi organized by the World Bank.
As per agreement with SERP, project staffs from DPCU and BPIU level participated in 20 days
training cum exposure visit at SERP, Andhra Pradesh to learn the development dynamics and
processes of forming as well strengthening Village Organisation.
1 DPC, 1 DTC, 3 BPMs, 7 Area coordinators along with 1 PM and 1 SPM participated in a 3 days
training on small entrepreneurship development conducted by MART in Kolkata.
A twelve (12) days village immersion program for newly recruited AC and CCs conducted followed by
an Intensive Induction Training Program of nine days at SIHFW, Patna.
21
Requirements
Gaya
Nalanda
Muz
Mdh
Purnia
KHG
Office Set up
18
Furniture &
Fixtures
18
Available
Available
Available
Available
Available
Available
Telephone
Internet
18
Computer
36
Gen set
18
Operators
18
Available
Available
Available
Available
Available
Available
Office Boy
18
22
MIS Development
Safal Solutions Pvt. Ltd, Secunderabad has been hired by BRLPS to design and develop the MIS for the project.
The design of both first and second set of features of rural livelihoods software/application (RLMIS) has been
completed. MIS system is installed in all 18 blocks. Training to key staffs in all six districts have been completed.
Data Entry Operator in all the districts have also joined and they have been given training on MIS. In most of the
blocks computer infrastructure, power back up support and other required infrastructure is also made available at
the BPIU and DPCU. A TOR for the IInd phase MIS support is ready and it would be shared with the world bank
during their upcoming mission.
PROCESS MONITORING
An advertisement was given to invite expression of interest from different local and national agencies to conduct
process monitoring. 27agencies have applied for the assignment and six short-listed agencies were sent RFP,
out of which 4 of them turned up for technical presentation. procurement process will be over by the end of this
month.
23
COMMUNICATION
COM- Volume 1: SHG
The whole COM is divided into 4 volumes. The first volume of the COM deals
with various processes of village entry, SHG formation and other associated
processes. The designing, laying out and finally the print ready formats were
developed in-house. The procurement process for the printing has been
completed and it is sent to the printers. By October end it will be circulated to
all field staff.