You are on page 1of 16

11/10/2015

DESIGN TRAFFIC LOAD


TRAFFIC COUNT DATA, AXLE WEIGHT DATA, GROWTH OF TRAFFIC

TRAFFIC

passage of people or vehicles moving on a road


or public highway.

11/10/2015

AXLE
A supporting shaft
or member on or
with
which
a
wheel or a set of
wheels revolves.

AXLE LOAD
The axle load of a wheeled vehicle is the
total weight felt by the roadway for all
wheels connected to a given axle. Viewed
another way, it is the fraction of total vehicle
weight resting on a given axle.

11/10/2015

GENERAL
For the purposes of structural pavement design, it is
necessary to determine the traffic load to be carried
by the pavement during the design life.

GENERAL
The traffic which will pass over the pavement
will be composed of a number of different vehicle
types, each of which will apply a different load.
In order to combine these loads, the concept
of an equivalent standard axle (ESA) based on an
8 tonne axle load has been developed.

11/10/2015

GENERAL
The total number of equivalent standard axles
which will pass over the pavement during the selected
design life is the design traffic load.
For pavement design purposes, axle loads less than
3 tonnes can be ignored. This eliminates private saloon
cars and most jeepneys from the calculations of design
traffic load in equivalent standard axles. As a guide a
vehicle having at least one axle with dual wheels and/or
having more than two axles should be considered.

3 axles

11/10/2015

MAIN PARAMETERS
There are four fundamental factors to be
determined in order to be able to compute the
cumulative equivalent standard axles for
pavement design purposes. These are as follows:

11/10/2015

MAIN PARAMETERS
(a) Existing traffic flows on the length of road under
consideration, subdivided by vehicle class.
(b) A sample of axle weights for each class of heavy
goods vehicle.
(c) Growth rates for each class of vehicles, or an over
all growth rate applicable to all classes of vehicle.
(d) Design life for the pavement.

Process dat a t o
det ermine av erage
annual daily t raffic
(AADT) by v ehicles
t y pe

Conduct classified
t raffic count

Conduct ax le
w eight surv ey by
v ehicles class for
v ehicles > 3 t onne
gross w eight

Apply equiv alence


fact ors t o ax le
w eight s t o
det ermine av erage
equiv alence fact or
per ax le

Sum cumulat iv e ESA by


v ehicle class t o det ermine
t ot al ESA for design life.

Obt ain grow t h


fact ors and apply t o
AADT t o det ermine
t raffic by v ehicle
class at t ime of
opening road.

Apply grow t h fact ors


t o opening t raffic by
v ehicle class t o
det ermine cumulat iv e
t raffic ov er design life
by v ehicles class

Det ermine av erage


equiv alence fact or
by v ehicle t y pe.

Apply equiv alent fact or by


v ehicles class t o det ermine
cumulat iv e ESA by v ehicle
class ov er design life

11/10/2015

TRAFFIC COUNT DATA


Whether collected by a traffic survey conducted specifically for the project
under consideration, or based on earlier surveys on the same length of road,
the minimum requirements from the traffic survey data are as follows:

(i) Average annual daily traffic (AADT) i.e. average total flow of traffic on the
road in a 24-hour period. This is normally a 2 way flow i.e. the total of the
vehicular flow in each direction.
(ii) The make-up or composition of the AADT in terms of the number of
vehicles in each vehicles classification. This may be presented as a
percentage of flow for each vehicles classification.

AXLE WEIGHT DATA


At the same time as the traffic count, it is desirable to
conduct an axle weight sur vey. An axle load survey should
be carried out by weighing a sample of vehicles at the
roadside. The sample should be chosen such that a
maximum of about 60 vehicles per hour are weighed.

11/10/2015

Equivalence Factor
Axle Load in kg
Equivalence Factor =
8160

4.5

Equivalence Factors For


Different Axle Loads
Wheel load (single and dual)
(1000 kg)
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
8.00
8.50
9.00
9.50
10.00

Axle load
(1000 kg)
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

Equivalence Factor
0.01
0.04
0.11
0.25
0.50
0.91
1.55
2.50
3.83
5.67
8.13
11.35
15.48
20.70
27.19
35.17
44.85
56.50

11/10/2015

11/10/2015

TYPE OF VEHICLE

TRUCK W/ 2 AXLES
(6 WHEELS)

TRUCK W/ TANDEM REAR WHEELS


(3 AXLES/10 WHEELS)

TYPE OF VEHICLE

10

11/10/2015

GROWTH OF TRAFFIC
The determination of the cumulative total of equivalent
standard axles (ESA) that will pass over the pavement during the
design life must take into consideration the growth or increase in
traffic over the selected design life.
The determination of appropriate growth factors can be a
complex procedure. Unless accurate information is available,
from which predictions can be made with a high degree of
confidence, it is recommended that average growth figures should
be obtained from Planning Services Department of DPWH.

Formula for Traffic Growth


Factor at time of opening year
GF = (1 + i)n
Where:
i = growth rate, %
n = no. of years from initial study to the opening year

11

11/10/2015

Formula for Traffic Growth


Factor over design life
Using summation notation:

n1

i)xn
GF = (1(1++i)
x=0
Where:
i = growth rate, %
n = analysis period, years

Traffic Growth Factors


Analysis Period Years (n) No Growth
1
1.00
2
2.00
3
3.00
4
4.00
5
5.00
6
6.00
7
7.00
8
8.00
9
9.00
10
10.00
11
11.00
12
12.00
13
13.00
14
14.00
15
15.00
16
16.00
17
17.00
18
18.00
19
19.00
20
20.00
25
25.00
30
30.00
35
35.00

Annual Growth Rate, Percent


2.00
4.00
5.00
6.00
1.00
1.00
1.00
1.00
2.02
2.04
2.05
2.06
3.06
3.12
3.15
3.18
4.12
4.25
4.31
4.37
5.20
5.42
5.53
5.64
6.31
6.63
6.80
6.98
7.43
7.90
8.14
8.39
8.58
9.21
9.55
9.90
9.75
10.58
11.03
11.49
10.95
12.01
12.58
13.18
12.17
13.49
14.21
14.97
13.41
15.03
15.92
16.87
14.68
16.63
17.71
18.88
15.97
18.29
19.16
21.01
17.29
20.02
21.58
23.28
18.64
21.82
23.66
25.67
20.01
23.70
25.84
28.21
21.41
25.65
28.13
30.91
22.84
27.67
30.54
33.76
24.30
29.78
33.06
36.79
32.03
41.65
47.73
54.86
40.57
56.08
66.44
79.06
49.99
73.65
90.32
111.43

7.00
1.00
2.07
3.21
4.44
5.75
7.15
8.65
10.26
11.98
13.82
15.78
17.89
20.14
22.55
25.13
27.89
30.84
34.00
37.38
41.00
63.25
94.46
138.24

8.00
1.00
2.08
3.25
4.51
5.87
7.34
8.92
10.64
12.49
14.49
16.65
18.98
21.50
24.21
27.15
30.32
33.75
37.45
41.45
45.76
73.11
113.28
172.32

10.00
1.00
2.10
3.31
4.64
6.11
7.72
9.49
11.44
13.58
15.94
18.53
21.38
24.52
27.97
31.77
35.95
40.55
45.60
51.16
57.28
98.35
164.49
271.02

Note: The above growth factors multiplied by the first year traffic estimate will give the total volume
of traffic expected during the analysis period

12

11/10/2015

DESIGN LIFE
Since pavements, new or rehabilitated, are usually designed for
period ranging from 10 years to 20 years or more, it is necessary to
predict the ESA for this period of time i.e. the performance period.
The performance period often referred to as the design period or
design life of the pavement is defined as the period of time that an
initial (or overlaid) pavement will last before reaching its terminal
serviceability.
For roads in the Philippines, it is normal to use a design life of
10 years for asphalt surfaced roads and 20 years for concrete
surfaced roads.

UNEQUAL TRAFFIC LOADS


In some circumstances, it may be determined that the
traffic loading in one direction along a road is much
greater than that in the opposite direction. In this case,
design traffic loads computations should be carried out
for each direction and the highest loading used for
pavement design purposes.

13

11/10/2015

EXAMPLE CALCULATION of DESIGN


TRAFFIC LOAD DETERMINATION

The following data are results of an earlier traffic counts and axle weight
surveys:
(a) Initial AADT (Year of Study: 1995) = 3,000 vehicles per day
(b) Buses make up 5% of the AADT, 2 axle trucks 8% and others 4%
(c) Equivalence factors have been established as follows:
Buses = 1.2 per bus
2 axle trucks = 1.85 per truck
Other trucks = 1.37 per truck
(d) Growth rates to determine AADT by vehicle class at opening year:
Buses = 3%
2 axle trucks = 5%
Other trucks = 5%
The opening year is 1998 and the selected design life is 20 years (rigid
pavement). Determine the design traffic load.

Process dat a t o
det ermine av erage
annual daily t raffic
(AADT) by v ehicles
t y pe

Conduct classified
t raffic count

Conduct ax le
w eight surv ey by
v ehicles class for
v ehicles > 3 t onne
gross w eight

Apply equiv alence


fact ors t o ax le
w eight s t o
det ermine av erage
equiv alence fact or
per ax le

Sum cumulat iv e ESA by


v ehicle class t o det ermine
t ot al ESA for design life.

Obt ain grow t h


fact ors and apply t o
AADT t o det ermine
t raffic by v ehicle
class at t ime of
opening road.

Apply grow t h fact ors


t o opening t raffic by
v ehicle class t o
det ermine cumulat iv e
t raffic ov er design life
by v ehicles class

Det ermine av erage


equiv alence fact or
by v ehicle t y pe.

Apply equiv alent fact or by


v ehicles class t o det ermine
cumulat iv e ESA by v ehicle
class ov er design life

14

11/10/2015

Solution
1. Determine average annual daily traffic (AADT) by vehicles type.
Initial AADT = 3,000 vehicle per day
Buses
= 0.05 x 3000 = 150 per day
2 Axle Trucks = 0.08 x 3000 = 240 per day
Other Trucks = 0.04 x 3000 = 120 per day
2. Apply growth factors to determine AADT by vehicle class at opening year.
From 1995 (Year of Study) to 1998 (Opening year) = 3 years

Therefore growth by class is as follows:


Buses
= 150 x 1.033 = 164 per day
2 Axle Trucks = 240 x 1.053 = 278 per day
Other Trucks = 120 x 1.053 = 139 per day

3. Apply growth factors to each class to determine total number of axles that will pass over the
pavement in the design life.
For 5% growth rate, use the table below.
Traffic Growth Factors
Analysis Period Years (n) No Growth
1
1.00
2
2.00
3
3.00
4
4.00
5
5.00
6
6.00
7
7.00
8
8.00
9
9.00
10
10.00
11
11.00
12
12.00
13
13.00
14
14.00
15
15.00
16
16.00
17
17.00
18
18.00
19
19.00
20
20.00
25
25.00
30
30.00
35
35.00

Annual Growth Rate, Percent


2.00
4.00
5.00
6.00
1.00
1.00
1.00
1.00
2.02
2.04
2.05
2.06
3.06
3.12
3.15
3.18
4.12
4.25
4.31
4.37
5.20
5.42
5.53
5.64
6.31
6.63
6.80
6.98
7.43
7.90
8.14
8.39
8.58
9.21
9.55
9.90
9.75
10.58
11.03
11.49
10.95
12.01
12.58
13.18
12.17
13.49
14.21
14.97
13.41
15.03
15.92
16.87
14.68
16.63
17.71
18.88
15.97
18.29
19.16
21.01
17.29
20.02
21.58
23.28
18.64
21.82
23.66
25.67
20.01
23.70
25.84
28.21
21.41
25.65
28.13
30.91
22.84
27.67
30.54
33.76
24.30
29.78
33.06
36.79
32.03
41.65
47.73
54.86
40.57
56.08
66.44
79.06
49.99
73.65
90.32
111.43

7.00
1.00
2.07
3.21
4.44
5.75
7.15
8.65
10.26
11.98
13.82
15.78
17.89
20.14
22.55
25.13
27.89
30.84
34.00
37.38
41.00
63.25
94.46
138.24

8.00
1.00
2.08
3.25
4.51
5.87
7.34
8.92
10.64
12.49
14.49
16.65
18.98
21.50
24.21
27.15
30.32
33.75
37.45
41.45
45.76
73.11
113.28
172.32

10.00
1.00
2.10
3.31
4.64
6.11
7.72
9.49
11.44
13.58
15.94
18.53
21.38
24.52
27.97
31.77
35.95
40.55
45.60
51.16
57.28
98.35
164.49
271.02

15

11/10/2015

For 3%, use the following formula:

n1

(1 + i)x

GF =
x=0
201

(1 + 0.03)x

GF =
x=0

GF = 26.87
Therefore,
Buses
= 164 x 26.87 x 365 = 1,608,461
2 Axle Trucks = 278 x 33.06 x 365 = 3,354,598
Other Trucks = 139 x 33.06 x 365= 1,677,299

4. Multiply each class by respective equivalence factors to determine ESAL.

Buses
= 1,608,461 x 1.2 = 1,930,153
2 Axle Trucks = 3,354,598 x 1.85 = 6,206,006
Other Trucks = 1,677,299 x 1.37 = 2,297,900

5. Total ESAL.
Total ESAL = 1,930,153 + 6,206,006 + 2,297,900 = 10,434,059

Thus, the total ESA is 10,434,059. Therefore, the design traffic


load is per lane of carriageway which is 50% of ESA equal to 5.217 x 106
ESA.

16