You are on page 1of 132

HAZOP STUDY REPORT

Samsung Engineering

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

SO2331

S646-140-RT-00-04

Plant

DHU Unit (Unit -1400)

Dept.

Project

Document Number

OWNER
PMC
LICENSOR
FEED CONTRACTOR

:
:
:
:

0
Rev.

NAGARJUNA OIL CORPORATION LTD.


CB&I, LUMMUS
AXENS, IFP GROUP TECHNOLOGY
TECHNIP KT

06.12.10

Approved For Design

REV.

DATE

DESCRIPTION

PREPARED BY

CHECKED BY

APPROVED BY

PM

HAZOP STUDY REPORT

TECHNIP KT INDIA LTD.

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

S646

Plant

DHU Unit (Unit -1400)

Dept.

Project

Contents
1. Introduction ...4
1.1. Introduction 4
1.2. Objective.....4
2. Methodology..5
2.1. The HAZOP

HAZOP STUDY REPORT

S646-140-RT-00-04

Document Number

Rev.

...4
4
...4
..5

HAZOP STUDY REPORT

TECHNIP KT INDIA LTD.

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

S646

Plant

DHU Unit (Unit -1400)

Dept.

Project

Executive Summary
M/S Nagarjuna oil Corporation Ltd (NOCL) intends to install as Diesel Hydrodesulphurization Unit, (DHU, Unit 1400) in its
Cuddalore Refinery Project. The unit will be located in Cuddalore, Tamil Nadu, India. The unit will be treating a

HAZOP STUDY REPORT

S646-140-RT-00-04

Document Number

Rev.

desulphurization Unit, (DHU, Unit 1400) in its


u, India. The unit will be treating a

HAZOP STUDY REPORT

TECHNIP KT INDIA LTD.

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

S646

Plant

DHU Unit (Unit -1400)

Dept.

Project

1. Introduction
1.1 Introduction
M/S Nagarjuna oil Corporation Ltd (NOCL) intends to install as Diesel Hydrodesulphurization Unit, (DHU, Unit 1400) in its
Cuddalore Refinery Project. The unit will be located in Cuddalore, Tamil- Nadu, India. The unit will

HAZOP STUDY REPORT

S646-140-RT-00-04

Document Number

Rev.

desulphurization Unit, (DHU, Unit 1400) in its


du, India. The unit will

HAZOP STUDY REPORT

TECHNIP KT INDIA LTD.

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

S646

Plant

DHU Unit (Unit -1400)

Dept.

Project

2. HAZOP METHODOLOGY
2.1
THE HAZOP PROCESS

HAZOP is a qualitative method that reviews plant design to identify design faults and omissions, potential hazards and
operating problems. This technique applies guide words to process parameters to create

HAZOP STUDY REPORT

S646-140-RT-00-04

Document Number

Rev.

aults and omissions, potential hazards and


ers to create

HAZOP STUDY REPORT

TECHNIP KT INDIA LTD.

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

S646

Plant

DHU Unit (Unit -1400)

Dept.

Project

2.2

HAZOP ASSUMPTIONS

In Order to make HAZOP study more effective, complete and efficient following postulates were followed.
x
Wherever possible, causes will be identified in the Node under consideration.
x
Consequences

HAZOP STUDY REPORT

S646-140-RT-00-04

Document Number

Rev.

following postulates were followed.


ration.

HAZOP STUDY REPORT

TECHNIP KT INDIA LTD.

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

S646

Plant

DHU Unit (Unit -1400)

Dept.

Project

2.2.1 Node Selection


Appropriate section of the plant (called Node) will be selected to enable the HAZOP team to focus and clearly identify all the
design and operation issues.
The Nodes design intent will be defined.
When there are symmetrical syste

HAZOP STUDY REPORT

S646-140-RT-00-04

Document Number

Rev.

HAZOP team to focus and clearly identify all the

HAZOP STUDY REPORT

TECHNIP KT INDIA LTD.

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

S646

Plant

DHU Unit (Unit -1400)

Dept.

Project

2.3 GUIDEWORD APPLICABILITY

a) Causes
x All the potential causes of the deviation will be identified (by brainstorming).
x The credibility of each cause will be agreed upon.
x Only credible causes will be considered. Incredible or highly unlike

HAZOP STUDY REPORT

g).

S646-140-RT-00-04

Document Number

Rev.

GUIDE WORD
PARAMETER

NO

MORE

LESS

AS WELL
AS

PART OF

REVERSE

FLOW *

PRESSURE *

TEMPERATURE *

LEVEL

PHASE

COMPOSITION (SPECIFIC
COMPONENT)
OPERATION **

OTHER
THAN

y
y
n
n
y
y
y

* Normal Parameters
** Start-up / shutdown, isolation philosophy, different operating modes, maintenance access,
blow down, etc.

Not Used
Normally
Used

n
y

HAZOP STUDY REPORT

TECHNIP KT INDIA LTD.

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

S646

Plant

DHU Unit (Unit -1400)

Dept.

Project

Most hazards will be protected against by a combination of hardware, instrumentation and / or operating practices.
Protection may be provided by a combination of the following:
x The intrinsic mechanical strength of the plant
x Process control respo

HAZOP STUDY REPORT

S646-140-RT-00-04

Document Number

Rev.

mentation and / or operating practices.

HAZOP STUDY REPORT

TECHNIP KT INDIA LTD.

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

S646

Plant

DHU Unit (Unit -1400)

Dept.

Project

2.4

HAZOP SOFTWARE

Specialized software is used to record the proceedings of the HAZOP study in the form of work sheets. The software used is
PHA-Pro-VIII from Dyadem international.

HAZOP STUDY REPORT

S646-140-RT-00-04

Document Number

Rev.

in the form of work sheets. The software used is

HAZOP STUDY REPORT

TECHNIP KT INDIA LTD.

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

S646

Plant

DHU Unit (Unit -1400)

Dept.

Project

3. BASIS OF HAZOP STUDY


3.1 Nodes considered for Diesel Hydrodesulphurizing unit HAZOP study:
Refer to Annexure-III for Node details & Scanned copies of P&IDs used during HAZOP study.

HAZOP STUDY REPORT

dy:

OP study.

S646-140-RT-00-04

Document Number

Rev.

Node No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

24

Node Description

Feed from B/L to Feed Surge Drum


Feed Surge Drum to Reactor Feed Heater
Reactor Feed Heater
Reactor Feed Heater Outlet to Reactor, Effluent Air Cooler, Trim Cooler Up to separator inlet
Wash Water System
Separator bottom to Sour water Flash Drum and B/L
Separator Drum to Stripper Inlet
Separator Overhead to Recycle gas compressor Inlet
Recycle Gas compressor to Mixing Point
Lean Amine from B/L to LP and HP Amine Absorber column
Rich Amine from HP Amine Absorber ,LP Amine Absorber bottom to B/L.
LP Amine Absorber system (LP Amine column KOD, Off Gas KOD) to B/L
Stripper bottom to Gas oil Air cooler, Coalescer and Salt Dryer to B/L
Stripper Overhead system
Makeup H2 Compressor system
Chemical Injection System
Fuel oil, Fuel gas and Heater Firing System
HP/MP Steam & MP BFW
Cooling water system
Portable/Service Water, LP Steam, Plant /Instrument Air and Nitrogen
Flare system
Amine drain system
Hydrocarbon drain system
Condensate Collection system

HAZOP STUDY REPORT

TECHNIP KT INDIA LTD.

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

S646

Plant

DHU Unit (Unit -1400)

Dept.

Project

3.2 Documents referred for HAZOP study


Following is the list of documents referred during this study:

HAZOP STUDY REPORT

S646-140-RT-00-04

Document Number

Rev.

S.No.

Title

Document No.

Process Data Book

C450-1400-PB-REV0

Process flow diagram

CA-140-PR-11-0001 to 0006, Rev 0

Material Selection Diagram

CK-140-PR-19-0001 to 0003, Rev0

Plot Plan

CK-140-PI-16-0001,Rev1

Piping & instrumentation diagram


(Process)

CK-140-PR-15-0001 to 0027-Rev1

Piping & instrumentation diagram


(Utilities)

CK-140-PR-15-0030 to 0040,Rev1
CK-140-PR-15-0043 to 0044 ,Rev1

Equipment List

CK-140-PR-50-0001-Rev1

10

Flare load summary

CK-140-PR-50-0008-Rev1

11

Area Classification layout

CK-140-EL-12-0001-Rev 0

Process data sheet of equipments

13

Cause and effect Diagram

CK-140-PR-24-0001,Rev1

14

Safeguarding Memorandum

CK-140-PR-45-0001,Rev 1

12

HAZOP STUDY REPORT

TECHNIP KT INDIA LTD.

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

S646

Plant

DHU Unit (Unit -1400)

Dept.

Project

3.3 HAZOP TEAM

The HAZOP was carried out from 13th July to 17th July 2009.A team of experienced engineers from Process,
Operations/Commissioning and Engineering were formed the list of participants is as below:
HAZOP Chairman: Mr. Madan Kumar Sinha, Techn

HAZOP STUDY REPORT

S646-140-RT-00-04

Document Number

Rev.

enced engineers from Process,


nts is as below:

Technip KT India Ltd.

LCM

Full Time

Full Time

Mr.

Mr.

Part Time
Mr.

NOCL

Full Time
Mr.

HAZOP STUDY REPORT

TECHNIP KT INDIA LTD.

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

S646

Plant

DHU Unit (Unit -1400)

Dept.

Project

4. RECOMMENDATIONS

The total number of recommendations adds to 67.The HAZOP recommendation can be classified into three categories for
engineering, monitoring and tracking action completion.
Soft- The software recommendation mainly includes alarms on vari

HAZOP STUDY REPORT

S646-140-RT-00-04

Document Number

Rev.

tion can be classified into three categories for

HAZOP STUDY REPORT

TECHNIP KT INDIA LTD.

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

S646

Plant

DHU Unit (Unit -1400)

Dept.

Project

The recommendations of HAZOP study is listed below (For category wise list refer to Annexure I):

S.No

Recommendations

P&ID no

Responsibility

Provide High temperature alarm on


TI-107
Operating procedure should ensure
periodical checking of LG-506

CK-140-PR15-0001
CK-140-PR15-0002

DEC

Provide DCS indication from


FZ-448
Pump to be selected suitably to
provide safety margin for NPSH
requirements during detail
engineering

CK-140-PR15-0002
CK-140-PR15-0002

DEC

Provide low temp. alarm at


(TI-120) heater inlet
Provide low alarm at TI-122
&TI-223.
Operating procedure should ensure
safe shutdown of the plant

CK-140-PR15-0004
CK-140-PR15-0004

DEC

Hydrocarbon skimmer for both HP


& LP amine absorber (C-001 and
C-003) to be routed to CBD instead
of amine drain

CK-140-PR15-0010, CK140-PR-150016

Cooling water sample analysis to


be considered during detail
engineering of OSBL system

2
3

5
6
7

10
11
12
13
14

Provide Low alarm for FC420.


Operating procedure should ensure
periodical checking of PI-019.

DEC/NOCL

DEC

DEC
DEC/NOCL
DEC

PMC/NOCL

CK-140-PR15-0008
CK-140-PR15-0008

Operating procedure should ensure CK-140-PRperiodical checking of FI15-0006


458/459/460/461
Provide low alarm at FI-417.
CK-140-PR15-0006
Operating procedure should ensure CK-140-PRperiodical checking of LG-515
15-0006

DEC
DEC/NOCL
DEC/NOCL
DEC
DEC/NOCL

15

Operating procedure should ensure CK-140-PRperiodical checking of LG-543


15-0021

DEC/NOCL

16

Provide low alarm at FC-416

DEC

CK-140-PR15-0007

HAZOP STUDY REPORT

S646-140-RT-00-04

Document Number

Rev.

st refer to Annexure I):

Status
To be incorporated by DEC
To be incorporated by DEC

To be incorporated by DEC
To be incorporated by DEC

To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC

To be incorporated by DEC

To be incorporated by DEC

To be incorporated by DEC
To be incorporated by DEC

To be incorporated by DEC

To be incorporated by DEC
To be incorporated by DEC

To be incorporated by DEC

To be incorporated by DEC

HAZOP STUDY REPORT

TECHNIP KT INDIA LTD.

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

S646

Plant

DHU Unit (Unit -1400)

Dept.

Project

17
18

19
20

21

22

23

24
25
26

27

28

29
30
31

Provide low alarm at TI-190

CK-140-PR15-0017
Provide High alarm on TICK-140-PR190.
15-0017
Operating procedure to include
CK-140-PRoperation of HS-822 to select FCV- 15-0012
423 to purge H2S to flare header

DEC

Provide open feed back alarm from


ZB 702 A
Operating procedure to monitor LG522 for HC carry over. When HC
level builds up it should be drained
to CBD by using Skim line.

CK-140-PR15-0007
CK-140-PR15-0010

DEC

UZ-720 should activate UZCK-140-PR710 to trip pump (P-003A/B)


15-0009
Operating procedure should ensure
routing of off gas to flare header
when there is disturbance in lean
amine supply to C-003

DEC

Provide High alarm on TI170 at lean amine B.L


Provide additional LI with
HH alarm at C-001 bottom.
Provide LL alarm at LA-560

DEC

Operating procedure to ensure to


check LG 533
&LG-522 and drain out the
HC through Skim line.
LG-522&LG-533 to be transparent
to see the interface during upset
conditions.

CK-140-PR15-0009
CK-140-PR15-0010
CK-140-PR15-0016
CK-140-PR15-0010, CK140-PR-150016
CK-140-PR15-0010, CK140-PR-150016
CK-140-PR15-0010

DEC
DEC/NOCL

DEC/NOCL

DEC/NOCL

DEC
DEC
DEC/NOCL

DEC

The valve in HC Skimming line for


C-001 to be changed to Spring
loaded type.
Operating procedure should ensure CK-140-PRperiodical checking of LG-552
15-0016

DEC

Periodical checking of interface in


LG-533.

DEC/NOCL

CK-140-PR15-0016

DEC/NOCL

32

Pressure transmitter with low alarm CK-140-PRto be provided at top of C-003.


15-0016

DEC

33

Provide NRV on line DA-017


Close to mixing point with
DA-012

DEC

CK-140-PR15-0016

HAZOP STUDY REPORT

S646-140-RT-00-04

Document Number

Rev.

To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC

To be incorporated by DEC
To be incorporated by DEC

To be incorporated by DEC
To be incorporated by DEC

To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC

To be incorporated by DEC

To be incorporated by DEC

To be incorporated by DEC

To be incorporated by DEC

To be incorporated by DEC

To be incorporated by DEC

HAZOP STUDY REPORT

TECHNIP KT INDIA LTD.

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

S646

Plant

DHU Unit (Unit -1400)

Dept.

Project

Provide NRV on line P-806 close to CK-140-PRthe meeting point with line DA-012. 15-0016

DEC

Provide high alarm at TI185.


Include start permissive as a part of
safe guarding system for Pump P005A/B.

CK-140-PR15-0016
CK-140-PR15-0001
CK-140-PR15-0017

DEC

Provide high alarm for FC442.


Provide Pressure transmitter with
low alarm d/s V-019, before FCV442 on line P103.
Operating procedure should ensure
draining of salt dryer at regular
intervals by checking LG-554.

CK-140-PR15-0022
CK-140-PR15-0022

DEC

CK-140-PR15-0022

DEC/NOCL

40

Provide low alarm at TI-192.

CK-140-PR15-0017

DEC
DEC/NOCL

41

Operating procedure should ensure


draining of hydrocarbon from C-003
through skim line during failure of
EA-002
Provide power supply to EA002 fan motors from different
sources.
PID should contain a note that
signals from non running
compressor instruments shall not
be used for control and trip of the
running compressor.

DEC/NOCL
CK-140-PR15-0014&15

DEC/PMC

NRV to be provided at the junction


of H-162 and P-079 on line H-162.

CK-140-PR15-0021

DEC

Provide High alarm at TICK-140-PR176.


15-0013
Operating procedure should ensure
periodical checking of Chemical
injection
pumps.

DEC

34
35

36
37

38

39

42

43

44
45

46

DEC

DEC

DEC/NOCL

47

48

Provide stop alarm in DCS for


chemical injection pumps.
NRV to be provided on lineCC-020
near B.L.

DEC
CK-140-PR15-0023

DEC

HAZOP STUDY REPORT

S646-140-RT-00-04

Document Number

Rev.

To be incorporated by DEC

To be incorporated by DEC
To be incorporated by DEC

To be incorporated by DEC
To be incorporated by DEC

To be incorporated by DEC

To be incorporated by DEC
To be incorporated by DEC

To be incorporated by DEC

To be incorporated by DEC

To be incorporated by DEC

To be incorporated by DEC
To be incorporated by DEC

To be incorporated by DEC

To be incorporated by DEC

HAZOP STUDY REPORT

TECHNIP KT INDIA LTD.

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

S646

Plant

DHU Unit (Unit -1400)

Dept.

Project

49

Operating procedure should ensure


proper checking of levels in
chemical injection tanks.

50

Provide additional pressure


transmitter with low alarm in DCS.

CK-140-PR15-0026

DEC

Provide low alarm at PI-854


B.L.
CO, NOx Analyzer to be provided at
the stack.
Provide NRV on steam line to each
burner after shut down valve.

CK-140-PR15-0035
CK-140-PR15-0004
CK-140-PR15-0024

DEC

Provide high alarm at PI863.


Provided low alarm at TI832.
Operating procedure should ensure
draining of hydrocarbon from V-025
periodically.

CK-140-PR15-0024
CK-140-PR15-0024

DEC

51
52
53
54
55

56

57
58
59
60
61
62
63

64

DEC/NOCL

DEC
DEC

DEC
DEC/NOCL

Standard operating procedure to be


made for decoking/dry out
operation.
Consider shutdown DS-001 when
KT-002 trips
Provide steam trap to take care this
situation during detail engineering.

DEC/NOCL

Provide low alarm at TCCK-140-PR239.


15-0030
Provide low alarm on PI-818
Hydraulic check should be carried
out during detail engineering based
on actual plan layout

DEC

Provide one additional LI on


CK-140-PRV-022
15-0044
Separate nitrogen connection to the
drum as well as separate vent to
flare line with lock open valve and
NRV to be provided.

DEC

DEC/NOCL
DEC

DEC
DEC

DEC

65
66

Provide one additional LI on


V-021
Operating procedure should
prevent draining of hot

CK-140-PR15-0040

DEC
DEC/NOCL

HAZOP STUDY REPORT

S646-140-RT-00-04

Document Number

Rev.

To be incorporated by DEC

To be incorporated by DEC

To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC

To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC

To be incorporated by DEC

To be incorporated by DEC
To be incorporated by DEC

To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC

To be incorporated by DEC
To be incorporated by DEC

To be incorporated by DEC
To be incorporated by DEC

HAZOP STUDY REPORT

TECHNIP KT INDIA LTD.

Client

Nagarjuna Oil Corporation Ltd.

PROCESS

S646

Plant

DHU Unit (Unit -1400)

Dept.

Project

67

hydrocarbon in Hydrocarbon drain


drum.
Separate nitrogen connection to the
V-021 as well as separate vent to
flare line with lock open valve and
NRV to be provided.

DEC

HAZOP STUDY REPORT

S646-140-RT-00-04

Document Number

Rev.

To be incorporated by DEC

S. No.

Recommendation

(A)

Hard

DEC

8.Hydrocarbon skimmer for both HP & LP amine absorber (C-001 and C-003) to be routed to CBD instead
of amine drain.
25.Provide additional LI with HH alarm at C-001 bottom.

28.LG-522&LG-533 to be transparent to see the interface during upset conditions.

DEC

29.The valve in HC Skimming line for C-001 to be changed to Spring loaded type.

DEC

33.Provide NRV on line DA-017 Close to mixing point with DA-012.

DEC

34.Provide NRV on line P-806 close to the meeting point with line DA-012.

DEC

35.Provide high alarm at TI-185.

DEC

42.Provide power supply to EA-002 fan motors from different sources.

DEC/NOCL

44.NRV to be provided at the junction of H-162 and P-079 on line H-162.

DEC

10

48.NRV to be provided on lineCC-020 near B.L.

DEC

11

50.Provide additional pressure transmitter with low alarm in DCS.

DEC

12

52.CO,NOx Analyzer to be provided at the stack.

DEC

13

53.Provide NRV on steam line to each burner after shut down valve.

DEC

14

59.Provide steam trap in MP Steam line to take care this situation during detail engineering.

DEC

15

63.Provide one additional LI on V-022.

DEC

16

64.Separate nitrogen connection to the drum as well as separate vent to flare line with lock open valve and DEC
NRV to be provided.
65.Provide one additional LI on V-021.
DEC

17
18

Responsibility

DEC

67.Separate nitrogen connection to the V-021 as well as separate vent to flare line with
lock open valve and NRV to be provided.
Soft

DEC

(B)
1

1.Provide High temperature alarm on TI-107.

DEC

3.Provide DCS indication from FZ-448.

DEC

4.Pump to be selected suitably to provide safety margin for NPSH requirements during detail engineering.

DEC

5.Provide low temp. alarm at (TI-120) heater inlet.

DEC

6.Provide low alarm at TI-122 &TI-223.

DEC

10.Provide Low alarm for FC-420.

DEC

13.Provide low alarm at FI-417.

DEC

P&ID No.

CK-140-PR-15-0010 & 16
CK-140-PR-15-0010
CK-140-PR-15-0010 & 16
CK-140-PR-15-0010
CK-140-PR-15-0016
CK-140-PR-15-0016
CK-140-PR-15-0016

CK-140-PR-15-0021
CK-140-PR-15-0023
CK-140-PR-15-0026
CK-140-PR-15-0004
CK-140-PR-15-0024
CK-140-PR-15-0030
CK-140-PR-15-0044
CK-140-PR-15-0044
CK-140-PR-15-0040
CK-140-PR-15-0040

CK-140-PR-15-0001
CK-140-PR-15-0002
CK-140-PR-15-0002
CK-140-PR-15-0004
CK-140-PR-15-0004
CK-140-PR-15-0008
CK-140-PR-15-0006

S. No.

Recommendation

Responsibility

8 16.Provide low alarm at FC-416.

DEC

9 17.Provide low alarm at TI-190.

DEC

10 18.Provide high alarm at TI-190.

DEC

11 20.Provide open feed back alarm from ZB 702 A.

DEC

12 24.Provide High alarm on TI-170 at lean amine B.L

DEC

13 26.Provide LL alarm at LA-560.

DEC

14 32.Pressure transmitter with low alarm to be provided at top of C-003.

DEC

15 36.Include start permissive as a part of safe guarding system for Pump P-005A/B.

DEC

16 37.Provide high alarm for FC-442.

DEC

17 38.Provide Pressure transmitter with low alarm d/s V-019, before FCV-442 on line P103.

DEC

18 40.Provide low alarm at TI-192.

DEC

19 43.PID should contain a note that signals from non running compressor instruments shall not be used for
control and trip of the running compressor.

DEC/PMC

20 45.Provide High alarm at TI-176.

DEC

21 47.Provide

DEC

stop alarm in DCS for chemical injection pumps.

22

51.Provide low alarm at PI-854 B.L.

DEC

23

54.Provide high alarm at PI-863.

DEC

24

55.Provided low alarm at TI-832.

DEC

25

60.Provide low alarm at TC-239.

DEC

26

61.Provide low alarm on PI-818

DEC

27

62.Hydraulic check should be carried out during detail engineering based on actual plan
layout.

DEC

P&ID No.
CK-140-PR-15-0007
CK-140-PR-15-0017
CK-140-PR-15-0017
CK-140-PR-15-0007
CK-140-PR-15-0009
CK-140-PR-15-0016
CK-140-PR-15-0016
CK-140-PR-15-0017
CK-140-PR-15-0022
CK-140-PR-15-0022
CK-140-PR-15-0017
CK-140-PR-15-0014&15
CK-140-PR-15-0013

CK-140-PR-15-0035
CK-140-PR-15-0024
CK-140-PR-15-0024
CK-140-PR-15-0030
CK-140-PR-15-0033

S. No.

Recommendation

Responsibility

(C )

Operating Instructions

2.Operating procedure should ensure periodical checking of LG-506.

DEC/NOCL

7.Operating procedure should ensure safe shutdown of the plant.

DEC/NOCL

9.Cooling water sample analysis to be considered during detail engineering of OSBL


system.

PMC/NOCL

11.Operating procedure should ensure periodical checking of PI-019.

DEC/NOCL

12.Operating procedure should ensure periodical checking of FI-458/459/460/461.

DEC/NOCL

14.Operating procedure should ensure periodical checking of LG-515

DEC/NOCL

15.Operating procedure should ensure periodical checking of LG-543

DEC/NOCL

19.Operating procedure to include operation of HS-822 to select FCV-423 to purge H2S


to flare header.

DEC/NOCL

21.Operating procedure to monitor LG-522 for HC carry over. When HC level builds up it should be drained
to CBD by using Skim line.

DEC/NOCL

10

22.UZ-720 should activate UZ-710 to trip pump (P-003A/B).

DEC

11

23.Operating procedure should ensure routing of off gas to flare header when there is
disturbance in lean amine supply to C-003.

DEC/NOCL

12

27.Operating procedure to ensure to check LG 533 &LG-522 and drain out the HC
through Skim line.

DEC/NOCL

13

30.Operating procedure should ensure periodical checking of LG-552.

DEC/NOCL

14

31.Periodical checking of interface in LG-533.

DEC/NOCL

15

39.Operating procedure should ensure draining of salt dryer at regular intervals by


checking LG-554.

DEC/NOCL

16

41.Operating procedure should ensure draining of hydrocarbon from C-003 through skim line during failure
of EA-002

DEC/NOCL

17

46.Operating procedure should ensure periodical checking of Chemical injection pumps.

DEC/NOCL

18

49.Operating procedure should ensure proper checking of levels in chemical injection


tanks.

DEC/NOCL

19

56.Operating procedure should ensure draining of hydrocarbon from V-025 periodically.

DEC/NOCL

20

57.Standard operating procedure to be made for decoking/dry out operation.

DEC/NOCL

21

58.Consider shutdown DS-001 when KT-002 trips.

DEC/NOCL

22

66.Operating procedure should prevent draining of hot hydrocarbon in Hydrocarbon


drain drum.

DEC/NOCL

P&ID No.

CK-140-PR-15-0002

CK-140-PR-15-0008
CK-140-PR-15-0006
CK-140-PR-15-0006
CK-140-PR-15-0021
CK-140-PR-15-0012
CK-140-PR-15-0010
CK-140-PR-15-0009

CK-140-PR-15-0010 & 16
CK-140-PR-15-0016
CK-140-PR-15-0016
CK-140-PR-15-0022

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 01

Feed From B/L to Feed Surge Drum

DESIGN INTENTION

To Supply Gas Oil Feed from Unit B/L to Feed Surge Drum through Back Wash Filter.

DRAWINGS

CS-140-PR-15-001, CS-140-PR-15-002

EQUIPMENT

Feed Filter (140-F-001),Feed Surge Drum(140-V-001)

STREAM DETAILS

Gas Oil Feed from B/L to Feed Filter (F-001) and send to Feed Surge Drum (V-001)

AVAILABLE CONTROL
SCHEMES

None.

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating Parameters
SERVICE

Temperature(C)

Gas Oil Feed from B/L to Feed


Surge Drum

Pressure ( bar g)

Flow rate (Kg/hr)

63

3.4

120,083

Note:

Node

Deviation

Causes

Consequences

1. Feed from B/L to Feed Surge


Drum

Safeguards

1.Low Flow Alarm


(FQ447) at B/L.

1.U/S disturbance

1.Low level in FSD.

3.Automatic
backwash filter
system fails

2.High Flow

3.Low Pressure

1. Upstream
Disturbance

Remarks

1.1.1.1.3

1.Same as
safeguards for
cause 1
consequence 1

2.High Pressure drop in Feed


filter

2.High Alarm of PDI329 provided


1.1.2.2.2

1.Same as Cause-1
consequence1

1.Same as
safeguards for
cause 1
consequence 1

1.Feed Flow to FSD will


increase
.Liquid Overfilling can be
possible.

Responsibility

1.1.1.1.1

1.Same as Cause-1
consequence1
2.Choking of Back
wash Filter
(140-F-001).

Recommendations

2.Low level alarm


(LC501) provided at
1.1.1.1.2
FSD.

3.Low Low Level


Trip alarm (LZ504).

1.Low/No Flow

Ref. No.

1. High alarm (LC501) and High High


alarm (LI-503)
provided.

2. PSV-302A/B is
designed for liquid
overfilling case.

1. Same as Low/No
1.Refer Node-1 Deviation 1
flow

1.1.2.1.1

1.To be reviewed
during detail
engineering HAZOP
when vendor
information is
available.

1.1.3.1.1

1.2.1.1.1

1.2.1.1.2

1.3.1.1

1. System is
designed for
maximum U/S
pressure

1. U/S Disturbance

1. System may experience


higher than the operating
pressure

2. Choking of Feed
Filter(140-F001)

1.System is
1. System U/S feed filter may
designed for
experience higher than the
maximum U/S
operating pressure
pressure

1.U/S disturbance

1.System may experience


temperature higher than
design.

1.4.1.1.1

4.High Pressure

6.High Temperature

1.To be reviewed
during detail
engineering when
vendor information is
available

1.4.2.1.1

1.System is rated for


B/L
1.6.1.1.1
design temperature

1.Provide High temperature


alarm on
TI-107

DEC

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 01

Feed From B/L to Feed Surge Drum

DESIGN INTENTION

To Supply Gas Oil Feed from CDU directly to Feed Surge Drum through Back Wash Filter.

DRAWINGS

CS-140-PR-15-001 , CS-140-PR-15-002

EQUIPMENT

Feed Filter (140-F-001),Feed Surge Drum(140-V-001)

STREAM DETAILS

Gas Oil Feed from CDU to Feed Filter (F-001) and send to Feed Surge Drum (V-001)

AVAILABLE CONTROL
SCHEMES

None.

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Operating Parameters
SERVICE

Temperature(C)

Gas Oil Feed from CDU to Feed


Surge Drum

Pressure ( bar g)

Flow rate (Kg/hr)

55

3.5

120,083

Note:

Node

1'. Feed from CDU to Feed


Surge Drum during start-up
operation

Deviation

Causes

1.U/S disturbance

Consequences

1.Low level in FSD.

Safeguards

1.Low level alarm


(LC501) provided at
1'.1.1.1.1
FSD.

2.Low Low Level


Trip alarm (LZ504).

1.Same as Cause-1
consequence1
2.Choking of Back
wash Filter
(140-F-001).

Ref. No.

1.Same as
safeguards for
cause 1
consequence 1

1'.1.1.1.2

1'.1.2.1.1

Recommendations

1.In addition to FQ-447B


provide low Flow Alarm.

Responsibility

Remarks

Node

Deviation

Causes
2.Choking of Back
wash Filter
(140-F-001).

3.Automatic
backwash filter
system fails

2.High Flow

3.Low Pressure

1. Upstream
Disturbance

Consequences

Safeguards

Ref. No.

2.High Pressure drop in Feed


filter

2.High Alarm of PDI1'.1.2.2.2


329 provided

1.Same as Cause-1
consequence1

1.Same as
safeguards for
cause 1
consequence 1

1.Feed Flow to FSD will


increase
.Liquid Overfilling can be
possible.

1. High alarm (LC501) and High High


alarm (LI-503)
provided.

2. PSV-302A/B is
designed for liquid
overfilling case.

1. Same as Low/No
1.Refer Node-1 Deviation 1
flow

1'.1.3.1.1

Recommendations

Responsibility

Remarks

1.To be reviewed
during detail
engineering HAZOP
when vendor
information is
available.

1'.2.1.1.1

1'.2.1.1.2

1'.3.1.1

1. System is
designed for
maximum U/S
pressure

1. U/S Disturbance

1. System may experience


higher than the operating
pressure

2. Choking of Feed
Filter(140-F001)

1.System is
1. System U/S feed filter may
designed for
experience higher than the
maximum U/S
operating pressure
pressure

1'.4.1.1.1

1.B/L design pressure


to be verified during
detail engineering

4.High Pressure

1'.4.2.1.1

1.To be reviewed
during detail
engineering when
vendor information is
available

Node

Deviation

6.High
Temperature

Causes

1.U/S disturbance

Consequences

1.System may experience


temperature higher than
design.

Safeguards

Ref. No.

1.System is rated for


B/L
1'.1.1.1.1
design temperature

Recommendations

Responsibility

1.Provide High temperature


alarm on
TI-107

DEC

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 02

Feed Surge Drum to Reactor Fired Heater Inlet

DESIGN INTENTION

To Preheat the Gas oil feed and H2 through exchanger train (E-001A/B/C/D) before further heating by reactor feed heater.

DRAWINGS

CS-140-PR-15-002, CS-140-PR-15-003, CS-140-PR-15-004

EQUIPMENT

Feed Surge Drum(140-V-001),Gas Oil Feed Pump(140-P-001),Reactor Feed Effluent


Exchanger
(140-E-001A/B/C/D)
Gas
Oil from
Feed Surge Drum (V-001) pumped to feed Effluent Exchanger train(E-

STREAM DETAILS
AVAILABLE CONTROL
SCHEMES
SERVICE

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

001A/B/C/D)
and then send to Reactor Feed Heater (H-001) Inlet
PC-330,LC-501,LC-505,FC-407A/B,FC-408,TC-119,LC-501.
Operating Parameters
Temperature(C)

Gas Oil Feed pump to


Mixing Point
Mixing Point to Feed/ Effluent
Exchanger Inlet
Feed/Effluent Exchanger to Fired
Heater Inlet

Pressure ( bar g)

Flow rate (Kg/hr)

63

91.3-101.0

120083

68.8

92.2-94.7

113540-121388

307.3-338.7

90.7-93.2

126850-127392

Note:
Node
2.Feed Surge Drum to Reactor
Feed Heater

Deviation
1.Low/No Flow

Causes
1.Tripping of Gas oil feed
pump(P-001A/B)

2.FC-408 malfunctions to close

2.

High Flow

Consequences

Ref.

Safeguards

1.Reaction section losses gas oil feed

1 FC- 408
provided with low
alarm.

2.High level in FSD(V-001)

2 FZ-448 provide
2.1.1.2.1
with LL alarm to trip
the fired heater

3.Possible overfilling of FSD V-001

1 High alarm LC501

2.1.1.3.1

2 HH alarm at LI503

2.1.1.3.2

3.1 PSV-302A/B is
designed for
overfilling case.

2.1.1.3.3

Recommendations

Responsibility

2.1.1.1.1

1.Same as cause 1 consequence1&2

1 FZ-448 provide
2.1.2.1.1
with LL alarm to trip
the fired heater

2.P-001A/B likely damage

2 Pump is
protected with
Min. flow bypass

2.1.2.2.2

2.1.3.1

3.LC-505 malfunctions to close

1.V-001 boot level will increase &


possibilities of water going with gas oil feed

4. FCV-407A/B malfunctions to
open

1. Same as cause 1 consequence


1&2

1. Same as cause 2.1.3.1.1


1 consequence
1&2

5. XZV-719 malfunctions to
close

1. Same as cause 1 consequence


1&2

1. Same as cause 2.1.5.1.1


1 consequence
1&2

1. FC-408 malfunctions to full


open

1. H2 to HC ratio will change and may


adversely affect the product quality

1 Low alarm LC501

2. Level in FSD may go down

2 LL Trip alarm LZ- 2.2.1.2.2


504 will activate
UZ-701

2.Operating procedure should


ensure periodical checking of
LG-506

DEC/NOCL

2. Operating procedure
should ensure periodical
checking of LG506

DEC/NOCL

2.2.1.1.1

3 Provide DCS
2.2.1.2.3
indication from FZ448.
2. LC-505 malfunctions to full
open(sour water)

1. Loss of Gas oil feed to close drain no


hazardous consequence

1. Water comes with Gas oil


feed

1. Process upset

1. High Level alarm 2.3.1.1.1


in LC- 505.

5. Reverse/Misdirected
Flow

1. P-001 trips

1. Back flow from high pressure side


(Reaction section)

1. UZ-719 will
activate & close
XZV-719.

6.

Low Pressure

1. PC 330 malfunctions to close 1. P-001A/B may cavitate


PCV 330A and open PCV330B

7.

High Pressure

1. PC 330 malfunctions to open 1. Over pressurizing of the FSD (VPCV 330A and close PCV001)
330B

1. PSV-302A/B
provided

2.7.1.1.1

2. P-001 trips

1. PSV-302A/B is
designed for liquid
overfilling case

2.7.2.1.1

3.

As well as

1. Liquid overfilling of FSD(V-001)


may occur

2.2.2.1

2.5.1.1.1

2.6.1.1

4. Pump to be selected
DEC
suitably to provide safety
margin for NPSH requirements
during detail engineering

Remarks

7.

Node

High Pressure

Deviation

Causes
3. FC-408 to close FCV-408

4. XZV-719 malfunctions to
close

8. Less/Low
Temperature

Consequences

Safeguards

Ref.

1. Liquid overfilling of FSD(V-001)


may occur

1. PSV-302A/B is
designed for liquid
overfilling case

2. Pump discharge line up to FCV408 is subjected to high pressure

2. Pump (P2.7.3.2.2
001A/B) discharge
line is designed for
pump shutoff
pressure

1. Liquid overfilling of FSD(V-001)


may occur

1. PSV-302A/B is
designed for liquid
overfilling case

2. Pump discharge line up to XZV719 is subjected to high pressure

2. Pump (P2.7.4.2.2
001A/B) discharge
line is designed for
pump shutoff
pressure

2.8.1.1

2. FC-408 malfunctions to open 1. Likely low temp. at heater inlet, no major


FCV-408 fully
concern

2.8.2.1

9. High
Temperature

1. TC-119 malfunctions to close 1. No major concern


TCV-119

2.9.1.1

10.

1. FC-408 malfunctions to open 1. Refer High flow of this node


FCV-408

2.10.1.1

2. LC-505 malfunctions to open 1. Refer High flow of this node


LCV-505

2.10.2.1

3. LC-501 malfunctions to close 1. P-001A/B may cavitate


250 LCV-011A/B/C

11.

High Level

1. LZ-504 will
activate UZ701 which will trip
the pump

2.10.3.1.1

1. FC-408 malfunctions to close 1. Refer Low/No Flow of this node


FCV-408

2.11.1.1

2. XZV-719 malfunctions to
close

1. Refer Low/No Flow of this node

2.11.2.1

3. LC-505 malfunctions to close 1. Refer Low/No Flow of this node


LCV-505

2.11.3.1

4. LCV-501 malfunctions to
open
250 LCV-011A/B/C fully

1. Overfilling of FSD (V-001)

1. HH Alarm LI503

2.11.4.1.1

2. PSV-302A/B is 2.11.4.1.2
designed for Liquid
overfilling case

12. Problem/Requirements

1. Tube leakage in (EE001A/B/C/D)

1. Possible contamination of product with


feed

Responsibility

2.7.4.1.1

1. TC-119 malfunctions to open 1. Low temp. at heater inlet may lead to


TCV-119
operational upsets

Less/Low Level

Recommendations

2.7.3.1.1

1. Analyzer AI-003 2.12.1.1.1


is provided on
product line

5. Provide low temp. alarm at DEC


(TI120) heater inlet

Remarks

Flow rate (Kg/hr)


120083
113540-121388
126850-127392

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
PROJECT NO

: SO 2331

NODE NO: 03

Reactor Feed Heater

DESIGN INTENTION

To heat Gas Oil Feed +H2 mixture to Reactor inlet temperature.

DRAWINGS

CS-140-PR-15-0004

EQUIPMENT

Reactor Feed Heater (140-H-001)

STREAM DETAILS

After preheating from feed/effluent heat exchanger post heating is done in Fired Heater

AVAILABLE CONTROL SCHEMES

PC-899(For Detail see the Heater Firing P&ID for control system)
Operating Parameters

SERVICE
Temperature(C)
Fired Heater Outlet to
Hydrotreater Reactor Inlet

318.3-362.5

Note:
Node
3. Reactor Feed
Heater

Deviation

Causes

1.

Low/No Flow

1. U/S disturbance.

2.

High Flow

1. U/S disturbances

7. Low
Temperature

1. TC-124 malfunctions & less


firing in the heater

8. High
Temperature

1. TC-124 malfunctions and


over firing in heater

8. High
Temperature
Node

Deviation

11. Problem/Requirements

1. TC-124 malfunctions and


over firing in heater
Causes

1. Heater tube leak

HAZOP WORKSHEET
Client

Project :

ost heating is done in Fired Heater


Operating Parameters
Pressure ( bar g)
86.4-88.9

Consequences
1. Possible overheating of heater tubes
leading to tube failure.

Safeguards

Ref.

1. TC-124 controls
the firing of heater

3.1.1.1.1

2. High alarm is
provided at TI-121 &
222(Skin temp.),TI122 &
223(COT)

3.1.1.1.2

3. TZ-123 HH temp.
will activate UZ-718

3.1.1.1.3

1. Refer high flow of node-2

Recommendations

3.2.1.1

1. Desired reactor temp. will not be


achieved leads to gas oil product quality
upsets.

1.Low alarm at TZ123 is provided.

1. Possible coke formation in heater tubes

1. TI-121,TI-122,TI3.8.1.1.1
222
&TI-223 provided with
high alarm

2.7.1.1.1

6. Provide low alarm at TI122 &TI223.

1. Possible coke formation in heater tubes

Consequences

Safeguards

Ref.

Recommendations

2. TZ-123 HH will
3.8.1.1.2
activate UZ-718 to trip
the heater
3. TI-101 &TI-102
provided with high
alarm

3.8.1.1.3

1. Fire box temp. high, possible heater


damage

1.High temp alarm at


TI101&TI-102

3.11.1.1.1

2. Fire box pressure high.

2. PC-899 high alarm


provided.PZ-900
provided with HH
alarm and activate
UZ-718 to trip the
heater

3.11.1.2.2

7. Operating procedure
should ensure safe
shutdown of the plant

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

Flow rate (Kg/hr)

88.9

126850-127392

Responsibility

DEC

Remarks

Responsibility

DEC/NOCL

Remarks

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 04

Reacted Feed Heater Outlet to Reactor ,Effluent air cooler, Trim Cooler up to Separator inlet

DESIGN INTENTION

1.

To hydro treat Gas Oil Feed in Reactor for desulphurisation, denitrogenation & aromatic saturation.

2.

To cool reactor effluent by exchangers, air cooler & trim cooler to separate converted H2S, NH3 from gas Oil in Separator drum.

3.

To maintain reactor temperature by Hydrogen Guarding.

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

DRAWINGS

CS-140-PR-15-0004, CS-140-PR-15-0005, CS-140-PR-15-0006, CS-140-PR-15-0007

EQUIPMENT

Reactor Feed Heater (140-H-001)

STREAM DETAILS

After post heating in Heater, Gas Oil is hydrotreated and passes through in feed effluent exchanger for heat transfer to cold feed and then send to air cooler and trim cooler for further cooling and finally to separator.

AVAILABLE CONTROL SCHEMESFC-412,FC-413,FC-414,FC-415,TC-124,TC-131,TC-137,TC-143,TC-151


Operating Parameters

SERVICE
Temperature(C)
Reactor to stripper feed
preheater , Feed effluent
exchanger at inlet of Air cooler
Air cooler to Separator

Pressure ( bar g)

Flow rate (Kg/hr)

185.5-397

80.2-83.4

45-65

78.8-.79.3

137867
144751

Note:
Node

Deviation

4. Reactor Feed Heater Outlet 1.


to Reactor, Effluent Air Cooler,
Trim Cooler Up to separator inlet

2.

Low/No Flow

High Flow

Causes

Consequences

Safeguards

Ref.

1. U/S disturbance

1. No hazardous consequences

2. FC-412 /413/414/415
malfunction to close
FCV412/413/414/415 (quench
H2)

1. Reactor bed temp. increases leading to


runaway situation

1. High temp.
4.1.1.1.1
alarms are provided
for each bed

1. U/S disturbance

1. Possible incomplete reaction resulting in


poor product quality

1. AI-003 is
4.2.1.1.1
provided on product
line

2. FC-412 /413/414/415
malfunction to fully open FCV
412/413/414/415

1. Reactor bed temp. decreases &


may lead to incomplete reaction

1. AI-003 is
4.2.2.1.1
provided on product
line

5.

Low Pressure

1. U/S disturbance

1. Incomplete reaction may lead to poor


product quality

1. Analyzer AI-003
is provided at
product line

6.

High Pressure

1. Disturbance in Hydrogen
recycle loop.

1. Likely pressurization of the system.

1. PC-358 provided 4.6.1.1.1


with high alarm.

2. PSV-307A/B
provided.
7. Low
Temperature

1. More quench Hydrogen flow


to reactor

1. Refer high flow of this node

8. High
Temperature

1. Low quench gas to reactor

1. Refer Low/No Flow of this node

Recommendations

Responsibility

4.1.1.1

4.5.1.1.1

4.6.1.1.2

4.7.1.1

1. High temp.
4.8.1.1.1
Alarms are provided
for each bed.

2. Low alarm at FC- 4.8.1.1.2


412/413/414/415.

2. EA-001 Fan motor trips

1. Pressure buildup due to less


condensation

1 High alarm at TI163

4.8.2.1.1

2. Higher hydrocarbons may condense in


HP Amine column (C-001) leading to foam
formation

2. PC-358 is
provided with high
alarm

4.8.2.2.2

3. PSV-307A/B is
provided

4.8.2.2.3

4. TI-167 high alarm 4.8.2.2.4


and TI-212 high
alarm is also
provided
5. Hydrocarbon
4.8.2.2.5
skimmer for both
HP & LP amine
absorber (C-001 and
C-003) is routed to
CBD instead of
amine drain.

9. Problem/Requirements

3. Cooling water failure in EE003

1. Same as cause 2 consequence


1&2 of this node

1. Coking in reaction bed

1. High pressure drop in reactor bed

2. Vibration in Air cooler (EA001)


fans

1. Possible damage of EA-001 components 1. Vibration alarm 4.9.2.1.1


(VA001/002/003/004) is
provided

3. Tube leakage EE-003

1. Hydrocarbon may ingress in cooling


water

4.8.3.1

1. PDI with high


alarm provided for
each bed

4.9.1.1.1

4.9.3.1

9. Cooling water sample


analysis to be considered
during detail engineering
of OSBL system

PMC/NOCL

Remarks

Flow rate (Kg/hr)


137867
144751

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 05

Wash Water System

DESIGN INTENTION

Sour Water/MP BFW supply to Wash Water Drum(V-004)

DRAWINGS

CS-140-PR-15-0008, CS-140-PR-15-0021, CS-140-PR-15-0022

EQUIPMENT

Wash Water Drum(140-V-004) and Wash water pump(140-P-002A/B)

STREAM DETAILS

1.

To supply Stripper Sour Water/BFW/Recycle water to Wash water drum.

2.

To inject wash water in U/S of Reactor Effluent Air Cooler to dissolve ammonium salts.

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESFC-419,PC-368,LC-516,FC-451,FC-420,LC-542& LC-544


Operating Parameters

SERVICE
Temperature(C)
Sour Water/MP BFW supply to
Wash water Drum
Sour Water from Reflux
Drum

Pressure ( bar g)

65-128
45.0

Flow rate (Kg/hr)


5.0-24.0

5221-6212

6.4

3310

Note:
Node
5. Wash Water
System

Deviation
1.

Low/No Flow

Causes
1. U/S disturbance in unit 550.

Consequences
1. Level of (V-004) may go down

Ref.

Safeguards

1. BFW & Recycle 5.1.1.1.1


water is available
for make up.

2. Low alarm for FC- 5.1.1.1.2


420 is provided.
2. FC 420 malfunctions to close 1. Level of (V-004) may go down
FCV-420

1. BFW & Recycle 5.1.2.1.1


water is available
for make up

3. FC-451 malfunctions to close 1. Level of (V-004) may go down


FCV-451

1. Stripped sour
water and recycle
water is available
for makeup

5.1.3.1.1

4. LC-542 malfunction to close


LCV-542A

1. Level of (V-004) may go down

1. Stripped sour
water and BFW is
available for
makeup

5.1.4.1.1

5. LC-544 malfunction to close


LCV-544

1. Interface level of V-009 boot will


be high

1.1 LI-560A is
provided with
HH alarm

5.1.5.1.1

2. Water may carry over with diesel product. 1 SC-011is


provided.

5.1.5.2.1

6. LC-516 malfunction to close


FCV-420/451& LCV-542B

1. Level of (V-004) may go down

1. LZ-518 LL alarm 5.1.6.1.1


will activate UZ-713
to trip wash water
pumps and activate
UZ-721to close
XZV-721

7. P-002A/B trips

1. Level of (V-004) may go high

1 LI-559 is provided 5.1.7.1.1


with
HH alarm

2. Back flow from reaction section

1. LC-516 is
provided with high
alarm

5.1.7.2.1

2. PSV-310A/B
designed for liquid
overfilling case

5.1.7.2.2

3. FZ-450 LL alarm 5.1.7.2.3


will activate UZ-721
to close XZV-721

8. FC-419 malfunction to close 1. No wash water to EA-001, will increase


FCV-419
salt deposition

2. High level in V-004.

4. NRV is provided
at inlet of reactor
effluent air cooler

5.1.7.2.4

1.FZ-450 is
provided with
LL alarm

5.1.8.1.1

1. LI-559 is provided 5.1.8.2.1


with
HH alarm
2.LC-516 is
provided with high
alarm

9. XZV-721 malfunction to close 1. Same as cause 8,Consequence


1&2 above

5.1.8.2.2

5.1.9.1

Recommendations

Responsibility

Remarks

Node

Deviation

Causes
10. FC-455A/B malfunction to
full open FCV-455A/B

Consequences

1. Less wash water to EA-001, resulting salt 1 FZ-450 is


deposition in tubes.
provided with
LL alarm
2. FC-419
provided with low
alarm.

2.

High Flow

1. FC 420 malfunctions to open 1. Level of (V-004) may go high


FCV-420

2. FC-451 malfunctions to open 1. Same as Cause-1 consequence1 in the


FCV-451
same node.

4. LC-544 malfunction to open


LCV-544

5. LC-516 malfunction to open


FCV-420/451& LCV-542B

2. Boot level of V-008 may go down,HC


carry over to V-004 may lead to high
pressure

1. PC-368 provided
with high alarm.

5.2.3.2.1

1. Level of (V-004) may go high

1. Same as Cause
1, Consequence 1,
Safegaurds1&2.

5.2.4.1.1

2. Boot level of V-009 may go down,HC


carry over to V-004 may lead to high
pressure

1. PC-368 provided
with high alarm.

5.2.4.2.1

1. Level of (V-004) may go high

1. Same as Cause
1, Consequence 1,
Safegaurds2.

5.2.5.1.1

2. Boot level of V-008 may go down,HC


carry over to V-004 may lead to high
pressure

1. PC-368 provided
with high alarm.

5.2.5.2.1

2. PSV-310 A/B
provided.

5.2.5.2.2

1. LC-516 is
provided with low
alarm

5.2.6.1.1

2. LZ-518 provided
with low low alarm.

5.2.6.2.2

As well as

1. Contamination in Stripped
sour water.

5.

Low Pressure

1. PC-368 malfunctions to close 1. Pump may cavitate and wash water flow
PCV-368A and opens 368B
to EA-001 may be lost.

2. Nitrogen supply failure.

3. Low supply pressure of sour


water from unit 550
6.

High Pressure

11. Problem/Requirements

12. Operation/Maintenance

1. Water washing of EA-001 may get


affected.

1. Pump may cavitate and wash water flow


to EA-001 may be lost.

1. BFW may enter into sour water line

1. PC-368 malfunctions to open 1. V-004 may experience high pressure.


PCV-368A and closes PCV368B.

1. Misdistribution of wash water


in air cooler tube bundles.

5.2.2.1

5.2.3.1.1

3.

1. Salt may deposit on air cooler tubes.

Remarks

5.2.1.1.2

1. Same as Cause
1,Consequence
1,Safegaurds 1&2
above

2. Likely low level in V-004.

Responsibility

5.1.10.1.2

1. Level of (V-004) may go high

6. FC-419 malfunction to open 1. More wash water to EA-001,EEFCV-419


001 (when in operation)no major concern.

Recommendations

5.1.10.1.1

1. LC-516 provided 5.2.1.1.1


with
High alarm.
2. LI-559 provided
with HH
alarm.

3. LC-542 malfunction to open


LCV-542A

Ref.

Safeguards

1.
Ensure
sampling
provision is
given in
Unit
550 during
detailing.

5.3.1.1

5.5.1.1

1. PC-368
provided with low
alarm.

5.5.2.1.1

2. PI-806 at B.L is
provided with low
alarm

5.5.2.1.2

11. Operating
procedure should
ensure periodical
checking of PI019.

DEC/NOCL

12. Operating
procedure should
ensure periodical
checking of FI458/459/460/461

DEC/NOCL

1. NRV is provided 5.5.3.1.1

1. PSV-310 A/B is
provided.

5.6.1.1.1

5.11.1.1

5.12

Flow rate (Kg/hr)


5221-6212
3310

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 06

Separator bottom to sour water flash Drum and B/L

DESIGN INTENTION

To separate the sour water from HC in Separator and send to B/L.

DRAWINGS

CS-140-PR-15-0006, CS-140-PR-15-0021

EQUIPMENT

Sour water Flash Drum(140-V-017)

STREAM DETAILS

Sour water from Separator (V-006) to Sour water flash drum (V-017) and then water will send to B/L and flash gas will be sent to LP Amine KOD(V-010)

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESLC-514.LC-556,LC542


Operating Parameters

SERVICE
Temperature(C)
Separator bottoms to
Sour water flash drum
Sour water flash drum to
Sour water B/L

Pressure ( bar g)

Flow rate (Kg/hr)

45

6.4-78.8

10085

45

4.0-6.4

10080

Note:
Node
6. Separator bottom to Sour
water Flash Drum and B/L

Deviation
1.

Low/No Flow

2.

6.

High Flow

High Pressure

Causes

Consequences

Safeguards

Ref.

1. LC-510 malfunctions to close 1. Boot level of V-006 may go high resulting 1. LI 512 is
LCV -510
in water carry over with gas oil product.
provided with
HH alarm.

6.1.1.1.1

2. LC-556 malfunctions to close 1. V-017 water side level may go high.


LCV-556

6.1.2.1.1

1.Low alarm at FI417 is provided..

Recommendations

Responsibility

3. LC-514 malfunctions to close 1. V-017 Hydrocarbon side level may go


LCV-514
high.

6.1.3.1

14. Operating procedure


should ensure periodical
checking of LG515

DEC/NOCL

4. LC-542 malfunctions to close 1. V-008 boot level may go high, water may
LCV-542 B
go along with reflux/wild naphtha.

6.1.4.1

15. Operating procedure


should ensure periodical
checking of LG543

DEC/NOCL

14. Operating procedure


should ensure periodical
checking of LG515

DEC/NOCL

1. LC-510 malfunctions to
opens
LCV -510

1. Boot level of V-006 may go low resulting


in hydrocarbon carry over with Sour water.

1. LZ 513 is
provided with LL
alarm will activate
UZ-704 to close
XZV704.

6.2.1.1.1

2. LC-514 malfunctions to
opens
LCV-514

1. V-017 Hydrocarbon side level may go


low, flash gas may go to CBD.

1. CBD vessel is
connected to flare.

6.2.2.1.1

3. LC-556 malfunctions to open 1. V-017 water side level may go low and
LCV-556
HC may carry over with Sour water to B.L.

6.2.3.1

4. LC-542 malfunctions to
open
LCV-542 B

1. Boot level of V-008 may go low resulting


in hydrocarbon carry over with Sour water.

6.2.4.1

1. U/S Disturbance

1. System may experience higher than the


operating pressure

1. PSV-309A/B is
provided.

6.6.1.1.1

Remarks

1. Provision
for HC
carryover with
sour water to be
considered in
unit 550.

15. Operating procedure


should ensure periodical
checking of LG543

DEC/NOCL

1. Provision
for HC
carryover with
sour water to be
considered in
unit 550.

Flow rate (Kg/hr)


10085
10080

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 07

Separator drum to stripper inlet

DESIGN INTENTION

To preheat Gas oil in exchanger trains and send to stripper for strip out to naphtha and lighter components.

DRAWINGS

CS-140-PR-15-0007, CS-140-PR-15-0017, CS-140-PR-15-0018

EQUIPMENT

Separator Drum(140-V-006),Stripper Feed / Bottom Exchanger(140-EE-006),Stripper


Preheater (140-V-002)

STREAM DETAILS

Gas oil is separated in separator(V-006) and send for further heating In Stripper feed/bottom (EE-006) and stripper preheater (EE-002A/B) then stripper

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESFC-416,TC-191


Operating Parameters

SERVICE
Temperature(C)
Separator bottom to stripper
Preheater inlet
stripper Preheater to
Stripper Inlet

Pressure ( bar g)

Flow rate (Kg/hr)

45-51

11.9-78.8

41810-119768

213-260

8.9-10.3

119768

Note:
Node
7. Separator Drum to Stripper
Inlet

Deviation
1.

Low/No Flow

Causes
1. XZV-703 malfunctions to
close.

2. LC-507/FC-416 malfunctions
to close FCV-416.

Consequences

Safeguards

1. K.O.D V-007 is 7.1.1.2.1


provided.

1. Level of V-006 increases

1. When FC 416 7.1.2.1.1


malfuctions,LC
507 is available
with high alarm &
when LC 507
malfunctions FC
416 is available for
monitoring

16. Provide low alarm at


FC-416

DEC

1. PSV-930A/B

17. Provide low alarm at


TI-190

DEC

18. Provide High alarm


on TI-190.

DEC

1. Level of V-006 decreases and down


stream system will face high pressure

7.1.1.1.1

7.1.3.1.1

1. Mechanical
7.1.3.2.1
Limit stop
provided at TCV191A for minimum
flow to avoid total
blockage.

7.1.4.1

4. TC-191 malfunctions to open 1. No major concern


TCV-191A
1. LC-507/FC-416 malfunctions
to open FCV-416.

Responsibility

2. Liquid HC carryover in vapor line.

2. Low stripper inlet temperature possibly


leading to product off spec

High Flow

Recommendations

1. LC 507 high
alarm is provided.

3. TC-191 malfunctions to close 1. Pressure of system up to EE-002 may


TCV-191B
increase

2.

Ref.

1. Level of V-006 increases

1. LZ-509 is
provided with low
low alarm which
will activate UZ703 to trip XZV703.

7.2.1.1.1

2. PSV-319A/B is 7.2.1.1.2
designed for gas
blow case.

2. TC-191 malfunctions to open 1. No major concern


TCV-191B

3.

As well as

7.2.2.1

1. LC 510 malfunctions to close 1. V-006 boot level will increase, may lead
LCV-510
to water carry over with diesel.

1. LI-512 is
provided with
HH alarm.

7.3.1.1.1

7. Low
Temperature

1. Failure of heating medium in 1. Low stripper inlet temperature possibly


EE-006A/B/C/D
leading to product off spec

1. TC-191
provided with low
alarm.

7.7.1.1.1

8. High
Temperature

1. Malfunction of TCV-191 A

1. High inlet temperature in Stripper


C-002.

7.8.1.1

11. Problem/Requirements

1. Tube leak in EE-006

1. Stripper bottom will ingress in unstab gas


oil. No hazardous consequence.

7.11.1.1

2. Tube leak in EE-002

1. Reactor effluent may ingress in


Unstab gas oil leading to

12. Operation/Maintenance

1. PSV-319A/B is 7.11.2.1.1
provided for tube
rupture case.

7.12

Remarks

Flow rate (Kg/hr)


41810-119768
119768

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 08

Separator over head to Recycle gas compressor inlet

DESIGN INTENTION

1.

To remove H2S from separator overhead stream in HP Amine Absorber.

2.

To feed Recycle Gas to recycle gas Compressor.

DRAWINGS

CS-140-PR-15-0007, CS-140-PR-15-0009, CS-140-PR-15-0010, CS-140-PR-15-0012

EQUIPMENT

Separator (140-V-006),HP Absorber KOD(140-V-007), HP Amine absorber (140-C001),Recycle compressor KOD(140-V-005)

STREAM DETAILS

Separator (V-006) Overhead goes to KOD (V-007)and then HP Amine absorber column (C001) where H2S treated by lean amine solution and send to KOD of Recycle gas compressor (V-005)then finally recycle gas compressor (K-002)

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESLC-519,HC-826.LC-521,LC-524


Operating Parameters

SERVICE
Temperature(C)
Separator overhead to
HP amine absorber
HP Amine absorber to
Recycle gas compressor

Pressure ( bar g)

Flow rate (Kg/hr)

45

78.8

15891-18053

54

78.4

13337-15497

Note:
Node
8. Separator Overhead to
Recycle gas compressor Inlet

Deviation
1.

Low/No Flow

Causes
1. HCV-826 malfunction to full
open (No flow through to
column)

Consequences

4. LC-524 malfunction to open


LCV-524

Ref.

1. AI-001 is provided on
K-002 suction line

8.1.1.1.1

2. System pressure may increase due to


non removal of H2S

1. PC-358 is provided
with high alarm

8.1.1.2.1

2. PC-358/FC-423 malfunction 1. System pressure may go down possible


to open FCV-423(Less flow in
damage of compressor(K-002)
Recycle gas compressor Suction
line)

3. LC-519 malfunction to open


LCV-519

Safeguards

1. High H2S concentration in recycle gas


lead to off spec product

1. Level loses in V-007,stripper (C002)/(EE-006A/B/C/D) /(EE002)may subject to high pressure due to gas
blow by

1. Level loses in V-005, Gas blow by may


happen to C-003

2. PI-377B is provided
with low alarm

8.1.2.1.2

3. FI-429 is provided
with low alarm

8.1.2.1.3

1. PSV-319A/B is
designed for this gas
blow by case

8.1.3.1.1

2. PI-903 is provided
with high alarm.

8.1.3.1.2

1. PC-394 is provided
with high alarm.

8.1.4.1.1

2. PSV-318A/B is
designed for this gas
blow by case.

8.1.4.1.2

8.2.1.1.1

High Flow

1. PC-358/FC-423 malfunction
to
Open FCV-423(Fuel gas line)

1. Fuel gas line may subjected to high


pressure.

1. PSV-941A/B is
designed for this case.

5.

Low Pressure

1. XZV-702 malfunctions to
open.

1. System pressure may go down

1. PI-377B provided with 8.5.1.1.1


Low alarm

High Pressure

1. U/S Disturbance

1. Over pressurizing the system.

2. FI-429 provided with


Low alarm.

8.5.1.1.2

3. Compressor gets
tripped on PZ-378 LL
alarm.

8.5.1.1.3

2. PSV-307 A/B is
provided.

8.6.1.1.2

1. U/S disturbance

1. Heavier hydrocarbon carry over from


separator (V-006) to Hp Amine absorber(C001)

1. TI-167 and TI-212 is


provide with high alarm

8.8.1.1.1

10.

1. LC-519 malfunction to close


LCV-519

1. HC Liquid carry over to C-001

1. LC-521 is provided
with
High alarm.

8.10.1.1.1

11. Problem/Requirements

12. Operation/Maintenance

2. LC-524 malfunctions to close 1. Liquid carry over with recycle gas to KLCV-524
002

1. LZ-526 provided with 8.10.2.1.1


HH alarm which will
activate UZ-705 to trip the
compressor.

1. Over pressurization of the


system due to some
emergencies

1. Emergency
8.11.1.1.1
depressurization
safeguarding system UZ702 is provided.

1. Possible loss of life and property.

Remarks

1.
Ensure
refinery fuel
gas
compositio
n has
considered
addition of
hydrogen
from this
unit during
detail
engineering
.

20. Provide open feed back


alarm from ZB 702 A

DEC

1. PC-358 provided with 8.6.1.1.1


high alarm.

8. High
Temperature

High Level

Responsibility
DEC/NOCL

1. PZ-378 LL alarm will 8.1.2.1.1


activate UZ-705 to trip the
compressor (K-002)

2.

6.

Recommendations
19. Operating procedure to
include operation of HS-822 to
select FCV-423 to purge H2S to
flare header

8.12

21. Operating procedure to


DEC/NOCL
monitor LG-522 for HC carry
over. When HC level builds up it
should be drained to CBD by
using Skim line.

15891-18053
13337-15497

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 09

Recycle gas compressor to mixing point

DESIGN INTENTION

To supply recycle gas from recycle gas compressor to Reaction section

DRAWINGS

CS-140-PR-15-0011, CS-140-PR-15-0003

EQUIPMENT

Recycle gas compressor (140-K-002)

STREAM DETAILS

H2 and lighter gases are recycled through RGC(K-002) to mixing point at the inlet of
Reactor feed/effluent exchanger

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESFC-427


Operating Parameters

SERVICE
Temperature(C)
Recycle gas compressor to
Mixing point

Pressure ( bar g)

Flow rate (Kg/hr)

75.7-79

92.5-95.2

4310-5022

Note:
Node
9. Recycle Gas compressor to
Mixing Point

Deviation
1.

Low/No Flow

Causes
1. K-002 trip

Consequences
1. No hydrogen supply to reactor.

Safeguards
1.1 UZ-705 will
activate
UZ-706

2. Gas oil may enter Compressor discharge 1. NRV is provided.


line

Ref.

Recommendations

Responsibility

Remarks

9.1.1.1.1

9.1.1.2.1

2. UZ-706 will activate 9.1.1.2.2


UZ719(back flow
protection system) to
close XZV-719

2. FC-427 malfunction to close


FCV-427(Antisurge line)

1. Possibly more hydrogen to Reactor


section.(NO major concern.)

9.1.2.1

3. Malfunctioning of XCV-715
(Antisurge line by supplier)

1. Possible damage of compressor.

9.1.3.1

4. FC-427 malfunction to open 1. Less Hydrogen to reactor/quench leading 1. FCFCV-427(Recycle gas and
to low product quality.
412/413/414/415 is
quench gas line)
provided with low
alarm.

High Flow

9.1.4.1.1

2. FZ-428 is
provided with
LL alarm

9.1.4.1.2

1. Anti surge valve


XCV715 provided.

9.1.5.1.1

1. To be
reviewed during
detail
engineering
when vendor
information is
available

1. FC-427 malfunction to open 1. Less Hydrogen to reactor/quench leading 1. FCFCV-427 (high flow in antisurge to low product quality.
412/413/414/415 is
line)
provided with low
alarm.

9.2.1.1.1

1. Low low
alarm of FZ428 to be verified
for this cause
during detailed
engineering.

5. U/S disturbance (Recycle


gas becomes less)

2.

1. This
antisurge is not
considered in
this HAZOP. To
be Considered in
Detail
engineering.

1. Possible surging of compressor.

2. FZ-428 is provided 9.2.1.1.2


with
LL alarm

4. Reverse/Misdirected
Flow

2. K-002 trips

1. Make up hydrogen may back up in


recycle compressor discharge

6.

1. Malfunction of K-002

1. Possible over pressure causing damage


to the system

1. Malfunction of K-002

1. High discharge temperature may lead to


system damage

High Pressure

8. High
Temperature

11. Problem/Requirements

1. Operational and safety


1. Possible hazard of life and property.
issues related to compressor (K002
& KT-002) and turbine system

1. NRV is provided.

9.4.2.1.1

9.6.1.1

1. To be
reviewed during
detail
engineering
when vendor
information is
available

1. TI-175 is provided
with high alarm.

9.8.1.1.1

2. TZ-174 with HH
alarm to activate UZ705

9.8.1.1.2

1. To be
reviewed during
detail
engineering
HAZOP when
vendor
information is
available.

9.11.1.1

1. To be
reviewed during
detail
engineering
HAZOP when
vendor
information is
available.

Flow rate (Kg/hr)


4310-5022

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

NODE NO: 10

Lean Amine from B/L to LP and HP amine absorber column

DESIGN INTENTION

Lean Amine supply to HP and LP amine absorber columns.

DRAWINGS

CS-140-PR-15-0009, CS-140-PR-15-0010, CS-140-PR-15-0016

EQUIPMENT

Lean Amine booster pumps(140-P-003A/B),HP Amine absorber column(140-C-001),LP Amine absorber columns(140-C-003)

STREAM DETAILS

Lean amine comes from B/L and goes to LP Amine absorber column (C-003) and pumped through amine Pump(P-003)to HP Amine absorber column

AVAILABLE CONTROL SCHEMES

FC-434,FC-424

Nagarjuna Oil Corporation Ltd

Project :

Diesel hydro Desulphurization unit

Operating Parameters

SERVICE
Temperature(C)
Lean Amine from B/L to LP Amine
absorber column
Lean Amine from B/L to HP Amine
absorber column

Pressure ( bar g)

50

9.5

50

9.5-86.5

Note:
Node

Deviation

10. Lean Amine from B/L to LP and HP 1.


Amine Absorber column

Low/No Flow

Causes
1. U/S disturbance

Consequences
1. P-003A/B may starve and get damaged

Safeguards
1. FC-424/434 provided
with low alarm

2. Less/No removal of H2S from recycle/ Off 1. PI-373 is provided with


gas
low alarm

2. P-003A/B trips(Lean Amine


to
C-001)

3. FC-434 malfunction to close


FCV-434(Lean Amine to C003)

3. AI-001 provide on
recycle gas line for
monitoring

10.1.1.2.3

4. AI-002 provided on off


gas drum outlet

10.1.1.2.4

10.1.2.1.1

2. back flow from HP Amine absorber to


lean amine pump(P003A/B)

1. FZ-443 provided with


LL alarm to activate UZ720(Lean amine to C001)

10.1.2.2.1

2. NRV is provided

10.1.2.2.2

1. AI-002 provided on off 10.2.3.1.1


gas drum outlet

1. Same as cause 4, consequences 1


;deviation (Less/No flow) in this node

6. FC-456A/B malfunction to full 1. Less removal of H2S from recycle gas


open FCV-456A/B(Low flow of
Lean amine to C-001)

2.

High Flow

1. FC-434 malfunction to open


FCV-434(Lean Amine to C003)

23. Operating procedure


DEC/NOCL
should ensure routing of off gas
to flare header when there is
disturbance in lean amine
supply to C-003

22. UZ-720 should activate


DEC
UZ-710 to trip pump (P-003A/B)

10.2.4.1.2

1. AI-001 provide on
recycle gas line for
monitoring

10.2.6.1.1

2. FC-424 provided with


Low alarm

10.2.6.1.2

1. C-003 level increases, possible column


overfilling

1. LC-532 is provided with 10.2.1.1.1


high alarm

2. Possible column (C-003)flooding

1. LA-560 is provided with 10.2.1.2.1


HH alarm

2. FC-424 malfunctions to open 1. C-001 level increases, possible column


FCV-424(Lean Amine to Coverfilling
001)

2. U/S disturbance

10.2.4.1.1

10.2.5.1

2. PDI-392 is provided
with high alarm

4. Reverse/Misdirected
Flow

23. Operating procedure


DEC/NOCL
should ensure routing of off gas
to flare header when there is
disturbance in lean amine
supply to C-003

10.1.1.2.2

2. FZ-443 provided with


LL
alarm to activate UZ720(Lean amine to C001)

Responsibility

10.1.1.2.1

1. Less/No removal of H2S from recycle gas 1. AI-001 provide on


recycle gas line for
monitoring

1. Less/No removal of H2S from Off gas

Recommendations
22. UZ-720 should activate
DEC
UZ-710 to trip pump (P-003A/B)

2. FZ-443 provided with


LL alarm to activate UZ720(Lean amine to C001)

4. FC-424 malfunctions to close 1. Less/No removal of H2S from recycle gas 1. AI-001 provide on
FCV-424(Lean Amine to Crecycle gas line for
001)
monitoring

5. XZV-720 malfunctions to
close(Lean Amine to C-001)

Ref.
10.1.1.1.1

10.2.1.2.2

1. LC-521 is provided with 10.2.2.1.1


high alarm

2. Possible column (C-001)flooding

1. PDI-372 is provide with


high alarm

1. Off/Fuel gas may back to OSBL


through lean amine line from C003

1. NRV is provided in the 10.4.2.1.1


line

10.2.2.21.1

22. UZ-720 should activate


DEC
UZ-710 to trip pump (P-003A/B)

Remarks

Node

Deviation
6.

High Pressure

7. Low
Temperature

Causes

Consequences

Safeguards

Ref.

1. FC-424 malfunctions to close 1. System up to FCV-424 from PFCV-424(Lean Amine to C003 may get pressurized
001)

1. System is designed for 10.6.1.1.1


shut off pressure of the
pump P-003.

2. XZV-720 malfunctions to
close(Lean Amine to C-001)

1. System up to XZV-720 from P003 may get pressurized

1. System is designed for 10.6.2.1.1


shut off pressure of the
pump P-003.

1. U/S disturbance

1. HC may condense in amine solution


leading to foaming

1. TI-171 is provided with 10.7.1.1.1


low alarm(for C-001), TI186 is provided with low
alarm(for C-003)

2. TDI-213 is provided
with low alarm(for C001),TDI-214 is provided
with low alarm(for C-003)

Recommendations

Responsibility

27. Operating procedure to


ensure to check LG 533 &LG522 and drain out the HC
through Skim line.

DEC/NOCL

24. Provide High alarm on TI170 at lean amine B.L

DEC

10.7.1.1.2

3. LG-522 & LG-533 are


10.7.1.1.3
transparent type to see the
interface during upset
conditions.
4. The valve in HC
10.7.1.1.4
Skimming line for C-001 is
Spring loaded type.

8. High
Temperature

1. U/S disturbance

1. Poor removal of H2S from


Recycle gas/Off gas

1. AI-001/AI-002 is
provided for monitoring

10.8.1.1.1

Remarks

Flow rate (Kg/hr)


17649-18370
57857

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 11

Rich Amine from HP Amine absorber system to LP amine absorber bottom to B/L

DESIGN INTENTION

To supply Rich amine from HP amine absorber column to LP amine absorber column

DRAWINGS

CS-140-PR-15-0011, CS-140-PR-15-0016

EQUIPMENT

HP Amine absorber column (140-C-001), LP Amine absorber column (140-C-003)

STREAM DETAILS

Rich amine from HP Amine absorber column(C-001) bottom to LP Amine absorber column(C-003)

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESLC-521


Operating Parameters

SERVICE
Temperature(C)
Rich amine from HP
amine absorber column to LP
Amine absorber column

Pressure ( bar g)

Flow rate (Kg/hr)

56-57

6.2-78.6

60413

Note:
Node
11. Rich Amine from HP Amine
Absorber ,LP Amine Absorber
bottom to B/L.

Deviation
1.

2.

Less/No flow

High Flow

4. Reverse/Misdirected
Flow

Causes

Consequences

Safeguards

Ref.
11.1.1.1

1. LC-521 Malfunctions to
Close LCV-521

1. Level of C-001 may go high.

2. XZV-709 Malfunctions to
close

1. Level of C-001 may go high.

1. LC-521 is provided
with
High alarm.

11.1.2.1.1

3. LC-532 Malfunctions to
Close
LCV-532

1. Level of C-003 may go high.

1. LA-560 is provided
with
HH alarm.

11.1.3.1.1

1. LC-521 Malfunctions to open 1. Level of C-001 may go down.


LCV-521

1. LZ-523 LL alarm
will activate UZ-709.

11.2.1.1.1

2. LC-532 Malfunctions to open 1. Level of C-003 may go down.


LCV-532

1. Low low alarm at LA- 11.2.2.1.1


560 is provided.

1. Reverse flow of Rich amine


from B.L to C-003 bottom.

1. NRV is provided at
B.L

11.4.1.1.1

2. LC-532 is provided
with high alarm.

11.4.1.1.2

3. LA-560 is provided
with high alarm.

11.4.1.1.3

1. Level in C-003 may go high

Recommendations
25. Provide additional LI
with HH
alarm at C-001 bottom.

Responsibility
DEC

Remarks

Flow rate (Kg/hr)


60413

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

Nagarjuna Oil Corporation Ltd

NODE NO: 12

LP Amine absorber system (LP Amine Column KOD, Off gas KOD) to B/L

DESIGN INTENTION

To Supply Off /Fuel gases from reflux drum to B/L Unit-350

DRAWINGS

CS-140-PR-15-0021, CS-140-PR-15-0016

EQUIPMENT

Stripper Reflux Drum (140-V-008),LP Amine KOD(140-V-010), LP Amine Absorber Column


(140-C-003), Off gas KOD (140-V-018) ,Sour water flash Drum(140-V-017)

STREAM DETAILS

Flash gas from flash drum(V-017)and off gases from Reflux drum (V-008) is collected to KOD of LP Amine absorber column (C-010) where it is treated with amine solution and send to B/L or Fuel gas header

Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESPC-394,LC-551


Operating Parameters

SERVICE
Temperature(C)
Off gases from reflux drum to
KOD of LP Amine absorber
Off gases/Fuel gases LP
amine KOD to B/L

Pressure ( bar g)

Flow rate (Kg/hr)

45.0

6.4

1172-1371

45.0

2.6 - 6.3

512-741

Note:
Node

Deviation

12. LP Amine Absorber system 1.


(LP Amine column KOD, Off Gas
KOD) to B/L

2.

Less/No flow

High Flow

Causes

Consequences

1. PC-394 malfunctions to close 1. System will be pressurized


PCV-394A/B.

1. PI-903 is provide with


high alarm at C-002
overhead

12.1.1.2.1

3. Improper flashing of HC in V-017 leading


to HC carryover with
Sour water.

1. AI-003 is provided

12.1.1.3.1

2. PI-903 is provide with


high alarm at C-002
overhead

12.1.1.3.2

8. High
Temperature

Recommendations

Responsibility

2. LC-551 malfunctions to close 1. V-018 level will increase & Liquid may
LCV-551 when required.
carryover with off gas/fuel gas

12.1.2.1

30. Operating procedure


should ensure periodical
checking of LG552

DEC/NOCL

3. LC-530 malfunctions to close 1. V-010 level will increase & Liquid may
LCV-530 when required.
carryover with off gas to C- 003 leads to
foaming in C-003.

12.1.3.1

31. Periodical checking of


interface in
LG-533.

DEC/NOCL

4. U/S disturbance in C-002

12.1.4.1

1. No major consequence for this node

1. PC-394 malfunctions to open 1. Column level in C-003 will increase.


PCV-394A/B.

3. System pressure may go down

High Pressure

Ref.

2. Pressurization may lead to off spec


product gas oil

2. Less removal of H2S from off gas

6.

Safeguards

1. PSV-318A/B is provided 12.1.1.1.1

1. LC-532 is provided with 12.2.1.1.1


high alarm.
1. LA-560 is provided with 12.2.1.2.1
HH alarm.

2. H2S analyzer (AI-002)


in the product line
indicates off-spec off gas

12.2.1.2.2

1. AI-002 is provided for


monitoring.

12.2.1.3.1

2. Pressure transmitter
PT-999 is provided with
low alarm at top of C003.

12.2.1.3.2

2. LC-551 malfunctions to open 1. Rich Amine may backup to V-018


LCV-551 when required.

1. NRV is provided on line 12.2.2.1.1


DA-017 close to mixing
point with DA-012.

3. LC-530 malfunctions to open 1. System will face low pressure.


LCV-530 when required.

1. Pressure transmitter
PT-999 is provided with
low alarm at top of C003.

2. Choking of Packed Bed in C- 1. High Pressure drop in Column leading to


003
Improper H2S removal.

1. PDI-392 provided with 12.6.2.1.1


high alarm.

1. U/S disturbance

1. Heavier HC condenses in C-003

12.2.3.1.1

2. PSV-318A/B is
provided.

12.6.2.1.2

1. TI-208 at V-008 top is


provided with high alarm.

12.8.1.1.1

2. TI-184 on inlet of C003 is provided with high


alarm.

12.8.1.1.2

35. Provide high alarm at TI- DEC


185.

Remarks

Flow rate (Kg/hr)


1172-1371
512-741

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

Nagarjuna Oil Corporation Ltd

NODE NO: 13

Stripper bottom to Gas oil air cooler , Coalescer and salt dryer to B/L

DESIGN INTENTION

To supply Hydro treated gas oil from Stripper Bottom to B/L.

DRAWINGS

CS-140-PR-15-0017, CS-140-PR-15-0018, CS-140-PR-15-0019, CS-140-PR-15-0022

EQUIPMENT

Stripper(140-C-002),Stripper bottoms pump(140-P-005),Stripper feed/bottom exchanger(140-EE-006),Gas oil air cooler (140-EA-003),Gas oil trim cooler (140-EE-007), Coalescer (140-V-009),Salt dryer (140-V-019)

STREAM DETAILS

Stripper bottoms is cooled in Stripper feed bottoms exchanger, Gas oil air cooler and Gas oil trim cooler. Then it is passed to coalescer and salt dryer to remove moisture. Then it is sent to B.L.

Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESFC-442,LC-535,LC-544


Operating Parameters

SERVICE
Temperature(C)
Stripper bottoms to feed bottom
exchanger, Gas Oil Air cooler,
Trim cooler
Gas oil From Coalescer to B.L.

Pressure ( bar g)

Flow rate (Kg/hr)

65-252.1

7.3-11.8

115553

40.0

5.0-7.3

115214

Note:
Node

Deviation

13. Stripper bottom to Gas oil Air 1.


cooler, Coalescer and Salt Dryer
to B/L

Less/No flow

Causes
1. P-005A/B trips.

Consequences
1. C-002 level will increase

2. System pressure at pump P-005 d/s will


come down

Safeguards
1. LC-535 provided with
high alarm

Ref.

Recommendations

Responsibility

13.1.1.1.1

1. LZ-537 is provided with 13.1.1.2.1


HH alarm & activates UZ717 to isolate MP Steam
toC-002

2.Pressure transmitter PT- 13.1.1.2.2


444 is provided with low
alarm downstream of V019, before FCV-442 on
line P-103.

2. LC-535/FC-442 malfunctions
to close FCV-442.

3. LC-535/FC-454 malfunctions
to close FCV-454(Start-up
recirculation line).

1. System will face P-005 shut off pressure

1. System is designed for


pump shut off pressure.

2. Level will increase in column C002.

1. Same as safeguards 1, 13.1.2.2.1


2 for cause 1 in this
node.

High Flow

13.1.3.1

1. Same as cause 2 consequence


1&2 of deviation less/no flow in this node.

4. MOV -004 in closed condition 1. Pump will run dry if it is started.

1.Start permissive is
13.1.4.1.1
included as a part of safe
guarding system for Pump
P-005A/B.

5. Choking of coalescer in V009

1. C-002 level will increase

1.PDI-914 provided with


High alarm.

6. Choking of salt dryer in V019

1. C-002 level will increase

1. PDI-923 Provided with 13.1.6.1.1


High alarm

7. FC-436 malfunctions to close 1. Product quality upset (Flash point ,sulfur


FCV-436
content of Gas oil)

2.

13.1.2.1.1

13.1.5.1.1

1. SC-012 is provided at 13.1.7.1.1


pump discharge P-005

2. AI-003 is provided for


monitoring

13.1.7.1.2

13.1.8.1.1

8. XZV-717 malfunctions to
close

1. Same as cause 7 deviation less/no flow


in this node

1. FC-436 provided with


low alarm.

1. LC-535/FC-442 malfunctions
to open FCV-442.

1. Level of C-002 may go down.

1. LZ-538 is provided with 13.2.1.1.1


LL alarm to activate UZ712.
13.2.1.2.1

2. Product quality may get affected due to


less residence time in V009/V-019 respectively.
2. LC-535/FC-454 malfunctions
to open FCV-454(Start-up
recirculation line).

1. Level of C-002 may go down.

1. LZ-538 is provided
with
LL alarm to activate UZ712.

13.2.2.1.1

3. FC-436 malfunctions to
open
FCV-436

1. V-008 boot level may increase.

1. LC-542 is provided
with high alarm.

13.2.3.1.1

4. Reverse/Misdirected
Flow

1. P-005 A/B trips

1. Gas oil may backup from storage

1. NRV provided in
Rundown line at B.L.

13.4.1.1.1

5.

1. U/S disturbance

1. P-005 capacity reduces and level in


column will rise.

1. LZ-537 HH will
activate
UZ-717 to close XZV717 on M.P steam line.

13.5.1.1.1

1. EA-003 trips

1. Likely Poor performance of V009/V-019

1. High alarm provided


at TI-203.

13.8.1.1.1

2. Cooling water failure in EE007

1. Likely Poor performance of V009/V-019

1. High alarm provided


at TI-204.

13.8.2.1.1

Low Pressure

8. High
Temperature

37. Provide high alarm for


FC-442.

DEC

Remarks

8. High
Temperature

Node

Deviation

Causes
3. Cooling medium failure in
EE-006

11. Problem/Requirements

Consequences
1. Likely Poor performance of V009/V-019

Safeguards

13.8.3.1.1

2. High alarm provided


at TI-204.

13.8.3.1.2

13.11.1.1

1. Not Draining of salt dryer

1. Water may carry over with diesel product.

2. Loss of salt in salt dryer

1. Water may carry over with diesel product. 1. SC-011 is provided for 13.11.2.1.1
sampling

3. Leakage through Seal in P005A/B

1. Possible fire

Recommendations

Responsibility

1. P&ID -0017
rev 1, to be
corrected
accordingly

13.11.3.1.2

13.11.4.1

4. Tube leak in EE-007

1. Stripper bottom will ingress in cooling


water line

5. Vibration in Air cooler (EA003) fans

1. Possible damage of EA-003 components 1. VA-008A/B is provided 13.11.5.1.1


with high alarm

13.12

Remarks

39. Operating procedure


DEC/NOCL
should ensure draining of
salt dryer at regular intervals
by checking LG554.

1. Pump is provided with 13.11.3.1.1


double mechanical seal

2. HZ-850 is provided at
safe distance to activate
UZ-712.

12. Operation/Maintenance

Ref.

1. High alarm provided


at TI-203.

9. Cooling water sample


analysis to be considered
during detail engineering of
OSBL system

PMC/NOCL

Flow rate (Kg/hr)


115553
115214

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 14

Stripped overhead system

DESIGN INTENTION

To Supply Wild Naphtha to B/L.

DRAWINGS

CS-140-PR-15-0017, CS-140-PR-15-0020, CS-140-PR-15-0021

EQUIPMENT

Stripper Air Condenser(140-EA-002), Stripper Trim Condenser(140-EE-005),Stripper


Reflux Drum(140-V-008), Stripper Reflux Drum(140-V-008),Stripper Reflux Pumps(140-P004A/B)
Stripper Overhead is condensed and sent to B.L for storage. A part is sent back to column as reflux.

STREAM DETAILS

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESLC-542,FC-439,FC-441,LC-540


Operating Parameters

SERVICE
Temperature(C)
Stripper Reflux
Wild Naphtha to Storage
.

Pressure ( bar g)

Flow rate (Kg/hr)

45
45

9.5-11.5
6.0-11

9105
2956

Note:
Node
14. Stripper Overhead system

Deviation
1.

Low/No Flow

Causes
1. U/S disturbance(stripping
steam failure/Low feed inlet
temperature to C-002)

Consequences
1. Product quality may get affected
(Gas oil) due to poor stripping.

Safeguards

2. SC-011 is provided

2. P-004A/B trips(reflux)

Ref. No.

Recommendations

Responsibility

1. AI-003 is provided on 14.1.1.1.1


product line

1. V-008 level may go high

11 LC-540 is provided
with high alarm.

2. C-002 overhead pressure &


temp. may increase.

1.2 FC-439/441 is
provided with low alarm

14.1.2.1.1

2.1 PI-903 is provided


with high alarm.
2.2 PSV-319A/B is
designed for reflux failure
case
3. FC 439 malfunctions to close 1. Same as cause 2 consequence
FCV-439
1&2 of deviation less/no flow in this node.

2.

High Flow

4. FC 441 malfunctions to close 1. V-008 level may go high


FCV-441

1. LC-540 is provided
with high alarm.

5. LC-540 malfunction to close


LCV-540B/FCV-441

1. FC-441 is provided
with low alarm.

1. V-008 level may go high

1. FC 439 malfunctions to open 1. Column overhead temperature may come 1.1 SC-011 is provided
FCV-439
down which lead to gas oil product off
for sampling
spec(Flash point)
Low alarm at TI-192 is
provided.
2. V-008 level may come down

2.1 LC-540 is provided


with low alarm.

2. FC 441 malfunctions to open 1. V-008 level may go down


FCV-441

1. LC-540 is provided
with low alarm.

3. LC-540 malfunction to open


LCV-540B/FCV-441

1. V-008 level may go down

1. FC-441/FC-439 is
provided with Low alarm

2. Pump will loose suction.

2. Refer safeguards 2.1,


2.2 for cause 2, deviation
low/no flow in this node.

1. Reverse flow may occur from unit


160/200.

1. NRV is provided at
B.L.

4. Reverse/Misdirected
Flow

1. P-004 A/B trips

5.

1. D/S disturbance(PCV-394A/B 1. Carry over of diesel in stripper overhead. 2.1 LC-540 is provided
full open)
heavies in wild naphtha to unit -160/200.No
with high alarm
hazardous consequences

Low Pressure

2. P-004 discharge pressure will come down 2.2 FC-439 and FCleading to increase of level in V-008.
441are provided with low
alarm
8. High
Temperature

2. EA-002 trips

1. Heavier hydrocarbon carryover with Off


gas to upset C-003

1.1FI-438 is provide with


high alarm

2. Level of V-008 may come down which


leads to reflux failure,

2.1PI-903 is provided with


high alarm.

41. Operating procedure


should ensure draining of
hydrocarbon from C-003
through skim line during
failure of EA-002

DEC/NOCL

Remarks

8. High
Temperature

Node

Deviation

2. EA-002 trips

Causes

2. Level of V-008 may come down which


leads to reflux failure,
Consequences

Safeguards

Ref. No.

Recommendations

Responsibility

2.2PSV-319A/B is
designed for reflux failure
case
2.3TI-208 is provided with
high alarm
Power supply to EA-002
fan motors from different
sources is provided.

11. Problem/Requirements

12. Operation/Maintenance

3. Cooling water failure in EE005

1. Same as cause 2 consequence


1&2 above.

1. Tube leak in EE-005

1. Stripper over head will ingress in cooling


water line

2. Vibration in Air cooler (EA002) fans

1. Possible damage of EA-002 components 1. VA-005/006 is


provided with high alarm

9. Cooling water sample


analysis to be considered
during detail
engineering of OSBL
system

PMC/NOCL

Remarks

Flow rate (Kg/hr)


9105
2956

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

Nagarjuna Oil Corporation Ltd

NODE NO: 15

Makeup H2 Compressor System

DESIGN INTENTION

To make up Hydrogen supply to make-up Compressor.

DRAWINGS

CS-140-PR-15-0013, CS-140-PR-15-0014, CS-140-PR-15-0015

EQUIPMENT

Make Up Gas Compressor K.O.Drum (140-V-002), Make-up Compressor (140-K-001A/B), Make-up Compressor Inter stage Cooler (140-EE-008A/B), Make-Up Compressor Interstage K.O. Drum (140-V-003A/B).

STREAM DETAILS

Make up hydrogen comes from B.L. to K.O.Drum to remove any liquid content and compressed to 95 barg

Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMES


Operating Parameters

SERVICE
Temperature(C)
Hydrogen from B.L.
.

Pressure ( bar g)

Flow rate (Kg/hr)

45

20

2457

Note:
Node
15. Makeup H2
Compressor system

Deviation
1.

Low/No Flow

Causes
1. U/S disturbance

Consequences

Safeguards

1. Less/No hydrogen make up to reaction


section

1.1 FI-432 is provided


with low alarm.

2. Suction pressure of compressor may go


down

2.1 PC-383 is provided


with low alarm

Ref.

Recommendations

Responsibility

Remarks

2.2 PZ-385/PZ-956 LL
alarm will activate UZ707 to trip K-001A/B

Note-13 is provided in
P&ID stating that signals
from non running
compressor instruments
shall not be used for
control and trip of the
running compressor.

2. K-001A/B trips

1. No hydrogen make up to reaction section 1. Standby compressor


is available.

3. XZV-707 Malfunction to close 1. No hydrogen make up to reaction section 1.1 PC-974 is provided
with high alarm

2. Compressor discharge may experience


high pressure.

2.1 Spill back line is


provided.
2.2 FI-432 is provided
with low alarm

4. FC-431/PC-383/PC-974
malfunctions to open FCV431(Makeup line)

1. Less hydrogen make up to reaction


section

1. FI-432 is provided
with low alarm

5. FC-431/PC-383 /PC-974
malfunctions to close FCV431(Spill back line)

1. System pressure may go high

1. PC-974 is provided
with high alarm

2. PSV-316/317 is
provided.

2.

High Flow

4. Reverse/Misdirected
Flow

6. PC-922 malfunction to close


PCV-922(hydrogen to Unit2500)

1. No major concern as this line is


NNF.

7. PC-922 malfunction to open


PCV-922(Make up line)

1. System d/s PCV-922 may experience


high pressure.

1. FC-431/PC-383/PC-974
malfunctions to close FCV431(Makeup line)

1. Refer cause 5, Low/No flow in this node.

2. FC-431/PC-383 /PC-974
malfunctions to open FCV431(Spill back line)

1. Refer cause 4, Low/No flow in this node.

3. PC-922 malfunction to open


PCV-922(hydrogen to Unit2500)

1. Refer cause 7, Low/No flow in this node.

4. PC-922 malfunction to close


PCV-922(Make up line)

1. Refer cause 6, Low/No flow in this node.

1. K-001A/B trips.

1. Recycle gas may backflow in the system

2. U/S disturbance at Unit


1500(start up line to V-008)

1. Off gas may back up in the system

1. PSV-952A/B is
provided.

1. NRV is provided in
make up hydrogen line to
Recycle gas.
2. UZ-707 will close
XZV- 707
NRV is provided at the
junction of H-162 and P079 on line H-162.

1. Compressor
safeguards and
system should be
Hazoped when the
vendor information
is available during
detailed
engineering.

Node

Deviation
5.

Low Pressure

Causes
2. Compressor malfunctioning

Consequences
1. Less makeup hydrogen flow to
Reaction section

Safeguards

Ref.

Recommendations

Responsibility

1. PI-036/037 is
provided with low alarm

Remarks
1. To be
reviewed during
detail engineering
HAZOP when
vendor information
is available.

2. PZ-385A/956A is
provided with LL alarm to
activate UZ-707.

3. Note-13 is provided in
P&ID stating that signals
from non running
compressor instruments
shall not be used for
control and trip of the
running compressor.

6.

High Pressure

8. High
Temperature

2. Cooling water failure for EE008A/B

1. V-003A/B pressure may go high

1. PI-036/037 is
provided with high alarm.

1. Cooling water failure in EE008A/B

1. Compressor may get damage

1. TI-229/230provided
with high alarm.
2. TI-180/182 is
provided with High alarm.

3. TZ-181/183 HH alarm
will activate UZ-707.

4. Note-13 is provided in
P&ID stating that signals
from non running
compressor instruments
shall not be used for
control and trip of the
running compressor.

2. Compressor (K-001A/B)
malfunctions

1. Compressor may get damage

1. TI-231/233 is
provided with High alarm

2. TI-180/182 is
provided with High alarm.

3. TZ-181/183 HH alarm
will activate UZ-707.

4. TZ-232/234 HH alarm
Will activate UZ-707.

5. Note-13 is provided in
P&ID stating that signals
from non running
compressor instruments
shall not be used for
control and trip of the
running compressor.

3. Cooling water failure in EE004

1. Compressor may get damage

1. TI-178 is provided
with
HH alarm
2. TI-231/233 is
provided with High alarm

3. TI-180/182 is
provided with High alarm.

4. TZ-181/183 HH alarm
will activate UZ-707.

5. TZ-232/234 HH alarm
Will activate UZ-707.

4. Cooling water failure in EE009

1. Hydrogen to B.L will go at High


temperature, possible damage in d/s

1. TI-211 is provided
with high alarm

5. U/S disturbance

1. Compressor may get damage

1. TI-231/233 is
provided with High alarm

2. TI-180/182 is
provided with High alarm.

3. TZ-181/183 HH alarm
will activate UZ-707.

4. TZ-232/234 HH alarm
Will activate UZ-707.

10.

High Level

1. U/S disturbance

1. Compressor may get damage due to


carryover of liquid.

1. LI-527/562/565 is
provided with High alarm.
2. LZ-529/561/564 HH
alarm will activate UZ707 to trip compressor.

1. Consider CW
failure in EE-009
during detail
engineering of Unit2500.

45. Provide High alarm at


TI-176.

DEC

Node

Deviation

Causes

Consequences

Safeguards

Ref.

Recommendations

Responsibility

Remarks

3. Note-13 is provided in
P&ID stating that signals
from non running
compressor instruments
shall not be used for
control and trip of the
running compressor.

11. Problem/Requirements

12. Operation/Maintenance

1. Tube leak in EE004/008A/008B/009

1. Hydrogen may ingress in cooling water.


No major concern for
small leak. For major leak system will loose
hydrogen and compressor suction pressure
may go down.

1. PC-383 is provided
with low alarm

1.
Hydrogen
ingress in Cooling
water should be
considered during
detail engineering
of cooling water
system.

Flow rate (Kg/hr)


2457

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 16

Chemical Injection package

DESIGN INTENTION

Chemical injection to prevent Corrosion/undesirable upsets in process.

DRAWINGS

CS-140-PR-15-0023, CS-140-PR-15-0025

EQUIPMENT

Antifoaming Agent /Anti Oxidant /Sulfiding Agent/Anti foulant /Corrosion Inhibitor injection
System

STREAM DETAILS

Antifoaming Agent /Anti Oxidant /Sulfiding Agent/Anti foulant /Corrosion Inhibitor injection
System

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMES


Operating Parameters

SERVICE
Temperature(C)
Sulfiding Agent
Antifoulant
Corrosion Inhibitor Antifoaming
Anti Oxidant

Pressure ( bar g)

Flow rate (Kg/hr)

Ambient
Ambient
Ambient
Ambient
Ambient

1.5-7.5
0.0-4.0
0-10.8
0-11/12
0-7.5

1600
14.0
1.6
0.34/0.11
6.0

Note:
Node
16. Chemical Injection System

Deviation
1.

Low/No Flow

Causes
1. P-007A trips( during
sulfidation)

Consequences
1. Discharge pressure will go down.
Delaying in sulfiding process.

Safeguards

Ref.

Recommendations

Responsibility

Remarks

1. Sulfiding process is
attended activity, LG549 is provided for
monitoring.

2. Stop alarm in DCS is


provided for chemical
injection pumps.
2. P-008A trips

1. Discharge pressure will go down.


Reactor circuit may get fouled.

1. LG-550 is provided for


monitoring.

46. Operating procedure


should ensure periodical
checking of Chemical
injection pumps.

DEC/NOCL

46. Operating procedure


should ensure periodical
checking of Chemical
injection pumps.

DEC/NOCL

46. Operating procedure


should ensure periodical
checking of Chemical
injection pumps.

DEC/NOCL

46. Operating procedure


should ensure periodical
checking of Chemical
injection pumps.

DEC/NOCL

2. Stop alarm in DCS is


provided for chemical
injection pumps.
3. P-011A trips

1. Discharge pressure will go down.


Corrosion in stripper overhead circuit.

1. LG-539 is provided for


monitoring.

2. Stop alarm in DCS is


provided for chemical
injection pumps.
4. P-010A trips

1. Discharge pressure will go down.


Possible Foaming in C-001/003

1. LG-546 is provided for


monitoring.

2. Stop alarm in DCS is


provided for chemical
injection pumps.
5. P-012A/B

1. Discharge pressure will go down.


Possible gum formation in product

1. LG-555 is provided for


monitoring.

2. Stop alarm in DCS is


provided for chemical
injection pumps.

2.

High Flow

4. Reverse/Misdirected
Flow

6. Nitrogen failure

1. Discharge pressure will go down.


Possible detoriation of chemicals due to air
ingress.

1. DEC should
ensure the
requirement of
nitrogen
blanketing during
detail
engineering.(local
environmental
regulations)

1. High stroke in P-007A

1. Possible damage/reduced life of reactor


catalyst.

1. Sulfiding process is a
attended activity.

1. Reverse flow from unit 400

1. possible contamination

NRV is provided on line CC020 near B.L.

2. Reverse flow from P-001


suction line.

1. Reactor circuit may get fouled.

1.1 NRV is provided on the


line

1. Draining of
the OSBL line to
be reviewed
during detail
engineering of
Unit 400.

2. Delay in sulfiding process(during sulfiding 2.1 NRV is provided on the


operation)
line
3. Reverse flow from C-002
overhead.

1. Stripper overhead backflows.

1. NRV is provided on the


line

4. Reverse flow P-003 Suction


line/C-003

1. Lean amine backflows

1. NRV is provided on the


line

1. Ensure in
detail engineering
that mixing point
of antifoam agent
is close to P003A/B suction.

Node

Deviation

Causes

Consequences

Safeguards

5. Reverse flow of gas oil


product to P-012A

1. Gas oil backflows to anti oxidant drum.

1. NRV is provided on the


line.
1. PSV304/305/971/932/322

6.

High Pressure

1. D/S disturbance

1. less/no flow of chemicals

9.

Low Level

1. low level in tanks

1. Pump will run dry.

Ref.

Recommendations

49. Operating procedure


should ensure proper
checking of levels in
chemical injection tanks.

Responsibility

DEC/NOCL

Remarks

Flow rate (Kg/hr)


1600
14.0
1.6
0.34/0.11
6.0

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 17

Fuel oil, Fuel gas and Heater Firing system.

DESIGN INTENTION

To Supply fuel gas/fuel oil to reactor fire heater.

DRAWINGS

CS-140-PR-15-0024, CS-140-PR-15-0026

EQUIPMENT

Hydro treating reactor feed Heater (140-H-001)

STREAM DETAILS

Heater is Dual fired

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMESPC-802,PC-823,UC-001


Operating Parameters

SERVICE
Temperature(C)
Fuel Gas
Fuel Oil

Pressure ( bar g)

Flow rate (Kg/hr)

25
180

3.5
11

416
615

Note:
Node
17. Fuel oil, Fuel gas and
Heater Firing System

Deviation
1.

Low/No Flow

Causes
1. PC -802 malfunctions to
close
PCV-802(fuel gas line)

Consequences

Safeguards

1. Loss of firing of fuel gas may lead to


process upset

1. Fuel oil is provided as


alternate fuel to provide
adequate firing from
UC-001.

2. Fuel gas pressure may come down.

2. PZ-821 is low low alarm to


activate UZ-718.

2. XZV-718A/C malfunctions to
close(fuel gas line)

1. Same as Cause 1 above.

3. XZV-718E/F malfunctions to
close(pilot gas line)

1. Pilot flame will loss

1. Pilot flame scanner (BZS001/002/003) is provided

2. PZ-823 is provided with low


low alarm to
activate UZ-718.
4. PC-823 malfunctions to close 1. Loss of firing of fuel oil may lead to
PCV-823A(Fuel oil line)
process upset

2. Fuel oil pressure may come down.

5. XZV-718N malfunctions to
close(Fuel oil line)

1. Same as Cause 4 above.

6. PDC-826 malfunctions to
close
PCV-826

1. Loss of fuel oil flame


2. Fuel oil spillage in heater leading to
burner tip choking.

1. Fuel gas is provided as


alternate fuel to provide
adequate firing from
UC-001.

2. PZ-858 is provided with low


low alarm to
activate UZ-718.

1. PDZ-860 is provided with


low low alarm to activate UZ718.

3. Steam pressure may come down


7. U/S disturbance in fuel gas

1. Refer cause 1,Consequence 1

Low alarm is provided at PI-854


B.L .

8.

1. Refer cause 4,Consequence 1

Addtional pressure transmitter


with low alarm in DCS is
provided.

9. U/S disturbance in atomizing 1. Refer cause 6, Consequence 1


Steam line

1. PI-808 is provided with low


alarm.

10. Strainer choking.

1. PDI -827 is provided with


high alarm(Fuel gas line)

U/S disturbance in fuel oil

1. Possible loss of fuel may lead to flame


failure.

2. PDI-857 is provided with


high alarm(Fuel oil line)

3. All strainers are provided


with spare for change over.

11. PC-899/HCV-830
malfunctions to close.

1. Box pressure will increase.

1.1 PZ-900 is provided with HH


alarm to activate to trip UZ-718.

2. Less air flow may lead to incomplete


combustion.

2.1 AI-004 provided for


monitoring.

3. Box temperature likely to increase

3.1 (3.1)TI-102 is provided with


high alarm.
O2/CO analyzer (For
combustion control), Two
Pollution Monitoring Nozzles for
monitoring purpose are
provided.

12. 180-FA-001C/D Choking

1. Unit 1800 may get disturbed.

1. PDI-010 is provided with


high alarm
2. Spare Flame arrestor is
provided.

2.

High Flow

1. PC-823 malfunctions to open 1. Possible Improper atomization may lead


PCV-823A(Fuel oil line)
to flame loss.

1.1 (PDZ-860 with LL alarm will


activate UZ-718.

Ref.

Recommendations

Responsibility

Remarks

2.
Node

High Flow
Deviation

1. PC-823 malfunctions to open


PCV-823A(Fuel
oil line)
Causes

Consequences
2. Spillage at burner tip leading to burner
choking.

Safeguards

Ref.

Recommendations

Responsibility

Remarks

3.1 PZ-858 with HH alarm will


activate UZ-718.

3. Fuel oil pressure will increase and it may


back flow in steam line
NRV is provided on steam line
to each burner after shut down
valve.
2. PC -802 malfunctions to
open
PCV-802(fuel gas line)

1. Flame lifting may occur, leading to higher 1. TI-121/122 is provided with


Tube metal temperature.
high alarm
2. Fuel gas line operating pressure will
increase

3. PDC-826 malfunctions to
open
PCV-826

4. PC-899/HCV-830
malfunctions to open.

2. PZ-821 HH alarm will


activate UZ-718 to trip heater.

1. Flame lifting may occur, leading to higher 1. TI-121/122 is provided with


Tube metal temperature.
high alarm
2. Steam line operating pressure will
increase

2. High alarm at PI-863 is


provided.

1. Fuel efficiency may decrease.

1. Oxygen analyzer AI-004 is


provided for monitoring

2. Draft will be increased, no major concern. 2. PI-048 is provided for


monitoring.
5.

Low Pressure

7. Low
Temperature

3. U/S disturbance (off gas


from
LPG Merox)

1. Flame may propagate back to line

1. Flame Arrester 180-FA001 is provided.

1. U/S disturbance (fuel gas


line)

1. Carryover of condensate with


1. Steam tracing is provided
fuel gas line leading to choking of the burner d/s V-025

2. U/S disturbance (fuel oil line) 1. Improper atomization may lead to sooty
flame(incomplete combustion)

Low alarm at TI-832 is


provided.

3. Steam tracing failure in fuel


oil line.

1. Improper atomization may lead to sooty


flame(incomplete combustion)

Low alarm at TI-832 is


provided.

8. High
Temperature

1. U/S disturbance (Fuel oil


supply)

1. Vapor lock of burner may occur.

10.

1. High level in V-025

1. Liquid may carry over with fuel gas

High Level

1. It is
assumed that
Fuel oil is
homogenous
mixture.

1. LI-807 is provided with


High alarm
2. LZ-810 HH alarm will
activate UZ-718.

11. Problem/Requirements

1. Heavies in fuel gas

1. Improper firing and possible burner


choking.

1. V-025 is provided

2. Low/No flow of M.P


steam(during decoking/dry out
operation)

1. Hot spot may appear

1. FI-409A is provided with low


alarm
2. TI-121/222 is provided with
high temp.alarm

12. Operation/Maintenance

56. Operating procedure DEC/NOCL


should ensure draining of
hydrocarbon from V-025
periodically.

57. Standard operating DEC/NOCL


procedure to be made for
decoking/dry out
operation.

Flow rate (Kg/hr)


416
615

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 18

HP/MP Steam & MP BFW

DESIGN INTENTION

To supply HP steam ,MP steam and MP BFW

DRAWINGS

CS-140-PR-15-0030, CS-140-PR-15-0024, CS-140-PR-15-0004, CS-140-PR-15-0012, CS-140-PR-15-0011, CS-140-PR-15-0017

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

EQUIPMENT

Hydrotreater Reactor Feed Heater (140-H-001),Start-Up Ejector (140-J-001),Recycle


Compressor Steam Turbine (140-KT-01),MP Steam Desuperheater (140-DS-001)

STREAM DETAILS

HP steam, MP Steam and MP BFW will be supplied from B/L to Unit. HP steam will be send to RGC Turbine from where it converts to MP steam and some amount send to Stripper column and rest is send to the return header of MP
steam via desuperheater.

AVAILABLE CONTROL SCHEMESSCV-002,TCV-239


Operating Parameters

SERVICE
Temperature(C)
HP STEAM
MP STEAM
MP BFW

Pressure ( bar g)

388
184
128

Flow rate (Kg/hr)


53.5
10
24

27437
1500
7687

Note:
Node
18. HP/MP Steam
& MP BFW

Deviation
1.

Low/No Flow

Causes
1. U/S disturbance (HP Steam
Failure)

2. 1. U/S disturbance (MP Steam


Failure)

3.

U/S disturbance (MP BFW Failure)

Consequences

Safeguards

1. KT-002 trips

1. PI-810 is provided
with low alarm.

2. MP steam go back to stripper from main


header via DS-001

1. Shutdown of DS-001
is considered when
KT-002 trips

1. No supply of atomization of fuel oil in


Fired heater

1. FI-804 is provided
with low alarm

2. No supply of MP steam for decoking


when required

2. PI-808 is provided
with low alarm.

1. MP steam temp. Will be high.

4. TC-239 malfunctions to close


TCV-239

1. Same as cause 3 consequence1 above.

Ref.

Recommendations

Responsibility

Remarks

1. To be
reviewed during
detail engineering
HAZOP when
vendor
information is
available.

2.

High Flow

1. TC-239 malfunctions to open


TCV-239

1. BFW may enter MP steam line header


leading to hammering.

1. Steam trap is
provided.

5.

Low Pressure

1. U/S disturbance (HP Steam


Failure)

1. KT-002 may get tripped

1. PI-810 is provided
with low alarm.
2. Shutdown of DS-001
is considered when
KT-002 trips

2. 1. U/S disturbance (MP Steam


Failure)

1. Atomization of fuel oil in Fired heater may 1.1 FI-804 is provided


get affected.
with low alarm
1.2 High alarm at PI863 is provided.
2. No supply of MP steam for decoking
when required

3.

6.

High Pressure

U/S disturbance (MP BFW Failure)

2.1 PI-808 is provided


with low alarm.

1. MP steam temp. will be high.

1. To be
reviewed during
detail engineering
HAZOP when
vendor
information is
available.

1. U/S disturbance (HP Steam high


header pressure)

1. KT-002 may get tripped

1. PI-810 is provided
with high alarm.

2. 1. U/S disturbance (MP Steam high


header pressure )

1. Atomization of fuel oil in Fired heater may 1. FI-804 is provided


get affected. Refer cause 3, Consequence 1 with high alarm
of deviation high flow of node 17.

1. To be
reviewed during
detail engineering
HAZOP when
vendor
information is
available.

2. PI-808 is provided
with high alarm.

3. U/S disturbance (MP BFW


high pressure)

1. No major concern

1. To be
reviewed during
detail engineering
HAZOP when
vendor
information is
available.

27437
1500
7687

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

Nagarjuna Oil Corporation Ltd

NODE NO: 19

Cooling Water

DESIGN INTENTION

Cooling water supply to exchangers

DRAWINGS

CS-140-PR-15-0032

EQUIPMENT

Reactor Effluent trim cooler(140-EE-003),Hydrogen cooler(140-EE-009), Hydrogen makeup kick back cooler(140-EE-004), Make up compressor interstage cooler (140-EE-008A/B),

Diesel hydro Desulphurization unit

Stripper trim condenser(140-EE-005),Gas oil trim cooler(140-EE-007)


STREAM DETAILS

Cooling water is supplied to all cooling water exchangers from B/L and similarly cooling water return from all exchangers to header

AVAILABLE CONTROL SCHEMESPC-330,LC-501,LC-505,FC-407A/B,FC-408,TC-119,FCV-436


Operating Parameters

SERVICE
Temperature(C)
Cooling water supply
Cooling water return

Pressure ( bar g)

Flow rate (Kg/hr)

33
44

4
3

688411
688411

Note:
Node
19. Cooling water system

Deviation
1.

Low/No Flow

8. High
Temperature

11. Problem/Requirements

12. Operation/Maintenance

Causes

Consequences

Safeguards

1. U/S disturbance

1. Cooling water exchangers will be starved 1. PI-816 is provided


with low alarm

1. U/S disturbance

1. Desired cooling of process stream is not


achieved in water cooled exchangers

1.1 High temp. alarm on


process outlet side is
provided on all critical
cooling water
exchangers

2. Expected high return temperature of


cooling water

2.1 TI-818 is provided


with high alarm

1. Insufficient cooling in some exchangers

Hydraulic Check is
carried out based on
actual plant layout.

1. Possibilities of cooling water


misdistribution

Ref.

Recommendations

Responsibility

Remarks

1. Operation to
ensure proper
distribution of
cooling water
during startup

Flow rate (Kg/hr)


688411
688411

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 20

Portable/Service Water, LP Steam, Plant /Instrument Air and Nitrogen

DESIGN INTENTION

To supply Portable/Service Water, LP Steam, Plant /Instrument Air and Nitrogen

DRAWINGS

CS-140-PR-15-0031, CS-140-PR-15-0033, CS-140-PR-15-0034

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

EQUIPMENT
STREAM DETAILS

Portable/Service Water, LP Steam, Plant /Instrument Air and Nitrogen will be supplied from
B/L to Hose station.

AVAILABLE CONTROL SCHEMESPC-330,LC-501,LC-505,FC-407A/B,FC-408,TC-119,FCV-436


Operating Parameters

SERVICE
Temperature(C)
LP steam
Service water
Potable water
Plant air
Instrument air
Nitrogen

Pressure ( bar g)

152
Amb.
Amb.
Amb.
Amb.
Amb

Flow rate (Kg/hr)


4
3
3
4.9
6.1
8

2818
1000(1)
1000(1)
518
215
430(2)

Note:1- Confirmed by DEC


2. Flow rate is based on startup and shutdown requirement

Node
20. Portable/Service Water, LP
Steam,
Plant/Instrument Air
and Nitrogen

Deviation
1.

Low/No Flow

Causes

Consequences

1. U/S disturbance(Potable
water)

1. Water is not available at eye wash


fountain and for drinking

2. U/S disturbance(Service
water)

1. All hose stations will run dry. No major


concern.

3. U/S disturbance(Plant Air)

1. Plant air will not be available at hose


stations. No major concern.

Safeguards

Ref.

Recommendations

Responsibility

Remarks

Low alarm on PI-818


is provided.

2. Plant air is not available for decoking of


heater when required. No major concern.

4. U/S disturbance(Instrument 1. Instrument air pressure will come down


Air)
leading to unit shut down

5. U/S disturbance(Nitrogen)

6.

6.

High Pressure

1. No/low pressure of nitrogen for blanketing 1. PI-806 is provided


and purging, may lead to hazards
with low alarm.

U/S disturbance(LP Steam) 1. No/Low flow in header will result in low


pressure of snuffing/purging steam available
when required

1. U/S Disturbance(LP steam)

1. PI-802 is provided
with low alarm.

1. System may experience higher than the


operating pressure

1. PI-846 is provided
with low alarm.

1. PI-846 is provided
with high alarm.

1.
Safeguards
to be
reviewed
during
detail
engineering
when
complete
information
is available

Flow rate (Kg/hr)


2818
1000(1)
1000(1)
518
215
430(2)

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

Nagarjuna Oil Corporation Ltd

NODE NO: 21

Flare System

DESIGN INTENTION

To vent PSV discharge gases to main flare header

DRAWINGS

CS-140-PR-15-0037, CS-140-PR-15-0038

EQUIPMENT

Flare K.O drum(140-V-023), Flare K.O drum pump(140-P-015A/B)

STREAM DETAILS

PSV discharge collected in Flare K.O drum (140-V-023) where liquid and gaseous phase is separated .Liquid HC is sent to slop header through flare K.O. drum pump (140-P-015A/B) and gaseous HC is sent to main flare header for burning.

Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMES


Operating Parameters

SERVICE
Temperature(C)
Flare Gas From Flare
KOD to Flare header
Flare KOD/CBD Pump to
Slops Tank

Flare system

1.

9.

Low/No Flow

Low Level

Flow rate (Kg/hr)


0.25

45

57

5.5

57

Note:1- Confirmed by DEC


2. Flow rate is based on startup and shutdown requirement
Node
Deviation
21.

Pressure ( bar g)

45

Causes

Consequences

Safeguards

1. U/S disturbance(No flow of


fuel gas to flare header)

1. Possible air ingress in flare header

2. LS-806 malfunctions to trip


P015A/B

1. V-023 level may increase leading to liquid 1. LI-805 provided with


overloading in flare header and downstream high alarm.
system.

1. LS-806 malfunctions ,not


stopping the pump-015A/B.

1. Pump will run dry.

Ref.

Recommendations

Responsibility

Remarks

Low alarm at PI-854


(located at B.L.) is
provided.

1. LI-805 is provided with


low alarm.

1. Review of
US-731 to be
done during
detail
engineering.

Flow rate (Kg/hr)


45
57

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

Nagarjuna Oil Corporation Ltd

NODE NO: 22

Amine System

DESIGN INTENTION

To collect drained Amine

DRAWINGS

CS-140-PR-15-0043, CS-140-PR-15-0044

EQUIPMENT

Amine drain drum (140-V-022), Amine drain drum pump (140-P-014A/B)

STREAM DETAILS

Amine effluent collected in Amine drain drum (140-V-022) where liquid and gaseous phase is separated .Liquid HC is sent to ARU Unit through amine drain pump( 140-P-014A/B) and gaseous HC is sent to flare header for burning.

Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMES


Operating Parameters

SERVICE
Temperature(C)

Pressure ( bar g)

57

Amine

Flow rate (Kg/hr)

0.25

27634

Note:
Node
22. Amine drain system

Deviation
1.

Low/No Flow

Causes

Consequences

Safeguards

1. LS-801 malfunctions, not


starting P-014A

1. Level of V-022 will increase

LI on V-022 is
provided.

4. Reverse/Misdirected
Flow

1. P-014A trips

1. Rich Amine may backup to V022 from ARU

1. NRV is provided
at pump discharge.

9. Low Level

1. LS-801 malfunctions ,not


stopping the pump-014A

1. Pump may run dry

LI on V-022 is
provided.

11. Problem/Requirements

1. Purging of V-022 with nitrogen 1. May lead to hazard affecting plant


personnel and property.

12. Operation/Maintenance

Separate nitrogen
connection to the
drum as well as
separate vent to flare
line with lock open
valve and NRV is
provided.

Ref.

Recommendations

Responsibility

Remarks
1. Review of US-733 to
be done during detail
engineering.

Flow rate (Kg/hr)

27634

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

Nagarjuna Oil Corporation Ltd

NODE NO: 23

Hydrocarbon drain system

DESIGN INTENTION

To collect drained hydrocarbon from different equipments

DRAWINGS

CS-140-PR-15-0039, CS-140-PR-15-0040

EQUIPMENT

Hydrocarbon drain drum (140-V-021), Closed drain drum pumps (140-P-013A/B)

STREAM DETAILS

HC effluent collected in HC drain drum 140-V-021 where liquid and gaseous phase is separated .Liquid HC is sent to SLOP through closed drain pump 140-013A/B and gaseous HC is sent to flare header for burning.

Diesel hydro Desulphurization unit

AVAILABLE CONTROL SCHEMES


Operating Parameters

SERVICE

Temperature(C)

Hydrocarbon

Pressure ( bar g)
40

Flow rate (Kg/hr)


0.25

7500

Note:
Node
23. Hydrocarbon drain system

Deviation
1.

Low/No Flow

Causes

Consequences

Safeguards

1. LS-802 malfunctions, not


starting P-013A

1. Level of V-021 will increase

LI on V-021 is
provided.

4. Reverse/Misdirected
Flow

1. P-013A trips

1. HC may backup to V-021 from slops


header

1. NRV is provided
at pump discharge.

8. High
Temperature

1. Draining hot HC material

1. System may experience higher than the


design temperature

1. TI-820 is provided
with high alarm

9.

1. LS-802 malfunctions ,not


stopping the pump-013A

1. Pump may run dry

LI on V-021 is
provided.

1. Purging of V-021with
nitrogen

1. May lead to hazard affecting plant


personnel and property.

Separate nitrogen
connection to the
drum as well as
separate vent to flare
line with lock open
valve and NRV is
provided.

Low Level

11. Problem/Requirements

12. Operation/Maintenance

Ref.

Recommendations

Responsibility

Remarks
1. Review of US-732 to
be done during detail
engineering.

66. Operating procedure


should prevent draining of hot
hydrocarbon in Hydrocarbon
drain drum.

DEC/NOCL

Flow rate (Kg/hr)


7500

HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd

Client

PROJECT NO

: SO 2331

Project :

NODE NO: 24

Condensate collection system

DESIGN INTENTION

To collect condensate from different traps

DRAWINGS

CS-140-PR-15-0041

Nagarjuna Oil Corporation Ltd


Diesel hydro Desulphurization unit

EQUIPMENT
STREAM DETAILS

Condensate from steam traps is collected in LP/MP/HP headers & drained to ND after cooling

AVAILABLE CONTROL SCHEMES


Operating Parameters

SERVICE

Temperature(C)

Flow rate (Kg/hr)

Pressure ( bar g)

1030
Condensate (Water) in LP/MP
condensate header
Condensate (Water) in HP
condensate header

102

0.1

102

0.1

350

Note:
Node
24. Condensate Collection
system

Deviation

Causes

Consequences

Safeguards

Ref.

Recommendations

Responsibility

Remarks

Flow rate (Kg/hr)


1030
350