Professional Documents
Culture Documents
Samsung Engineering
Client
PROCESS
SO2331
S646-140-RT-00-04
Plant
Dept.
Project
Document Number
OWNER
PMC
LICENSOR
FEED CONTRACTOR
:
:
:
:
0
Rev.
06.12.10
REV.
DATE
DESCRIPTION
PREPARED BY
CHECKED BY
APPROVED BY
PM
Client
PROCESS
S646
Plant
Dept.
Project
Contents
1. Introduction ...4
1.1. Introduction 4
1.2. Objective.....4
2. Methodology..5
2.1. The HAZOP
S646-140-RT-00-04
Document Number
Rev.
...4
4
...4
..5
Client
PROCESS
S646
Plant
Dept.
Project
Executive Summary
M/S Nagarjuna oil Corporation Ltd (NOCL) intends to install as Diesel Hydrodesulphurization Unit, (DHU, Unit 1400) in its
Cuddalore Refinery Project. The unit will be located in Cuddalore, Tamil Nadu, India. The unit will be treating a
S646-140-RT-00-04
Document Number
Rev.
Client
PROCESS
S646
Plant
Dept.
Project
1. Introduction
1.1 Introduction
M/S Nagarjuna oil Corporation Ltd (NOCL) intends to install as Diesel Hydrodesulphurization Unit, (DHU, Unit 1400) in its
Cuddalore Refinery Project. The unit will be located in Cuddalore, Tamil- Nadu, India. The unit will
S646-140-RT-00-04
Document Number
Rev.
Client
PROCESS
S646
Plant
Dept.
Project
2. HAZOP METHODOLOGY
2.1
THE HAZOP PROCESS
HAZOP is a qualitative method that reviews plant design to identify design faults and omissions, potential hazards and
operating problems. This technique applies guide words to process parameters to create
S646-140-RT-00-04
Document Number
Rev.
Client
PROCESS
S646
Plant
Dept.
Project
2.2
HAZOP ASSUMPTIONS
In Order to make HAZOP study more effective, complete and efficient following postulates were followed.
x
Wherever possible, causes will be identified in the Node under consideration.
x
Consequences
S646-140-RT-00-04
Document Number
Rev.
Client
PROCESS
S646
Plant
Dept.
Project
S646-140-RT-00-04
Document Number
Rev.
Client
PROCESS
S646
Plant
Dept.
Project
a) Causes
x All the potential causes of the deviation will be identified (by brainstorming).
x The credibility of each cause will be agreed upon.
x Only credible causes will be considered. Incredible or highly unlike
g).
S646-140-RT-00-04
Document Number
Rev.
GUIDE WORD
PARAMETER
NO
MORE
LESS
AS WELL
AS
PART OF
REVERSE
FLOW *
PRESSURE *
TEMPERATURE *
LEVEL
PHASE
COMPOSITION (SPECIFIC
COMPONENT)
OPERATION **
OTHER
THAN
y
y
n
n
y
y
y
* Normal Parameters
** Start-up / shutdown, isolation philosophy, different operating modes, maintenance access,
blow down, etc.
Not Used
Normally
Used
n
y
Client
PROCESS
S646
Plant
Dept.
Project
Most hazards will be protected against by a combination of hardware, instrumentation and / or operating practices.
Protection may be provided by a combination of the following:
x The intrinsic mechanical strength of the plant
x Process control respo
S646-140-RT-00-04
Document Number
Rev.
Client
PROCESS
S646
Plant
Dept.
Project
2.4
HAZOP SOFTWARE
Specialized software is used to record the proceedings of the HAZOP study in the form of work sheets. The software used is
PHA-Pro-VIII from Dyadem international.
S646-140-RT-00-04
Document Number
Rev.
Client
PROCESS
S646
Plant
Dept.
Project
dy:
OP study.
S646-140-RT-00-04
Document Number
Rev.
Node No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
Node Description
Client
PROCESS
S646
Plant
Dept.
Project
S646-140-RT-00-04
Document Number
Rev.
S.No.
Title
Document No.
C450-1400-PB-REV0
Plot Plan
CK-140-PI-16-0001,Rev1
CK-140-PR-15-0001 to 0027-Rev1
CK-140-PR-15-0030 to 0040,Rev1
CK-140-PR-15-0043 to 0044 ,Rev1
Equipment List
CK-140-PR-50-0001-Rev1
10
CK-140-PR-50-0008-Rev1
11
CK-140-EL-12-0001-Rev 0
13
CK-140-PR-24-0001,Rev1
14
Safeguarding Memorandum
CK-140-PR-45-0001,Rev 1
12
Client
PROCESS
S646
Plant
Dept.
Project
The HAZOP was carried out from 13th July to 17th July 2009.A team of experienced engineers from Process,
Operations/Commissioning and Engineering were formed the list of participants is as below:
HAZOP Chairman: Mr. Madan Kumar Sinha, Techn
S646-140-RT-00-04
Document Number
Rev.
LCM
Full Time
Full Time
Mr.
Mr.
Part Time
Mr.
NOCL
Full Time
Mr.
Client
PROCESS
S646
Plant
Dept.
Project
4. RECOMMENDATIONS
The total number of recommendations adds to 67.The HAZOP recommendation can be classified into three categories for
engineering, monitoring and tracking action completion.
Soft- The software recommendation mainly includes alarms on vari
S646-140-RT-00-04
Document Number
Rev.
Client
PROCESS
S646
Plant
Dept.
Project
The recommendations of HAZOP study is listed below (For category wise list refer to Annexure I):
S.No
Recommendations
P&ID no
Responsibility
CK-140-PR15-0001
CK-140-PR15-0002
DEC
CK-140-PR15-0002
CK-140-PR15-0002
DEC
CK-140-PR15-0004
CK-140-PR15-0004
DEC
CK-140-PR15-0010, CK140-PR-150016
2
3
5
6
7
10
11
12
13
14
DEC/NOCL
DEC
DEC
DEC/NOCL
DEC
PMC/NOCL
CK-140-PR15-0008
CK-140-PR15-0008
DEC
DEC/NOCL
DEC/NOCL
DEC
DEC/NOCL
15
DEC/NOCL
16
DEC
CK-140-PR15-0007
S646-140-RT-00-04
Document Number
Rev.
Status
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
Client
PROCESS
S646
Plant
Dept.
Project
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
CK-140-PR15-0017
Provide High alarm on TICK-140-PR190.
15-0017
Operating procedure to include
CK-140-PRoperation of HS-822 to select FCV- 15-0012
423 to purge H2S to flare header
DEC
CK-140-PR15-0007
CK-140-PR15-0010
DEC
DEC
DEC
CK-140-PR15-0009
CK-140-PR15-0010
CK-140-PR15-0016
CK-140-PR15-0010, CK140-PR-150016
CK-140-PR15-0010, CK140-PR-150016
CK-140-PR15-0010
DEC
DEC/NOCL
DEC/NOCL
DEC/NOCL
DEC
DEC
DEC/NOCL
DEC
DEC
DEC/NOCL
CK-140-PR15-0016
DEC/NOCL
32
DEC
33
DEC
CK-140-PR15-0016
S646-140-RT-00-04
Document Number
Rev.
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
Client
PROCESS
S646
Plant
Dept.
Project
Provide NRV on line P-806 close to CK-140-PRthe meeting point with line DA-012. 15-0016
DEC
CK-140-PR15-0016
CK-140-PR15-0001
CK-140-PR15-0017
DEC
CK-140-PR15-0022
CK-140-PR15-0022
DEC
CK-140-PR15-0022
DEC/NOCL
40
CK-140-PR15-0017
DEC
DEC/NOCL
41
DEC/NOCL
CK-140-PR15-0014&15
DEC/PMC
CK-140-PR15-0021
DEC
DEC
34
35
36
37
38
39
42
43
44
45
46
DEC
DEC
DEC/NOCL
47
48
DEC
CK-140-PR15-0023
DEC
S646-140-RT-00-04
Document Number
Rev.
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
Client
PROCESS
S646
Plant
Dept.
Project
49
50
CK-140-PR15-0026
DEC
CK-140-PR15-0035
CK-140-PR15-0004
CK-140-PR15-0024
DEC
CK-140-PR15-0024
CK-140-PR15-0024
DEC
51
52
53
54
55
56
57
58
59
60
61
62
63
64
DEC/NOCL
DEC
DEC
DEC
DEC/NOCL
DEC/NOCL
DEC
DEC
DEC/NOCL
DEC
DEC
DEC
DEC
65
66
CK-140-PR15-0040
DEC
DEC/NOCL
S646-140-RT-00-04
Document Number
Rev.
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
To be incorporated by DEC
Client
PROCESS
S646
Plant
Dept.
Project
67
DEC
S646-140-RT-00-04
Document Number
Rev.
To be incorporated by DEC
S. No.
Recommendation
(A)
Hard
DEC
8.Hydrocarbon skimmer for both HP & LP amine absorber (C-001 and C-003) to be routed to CBD instead
of amine drain.
25.Provide additional LI with HH alarm at C-001 bottom.
DEC
29.The valve in HC Skimming line for C-001 to be changed to Spring loaded type.
DEC
DEC
34.Provide NRV on line P-806 close to the meeting point with line DA-012.
DEC
DEC
DEC/NOCL
DEC
10
DEC
11
DEC
12
DEC
13
53.Provide NRV on steam line to each burner after shut down valve.
DEC
14
59.Provide steam trap in MP Steam line to take care this situation during detail engineering.
DEC
15
DEC
16
64.Separate nitrogen connection to the drum as well as separate vent to flare line with lock open valve and DEC
NRV to be provided.
65.Provide one additional LI on V-021.
DEC
17
18
Responsibility
DEC
67.Separate nitrogen connection to the V-021 as well as separate vent to flare line with
lock open valve and NRV to be provided.
Soft
DEC
(B)
1
DEC
DEC
4.Pump to be selected suitably to provide safety margin for NPSH requirements during detail engineering.
DEC
DEC
DEC
DEC
DEC
P&ID No.
CK-140-PR-15-0010 & 16
CK-140-PR-15-0010
CK-140-PR-15-0010 & 16
CK-140-PR-15-0010
CK-140-PR-15-0016
CK-140-PR-15-0016
CK-140-PR-15-0016
CK-140-PR-15-0021
CK-140-PR-15-0023
CK-140-PR-15-0026
CK-140-PR-15-0004
CK-140-PR-15-0024
CK-140-PR-15-0030
CK-140-PR-15-0044
CK-140-PR-15-0044
CK-140-PR-15-0040
CK-140-PR-15-0040
CK-140-PR-15-0001
CK-140-PR-15-0002
CK-140-PR-15-0002
CK-140-PR-15-0004
CK-140-PR-15-0004
CK-140-PR-15-0008
CK-140-PR-15-0006
S. No.
Recommendation
Responsibility
DEC
DEC
DEC
DEC
DEC
DEC
DEC
15 36.Include start permissive as a part of safe guarding system for Pump P-005A/B.
DEC
DEC
17 38.Provide Pressure transmitter with low alarm d/s V-019, before FCV-442 on line P103.
DEC
DEC
19 43.PID should contain a note that signals from non running compressor instruments shall not be used for
control and trip of the running compressor.
DEC/PMC
DEC
21 47.Provide
DEC
22
DEC
23
DEC
24
DEC
25
DEC
26
DEC
27
62.Hydraulic check should be carried out during detail engineering based on actual plan
layout.
DEC
P&ID No.
CK-140-PR-15-0007
CK-140-PR-15-0017
CK-140-PR-15-0017
CK-140-PR-15-0007
CK-140-PR-15-0009
CK-140-PR-15-0016
CK-140-PR-15-0016
CK-140-PR-15-0017
CK-140-PR-15-0022
CK-140-PR-15-0022
CK-140-PR-15-0017
CK-140-PR-15-0014&15
CK-140-PR-15-0013
CK-140-PR-15-0035
CK-140-PR-15-0024
CK-140-PR-15-0024
CK-140-PR-15-0030
CK-140-PR-15-0033
S. No.
Recommendation
Responsibility
(C )
Operating Instructions
DEC/NOCL
DEC/NOCL
PMC/NOCL
DEC/NOCL
DEC/NOCL
DEC/NOCL
DEC/NOCL
DEC/NOCL
21.Operating procedure to monitor LG-522 for HC carry over. When HC level builds up it should be drained
to CBD by using Skim line.
DEC/NOCL
10
DEC
11
23.Operating procedure should ensure routing of off gas to flare header when there is
disturbance in lean amine supply to C-003.
DEC/NOCL
12
27.Operating procedure to ensure to check LG 533 &LG-522 and drain out the HC
through Skim line.
DEC/NOCL
13
DEC/NOCL
14
DEC/NOCL
15
DEC/NOCL
16
41.Operating procedure should ensure draining of hydrocarbon from C-003 through skim line during failure
of EA-002
DEC/NOCL
17
DEC/NOCL
18
DEC/NOCL
19
DEC/NOCL
20
DEC/NOCL
21
DEC/NOCL
22
DEC/NOCL
P&ID No.
CK-140-PR-15-0002
CK-140-PR-15-0008
CK-140-PR-15-0006
CK-140-PR-15-0006
CK-140-PR-15-0021
CK-140-PR-15-0012
CK-140-PR-15-0010
CK-140-PR-15-0009
CK-140-PR-15-0010 & 16
CK-140-PR-15-0016
CK-140-PR-15-0016
CK-140-PR-15-0022
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 01
DESIGN INTENTION
To Supply Gas Oil Feed from Unit B/L to Feed Surge Drum through Back Wash Filter.
DRAWINGS
CS-140-PR-15-001, CS-140-PR-15-002
EQUIPMENT
STREAM DETAILS
Gas Oil Feed from B/L to Feed Filter (F-001) and send to Feed Surge Drum (V-001)
AVAILABLE CONTROL
SCHEMES
None.
Operating Parameters
SERVICE
Temperature(C)
Pressure ( bar g)
63
3.4
120,083
Note:
Node
Deviation
Causes
Consequences
Safeguards
1.U/S disturbance
3.Automatic
backwash filter
system fails
2.High Flow
3.Low Pressure
1. Upstream
Disturbance
Remarks
1.1.1.1.3
1.Same as
safeguards for
cause 1
consequence 1
1.Same as Cause-1
consequence1
1.Same as
safeguards for
cause 1
consequence 1
Responsibility
1.1.1.1.1
1.Same as Cause-1
consequence1
2.Choking of Back
wash Filter
(140-F-001).
Recommendations
1.Low/No Flow
Ref. No.
2. PSV-302A/B is
designed for liquid
overfilling case.
1. Same as Low/No
1.Refer Node-1 Deviation 1
flow
1.1.2.1.1
1.To be reviewed
during detail
engineering HAZOP
when vendor
information is
available.
1.1.3.1.1
1.2.1.1.1
1.2.1.1.2
1.3.1.1
1. System is
designed for
maximum U/S
pressure
1. U/S Disturbance
2. Choking of Feed
Filter(140-F001)
1.System is
1. System U/S feed filter may
designed for
experience higher than the
maximum U/S
operating pressure
pressure
1.U/S disturbance
1.4.1.1.1
4.High Pressure
6.High Temperature
1.To be reviewed
during detail
engineering when
vendor information is
available
1.4.2.1.1
DEC
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 01
DESIGN INTENTION
To Supply Gas Oil Feed from CDU directly to Feed Surge Drum through Back Wash Filter.
DRAWINGS
CS-140-PR-15-001 , CS-140-PR-15-002
EQUIPMENT
STREAM DETAILS
Gas Oil Feed from CDU to Feed Filter (F-001) and send to Feed Surge Drum (V-001)
AVAILABLE CONTROL
SCHEMES
None.
Operating Parameters
SERVICE
Temperature(C)
Pressure ( bar g)
55
3.5
120,083
Note:
Node
Deviation
Causes
1.U/S disturbance
Consequences
Safeguards
1.Same as Cause-1
consequence1
2.Choking of Back
wash Filter
(140-F-001).
Ref. No.
1.Same as
safeguards for
cause 1
consequence 1
1'.1.1.1.2
1'.1.2.1.1
Recommendations
Responsibility
Remarks
Node
Deviation
Causes
2.Choking of Back
wash Filter
(140-F-001).
3.Automatic
backwash filter
system fails
2.High Flow
3.Low Pressure
1. Upstream
Disturbance
Consequences
Safeguards
Ref. No.
1.Same as Cause-1
consequence1
1.Same as
safeguards for
cause 1
consequence 1
2. PSV-302A/B is
designed for liquid
overfilling case.
1. Same as Low/No
1.Refer Node-1 Deviation 1
flow
1'.1.3.1.1
Recommendations
Responsibility
Remarks
1.To be reviewed
during detail
engineering HAZOP
when vendor
information is
available.
1'.2.1.1.1
1'.2.1.1.2
1'.3.1.1
1. System is
designed for
maximum U/S
pressure
1. U/S Disturbance
2. Choking of Feed
Filter(140-F001)
1.System is
1. System U/S feed filter may
designed for
experience higher than the
maximum U/S
operating pressure
pressure
1'.4.1.1.1
4.High Pressure
1'.4.2.1.1
1.To be reviewed
during detail
engineering when
vendor information is
available
Node
Deviation
6.High
Temperature
Causes
1.U/S disturbance
Consequences
Safeguards
Ref. No.
Recommendations
Responsibility
DEC
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 02
DESIGN INTENTION
To Preheat the Gas oil feed and H2 through exchanger train (E-001A/B/C/D) before further heating by reactor feed heater.
DRAWINGS
EQUIPMENT
STREAM DETAILS
AVAILABLE CONTROL
SCHEMES
SERVICE
001A/B/C/D)
and then send to Reactor Feed Heater (H-001) Inlet
PC-330,LC-501,LC-505,FC-407A/B,FC-408,TC-119,LC-501.
Operating Parameters
Temperature(C)
Pressure ( bar g)
63
91.3-101.0
120083
68.8
92.2-94.7
113540-121388
307.3-338.7
90.7-93.2
126850-127392
Note:
Node
2.Feed Surge Drum to Reactor
Feed Heater
Deviation
1.Low/No Flow
Causes
1.Tripping of Gas oil feed
pump(P-001A/B)
2.
High Flow
Consequences
Ref.
Safeguards
1 FC- 408
provided with low
alarm.
2 FZ-448 provide
2.1.1.2.1
with LL alarm to trip
the fired heater
2.1.1.3.1
2 HH alarm at LI503
2.1.1.3.2
3.1 PSV-302A/B is
designed for
overfilling case.
2.1.1.3.3
Recommendations
Responsibility
2.1.1.1.1
1 FZ-448 provide
2.1.2.1.1
with LL alarm to trip
the fired heater
2 Pump is
protected with
Min. flow bypass
2.1.2.2.2
2.1.3.1
4. FCV-407A/B malfunctions to
open
5. XZV-719 malfunctions to
close
DEC/NOCL
2. Operating procedure
should ensure periodical
checking of LG506
DEC/NOCL
2.2.1.1.1
3 Provide DCS
2.2.1.2.3
indication from FZ448.
2. LC-505 malfunctions to full
open(sour water)
1. Process upset
5. Reverse/Misdirected
Flow
1. P-001 trips
1. UZ-719 will
activate & close
XZV-719.
6.
Low Pressure
7.
High Pressure
1. PC 330 malfunctions to open 1. Over pressurizing of the FSD (VPCV 330A and close PCV001)
330B
1. PSV-302A/B
provided
2.7.1.1.1
2. P-001 trips
1. PSV-302A/B is
designed for liquid
overfilling case
2.7.2.1.1
3.
As well as
2.2.2.1
2.5.1.1.1
2.6.1.1
4. Pump to be selected
DEC
suitably to provide safety
margin for NPSH requirements
during detail engineering
Remarks
7.
Node
High Pressure
Deviation
Causes
3. FC-408 to close FCV-408
4. XZV-719 malfunctions to
close
8. Less/Low
Temperature
Consequences
Safeguards
Ref.
1. PSV-302A/B is
designed for liquid
overfilling case
2. Pump (P2.7.3.2.2
001A/B) discharge
line is designed for
pump shutoff
pressure
1. PSV-302A/B is
designed for liquid
overfilling case
2. Pump (P2.7.4.2.2
001A/B) discharge
line is designed for
pump shutoff
pressure
2.8.1.1
2.8.2.1
9. High
Temperature
2.9.1.1
10.
2.10.1.1
2.10.2.1
11.
High Level
1. LZ-504 will
activate UZ701 which will trip
the pump
2.10.3.1.1
2.11.1.1
2. XZV-719 malfunctions to
close
2.11.2.1
2.11.3.1
4. LCV-501 malfunctions to
open
250 LCV-011A/B/C fully
1. HH Alarm LI503
2.11.4.1.1
2. PSV-302A/B is 2.11.4.1.2
designed for Liquid
overfilling case
12. Problem/Requirements
Responsibility
2.7.4.1.1
Less/Low Level
Recommendations
2.7.3.1.1
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
PROJECT NO
: SO 2331
NODE NO: 03
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0004
EQUIPMENT
STREAM DETAILS
After preheating from feed/effluent heat exchanger post heating is done in Fired Heater
PC-899(For Detail see the Heater Firing P&ID for control system)
Operating Parameters
SERVICE
Temperature(C)
Fired Heater Outlet to
Hydrotreater Reactor Inlet
318.3-362.5
Note:
Node
3. Reactor Feed
Heater
Deviation
Causes
1.
Low/No Flow
1. U/S disturbance.
2.
High Flow
1. U/S disturbances
7. Low
Temperature
8. High
Temperature
8. High
Temperature
Node
Deviation
11. Problem/Requirements
HAZOP WORKSHEET
Client
Project :
Consequences
1. Possible overheating of heater tubes
leading to tube failure.
Safeguards
Ref.
1. TC-124 controls
the firing of heater
3.1.1.1.1
2. High alarm is
provided at TI-121 &
222(Skin temp.),TI122 &
223(COT)
3.1.1.1.2
3. TZ-123 HH temp.
will activate UZ-718
3.1.1.1.3
Recommendations
3.2.1.1
1. TI-121,TI-122,TI3.8.1.1.1
222
&TI-223 provided with
high alarm
2.7.1.1.1
Consequences
Safeguards
Ref.
Recommendations
2. TZ-123 HH will
3.8.1.1.2
activate UZ-718 to trip
the heater
3. TI-101 &TI-102
provided with high
alarm
3.8.1.1.3
3.11.1.1.1
3.11.1.2.2
7. Operating procedure
should ensure safe
shutdown of the plant
88.9
126850-127392
Responsibility
DEC
Remarks
Responsibility
DEC/NOCL
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 04
Reacted Feed Heater Outlet to Reactor ,Effluent air cooler, Trim Cooler up to Separator inlet
DESIGN INTENTION
1.
To hydro treat Gas Oil Feed in Reactor for desulphurisation, denitrogenation & aromatic saturation.
2.
To cool reactor effluent by exchangers, air cooler & trim cooler to separate converted H2S, NH3 from gas Oil in Separator drum.
3.
DRAWINGS
EQUIPMENT
STREAM DETAILS
After post heating in Heater, Gas Oil is hydrotreated and passes through in feed effluent exchanger for heat transfer to cold feed and then send to air cooler and trim cooler for further cooling and finally to separator.
SERVICE
Temperature(C)
Reactor to stripper feed
preheater , Feed effluent
exchanger at inlet of Air cooler
Air cooler to Separator
Pressure ( bar g)
185.5-397
80.2-83.4
45-65
78.8-.79.3
137867
144751
Note:
Node
Deviation
2.
Low/No Flow
High Flow
Causes
Consequences
Safeguards
Ref.
1. U/S disturbance
1. No hazardous consequences
2. FC-412 /413/414/415
malfunction to close
FCV412/413/414/415 (quench
H2)
1. High temp.
4.1.1.1.1
alarms are provided
for each bed
1. U/S disturbance
1. AI-003 is
4.2.1.1.1
provided on product
line
2. FC-412 /413/414/415
malfunction to fully open FCV
412/413/414/415
1. AI-003 is
4.2.2.1.1
provided on product
line
5.
Low Pressure
1. U/S disturbance
1. Analyzer AI-003
is provided at
product line
6.
High Pressure
1. Disturbance in Hydrogen
recycle loop.
2. PSV-307A/B
provided.
7. Low
Temperature
8. High
Temperature
Recommendations
Responsibility
4.1.1.1
4.5.1.1.1
4.6.1.1.2
4.7.1.1
1. High temp.
4.8.1.1.1
Alarms are provided
for each bed.
4.8.2.1.1
2. PC-358 is
provided with high
alarm
4.8.2.2.2
3. PSV-307A/B is
provided
4.8.2.2.3
9. Problem/Requirements
4.8.3.1
4.9.1.1.1
4.9.3.1
PMC/NOCL
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 05
DESIGN INTENTION
DRAWINGS
EQUIPMENT
STREAM DETAILS
1.
2.
To inject wash water in U/S of Reactor Effluent Air Cooler to dissolve ammonium salts.
SERVICE
Temperature(C)
Sour Water/MP BFW supply to
Wash water Drum
Sour Water from Reflux
Drum
Pressure ( bar g)
65-128
45.0
5221-6212
6.4
3310
Note:
Node
5. Wash Water
System
Deviation
1.
Low/No Flow
Causes
1. U/S disturbance in unit 550.
Consequences
1. Level of (V-004) may go down
Ref.
Safeguards
1. Stripped sour
water and recycle
water is available
for makeup
5.1.3.1.1
1. Stripped sour
water and BFW is
available for
makeup
5.1.4.1.1
1.1 LI-560A is
provided with
HH alarm
5.1.5.1.1
5.1.5.2.1
7. P-002A/B trips
1. LC-516 is
provided with high
alarm
5.1.7.2.1
2. PSV-310A/B
designed for liquid
overfilling case
5.1.7.2.2
4. NRV is provided
at inlet of reactor
effluent air cooler
5.1.7.2.4
1.FZ-450 is
provided with
LL alarm
5.1.8.1.1
5.1.8.2.2
5.1.9.1
Recommendations
Responsibility
Remarks
Node
Deviation
Causes
10. FC-455A/B malfunction to
full open FCV-455A/B
Consequences
2.
High Flow
1. PC-368 provided
with high alarm.
5.2.3.2.1
1. Same as Cause
1, Consequence 1,
Safegaurds1&2.
5.2.4.1.1
1. PC-368 provided
with high alarm.
5.2.4.2.1
1. Same as Cause
1, Consequence 1,
Safegaurds2.
5.2.5.1.1
1. PC-368 provided
with high alarm.
5.2.5.2.1
2. PSV-310 A/B
provided.
5.2.5.2.2
1. LC-516 is
provided with low
alarm
5.2.6.1.1
2. LZ-518 provided
with low low alarm.
5.2.6.2.2
As well as
1. Contamination in Stripped
sour water.
5.
Low Pressure
1. PC-368 malfunctions to close 1. Pump may cavitate and wash water flow
PCV-368A and opens 368B
to EA-001 may be lost.
High Pressure
11. Problem/Requirements
12. Operation/Maintenance
5.2.2.1
5.2.3.1.1
3.
Remarks
5.2.1.1.2
1. Same as Cause
1,Consequence
1,Safegaurds 1&2
above
Responsibility
5.1.10.1.2
Recommendations
5.1.10.1.1
Ref.
Safeguards
1.
Ensure
sampling
provision is
given in
Unit
550 during
detailing.
5.3.1.1
5.5.1.1
1. PC-368
provided with low
alarm.
5.5.2.1.1
2. PI-806 at B.L is
provided with low
alarm
5.5.2.1.2
11. Operating
procedure should
ensure periodical
checking of PI019.
DEC/NOCL
12. Operating
procedure should
ensure periodical
checking of FI458/459/460/461
DEC/NOCL
1. PSV-310 A/B is
provided.
5.6.1.1.1
5.11.1.1
5.12
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 06
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0006, CS-140-PR-15-0021
EQUIPMENT
STREAM DETAILS
Sour water from Separator (V-006) to Sour water flash drum (V-017) and then water will send to B/L and flash gas will be sent to LP Amine KOD(V-010)
SERVICE
Temperature(C)
Separator bottoms to
Sour water flash drum
Sour water flash drum to
Sour water B/L
Pressure ( bar g)
45
6.4-78.8
10085
45
4.0-6.4
10080
Note:
Node
6. Separator bottom to Sour
water Flash Drum and B/L
Deviation
1.
Low/No Flow
2.
6.
High Flow
High Pressure
Causes
Consequences
Safeguards
Ref.
1. LC-510 malfunctions to close 1. Boot level of V-006 may go high resulting 1. LI 512 is
LCV -510
in water carry over with gas oil product.
provided with
HH alarm.
6.1.1.1.1
6.1.2.1.1
Recommendations
Responsibility
6.1.3.1
DEC/NOCL
4. LC-542 malfunctions to close 1. V-008 boot level may go high, water may
LCV-542 B
go along with reflux/wild naphtha.
6.1.4.1
DEC/NOCL
DEC/NOCL
1. LC-510 malfunctions to
opens
LCV -510
1. LZ 513 is
provided with LL
alarm will activate
UZ-704 to close
XZV704.
6.2.1.1.1
2. LC-514 malfunctions to
opens
LCV-514
1. CBD vessel is
connected to flare.
6.2.2.1.1
3. LC-556 malfunctions to open 1. V-017 water side level may go low and
LCV-556
HC may carry over with Sour water to B.L.
6.2.3.1
4. LC-542 malfunctions to
open
LCV-542 B
6.2.4.1
1. U/S Disturbance
1. PSV-309A/B is
provided.
6.6.1.1.1
Remarks
1. Provision
for HC
carryover with
sour water to be
considered in
unit 550.
DEC/NOCL
1. Provision
for HC
carryover with
sour water to be
considered in
unit 550.
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 07
DESIGN INTENTION
To preheat Gas oil in exchanger trains and send to stripper for strip out to naphtha and lighter components.
DRAWINGS
EQUIPMENT
STREAM DETAILS
Gas oil is separated in separator(V-006) and send for further heating In Stripper feed/bottom (EE-006) and stripper preheater (EE-002A/B) then stripper
SERVICE
Temperature(C)
Separator bottom to stripper
Preheater inlet
stripper Preheater to
Stripper Inlet
Pressure ( bar g)
45-51
11.9-78.8
41810-119768
213-260
8.9-10.3
119768
Note:
Node
7. Separator Drum to Stripper
Inlet
Deviation
1.
Low/No Flow
Causes
1. XZV-703 malfunctions to
close.
2. LC-507/FC-416 malfunctions
to close FCV-416.
Consequences
Safeguards
DEC
1. PSV-930A/B
DEC
DEC
7.1.1.1.1
7.1.3.1.1
1. Mechanical
7.1.3.2.1
Limit stop
provided at TCV191A for minimum
flow to avoid total
blockage.
7.1.4.1
Responsibility
High Flow
Recommendations
1. LC 507 high
alarm is provided.
2.
Ref.
1. LZ-509 is
provided with low
low alarm which
will activate UZ703 to trip XZV703.
7.2.1.1.1
2. PSV-319A/B is 7.2.1.1.2
designed for gas
blow case.
3.
As well as
7.2.2.1
1. LC 510 malfunctions to close 1. V-006 boot level will increase, may lead
LCV-510
to water carry over with diesel.
1. LI-512 is
provided with
HH alarm.
7.3.1.1.1
7. Low
Temperature
1. TC-191
provided with low
alarm.
7.7.1.1.1
8. High
Temperature
1. Malfunction of TCV-191 A
7.8.1.1
11. Problem/Requirements
7.11.1.1
12. Operation/Maintenance
1. PSV-319A/B is 7.11.2.1.1
provided for tube
rupture case.
7.12
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 08
DESIGN INTENTION
1.
2.
DRAWINGS
EQUIPMENT
STREAM DETAILS
Separator (V-006) Overhead goes to KOD (V-007)and then HP Amine absorber column (C001) where H2S treated by lean amine solution and send to KOD of Recycle gas compressor (V-005)then finally recycle gas compressor (K-002)
SERVICE
Temperature(C)
Separator overhead to
HP amine absorber
HP Amine absorber to
Recycle gas compressor
Pressure ( bar g)
45
78.8
15891-18053
54
78.4
13337-15497
Note:
Node
8. Separator Overhead to
Recycle gas compressor Inlet
Deviation
1.
Low/No Flow
Causes
1. HCV-826 malfunction to full
open (No flow through to
column)
Consequences
Ref.
1. AI-001 is provided on
K-002 suction line
8.1.1.1.1
1. PC-358 is provided
with high alarm
8.1.1.2.1
Safeguards
1. Level loses in V-007,stripper (C002)/(EE-006A/B/C/D) /(EE002)may subject to high pressure due to gas
blow by
2. PI-377B is provided
with low alarm
8.1.2.1.2
3. FI-429 is provided
with low alarm
8.1.2.1.3
1. PSV-319A/B is
designed for this gas
blow by case
8.1.3.1.1
2. PI-903 is provided
with high alarm.
8.1.3.1.2
1. PC-394 is provided
with high alarm.
8.1.4.1.1
2. PSV-318A/B is
designed for this gas
blow by case.
8.1.4.1.2
8.2.1.1.1
High Flow
1. PC-358/FC-423 malfunction
to
Open FCV-423(Fuel gas line)
1. PSV-941A/B is
designed for this case.
5.
Low Pressure
1. XZV-702 malfunctions to
open.
High Pressure
1. U/S Disturbance
8.5.1.1.2
3. Compressor gets
tripped on PZ-378 LL
alarm.
8.5.1.1.3
2. PSV-307 A/B is
provided.
8.6.1.1.2
1. U/S disturbance
8.8.1.1.1
10.
1. LC-521 is provided
with
High alarm.
8.10.1.1.1
11. Problem/Requirements
12. Operation/Maintenance
2. LC-524 malfunctions to close 1. Liquid carry over with recycle gas to KLCV-524
002
1. Emergency
8.11.1.1.1
depressurization
safeguarding system UZ702 is provided.
Remarks
1.
Ensure
refinery fuel
gas
compositio
n has
considered
addition of
hydrogen
from this
unit during
detail
engineering
.
DEC
8. High
Temperature
High Level
Responsibility
DEC/NOCL
2.
6.
Recommendations
19. Operating procedure to
include operation of HS-822 to
select FCV-423 to purge H2S to
flare header
8.12
15891-18053
13337-15497
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 09
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0011, CS-140-PR-15-0003
EQUIPMENT
STREAM DETAILS
H2 and lighter gases are recycled through RGC(K-002) to mixing point at the inlet of
Reactor feed/effluent exchanger
SERVICE
Temperature(C)
Recycle gas compressor to
Mixing point
Pressure ( bar g)
75.7-79
92.5-95.2
4310-5022
Note:
Node
9. Recycle Gas compressor to
Mixing Point
Deviation
1.
Low/No Flow
Causes
1. K-002 trip
Consequences
1. No hydrogen supply to reactor.
Safeguards
1.1 UZ-705 will
activate
UZ-706
Ref.
Recommendations
Responsibility
Remarks
9.1.1.1.1
9.1.1.2.1
9.1.2.1
3. Malfunctioning of XCV-715
(Antisurge line by supplier)
9.1.3.1
4. FC-427 malfunction to open 1. Less Hydrogen to reactor/quench leading 1. FCFCV-427(Recycle gas and
to low product quality.
412/413/414/415 is
quench gas line)
provided with low
alarm.
High Flow
9.1.4.1.1
2. FZ-428 is
provided with
LL alarm
9.1.4.1.2
9.1.5.1.1
1. To be
reviewed during
detail
engineering
when vendor
information is
available
1. FC-427 malfunction to open 1. Less Hydrogen to reactor/quench leading 1. FCFCV-427 (high flow in antisurge to low product quality.
412/413/414/415 is
line)
provided with low
alarm.
9.2.1.1.1
1. Low low
alarm of FZ428 to be verified
for this cause
during detailed
engineering.
2.
1. This
antisurge is not
considered in
this HAZOP. To
be Considered in
Detail
engineering.
4. Reverse/Misdirected
Flow
2. K-002 trips
6.
1. Malfunction of K-002
1. Malfunction of K-002
High Pressure
8. High
Temperature
11. Problem/Requirements
1. NRV is provided.
9.4.2.1.1
9.6.1.1
1. To be
reviewed during
detail
engineering
when vendor
information is
available
1. TI-175 is provided
with high alarm.
9.8.1.1.1
2. TZ-174 with HH
alarm to activate UZ705
9.8.1.1.2
1. To be
reviewed during
detail
engineering
HAZOP when
vendor
information is
available.
9.11.1.1
1. To be
reviewed during
detail
engineering
HAZOP when
vendor
information is
available.
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
NODE NO: 10
DESIGN INTENTION
DRAWINGS
EQUIPMENT
Lean Amine booster pumps(140-P-003A/B),HP Amine absorber column(140-C-001),LP Amine absorber columns(140-C-003)
STREAM DETAILS
Lean amine comes from B/L and goes to LP Amine absorber column (C-003) and pumped through amine Pump(P-003)to HP Amine absorber column
FC-434,FC-424
Project :
Operating Parameters
SERVICE
Temperature(C)
Lean Amine from B/L to LP Amine
absorber column
Lean Amine from B/L to HP Amine
absorber column
Pressure ( bar g)
50
9.5
50
9.5-86.5
Note:
Node
Deviation
Low/No Flow
Causes
1. U/S disturbance
Consequences
1. P-003A/B may starve and get damaged
Safeguards
1. FC-424/434 provided
with low alarm
3. AI-001 provide on
recycle gas line for
monitoring
10.1.1.2.3
10.1.1.2.4
10.1.2.1.1
10.1.2.2.1
2. NRV is provided
10.1.2.2.2
2.
High Flow
10.2.4.1.2
1. AI-001 provide on
recycle gas line for
monitoring
10.2.6.1.1
10.2.6.1.2
2. U/S disturbance
10.2.4.1.1
10.2.5.1
2. PDI-392 is provided
with high alarm
4. Reverse/Misdirected
Flow
10.1.1.2.2
Responsibility
10.1.1.2.1
Recommendations
22. UZ-720 should activate
DEC
UZ-710 to trip pump (P-003A/B)
4. FC-424 malfunctions to close 1. Less/No removal of H2S from recycle gas 1. AI-001 provide on
FCV-424(Lean Amine to Crecycle gas line for
001)
monitoring
5. XZV-720 malfunctions to
close(Lean Amine to C-001)
Ref.
10.1.1.1.1
10.2.1.2.2
10.2.2.21.1
Remarks
Node
Deviation
6.
High Pressure
7. Low
Temperature
Causes
Consequences
Safeguards
Ref.
1. FC-424 malfunctions to close 1. System up to FCV-424 from PFCV-424(Lean Amine to C003 may get pressurized
001)
2. XZV-720 malfunctions to
close(Lean Amine to C-001)
1. U/S disturbance
2. TDI-213 is provided
with low alarm(for C001),TDI-214 is provided
with low alarm(for C-003)
Recommendations
Responsibility
DEC/NOCL
DEC
10.7.1.1.2
8. High
Temperature
1. U/S disturbance
1. AI-001/AI-002 is
provided for monitoring
10.8.1.1.1
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 11
Rich Amine from HP Amine absorber system to LP amine absorber bottom to B/L
DESIGN INTENTION
To supply Rich amine from HP amine absorber column to LP amine absorber column
DRAWINGS
CS-140-PR-15-0011, CS-140-PR-15-0016
EQUIPMENT
STREAM DETAILS
Rich amine from HP Amine absorber column(C-001) bottom to LP Amine absorber column(C-003)
SERVICE
Temperature(C)
Rich amine from HP
amine absorber column to LP
Amine absorber column
Pressure ( bar g)
56-57
6.2-78.6
60413
Note:
Node
11. Rich Amine from HP Amine
Absorber ,LP Amine Absorber
bottom to B/L.
Deviation
1.
2.
Less/No flow
High Flow
4. Reverse/Misdirected
Flow
Causes
Consequences
Safeguards
Ref.
11.1.1.1
1. LC-521 Malfunctions to
Close LCV-521
2. XZV-709 Malfunctions to
close
1. LC-521 is provided
with
High alarm.
11.1.2.1.1
3. LC-532 Malfunctions to
Close
LCV-532
1. LA-560 is provided
with
HH alarm.
11.1.3.1.1
1. LZ-523 LL alarm
will activate UZ-709.
11.2.1.1.1
1. NRV is provided at
B.L
11.4.1.1.1
2. LC-532 is provided
with high alarm.
11.4.1.1.2
3. LA-560 is provided
with high alarm.
11.4.1.1.3
Recommendations
25. Provide additional LI
with HH
alarm at C-001 bottom.
Responsibility
DEC
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 12
LP Amine absorber system (LP Amine Column KOD, Off gas KOD) to B/L
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0021, CS-140-PR-15-0016
EQUIPMENT
STREAM DETAILS
Flash gas from flash drum(V-017)and off gases from Reflux drum (V-008) is collected to KOD of LP Amine absorber column (C-010) where it is treated with amine solution and send to B/L or Fuel gas header
SERVICE
Temperature(C)
Off gases from reflux drum to
KOD of LP Amine absorber
Off gases/Fuel gases LP
amine KOD to B/L
Pressure ( bar g)
45.0
6.4
1172-1371
45.0
2.6 - 6.3
512-741
Note:
Node
Deviation
2.
Less/No flow
High Flow
Causes
Consequences
12.1.1.2.1
1. AI-003 is provided
12.1.1.3.1
12.1.1.3.2
8. High
Temperature
Recommendations
Responsibility
2. LC-551 malfunctions to close 1. V-018 level will increase & Liquid may
LCV-551 when required.
carryover with off gas/fuel gas
12.1.2.1
DEC/NOCL
3. LC-530 malfunctions to close 1. V-010 level will increase & Liquid may
LCV-530 when required.
carryover with off gas to C- 003 leads to
foaming in C-003.
12.1.3.1
DEC/NOCL
12.1.4.1
High Pressure
Ref.
6.
Safeguards
12.2.1.2.2
12.2.1.3.1
2. Pressure transmitter
PT-999 is provided with
low alarm at top of C003.
12.2.1.3.2
1. Pressure transmitter
PT-999 is provided with
low alarm at top of C003.
1. U/S disturbance
12.2.3.1.1
2. PSV-318A/B is
provided.
12.6.2.1.2
12.8.1.1.1
12.8.1.1.2
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 13
Stripper bottom to Gas oil air cooler , Coalescer and salt dryer to B/L
DESIGN INTENTION
DRAWINGS
EQUIPMENT
Stripper(140-C-002),Stripper bottoms pump(140-P-005),Stripper feed/bottom exchanger(140-EE-006),Gas oil air cooler (140-EA-003),Gas oil trim cooler (140-EE-007), Coalescer (140-V-009),Salt dryer (140-V-019)
STREAM DETAILS
Stripper bottoms is cooled in Stripper feed bottoms exchanger, Gas oil air cooler and Gas oil trim cooler. Then it is passed to coalescer and salt dryer to remove moisture. Then it is sent to B.L.
SERVICE
Temperature(C)
Stripper bottoms to feed bottom
exchanger, Gas Oil Air cooler,
Trim cooler
Gas oil From Coalescer to B.L.
Pressure ( bar g)
65-252.1
7.3-11.8
115553
40.0
5.0-7.3
115214
Note:
Node
Deviation
Less/No flow
Causes
1. P-005A/B trips.
Consequences
1. C-002 level will increase
Safeguards
1. LC-535 provided with
high alarm
Ref.
Recommendations
Responsibility
13.1.1.1.1
2. LC-535/FC-442 malfunctions
to close FCV-442.
3. LC-535/FC-454 malfunctions
to close FCV-454(Start-up
recirculation line).
High Flow
13.1.3.1
1.Start permissive is
13.1.4.1.1
included as a part of safe
guarding system for Pump
P-005A/B.
2.
13.1.2.1.1
13.1.5.1.1
13.1.7.1.2
13.1.8.1.1
8. XZV-717 malfunctions to
close
1. LC-535/FC-442 malfunctions
to open FCV-442.
1. LZ-538 is provided
with
LL alarm to activate UZ712.
13.2.2.1.1
3. FC-436 malfunctions to
open
FCV-436
1. LC-542 is provided
with high alarm.
13.2.3.1.1
4. Reverse/Misdirected
Flow
1. NRV provided in
Rundown line at B.L.
13.4.1.1.1
5.
1. U/S disturbance
1. LZ-537 HH will
activate
UZ-717 to close XZV717 on M.P steam line.
13.5.1.1.1
1. EA-003 trips
13.8.1.1.1
13.8.2.1.1
Low Pressure
8. High
Temperature
DEC
Remarks
8. High
Temperature
Node
Deviation
Causes
3. Cooling medium failure in
EE-006
11. Problem/Requirements
Consequences
1. Likely Poor performance of V009/V-019
Safeguards
13.8.3.1.1
13.8.3.1.2
13.11.1.1
1. Water may carry over with diesel product. 1. SC-011 is provided for 13.11.2.1.1
sampling
1. Possible fire
Recommendations
Responsibility
1. P&ID -0017
rev 1, to be
corrected
accordingly
13.11.3.1.2
13.11.4.1
13.12
Remarks
2. HZ-850 is provided at
safe distance to activate
UZ-712.
12. Operation/Maintenance
Ref.
PMC/NOCL
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 14
DESIGN INTENTION
DRAWINGS
EQUIPMENT
STREAM DETAILS
SERVICE
Temperature(C)
Stripper Reflux
Wild Naphtha to Storage
.
Pressure ( bar g)
45
45
9.5-11.5
6.0-11
9105
2956
Note:
Node
14. Stripper Overhead system
Deviation
1.
Low/No Flow
Causes
1. U/S disturbance(stripping
steam failure/Low feed inlet
temperature to C-002)
Consequences
1. Product quality may get affected
(Gas oil) due to poor stripping.
Safeguards
2. SC-011 is provided
2. P-004A/B trips(reflux)
Ref. No.
Recommendations
Responsibility
11 LC-540 is provided
with high alarm.
1.2 FC-439/441 is
provided with low alarm
14.1.2.1.1
2.
High Flow
1. LC-540 is provided
with high alarm.
1. FC-441 is provided
with low alarm.
1. FC 439 malfunctions to open 1. Column overhead temperature may come 1.1 SC-011 is provided
FCV-439
down which lead to gas oil product off
for sampling
spec(Flash point)
Low alarm at TI-192 is
provided.
2. V-008 level may come down
1. LC-540 is provided
with low alarm.
1. FC-441/FC-439 is
provided with Low alarm
1. NRV is provided at
B.L.
4. Reverse/Misdirected
Flow
5.
1. D/S disturbance(PCV-394A/B 1. Carry over of diesel in stripper overhead. 2.1 LC-540 is provided
full open)
heavies in wild naphtha to unit -160/200.No
with high alarm
hazardous consequences
Low Pressure
2. P-004 discharge pressure will come down 2.2 FC-439 and FCleading to increase of level in V-008.
441are provided with low
alarm
8. High
Temperature
2. EA-002 trips
DEC/NOCL
Remarks
8. High
Temperature
Node
Deviation
2. EA-002 trips
Causes
Safeguards
Ref. No.
Recommendations
Responsibility
2.2PSV-319A/B is
designed for reflux failure
case
2.3TI-208 is provided with
high alarm
Power supply to EA-002
fan motors from different
sources is provided.
11. Problem/Requirements
12. Operation/Maintenance
PMC/NOCL
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 15
DESIGN INTENTION
DRAWINGS
EQUIPMENT
Make Up Gas Compressor K.O.Drum (140-V-002), Make-up Compressor (140-K-001A/B), Make-up Compressor Inter stage Cooler (140-EE-008A/B), Make-Up Compressor Interstage K.O. Drum (140-V-003A/B).
STREAM DETAILS
Make up hydrogen comes from B.L. to K.O.Drum to remove any liquid content and compressed to 95 barg
SERVICE
Temperature(C)
Hydrogen from B.L.
.
Pressure ( bar g)
45
20
2457
Note:
Node
15. Makeup H2
Compressor system
Deviation
1.
Low/No Flow
Causes
1. U/S disturbance
Consequences
Safeguards
Ref.
Recommendations
Responsibility
Remarks
2.2 PZ-385/PZ-956 LL
alarm will activate UZ707 to trip K-001A/B
Note-13 is provided in
P&ID stating that signals
from non running
compressor instruments
shall not be used for
control and trip of the
running compressor.
2. K-001A/B trips
3. XZV-707 Malfunction to close 1. No hydrogen make up to reaction section 1.1 PC-974 is provided
with high alarm
4. FC-431/PC-383/PC-974
malfunctions to open FCV431(Makeup line)
1. FI-432 is provided
with low alarm
5. FC-431/PC-383 /PC-974
malfunctions to close FCV431(Spill back line)
1. PC-974 is provided
with high alarm
2. PSV-316/317 is
provided.
2.
High Flow
4. Reverse/Misdirected
Flow
1. FC-431/PC-383/PC-974
malfunctions to close FCV431(Makeup line)
2. FC-431/PC-383 /PC-974
malfunctions to open FCV431(Spill back line)
1. K-001A/B trips.
1. PSV-952A/B is
provided.
1. NRV is provided in
make up hydrogen line to
Recycle gas.
2. UZ-707 will close
XZV- 707
NRV is provided at the
junction of H-162 and P079 on line H-162.
1. Compressor
safeguards and
system should be
Hazoped when the
vendor information
is available during
detailed
engineering.
Node
Deviation
5.
Low Pressure
Causes
2. Compressor malfunctioning
Consequences
1. Less makeup hydrogen flow to
Reaction section
Safeguards
Ref.
Recommendations
Responsibility
1. PI-036/037 is
provided with low alarm
Remarks
1. To be
reviewed during
detail engineering
HAZOP when
vendor information
is available.
2. PZ-385A/956A is
provided with LL alarm to
activate UZ-707.
3. Note-13 is provided in
P&ID stating that signals
from non running
compressor instruments
shall not be used for
control and trip of the
running compressor.
6.
High Pressure
8. High
Temperature
1. PI-036/037 is
provided with high alarm.
1. TI-229/230provided
with high alarm.
2. TI-180/182 is
provided with High alarm.
3. TZ-181/183 HH alarm
will activate UZ-707.
4. Note-13 is provided in
P&ID stating that signals
from non running
compressor instruments
shall not be used for
control and trip of the
running compressor.
2. Compressor (K-001A/B)
malfunctions
1. TI-231/233 is
provided with High alarm
2. TI-180/182 is
provided with High alarm.
3. TZ-181/183 HH alarm
will activate UZ-707.
4. TZ-232/234 HH alarm
Will activate UZ-707.
5. Note-13 is provided in
P&ID stating that signals
from non running
compressor instruments
shall not be used for
control and trip of the
running compressor.
1. TI-178 is provided
with
HH alarm
2. TI-231/233 is
provided with High alarm
3. TI-180/182 is
provided with High alarm.
4. TZ-181/183 HH alarm
will activate UZ-707.
5. TZ-232/234 HH alarm
Will activate UZ-707.
1. TI-211 is provided
with high alarm
5. U/S disturbance
1. TI-231/233 is
provided with High alarm
2. TI-180/182 is
provided with High alarm.
3. TZ-181/183 HH alarm
will activate UZ-707.
4. TZ-232/234 HH alarm
Will activate UZ-707.
10.
High Level
1. U/S disturbance
1. LI-527/562/565 is
provided with High alarm.
2. LZ-529/561/564 HH
alarm will activate UZ707 to trip compressor.
1. Consider CW
failure in EE-009
during detail
engineering of Unit2500.
DEC
Node
Deviation
Causes
Consequences
Safeguards
Ref.
Recommendations
Responsibility
Remarks
3. Note-13 is provided in
P&ID stating that signals
from non running
compressor instruments
shall not be used for
control and trip of the
running compressor.
11. Problem/Requirements
12. Operation/Maintenance
1. PC-383 is provided
with low alarm
1.
Hydrogen
ingress in Cooling
water should be
considered during
detail engineering
of cooling water
system.
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 16
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0023, CS-140-PR-15-0025
EQUIPMENT
Antifoaming Agent /Anti Oxidant /Sulfiding Agent/Anti foulant /Corrosion Inhibitor injection
System
STREAM DETAILS
Antifoaming Agent /Anti Oxidant /Sulfiding Agent/Anti foulant /Corrosion Inhibitor injection
System
SERVICE
Temperature(C)
Sulfiding Agent
Antifoulant
Corrosion Inhibitor Antifoaming
Anti Oxidant
Pressure ( bar g)
Ambient
Ambient
Ambient
Ambient
Ambient
1.5-7.5
0.0-4.0
0-10.8
0-11/12
0-7.5
1600
14.0
1.6
0.34/0.11
6.0
Note:
Node
16. Chemical Injection System
Deviation
1.
Low/No Flow
Causes
1. P-007A trips( during
sulfidation)
Consequences
1. Discharge pressure will go down.
Delaying in sulfiding process.
Safeguards
Ref.
Recommendations
Responsibility
Remarks
1. Sulfiding process is
attended activity, LG549 is provided for
monitoring.
DEC/NOCL
DEC/NOCL
DEC/NOCL
DEC/NOCL
2.
High Flow
4. Reverse/Misdirected
Flow
6. Nitrogen failure
1. DEC should
ensure the
requirement of
nitrogen
blanketing during
detail
engineering.(local
environmental
regulations)
1. Sulfiding process is a
attended activity.
1. possible contamination
1. Draining of
the OSBL line to
be reviewed
during detail
engineering of
Unit 400.
1. Ensure in
detail engineering
that mixing point
of antifoam agent
is close to P003A/B suction.
Node
Deviation
Causes
Consequences
Safeguards
6.
High Pressure
1. D/S disturbance
9.
Low Level
Ref.
Recommendations
Responsibility
DEC/NOCL
Remarks
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 17
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0024, CS-140-PR-15-0026
EQUIPMENT
STREAM DETAILS
SERVICE
Temperature(C)
Fuel Gas
Fuel Oil
Pressure ( bar g)
25
180
3.5
11
416
615
Note:
Node
17. Fuel oil, Fuel gas and
Heater Firing System
Deviation
1.
Low/No Flow
Causes
1. PC -802 malfunctions to
close
PCV-802(fuel gas line)
Consequences
Safeguards
2. XZV-718A/C malfunctions to
close(fuel gas line)
3. XZV-718E/F malfunctions to
close(pilot gas line)
5. XZV-718N malfunctions to
close(Fuel oil line)
6. PDC-826 malfunctions to
close
PCV-826
8.
11. PC-899/HCV-830
malfunctions to close.
2.
High Flow
Ref.
Recommendations
Responsibility
Remarks
2.
Node
High Flow
Deviation
Consequences
2. Spillage at burner tip leading to burner
choking.
Safeguards
Ref.
Recommendations
Responsibility
Remarks
3. PDC-826 malfunctions to
open
PCV-826
4. PC-899/HCV-830
malfunctions to open.
Low Pressure
7. Low
Temperature
2. U/S disturbance (fuel oil line) 1. Improper atomization may lead to sooty
flame(incomplete combustion)
8. High
Temperature
10.
High Level
1. It is
assumed that
Fuel oil is
homogenous
mixture.
11. Problem/Requirements
1. V-025 is provided
12. Operation/Maintenance
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 18
DESIGN INTENTION
DRAWINGS
EQUIPMENT
STREAM DETAILS
HP steam, MP Steam and MP BFW will be supplied from B/L to Unit. HP steam will be send to RGC Turbine from where it converts to MP steam and some amount send to Stripper column and rest is send to the return header of MP
steam via desuperheater.
SERVICE
Temperature(C)
HP STEAM
MP STEAM
MP BFW
Pressure ( bar g)
388
184
128
27437
1500
7687
Note:
Node
18. HP/MP Steam
& MP BFW
Deviation
1.
Low/No Flow
Causes
1. U/S disturbance (HP Steam
Failure)
3.
Consequences
Safeguards
1. KT-002 trips
1. PI-810 is provided
with low alarm.
1. Shutdown of DS-001
is considered when
KT-002 trips
1. FI-804 is provided
with low alarm
2. PI-808 is provided
with low alarm.
Ref.
Recommendations
Responsibility
Remarks
1. To be
reviewed during
detail engineering
HAZOP when
vendor
information is
available.
2.
High Flow
1. Steam trap is
provided.
5.
Low Pressure
1. PI-810 is provided
with low alarm.
2. Shutdown of DS-001
is considered when
KT-002 trips
3.
6.
High Pressure
1. To be
reviewed during
detail engineering
HAZOP when
vendor
information is
available.
1. PI-810 is provided
with high alarm.
1. To be
reviewed during
detail engineering
HAZOP when
vendor
information is
available.
2. PI-808 is provided
with high alarm.
1. No major concern
1. To be
reviewed during
detail engineering
HAZOP when
vendor
information is
available.
27437
1500
7687
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 19
Cooling Water
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0032
EQUIPMENT
Reactor Effluent trim cooler(140-EE-003),Hydrogen cooler(140-EE-009), Hydrogen makeup kick back cooler(140-EE-004), Make up compressor interstage cooler (140-EE-008A/B),
Cooling water is supplied to all cooling water exchangers from B/L and similarly cooling water return from all exchangers to header
SERVICE
Temperature(C)
Cooling water supply
Cooling water return
Pressure ( bar g)
33
44
4
3
688411
688411
Note:
Node
19. Cooling water system
Deviation
1.
Low/No Flow
8. High
Temperature
11. Problem/Requirements
12. Operation/Maintenance
Causes
Consequences
Safeguards
1. U/S disturbance
1. U/S disturbance
Hydraulic Check is
carried out based on
actual plant layout.
Ref.
Recommendations
Responsibility
Remarks
1. Operation to
ensure proper
distribution of
cooling water
during startup
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 20
DESIGN INTENTION
DRAWINGS
EQUIPMENT
STREAM DETAILS
Portable/Service Water, LP Steam, Plant /Instrument Air and Nitrogen will be supplied from
B/L to Hose station.
SERVICE
Temperature(C)
LP steam
Service water
Potable water
Plant air
Instrument air
Nitrogen
Pressure ( bar g)
152
Amb.
Amb.
Amb.
Amb.
Amb
2818
1000(1)
1000(1)
518
215
430(2)
Node
20. Portable/Service Water, LP
Steam,
Plant/Instrument Air
and Nitrogen
Deviation
1.
Low/No Flow
Causes
Consequences
1. U/S disturbance(Potable
water)
2. U/S disturbance(Service
water)
Safeguards
Ref.
Recommendations
Responsibility
Remarks
5. U/S disturbance(Nitrogen)
6.
6.
High Pressure
1. PI-802 is provided
with low alarm.
1. PI-846 is provided
with low alarm.
1. PI-846 is provided
with high alarm.
1.
Safeguards
to be
reviewed
during
detail
engineering
when
complete
information
is available
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 21
Flare System
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0037, CS-140-PR-15-0038
EQUIPMENT
STREAM DETAILS
PSV discharge collected in Flare K.O drum (140-V-023) where liquid and gaseous phase is separated .Liquid HC is sent to slop header through flare K.O. drum pump (140-P-015A/B) and gaseous HC is sent to main flare header for burning.
SERVICE
Temperature(C)
Flare Gas From Flare
KOD to Flare header
Flare KOD/CBD Pump to
Slops Tank
Flare system
1.
9.
Low/No Flow
Low Level
45
57
5.5
57
Pressure ( bar g)
45
Causes
Consequences
Safeguards
Ref.
Recommendations
Responsibility
Remarks
1. Review of
US-731 to be
done during
detail
engineering.
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 22
Amine System
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0043, CS-140-PR-15-0044
EQUIPMENT
STREAM DETAILS
Amine effluent collected in Amine drain drum (140-V-022) where liquid and gaseous phase is separated .Liquid HC is sent to ARU Unit through amine drain pump( 140-P-014A/B) and gaseous HC is sent to flare header for burning.
SERVICE
Temperature(C)
Pressure ( bar g)
57
Amine
0.25
27634
Note:
Node
22. Amine drain system
Deviation
1.
Low/No Flow
Causes
Consequences
Safeguards
LI on V-022 is
provided.
4. Reverse/Misdirected
Flow
1. P-014A trips
1. NRV is provided
at pump discharge.
9. Low Level
LI on V-022 is
provided.
11. Problem/Requirements
12. Operation/Maintenance
Separate nitrogen
connection to the
drum as well as
separate vent to flare
line with lock open
valve and NRV is
provided.
Ref.
Recommendations
Responsibility
Remarks
1. Review of US-733 to
be done during detail
engineering.
27634
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 23
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0039, CS-140-PR-15-0040
EQUIPMENT
STREAM DETAILS
HC effluent collected in HC drain drum 140-V-021 where liquid and gaseous phase is separated .Liquid HC is sent to SLOP through closed drain pump 140-013A/B and gaseous HC is sent to flare header for burning.
SERVICE
Temperature(C)
Hydrocarbon
Pressure ( bar g)
40
7500
Note:
Node
23. Hydrocarbon drain system
Deviation
1.
Low/No Flow
Causes
Consequences
Safeguards
LI on V-021 is
provided.
4. Reverse/Misdirected
Flow
1. P-013A trips
1. NRV is provided
at pump discharge.
8. High
Temperature
1. TI-820 is provided
with high alarm
9.
LI on V-021 is
provided.
1. Purging of V-021with
nitrogen
Separate nitrogen
connection to the
drum as well as
separate vent to flare
line with lock open
valve and NRV is
provided.
Low Level
11. Problem/Requirements
12. Operation/Maintenance
Ref.
Recommendations
Responsibility
Remarks
1. Review of US-732 to
be done during detail
engineering.
DEC/NOCL
HAZOP WORKSHEET
Samsung Engineering India Pvt Ltd
Client
PROJECT NO
: SO 2331
Project :
NODE NO: 24
DESIGN INTENTION
DRAWINGS
CS-140-PR-15-0041
EQUIPMENT
STREAM DETAILS
Condensate from steam traps is collected in LP/MP/HP headers & drained to ND after cooling
SERVICE
Temperature(C)
Pressure ( bar g)
1030
Condensate (Water) in LP/MP
condensate header
Condensate (Water) in HP
condensate header
102
0.1
102
0.1
350
Note:
Node
24. Condensate Collection
system
Deviation
Causes
Consequences
Safeguards
Ref.
Recommendations
Responsibility