Professional Documents
Culture Documents
DOCUMENT NO :
CONSORTIUM
PT. SULUH ARDHI ENGINEERING -
PROJECT NO :
4500001473
11 pages
LOCATION
OWNER
CONTRACTOR
PO. NO.
: GRS-CT-N-002
01/04/2014
Rev.
Date
Description
BY
CHKD
APPD
CONTRACTOR
APPD
CLIENT
Date : 01/04/2014
MECHANICAL EQUIPMENT
ERECTION PROCEDURE
Rev: A
Page 2 of 11
REVISION TABLE
REVISION
REVISION
PAGE
REVISION
PAGE
A
ATTACHMENT
A
31
32
33
34
35
36
37
38
39
10
40
11
41
12
42
13
43
14
44
15
45
16
46
15
47
18
48
19
49
20
50
21
51
22
52
23
53
24
54
25
55
26
56
27
57
28
58
29
59
30
60
MECHANICAL EQUIPMENT
ERECTION PROCEDURE
Rev: A
Date : 01/04/2014
Page 3 of 11
RECORD OF REVISION
Rev No
Section
Page
Company Comment
Implemented (Y/N)
Explanation
All
All
Rev: A
MECHANICAL EQUIPMENT
ERECTION PROCEDURE
Date : 01/04/2014
Page 4 of 11
TABLE OF CONTENTS
1.
GENERAL
2.
PURPOSE
3.
REFFERENCE
4.
DESCRIPTION OF PROCEDURE
4.1
4.2
5.
6.
7.
EQUIPMENT INSTALLATION
5.1
Equipment
Vent Stack
GROUTING
6.1
Chipping
6.2
Cleaning
6.3
Making Formwork
6.4
6.5
Clean Up
6.6
Grouting Process
ATTACHMENT
Table 1.1.
Drawing 1.1.
SikaGrout 125
10
Rev: A
MECHANICAL EQUIPMENT
ERECTION PROCEDURE
Date : 01/04/2014
Page 5 of 11
1. General
Installation of Sales Gas Metering Package, Venting System, Power Generation system,Potable
Water and Fire Fighting and Safety System for EPC Gas Metering at Grissiks project, JOB
Pertamina - Talisman, Jambi.
2. Purpose
This procedure covers the installation Mechanical with reference to specifications, standards
and drawings provided by the client and as a guide for companies to carry out the above work.
3. Refference
3.1. PQP
3.2. Flow Chart Mechanical Prosedur
3.3. Equipment Installation Procedure Manual Book.
3.4
Equipment Construction Drawing.
4. Description of Procedure
4.1 .
4.2.
Rev: A
MECHANICAL EQUIPMENT
ERECTION PROCEDURE
Date : 01/04/2014
Page 6 of 11
Ensure that the crane had a solid foundation, if it should be necessary hardening or
setting up a steel plate that corresponds to the capacity.
Perform chipping at the foundation approximately 3-5 cm.
Then mark the position of the padding plate
The surface to be cleaned, and the former chipping moistened, then given cemen
grouting for padding plate and make sure that the elevation of padding plate in
accordance with the specifications or drawing.
5. Equipment Installation
5.1 Equipment :
a.
b.
c.
d.
e.
f.
g.
Sales Gas Filter 38 Inch (OD), 120 Inch (H), Weight 4.800 Kg
Vent CO2 Snuffing Package
Vent Stack
Emergency Diesel Generator Package Dim. 2 m x 1.2 m x 1.35 m, Weight 1.100 Kg
Diesel Supply Tank Dimension 2.54 m x 76.2 m x 1.35 m, Weight 330 Kg
Potable Water Overhead Tank
Equipment Fire Fighting and Safety System
Rev: A
MECHANICAL EQUIPMENT
ERECTION PROCEDURE
Date : 01/04/2014
Page 7 of 11
h. Equipment Sales Gas Metering Package Dim. : 12.55 m x 2.8 m x 2.16 m, Weight
17.500 kg
Installation procedure as follows:
- Installation of using a crane with a capacity of 10 tons
- Position the crane in a safe place, where there are no objects or disturbing material
at the time of swing
- Use as a spreader and chain block lifting aids if necessary
- Setting up a sling and sackle according to capacity and there should be no damage
to the lifting tools
- Assure that sackle accordance with the dimensions of the hole in the lifting lug Gas
Metering equipment skid.
- Taking into account the position of the direction of the equipment is in conformity
with the specifications and drawings
- Install the Gas Metering equipment
- Assure that at the time of installation in accordance with the specification and the
desired elevation
- Install the anchor bolt nut
- When the installation is in accordance with the drawings and specifications, then
remove the sling and other tools
- Have a general elevation in accordance with the specifications and drawings
(accompanied by the inspection report with clients)
- Grouting (See Grouting Procedure)
6. Grouting
Preparation :
a. Chipping
Perform cipping the concrete surface is still flat, so it can penetrate the grout cement
slurry and blend with the concrete base.
b. Cleaning
After chipping activities done then proceed with cleaning the floor surface until no dust,
and other materials to cause the cement grout that may not converge
c. Making Formwork
Formwork need to be made so that at the time of pouring cement grout did not come out
of the foundation going in the grout
d. Preparing Grouting Equipment and Water
Prepare all equipment for the preparation of a grouting cement mixers, clean water.
e. Clean up
After all the preparation is done, then pour water into the location that will digrouting
and let the condition for about 2 hours, then dry the area.
Rev: A
MECHANICAL EQUIPMENT
ERECTION PROCEDURE
Date : 01/04/2014
Page 8 of 11
f. Grouting Process
- After all the preparation is done, it should be noted that the temperature of the water
must follow the appropriate temperature required in the procedure (procedure
parbik).
- Ensure that the results of mixing cement grout according to manufacturer's
standards
- Add water into the mixing vessel and stir slowly until the condition completely
fused cement with water for approximately 5 minutes. (See table 1.1)
- Once the mixture is completely blended, pour cement grout mixture is stirred slowly
into bagasting that has been provided on one side (see figure 1.1).
- Mortar shall evenly to fill every pore under the base plate
- After all the grouting process is done, then let the cars for 3 days (72) hours and the
condition should be kept moist by watering.
Table. (1.1)
SikaGrout 215
No
01
02
Water Requirement
( Litres / 25 Kg bag )
2.75
4.25
Flow Condition
Trowellable
Flowllable
Drawing 1.1
Rev: A
MECHANICAL EQUIPMENT
ERECTION PROCEDURE
Date : 01/04/2014
Page 9 of 11
Rev: A
MECHANICAL EQUIPMENT
ERECTION PROCEDURE
Date : 01/04/2014
Page 10 of 11
Rev: A
MECHANICAL EQUIPMENT
ERECTION PROCEDURE
Date : 01/04/2014
Page 11 of 11