DRIVE TEST REPORT


SITE

SEDJE-DENOU

Is an exiting mono band site with


900MHZ band

2 (17)
Commercial in Confidence
Prepared (also subject responsible if other)

No.

Fidle F.
Approved

Checked

Alex Botwe

Date

Rev.

10/29/2014

TABLE OF CONTENTS

1.
2.
2.1
2.2
2.3
3.
3.1
3.2
3.3
3.4
4.
5.
6.
7.

INTRODUCTION
SITE AUDIT
General Information
Site Engineering Parameter Checking
CDD Checking
DRIVE TEST ANALYSIS
Serving Cell (in Idle mode) Plot for Pre Drive test and after
Coverage (RxLev in Idle Mode) Plot for Pre Drive test and after
Coverage (RxLev in Dedicated Mode) Plot for Pre Drive test and after
Signal Quality (RxQual in Dedicated) Plot for Pre Drive test and after
HOSR Performance for Pre Drive test and after
KPI STATISTICS
CONCLUSION
DRIVE TEST ACCEPTANCE CERTIFICATE

4
4
4
4
4
5
5
6
7
8
8
9
9
10

3 (17)
Commercial in Confidence
Prepared (also subject responsible if other)

No.

Fidle F.
Approved

Checked

Alex Botwe
ABBREVIATIONS

BA
BCCH
BTS
CDD
CGI
KPI
MF
HOSR
RND
TCH
CSSR

BCCH Allocation
Broadcast Control Channel
Base Transceiver Station
Cell Design Data
Cell Global Identity
Key Performance Indicator
Measurement Frequency
Hand Over Success Rate
Radio Network Design
Traffic Channel
Call Setup Success Rate

Date

Rev.

10/29/2014

4 (17)
Commercial in Confidence
Prepared (also subject responsible if other)

No.

Fidle F.
Approved

Checked

Alex Botwe
1

Date

Rev.

10/29/2014

INTRODUCTION
The objective of the report is to document fulfilment of the agreed Responsibility Matrix concerning Radio Network
Design service related to the densification, as offered by Ericsson.

SITE AUDIT
2.1

General information

SEDJE-DENOUis an existing mono band site with 900MHZ serving in their designated areas

2.2

Sites Engineering Parameters Checking


PHYSICAL PARAMETERS

Longitude (deg)
Latitude (deg)
BTS Type
No of TRU's
Frequency Band
RBS Antenna Quantity
RBS Antenna Azimuth
RBS Antenna Electrical Down tilt (deg)
RBS Antenna Mechanical Down tilt
(deg)
RBS Antenna Height above Ground
(m)
Tower Height (m)

MEDED1
2.37704
6.72442
6102

MEDED2
2.37704
6.72442
6102

MEDED3
2.37704
6.72442
6102

4
GSM900
1
0

4
GSM900
1
140

4
GSM900
1
250

41

41

41

45

45

45

MEDED2
ERIBSC1
616-02-742072

BCCH Frequencies

MEDED1
ERIBSC1
616-02-742071
56

BSIC

14

2.3

Remarks
As
As
As
As
As
As
As

planned
planned
planned
planned
planned
planned
planned

As planned

CDD Checking (compare sites founding and CDD)

BSC
CGI

TCH Frequencies

Comments:

64
17

MEDED3 Remarks
ERIBSC1 As planned
616-02-7As planned
42073
58
14

5 (17)
Commercial in Confidence
Prepared (also subject responsible if other)

No.

Fidle F.
Approved

Checked

Alex Botwe
3

Date

Rev.

10/29/2014

DRIVE TEST RESULTS


3.1

Serving Cell (in Idle mode) Plot for Pre Drive test
Before Swap

SEDJE-DENOUIDLE-ServCI Plot

CAN NOT ACESS


BECAUSE THERE IS
WATER

After Swap

CAN NO
T ACESS
BECAU
SE THE
RE
WATER
STILL E IS
XIST

SEDJ E-DENOU POST IDLE -ServCI (N/ A)

40023 (13) 0.5%


40581 (46) 1.9%
40881 (89) 3.7%
40951 (56) 2.3%
42071 (404) 16.8%
42072 (542) 22.6%
42073 (759) 31.6%
42062 (491) 20.5%

Comments: No sector inversion

SEDJE-DENOUIDLE-ServCI Plot

6 (17)
Commercial in Confidence
Prepared (also subject responsible if other)

No.

Fidle F.
Approved

Checked

Alex Botwe
3.2

Date

Rev.

10/29/2014

Coverage (RxLev in Idle Mode) Plot for Pre and Post Drive test
Before Swap SEDJE-DENOUIDLE-RxLev Plot

SEDJ E_DENOU PRE IDLE-ServRxLevIdle (dBm)

Below -95 (21) 1,2%

>=-95 to <-85 (417) 24,6%

>=-85 to <-75 (454) 26,8%

Above -75 (800) 47,3%

After Swap

SEDJ E-DENOU POST IDLE ServRxLevIdle (dBm)

Below -95 (41) 2.6%

>=-95 to <-85 (500) 31.3%

>=-85 to <-75 (499) 31.2%

Above -75 (557) 34.9%

Comments: RxLev on Idle mode become litlle poor .

SEDJE-DENOUIDLE-RxLev Plot

7 (17)
Commercial in Confidence
Prepared (also subject responsible if other)

No.

Fidle F.
Approved

Checked

Alex Botwe

3.3

Date

Rev.

10/29/2014

Coverage (RxLev in Dedicated Mode) Plot for Pre and Post Drive test
Before Swap SEDJE-DENOUDedicated-RxLev Plot

SEDJ E_DENOU PRE DEDICATED-ServRxLevSub (dBm)

Below -95 (6) 0,2%

>=-95 to <-85 (618) 25,6%

>=-85 to <-75 (871) 36,1%

Above -75 (921) 38,1%

After Swap

SEDJ E-DENOU DEDICATED-ServRxLevSub (dBm)

Below -95 (0) 0.0%

>=-95 to <-85 (259) 10.9%

>=-85 to <-75 (952) 39.9%

Above -75 (1172) 49.2%

Comments: On dedicated mode RxLev becomes more improved

SEDJE-DENOUDedicated-RxLev Plot

8 (17)
Commercial in Confidence
Prepared (also subject responsible if other)

No.

Fidle F.
Approved

Checked

Alex Botwe

3.4

Date

Rev.

10/29/2014

Signal Quality (RxQual in Dedicated) Plot for Pre and Post Drive test
Before Swap

SEDJE-DENOUDedicated-RxQual Plot

After Swap

SEDJE-DENOUDedicated-RxQual Plot

SEDJ E_DENOU PRE DEDICATED-ServRxQualSub (RxQual)


>=0 to <3 (1854) 76,7%

>=3 to <5 (354) 14,7%


>=5 to <8 (208) 8,6%

SEDJ E-DENOU DEDICATED-ServRxQualSub (RxQual)

>=0 to <3 (1885) 79.1%


>=3 to <5 (358) 15.0%
>=5 to <8 (140) 5.9%

Comments: Good Received Quality but still following coverage behaviour

9 (17)
Commercial in Confidence
Prepared (also subject responsible if other)

No.

Fidle F.
Approved

Checked

Alex Botwe
4

Date

Rev.

10/29/2014

HOSR Performance Plot for Pre and Post Drive test


Before Swap

SEDJE-DENOUHOSR Performance Plot

After Swap

SEDJE-DENOUHOSR Performance Plot

SEDJ E_DENOU PRE DEDICATED-EventHandoverOK (EVENT)

1 (25) 1,0%

SEDJ E-DENOU DEDICATED-EventHandoverOK (EVENT)

Serving Cell

1 (15) 0.6%

Band

Target Cell

Band of the Target Cell

Comment: Handovers performance is good.

No. of Handover
Attempts

Handover Success
(%)

Handover
Reversion (%)

Handover
Lost (%)

Data
Availability
(%)

10 (17)
Commercial in Confidence
Prepared (also subject responsible if other)

No.

Fidle F.
Approved

Checked

Alex Botwe
5

Date

Rev.

10/29/2014

KPI STATISTICS
SEDJE-DENOUKPI STATISTICS
CELL

Date

CONCLUSION
Globaly, site performance is not too bad

Traffic (E)

TCH Drop (%)

TCH Cong (%)

SDCCH Drop
(%)

CSSR (%)

HOSR (%)

11 (17)
Commercial in Confidence
Prepared (also subject responsible if other)

No.

Fidle F.
Approved

Checked

Alex Botwe

Date

Rev.

10/29/2014

Moov BENIN Drive Test Acceptance Certificate

SITE

SEDJE-DENOU

This is to certify that the SITE SEDJE-DENOU has been implemented and
demonstrated, as per the Contract between the Moov BENIN and Ericsson.
Pending Items, if any, are listed in the Outstanding Items List.

For Moov BENIN

For ERICSSON

......................................................
(Authorized Signatory)

......................................................
(Authorized Signatory)

Name:

Name:

Designation:

Designation:

Place: COTONOU

Place: COTONOU

Date: .......................................

Date: .......................................

SECTOR_1

SECTOR_2

SECTOR_2

SECTOR_3

SECTOR_1

SECTOR_2

SECTOR_2

SECTOR_3

You might also like