Professional Documents
Culture Documents
Commercial in Confidence
Prepared (also subject responsible if other)
No.
Fidle F.
Approved
Checked
Alex Botwe
Date
Rev.
10/29/2014
SEDJE-DENOU
2 (17)
Commercial in Confidence
Prepared (also subject responsible if other)
No.
Fidle F.
Approved
Checked
Alex Botwe
Date
Rev.
10/29/2014
TABLE OF CONTENTS
1.
2.
2.1
2.2
2.3
3.
3.1
3.2
3.3
3.4
4.
5.
6.
7.
INTRODUCTION
SITE AUDIT
General Information
Site Engineering Parameter Checking
CDD Checking
DRIVE TEST ANALYSIS
Serving Cell (in Idle mode) Plot for Pre Drive test and after
Coverage (RxLev in Idle Mode) Plot for Pre Drive test and after
Coverage (RxLev in Dedicated Mode) Plot for Pre Drive test and after
Signal Quality (RxQual in Dedicated) Plot for Pre Drive test and after
HOSR Performance for Pre Drive test and after
KPI STATISTICS
CONCLUSION
DRIVE TEST ACCEPTANCE CERTIFICATE
4
4
4
4
4
5
5
6
7
8
8
9
9
10
3 (17)
Commercial in Confidence
Prepared (also subject responsible if other)
No.
Fidle F.
Approved
Checked
Alex Botwe
ABBREVIATIONS
BA
BCCH
BTS
CDD
CGI
KPI
MF
HOSR
RND
TCH
CSSR
BCCH Allocation
Broadcast Control Channel
Base Transceiver Station
Cell Design Data
Cell Global Identity
Key Performance Indicator
Measurement Frequency
Hand Over Success Rate
Radio Network Design
Traffic Channel
Call Setup Success Rate
Date
Rev.
10/29/2014
4 (17)
Commercial in Confidence
Prepared (also subject responsible if other)
No.
Fidle F.
Approved
Checked
Alex Botwe
1
Date
Rev.
10/29/2014
INTRODUCTION
The objective of the report is to document fulfilment of the agreed Responsibility Matrix concerning Radio Network
Design service related to the densification, as offered by Ericsson.
SITE AUDIT
2.1
General information
SEDJE-DENOUis an existing mono band site with 900MHZ serving in their designated areas
2.2
Longitude (deg)
Latitude (deg)
BTS Type
No of TRU's
Frequency Band
RBS Antenna Quantity
RBS Antenna Azimuth
RBS Antenna Electrical Down tilt (deg)
RBS Antenna Mechanical Down tilt
(deg)
RBS Antenna Height above Ground
(m)
Tower Height (m)
MEDED1
2.37704
6.72442
6102
MEDED2
2.37704
6.72442
6102
MEDED3
2.37704
6.72442
6102
4
GSM900
1
0
4
GSM900
1
140
4
GSM900
1
250
41
41
41
45
45
45
MEDED2
ERIBSC1
616-02-742072
BCCH Frequencies
MEDED1
ERIBSC1
616-02-742071
56
BSIC
14
2.3
Remarks
As
As
As
As
As
As
As
planned
planned
planned
planned
planned
planned
planned
As planned
BSC
CGI
TCH Frequencies
Comments:
64
17
MEDED3 Remarks
ERIBSC1 As planned
616-02-7As planned
42073
58
14
5 (17)
Commercial in Confidence
Prepared (also subject responsible if other)
No.
Fidle F.
Approved
Checked
Alex Botwe
3
Date
Rev.
10/29/2014
Serving Cell (in Idle mode) Plot for Pre Drive test
Before Swap
SEDJE-DENOUIDLE-ServCI Plot
After Swap
CAN NO
T ACESS
BECAU
SE THE
RE
WATER
STILL E IS
XIST
SEDJE-DENOUIDLE-ServCI Plot
6 (17)
Commercial in Confidence
Prepared (also subject responsible if other)
No.
Fidle F.
Approved
Checked
Alex Botwe
3.2
Date
Rev.
10/29/2014
Coverage (RxLev in Idle Mode) Plot for Pre and Post Drive test
Before Swap SEDJE-DENOUIDLE-RxLev Plot
After Swap
SEDJE-DENOUIDLE-RxLev Plot
7 (17)
Commercial in Confidence
Prepared (also subject responsible if other)
No.
Fidle F.
Approved
Checked
Alex Botwe
3.3
Date
Rev.
10/29/2014
Coverage (RxLev in Dedicated Mode) Plot for Pre and Post Drive test
Before Swap SEDJE-DENOUDedicated-RxLev Plot
After Swap
SEDJE-DENOUDedicated-RxLev Plot
8 (17)
Commercial in Confidence
Prepared (also subject responsible if other)
No.
Fidle F.
Approved
Checked
Alex Botwe
3.4
Date
Rev.
10/29/2014
Signal Quality (RxQual in Dedicated) Plot for Pre and Post Drive test
Before Swap
SEDJE-DENOUDedicated-RxQual Plot
After Swap
SEDJE-DENOUDedicated-RxQual Plot
9 (17)
Commercial in Confidence
Prepared (also subject responsible if other)
No.
Fidle F.
Approved
Checked
Alex Botwe
4
Date
Rev.
10/29/2014
After Swap
1 (25) 1,0%
Serving Cell
1 (15) 0.6%
Band
Target Cell
No. of Handover
Attempts
Handover Success
(%)
Handover
Reversion (%)
Handover
Lost (%)
Data
Availability
(%)
10 (17)
Commercial in Confidence
Prepared (also subject responsible if other)
No.
Fidle F.
Approved
Checked
Alex Botwe
5
Date
Rev.
10/29/2014
KPI STATISTICS
SEDJE-DENOUKPI STATISTICS
CELL
Date
CONCLUSION
Globaly, site performance is not too bad
Traffic (E)
SDCCH Drop
(%)
CSSR (%)
HOSR (%)
11 (17)
Commercial in Confidence
Prepared (also subject responsible if other)
No.
Fidle F.
Approved
Checked
Alex Botwe
Date
Rev.
10/29/2014
SITE
SEDJE-DENOU
This is to certify that the SITE SEDJE-DENOU has been implemented and
demonstrated, as per the Contract between the Moov BENIN and Ericsson.
Pending Items, if any, are listed in the Outstanding Items List.
For ERICSSON
......................................................
(Authorized Signatory)
......................................................
(Authorized Signatory)
Name:
Name:
Designation:
Designation:
Place: COTONOU
Place: COTONOU
Date: .......................................
Date: .......................................
SECTOR_1
SECTOR_2
SECTOR_2
SECTOR_3
SECTOR_1
SECTOR_2
SECTOR_2
SECTOR_3