Content:1.

Objective

2.

Efficiently SSV Report Preparation (subcon)

3.

SSV - Drive Test Flow


1.

A. Moving Test Method & KPI

2.

B1 Static Test Attach Setup Time

3.

B2 Static Test EPS Bearer Setup Time

4.

B3 Static Test Ping Test

5.

B4 Static Test Static FTP UL & DL Test

6.

B5 Static Test Speed Test

4.

Appendix 1 Drive Test Basic Knowledge

5.

Attachment 1 DT using GENEX Probe V3R5

6.

Attachment 2 - Single Site Verification Flow_V1.1

7.

Attachment 3 - SSV Guideline (Simplified M.Word)


HUAWEI TECHNOLOGIES CO., LTD.

Page
Huawei proprietary. No spread without permission.

Objective
Upon completion of these, you should able to:i. Understand the progress of SSV Report Preparation Progress

Understand how is the progress of SSV test upon receive the


related site assigned
ii. How to conduct the SSV Drive Test on site
Understand how to conduct the SSV test using GENEX Probe
and related equipment.
iii. Requirements from a SSV Test.
Understand the output required from a SSV test.

HUAWEI TECHNOLOGIES CO., LTD.

Page
Huawei proprietary. No spread without permission.

SSV Report Preparation Flow


(For Sub-Con)

HUAWEI TECHNOLOGIES CO., LTD.

Page
Huawei proprietary. No spread without permission.

Efficiently SSV Report Preparation (subcon)


Received site assigned by Huawei

Site Audit Result


- Lat Long
- Azimuth
- Tilting

Site Planning Output


- Prediction Cov Plot
- Comparison Cov Plot

Clear to conduct SSV

Not
OK
Drive Test Result

Prepare SSV Report Template with completed data


DT Engineer Upload file to
Public Server once COMPLETE,
send link to reporter.

Complete SSV Report

Fill up KPI excel


sheet, feedback
Huawei within 24
hrs.

Cross Check FULL Report


Submit to Huawei FULL SSV Report within 3 working days from
SSV Drive Test Completed date.
Close

OK

Not OK
Huawei Cross Check

HUAWEI TECHNOLOGIES CO., LTD.

Feedback
Huawei, retest after reconfirm

KPI sheet:Reject to sub-con,


revised within 1
working day

Page
Huawei proprietary. No spread without permission.

SSV Drive Test at Site

HUAWEI TECHNOLOGIES CO., LTD.

Page
Huawei proprietary. No spread without permission.

SSV - Drive Test Flow


Site assign by Huawei
SSV Report

Site audit

SSV Drive Test : Cross check


site alarm before start

A. Moving Test

B1. Attach Setup


Time

B2. EPS Bearer


Setup Time

Site
Planning

Note down Alarm type,


feedback to Huawei
(performance alarm)

Yes

B. Static Test

B3. Ping Test

B4. Static FTP UL


& DL Test

Feedback to
Huawei if theres
any unachievable
KPI.

Fill in KPI excel Sheet (within 24hrs after DT complete)


SSV Report
HUAWEI TECHNOLOGIES CO., LTD.

Page
Huawei proprietary. No spread without permission.

B5. Speed Test

A. Moving Test Method & KPI


A. Moving Test

KPI to look into-

1. Login to FTP Server using Filezilla and select


multiple file for DL.
2. Begin DT in clockwise & anti-clockwise
directions at least in two different file.
3. Save the DT log, cross check all KPI achieved.
Ensure naming of log are correct

KPI01 - Intra-HO : => 98%


KPI02 - EUTRAN Call Drop <=2%
KPI03 - SINR
: =>2dB, =>96%

Other Aware
Cross check on cross feeder / swap
sector problem during moving test.
Capture and report to Huawei if any.

4. Fill up the KPI excel sheet, submit to Huawei


within 24 hours

FTP Server:
IP
: 10.255.1.2
UN / PW : huawei / huawei
(Log file naming format:- <ddmmyyyy>_<Sitename>_FMv_D<1/2>_<1/2/3/4/5>
Example:- 31082013_ Angke Kusuma M-S-RT _FMv_D1_1)
HUAWEI TECHNOLOGIES CO., LTD.

Page
Huawei proprietary. No spread without permission.

B1 Static Test Attach Setup Time


B. Static Test

B1. Attach Setup


Time

KPI to look into-

1. Choose a good spot (RSRP > 85dBm, SINR > 20dB)


2. Perform Attach Connection TimeTest, run test plan.
(refer attachment)
3. Save the DT log, cross check all KPI achieved. Ensure
naming of log are correct

KPI04 Ave. Attach Connection


Time : <500ms
KPI05 Attach SR : => 98%
KPI06 RRC SSR : => 98%

Other Aware
Ensure 20 attach samples made.
Test Plan:

4. Fill up the KPI excel sheet, submit to Huawei within


24 hours

(Log file naming format:- <ddmmyyyy>_<Sitename>_Att_S<1/2/3>


Example:- 31082013_ Angke Kusuma M-S-RT _Att_S1)
HUAWEI TECHNOLOGIES CO., LTD.

Page
Huawei proprietary. No spread without permission.

B2 Static Test EPS Bearer Setup Time


B. Static Test

B2. EPS Bearer


Setup Time
1. Choose a good spot (RSRP > 85dBm, SINR > 20dB)

KPI to look intoKPI06 EPS Setup Time : <=105ms

2. Perform EPS Bearer Setup Test, run test plan.


(refer attachment)
3. Save the DT log, cross check all KPI achieved. Ensure
naming of log are correct

Other Aware
Ensure 10 samples made.
Test Plan:

4. Fill up the KPI excel sheet, submit to Huawei within


24 hours

(Log file naming format:- <ddmmyyyy>_<Sitename>_I2A_S<1/2/3>)


Example:- 31082013_ Angke Kusuma M-S-RT _I2A_S1)
HUAWEI TECHNOLOGIES CO., LTD.

Page
Huawei proprietary. No spread without permission.

10

B3 Static Test Ping Test


B. Static Test

B3. Ping Test

1. Choose a good spot (RSRP > 85dBm, SINR > 20dB)


2. Perform Ping Test using CMD from Window.
3. Screen shot the result, ensure KPI achieved.

KPI to look intoKPI07 Ping Latency: <=30ms

Other Aware
- Ensure 100 samples made.
- Ensure screen shot as below:

4. Fill up the KPI excel sheet, submit to Huawei within


24 hours

Ping command:a. ping 10.1.12.49 n100


b. ping 10.1.12.105 n 100
(Screen shot naming format:- <ddmmyyyy>_<Sitename>_Ping_S<1/2/3>)
Example:- 31082013_ Angke Kusuma M-S-RT _Ping_S1)
HUAWEI TECHNOLOGIES CO., LTD.

Page
Huawei proprietary. No spread without permission.

11

B4 Static Test Static FTP UL & DL Test


B. Static Test

KPI to look into-

B4. Static FTP UL


& DL Test

KPI08 FTP DL (Near) 90% => 55Mbps


KPI09 FTP UL (Near) 90% => 7Mbps

1. Choose 3 different location; Near, Middle, Far


2. Perform FTP DL & FTP UL Test over Filezilla.
3. Save the DT log, cross check all KPI achieved. Ensure
naming of log are correct

Other Aware
- Ensure Multiple tread DL / UL.
- Ensure DL / UL more than 120sec / 2min
- Near (SINR >= 25 dB) / Middle (15 dB =<
SINR < 25 dB) / Far (SINR < 15 dB)

4. Fill up the KPI excel sheet, submit to Huawei within


24 hours

FTP Server:
IP
: 10.255.1.2
UN / PW : huawei / huawei
(Log file naming format :- <ddmmyyyy>_<Sitename>_FTP_<DL/UL>_<Nr/Md/Fr>_S<1/2/3>
Example:- 31082013_ Angke Kusuma M-S-RT_FTP_DL_Nr _S1)
HUAWEI TECHNOLOGIES CO., LTD.

Page
Huawei proprietary. No spread without permission.

12

B5 Static Test Speed Test


B. Static Test

KPI to look intoB5. Speed Test


1. Choose 3 different location; Near, Middle, Far
2. Perform Speedtest at www.speedtest.net
3. Choose the correct server related to operator for
test. Eg PT.Internux server @ Tangereng

N/A (ensure the throughput at near is


readable

Other Aware
-Ensure correct server are chosen
- Near (SINR >= 25 dB) / Middle (15 dB =<
SINR < 25 dB) / Far (SINR < 15 dB)
-Ensure screenshot correct as below:-

4. Screen shot the result, ensure KPI achieved.


5. Fill up the KPI excel sheet, submit to Huawei within
24 hours

(Screen shot naming format:- <ddmmyyyy>_<Sitename>_<Inux/Indo/SFren/Telkom>_<Nr/Md/Fr>_S<1/2/3>)


Example:- 31082013_ Angke Kusuma M-S-RT_Inux_Nr _S1)
HUAWEI TECHNOLOGIES CO., LTD.

Page
Huawei proprietary. No spread without permission.

13

Appendix 1 Drive Test Basic


Knowledge

HUAWEI TECHNOLOGIES CO., LTD.

Page
Huawei proprietary. No spread without permission.

14

Radio Parameter @ GENEX Probe


PCI (Physical Cell Identifier)
Value range : 0 839, cross-check any cross
feeder problem when conducting moving
test.
RSRP (Reference Signal Receive Power)
-70 dBm to -90 dBm
Good
-91 dBm to -110 dBm Normal
-110 dBm to -130 dBm Bad
SINR (Signal to Interference+Noise Ratio)
16 dB to 30 dB
Good
1 dB to 15 dB
Normal
-10 dB to 0 dB
Bad

HUAWEI TECHNOLOGIES CO., LTD.

Page
Huawei proprietary. No spread without permission.

15

Radio Parameter @ GENEX Probecont


Modulation Coding Scheme

64 QAM Good
16 QAM Normal
QPSK
Bad

Neighboring cell
HUAWEI TECHNOLOGIES CO., LTD.

Downlink EARFCN
Page
Huawei proprietary. No spread without permission.

16

On-Site Hardware

MIMO Antenna

BBU : Baseband Unit

RRU : Radio Remote Unit


HUAWEI TECHNOLOGIES CO., LTD.

Page
Huawei proprietary. No spread without permission.

17

Attachment 1 DT using GENEX


Probe V3R5
Guideline on Probe V3R5

HUAWEI TECHNOLOGIES CO., LTD.

Page
Huawei proprietary. No spread without permission.

18

Attachment 2
Single Site Verification Flow_V1.1
SSV Flow V1.1 (Full Flow)

HUAWEI TECHNOLOGIES CO., LTD.

Page
Huawei proprietary. No spread without permission.

19

Attachment 3
SSV Guideline
(Simplified M.Words)
SSV Guideline (Microsoft Words)

HUAWEI TECHNOLOGIES CO., LTD.

Page
Huawei proprietary. No spread without permission.

20

Thank you
www.huawei.com
Copyright2011 Huawei Technologies Co., Ltd. All Rights Reserved.
The information in this document may contain predictive statements including, without limitation,
statements regarding the future financial and operating results, future product portfolio, new
technology, etc. There are a number of factors that could cause actual results and developments to
differ materially from those expressed or implied in the predictive statements. Therefore, such
information is provided for reference purpose only and constitutes neither an offer nor an
acceptance. Huawei may change the information at any time without notice.

You might also like