You are on page 1of 20

Mukasurat 1 dari 4

NO. KONTRAK :

PKNS/IP/KP/KON-07/2010

MEMBINA DAN MENYIAPKAN 94 UNIT RUMAH LINK (24 x 65) 2 TINGKAT FASA 2, SEBUAH PENCAWANG ELEKTRIK (SINGLE CHAMBER), SERTA
KERJA-KERJA INFRASTRUKTUR YANG BERKAITAN DI SEKSYEN 2, KOTA PUTERI, DAERAH GOMBAK, SELANGOR DARUL EHSAN
Tajuk

Pindaan/Tambahan Kepada Kerja-kerja Bangunan dan Luar Bangunan


~ Kerja-kerja Cerucuk

Item

Description

BQ
Reference

Contract
Unit

As Per
Quotation

Rate
Qty

Amount

Qty

Specification and General Labour Clauses :For description of materials, workmanship and general
labour applicable to this Bill , see "Specification" (Part F)
PILING WORKS
PREAMBLES
Note:The contractor shall note that all precast concrete piles shall
be obtained from an approved manufacturer.
Piling equipment used shall be of the hammer type or other
approved by the Authority and to the approval of the S.O.
The pay length for supply of the concrete piles shall be
measured from toe to cut off level.
The pay length for driving shall be measured from toe
to commencing ground level.
The rate for pay length of the pile shall be deemed to
include whether the pile is driven in singly or cluster ,
shoeing , pointing and wastages. The rates shall also
deemed to include for piling on flat or sloping ground
including all the necessary modifications to piling frame to
accomodate stiff or any gradient of slope.
A

Allow for the provision of mobilisation for all necessary piling


equipment, plant, tools and ancillary equipment to site and
handling, assembling and removal off site upon completion
of the work, etc.

No

Allow for moving and handling piling equipment etc. about


the site as often and whenever necesssary including all
idling times and all necessary excavation and filling with
crusher run to form a firm working platform etc.

Item

Allow for welding machine to site and handling, assembling


and removal off site upon completion of the work, etc.

Item

TOTAL CARRIED FORWARD

25,000.00

Mukasurat 2 dari 4
NO. KONTRAK :

PKNS/IP/KP/KON-07/2010

MEMBINA DAN MENYIAPKAN 94 UNIT RUMAH LINK (24 x 65) 2 TINGKAT FASA 2, SEBUAH PENCAWANG ELEKTRIK (SINGLE CHAMBER), SERTA
KERJA-KERJA INFRASTRUKTUR YANG BERKAITAN DI SEKSYEN 2, KOTA PUTERI, DAERAH GOMBAK, SELANGOR DARUL EHSAN
Tajuk

Item

Pindaan/Tambahan Kepada Kerja-kerja Bangunan dan Luar Bangunan


Kerja-kerja Tambahan - Kerja-kerja Cerucuk

Description

BQ
Reference

Contract
Unit

As Per
Quotation

Rate
Qty

TOTAL BROUGHT FORWARD

Amount

Qty
-

The following in Main Building:The following in approved precast concrete Grade 45 pile
including all reinforcement, jointing plates, etc. :A

Supply only 150mm x 150mm initial pile in 6.00m length

35.00

4,416

Supply only 150mm x 150mm extension pile in 3.00m


length

45.00

978

Supply only 150mm x 150mm extension pile in 6.00m


length

35.00

3,924

Handle, transport and pitch 150mm x 150mm initial piles in


6.00m length

No

12.00

736

Handle, transport and pitch 150mm x 150mm extension


piles in 3.00m length

No

12.00

326

Handle, transport and pitch 150mm x 150mm extension


piles in 6.00m length

No

12.00

654

Drive only 150mm x 150mm precast concrete piles not


exceeding 10.00m deep

8.50

6,790

Ditto exceeding 10.00m and not exceeding 13.00m deep

8.50

827

Do exceeding 13.00m and not exceeding 16.00m deep

8.50

425

Do exceeding 16.00m and not exceeding 19.00m deep

8.50

172

Labour and material for welding extension joint for 150mm x


150mm precast concrete piles including all necessary mild
steel plate with fillet welded to manufacturer's specification

No

15.00

723

No

20.00

No

50.00

Cut off and hack off top of 150mm x 150mm precast


concrete piles by means of pneumatic tools down to the
required cut off level and bent steel reinforcement for tying
with new reinforcement for casting into pilecaps including all
necessary cutting off excess length of reinforcement
Mild steel 'X' pointed shoe welded to mild steel plate for
150mm x 150mm pile

737

TOTAL CARRIED FORWARD

Mukasurat 3 dari 4
NO. KONTRAK :

PKNS/IP/KP/KON-07/2010

MEMBINA DAN MENYIAPKAN 94 UNIT RUMAH LINK (24 x 65) 2 TINGKAT FASA 2, SEBUAH PENCAWANG ELEKTRIK (SINGLE CHAMBER), SERTA
KERJA-KERJA INFRASTRUKTUR YANG BERKAITAN DI SEKSYEN 2, KOTA PUTERI, DAERAH GOMBAK, SELANGOR DARUL EHSAN
Tajuk

Item

Pindaan/Tambahan Kepada Kerja-kerja Bangunan dan Luar Bangunan


Kerja-kerja Tambahan - Kerja-kerja Cerucuk

Description

BQ
Reference

Contract
Unit

Qty

TOTAL BROUGHT FORWARD


A

No

8,500.00

Integrity test for 150mm x 150mm pile using pile driving


analyser (PDA) at random. The point to be tested shall be
decided by the S.O. in conjunction with Engineer. The test
shall be carried out by specialist to the approved of S.O.

No

2,000.00

14

Allow for dolly of pile as per requested by the Engineer /


S.O.

No

50.00

Allow for carried out trial driven points and to be tested at


every block all as per Engineer's Drawings

No

100.00

Allow for the provision of mobilisation for all necessary piling


equipment, plant, tools and ancillary equipment to site and
handling, assembling and removal off site upon completion
of the work, etc.

Item

Allow for moving and handling piling equipment etc. about


the site as often and whenever necesssary including all
idling times and all necessary excavation and filling with
crusher run to form a firm working platform etc.

Item

Supply only 150mm x 150mm initial pile in 6.00m length

35.00

Supply only 150mm x 150mm extension pile in 6.00m


length

35.00

Handle, transport and pitch 150mm x 150mm initial piles in


6.00m length

No

12.00

Handle, transport and pitch 150mm x 150mm extension


piles in 6.00m length

No

12.00

Drive only 150mm x 150mm precast concrete piles not


exceeding 10.00m deep

8.50

Ditto exceeding 10.00m but not exceeding 13.00m deep

8.50

Qty

Provide all necessary equipment for carrying out maintain


load test on 150mm x 150mm precast concrete piles up to
twice working load (100kN per working load)

The following in approved precast concrete Grade 40 pile


including all reinforcement, jointing plates, etc. :-

Amount
-

The following in TNB Substation:-

As Per
Quotation

Rate

50

TOTAL CARRIED FORWARD

Mukasurat 4 dari 4
NO. KONTRAK :

PKNS/IP/KP/KON-07/2010

MEMBINA DAN MENYIAPKAN 94 UNIT RUMAH LINK (24 x 65) 2 TINGKAT FASA 2, SEBUAH PENCAWANG ELEKTRIK (SINGLE CHAMBER), SERTA
KERJA-KERJA INFRASTRUKTUR YANG BERKAITAN DI SEKSYEN 2, KOTA PUTERI, DAERAH GOMBAK, SELANGOR DARUL EHSAN
Tajuk

Pindaan/Tambahan Kepada Kerja-kerja Bangunan dan Luar Bangunan


Kerja-kerja Tambahan - Kerja-kerja Cerucuk

Item

BQ
Reference

Description

Contract
Unit

Qty

TOTAL BROUGHT FORWARD


A

No

15.00

Mild steel 'X' pointed shoe welded to mild steel plate for
150mm x 150mm pile

No

50.00

Provide all necessary equipment for carrying out maintain


load test on 150mm x 150mm precast concrete piles up to
twice working load (100kN per working load)

No

8,500.00

Integrity test for 150mm x 150mm pile using pile driving


analyser (PDA) at random. The point to be tested shall be
decided by the S.O. in conjunction with Engineer. The test
shall be carried out by specialist to the approved of S.O.

No

2,000.00

Allow for As-built drawings and measurement of piling


density

Item

Allow for setting out of piling works

Item

Allow for idling time during maintain load test of the 50 trial
pile

Item

Disediakan Oleh :

Disemak Oleh :

Amount

Qty
-

Labour and material for welding extension joint for 150mm x


150mm precast concrete piles including all necessary mild
steel plate with fillet welded to manufacturer's specification

JUMLAH DIBAWA KE LAMPIRAN `A'

As Per
Quotation

Rate

Disahkan Oleh :

JURUKUR BAHAN

PRINSIPAL JURUKUR BAHAN

PENOLONG JURUTERA KANAN

Lampiran A
Mukasurat 1 dari 4

NGLE CHAMBER), SERTA


HSAN

As Per
Quotation
Amount

50,000.00

20,000.00

15,000.00

85,000.00

Lampiran A
Mukasurat 2 dari 4

NGLE CHAMBER), SERTA


HSAN

As Per
Quotation
Amount
85,000.00

154,560.00

44,010.00

137,340.00

8,832.00

3,912.00

7,848.00

57,715.00
7,029.50
3,612.50
1,462.00

10,845.00

36,850.00

559,016.00
Lampiran A
Mukasurat 3 dari 4

NGLE CHAMBER), SERTA


HSAN

As Per
Quotation
Amount
559,016.00

8,500.00

28,000.00

5,000.00

600,516.00
Lampiran A
Mukasurat 4 dari 4

NGLE CHAMBER), SERTA


HSAN

As Per
Quotation
Amount
600,516.00

15,000.00
25,000.00

640,516.00
420000
220,516

G JURUTERA KANAN

SUMMARY OF PILING RECORD


PROJECT TITLE

PILE SIZE
DATE

21/05/12
22/05/12
22/05/12
24/05/12
24/05/12

22/05/12
22/05/12
22/05/12

22/05/12
22/05/12
22/05/12
22/05/12

22/05/12
22/05/12
22/05/12

23/05/12
23/05/12
23/05/12

23/05/12
23/05/12
23/05/12

23/05/12
23/05/12
23/05/12
23/05/12

22/05/12
22/05/12
22/05/12

DATE
RECEIVED

24/05/12

24/05/12

24/05/12

24/05/12

24/05/12

24/05/12

24/05/12

24/05/12

BLOCK

PILE
POSITIO
N

47
3
31
48
49

13
33
68

4
37
66
94

14
42
80

3
58
87

13
60
80

4
31
58
95

12
35
58

MEMBINA DAN MENYIAPKAN 94 UNIT RUMAH LINK 2 TINGKAT (24 X 65) FASA 2, SEBUAH PENCAWANG ELEKTRIK SERTA KERJA-KERJA INFRASTRUKTUR YANG
BERKAITAN DI SEKSYEN 2, KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN.
150 MM X 150 MM RC PILE (40 NOS. TRIAL POINTS)
SUPLLY INITIAL
6M
3M
no
no

SUPPLY EXTENSION
6M
3M
no
no

HANDLE
6M
3M
no
no

DRIVEN
PENT

< 10M
m

10 - 13
m

13 - 16
m

1.00
1.00
1.00
1.00
1.00
5.00

1.00
1.00
2.00

4.00
1.00
1.00
2.00
1.00
9.00

1.00
1.00
1.00
2.00
2.00
7.00

4.00
1.00
1.00
2.00
1.00
9.00
Average

16.00
8.00
8.00
15.10
13.00
60.10
12.02

10.00
8.00
8.00
10.00
10.00
46.00

3.00

3.00

3.00
3.00
9.00

2.10

1.00
1.00
1.00
3.00

2.00
2.00
2.00
6.00

1.00
1.00
1.00
3.00

2.00
2.00
2.00
6.00
Average

11.00
9.10
9.20
29.30
9.77

10.00
9.10
9.20
28.30

1.00

1.00
1.00
1.00
1.00
4.00

2.00
2.00
2.00
6.00

1.00
1.00
1.00
1.00
4.00

2.00
2.00
2.00
6.00
Average

9.10
10.00
9.10
5.10
33.30
8.33

9.10
10.00
9.10
5.10
33.30

1.00
1.00
1.00
3.00

2.00
3.00
3.00
8.00

1.00
1.00
1.00
3.00

2.00
3.00
3.00
8.00
Average

11.20
13.10
12.10
36.40
12.13

10.00
10.00
10.00
30.00

1.20
3.00
2.10
6.30

1.00
1.00
1.00
3.00

1.00
2.00
3.00
6.00

1.00
1.00
1.00
3.00

1.00
2.00
3.00
6.00
Average

8.20
10.20
13.20
31.60
10.53

8.20
10.00
10.00
28.20

0.20
3.00
3.20

1.00
1.00
1.00
3.00

2.00
2.00
2.00
6.00

1.00
1.00
1.00
3.00

2.00
2.00
2.00
6.00
Average

10.20
11.20
10.10
31.50
10.50

10.00
10.00
10.00
30.00

0.20
1.20
0.10
1.50

1.00
1.00
1.00
1.00
4.00

3.00
3.00
2.00
2.00
10.00

1.00
1.00
1.00
1.00
4.00

3.00
3.00
2.00
2.00
10.00
Average

13.00
13.10
10.10
11.10
47.30
11.83

10.00
10.00
10.00
10.00
40.00

3.00
3.00
0.10
1.10
7.20

1.00
1.00
1.00
3.00

2.00
1.00
3.00

1.00
1.00
1.00
3.00

2.00
1.00
3.00
Average

10.00
8.10
5.20
23.30
7.77

10.00
8.10
5.20
23.30

1.00

5.10

16 - 19
m

19 - 22
m

22 - 25
m

25 - 28
m

28 - 31
m

0.20
0.20

SHOE
no

4.00
1.00
1.00
3.00
1.00
10.00

1.00
1.00
1.00
1.00
1.00
5.00

11.00
9.10
9.20
29.30

2.00
2.00
2.00
6.00

1.00
1.00
1.00
3.00

9.10
10.00
9.10
5.10
33.30

2.00
2.00
2.00
6.00

1.00
1.00
1.00
1.00
4.00

11.20
13.10
12.10
36.40

2.00
3.00
3.00
8.00

1.00
1.00
1.00
3.00

8.20
10.20
13.20
31.60

1.00
2.00
3.00
6.00

1.00
1.00
1.00
3.00

10.20
11.20
10.10
31.50

2.00
2.00
2.00
6.00

1.00
1.00
1.00
3.00

13.00
13.10
10.10
11.10
47.30

3.00
3.00
2.00
2.00
10.00

1.00
1.00
1.00
1.00
4.00

2.00
1.00

10.00
8.10
5.20
23.30

1.00
1.00
1.00
3.00

0.10

0.10

WELD
JOINTS
no

16.00
8.00
8.00
15.10
13.00
60.10

0.10
0.10

Check
m

3.00

SUMMARY OF PILING RECORD


PROJECT TITLE

PILE SIZE

DATE
RECEIVED
22/05/12
24/05/12
22/05/12
22/05/12
DATE

21/05/12
21/05/12
21/05/12

23/05/12
23/05/12
23/05/12

24/05/12
24/05/12
24/05/12

24/05/12

24/05/12

28/05/12

BLOCK
I

PILE
POSITIO
N
50
6
22

4
38
58

9
41
67

32
47
2

TOTAL FOR 40 NOS TRIAL POINTS

SUPPLY

INITIAL
EXTENSION

HANDLE

MEMBINA DAN MENYIAPKAN 94 UNIT RUMAH LINK 2 TINGKAT (24 X 65) FASA 2, SEBUAH PENCAWANG ELEKTRIK SERTA KERJA-KERJA INFRASTRUKTUR YANG
BERKAITAN DI SEKSYEN 2, KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN.
150 MM X 150 MM RC PILE (40 NOS. TRIAL POINTS)
SUPLLY INITIAL
6M
3M
1.00
1.00
1.00
3.00
-

SUPPLY EXTENSION
6M
3M
1.00
1.00
1.00
3.00

HANDLE
6M
3M
1.00
1.00
1.00
1.00
1.00
1.00
3.00
3.00
Average

DRIVEN
PENT
7.20
6.00
6.20
19.40
6.47

< 10M
7.20
6.00
6.20
19.40

10 - 13

13 - 16

16 - 19

19 - 22

22 - 25

25 - 28

7.20
6.00
6.20
19.40

Check
-

WELD
JOINTS
1.00
1.00
1.00
3.00

8.10
9.20
12.10
29.40

1.00
2.00
3.00
6.00

1.00
1.00
1.00
3.00

17.00
14.10
12.10
43.20

4.00
3.00
3.00
10.00

1.00
1.00
1.00
3.00

3.00
1.00
4.00
8.00

1.00
1.00
1.00
3.00

82.00

40.00

28 - 31

1.00
1.00
1.00
3.00

1.00
2.00
3.00
6.00

1.00
1.00
1.00
3.00

1.00
2.00
3.00
6.00
Average

8.10
9.20
12.10
29.40
9.80

8.10
9.20
10.00
27.30

2.10
2.10

1.00
1.00
1.00
3.00

4.00
3.00
3.00
10.00

1.00
1.00
1.00
3.00

4.00
3.00
3.00
10.00
Average

17.00
14.10
12.10
43.20
14.40

10.00
10.00
10.00
30.00

3.00
3.00
2.10
8.10

1.00
1.00
1.00
3.00

1.00
1.00

3.00
4.00
7.00

1.00
2.00
1.00
4.00

3.00
4.00
7.00
Average

12.10
11.00
15.10
38.20
12.73

10.00
10.00
10.00
30.00

2.10
1.00
3.00
6.10

2.10
2.10

12.10
11.00
15.10
38.20

40.00

3.00

80.00

43.00

80.00
Average

423.00
10.58

365.80

44.50

11.70

1.00

423.00

240.00
18.00
240.00
258.00
240.00

258.00
240.00

6M
3M
6M
3M
6M
3M

40.00
3.00
80.00
43.00
80.00

3.00
1.10

1.00

4.10

1.00

SHOE
1.00
1.00
1.00
3.00

SUMMARY OF PILING RECORD


PROJECT TITLE

PILE SIZE

DATE

21/05/12
22/05/12

DATE
RECEIVED

24/05/12

PILE
BLOCK POSITIO
N

22/05/12
24/05/12
24/05/12

MEMBINA DAN MENYIAPKAN 94 UNIT RUMAH LINK 2 TINGKAT (24 X 65) FASA 2, SEBUAH PENCAWANG ELEKTRIK SERTA KERJA-KERJA INFRASTRUKTUR YANG
BERKAITAN DI SEKSYEN 2, KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN.
150 MM X 150 MM RC PILE
SUPLLY INITIAL
6M
3M
no
no

47
3

1.00
1.00

31
48

1.00
1.00

49

1.00
5.00

SUPPLY EXTENSION
6M
3M
no
no

HANDLE
6M
3M
no
no

24/05/12

11/06/12

21/06/12

1.00
1.00

4.00
1.00

16.00
8.00

10.00
8.00

1.00

1.00
2.00

1.00
2.00

1.00
2.00

8.00
15.10

1.00

1.00

2.00

1.00

2.00

9.00

7.00

9.00

24/05/12

22/05/12
22/05/12
11/06/12

21/06/12

3.00

3.00

8.00
10.00

3.00

2.10

13.00

10.00

3.00

60.10

46.00

9.00

1.00

5.10

Check
m

WELD
JOINTS
no

SHOE
no

16.00
8.00

4.00
1.00

8.00
15.10

1.00
3.00

13.00

2.00

1.00
1.00

60.10

11.00

5.00

1.00
1.00

1.00
1.00
1.00

12.02

13

1.00

2.00

1.00

2.00

11.00

10.00

11.00

2.00

33
68

1.00
1.00

2.00
2.00

1.00
1.00

2.00
2.00

9.10
9.20

9.10
9.20

9.10
9.20

2.00
2.00

49

1.00

1.00

1.00

1.00

9.60

9.60

9.60

1.00

1.00
1.00

4.00

7.00

4.00

7.00

38.90

37.90

38.90

7.00

4.00

Average

22/05/12
22/05/12

< 10M 10 - 13 13 - 16 16 - 19 19 - 22 22 - 25 25 - 28 28 - 31
m
m
m
m
m
m
m
m

4.00
1.00

Average

22/05/12
22/05/12
22/05/12

DRIVEN
PENT

1.00

9.73

4
37

1.00
1.00

2.00
2.00

1.00
1.00

2.00
2.00

9.10
10.00

9.10
10.00

9.10
10.00

2.00
2.00

1.00
1.00

66
94
29

1.00
1.00
1.00

2.00
1.00

1.00
1.00
1.00

2.00
1.00

9.10
5.10
8.60

9.10
5.10
8.60

9.10
5.10
8.60

2.00
1.00

1.00
1.00

5.00

7.00

5.00

7.00

41.90

41.90

41.90

7.00

5.00

Average

1.00

8.38

14

1.00

2.00

1.00

2.00

11.20

10.00

1.20

11.20

2.00

42

1.00

3.00

1.00

3.00

13.10

10.00

3.00

0.10

13.10

3.00

1.00
1.00

11/6/2012

56

1.00

3.00

1.00

3.00

14.00

10.00

3.00

1.00

14.00

2.00

1.00

22/05/12

80

1.00

3.00

1.00

3.00

12.10

10.00

2.10

12.10

3.00

1.00

4.00

11.00

4.00

11.00

50.40

40.00

9.30

50.40

10.00

4.00

Average

12.60

8.20
11.60
10.20

1.00
1.00
2.00

13.20

3.00

1.00
1.00
1.00
1.00

43.20

7.00

4.00

22/05/12
22/05/12

23/05/12
11/6/2012
23/05/12
23/05/12

24/05/12

24/05/12

13
32
58

1.00
1.00
1.00

87

1.00

4.00

1.00
1.00

1.10

1.00
2.00

1.00
2.00
1.00

1.00
2.00

8.20
11.60
10.20

8.20
10.00
10.00

1.60
0.20

3.00

1.00

3.00

13.20

10.00

3.00

0.20

6.00

5.00

6.00

43.20

38.20

4.80

0.20

SUMMARY OF PILING RECORD


PROJECT TITLE

PILE SIZE

DATE

DATE
RECEIVED

PILE
BLOCK POSITIO
N

MEMBINA DAN MENYIAPKAN 94 UNIT RUMAH LINK 2 TINGKAT (24 X 65) FASA 2, SEBUAH PENCAWANG ELEKTRIK SERTA KERJA-KERJA INFRASTRUKTUR YANG
BERKAITAN DI SEKSYEN 2, KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN.
150 MM X 150 MM RC PILE
SUPLLY INITIAL
6M
3M

SUPPLY EXTENSION
6M
3M

HANDLE
6M
3M

DRIVEN
PENT

Average

23/05/12
11/6/2012

24/05/12

23/05/12
23/05/12

13
31

1.00
1.00

60
80

1.00
1.00

4.00

1.00
1.00

WELD
JOINTS

SHOE

10.80

2.00
-

1.00
2.00

2.00
-

10.20
10.00

10.00
10.00

0.20

10.20
10.00

2.00
1.00

2.00
2.00

1.00
1.00

2.00
2.00

11.20
10.10

10.00
10.00

1.20
0.10

11.20
10.10

2.00
2.00

1.00
1.00
1.00

6.00

5.00

6.00

41.50

40.00

1.50

41.50

7.00

4.00

13.00
13.10

3.00
3.00

Average

22/05/12
22/05/12

Check

< 10M 10 - 13 13 - 16 16 - 19 19 - 22 22 - 25 25 - 28 28 - 31

1.00

10.38

4
31

1.00
1.00

3.00
3.00

1.00
1.00

3.00
3.00

13.00
13.10

10.00
10.00

3.00
3.00

22/05/12
11/6/2012

58
78

1.00
1.00

2.00
2.00

1.00
1.00

2.00
2.00

10.10
11.30

10.00
10.00

0.10
1.30

10.10
11.30

2.00

1.00
1.00
1.00

22/05/12

95

1.00

2.00

1.00

2.00

11.10

10.00

1.10

11.10

2.00

1.00
1.00

5.00

12.00

5.00

12.00

58.60

50.00

8.50

58.60

10.00

5.00

Average

11.72

1.00
1.00

22/05/12

24/05/12

24/05/12

0.10

0.10

12

1.00

2.00

1.00

2.00

10.00

10.00

10.00

2.00

11/6/2012
22/05/12

29
35

1.00
1.00

1.00
1.00

1.00
1.00

1.00
1.00

8.00
8.10

8.00
8.10

8.00
8.10

1.00
1.00

22/05/12

58

1.00

5.20

5.20

5.20

4.00

31.30

31.30

31.30

4.00

4.00

4.00

1.00
4.00

4.00
Average

22/05/12
22/05/12

24/05/12

22/05/12
11/6/2012

24/05/12

7.83

50
6

1.00
1.00

1.00
1.00

1.00
1.00

1.00
1.00

7.20
6.00

7.20
6.00

7.20
6.00

1.00
1.00

1.00
1.00

22
35

1.00
1.00

1.00
1.00

1.00
1.00

1.00
1.00

6.20
8.30

6.20
8.30

6.20
8.30

1.00
3.00

1.00
1.00

4.00

4.00

4.00

4.00

27.70

27.70

27.70

6.00

4.00

8.10
9.20
12.10

1.00
2.00
3.00

1.00
1.00
1.00

29.40

6.00

3.00

Average

22/5/2012
22/5/2012
22/5/2012

1.00
1.00

4
38
58

1.00
1.00
1.00

1.00
2.00
3.00

1.00
1.00
1.00

3.00

6.00

3.00

1.00
2.00
3.00

8.10
9.20
12.10

8.10
9.20
10.00

2.10

6.00

29.40

27.30

2.10

Average

6.93

9.80

SUMMARY OF PILING RECORD


PROJECT TITLE

PILE SIZE

DATE
23/05/12

DATE
RECEIVED
24/05/12

MEMBINA DAN MENYIAPKAN 94 UNIT RUMAH LINK 2 TINGKAT (24 X 65) FASA 2, SEBUAH PENCAWANG ELEKTRIK SERTA KERJA-KERJA INFRASTRUKTUR YANG
BERKAITAN DI SEKSYEN 2, KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR DARUL EHSAN.

PILE
BLOCK POSITIO
N
K
9

150 MM X 150 MM RC PILE


SUPLLY INITIAL
6M
3M
1.00
-

SUPPLY EXTENSION
6M
3M
4.00

HANDLE
6M
3M
1.00
4.00

DRIVEN
PENT
17.00

< 10M 10 - 13 13 - 16 16 - 19 19 - 22 22 - 25 25 - 28 28 - 31
10.00
3.00
3.00
1.00

11/6/2012
23/05/12

27
41

1.00
1.00

4.00
3.00

1.00
1.00

4.00
3.00

17.70
14.10

10.00
10.00

3.00
3.00

23/05/12

67

1.00

3.00

1.00

3.00

12.10

10.00

2.10

4.00

14.00

4.00

14.00

60.90

40.00

11.10

Average

15.23

23/05/12
23/05/12

28/05/12

23/05/12
11/6/2012

32

1.00

47
2

1.00
1.00

22

1.00

4.00

TOTAL FOR 50 NOS TRIAL POINTS

SUPPLY

HANDLE

50.00

1.00
1.00

5.00

INITIAL

6M
3M

50.00
-

300.00
-

EXTENSION

6M
3M

5.00
95.00

30.00
285.00

6M
3M

55.00
95.00

330.00
285.00

3.00
1.10

7.10

1.70

2.70

17.00

Check
-

WELD
JOINTS
4.00

SHOE
1.00
1.00

17.70
14.10

4.00
3.00

12.10

3.00

1.00
1.00

60.90

14.00

4.00

1.00
1.00

3.00

1.00

3.00

12.10

10.00

2.10

12.10

3.00

4.00

2.00
1.00

4.00

11.00
15.10

10.00
10.00

1.00
3.00

11.00
15.10

1.00
4.00

2.00

1.00

2.00

9.60

9.60

9.60

2.00

1.00
1.00

9.00

5.00

9.00

47.80

39.60

6.10

2.10

459.90

53.40

15.70

95.00

330.00
285.00

55.00

Average

11.95

95.00

531.70

Average

10.63

2.10

2.70

47.80

10.00

4.00

531.70

99.00

50.00

SUMMARY OF PILING RECORD


PROJECT TITLE

PILE SIZE

DATE

PILE
POSITIO
N

DATE
RECEIVED

BLOCK

150 MM X 150 MM RC PILE


SUPLLY INITIAL

SUPPLY EXTENSION

HANDLE

DRIVEN

6M

3M

6M

3M

6M

3M

no

no

no

no

no

no

PENT

< 10M
m

10 - 13 13 - 16 16 - 19 19 - 22 22 - 25 25 - 28 28 - 31
m

Check

WELD
JOINTS

SHOE

no

no

2
3
4

5
6

7
8

9
10

11
12

13

14

15

16

17

18

1.00

25/7/13

U13

19
20

25/7/13
25/7/13

U13
U13

21
22

1.00
1.00

25/7/13
25/7/13

U13
U13

23
24

1.00
1.00

25/7/13

U13

25
26

1.00

1.00

2.00
-

11.70

10.00

1.70

11.70
-

1.00

1.00

25/7/13
25/7/13

U13

27
28
29

1.00
1.00

1.00
1.00

2.00
2.00
-

11.10
11.10

10.00
10.00

1.10
1.10

11.10
11.10
-

1.00
1.00

1.00

25/7/13

U13
U13
U13

30
31

1.00
1.00

1.00
1.00

2.00
2.00

11.70
11.70

10.00
10.00

1.70
1.70

11.70
11.70

1.00
1.00

1.00

25/7/13
25/7/13
25/7/13

32
33

1.00
1.00

1.00
1.00

2.00
2.00

11.40
10.50

10.00
10.00

1.40
0.50

11.40
10.50

1.00
1.00

U13

34
35
36

1.00
1.00

1.00
1.00

2.00
2.00
-

10.80
11.10

10.00
10.00

0.80
1.10

10.80
11.10
-

1.00
1.00

25/7/13
25/7/13

U13
U13

37
38

1.00
1.00

25/7/13
25/7/13

U13
U13

39
40

1.00
1.00

25/7/13
25/7/13

U13

U13
U13

41
42
25/7/13
25/7/13
25/7/13

U13

25/7/13

2.00

11.10

10.00

1.00
1.00

2.00
2.00

11.10
11.06

1.00
1.00

2.00
2.00

2.00

43
44
45

1.00
1.00
1.00

U13
U13
U13

46
47

26/7/13
26/7/13
26/7/13

U13

26/7/13

25/7/13
25/7/13

1.00

1.10

11.10

1.00

1.00

10.00
10.00

1.10
1.06

11.10
11.06

1.00
1.00

1.00
1.00

10.15
9.87

10.00
9.87

0.15

10.15
9.87

1.00
1.00

1.00
1.00

1.00

1.00
1.00
1.00
1.00
1.00

1.00
1.00

1.00
1.00

1.00
1.00

9.00
8.40

9.00
8.40

9.00
8.40

1.00
1.00

1.00
1.00

1.00

1.00
3.00

1.00
-

8.10
9.00

8.10
9.00

8.10
9.00

1.00
2.00

1.00
1.00

2.00
2.00
2.00

10.50
11.88
11.92

10.00
10.00
10.00

0.50
1.88
1.92

10.50
11.88
11.92

1.00
1.00
1.00

1.00

1.00
1.00
1.00

1.00
1.00

1.00
1.00

2.00
2.00

11.59
12.00

10.00
10.00

1.59
2.00

11.59
12.00

1.00
1.00

48
49

1.00

1.00

2.00
-

11.58

10.00

1.58

11.58
-

1.00

1.00
1.00
1.00

50
51
52

1.00
1.00
1.00

1.00
1.00
1.00

2.00
2.00
2.00

12.00
12.00
12.00

10.00
10.00
10.00

2.00
2.00
2.00

12.00
12.00
12.00

1.00
1.00
1.00

1.00

U13
U13
U13

53

1.00

1.00

2.00

11.40

10.00

1.40

11.40

1.00

1.00

U13
U13

1.00
1.00

1.00
1.00

SUMMARY OF PILING RECORD


PROJECT TITLE

PILE SIZE

DATE

PILE
POSITIO
N

26/7/13
26/7/13

DATE
RECEIVED

BLOCK

150 MM X 150 MM RC PILE


SUPLLY INITIAL
6M

3M

SUPPLY EXTENSION
6M

3M

HANDLE
6M

54
55

1.00
1.00

56
57

1.00
1.00

1.00
1.00

2.00
2.00

U13

58
59
60

1.00
1.00

1.00
1.00

2.00
2.00
-

26/7/13
26/7/13

U13
U13

61
62

1.00
1.00

1.00
1.00

26/7/13
26/7/13

U13
U13

63
64

1.00
1.00

26/7/13
26/7/13
26/7/13
26/7/13

U13
U13
U13
U13
U13

65

27/7/13
27/7/13
27/7/13
26/7/13

U12
U12
U12
U12
U12
U12

1.00
1.00
-

38.00

27/7/13
27/7/13

1.00
1.00

32.00

7.00

1.00
1.00

2.00
2.00
1.00
1.00
70.00

1.00
1.00
-

< 10M
9.00
9.00

11.92
11.61

10.00
10.00

11.64
13.50

1.00
1.00

1.92
1.61

11.92
11.61

1.00
1.00

10.00
10.00

1.64
3.00

11.64
13.50
-

1.00
2.00

12.00
12.00

10.00
10.00

2.00
2.00

12.00
12.00

1.00
1.00

1.00
1.00

9.00
5.40

9.00
5.40

9.00
5.40

1.00

1.00
1.00

39.00

38.00

1.00

0.50

7.00

410.82

Average

10.81

366.77

43.55

0.50

19.50
18.00

10.00
10.00

3.00
3.00

3.00
3.00

3.00
2.00

1.00

2.00

3.00

17.60

10.00

3.00

3.00

1.00

2.00

3.00

18.00

10.00

3.00

1.00

2.00

3.00

18.00

10.00

3.00

1.00

1.00

15.00

10.00

3.00

2.00

1.00

2.00

3.00

2.00

18.00

2.00

3.00

2.00

18.00

2.00

15.00

2.00

1.00
1.00
1.00

1.00

1.00

1.00

2.00

1.00

13.80

10.00

3.00

0.80

1.00
1.00

2.00
2.00

1.00
1.00

3.00
3.00

1.00
1.00

21.00
21.00

10.00
10.00

3.00
3.00

3.00
3.00

3.00
3.00

27/7/13
27/7/13

U12
U12

12
13

1.00
1.00

2.00
2.00

3.00
3.00

16.50
17.10

10.00
10.00

3.00
3.00

3.00
3.00

27/7/13
26/7/13

U12
U12

14
15

1.00
1.00

2.00
2.00

3.00
3.00

16.40
17.70

10.00
10.00

3.00
3.00

27/7/13
26/7/13

U12

16
17

1.00
1.00

2.00
1.00

22/7/13

U12

18
19
20

1.00

2.00
-

23/7/13
23/7/13

2.00

1.00

21.00
21.00

3.00
3.00

1.00
1.00

0.50
1.10

16.50
17.10

2.00
2.00

1.00
1.00

3.00
3.00

0.40
1.70

16.40
17.70

2.00
2.00

1.00
1.00

18.00
18.00

2.00
3.00

1.00

20.70
-

3.00

1.00

1.00

2.00

18.00
18.00

10.00
10.00

3.00
3.00

3.00
3.00

2.00
2.00

3.00
-

1.00
-

20.70

10.00

3.00

3.00

3.00

2.00
2.00

1.70

1.00

23
24

1.00
1.00

2.00
2.00

3.00
3.00

17.39
16.50

10.00
10.00

3.00
3.00

3.00
3.00

1.39
0.50

17.39
16.50

2.00
2.00

U12
U12

25
26
27

1.00
1.00
1.00

2.00
2.00
2.00

3.00
3.00
3.00

17.40
16.80
18.00

10.00
10.00
10.00

3.00
3.00
3.00

3.00
3.00
3.00

1.40
0.80
2.00

17.40
16.80
18.00

2.00
2.00
2.00

24/7/13

U12

28
29

1.00

2.00

3.00

18.00

10.00

3.00

3.00

2.00

18.00

2.00

1.00

23/7/13
23/7/13

30
31

1.00
1.00

2.00
2.00

3.00
3.00

18.00
17.10

10.00
10.00

3.00
3.00

3.00
3.00

2.00
1.10

18.00
17.10

2.00
2.00

23/17/13

U12
U12
U12

23/7/13
23/7/13

U12
U12

32
33

1.00
1.00

2.00
2.00

3.00
3.00

17.40
17.40

10.00
10.00

3.00
3.00

3.00
3.00

1.40
1.40

17.40
17.40

2.00
2.00

1.00
1.00
1.00

1.00

3.00
2.00

3.00

3.00

0.50

10.00

2.60

1.00
1.00

12.60

16.50
12.60

2.00

1.00

2.00
1.00

10.00

U12

16.50

24/7/13

34
35
36

2.00

1.00

23/7/13
23/7/13

U12
U12
U12

37
38

1.00
1.00

2.00
2.00

18.00
18.00

10.00
10.00

3.00
3.00

3.00
3.00

2.00
2.00

18.00
18.00

2.00
2.00

39

1.00

1.00

13.80

10.00

3.00

0.80

13.80

2.00

1.00
1.00
1.00

23/7/13
23/7/13
24/7/13

24/7/13

U12

1.00
1.00

13.80

3.00
2.00

0.50

17.60

10
11

410.82

1.60

U12
U12

21

1.00

3.00
2.00

U12

1.00

1.00
1.00

27/7/13
27/7/13

2.00

1.00
1.00
1.00

19.50
18.00

26/7/13

U12

2.00

2.00
2.00

1.00

SHOE

WELD
JOINTS

9.00
9.00

1.00
-

Check

10 - 13 13 - 16 16 - 19 19 - 22 22 - 25 25 - 28 28 - 31

1.00
1.00

3.00
3.00

1.00
1.00

PENT
9.00
9.00

2
3

1.00

DRIVEN

3M

U12
U12

1.00

3.00
3.00
1.00

2.00

1.00
1.00

1.00
1.00
1.00
1.00

SUMMARY OF PILING RECORD


PROJECT TITLE

PILE SIZE

DATE

PILE
POSITIO
N

24/7/13
24/7/13
24/7/13
24/7/13

24/7/13
24/7/13

DATE
RECEIVED

BLOCK
U12
U12
U12
U12

SUPLLY INITIAL
6M

3M

SUPPLY EXTENSION
6M

3M

HANDLE
6M

DRIVEN

3M

40
41

1.00
1.00

1.00
1.00

1.00
1.00

2.00
2.00

1.00
1.00

PENT
13.43
13.67

42
43

1.00
1.00

1.00
1.00

1.00
1.00

2.00
2.00

1.00
1.00

13.93
14.10

< 10M
10.00
10.00
10.00
10.00

10 - 13 13 - 16 16 - 19 19 - 22 22 - 25 25 - 28 28 - 31
3.00
0.43
3.00
0.67
3.00
3.00

0.93
1.10

Check

WELD
JOINTS

13.43
13.67

2.00
2.00

13.93
14.10

2.00
2.00

44
45
46

47
48

49
50

51
52

53
54

1.00
1.00

2.00
2.00

3.00
3.00

17.03
17.70

10.00
10.00

3.00
3.00

3.00
3.00

1.03
1.70

17.03
17.70

2.00
2.00

55

1.00

2.00

3.00

18.00

10.00

3.00

3.00

2.00

18.00

2.00

U12
U12
U12

56

1.00

2.00

3.00

16.50

10.00

3.00

3.00

0.50

16.50

2.00

57

1.00

2.00

3.00

18.00

10.00

3.00

3.00

2.00

18.00

2.00

58

1.00

2.00

0.50

59

1.00

24/7/13

U12
U12

60

1.00

24/7/13
24/7/13

U12
U12

61
62

24/7/13

U12

63

24/7/13
24/7/13
24/7/13
24/7/13
24/7/13

U12

150 MM X 150 MM RC PILE

U12
U12

1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00
1.00

16.50

10.00

3.00

3.00

16.50

2.00

1.00

1.00

2.00

1.00

15.00

10.00

3.00

2.00

15.00

2.00

1.00

1.00

2.00

1.00

15.00

10.00

3.00

2.00

15.00

2.00

1.00
1.00

1.00
1.00

2.00
2.00

3.00
3.00

18.00
17.35

10.00
10.00

3.00
3.00

3.00
3.00

2.00
1.35

18.00
17.35

2.00
2.00

1.00
1.00

1.00

2.00

3.00

18.00

10.00

3.00

3.00

2.00

18.00

2.00

1.00

46.00

81.00

460.00

137.60

118.73

58.87

781.40

97.00

46.00

10.00

3.00

3.00

2.00

18.00

3.00

1.00

U7

1.00

3/7/2013

U7

2
3

1.00

6/7/2013

U7

6/7/2013

U7

4
5

1.00
1.00

6/7/2013

U7

6/7/2013

U7

6/7/2013

U7

6
7
8

1.00
1.00
1.00

6/7/2013

U7

6/7/2013
3/7/2013

U7
U7

9
10

3/7/2013
3/7/2013

U7
U7

3/7/2013
3/7/2013

3/7/2013

2.00

3.00

SHOE

16.00

1.00

127.00

3.00

16.00

781.40

Average

16.99

1.00

18.00

6.20

2.00

3.00

17.10

10.00

3.00

3.00

1.10

17.10

2.00

1.00

2.00
2.00

3.00
3.00

18.00
18.00

10.00
10.00

3.00
3.00

3.00
3.00

2.00
2.00

18.00
18.00

2.00
2.00

1.00

2.00
2.00
2.00

3.00
3.00
3.00

18.00
18.00
16.80

10.00
10.00
10.00

3.00
3.00
3.00

3.00
3.00
3.00

2.00
2.00
0.80

18.00
18.00
16.80

2.00
2.00
2.00

1.00

1.00
1.00

2.00
2.00

3.00
3.00

18.00
16.38

10.00
10.00

3.00
3.00

3.00
3.00

2.00
0.38

18.00
16.38

2.00
2.00

1.00

11
12

1.00
1.00

2.00
2.00

1.00

3.00
3.00

1.00

17.00
19.80

10.00
10.00

3.00
3.00

3.00
3.00

1.00
3.00

0.80

17.00
19.80

2.00
3.00

U7
U7

13
14
15

1.00
1.00
1.00

2.00
2.00
2.00

1.00
1.00
1.00

3.00
3.00
3.00

1.00
1.00
1.00

20.10
19.71
19.20

10.00
10.00
10.00

3.00
3.00
3.00

3.00
3.00
3.00

3.00
3.00
3.00

1.10
0.71
0.20

20.10
19.71
19.20

3.00
2.00
3.00

6/7/2013
6/7/2013

U7
U7

16
17

1.00
1.00

2.00
2.00

3.00
3.00

17.70
18.00

10.00
10.00

3.00
3.00

3.00
3.00

1.70
2.00

17.70
18.00

2.00
2.00

1.00
1.00

6/7/2013
6/7/2013
6/7/2013

U7
U7
U7

18
19

1.00
1.00

2.00
2.00

3.00
3.00

17.70
18.00

10.00
10.00

3.00
3.00

3.00
3.00

1.70
2.00

17.70
18.00

2.00
2.00

U7
U7

1.00
1.00

2.00
2.00

1.00

3.00
3.00

6/7/2013
6/7/2013

20
21

1.00

17.70
19.20

10.00
10.00

3.00
3.00

3.00
3.00

1.70
3.00

17.70
19.20

2.00
3.00

1.00
1.00
1.00

6/7/2013
8/7/2013

U7
U7

22
23
24

1.00
1.00
1.00

2.00
2.00
2.00

1.00
1.00
1.00

3.00
3.00
3.00

1.00
1.00
1.00

18.90
19.50
18.60

10.00
10.00
10.00

3.00
3.00
3.00

3.00
3.00
3.00

2.90
3.00
2.60

0.50

18.90
19.50
18.60

3.00
3.00
3.00

8/7/2013
3/7/2013

U7
U7

25
26

1.00
1.00

2.00
2.00

1.00
1.00

3.00
3.00

1.00
1.00

19.50
19.80

10.00
10.00

3.00
3.00

3.00
3.00

3.00
3.00

0.50
0.80

19.50
19.80

3.00
3.00

27

0.20

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00
1.00

SUMMARY OF PILING RECORD


PROJECT TITLE

PILE SIZE

DATE

PILE
POSITIO
N

DATE
RECEIVED

BLOCK

150 MM X 150 MM RC PILE


SUPLLY INITIAL
6M

3M

SUPPLY EXTENSION
6M

3M

HANDLE
6M

DRIVEN

3M

28
29

1.00
1.00

2.00
2.00

1.00
1.00

3.00
3.00

1.00
1.00

PENT
19.80
19.80

30
31

1.00
1.00

2.00
2.00

1.00
1.00

3.00
3.00

1.00
1.00

19.80
19.75

10.00
10.00

3.00
3.00

3.00
3.00

3.00
3.00

U7
U7

32
33
34

1.00
1.00
1.00

2.00
2.00
2.00

1.00
1.00
1.00

3.00
3.00
3.00

1.00
1.00
1.00

19.50
19.20
18.78

10.00
10.00
10.00

3.00
3.00
3.00

3.00
3.00
3.00

6/7/2013
6/7/2013

U7
U7

35
36

1.00
1.00

2.00
2.00

1.00

3.00
3.00

1.00
-

18.76
17.10

10.00
10.00

3.00
3.00

6/7/2013
6/7/2013

U7
U7

37
38

1.00
1.00

2.00
2.00

17.40
16.90

10.00
10.00

3.00
3.00

3/7/2013
3/7/2013
3/7/2013

U7
U7
U7

3/7/2013
6/7/2013

U7
U7

6/7/2013
6/7/2013

3.00
3.00

< 10M
10.00
10.00

10 - 13 13 - 16 16 - 19 19 - 22 22 - 25 25 - 28 28 - 31
3.00
3.00
3.00
0.80
3.00
3.00
3.00
0.80

Check

WELD
JOINTS

SHOE

19.80
19.80

3.00
3.00

0.80
0.75

19.80
19.75

3.00
3.00

3.00
3.00
2.00

0.50
0.20
0.78

19.50
19.20
18.78

3.00
3.00
3.00

3.00
3.00

2.00
1.10

0.76

18.76
17.10

3.00
2.00

1.00
1.00

3.00
3.00

1.40
0.90

17.40
16.90

2.00
2.00

1.00
1.00

39
40

41
42

1.00
1.00
1.00
1.00
1.00
1.00
1.00

8/7/2013

U7

43

1.00

2.00

1.00

3.00

1.00

18.60

10.00

3.00

3.00

2.00

0.60

18.60

3.00

2.00

8/7/2013
8/7/2013
8/7/2013

U7
U7
U7

44

1.00

2.00

1.00

3.00

1.00

18.60

10.00

3.00

3.00

2.00

0.60

18.60

3.00

45

1.00

2.00

3.00

17.93

10.00

3.00

3.00

1.93

17.93

2.00

46

1.00

2.00

3.00

16.60

10.00

3.00

3.00

0.60

16.60

2.00

1.00
1.00
1.00

8/7/2013
8/7/2013

U7
U7

47

1.00

2.00

3.00

17.10

10.00

3.00

3.00

1.10

17.10

2.00

48

1.00

2.00

3.00

16.41

10.00

3.00

3.00

0.41

16.41

2.00

1.00
1.00

49
50

8/7/2013
8/7/2013

U7
U7

51
52

1.00
1.00

2.00
2.00

3.00
3.00

17.61
17.57

10.00
10.00

3.00
3.00

3.00
3.00

1.61
1.57

17.61
17.57

2.00
2.00

1.00
1.00

8/7/2013
8/7/2013

U7
U7

53
54

1.00
1.00

2.00
2.00

3.00
3.00

17.60
18.00

10.00
10.00

3.00
3.00

3.00
3.00

1.60
2.00

17.60
18.00

2.00
2.00

1.00
1.00

6/7/2013

U7

55
56

57
58
59

60

1.00

2.00

47.00

94.00

3.00
21.00

141.00

17.40

10.00

3.00

3.00

1.40

21.00

858.90

470.00

141.00

141.00

95.50

Average

18.27

11.40

17.40

2.00

1.00

858.90

114.00

48.00

1.00
1.00

1.00

2.00

3.00

15.49

10.00

3.00

2.49

15.49

2.00

2
3

1.00
1.00

2.00
2.00

3.00
3.00

15.60
15.60

10.00
10.00

3.00
3.00

2.60
2.60

15.60
15.60

2.00
2.00

U9

4
5
6

1.00
1.00

1.00
2.00

1.00
-

2.00
3.00
-

1.00
-

15.00
15.90

10.00
10.00

3.00
3.00

2.00
2.90

15.00
15.90
-

2.00
2.00

3/7/2013
4/7/2013

U9
U9

7
8

1.00
1.00

2.00
1.00

1.00

3.00
2.00

1.00

14.67
15.00

10.00
10.00

3.00
3.00

1.67
2.00

14.67
15.00

2.00
2.00

1.00
1.00

3/7/2013
3/7/2013

U9
U9

9
10

1.00

1.00

10.34

10.00

0.34

10.34

1.00

1.00

1.00
1.00

5/7/2013

U9
U9

10.80
-

U9
U9

16.80
15.60
15.25

2.00
2.00
2.00

1.00

5/7/2013
5/7/2013
5/7/2013
4/7/2013
4/7/2013

U9
U9
U9

20.10
15.00

3.00
2.00

15.00

2.00

1.00
1.00
1.00

5/7/2013
5/7/2013

U9
U9

5/7/2013
4/7/2013

U9
U9

4/7/2013

2.00

11
12

1.00

1.00

2.00
-

10.80

10.00

0.80

13
14
15

1.00
1.00
1.00

2.00
2.00
2.00

3.00
3.00
3.00

16.80
15.60
15.25

10.00
10.00
10.00

3.00
3.00
3.00

3.00
2.60
2.25

0.80

16
17

1.00
1.00

2.00
1.00

1.00
1.00

3.00
2.00

1.00
1.00

20.10
15.00

10.00
10.00

3.00
3.00

3.00
2.00

3.00

18

1.00

1.00

1.00

2.00

1.00

15.00

10.00

3.00

2.00

1.10

1.00
1.00
1.00

1.00
1.00

SUMMARY OF PILING RECORD


PROJECT TITLE

PILE SIZE

DATE

PILE
POSITIO
N

DATE
RECEIVED

BLOCK

150 MM X 150 MM RC PILE


SUPLLY INITIAL
6M

3M

SUPPLY EXTENSION
6M

3M

HANDLE
6M

19
20

1.00
1.00

1.00
1.00

21
22

1.00
1.00

2.00
2.00

U9
U9

23
24
25

1.00
1.00
1.00

2.00
1.00
2.00

5/7/2013
5/7/2013

U9
U9

26
27

1.00
1.00

2.00
2.00

5/7/2013
5/7/2013
5/7/2013

U9
U9
U9

28
29

1.00
1.00

1.00
1.00

1.00
1.00

2.00
2.00

1.00
1.00

5/7/2013
4/7/2013

U9
U9

30
31

1.00
1.00

1.00
2.00

1.00
-

2.00
3.00

4/7/2013
4/7/2013

U9
U9

32
33

1.00
1.00

1.00
1.00

1.00
1.00

34

1.00

1.00

4/7/2013
3/7/2013
3/7/2013

U9
U9
U9

35

1.00

36

1.00

37

1.00

3/7/2013
3/7/2013

U9
U9

38

1.00

39

3/7/2013
5/7/2013

U9
U9

5/7/2013
5/7/2013

10 - 13 13 - 16 16 - 19 19 - 22 22 - 25 25 - 28 28 - 31
3.00
2.00
3.00
2.00

14.40
15.60

10.00
10.00

3.00
3.00

15.60
14.60
14.70

10.00
10.00
10.00

15.30
15.58

Check

WELD
JOINTS

SHOE

2.00
2.00

1.40
2.60

14.40
15.60

2.00
2.00

3.00
3.00
3.00

2.60
1.60
1.70

15.60
14.60
14.70

2.00
2.00
2.00

10.00
10.00

3.00
3.00

2.30
2.58

15.30
15.58

2.00
2.00

1.00
1.00

15.00
14.60

10.00
10.00

3.00
3.00

2.00
1.60

15.00
14.60

2.00
2.00

1.00
-

15.00
14.70

10.00
10.00

3.00
3.00

2.00
1.70

15.00
14.70

2.00
2.00

1.00
1.00
1.00

2.00
2.00

1.00
1.00

14.33
14.40

10.00
10.00

3.00
3.00

1.33
1.40

14.33
14.40

2.00
2.00

1.00

2.00

1.00

14.70

10.00

3.00

1.70

14.70

2.00

1.00

1.00

2.00

1.00

14.24

10.00

3.00

1.24

14.24

2.00

1.00

1.00

2.00

1.00

13.05

10.00

3.00

0.05

13.05

2.00

1.00

1.00

2.00

1.00

13.12

10.00

3.00

0.12

13.12

2.00

2.00

13.80

10.00

3.00

0.80

13.80

2.00

1.00

1.00

1.00

2.00

1.00

13.48

10.00

3.00

0.48

13.48

2.00

1.00
1.00

40
41

1.00
1.00

1.00
1.00

1.00
1.00

2.00
2.00

1.00
1.00

13.80
14.40

10.00
10.00

3.00
3.00

0.80
1.40

13.80
14.40

2.00
2.00

1.00
1.00

U9
U9

42
43

1.00
1.00

1.00
1.00

1.00
1.00

2.00
2.00

1.00
1.00

14.32
14.53

10.00
10.00

3.00
3.00

1.32
1.53

14.32
14.53

2.00
2.00

1.00
1.00

5/7/2013
4/7/2013

U9
U9

44
45

1.00
1.00

2.00
2.00

3.00
3.00

14.40
15.60

10.00
10.00

3.00
3.00

1.40
2.60

14.40
15.60

2.00
2.00

1.00
1.00

4/7/2013

U9
U9

46
47

1.00
1.00

2.00
2.00

3.00
3.00

14.70
15.60

10.00
10.00

3.00
3.00

1.70
2.60

14.70
15.60

2.00
2.00

1.00

4/7/2013
3/7/2013

U9
U9

3/7/2013

U9

1.00
1.00
1.00

2.00
2.00
2.00

3.00
3.00
3.00

14.40
14.40
14.38

10.00
10.00
10.00

3.00
3.00
3.00

1.40
1.40
1.38

14.40
14.40
14.38

2.00
2.00
2.00

1.00

3/7/2013

48
49
50

5/7/2013

U9
U9
U9

1.00
1.00

2.00
2.00

3.00
3.00

15.30
15.75

10.00
10.00

3.00
3.00

2.30
2.75

15.30
15.75

2.00
2.00

1.00

5/7/2013
4/7/2013

51
52

4/7/2013
4/7/2013

U9
U9

53
54

1.00
1.00

1.00
2.00

2.00
3.00

14.50
15.50

10.00
10.00

3.00
3.00

1.50
2.50

14.50
15.50

1.00
2.00

55

1.00

2.00

3.00

15.30

10.00

3.00

2.30

15.30

2.00

1.00
1.00

6/7/2013

U9

57

1.00

1.00

14.51

10.00

3.00

1.51

14.51

2.00

1.00

6/7/2013
6/7/2013
6/7/2013

U9
U9
U9

58

1.00

2.00

3.00

16.50

10.00

3.00

3.00

0.50

16.50

2.00

59

1.00

2.00

3.00

16.50

10.00

3.00

3.00

0.50

16.50

2.00

60

1.00

2.00

3.00

17.10

10.00

3.00

3.00

1.10

17.10

2.00

1.00
1.00
1.00

56.00

87.00

23.00

833.84

560.00

163.14

103.70

5.90

1.10

833.84

110.00

56.00

Average

14.89

6,789.97

826.69

424.63

171.67

18.70

8,231.66

723.00

737.00

4/7/2013
4/7/2013

U9
U9

3/7/2013
3/7/2013

56

TOTAL FOR 179 PILE POINTS

1.00
-

736.00

3.00
3.00
3.00
2.00
3.00
3.00
3.00

3.00

654.00

1.00

23.00

326.00

2.00

143.00

###

1.00
1.00

< 10M
10.00
10.00

U9
U9
U9

2.00
2.00

PENT
15.00
15.00

15.00
15.00

4/7/2013
4/7/2013
4/7/2013

1.00
1.00

DRIVEN

3M

1.00
-

1.00

326.00
Average

SUPPLY

HANDLE

INITIAL

6M

736.00

###

EXTENSION

3M
6M

654.00

###

3M
6M

326.00
###

978.00
###

###
978.00

8,231.66
11.18

1.00
1.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00