You are on page 1of 203

GOVERNMENT OF INDIA

Ministry of EXTERNAL AFFAIRS


PMC for Sri Lanka Housing Project- Construction
of 4,000 Low Cost Housing Units in Central and
UVA Provinces in Sri Lanka

DETAILED PROJECT REPORT (Construction of 862 Housing Units)

76- C, INSTITUTIONAL AREA, SECTOR-18


GURGAON- 122015 (Haryana), INDIA.
Tel: +91-124-2397391, Fax: +91-124-2399224
E-mail- commercial@wapcos.gov.in
OCTOBER, 2015

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Contents

CHAPTER 1.....................................................................................................................................................................3
1.0

PROJECT BACKGROUND ..................................................................................................................................3

1.1.

OBJECTIVES OF THE PROJECT .....................................................................................................................4

1.2.

SCOPE OF WORK.........................................................................................................................................5

CHAPTER 2.....................................................................................................................................................................7
2.0

INTRODUCTION ...............................................................................................................................................7

2.1.

LOCATION OF HOUSING SITES ....................................................................................................................8

2.2.

CLIMATIC CONDITIONS.............................................................................................................................14

2.3.

DEMOGRAPHY ..........................................................................................................................................14

2.3.1.

Population and Density.......................................................................................................................14

2.3.2.

Sex Ratio ..............................................................................................................................................14

2.4.

ECONOMIC PROFILE .................................................................................................................................15

2.5.

PROJECT REQUIREMENT AND GENERAL GUIDELINES ..............................................................................16

2.5.1.

Project Requirements .........................................................................................................................16

2.5.2.

Guide Lines For The Project Of The Housing Units.............................................................................16

CHAPTER 3...................................................................................................................................................................17
3.0

ASSESSMENT OF HOUSING SITES ..................................................................................................................17


I.

Hellbodde Estate, Pussellawa Plantation................................................................................................17

II.

Dunsinane Estate, Pussellawa Plantation ...............................................................................................18

III.

Diyagama West Estate, Agarapathana Plantation..................................................................................18

IV.

Bogawana Estate, Bogwanthala Plantation ............................................................................................20

V.

Ledgerwatte, Malwattevalley Plantation ...............................................................................................21

3.1.

SURVEY DATA ...........................................................................................................................................22

3.2

BENEFICIERIES DATA .....................................................................................................................................23

3.3

GEOTECHNICAL DATA- NBRO REPORT ..........................................................................................................24

CHAPTER 4...................................................................................................................................................................25
4.0

GENERAL........................................................................................................................................................25

4.1.

SITE PLANNING AND SITE LAYOUT ...........................................................................................................27

4.1.1.
4.2.

ARCHITECTURE DESIGN AND LAYOUT ......................................................................................................27

4.2.1.
4.3

SITE PLAN.............................................................................................................................................27
Single Dwelling Unit Plan ....................................................................................................................27

DESIGN CONSIDERATIONS.............................................................................................................................31

Lintel Beams Detail: ...........................................................................................................................................31

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Plinth Beams Detail: ...........................................................................................................................................33


Footing Detail .....................................................................................................................................................34
4.4

INFRASTRUCTURE FACILITIES / SERVICE PLANS ............................................................................................36

4.4.1

Road Network .....................................................................................................................................37

4.4.2

Storm Water Drainage ........................................................................................................................37

4.4.3

Electrification ......................................................................................................................................37

4.4.4

Water Supply.......................................................................................................................................37

4.4.5

Sewerage System ................................................................................................................................38

4.4.6

Solid Waste Management...................................................................................................................38

CHAPTER 5...................................................................................................................................................................39
5.0

GENERAL........................................................................................................................................................39

5.1

PROJECT MANAGEMENT CONSULTANT ........................................................................................................40

5.2

QUALITY CONTROL AND ASSURANCE ...........................................................................................................40

5.3

MEASUREMENT AND VALUATION CONTROL ................................................................................................40

5.4

ENVIRONMENT SUSTAINABILITY ...................................................................................................................41

5.5

POST CONSTRUCTION SERVICES ...................................................................................................................42

CHAPTER 6...................................................................................................................................................................43
6.0

COST ESTIMATES ...........................................................................................................................................43

SITE LAYOUT & PLANNING


COST ESTIMATE FOR SITE DEVELOPMENT
COST ESTMATE FOR HOUSING UNIT
ARCHITECTURAL DRAWINGS
CONSTRUCTION DRAWINGS
BENEFICIARIES DATA (Annexure I)
NBRO REPORT (Annexure II)

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

CHAPTER 1
INTRODUCTION
1.0 PROJECT BACKGROUND

SRI LANKA, officially the Democratic Socialist


Republic of Sri Lanka, is an island country in the
northern Indian Ocean off the southern coast of
the Indian subcontinent in South Asia known until
1972 as Ceylon, Sri Lanka has maritime borders
with India to the northwest and the Maldives to
the southwest. Sri Lanka is located off the southeastern cost shores of India, 880 km north of the
equator, in the Indian Ocean. It lies between 5
55' and 9 55' north of the equator and between
the eastern longitudes 79 42' and 81 52'.

The Government of the Republic of India and the

Figure 1 Physical map of Sri Lanka

Government of the Democratic Socialist Republic of Sri Lanka had signed a MoU for construction
of houses for assisting the IOTs in Sri Lanka. The Ministry of External Affairs has appointed
WAPCOS Limited (A Government of India Undertaking) as Project Management Consultancy for
Sri Lanka Housing Project- Construction of 4,000 Housing Units in Central and UVA Provinces in
Sri Lanka. An Agreement has been signed between MEA and WAPCOS on 25 th September, 2014.
1.1. OBJECTIVES OF THE PROJECT

The main Objectives of the Project are as follows:


The construction of houses for assisting the IOTs in Sri Lanka is part of the overall
commitment of 50,000 houses announced by the Government of India in June 2010.

Detailed Project Report


Meeting Societys Needs Globally

Page1

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

The Project envisages construction of new houses through agencies (Agency-driven


model).
The Project is intended to assist the IOTs (Indian Origin Tamils) to meet their
requirements of shelter.
A total of 4,000 houses would be constructed in various tea estates in Central and Uva
provinces where the terrain is hilly. Such construction work will be carried out on plots
of land made available by tea plantation companies
The project will be implemented within the framework of the India-Sri Lanka MoU
signed by the Foreign Ministers of the two countries on January 17, 2012

1.2. SCOPE OF WORK

The Scope of Work of Consultant is as follows:


Preparation of a Detailed Project Report (DPR) providing specifications, housing
designs and Bill of Quantities which would be submitted for vetting to the
designated authority. The DPR will take into account the different conditions and
requirements in the areas in which the project will be implemented;
Preparation of Engineering design, tender documents and other technical inputs for
selection of Contractors;
Undertaking the process of open tendering for selection of Contractors in consultation
with Ministry of External Affairs;
Drawing up relevant agreements with selected Contractor(s);
Preparation of operations manual for programme management;
Undertaking selection of beneficiaries jointly with the designated officials of the
Government of Sri Lanka or undertaking a full verification of the beneficiary list as
provided;
Obtaining requisite approvals from local authorities for construction of houses at
different sites in consultation with GoSL and the High Commission of India;

Detailed Project Report


Meeting Societys Needs Globally

Page2

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Carrying out continuous monitoring of processes for compliance with guidelines and
operations manual;
Carrying out monitoring of construction, including technical oversight of construction
activities;
Exercising quality control on construction and construction materials;
Undertaking Environment Impact Assessment of the Project and preparing
necessary reports on outcome / benefits of the Project;
Recommendation to the HCI for release of stage-payments to Contractors
on achievement of the prescribed milestones; and duly certifying the Measurement
Book for this purpose;
Submitting regular progress reports to the HCI detailing the physical and financial
progress of work, including causes for delay in the work schedule wherever
applicable;
Undertaking a public information campaign and creating awareness among all
stakeholders;
Developing and implementing an online Project Information Management to provide
real-time information on progress;
Provision of relevant information on project implementation in the prescribed
format for the HCI's website;
Issuance of certificate of completion and facilitate handing over of the houses to the
beneficiaries.

Detailed Project Report


Meeting Societys Needs Globally

Page3

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

CHAPTER 2
PROJECT AREA
2.0 INTRODUCTION

Central Province is one of the nine provinces of Sri Lanka, the first level administrative division of
the country. The provinces have existed since the 19th century but did not have any legal status
until 1987 when the 13th Amendment to the Constitution of Sri Lanka established provincial
councils. The Central Province is situated primarily in the central mountainous terrain of Sri
Lanka. It is the 6th largest province by area and is home to 2.5 million people. The province is
bordered

by North

Central

Province to the North, Uva


Province to the East, North
Western Province to the West
and Sabaragamuwa Province to
the South and West. The
Province's capital is Kandy.
The cities of Matale and Nuwara
Eliya are also located within the
Central Province. The province is
famous for its production of the
famous Ceylon tea, planted by
the British in the 1860s after a
devastating disease killed all the
coffee

plantations

in

the

province. The Central Province


attracts many tourists, with hill
station towns such as Gampola,
Hatton and Nuwara Eliya.

Figure 2 Index Map Showing Location of Housing Sites in Central & Uva Provinces of
Sri Lanka

Detailed Project Report


Meeting Societys Needs Globally

Page4

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

2.1. LOCATION OF HOUSING SITES


Kandy, Nuwara Eliya and Hatton regions are situated in Central Province and Badulla region is
situated in Uva Province. With reference to the above cited Project, WAPCOS team visited Sri
Lanka from 7th October, 2014 to 18th October, 2014 to have first-hand information of Housing
Project Sites, Meeting and discussions with officials of High Commission of India (HCI) and officials
of Plantation Human Development Trust (PHDT) and various concerned officials of Tea Estates of
the Project Area.

Figure 3 LOCATION OF HOUSING SITES IN CENTRAL & UVA PROVINCES OF SRI LANKA

Detailed Project Report


Meeting Societys Needs Globally

Page5

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

The team visited and collected the information from 08.10.14 to 14.10.14 for 16 Tea Estates
spreading over Nuwara Eliya and Badulla Districts of Central and Uva Provinces along with PHDT
officials.

After completing the Site Visit, a meeting was held on 16th October, 2014 along with the Honble
Minister, Ministry of Livestock and Rural Community Development, Government of Sri Lanka, all
the Officials of Tea Estates, PHDT Officials and Second Secretary, HCI to discuss the various issues
across the table.
It was emphasized in the meeting that the Tea Estate should undertake the Topographic Surveys
to decide on the benching of the Housing sites, representative soil investigations to arrive at the
soil bearing capacity (SBC) to decide the foundation, which would be required for finalizing the
DPR and Drawings. WAPCOS requested for the following data to be made available preferably by
end of November, 2014.
Perimeter survey of the area of the proposed housing plots.
NBRO report of the proposed housing sites (English Version, if available)
Topographic survey (Contour survey) of the proposed housing sites
Soil investigations report of the proposed housing sites
Beneficiary list of these housing scheme from the tea estates

Subsequently, as per PHDT letter date 03.12.15 received through Email from Second Secretary,
HCI, Colombo it was suggested by M/s. PHDT to commence the project for 906 Number of houses
immediately based on the survey work and NBRO Report Completed/ under progress.

WAPCOS team had undertaken the site visit to Sri Lanka from 17 th December, 2014 to 23rd
December, 2014. However, during the visit, it was observed the none of the Tea Estate has
completed the contour survey which has already been mentioned to all the Tea Estates officials
during the above cited meeting held on 16th November, 2014.

Detailed Project Report


Meeting Societys Needs Globally

Page6

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

WAPCOS Team along with PHDT officials visited all the project sites for 2070 houses as being
prioritized by PHDT in order to emphasize the ongoing survey team at project site/ tea estate
officials regarding necessity and importance of contour survey and features to be included in the
contour survey.

The officials of HCI and WAPCOS Team had the meeting with PHDT officials. It was decided during
the meeting that NBRO Report (in English), Survey Data and Beneficiary List for 2070 houses shall
be furnished to WAPCOS on and before 10th January, 2015.

WAPCOS received the Survey Data of 1192 Housing Units in the Month of February, 2015. Also a
mail stating the revised list of 1409 houses to be considered in Phase-I was received. Based on
the Survey Data received, WAPCOS prepared and submitted the Site Planning and Cost
Estimation of Site development of 604 Housing Units, Architectural Plan of Housing Units to High
Commission of India, Colombo, during first week of April 2015.

In order to finalize the Architectural Plan of Housing Units, Site Planning, Cost Estimate of Housing
Units and Site Development Cost, WAPCOS team visited Sri Lanka from 5th April-10th April, 2015.

During the visit, WAPCOS team had discussions and meeting with the Second Secretary, High
Commission of India, Colombo, The Secretary, Ministry of Plantation Infrastructure
Development, Government of Sri Lanka and the Officials of PHDT, Sri Lanka.

Site Development Works includes Site Clearance, Bench Cutting, Construction of Road Pavement,
Storm Water Drain, External Water supply Line, and Electrification Works & Street Lighting. The
following aspects observed needs to be considered:
The Site Development Cost shall vary from site to site depending on terrain / contours.
Therefore every site will have different site development cost.

Detailed Project Report


Meeting Societys Needs Globally

Page7

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

The Basic community facilities such as school, dispensary, bus stand, water supply,
electricity, sewerage needs to be addressed separately for these housing units, by Govt.
of Sri Lanka.
The Site Development and Construction of Housing Units shall be carried out under a
single tender package for each site for effective and faster execution of work
Confirmatory Boreholes needs to be undertaken for each tea estate for assessing the
geotechnical Data and Soil Property to confirm the soil bearing capacity (SBC).
Based on the availability of Survey data the 1134 housing Units will be included under Phase-I.
The detail is given below:

Detailed Project Report


Meeting Societys Needs Globally

Page8

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

S/
Nos
1

Region
Kandy

N' Eliya

N' Eliya

RPC
Pussellawa

Elpitiya

Agarapatana

Total

Extent

Units

Ha

Land

Middle

100

1.6

Barren

Middle

204

Seedlings

Factory

200

Seedlings

1st/2nd

150

Seedlings

Estate
Helbodde

Division

Dunsinane

Diyagama West
Sub Total

Hatton

Bogawantalawa

Bogawana

654
Bogawana

100

Bridvil

155

Lynsted

100

Sub Total

Badulla

Malwatte Valley

Seedlings
Seedlings

75

Ledgerwatte

Seedlings
4

Narangala

50

Sub Total
Grand Total - Phase I- Initially proposed housing units

Seedlings

355
Ledgerwatte

Type of

Seedlings

125
1134

Detailed Project Report


Meeting Societys Needs Globally

Page9

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

However, based on the site conditions and availability of area only 862 housing units are being proposed as shown in the table below:
S/
Nos
1

Region
Kandy

N' Eliya

N' Eliya

RPC
Pussellawa

Elpitiya

Agarapatana

Estate
Helbodde

Total

Extent

Units

Ha

Land

Middle

100

1.6

Barren

Middle

156

Seedlings

Factory

154

Seedlings

1st/2nd

127

Seedlings

Division

Dunsinane

Diyagama West
Sub Total

537
Bogawana

Hatton

Bogawantalawa

116

75

Ledgerwatte

Grand Total - Phase I - Proposed housing units as per Site Conditions

Seedlings
4

Narangala
Sub Total

Seedlings

200
Ledgerwatte

Malwatte Valley

Seedlings
8

Sub Total

Badulla

84

Bogawana
Bridvil

Type of

50

Seedlings

125
862

Detailed Project Report


Meeting Societys Needs Globally

Page10

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

2.2. CLIMATIC CONDITIONS

The climate is cool, and many areas about 1500 metres often have chilly nights. The western
slopes are very wet, some places having almost 7000 mm of rain per year. The eastern slopes are
parts of the mid-dry zone as it is receiving rain only from North-Eastern monsoon. The
Temperatures range from 24C at Kandy to just 16C in Nuwara Eliya, which is located 1,889 m
above sea level. The highest mountains in Sri Lanka are located in the Central Province. The
terrain is mostly mountainous, with deep valleys cutting into it. The two main mountain regions
are the central massif and the Knuckles range to the east of Kandy.

2.3. DEMOGRAPHY

2.3.1. Population and Density


As per 2007 census, the population of Central Province was 2599000 peoples spreading over an
area of 5575 Sq. km and the density of the area is 466.2 per Sq. km. The population is a mixture
of Sinhalese, Tamil and the Moors. Many tea plantation workers are Indian Tamils, brought over
to Sri Lanka by the British in the 19th century.

Population

Ethnic Group
Sinhalese

Tamil

Sri Lankan Moor

Other

20,359,439

74.9

15.3

9.3

0.5

Central Province

2,571,557

66.0

23.8

9.9

0.3

Uva Province

1,266,463

80.8

14.7

4.3

0.3

Sri Lanka

2.3.2. Sex Ratio


According to the Census 2012, female population is higher than male population in the country.
Out of the total population, 48.4 percent are males and 51.6 percent are females. Sex ratio is

Detailed Project Report


Meeting Societys Needs Globally

Page11

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

reported as 94, reflecting there are 94 males for every 100 females in the country. Table presents
the sex ratio by province;
Population

Sex Ratio

Sri Lanka

20,359,439

94

Central Province

2,571,557

92

Uva Province

1,266,463

95

2.4. ECONOMIC PROFILE

The country's economy has traditionally been based on agriculture, which now contributes less
than 20% to the gross domestic product and employs about a third of the work force. The
emphasis is on export crops such as tea, rubber, and coconuts (all plantation-grown). Cinnamon,
cardamom, pepper, cloves, nutmeg, citronella, tobacco, cocoa, and coffee are also exported.
Rice, sugarcane, grains, pulses, oilseed, fruit, and vegetables are grown for local use and
consumption. Petroleum refining is important and amorphous graphite, precious and
semiprecious gems, mineral sands, clay, and limestone are mined. Port construction,
telecommunications, and offshore insurance and banking are also important industries. The
island's swift rivers have considerable hydroelectric potential.
The port of Colombo, on which most of the country's railroads converge, handles most of the
foreign trade. Exports include textiles and apparel, tea and spices, diamonds, emeralds, rubies,
coconut products, rubber goods, and fish. Textile fabrics, mineral products, petroleum,
foodstuffs, machinery, and transportation equipment are imported. The United States, India, and
Great Britain are the largest trading partners.

Detailed Project Report


Meeting Societys Needs Globally

Page12

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

2.5. PROJECT REQUIREMENT AND GENERAL GUIDELINES

2.5.1. Project Requirements


Construction of 862 Housing Units and
Development of Different Infrastructure Projects which includes Roads, Public
lighting, Water Supply, Drainage and Sewerage System

2.5.2. Guide Lines For The Project Of The Housing Units


The Proposed Project would meet the following guidelines:
Rational use of natural resources;
Energy efficiency ;
Thermal and acoustic comfort;
Use of long-lasting materials that require little maintenance, that cause less
environmental impact and have better performance;
Use of equipment and building systems that cause less environmental impact;
Durability, simplicity and flexibility in the design of spaces and installations that
allow to reduce maintenance costs and a possible future revitalization;
Reuse and responsible destination of waste generated;
Adaptation to the local topography, vegetation, drainage;
Improved environmental performance during construction;
Less impact in the case of their demobilization

Detailed Project Report


Meeting Societys Needs Globally

Page13

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

CHAPTER 3
DATA COLLECTION
3.0 ASSESSMENT OF HOUSING SITES
The WAPCOS team along with the officials of PHDT and Tea Plantation visited the following sites
I.

Hellbodde Estate, Pussellawa Plantation

The Team visited the Hellbodde Estate in Nuwara Eliya district on 08.10.14. The Hellbodde
Estate has a site for 100 Housing Units as Cluster 1. The Site for Cluster 1 has 1.6 Ha of Land
having approximately 3 Km of access to approach road from Main road. The Land is barren
and power and water supply is available.

Fig No. 4 Site Visit of WAPCOS Team along with


Officials of Tea Estate and PHDT

Fig No: 5 Existing Site for Proposed Housing


Units

Detailed Project Report


Meeting Societys Needs Globally

Page14

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

II.

Dunsinane Estate, Pussellawa Plantation

The team visited the Dunsinane Estate, Pussellawa Plantation in Nuwara Eliya District on
08.10.14. The Dunsinane Estate has two sites for 310 Housing units as Cluster 1 (for 156 units)
and Cluster 2 (for 154 units). The Site for Cluster 1 has 6 Hectares of Land having Tea
Plantation (Seedlings). The Water Supply and Power are available. The Access to Internal
Road in Estate needs to be strengthen. The Site for Cluster 2 has 8 Hectares of Land having
Tea Plantation (Seedlings). The water supply and power is available. However, the access to
internal road for Cluster 2 needs to be strengthened.

Site for Cluster 2

Site for Cluster 1

Fig 6 Existing Site for Proposed Housing Units

III.

Diyagama West Estate, Agarapathana Plantation

The Team visited the Diyagama West Estate on 10.10.14 in Nuwara Eliya District. The
Diyagama West Estate has three sites for 124 units as Cluster 1. The Site for Cluster 1 has

Hectares of land having Tea Plantation (Seedlings) and site is near to main road. The water
supply and power is available. The water supply and power is available and site has access
near to main road.

Detailed Project Report


Meeting Societys Needs Globally

Page15

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Site for Cluster 1

Site for Cluster 2

Site for Cluster 3

Fig 7 Existing Site for Proposed Housing Units

Detailed Project Report


Meeting Societys Needs Globally

Page16

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

IV.

Bogawana Estate, Bogwanthala Plantation

The team visited the Bogawana Estate on 11.10.14 in NuwaraEliya District. The Bogwana Estate
has two sites for 255 units as Cluster 1 (for 84 units) and Cluster 2 (for 155 units). The site for
Cluster 1 has 3 Hectares of Land having Tea Plantation (Seedlings) and site is adjacent to main
road. The water supply and power is available. The site for Cluster 2 has 4 Hectares of Land having
Tea Plantation (Seedlings). The Water Supply and Power is available and site has access near to
Main Road.

Site for Cluster 1

Site for Cluster 2

Team at site

Fig 8 Existing Site for Proposed Housing Units

Detailed Project Report


Meeting Societys Needs Globally

Page17

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

V.

Ledgerwatte, Malwattevalley Plantation


The team visited the Ledgerwatte on 13.10.14 in Badulla District. Ledgerwatte has two sites.
First Site is at Ledgerwatte Division for 75 Units having an area of 2 Hectares. Second Site is
at Narangala Division for 50 Units having an area of 2 Hectares. The water supply and power
is available and site has access of about 7 Km from Narangala Road. The site is having Tea
Plantation (Seedlings).

Fig 9 Existing Site for Proposed Housing Units

Detailed Project Report


Meeting Societys Needs Globally

Page18

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

3.1. SURVEY DATA

The Survey Data of proposed sites have provided by PHDT to WAPCOS. The Survey has been
carried out by respective Tea Plantation Company of the site. The Survey Maps as provided by
PHDT are given below.

Detailed Project Report


Meeting Societys Needs Globally

Page19

SURVEY DATA

P.GNANAPRAKASAM J.P.F.S.I.(SRI LANKA)


Registered Licensed Surveyor ,
No.10, Benedict Avenue,
Bawwagama,
Nawalapitiya.
Tel. 054-3541130 & 077-6056778

Remaining portion of same land

ADVANCE PLAN

7.3
99

.0
00
10

.7
00
10
7.7
99

Remaining portion of same land

Rk
0
100
D

6.7
99

O
R

8.8
99

998

5.3
99

3.4
99

996

1.1
99
I N

994

990

988
986

9.8
98

992

Remaining portion of
same land

Remaining portion of same land


Reference:
Rk Rock

Scale: 1 : 1 0 0 0

COUNTOUR PLAN
Of

The area of proposed Housing Scheme in


'MIDDLE DIVISION'
of 'HELLBODDE ESTATE'
Situated in Katukitula - Within the Limits of Kotmale Pradeshiya Sabha.
Within Helboddewatta Grama Niladhari Division No.474J & Kotmale Divisional Secratariat area.
In

RAMBODA KORALE
NUWARAELIYA DISTRICT

CENTRAL PROVINCE
NOTE:
ASSUMED DATUM : 1000 METERS.
CONTOUR SHOWN ARE INTERPOLATED
CONTOUR INTERVAL 1 METER.

Boundaries

: As described above

Surveyed & Levelled on : December,2014

Registered Licensed Surveyor


REGD. NO. 19670167

P.GNANAPRAKASAM J.P.F.S.I.(SRI LANKA)


Registered Licensed Surveyor ,
No.10, Benedict Avenue,
Bawwagama,
Nawalapitiya.
Tel. 054-3541130 & 077-6056778

ADVANCE PLAN
R

29

30

1000 N
1000 E

57

1
31

27

25

23

R O A D

20

10

19

11

52

51

35

50

36

49

37

&

&

21

48

38

18

47

39

17

Remaining portion of same land

Rocky
area

D R A I N

22

53

46

40

14

16

15

41

42

59

71

60
&

61

D R A I N

70

69

Rocky
area

72

R O A D

85

62

63

64

73

R E S E R
V A T I O
N

68

67

66

65

74

&

84

75

76

D R A I N

83

82

77

81

78

44

Rocky
area

R O A D

100

43

&

99

88

89

D R A I N

98

97

87

R E S E R
V A T I O
N

Rocky
area

80

79

45
86

13

58

R O A D

D R A I N

24

54

34

R E S E R
V A T I O
N

12

33

R O A D

R E S E R
V A T I O
N

D R A I N

Remaining portion of
same land

26

55

&

32

R O A D

56

R E S E R
V A T I O
N

28

Rocky
area

91

92

90

92

R E S E R
V A T I O
N

96

95

94

101

Remaining portion of same land

Scale: 1 : 1 0 0 0

BLOCKING-OUT DIAGRAM
Of

The proposed Housing Scheme in


'MIDDLE DIVISION'
of 'HELLBODDE ESTATE'
Situated in Katukitula - Within the Limits of Kotmale Pradeshiya Sabha.
Within Helboddewatta Grama Niladhari Division No.474J & Kotmale Divisional Secratariat area.
In

RAMBODA KORALE
NUWARAELIYA DISTRICT

CENTRAL PROVINCE
Boundaries

Surveyed on : December,2014

: As described above

Containing in Extent : - Lots 1 - 101 - 7 Perches each


Registered Licensed Surveyor
REGD. NO. 19670167

Lot 1

Lot 2
Lot 3

Lot 4

Deniya

Lot 5

Lot 6

Lot 7
Lot 11
Lot 10

Lot 8

Lot 9

Deniya

SUMANGALY SUBRAMANIAM
Registered Licensed Surveyor,Leveller
Court commissioner & Valuer
20c, Pansala Road, Hatton
Registration No:-20041064

nd

rd

Surveyed on : 22 - 23

January 2015

CONTOUR PLAN

SUMANGALY SUBRAMANIAM
Registered Licensed Surveyor,Leveller
Court commissioner & Valuer
20c, Pansala Road, Hatton
Registration No:-20041064

th

th

Surveyed on : 26 - 27

January 2015

CONTOUR PLAN

Surveyed on : 12- 11 - 2014


02,09- 01 - 2015

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

3.2 BENEFICIERIES DATA

The beneficiary data has been provided by PHDT, Sri Lanka. The Beneficiary has been already selected (enclosed as Annex-I) and the
list has been furnished as per details given below
S/
Nos

Region

RPC

Estate

Kandy

Pussellawa

Helbodde

N' Eliya

Elpitiya

Dunsinane

N' Eliya

Agarapatana

Diyagama West

Proposed

TOTAL IDENTIFIED

Units

BENEFICIARIES

Middle

100

100

Middle

156

308

Factory

154

96

1st/2nd

127

150

Division

Sub Total
4

Hatton

Bogawantalawa

Bogawana

537
Bogawana

84

99

Bridvil

116

154

Sub Total
5

Badulla

Malwatte Valley

Ledgerwatte
Sub Total

Grand Total - Phase I- Initially proposed housing units

200
Ledgerwatte

75

75

Narangala

50

50

125
862

Detailed Project Report


Meeting Societys Needs Globally

Page20

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

3.3 GEOTECHNICAL DATA- NBRO REPORT

National Building Research Organization (NBRO) under the Ministry of Disaster Management is
the national focal point of Sri Lanka for all landslide related studies and services. The Geotechnical
Investigations through NBRO have been conducted for proposed housing sites. Based on these
NBRO reports and site conditions, the sites have been identified by Tea Estate and PHDT. The
NBRO reports of above mentioned sites is under the translation by PHDT. However a sample
NBRO report has been enclosed as Annex-II
The Geotechnical Investigations gives an overview of the site pertaining to proposed structures.
The Investigations will elaborate the terrain, prior known land use, general area geology,
groundwater etc. The various explorations and tests are translated into specific loading criteria,
settlements etc.
During Implementation, in depth geotechnical investigations will be carried out prior to
construction. Confirmatory Boreholes needs to be undertaken by PHDT/ Tea Estate for each tea
estate for assessing the geotechnical Data and Soil Property to calculate the soil bearing capacity
priority to Construction.

Detailed Project Report


Meeting Societys Needs Globally

Page21

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

CHAPTER 4
PROJECT PROPOSALS
4.0 GENERAL

The scope of the assignment covers the Project Management Consultancy Services for design and
Construction supervision of 4000 housing units in Central and Uva Province. However based on
the site availability and its conditions, 862 housing units are being proposed in Phase-I.
The works mainly consists of construction of housing units, infrastructure works like road,
drainage, water supply, sewerage, landscaping, etc. The proposals for the planning and designing
of the project area are prepared and presented in this Chapter.
The work undertaken by WAPCOS from Oct 2014 (i.e. signing of agreement) was presented to
the monitoring committee during the meeting held on 09.05.14 at HCI, Colombo. The officials
from PHDT were also present. During the meeting it was discussed that under Phase-I, 1134
number of houses shall be constructed spread over at 9 Division of 5 Estates in Central and Uva
Province. Initially WAPCOS has prepared the site layouts for 1034 houses. However, based on the
site conditions and availability of area, the 862 number of housing units are being proposed.
The area proposed for each housing unit is 550 sq.ft. of built up area with total plot area of
7 perches ( 1905.75 Sq.ft) per house as per local requirement (1 perch = 272.25 sq.ft) ,this area
is excluding common area for community infrastructure.
However, each house will require minimum approx. 10 perches which will include internal roads
for planning purpose.
Tentative cost of each housing unit of 550 sq.ft works out to LKR 13.00 Lakhs. The housing cost
does not include Common Water Supply from Source to these individual houses, Common Power
Supply from Source to these individual houses, Access Road, Internal Roads, Common Street
lighting (solar lighting with panels) and Storm Water Drainage System.

The Site Development Cost Comprises of earthwork, 3.6 m road, laying of RCC Drain over Road,
external water supply line, electrification works and street lightening.

Detailed Project Report


Meeting Societys Needs Globally

Page22

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

The Site Development Cost for each site is tabulated below:


Sr
No.

Region

RPC

Estate

Kandy

Pussellawa

Helbodde

N' Eliya

Elpitiya

Dunsinane

N' Eliya

Agarapatana

Division
Middle

100

Middle

156

Factory

154

34,986,184

127

18,183,047

Diyagama West
Sub Total

Hatton

Bogawantalawa

Bogawana

Badulla

Malwatte Valley

Ledgerwatte

Sub Total
Grand Total - Phase I

27,232,629
28,991,170

537
Bogawana

84

19,231,907

Bridvil

116

26,857,214

Sub Total
5

Cost of
Total
Site
Units
Development

200
Ledgerwatte

75

10,633,945

Narangala

50

12,310,869

125
862

178,426,965

During Construction, the Water Supply and Power for Construction purpose shall be provided by
Tea Estates to Contractor at free of cost. Road Traces being done during Construction shall be
developed as internal roads at a later date by Tea Estates. The Tea Estates will give the clear sites
free from Tea Bushes and clearly demarcated. Further the Water and Power for construction
purpose at site shall be provided by Tea Estate. The Tea Estates shall provide power and water
for construction purpose at free cost. Confirmatory Boreholes needs to be undertaken by PHDT/
Tea Estate for each tea estate for assessing the geotechnical Data and Soil Property to calculate
the soil bearing capacity priority to Construction.

Detailed Project Report


Meeting Societys Needs Globally

Page23

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

4.1. SITE PLANNING AND SITE LAYOUT

As per the scope of work site planning of the project site has been done. Accordingly, the site
layouts has been prepared. Site Planning of these sites includes the organization of land use
zoning, access, circulation, privacy, security, shelter, land drainage, and other factors.
4.1.1. SITE PLAN
A detailed site plan is prepared showing the existing and surrounding development and detailed
contour map is prepared. Site Plans includes building placement, parking, and vehicular and
pedestrian circulation, responding to programmatic, functional, environmental, and setback
requirements utilizing general site planning principles.

4.2. ARCHITECTURE DESIGN AND LAYOUT


4.2.1. Single Dwelling Unit Plan
As per the space requirements, a Single Dwelling Unit (DU) plan was prepared and the details
are presented in the table below
Sl.No. PARTICULAR

BUILT UP AREA (SQ.FT)

1.

Living Hall

158

2.

Kitchen

79.00

3.

Bed Room 1

115.00

4.

Bed Room 2

122.00

5.

Toilet

76.00

Total

550

Total Built Up Area = 550 Sq. ft.

Detailed Project Report


Meeting Societys Needs Globally

Page24

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

The plan of single dwelling unit is shown in Fig 10.

Fig 10 - Plan for Single Dwelling Unit

The Design of housing unit has been carried out to create more livable spaces for living of Tea
Plantation workers. The proposed housing unit incorporate sustainable features that reduce the
cost of construction and cost of maintenance that empowers the Project to meet its intended
objectives. Schedule of Doors and Windows are detailed in Table below:
S. No.

SIZE (m m)

SILL LEVEL (m)

LINTEL LEVEL (m)

DOOR SCHEDULE
D

1.2 1.2

00

2.1

D1

0.9 2.1

00

2.1

D2

0.8 2.1

00

2.1

WINDOW SCHEDULE
W

1.5 1.2

0.90

2.1

KW

1.2 1.05

1.05

2.1

Detailed Project Report


Meeting Societys Needs Globally

Page25

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

VENTILATOR SCHEDULE
v

0.8 0.6

1.50

2.1

The Single dwelling unit plan, floor plan and doors, windows details are given in Annexure.
Fig 11 PROSPECTIVE VIEWS

Detailed Project Report


Meeting Societys Needs Globally

Page26

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Detailed Project Report


Meeting Societys Needs Globally

Page27

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

4.3 DESIGN CONSIDERATIONS

The housing blocks are proposed to be of RCC frame structure with 20 cm concrete block walls.
All blocks and all floor share identical. Every dwelling unit has 2 bed rooms + kitchen + living hall
+ verandah + toilet.
Different loads Considered in Designing the Housing Unit are given in the Table below:

Type of Load

Description

Value

Dead Load

Brick Load

15.70 to 18.85 kN/m2

Slab

23.25 to 24.80 kN/m2

Floor

1.67 kN/m2

Roof

0.10 kN/m2

Kitchen, Bed Room, Living, Toilet, Living Corridor

2.0 kN/m2

Balcony

3.0 kN/m2

Roof

2.0 kN/m2

Load taken based on the average wind speed

5 m/sec

Live Load

Wind load

Based on the loads calculated, a model is generated and Analysis and structural designing is done.
Beams and Columns of the Super Structure are modelled by applying Dead Load, Live Load, Wind
Load with different combinations as per the standards and Analysis is done. After the Analysis of
the Bending Moment, Shear Force, Displacements at the Joints designing is done as per the
Standards.
The following are the outcomes:
Lintel Beams Detail:
Keeping in view of the spans, loads, and moments three different size of beams are considered
for the housing unit and the details are given in the Table below and the structural details of the
beams are given in Annexures.

Detailed Project Report


Meeting Societys Needs Globally

Page28

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Fig 12 LINTEL BEAM PLAN

Schedule of Lintel Beams


BEAM

SIZE THICKNESS

BOTTOM BARS

TOP BARS

RING DISTRIBUTION

NO.

(BD) OVERALL

LB1

9"x 9"

2-12#

2-10#

8 @150MMC/C

LB2

9"x 6"

2-10#

2-10#

8 @150MMC/C

LB3

5"x 5"

2-12#

2-10#

8 @150MMC/C

(C/C)

Detailed Project Report


Meeting Societys Needs Globally

Page29

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Plinth Beams Detail:

Based on the loads defined and further analysis in design is done. The details of the plinth beams
are given in the Table below and the structural details of the plinth beam are given in
Annexures.

Fig 13 PLINTH BEAM PLAN

Detailed Project Report


Meeting Societys Needs Globally

Page30

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Schedule of Plinth Beams


BEAM

SIZE

TYPE
WIDTH

DEPTH

(B)

(D)

TOP R/F

TOP EXTRA

BOTTOM R/F

BOTTOM

STRAIGHT

UPTO L/4

STRAIGHT

EXTRA

FROM

0.7 L AT

SUPPORT

CENTRE

VERTICAL STIRRUPS
UPTO 2-D

AT

FROM

CENTRE

SUPPORT
PB1

12

2-12

2-12

2-12

2-12

8 @ 150c/c

8@
100c/c

PB2

12

2-12

2-10

2-12

--

8 @ 150c/c

8@
150c/c

PB3

2-12

--

2-10

--

8 @ 150c/c

8@
150c/c

PB4

2-10

--

2-10

--

8 @ 200c/c

8@
150c/c

Footing Detail
Foundations are of types like isolated footing, combined footing, strip footing, raft footing, pile
foundations etc. They are selected based on structural requirement and soil conditions.
Reinforcement detailing of footing is as much important as site investigation for the type of
footing and structural design of footing.
Reinforcement Cover: The minimum thickness to main reinforcement in footing should
not be less than 50mm. Footing is in contact with earth surface directly, and 40mm for
external exposed face such as surface levelling PCC.
Minimum reinforcement and bar diameter: The minimum diameter for main
reinforcement should not be less than 10mm.
Detailing method of Isolated Footing: The isolated footing are generally square or
rectangular in plan based on structural requirement and forces acting on the column.
Reinforcement Distribution in Footing: In the case of two-way rectangular footings,
reinforcement is distributed across the full width of footing in long direction, however for
short direction, the reinforcement is distributed in the central band as per calculations
below. The rest reinforcement in short direction is distributed equally on both sides of
the central band.

Detailed Project Report


Meeting Societys Needs Globally

Page31

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka


2
=
( ) + 1

Where y is the long side and x is the short side of the footing

Schedule for Footing


COLUMN

EXCAVATION

SIZE

NO.

WIDTH

WIDTH

DEPTH

FOOTING DETAILS
DEPTH

DEPTH

DEPTH AT

R/F

R/F

AT

PEDESTAL

PARALLEL

PARALLEL

TO SHORT

TO LONG

SIDE

SIDE

10 MM 6"

10 MM 8"

C/C

C/C

10 MM 6"

10 MM 8"

C/C

C/C

EDGE

F1

F2

46

46

36

36

11

13

FIG 14 - FOOTING DETAILS

Detailed Project Report


Meeting Societys Needs Globally

Page32

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Schedule for Column


COLUMN NO.
C1

COLUMN DETAIL
9

4-12

8 @6 C/C

Fig 15 COLUMN DETAIL

4.4 INFRASTRUCTURE FACILITIES / SERVICE PLANS


As per the project requirements, the following infrastructure facilities are required for the project
and service layout plan are required to be prepared accordingly
A. Road Network
B. Storm Water Drainage

Detailed Project Report


Meeting Societys Needs Globally

Page33

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

C. Electrification
D. Water Supply
E. Sewerage System
F. Solid Waste Management
4.4.1 Road Network
The layout of roads are required to be kept such that connection from various units /
buildings to main roads are direct, convenient, free from meandering, clear of present
and future installation and follow standards. All service lines for power, water, utilities,
drainage, sewerage, street lighting etc. are required to be laid outside the roadways
widths as far as practicable. The project area is required to be connected to the external
road with approach road

4.4.2 Storm Water Drainage


The storm water drainage is required on either side/ one side of the road and the
typical cross to drain the Rain Water outside the Project Area.

4.4.3 Electrification
The Electrification is required at the project site. The sufficient street lights would be
considered to cover the entire project area.

4.4.4 Water Supply


External Water supply:
It is required to have a raw water pipeline from source to the project site and Water
Storage Tank for further internal distribution of water from Water Treatment Plant (if
required) to the project area.
Internal Water Supply:
Water from the Transmission main is collected to an internal storage tank provided in
the site area.

Detailed Project Report


Meeting Societys Needs Globally

Page34

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Then Water is distributed to the individual blocks with a distribution main


From the distribution main, distribution line of is connected up to the bottom of the
each block, and then fill the tank provided at the top of each block.

4.4.5 Sewerage System


The Septic tanks are required at the site for the collection of sewage from the individual
household

Fig 16 TYPICAL SKETCH OF TWO COMPARTMENT SEPTIC TANK

4.4.6 Solid Waste Management


Dustbins are required at each block for the proper management of the solid waste and to
improve the hygienic conditions in and around.

Detailed Project Report


Meeting Societys Needs Globally

Page35

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

CHAPTER 5
PROJECT IMPLEMENTATION AND MANAGEMENT FRAMEWORK
5.0 GENERAL

High Commission of India (HCI), Sri Lanka is the Principal Executive Agency for the project and
the expected time period for completion of each lot of houses taken up for construction is 12
months from the date of handing over of land to the contractor. The existing framework for
tendering, monitoring & managing will be taken care by WAPCOS on behalf of HCI. The tender
will be invited by the HCI adopting the procedure involving pre-qualification bid, technical and
financial bid for finalizing the construction agency. The entire framework of implementation &
management will be as under:

Project Approval by
HCI and
Goevrnment of
Sri Lanka

Quality control &


assurance, Monitoring
and Day to day
Supervision and
Completion of work

Publication of NIT by
HCI

Issue of work order/


Execution of
agreement and
commencement of
work

Tender Submission
by the Agency

Scrutinity and
finalization of
Contractor by Tender
Selection Committee

Handing over of
Housing Units to
Beneficiaries

Detailed Project Report


Meeting Societys Needs Globally

Page36

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

5.1 PROJECT MANAGEMENT CONSULTANT

WAPCOS, the Project Management Consultant would report on a regular basis to the monitoring
and oversight mechanisms constituted for the Project. WAPCOS would prepare Engineering
design, tender documents and other technical inputs for selection of Contractors. HCI would take
up the process of open tendering for selection of Contractors in consultation with Ministry of
External Affairs, Government of India. WAPCOS would carry out continuous monitoring of
processes for compliance with guidelines and operations manual and monitoring of construction,
including technical oversight of construction activities. WAPCOS would exercise quality control
on construction and construction materials. WAPCOS would recommend

to the HCI for

release of stage-payments to Contractors on achievement of the prescribed milestones and


duly certifying the Measurement Book for this purpose. WAPCOS would render assistance in
issuance of certificate of completion and facilitate handing over of the houses to the
beneficiaries.
5.2 QUALITY CONTROL AND ASSURANCE

Quality control and assurance implies use of correct design, specifications and materials which
has to be imposed by the contractor. WAPCOS would assure quality of the works undertaken by
the contractor. All the building materials would be checked and tested on specified technical
parameters. The quality control would also take care of proper certification of structural safety
and stability to get the desired serviceability of the buildings and infrastructures facilities.

5.3 MEASUREMENT AND VALUATION CONTROL

Measurement of Quantities is important for bill verification submitted by the Contractor.


Consultant proposes a joint measurement with Contractor on site to save the time for this
activity. Measurement would cover the following activities:

Detailed Project Report


Meeting Societys Needs Globally

Page37

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Periodic measurement of the permanent work on submission of bills by the Contractor,


verify the measurements and value them with the method of measurement and notes on
pricing as well as the unit rates of bill of quantities as included in the construction contract
Review the Contractors statement and upon verification against the measurement and
valuation as above certify the statements or correct them as required under the
construction contract and forward them with recommendation to the HCI for check
measurement and recording in the prescribed format or measurement book.
Recommend to HCI for payment and duly certify the bills and measurement.
Keep accurate records to maintain as effective cost control system in order that the cost
of works execution remains within budgeting provision
Keep accurate records of all variations made and all claims forwarded by the Contractor
together with reasons thereof, which may affect the sum becoming payable to the
Contractor under provision of the Contract. Claim shall be verified skillfully, but fairly
interpreting the provisions of the construction contract and commended when truly
justified
Upon agreement with Contractor on outstanding work still to be carried out by him during
the defect correction period upon having approval of the HCI there to, issue at the
appropriate time the certificate of substantial completion and certify for release the
portion of the retention money related thereto.

5.4 ENVIRONMENT SUSTAINABILITY

Care will be taken for any negative impact during construction stage. Construction materials, less
harmful effect and more durability will be used. Provision has been made for natural Plantation.
While planning the building unit, attempt has been made for natural light & ventilation provision
is also made to in the locality. Terrace water will be collected through rain water pipes and be
recharged through harvesting pits for proper recharging or will be used in gardens. Greenery and
individual toilets from units will keep the environment healthy and hygienic. Proper open spaces

Detailed Project Report


Meeting Societys Needs Globally

Page38

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

covering the parking and approach requirements around the building will provide very well
ventilated and airy ambience in the housing units.

5.5 POST CONSTRUCTION SERVICES

It includes regular maintenance of the services as well as the building part with overall cleanliness
of the township, supply of water and its efficient disposal, proper cleanliness of toilets, effective
drainage, proper maintaining of roads & pathways, landscaping, proper night illumination etc.

Detailed Project Report


Meeting Societys Needs Globally

Page39

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

CHAPTER 6
COST ANALYSIS

6.0 COST ESTIMATES

The cost estimates of construction of housing units and site development under Sri Lanka Housing
Project have been worked out by assessing quantities of different items for various works.
The Summary of the cost estimates is given in Table 6.1 below:
Table 6.1 SRI LANKA HOUSING PROJECT PROPOSED FOR THE ESTATES AND NUMBER OF HOUSES FOR PHASE I

Sr
No.

Region

Estate

Division

Total
Units

Cost of
Construction
Housing Units
(LKR)

Kandy

Helbodde

Middle

100

129,811,083

27,232,629

157,043,712

Middle

156

202,505,289

28,991,170

231,496,459

N' Eliya

Dunsinane
Factory

154

199,909,067

34,986,184

234,895,251

Diyagama West

127

164,860,075

18,183,047

183,043,122

Sub Total

537

N' Eliya

Hatton

Badulla

Total Cost
(LKR)

Bogawana

84

109,041,309

19,231,907

128,273,216

Bridvil

116

150,580,856

26,857,214

177,438,070

Bogawana
Sub Total

Cost of
Site
Development
(LKR)

200
Ledgerwatte

75

97,358,312

10,633,945

107,992,257

Narangala

50

64,905,541

12,310,869

77,216,410

Ledgerwatte
Sub Total

125

Grand Total - Phase I

862

1,297,398,497

Detailed Project Report


Meeting Societys Needs Globally

Page40

HELBODDE
Tea Estate

Site Layout &


Planning

Remaining portion of same land

7.3

99

100

97

96

95

98

99

94

93

00

10

.0

00

10

.7

7.7

88

99

89

3.60 M R O A D

78

80

79

83

81

01

82

73

74

75

0
100
72

44

42

43

41

40

3.4
99

17

51

50

54

53

52

20

19

55

57

56

58

99

39

36

37

38

35

32

33

34

13

12

21

11

ROAD AREA

3703 SQ.M

(12.34%)

10

TOTAL UNIT NO. -- 100 NO's

PLOT AREA FOR EACH UNIT -

COVERED AREA / UNIT -

TOTAL COVERED
AREA BY ALL BLOCK .
( 100x55.0)

100x177.11=17711.43 m2

5,500.00

23

22

09

25

24

08

07

994

27

26

28

01

HOUSING BLOCK

02

PLANNING BOUNDARY

03

RD

ROAD DISTANCE

04

RL

ROAD LEVEL

Note:1.) Survey maps are not on WGS-84 projection.


2.) All the dimension are in meters unless
otherwise specified.
3.) The site planning is for 100 housing units.
4.) Dimension need not to be scaled.

29

30

A'

1.1

05

04

03

02

01

PROJECT MANAGEMENT CONSULTANCY


FOR SRILANKA HOUSING PROJECTCONSTRUCTION OF 4,000 HOUSING UNITS
IN CENTRAL AND UVA PROVINCES IN SRILANKA

990

988

986

9.8
98

992

Remaining portion of
same land

Layout Plan of Housing Units


at Hellbodde

MINISTRY OF EXTERNAL AFFAIRS,


GOVT. OF INDIA

40

39

38

10

37

36

11

35

12

34

(17.70%)

99
06

3.60 M R O A D

3.60 M R O A D

09

(59.02%)

31

I N

14

(100%)

LEGEND

3.60 M R O A D

18

30,006.4 SQ.M.
(3.006 Hec.)

59

60

8.8

996
15

61

3.60 M R O A D

3.60 M R O A D

16

62

49

63

64

65

48

1456 sq.m
Area left for
Garden /
Community
center

3.60 M R O A D

47

46

3.60 M R O A D

45

66

67

68

3.60 M R O A D

TOTAL PLOT AREA

998

5.3

99

69

DESCREPTION

Housing unit Area

71

70

S.NO.

Remaining portion of same land

Rk
76

77

84

AREA STATEMENT

3.60 M R O A D

85

86

3.60 M R O A D

87

92

91

90

13

33

14

32

31

30

29

28

27

26

Drawing No:- WAP/SL/HEL/DRG/001

General Abstract

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

GENERAL ABSTRACT
ABSTRACT ESTIMATE FOR CONSTRUCTION OF BUILDING & SITE DEVELOPMENT
AT HELBODDE, SRILANKA
S.No.
A
B

SUB HEAD
Dwelling unit @ LKR.1298111 Per DU
Site Development Works including Site Clearance, Bench
Cutting,Construction of Road Pavement, Storm Water Drain,
External Water supply Line, and Electrification Works & Street
Lighting

Quantity

Unit

100

DU

Grand Total(i)
TO Say (lakhs) Single Unit Cost (Lakhs)
Development Works as percentage of (i)

AMOUNT
(in LKR.)
129811082.7
27,232,628.93
157,043,712
1,570.44
15.70
17.34

DETAILED PROJECT REPORT

Page41

Cost Estimate for


Site Development

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

DETAILED ESTIMATE FOR SITE DEVELOPMENT WORKS


AT HELBODDE, SRI LANKA
I. SITE CLEARANCE
Sl.NO

PARTICULAR

NO

Measurment (m)
L
B

D/H

Earthwork
Clearing jungle including uprooting of vegetation &
trees of girth <300mm, disposal with all leads of the
site

QTY

UNIT

RATE (in LKR )

AMOUNT (in LKR)

30006.40

sq.m

12.05

361577.12

Sub Total

361,577.12

II. ROAD - 3.6 MT. WIDE


1

Excavation for drains (Earthwork in excavation for drain


/ chamber as per drawing and techanical specification,
including setting out, construction of shoring and
bracing, removal of staumps and other deleterious
matter, dressing of sides and bottom and backfilling
with approved material.
1

1045.00

3.60

0.60

Average 50 % excavation taken

2257.20
1128.60
1128.60 cum.

350.00

395010.00

1128.60 cum.

557.50

629194.50

cum

1635.00

768858.75

cum

3690.00

1735222.50

313.50 CUM

5830.00

1827705.00

Construction of embankment/sub grade with material


obtained from Borrow pits (Construction of
embankment with approved material/selectrd soil
having C.B.R. > 5 (unless specified otherwise in the
contract) obtained from borrow pits with all lifts and
leads, transporting to site , spreading, grading to
required slope and compacting to meet requirement .

1045.00

3.60

0.30

1045.00

3.00

0.15

470.25

1045.00

3.00

0.15

470.25

Construction of granular sub base by providing close


graded material , carriage of mixed material to work
site, spreading in uniform layers with motor grader on
prepared surface watering rolling and compacting with
vibratory power roller at OMC to achieve the desired
density, complete .
By mix in place method
Disintegrated rock i.e. moorum having having CBR
value not less than 6 and PI and L.L not more than 6
and 20 respectively.

Providing laying, spreading and compacting stone


aggregates of specific sizes to specification including
spreading in uniform thickness, hand packing, rolling
with vibratory roller 8-10 tonnes in stages to proper
grade and chamber applying and brooming requisite
type of screening/ binding Materials to fill up the
interstices of coarse aggregate, watering and
compacting to the required density.)
i) Using Screening Crushable type such as Moorum or
Gravel
470.25

Dry Lean Cement Concrete Sub- base (Construction of


dry lean cement concrete Sub- base over a prepared
sub-grade with coarse and fine aggregate conforming
to IS: 383, the size of coarse aggregate not exceeding
25 mm, aggregate cement ratio not to exceed 15:1,
aggregate gradation after blending to be as per table
600-1, cement content not to be less than 150 kg/
cum, optimum moisture content to be determined
during trial length construction, concrete strength not
to be less than 10 Mpa at 7 days, mixed in a batching
plant, transported to site, laid with a paver with
electronic sensor, compacting with 8-10 tonnes
vibratory roller, finishing and curing.)

1045.00

3.00

0.1

313.50

DETAILED PROJECT REPORT

Page42

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

Providing and laying Cement Concrete for plain


concrete/ reinforced concrete i/c form work,
shuttering complete in as per drawings and
specifications (for village roads )

NO

(iii) PCC M-20

Measurment (m)
L
B

3.00

QTY

D/H

1045.00

0.2

c/c road excavation


1045.00

1045.00

0.80

2
1

1045.00
1045.00

0.15
0.30

UNIT

627.00
627.00 CUM

RATE (in LKR )

AMOUNT (in LKR)

10452.50
Sub Total

6553718.00
11909708.75

CUM

350.00

0.00

0.10

83.60 CUM

7080.00

591888.00

0.50
0.10

156.75
31.35
188.10 CUM

10365.00

1949656.50

140752.50

1323777.26

Sub Total

3865321.76

III. R.C.C. DRAIN ALONG 3.6 M ROAD (300 X 400 MM)


1

Excavation for drains (Earthwork in excavation for drain


/ chamber as per drawing and techanicqal
specification, including setting out, construction of
shoring and bracing, removal of stumps and other
deleterious matter, dressing of sides and bottom and
backfilling with approved material.

Drain 2

PCC 1:3:6 in foundation (Plain cement concrete 1:3:6


mix with crush stone aggregate 40mm nominal size
mechanically mixed ,placed in foundation 7 compacted
by vibration including curing ).

Construction of RCC drain/ cover / chamber placing in


position providing shuttering and concreting by using
concrete mixture compaction by vibration etc.
complete as per drawing and technical specification
excluding reinforcement with RCC M-20

Bottom-

0.00

Supplying , Fitting and placing un-coated HYSD bar


reinforcement in drain/ cover / chamber complete as
per drawing and technical specification.

Quantity as per item No.-4


188.10
188.10 @. 50 kg/cum

9405.00
9.405

kg
MT

IV. EXTERNAL WATER SUPPLY LINE


1
Excavation for all types and sizes of foundations,
trenches and drains or for any other purpose including
disposal of excavated stuff upto 1.5 m lift and lead
upto 50m (at least 5m away from the excavated area),
including dressing and leveling of pits.
In all types of soil
850.00x0.30x0.3
2

850.00

0.30

76.50

cum

282.00

21,573.00

76.50

cum

95.38

7,296.19

Filling from available excavated stuff (Excluding rock) in


trenches, plinth, sides of foundation etc. in layers not
exceeding 20cm in depth consolidating each deposited
layer by ramming and watering with a lead upto 50 M.
and lift upto 1.5 M.

100 % OF ITEM NO. 1


3

0.30

Providing and fixing Chlorinated Polyvinyl Chloride


(CPVC) pipes, having thermal stability for hot & cold
water supply including all CPVC plain & brass threaded
fittings. This included jointing of pipes & fittings with
one step CPVC solvent cement, trenching, refilling &
testing of joints complete as per direction of Engineer
in Charge
62.50 mm nominal inner dia pipes

260.00

260.00

2980.00

774,800.00

75 mm nominal inner dia pipes

240.00

240.00

4205.00

1,009,200.00

DETAILED PROJECT REPORT

Page43

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

100mm nominal inner dia pipes


4

NO

Measurment (m)
L
B

300.00

D/H

QTY

UNIT

RATE (in LKR )

300.00

5812.50

AMOUNT (in LKR)

1,743,750.00

1.00

each

8572.50

8,572.50

Providing and placing in position C.I. sluice valves


category A (Make: Kirloskar Bros. Ltd., Indian Valve
Co. (IVC), Fouress Engineers Pvt. Ltd.,WAG) (with cap)
complete:
100 mm diameter

1.00

DETAILED PROJECT REPORT

Page44

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

Providing, laying and jointing following socket & spigot


centrifugally csat (Spun) Ductile iron pressure pipes
inside cement mortor lining (Class K7) conforming to IS
8329/2000 with siutable Rubber gasket (push on) joints
as per IS: 5382/85 including.

NO

100 mm Dia
150 MM Dia
6

Measurment (m)
L
B

350.00
500.00

D/H

QTY

UNIT

RATE (in LKR )

AMOUNT (in LKR)

350.00
500.00

m
m

2405.00
3555.00

841,750.00
1,777,500.00

Labour for providing Rubber Gasket (push on) joints to


following D.I pipes class K8 and K9 including joints but
excluding cost of Rubber Gasket

36.00

36.00

each

290.00

10,440.00

Providing Laying Ductile Iron Double socket Reducer


conforming to IS 9523/2000 having dimension as per
table 21 of IS 9523/2000 in the following nominal
diameter/ sizes with external bitumen coating and
internal cement mortor lining with finishing as per
clause 13 of IS-9523/2000.
100 mm x 80 mm
200 mm x 100 mm
200mmx150mm

4.00
2.00
2.00

4.00
2.00
2.00

each
each
each

1942.50
4855.00
4860.00

7,770.00
9,710.00
9,720.00

Providing Laying DI Double socket 900 bends


conforming to IS- 9523/2000 having dimension as per
table 15 of IS- 9523/2000 in the following nominal
diameter/sizes with external bitumen coating and
internal cement mortar lining
100 mm Dia

4.00

4.00

each

1967.50

7,870.00

3.00
1.00
6.00

3.00
1.00
6.00

each
each
each

5352.50
5215.00
3737.50

16,057.50
5,215.00
22,425.00

3.00
1.00

3.00
1.00

each
each

3752.50
5570.00

11,257.50
5,570.00

Providing and Laying Ductile Iron Double Socket branch


flange Tee conforming to IS- 9523/2000 having
dimension as per table 21 of IS-9523/2000 in the
following nominal diameter/sizes with external
bitumen coating and internal cement mortar lining
with finishing as per clause of IS-9523/2000.
150x100
150x80
100x80

10

11

12

13

Providing and laying all socketed tees conforming to IS9523/2000 having dimension as per table 21 of IS9523/2000 in the following nominal diameters/ sizes
with externalbitumen coating and internal cement
mortor lining with finishing as per clause 13 of IS9523/2000.
100mmx 100mm
150mmx 100mm
Providing and fixing Chlorinated Polyvinyl Chloride
(CPVC) pipes in trenches, having thermal stability for
hot & cold water supply including all CPVC plain &
brass threaded fittings. this included jointing of pipes &
fittings with one step CPVC solvent cement, excavation
of trenches, refilling the same and testing of joints
complete as per direction of engineer in charge

19.6.6) 50 mm nominal outer dia

110.89

110.89

875.00

97,028.75

19.6.7) 62.5 mm nominal ineer dia pipes

270.79

270.79

2675.25

724,430.95

19.6.8) 75 mm nominal inner dia pipes

28.33

28.33

3495.38

99,023.97

1.00

each

9730.00

9,730.00

Providing and fixing of following CI double flanged


sluice valves as per IS: 14846-2000 fitted with cast iron
cap including jointig & testing with cost of jointing
material such as bolts, nuts, rubber insertions etc. all
complete.
100 mm Dia PN-1.6

Constructing masonry Chamber 60x60x75 cm, inside


with modular well burnt clay bricks of 35 kg/ cm in
cement mortar 1:4 (1 cement : 4 coarse sand) for sluice
valve, with C.I. surface box 100mm. top diameter, 160
mm bottom diameter and 180 mm deep (inside) with
chained lid and RCC top slab 1:2:4 mix (1 cement : 2
coarse sand : 4 graded stone aggregate 20mm nominal
size) necessary excavation foundation concrete 1:5:10
(1 cement : 5 fine sand : 10 graded stone aggregate 40
mm nominal size) and inside plastering with cement
mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick
finished with a floating coat of neat cement complete
as per standard design :

1.00

DETAILED PROJECT REPORT

Page45

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

Constructing masonry Chamber 60x60x75 cm, inside


PARTICULAR
with modular well burnt clay bricks of 35 kg/ cm in
cement mortar 1:4 (1 cement : 4 coarse sand) for sluice
valve, with C.I. surface box 100mm. top diameter, 160
mm bottom diameter and 180 mm deep (inside) with
chained lid and RCC top slab 1:2:4 mix (1 cement : 2
coarse sand : 4 graded stone aggregate 20mm nominal
size) necessary excavation foundation concrete 1:5:10
(1 cement : 5 fine sand : 10 graded stone aggregate 40
mm nominal size) and inside plastering with cement
mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick
finished with a floating coat of neat cement complete
as per standard design :

For 65 mm to 100 mm valve-

NO

1.00

Measurment (m)
L
B

D/H

QTY

UNIT

RATE (in LKR )

1.00

each

8321.00

Sub Total

Total (i)
Add 5% of (i) for Bench Cutting & Levelling
Add 6% of (i) for Electrification Works & Street Lighting
Net Total (ii)
Contingency Charges of 5% of (ii)
Gross Total

AMOUNT (in LKR)

8,321.00

7,229,011.36

23,365,618.99
1,168,280.95
1,401,937.14
25,935,837.08
1,296,791.85
27,232,628.93

DETAILED PROJECT REPORT

Page46

DUNSINANE
Middle Division

Site Layout &


Planning

General Abstract

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

GENERAL ABSTRACT
ABSTRACT ESTIMATE FOR CONSTRUCTION OF BUILDING
AT DUNSINANE MIDDLE DIVISION, SRILANKA
S.No.
A
B

SUB HEAD
Dwelling unit @ LKR.1298111 Per DU
Site Development Works including Site Clearance, Bench
Cutting,Construction of Road Pavement, Storm Water Drain,
External Water supply Line, and Electrification Works & Street
Lighting

Quantity

Unit

156

DU

Grand Total(i)
TO Say (lakhs) Single Unit Cost (Lakhs)
Development Works as percentage of (i)

AMOUNT
(in LKR.)
202505289
28,991,169.88
231,496,459
2,314.96
14.84
12.52

DETAILED PROJECT REPORT

Page47

Cost Estimate for


Site Development

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

DETAILED ESTIMATE FOR SITE DEVELOPMENT WORKS


AT DUNSINANE MIDDLE DIVISION, SRI LANKA
I. SITE CLEARANCE
Sl.NO

PARTICULAR

NO

Measurment (m)
L
B

D/H

Earthwork
Clearing jungle including uprooting of
vegetation & trees of girth <300mm, disposal
with all leads of the site

QTY

UNIT

RATE (in LKR )

AMOUNT (in LKR)

53454.50

sq.m

12.05

644126.725

Sub Total

644,126.73

II. ROAD - 3.6 MT. WIDE


1

Excavation for drains (Earthwork in excavation


for drain / chamber as per drawing and
techanical specification, including setting out,
construction of shoring and bracing, removal of
staumps and other deleterious matter, dressing
of sides and bottom and backfilling with
approved material.
1

1212.00

3.60

0.60

Average 50 % excavation taken

2617.92
1308.96
1308.96 cum.

350.00

458136.00

Construction of embankment/sub grade with


material obtained from Borrow pits
(Construction of embankment with approved
material/selectrd soil having C.B.R. > 5 (unless
specified otherwise in the contract) obtained
from borrow pits with all lifts and leads,
transporting to site , spreading, grading to
required slope and compacting to meet
requirement .

1212.00

3.60

0.30

1308.96 cum.

557.50

729745.20

1212.00

3.00

0.15

545.40 cum

1635.00

891729.00

1212.00

3.00

0.15

545.40
3690.00

2012526.00

Construction of granular sub base by


providing close graded material , carriage of
mixed material to work site, spreading in
uniform layers with motor grader on prepared
surface watering rolling and compacting with
vibratory power roller at OMC to achieve the
desired density, complete .

By mix in place method


Disintegrated rock i.e. moorum having having
CBR value not less than 6 and PI and L.L not
more than 6 and 20 respectively.
4

Providing laying, spreading and compacting


stone aggregates of specific sizes to
specification including spreading in uniform
thickness, hand packing, rolling with vibratory
roller 8-10 tonnes in stages to proper grade
and chamber applying and brooming requisite
type of screening/ binding Materials to fill up
the interstices of coarse aggregate, watering
and compacting to the required density.)
Grading- II (Using Screening Crushable type
such as Moorum or Gravel)
i) Using Screening Crushable type such as
Moorum or Gravel

545.40 cum

DETAILED PROJECT REPORT

Page48

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

Dry Lean Cement Concrete Sub- base


(Construction of dry lean cement concrete Subbase over a prepared sub-grade with coarse
and fine aggregate conforming to IS: 383, the
size of coarse aggregate not exceeding 25 mm,
aggregate cement ratio not to exceed 15:1,
aggregate gradation after blending to be as per
table 600-1, cement content not to be less than
150 kg/ cum, optimum moisture content to be
determined during trial length construction,
concrete strength not to be less than 10 Mpa at
7 days, mixed in a batching plant, transported
to site, laid with a paver with electronic sensor,
compacting with 8-10 tonnes vibratory roller,
finishing and curing.)

NO

Measurment (m)
L
B

1212.00

3.00

D/H

0.1

QTY

UNIT

AMOUNT (in LKR)

363.60
363.60 CUM

RATE (in LKR )

5830.00

2119788.00

10452.50
Sub Total

7601058.00
13812982.20

CUM

350.00

0.00

Providing and laying Cement Concrete for plain


concrete/ reinforced concrete i/c form work,
shuttering complete in as per drawings and
specifications (for village roads )
(iii) PCC M-20

1212.00

3.00

0.2

727.20
727.20 CUM

III. R.C.C. DRAIN ALONG 3.6 M ROAD (300 X 400 MM)


1

Excavation for drains (Earthwork in excavation


for drain / chamber as per drawing and
techanicqal specification, including setting out,
construction of shoring and bracing, removal of
stumps and other deleterious matter, dressing
of sides and bottom and backfilling with
approved material.

Drain 2

c/c road excavation


1212.00

0.00

PCC 1:3:6 in foundation (Plain cement concrete


1:3:6 mix with crush stone aggregate 40mm
nominal size mechanically mixed ,placed in
foundation 7 compacted by vibration including
curing ).
1

1212.00

0.80

0.10

96.96 CUM

7080.00

686476.80

2
1

1212.00
1212.00

0.15
0.30

0.50
0.10

181.80
36.36
218.16 CUM

10365.00

2261228.40

140752.50

1535328.27

Sub Total

4483033.47

Construction of RCC drain/ cover / chamber


placing in position providing shuttering and
concreting by using concrete mixture
compaction by vibration etc. complete as per
drawing and technical specification excluding
reinforcement with RCC M-20

Bottom-

Supplying , Fitting and placing un-coated HYSD


bar reinforcement in drain/ cover / chamber
complete as per drawing and technical
specification.

Quantity as per item No.-4 218.16


218.16 @. 50 kg/cum

10908.00
10.908

kg
MT

DETAILED PROJECT REPORT

Page49

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

NO

Measurment (m)
L
B

D/H

1212.00

0.30

QTY

UNIT

RATE (in LKR )

AMOUNT (in LKR)

109.08

cum

282.00

30,760.56

109.08

cum

95.38

10,403.51

IV. EXTERNAL WATER SUPPLY LINE


1
Excavation for all types and sizes of
foundations, trenches and drains or for any
other purpose including disposal of excavated
stuff upto 1.5 m lift and lead upto 50m (at least
5m away from the excavated area), including
dressing and leveling of pits.
In all types of soil
850.00x0.30x0.3
2

Filling from available excavated stuff (Excluding


rock) in trenches, plinth, sides of foundation
etc. in layers not exceeding 20cm in depth
consolidating each deposited layer by ramming
and watering with a lead upto 50 M. and lift
upto 1.5 M.
100 % OF ITEM NO. 1

Providing and fixing Chlorinated Polyvinyl


Chloride (CPVC) pipes, having thermal stability
for hot & cold water supply including all CPVC
plain & brass threaded fittings. This included
jointing of pipes & fittings with one step CPVC
solvent cement, trenching, refilling & testing of
joints complete as per direction of Engineer in
Charge
62.50 mm nominal inner dia pipes

260.00

260.00

2980.00

774,800.00

75 mm nominal inner dia pipes

240.00

240.00

4205.00

1,009,200.00

100mm nominal inner dia pipes

300.00

300.00

5812.50

1,743,750.00

1.00

1.00

each

8572.50

8,572.50

250.00
200.00
z

250.00
200.00

m
m

2405.00
3555.00

601,250.00
711,000.00

Providing and placing in position C.I. sluice


valves category A (Make: Kirloskar Bros. Ltd.,
Indian Valve Co. (IVC), Fouress Engineers Pvt.
Ltd.,WAG) (with cap) complete:
100 mm diameter

0.30

Providing, laying and jointing following socket


& spigot centrifugally csat (Spun) Ductile iron
pressure pipes inside cement mortor lining
(Class K7) conforming to IS 8329/2000 with
siutable Rubber gasket (push on) joints as per
IS: 5382/85 including.

100 mm Dia
150 MM Dia

DETAILED PROJECT REPORT

Page50

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

Labour for providing Rubber Gasket (push on)


joints to following D.I pipes class K8 and K9
including joints but excluding cost of Rubber
Gasket

Measurment (m)
L
B

QTY

UNIT

RATE (in LKR )

36.00

36.00

each

290.00

10,440.00

Providing Laying Ductile Iron Double socket


Reducer conforming to IS 9523/2000 having
dimension as per table 21 of IS 9523/2000 in
the following nominal diameter/ sizes with
external bitumen coating and internal cement
mortor lining with finishing as per clause 13 of
IS-9523/2000.
100 mm x 80 mm
200 mm x 100 mm
200mmx150mm

4.00
2.00
2.00

4.00
2.00
2.00

each
each
each

1942.50
4855.00
4860.00

7,770.00
9,710.00
9,720.00

Providing Laying DI Double socket 900 bends


conforming to IS- 9523/2000 having dimension
as per table 15 of IS- 9523/2000 in the
following nominal diameter/sizes with external
bitumen coating and internal cement mortar
lining
100 mm Dia

4.00

4.00

each

1967.50

7,870.00

3.00
1.00
6.00

3.00
1.00
6.00

each
each
each

5352.50
5215.00
3737.50

16,057.50
5,215.00
22,425.00

3.00
1.00

3.00
1.00

each
each

3752.50
5570.00

11,257.50
5,570.00

NO

D/H

AMOUNT (in LKR)

Providing and Laying Ductile Iron Double


Socket branch flange Tee conforming to IS9523/2000 having dimension as per table 21 of
IS-9523/2000 in the following nominal
diameter/sizes with external bitumen coating
and internal cement mortar lining with
finishing as per clause of IS-9523/2000.
150x100
150x80
100x80

10

11

12

Providing and laying all socketed tees


conforming to IS- 9523/2000 having dimension
as per table 21 of IS-9523/2000 in the following
nominal diameters/ sizes with externalbitumen
coating and internal cement mortor lining with
finishing as per clause 13 of IS-9523/2000.

100mmx 100mm
150mmx 100mm
Providing and fixing Chlorinated Polyvinyl
Chloride (CPVC) pipes in trenches, having
thermal stability for hot & cold water supply
including all CPVC plain & brass threaded
fittings. this included jointing of pipes & fittings
with one step CPVC solvent cement, excavation
of trenches, refilling the same and testing of
joints complete as per direction of engineer in
charge
19.6.6) 50 mm nominal outer dia

110.89

110.89

875.00

97,028.75

19.6.7) 62.5 mm nominal ineer dia pipes

270.79

270.79

2675.25

724,430.95

19.6.8) 75 mm nominal inner dia pipes

28.33

28.33

3495.38

99,023.97

1.00

each

9730.00

9,730.00

Providing and fixing of following CI double


flanged sluice valves as per IS: 14846-2000
fitted with cast iron cap including jointig &
testing with cost of jointing material such as
bolts, nuts, rubber insertions etc. all complete.
100 mm Dia PN-1.6

1.00

DETAILED PROJECT REPORT

Page51

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

13

Constructing masonry Chamber 60x60x75 cm,


inside with modular well burnt clay bricks of 35
kg/ cm in cement mortar 1:4 (1 cement : 4
coarse sand) for sluice valve, with C.I. surface
box 100mm. top diameter, 160 mm bottom
diameter and 180 mm deep (inside) with
chained lid and RCC top slab 1:2:4 mix (1
cement : 2 coarse sand : 4 graded stone
aggregate 20mm nominal size) necessary
excavation foundation concrete 1:5:10 (1
cement : 5 fine sand : 10 graded stone
aggregate 40 mm nominal size) and inside
plastering with cement mortar 1:3 (1 cement :
3 coarse sand) 12 mm thick finished with a
floating coat of neat cement complete as per
standard design :

For 65 mm to 100 mm valve-

NO

1.00

Measurment (m)
L
B

D/H

QTY

UNIT

RATE (in LKR )

1.00

each

8321.00

Sub Total

Total (i)
Add 5% of (i) for Bench Cutting & Levelling
Add 6% of (i) for Electrification Works & Street Lighting
Net Total (ii)
Contingency Charges of 5% of (ii)
Gross Total

AMOUNT (in LKR)

8,321.00

5,934,306.24

24,874,448.63
1,243,722.43
1,492,466.92
27,610,637.98
1,380,531.90
28,991,169.88

DETAILED PROJECT REPORT

Page52

DUNSINANE
Factory Division

Site Layout &


Planning

AREA STATEMENT
S.NO.
01

DESCREPTION
TOTAL PLOT AREA

47,832.99 SQ.M.
(4.78 Hec.)

(100%)

ROAD AREA

6598.70 SQ.M

(%)

Housing unit Area

TOTAL UNIT NO. -- 154 NO's

COVERED AREA / UNIT -

PLOT AREA / UNIT -

TOTAL COVERED
AREA BY ALL BLOCK .
( 154x55.0)

177x 154=27258SQ.M

8,470.00

LEGEND
01

HOUSING BLOCK

02

PLANNING BOUNDARY

03

RD

ROAD DISTANCE

04

RL

ROAD LEVEL

Note:1.) Survey maps are not on WGS-84 projection.


2.) All the dimension are in meters unless
otherwise specified.
3.) The site planning is for 154 housing units.
4.) Dimension need not to be scaled.

PROJECT MANAGEMENT CONSULTANCY


FOR SRILANKA HOUSING PROJECTCONSTRUCTION OF 4,000 HOUSING UNITS
IN CENTRAL AND UVA PROVINCES IN SRILANKA

Layout Plan of Housing Units


at Dun Factory Division

MINISTRY OF EXTERNAL AFFAIRS,


GOVT. OF INDIA

D:\yogesh\yks\Gaurav Tanvar\logo new.jpg

Drawing No:- WAP/SL/DUN-FAC/DRG/003

General Abstract

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

GENERAL ABSTRACT
ABSTRACT ESTIMATE FOR CONSTRUCTION OF BUILDING
AT DUNSINANE FACTORY DIVISION, SRILANKA
S.No.
A
B

SUB HEAD
Dwelling unit @ LKR.1298111 Per DU
Site Development Works including Site Clearance, Bench
Cutting,Construction of Road Pavement, Storm Water Drain,
External Water supply Line, and Electrification Works & Street
Lighting

Quantity

Unit

154

DU

Grand Total(i)
TO Say (lakhs) Single Unit Cost (Lakhs)
Development Works as percentage of (i)

AMOUNT
(in LKR.)
199909067.3
34,986,183.51
234,895,251
2,348.95
15.25
14.89

DETAILED PROJECT REPORT

Page53

Cost Estimate for


Site Development

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

DETAILED ESTIMATE FOR SITE DEVELOPMENT WORKS


AT DUNSINANE FACTORY DIVISION, SRI LANKA
I. SITE CLEARANCE
Sl.NO

PARTICULAR

NO

Measurment (m)
L
B

D/H

Earthwork
Clearing jungle including uprooting of
vegetation & trees of girth <300mm, disposal
with all leads of the site

QTY

UNIT

RATE (in LKR )

AMOUNT (in LKR)

47832.00

sq.m

12.05

576375.6

Sub Total

576,375.60

II. ROAD - 3.6 MT. WIDE


1

Excavation for drains (Earthwork in excavation


for drain / chamber as per drawing and
techanical specification, including setting out,
construction of shoring and bracing, removal
of staumps and other deleterious matter,
dressing of sides and bottom and backfilling
with approved material.
1

1470.00

3.60

0.60

Average 50 % excavation taken

3175.20
1587.60
1587.60 cum.

350.00

555660.00

Construction of embankment/sub grade with


material obtained from Borrow pits
(Construction of embankment with approved
material/selectrd soil having C.B.R. > 5 (unless
specified otherwise in the contract) obtained
from borrow pits with all lifts and leads,
transporting to site , spreading, grading to
required slope and compacting to meet
requirement .

1470.00

3.60

0.30

1587.60 cum.

557.50

885087.00

1470.00

3.00

0.15

661.50 cum

1635.00

1081552.50

1470.00

3.00

0.15

661.50
3690.00

2440935.00

Construction of granular sub base by


providing close graded material , carriage of
mixed material to work site, spreading in
uniform layers with motor grader on prepared
surface watering rolling and compacting with
vibratory power roller at OMC to achieve the
desired density, complete .
By mix in place method
Disintegrated rock i.e. moorum having having
CBR value not less than 6 and PI and L.L not
more than 6 and 20 respectively.

Providing laying, spreading and compacting


stone aggregates of specific sizes to
specification including spreading in uniform
thickness, hand packing, rolling with vibratory
roller 8-10 tonnes in stages to proper grade
and chamber applying and brooming requisite
type of screening/ binding Materials to fill up
the interstices of coarse aggregate, watering
and compacting to the required density.)
Grading- II (Using Screening Crushable type
such as Moorum or Gravel)
i) Using Screening Crushable type such as
Moorum or Gravel
661.50 cum

DETAILED PROJECT REPORT

Page54

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

Dry Lean Cement Concrete Sub- base


(Construction of dry lean cement concrete Subbase over a prepared sub-grade with coarse
and fine aggregate conforming to IS: 383, the
size of coarse aggregate not exceeding 25 mm,
aggregate cement ratio not to exceed 15:1,
aggregate gradation after blending to be as
per table 600-1, cement content not to be less
than 150 kg/ cum, optimum moisture content
to be determined during trial length
construction, concrete strength not to be less
than 10 Mpa at 7 days, mixed in a batching
plant, transported to site, laid with a paver
with electronic sensor, compacting with 8-10
tonnes vibratory roller, finishing and curing.)

NO

Measurment (m)
L
B

1470.00

3.00

D/H

0.1

QTY

UNIT

AMOUNT (in LKR)

441.00
441.00 CUM

RATE (in LKR )

5830.00

2571030.00

10452.50
Sub Total

9219105.00
16753369.50

CUM

350.00

0.00

Providing and laying Cement Concrete for


plain concrete/ reinforced concrete i/c form
work, shuttering complete in as per drawings
and specifications (for village roads )
(iii) PCC M-20

1470.00

3.00

0.2

882.00
882.00 CUM

III. R.C.C. DRAIN ALONG 3.6 M ROAD (300 X 400 MM)


1

Excavation for drains (Earthwork in excavation


for drain / chamber as per drawing and
techanicqal specification, including setting out,
construction of shoring and bracing, removal
of stumps and other deleterious matter,
dressing of sides and bottom and backfilling
with approved material.

Drain 2

c/c road excavation


1470.00

0.00

PCC 1:3:6 in foundation (Plain cement


concrete 1:3:6 mix with crush stone aggregate
40mm nominal size mechanically mixed
,placed in foundation 7 compacted by
vibration including curing ).
1

1470.00

0.80

0.10

117.60 CUM

7080.00

832608.00

2
1

1470.00
1470.00

0.15
0.30

0.50
0.10

220.50
44.10
264.60 CUM

10365.00

2742579.00

Construction of RCC drain/ cover / chamber


placing in position providing shuttering and
concreting by using concrete mixture
compaction by vibration etc. complete as per
drawing and technical specification excluding
reinforcement with RCC M-20

Bottom-

Supplying , Fitting and placing un-coated HYSD


bar reinforcement in drain/ cover / chamber
complete as per drawing and technical
specification.

Quantity as per item No.-4 264.60


264.60 @. 50 kg/cum

13230.00

kg

DETAILED PROJECT REPORT

Page55

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

NO

Measurment (m)
L
B

D/H

QTY

13.23

UNIT

MT

RATE (in LKR )

AMOUNT (in LKR)

140752.50

1862155.58

Sub Total

5437342.58

IV. EXTERNAL WATER SUPPLY LINE


1
Excavation for all types and sizes of
foundations, trenches and drains or for any
other purpose including disposal of excavated
stuff upto 1.5 m lift and lead upto 50m (at
least 5m away from the excavated area),
including dressing and leveling of pits.
In all types of soil
850.00x0.30x0.3
2

1500.00

0.30

135.00

cum

282.00

38,070.00

135.00

cum

95.38

12,875.63

Filling from available excavated stuff


(Excluding rock) in trenches, plinth, sides of
foundation etc. in layers not exceeding 20cm
in depth consolidating each deposited layer by
ramming and watering with a lead upto 50 M.
and lift upto 1.5 M.
100 % OF ITEM NO. 1

0.30

Providing and fixing Chlorinated Polyvinyl


Chloride (CPVC) pipes, having thermal stability
for hot & cold water supply including all CPVC
plain & brass threaded fittings. This included
jointing of pipes & fittings with one step CPVC
solvent cement, trenching, refilling & testing
of joints complete as per direction of Engineer
in Charge

62.50 mm nominal inner dia pipes

260.00

260.00

2980.00

774,800.00

75 mm nominal inner dia pipes

240.00

240.00

4205.00

1,009,200.00

100mm nominal inner dia pipes

300.00

300.00

5812.50

1,743,750.00

1.00

1.00

each

8572.50

8,572.50

Providing and placing in position C.I. sluice


valves category A (Make: Kirloskar Bros. Ltd.,
Indian Valve Co. (IVC), Fouress Engineers Pvt.
Ltd.,WAG) (with cap) complete:
100 mm diameter

DETAILED PROJECT REPORT

Page56

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

Providing, laying and jointing following socket


& spigot centrifugally csat (Spun) Ductile iron
pressure pipes inside cement mortor lining
(Class K7) conforming to IS 8329/2000 with
siutable Rubber gasket (push on) joints as per
IS: 5382/85 including.

NO

100 mm Dia
150 MM Dia
6

Measurment (m)
L
B

350.00
500.00

D/H

QTY

UNIT

RATE (in LKR )

AMOUNT (in LKR)

350.00
500.00

m
m

2405.00
3555.00

841,750.00
1,777,500.00

Labour for providing Rubber Gasket (push on)


joints to following D.I pipes class K8 and K9
including joints but excluding cost of Rubber
Gasket

36.00

36.00

each

290.00

10,440.00

Providing Laying Ductile Iron Double socket


Reducer conforming to IS 9523/2000 having
dimension as per table 21 of IS 9523/2000 in
the following nominal diameter/ sizes with
external bitumen coating and internal cement
mortor lining with finishing as per clause 13 of
IS-9523/2000.
100 mm x 80 mm
200 mm x 100 mm
200mmx150mm

4.00
2.00
2.00

4.00
2.00
2.00

each
each
each

1942.50
4855.00
4860.00

7,770.00
9,710.00
9,720.00

Providing Laying DI Double socket 900 bends


conforming to IS- 9523/2000 having dimension
as per table 15 of IS- 9523/2000 in the
following nominal diameter/sizes with
external bitumen coating and internal cement
100 mm Dia

4.00

4.00

each

1967.50

7,870.00

3.00
1.00
6.00

3.00
1.00
6.00

each
each
each

5352.50
5215.00
3737.50

16,057.50
5,215.00
22,425.00

3.00
1.00

3.00
1.00

each
each

3752.50
5570.00

11,257.50
5,570.00

Providing and Laying Ductile Iron Double


Socket branch flange Tee conforming to IS9523/2000 having dimension as per table 21 of
IS-9523/2000 in the following nominal
diameter/sizes with external bitumen coating
and internal cement mortar lining with
finishing as per clause of IS-9523/2000.

150x100
150x80
100x80
10

11

Providing and laying all socketed tees


conforming to IS- 9523/2000 having dimension
as per table 21 of IS-9523/2000 in the
following nominal diameters/ sizes with
externalbitumen coating and internal cement
mortor lining with finishing as per clause 13 of
IS-9523/2000.
100mmx 100mm
150mmx 100mm
Providing and fixing Chlorinated Polyvinyl
Chloride (CPVC) pipes in trenches, having
thermal stability for hot & cold water supply
including all CPVC plain & brass threaded
fittings. this included jointing of pipes &
fittings with one step CPVC solvent cement,
excavation of trenches, refilling the same and
testing of joints complete as per direction of
engineer in charge
19.6.6) 50 mm nominal outer dia

110.89

110.89

875.00

97,028.75

19.6.7) 62.5 mm nominal ineer dia pipes

270.79

270.79

2675.25

724,430.95

DETAILED PROJECT REPORT

Page57

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

UNIT

RATE (in LKR )

28.33

3495.38

99,023.97

1.00

1.00

each

9730.00

9,730.00

1.00

1.00

each

8321.00

8,321.00

28.33

19.6.8) 75 mm nominal inner dia pipes


12

13

Providing and fixing of following CI double


flanged sluice valves as per IS: 14846-2000
fitted with cast iron cap including jointig &
testing with cost of jointing material such as
bolts, nuts, rubber insertions etc. all complete.
100 mm Dia PN-1.6

Measurment (m)
L
B

QTY

NO

D/H

AMOUNT (in LKR)

Constructing masonry Chamber 60x60x75 cm,


inside with modular well burnt clay bricks of
35 kg/ cm in cement mortar 1:4 (1 cement : 4
coarse sand) for sluice valve, with C.I. surface
box 100mm. top diameter, 160 mm bottom
diameter and 180 mm deep (inside) with
chained lid and RCC top slab 1:2:4 mix (1
cement : 2 coarse sand : 4 graded stone
aggregate 20mm nominal size) necessary
excavation foundation concrete 1:5:10 (1
cement : 5 fine sand : 10 graded stone
aggregate 40 mm nominal size) and inside
plastering with cement mortar 1:3 (1 cement :
3 coarse sand) 12 mm thick finished with a
floating coat of neat cement complete as per
standard design :

For 65 mm to 100 mm valve-

Sub Total

Total (i)
Add 5% of (i) for Bench Cutting & Levelling
Add 6% of (i) for Electrification Works & Street Lighting
Net Total (ii)
Contingency Charges of 5% of (ii)
Gross Total

7,251,087.80

30,018,175.47
1,500,908.77
1,801,090.53
33,320,174.77
1,666,008.74
34,986,183.51

DETAILED PROJECT REPORT

Page58

DIYAGAMA WEST

Site Layout &


Planning

Lot 1

Lot 2
Lot 3

Lot 4

Deniya

Note:1.) Survey maps are not on WGS-84 projection.


2.) All the dimension are in meters unless
otherwise specified.
3.) The site planning is for 127 housing units.
4.) Dimension need not to be scaled.

Lot 5

Lot 6

Lot 7
Lot 11
Lot 10

Lot 8

Lot 9

Deniya

PROPOSED LAY OUT PLAN

General Abstract

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

GENERAL ABSTRACT
ABSTRACT ESTIMATE FOR CONSTRUCTION OF BUILDING
AT DIYAGAMAWEST, SRILANKA
S.No.
A
B

SUB HEAD
Dwelling unit @ LKR.1298111 Per DU
Site Development Works including Site Clearance, Bench
Cutting,Construction of Road Pavement, Storm Water Drain,
External Water supply Line, and Electrification Works & Street
Lighting

Quantity

Unit

127

DU

Grand Total(i)
TO Say (lakhs) Single Unit Cost (Lakhs)
Development Works as percentage of (i)

AMOUNT
(in LKR.)
164860075
18,183,046.84
183,043,122
1,830.43
14.41
9.93

DETAILED PROJECT REPORT

Page59

Cost Estimate for


Site Development

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

DETAILED ESTIMATE FOR SITE DEVELOPMENT WORKS


AT DIYAGAMA WEST, SRI LANKA
I. SITE CLEARANCE
Sl.NO

PARTICULAR

NO

Measurment (m)
L
B

D/H

Earthwork
Clearing jungle including uprooting of
vegetation & trees of girth <300mm, disposal
with all leads of the site

QTY

UNIT

RATE (in LKR )

AMOUNT (in LKR)

41648.73

sq.m

12.05

501867.1965

Sub Total

501,867.20

II. ROAD - 3.6 MT. WIDE


1

Excavation for drains (Earthwork in


excavation for drain / chamber as per
drawing and techanical specification,
including setting out, construction of shoring
and bracing, removal of staumps and other
deleterious matter, dressing of sides and
bottom and backfilling with approved
material.
1

813.00

3.60

0.60

Average 50 % excavation taken

1756.08
878.04
878.04 cum.

350.00

307314.00

Construction of embankment/sub grade with


material obtained from Borrow pits
(Construction of embankment with approved
material/selectrd soil having C.B.R. > 5 (unless
specified otherwise in the contract) obtained
from borrow pits with all lifts and leads,
transporting to site , spreading, grading to
required slope and compacting to meet
requirement .

813.00

3.60

0.30

878.04 cum.

557.50

489507.30

813.00

3.00

0.15

365.85 cum

1635.00

598164.75

813.00

3.00

0.15

365.85
3690.00

1349986.50

Construction of granular sub base by


providing close graded material , carriage of
mixed material to work site, spreading in
uniform layers with motor grader on
prepared surface watering rolling and
compacting with vibratory power roller at
OMC to achieve the desired density, complete
.
By mix in place method
Disintegrated rock i.e. moorum having having
CBR value not less than 6 and PI and L.L not
more than 6 and 20 respectively.

Providing laying, spreading and compacting


stone aggregates of specific sizes to
specification including spreading in uniform
thickness, hand packing, rolling with vibratory
roller 8-10 tonnes in stages to proper grade
and chamber applying and brooming
requisite type of screening/ binding Materials
to fill up the interstices of coarse aggregate,
watering and compacting to the required
density.)
Grading- II (Using Screening Crushable type
such as Moorum or Gravel)
i) Using Screening Crushable type such as
Moorum or Gravel
365.85 cum

DETAILED PROJECT REPORT

Page60

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

Dry Lean Cement Concrete Sub- base


(Construction of dry lean cement concrete
Sub- base over a prepared sub-grade with
coarse and fine aggregate conforming to IS:
383, the size of coarse aggregate not
exceeding 25 mm, aggregate cement ratio not
to exceed 15:1, aggregate gradation after
blending to be as per table 600-1, cement
content not to be less than 150 kg/ cum,
optimum moisture content to be determined
during trial length construction, concrete
strength not to be less than 10 Mpa at 7 days,
mixed in a batching plant, transported to site,
laid with a paver with electronic sensor,
compacting with 8-10 tonnes vibratory roller,
finishing and curing.)

NO

Measurment (m)
L
B

813.00

3.00

D/H

0.1

QTY

UNIT

RATE (in LKR )

AMOUNT (in LKR)

243.90 CUM

5830.00

1421937.00

10452.50
Sub Total

5098730.00
9265639.55

CUM

350.00

0.00

243.90

Providing and laying Cement Concrete for


plain concrete/ reinforced concrete i/c form
work, shuttering complete in as per drawings
and specifications (for village roads )
(iii) PCC M-20

3.00

0.2

487.80
487.80 CUM

813.00

c/c road excavation


813.00

813.00

0.80

0.10

65.04 CUM

7080.00

460483.20

2
1

813.00
813.00

0.15
0.30

0.50
0.10

121.95
24.39
146.34 CUM

10365.00

1516814.10

140752.50

1029886.04

Sub Total

3007183.34

III. R.C.C. DRAIN ALONG 3.6 M ROAD (300 X 400 MM)


1

Excavation for drains (Earthwork in


excavation for drain / chamber as per
drawing and techanicqal specification,
including setting out, construction of shoring
and bracing, removal of stumps and other
deleterious matter, dressing of sides and
bottom and backfilling with approved
material.
Drain -

PCC 1:3:6 in foundation (Plain cement


concrete 1:3:6 mix with crush stone
aggregate 40mm nominal size mechanically
mixed ,placed in foundation 7 compacted by
vibration including curing ).

Construction of RCC drain/ cover / chamber


placing in position providing shuttering and
concreting by using concrete mixture
compaction by vibration etc. complete as per
drawing and technical specification excluding
reinforcement with RCC M-20

Bottom-

0.00

Supplying , Fitting and placing un-coated


HYSD bar reinforcement in drain/ cover /
chamber complete as per drawing and
technical specification.
Quantity as per item No.-4 146.34
146.34 @. 50 kg/cum

7317.00
7.317

kg
MT

DETAILED PROJECT REPORT

Page61

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

NO

Measurment (m)
L
B

D/H

813.00

0.30

QTY

UNIT

RATE (in LKR )

AMOUNT (in LKR)

73.17

cum

282.00

20,633.94

73.17

cum

95.38

6,978.59

IV. EXTERNAL WATER SUPPLY LINE


1
Excavation for all types and sizes of
foundations, trenches and drains or for any
other purpose including disposal of excavated
stuff upto 1.5 m lift and lead upto 50m (at
least 5m away from the excavated area),
including dressing and leveling of pits.
In all types of soil
850.00x0.30x0.3
2

Filling from available excavated stuff


(Excluding rock) in trenches, plinth, sides of
foundation etc. in layers not exceeding 20cm
in depth consolidating each deposited layer
by ramming and watering with a lead upto 50
M. and lift upto 1.5 M.
100 % OF ITEM NO. 1

Providing and fixing Chlorinated Polyvinyl


Chloride (CPVC) pipes, having thermal
stability for hot & cold water supply including
all CPVC plain & brass threaded fittings. This
included jointing of pipes & fittings with one
step CPVC solvent cement, trenching, refilling
& testing of joints complete as per direction
of Engineer in Charge
62.50 mm nominal inner dia pipes

150.00

150.00

2980.00

447,000.00

75 mm nominal inner dia pipes

50.00

50.00

4205.00

210,250.00

100mm nominal inner dia pipes

100.00

100.00

5812.50

581,250.00

1.00

1.00

each

8572.50

8,572.50

100.00
75.00

100.00
75.00

m
m

2405.00
3555.00

240,500.00
266,625.00

Providing and placing in position C.I. sluice


valves category A (Make: Kirloskar Bros.
Ltd., Indian Valve Co. (IVC), Fouress Engineers
Pvt. Ltd.,WAG) (with cap) complete:
100 mm diameter

Providing, laying and jointing following socket


& spigot centrifugally csat (Spun) Ductile iron
pressure pipes inside cement mortor lining
(Class K7) conforming to IS 8329/2000 with
siutable Rubber gasket (push on) joints as per
IS: 5382/85 including.
100 mm Dia
150 MM Dia

0.30

Labour for providing Rubber Gasket (push on)


joints to following D.I pipes class K8 and K9
including joints but excluding cost of Rubber
Gasket

36.00

36.00

each

290.00

10,440.00

Providing Laying Ductile Iron Double socket


Reducer conforming to IS 9523/2000 having
dimension as per table 21 of IS 9523/2000 in
the following nominal diameter/ sizes with
external bitumen coating and internal cement
mortor lining with finishing as per clause 13
of IS-9523/2000.
100 mm x 80 mm
200 mm x 100 mm
200mmx150mm

4.00
2.00
2.00

4.00
2.00
2.00

each
each
each

1942.50
4855.00
4860.00

7,770.00
9,710.00
9,720.00

DETAILED PROJECT REPORT

Page62

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

UNIT

RATE (in LKR )

4.00

4.00

each

1967.50

7,870.00

3.00
1.00
6.00

3.00
1.00
6.00

each
each
each

5352.50
5215.00
3737.50

16,057.50
5,215.00
22,425.00

3.00
1.00

3.00
1.00

each
each

3752.50
5570.00

11,257.50
5,570.00

110.89

110.89

875.00

97,028.75

19.6.7) 62.5 mm nominal ineer dia pipes

270.79

270.79

2675.25

724,430.95

19.6.8) 75 mm nominal inner dia pipes

28.33

28.33

3495.38

99,023.97

1.00

each

9730.00

9,730.00

Providing Laying DI Double socket 900 bends


conforming to IS- 9523/2000 having
dimension as per table 15 of IS- 9523/2000 in
the following nominal diameter/sizes with
external bitumen coating and internal
cement mortar lining
100 mm Dia

11

12

D/H

AMOUNT (in LKR)

Providing and Laying Ductile Iron Double


Socket branch flange Tee conforming to IS9523/2000 having dimension as per table 21
of IS-9523/2000 in the following nominal
diameter/sizes with external bitumen coating
and internal cement mortar lining with
finishing as per clause of IS-9523/2000.

150x100
150x80
100x80
10

Measurment (m)
L
B

QTY

NO

Providing and laying all socketed tees


conforming to IS- 9523/2000 having
dimension as per table 21 of IS-9523/2000 in
the following nominal diameters/ sizes with
externalbitumen coating and internal cement
mortor lining with finishing as per clause 13
of IS-9523/2000.
100mmx 100mm
150mmx 100mm
Providing and fixing Chlorinated Polyvinyl
Chloride (CPVC) pipes in trenches, having
thermal stability for hot & cold water supply
including all CPVC plain & brass threaded
fittings. this included jointing of pipes &
fittings with one step CPVC solvent cement,
excavation of trenches, refilling the same and
testing of joints complete as per direction of
engineer in charge
19.6.6) 50 mm nominal outer dia

Providing and fixing of following CI double


flanged sluice valves as per IS: 14846-2000
fitted with cast iron cap including jointig &
testing with cost of jointing material such as
bolts, nuts, rubber insertions etc. all
complete.
100 mm Dia PN-1.6

1.00

DETAILED PROJECT REPORT

Page63

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

13

Constructing masonry Chamber 60x60x75 cm,


inside with modular well burnt clay bricks of
35 kg/ cm in cement mortar 1:4 (1 cement : 4
coarse sand) for sluice valve, with C.I. surface
box 100mm. top diameter, 160 mm bottom
diameter and 180 mm deep (inside) with
chained lid and RCC top slab 1:2:4 mix (1
cement : 2 coarse sand : 4 graded stone
aggregate 20mm nominal size) necessary
excavation foundation concrete 1:5:10 (1
cement : 5 fine sand : 10 graded stone
aggregate 40 mm nominal size) and inside
plastering with cement mortar 1:3 (1 cement
: 3 coarse sand) 12 mm thick finished with a
For 65 mm to 100 mm valve-

NO

1.00

Measurment (m)
L
B

D/H

QTY

UNIT

RATE (in LKR )

1.00

each

8321.00
Sub Total

Total (i)
Add 5% of (i) for Bench Cutting & Levelling
Add 6% of (i) for Electrification Works & Street Lighting
Net Total (ii)
Contingency Charges of 5% of (ii)
Gross Total

AMOUNT (in LKR)

8,321.00
2,826,379.70

15,601,069.79
780,053.49
936,064.19
17,317,187.47
865,859.37
18,183,046.84

DETAILED PROJECT REPORT

Page64

BOGAWANA

Site Layout &


Planning

AREA STATEMENT
S.NO.
01

DESCRIPTION

TOTAL PLOT AREA

30,390.0 SQ.M.
(3.39 Hec.)

(100%)

ROAD AREA

4656.50 SQ.M

(%)

Housing unit Area

TOTAL UNIT NO. -- 84 NO's

COVERED AREA / UNIT -

TOTAL COVERED
AREA BY ALL BLOCK .
( 84x55.0)

177x 84=14868 SQ.M

4,620.00

(%)

LEGEND
01

HOUSING BLOCK

02

PLANNING BOUNDARY

03

RD

ROAD DISTANCE

04

RL

ROAD LEVEL

Note:1.) Survey maps are not on WGS-84 projection.


2.) All the dimension are in meters unless
otherwise specified.
3.) The site planning is for 84 housing units.
4.) Dimension need not to be scaled.

PROJECT MANAGEMENT CONSULTANCY


FOR SRILANKA HOUSING PROJECTCONSTRUCTION OF 4,000 HOUSING UNITS
IN CENTRAL AND UVA PROVINCES IN SRILANKA

Layout Plan of Housing Units


at Bogawana

MINISTRY OF EXTERNAL AFFAIRS,


GOVT. OF INDIA

LAY OUT PLAN


Drawing No:- WAP/SL/BOG/DRG/005

General Abstract

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

GENERAL ABSTRACT
ABSTRACT ESTIMATE FOR CONSTRUCTION OF BUILDING & SITE DEVLOPMENT
AT BOGAWANA , SRILANKA
S.No.
A
B

SUB HEAD
Dwelling unit @ LKR.1298111 Per DU
Site Development Works including Site Clearance, Bench
Cutting,Construction of Road Pavement, Storm Water Drain,
External Water supply Line, and Electrification Works & Street
Lighting

Quantity

Unit

84

DU

Grand Total(i)
TO Say (lakhs) Single Unit Cost (Lakhs)
Development Works as percentage of (i)

AMOUNT
(in LKR.)
109041309.5
19,231,906.95
128,273,216
1,282.73
15.27
14.99

DETAILED PROJECT REPORT

Page65

Cost Estimate for


Site Development

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

DETAILED ESTIMATE FOR SITE DEVELOPMENT WORKS


AT BOGAWANA , SRI LANKA
I. SITE CLEARANCE
Sl.NO

PARTICULAR

NO

Measurment (m)
L
B

D/H

Earthwork
Clearing jungle including uprooting of
vegetation & trees of girth <300mm, disposal
with all leads of the site

QTY

UNIT

RATE (in LKR )

AMOUNT (in LKR)

30390.00

sq.m

12.05

366199.5

Sub Total

366,199.50

II. ROAD - 3.6 MT. WIDE


1

Excavation for drains (Earthwork in excavation


for drain / chamber as per drawing and
techanical specification, including setting out,
construction of shoring and bracing, removal
of staumps and other deleterious matter,
dressing of sides and bottom and backfilling
with approved material.
1

782.00

3.60

0.60

Average 50 % excavation taken

1689.12
844.56
844.56 cum.

350.00

295596.00

Construction of embankment/sub grade with


material obtained from Borrow pits
(Construction of embankment with approved
material/selectrd soil having C.B.R. > 5 (unless
specified otherwise in the contract) obtained
from borrow pits with all lifts and leads,
transporting to site , spreading, grading to
required slope and compacting to meet
requirement .

782.00

3.60

0.30

844.56 cum.

557.50

470842.20

782.00

3.00

0.15

351.90 cum

1635.00

575356.50

782.00

3.00

0.15

351.90
3690.00

1298511.00

Construction of granular sub base by


providing close graded material , carriage of
mixed material to work site, spreading in
uniform layers with motor grader on prepared
surface watering rolling and compacting with
vibratory power roller at OMC to achieve the
desired density, complete .
By mix in place method
Disintegrated rock i.e. moorum having having
CBR value not less than 6 and PI and L.L not
more than 6 and 20 respectively.

Providing laying, spreading and compacting


stone aggregates of specific sizes to
specification including spreading in uniform
thickness, hand packing, rolling with vibratory
roller 8-10 tonnes in stages to proper grade
and chamber applying and brooming requisite
type of screening/ binding Materials to fill up
the interstices of coarse aggregate, watering
and compacting to the required density.)

Grading- II (Using Screening Crushable type


such as Moorum or Gravel)
i) Using Screening Crushable type such as
Moorum or Gravel
351.90 cum

DETAILED PROJECT REPORT

Page66

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

Dry Lean Cement Concrete Sub- base


(Construction of dry lean cement concrete Subbase over a prepared sub-grade with coarse
and fine aggregate conforming to IS: 383, the
size of coarse aggregate not exceeding 25 mm,
aggregate cement ratio not to exceed 15:1,
aggregate gradation after blending to be as
per table 600-1, cement content not to be less
than 150 kg/ cum, optimum moisture content
to be determined during trial length
construction, concrete strength not to be less
than 10 Mpa at 7 days, mixed in a batching
plant, transported to site, laid with a paver
with electronic sensor, compacting with 8-10
tonnes vibratory roller, finishing and curing.)

NO

Measurment (m)
L
B

782.00

3.00

D/H

0.1

QTY

UNIT

AMOUNT (in LKR)

234.60
234.60 CUM

RATE (in LKR )

5830.00

1367718.00

10452.50
Sub Total

4904313.00
8912336.70

CUM

350.00

0.00

Providing and laying Cement Concrete for


plain concrete/ reinforced concrete i/c form
work, shuttering complete in as per drawings
and specifications (for village roads )
(iii) PCC M-20

782.00

3.00

0.2

469.20
469.20 CUM

III. R.C.C. DRAIN ALONG 3.6 M ROAD (300 X 400 MM)


1

Excavation for drains (Earthwork in excavation


for drain / chamber as per drawing and
techanicqal specification, including setting out,
construction of shoring and bracing, removal
of stumps and other deleterious matter,
dressing of sides and bottom and backfilling
with approved material.

Drain 2

c/c road excavation


782.00

0.00

PCC 1:3:6 in foundation (Plain cement


concrete 1:3:6 mix with crush stone aggregate
40mm nominal size mechanically mixed
,placed in foundation 7 compacted by
vibration including curing ).
1

782.00

0.80

0.10

62.56 CUM

7080.00

442924.80

2
1

782.00
782.00

0.15
0.30

0.50
0.10

117.30
23.46
140.76 CUM

10365.00

1458977.40

Construction of RCC drain/ cover / chamber


placing in position providing shuttering and
concreting by using concrete mixture
compaction by vibration etc. complete as per
drawing and technical specification excluding
reinforcement with RCC M-20

Bottom-

Supplying , Fitting and placing un-coated HYSD


bar reinforcement in drain/ cover / chamber
complete as per drawing and technical
specification.

Quantity
as per
item No.4

140.76

DETAILED PROJECT REPORT

Page67

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

NO

Measurment (m)
L
B

D/H

140.76 @. 50
kg/cum

QTY

UNIT

7038.00
7.038

kg
MT

RATE (in LKR )

AMOUNT (in LKR)

140752.50

990616.10

Sub Total

2892518.30

IV. EXTERNAL WATER SUPPLY LINE


1
Excavation for all types and sizes of
foundations, trenches and drains or for any
other purpose including disposal of excavated
stuff upto 1.5 m lift and lead upto 50m (at
least 5m away from the excavated area),
including dressing and leveling of pits.
In all types of soil
850.00x0.30x0.3
2

800.00

0.30

0.30

72.00

cum

282.00

20,304.00

72.00

cum

95.38

6,867.00

Filling from available excavated stuff


(Excluding rock) in trenches, plinth, sides of
foundation etc. in layers not exceeding 20cm
in depth consolidating each deposited layer by
ramming and watering with a lead upto 50 M.
and lift upto 1.5 M.
100 % OF ITEM NO. 1

DETAILED PROJECT REPORT

Page68

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

Providing and fixing Chlorinated Polyvinyl


Chloride (CPVC) pipes, having thermal stability
for hot & cold water supply including all CPVC
plain & brass threaded fittings. This included
jointing of pipes & fittings with one step CPVC
solvent cement, trenching, refilling & testing
of joints complete as per direction of Engineer
in Charge

NO

UNIT

RATE (in LKR )

AMOUNT (in LKR)

160.00

2980.00

476,800.00

75 mm nominal inner dia pipes

140.00

140.00

4205.00

588,700.00

100mm nominal inner dia pipes

150.00

150.00

5812.50

871,875.00

1.00

1.00

each

8572.50

8,572.50

250.00
200.00

250.00
200.00

m
m

2405.00
3555.00

601,250.00
711,000.00

Providing and placing in position C.I. sluice


valves category A (Make: Kirloskar Bros.
Ltd., Indian Valve Co. (IVC), Fouress Engineers
Pvt. Ltd.,WAG) (with cap) complete:

Providing, laying and jointing following socket


& spigot centrifugally csat (Spun) Ductile iron
pressure pipes inside cement mortor lining
(Class K7) conforming to IS 8329/2000 with
siutable Rubber gasket (push on) joints as per
IS: 5382/85 including.

Labour for providing Rubber Gasket (push on)


joints to following D.I pipes class K8 and K9
including joints but excluding cost of Rubber
Gasket

36.00

36.00

each

290.00

10,440.00

Providing Laying Ductile Iron Double socket


Reducer conforming to IS 9523/2000 having
dimension as per table 21 of IS 9523/2000 in
the following nominal diameter/ sizes with
external bitumen coating and internal cement
mortor lining with finishing as per clause 13 of
IS-9523/2000.
100 mm x 80 mm
200 mm x 100 mm
200mmx150mm

4.00
2.00
2.00

4.00
2.00
2.00

each
each
each

1942.50
4855.00
4860.00

7,770.00
9,710.00
9,720.00

Providing Laying DI Double socket 900 bends


conforming to IS- 9523/2000 having
dimension as per table 15 of IS- 9523/2000 in
the following nominal diameter/sizes with
external bitumen coating and internal cement
mortar lining
100 mm Dia

4.00

4.00

each

1967.50

7,870.00

3.00
1.00
6.00

3.00
1.00
6.00

each
each
each

5352.50
5215.00
3737.50

16,057.50
5,215.00
22,425.00

Providing and Laying Ductile Iron Double


Socket branch flange Tee conforming to IS9523/2000 having dimension as per table 21
of IS-9523/2000 in the following nominal
diameter/sizes with external bitumen coating
and internal cement mortar lining with
finishing as per clause of IS-9523/2000.

150x100
150x80
100x80
10

QTY

160.00

100 mm Dia
150 MM Dia
6

D/H

62.50 mm nominal inner dia pipes

100 mm diameter
5

Measurment (m)
L
B

Providing and laying all socketed tees


conforming to IS- 9523/2000 having
dimension as per table 21 of IS-9523/2000 in
the following nominal diameters/ sizes with
externalbitumen coating and internal cement
mortor lining with finishing as per clause 13 of
IS-9523/2000.

DETAILED PROJECT REPORT

Page69

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

11

12

13

Providing and laying all socketed tees


conforming to IS- 9523/2000 having
PARTICULAR
dimension as per table 21 of IS-9523/2000 in
the following nominal diameters/ sizes with
externalbitumen coating and internal cement
mortor lining with finishing as per clause 13 of
IS-9523/2000.

100mmx 100mm
150mmx 100mm
Providing and fixing Chlorinated Polyvinyl
Chloride (CPVC) pipes in trenches, having
thermal stability for hot & cold water supply
including all CPVC plain & brass threaded
fittings. this included jointing of pipes &
fittings with one step CPVC solvent cement,
excavation of trenches, refilling the same and
testing of joints complete as per direction of
engineer in charge

NO

Measurment (m)
L
B

3.00
1.00

D/H

QTY

UNIT

RATE (in LKR )

AMOUNT (in LKR)

3.00
1.00

each
each

3752.50
5570.00

11,257.50
5,570.00

19.6.6) 50 mm nominal outer dia

110.89

110.89

875.00

97,028.75

19.6.7) 62.5 mm nominal ineer dia pipes

270.79

270.79

2675.25

724,430.95

19.6.8) 75 mm nominal inner dia pipes

28.33

28.33

3495.38

99,023.97

1.00

1.00

each

9730.00

9,730.00

1.00

1.00

each

8321.00

8,321.00

Providing and fixing of following CI double


flanged sluice valves as per IS: 14846-2000
fitted with cast iron cap including jointig &
testing with cost of jointing material such as
bolts, nuts, rubber insertions etc. all complete.
100 mm Dia PN-1.6

Constructing masonry Chamber 60x60x75 cm,


inside with modular well burnt clay bricks of
35 kg/ cm in cement mortar 1:4 (1 cement : 4
coarse sand) for sluice valve, with C.I. surface
box 100mm. top diameter, 160 mm bottom
diameter and 180 mm deep (inside) with
chained lid and RCC top slab 1:2:4 mix (1
cement : 2 coarse sand : 4 graded stone
aggregate 20mm nominal size) necessary
excavation foundation concrete 1:5:10 (1
cement : 5 fine sand : 10 graded stone
aggregate 40 mm nominal size) and inside
plastering with cement mortar 1:3 (1 cement :
3 coarse sand) 12 mm thick finished with a
floating coat of neat cement complete as per
standard design :

For 65 mm to 100 mm valve-

Sub Total

Total (i)
Add 5% of (i) for Bench Cutting & Levelling
Add 6% of (i) for Electrification Works & Street Lighting
Net Total (ii)
Contingency Charges of 5% of (ii)
Gross Total

4,329,938.17

16,500,992.67
825,049.63
990,059.56
18,316,101.86
915,805.09
19,231,906.95

DETAILED PROJECT REPORT

Page70

BRIDVIL

Site Layout &


Planning

46,874.9810 SQ.M.
(4.68 Hec.)
SQ.M

(116x55.0)

(100%)
(%)

6380.00

LEGEND
01

HOUSING BLOCK

02

PLANNING BOUNDARY

03

RD

ROAD DISTANCE

04

RL

ROAD LEVEL

Note:1.) Survey maps are not on WGS-84 projection.


2.) All the dimension are in meters unless
otherwise specified.
3.) The site planning is for 116 housing units.
4.) Dimension need not to be scaled.

PROJECT MANAGEMENT CONSULTANCY


FOR SRILANKA HOUSING PROJECTCONSTRUCTION OF 4,000 HOUSING UNITS
IN CENTRAL AND UVA PROVINCES IN SRILANKA

Layout Plan of Housing Units


at Bridweel

MINISTRY OF EXTERNAL AFFAIRS,


GOVT. OF INDIA

Drawing No:- WAP/SL/BRID/DRG/006

General Abstract

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

GENERAL ABSTRACT
ABSTRACT ESTIMATE FOR CONSTRUCTION OF BUILDING
AT BRIDVIL, SRILANKA
S.No.
A
B

SUB HEAD
Dwelling unit @ LKR.1298111 Per DU
Site Development Works including Site Clearance, Bench
Cutting,Construction of Road Pavement, Storm Water Drain,
External Water supply Line, and Electrification Works & Street
Lighting

Quantity

Unit

116

DU

Grand Total(i)
TO Say (lakhs) Single Unit Cost (Lakhs)
Development Works as percentage of (i)

AMOUNT
(in LKR.)
150580855.9
26,857,214.47
177,438,070
1,774.38
15.30
15.14

DETAILED PROJECT REPORT

Page71

Cost Estimate for


Site Development

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

DETAILED ESTIMATE FOR SITE DEVELOPMENT WORKS


AT BRIDVIL, SRI LANKA
I. SITE CLEARANCE
Sl.NO

PARTICULAR

NO

Measurment (m)
L
B

D/H

Earthwork
Clearing jungle including uprooting of
vegetation & trees of girth <300mm, disposal
with all leads of the site

QTY

UNIT

RATE (in LKR )

AMOUNT (in LKR)

48874.00

sq.m

12.05

588931.7

Sub Total

588,931.70

II. ROAD - 3.6 MT. WIDE


1

Excavation for drains (Earthwork in excavation


for drain / chamber as per drawing and
techanical specification, including setting out,
construction of shoring and bracing, removal
of staumps and other deleterious matter,
dressing of sides and bottom and backfilling
with approved material.
1

1150.00

3.60

0.60

Average 50 % excavation taken

2484.00
1242.00
1242.00 cum.

350.00

434700.00

Construction of embankment/sub grade with


material obtained from Borrow pits
(Construction of embankment with approved
material/selectrd soil having C.B.R. > 5 (unless
specified otherwise in the contract) obtained
from borrow pits with all lifts and leads,
transporting to site , spreading, grading to
required slope and compacting to meet
requirement .

1150.00

3.60

0.30

1242.00 cum.

557.50

692415.00

1150.00

3.00

0.15

517.50 cum

1635.00

846112.50

1150.00

3.00

0.15

517.50
3690.00

1909575.00

Construction of granular sub base by


providing close graded material , carriage of
mixed material to work site, spreading in
uniform layers with motor grader on prepared
surface watering rolling and compacting with
vibratory power roller at OMC to achieve the
desired density, complete .
By mix in place method
Disintegrated rock i.e. moorum having having
CBR value not less than 6 and PI and L.L not
more than 6 and 20 respectively.

Providing laying, spreading and compacting


stone aggregates of specific sizes to
specification including spreading in uniform
thickness, hand packing, rolling with vibratory
roller 8-10 tonnes in stages to proper grade
and chamber applying and brooming requisite
type of screening/ binding Materials to fill up
the interstices of coarse aggregate, watering
and compacting to the required density.)

Grading- II (Using Screening Crushable type


such as Moorum or Gravel)
i) Using Screening Crushable type such as
Moorum or Gravel
517.50 cum

DETAILED PROJECT REPORT

Page72

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

Dry Lean Cement Concrete Sub- base


(Construction of dry lean cement concrete Subbase over a prepared sub-grade with coarse
and fine aggregate conforming to IS: 383, the
size of coarse aggregate not exceeding 25 mm,
aggregate cement ratio not to exceed 15:1,
aggregate gradation after blending to be as
per table 600-1, cement content not to be less
than 150 kg/ cum, optimum moisture content
to be determined during trial length
construction, concrete strength not to be less
than 10 Mpa at 7 days, mixed in a batching
plant, transported to site, laid with a paver
with electronic sensor, compacting with 8-10
tonnes vibratory roller, finishing and curing.)

NO

Measurment (m)
L
B

1150.00

3.00

D/H

0.1

QTY

UNIT

AMOUNT (in LKR)

345.00
345.00 CUM

RATE (in LKR )

5830.00

2011350.00

10452.50
Sub Total

7212225.00
13106377.50

CUM

350.00

0.00

Providing and laying Cement Concrete for


plain concrete/ reinforced concrete i/c form
work, shuttering complete in as per drawings
and specifications (for village roads )
(iii) PCC M-20

1150.00

3.00

0.2

690.00
690.00 CUM

III. R.C.C. DRAIN ALONG 3.6 M ROAD (300 X 400 MM)


1

Excavation for drains (Earthwork in excavation


for drain / chamber as per drawing and
techanicqal specification, including setting out,
construction of shoring and bracing, removal
of stumps and other deleterious matter,
dressing of sides and bottom and backfilling
with approved material.

Drain 2

c/c road excavation


1150.00

0.00

PCC 1:3:6 in foundation (Plain cement


concrete 1:3:6 mix with crush stone aggregate
40mm nominal size mechanically mixed
,placed in foundation 7 compacted by
vibration including curing ).
1

1150.00

0.80

0.10

92.00 CUM

7080.00

651360.00

2
1

1150.00
1150.00

0.15
0.30

0.50
0.10

172.50
34.50
207.00 CUM

10365.00

2145555.00

140752.50

1456788.38

Construction of RCC drain/ cover / chamber


placing in position providing shuttering and
concreting by using concrete mixture
compaction by vibration etc. complete as per
drawing and technical specification excluding
reinforcement with RCC M-20

Bottom-

Supplying , Fitting and placing un-coated HYSD


bar reinforcement in drain/ cover / chamber
complete as per drawing and technical
specification.

Quantity
as per
item No.4
207.00 @. 50
kg/cum

207.00

10350.00
10.35

kg
MT

DETAILED PROJECT REPORT

Page73

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

NO

Measurment (m)
L
B

D/H

QTY

UNIT

RATE (in LKR )

Sub Total

AMOUNT (in LKR)

4253703.38

IV. EXTERNAL WATER SUPPLY LINE


1
Excavation for all types and sizes of
foundations, trenches and drains or for any
other purpose including disposal of excavated
stuff upto 1.5 m lift and lead upto 50m (at
least 5m away from the excavated area),
including dressing and leveling of pits.
In all types of soil
850.00x0.30x0.3
2

1150.00

0.30

103.50

cum

282.00

29,187.00

103.50

cum

95.38

9,871.31

Filling from available excavated stuff


(Excluding rock) in trenches, plinth, sides of
foundation etc. in layers not exceeding 20cm
in depth consolidating each deposited layer by
ramming and watering with a lead upto 50 M.
and lift upto 1.5 M.
100 % OF ITEM NO. 1

0.30

Providing and fixing Chlorinated Polyvinyl


Chloride (CPVC) pipes, having thermal stability
for hot & cold water supply including all CPVC
plain & brass threaded fittings. This included
jointing of pipes & fittings with one step CPVC
solvent cement, trenching, refilling & testing
of joints complete as per direction of Engineer
in Charge
62.50 mm nominal inner dia pipes

260.00

260.00

2980.00

774,800.00

75 mm nominal inner dia pipes

180.00

180.00

4205.00

756,900.00

100mm nominal inner dia pipes

200.00

200.00

5812.50

1,162,500.00

1.00

1.00

each

8572.50

8,572.50

Providing and placing in position C.I. sluice


valves category A (Make: Kirloskar Bros.
Ltd., Indian Valve Co. (IVC), Fouress Engineers
Pvt. Ltd.,WAG) (with cap) complete:
100 mm diameter

DETAILED PROJECT REPORT

Page74

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

Providing, laying and jointing following socket


& spigot centrifugally csat (Spun) Ductile iron
pressure pipes inside cement mortor lining
(Class K7) conforming to IS 8329/2000 with
siutable Rubber gasket (push on) joints as per
IS: 5382/85 including.

NO

100 mm Dia
150 MM Dia
6

Measurment (m)
L
B

250.00
200.00

D/H

QTY

UNIT

RATE (in LKR )

AMOUNT (in LKR)

250.00
200.00

m
m

2405.00
3555.00

601,250.00
711,000.00

Labour for providing Rubber Gasket (push on)


joints to following D.I pipes class K8 and K9
including joints but excluding cost of Rubber
Gasket

36.00

36.00

each

290.00

10,440.00

Providing Laying Ductile Iron Double socket


Reducer conforming to IS 9523/2000 having
dimension as per table 21 of IS 9523/2000 in
the following nominal diameter/ sizes with
external bitumen coating and internal cement
mortor lining with finishing as per clause 13 of
IS-9523/2000.
100 mm x 80 mm
200 mm x 100 mm

4.00
2.00

4.00
2.00

each
each

1942.50
4855.00

7,770.00
9,710.00

Providing Laying DI Double socket 900 bends


conforming to IS- 9523/2000 having
dimension as per table 15 of IS- 9523/2000 in
the following nominal diameter/sizes with
external bitumen coating and internal cement
mortar lining
100 mm Dia

4.00

4.00

each

1967.50

7,870.00

3.00
1.00
6.00

3.00
1.00
6.00

each
each
each

5352.50
5215.00
3737.50

16,057.50
5,215.00
22,425.00

3.00
2.00

3.00
2.00

each
each

3752.50
5570.00

11,257.50
11,140.00

Providing and Laying Ductile Iron Double


Socket branch flange Tee conforming to IS9523/2000 having dimension as per table 21
of IS-9523/2000 in the following nominal
diameter/sizes with external bitumen coating
and internal cement mortar lining with
finishing as per clause of IS-9523/2000.

150x100
150x80
100x80
10

11

Providing and laying all socketed tees


conforming to IS- 9523/2000 having
dimension as per table 21 of IS-9523/2000 in
the following nominal diameters/ sizes with
externalbitumen coating and internal cement
mortor lining with finishing as per clause 13 of
IS-9523/2000.

100mmx 100mm
150mmx 100mm
Providing and fixing Chlorinated Polyvinyl
Chloride (CPVC) pipes in trenches, having
thermal stability for hot & cold water supply
including all CPVC plain & brass threaded
fittings. this included jointing of pipes &
fittings with one step CPVC solvent cement,
excavation of trenches, refilling the same and
testing of joints complete as per direction of
engineer in charge

19.6.6) 50 mm nominal outer dia

110.89

110.89

875.00

97,028.75

19.6.7) 62.5 mm nominal ineer dia pipes

270.79

270.79

2675.25

724,430.95

19.6.8) 75 mm nominal inner dia pipes

28.33

28.33

3495.38

99,023.97

DETAILED PROJECT REPORT

Page75

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

Measurment (m)
L
B

QTY

UNIT

RATE (in LKR )

1.00

1.00

each

9730.00

9,730.00

1.00

1.00

each

8321.00

8,321.00

NO

D/H

AMOUNT (in LKR)

12
Providing and fixing of following CI double
flanged sluice valves as per IS: 14846-2000
fitted with cast iron cap including jointig &
testing with cost of jointing material such as
bolts, nuts, rubber insertions etc. all complete.
100 mm Dia PN-1.6
13

Constructing masonry Chamber 60x60x75 cm,


inside with modular well burnt clay bricks of
35 kg/ cm in cement mortar 1:4 (1 cement : 4
coarse sand) for sluice valve, with C.I. surface
box 100mm. top diameter, 160 mm bottom
diameter and 180 mm deep (inside) with
chained lid and RCC top slab 1:2:4 mix (1
cement : 2 coarse sand : 4 graded stone
aggregate 20mm nominal size) necessary
excavation foundation concrete 1:5:10 (1
cement : 5 fine sand : 10 graded stone
aggregate 40 mm nominal size) and inside
plastering with cement mortar 1:3 (1 cement :
3 coarse sand) 12 mm thick finished with a
floating coat of neat cement complete as per
standard design :

For 65 mm to 100 mm valve-

Sub Total

Total (i)
Add 5% of (i) for Bench Cutting & Levelling
Add 6% of (i) for Electrification Works & Street Lighting
Net Total (ii)
Contingency Charges of 5% of (ii)
Gross Total

5,094,500.48

23,043,513.06
1,152,175.65
1,382,610.78
25,578,299.50
1,278,914.97
26,857,214.47

DETAILED PROJECT REPORT

Page76

LEDGERWATTE

Site Layout &


Planning

General Abstract

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

GENERAL ABSTRACT
ABSTRACT ESTIMATE FOR CONSTRUCTION OF BUILDING
AT LEDGERWATTE, SRILANKA
S.No.
A
B

SUB HEAD
Dwelling unit @ LKR.1298111 Per DU
Site Development Works including Site Clearance, Bench
Cutting,Construction of Road Pavement, Storm Water Drain,
External Water supply Line, and Electrification Works & Street
Lighting

Quantity

Unit

75

DU

Grand Total(i)
TO Say (lakhs) Single Unit Cost (Lakhs)
Development Works as percentage of (i)

AMOUNT
(in LKR.)
97358312.02
10,633,945.47
107,992,257
1,079.92
14.40
9.85

DETAILED PROJECT REPORT

Page77

Cost Estimate for


Site Development

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

DETAILED ESTIMATE FOR SITE DEVELOPMENT WORKS


AT LEDGERWATTE, SRI LANKA
I. SITE CLEARANCE
Sl.NO

PARTICULAR

NO

Measurment (m)
L
B

D/H

Earthwork
Clearing jungle including uprooting of
vegetation & trees of girth <300mm, disposal
with all leads of the site

QTY

UNIT

RATE (in LKR )

AMOUNT (in LKR)

21549.90

sq.m

12.05

259676.295

Sub Total

259,676.30

II. ROAD - 3.6 MT. WIDE


1

Excavation for drains (Earthwork in


excavation for drain / chamber as per
drawing and techanical specification,
including setting out, construction of shoring
and bracing, removal of staumps and other
deleterious matter, dressing of sides and
bottom and backfilling with approved
material.
1

400.90

3.60

0.60

Average 50 % excavation taken

865.94
432.97
432.97 cum.

350.00

151540.20

Construction of embankment/sub grade with


material obtained from Borrow pits
(Construction of embankment with approved
material/selectrd soil having C.B.R. > 5 (unless
specified otherwise in the contract) obtained
from borrow pits with all lifts and leads,
transporting to site , spreading, grading to
required slope and compacting to meet
requirement .

400.90

3.60

0.30

432.97 cum.

557.50

241381.89

400.90

3.00

0.15

180.41 cum

1635.00

294962.18

400.90

3.00

0.15

180.41
3690.00

665694.45

Construction of granular sub base by


providing close graded material , carriage of
mixed material to work site, spreading in
uniform layers with motor grader on
prepared surface watering rolling and
compacting with vibratory power roller at
OMC to achieve the desired density,
complete .
By mix in place method
Disintegrated rock i.e. moorum having having
CBR value not less than 6 and PI and L.L not
more than 6 and 20 respectively.

Providing laying, spreading and compacting


stone aggregates of specific sizes to
specification including spreading in uniform
thickness, hand packing, rolling with vibratory
roller 8-10 tonnes in stages to proper grade
and chamber applying and brooming
requisite type of screening/ binding Materials
to fill up the interstices of coarse aggregate,
watering and compacting to the required
density.)
Grading- II (Using Screening Crushable type
such as Moorum or Gravel)
i) Using Screening Crushable type such as
Moorum or Gravel
180.41 cum

DETAILED PROJECT REPORT

Page78

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

Dry Lean Cement Concrete Sub- base


(Construction of dry lean cement concrete
Sub- base over a prepared sub-grade with
coarse and fine aggregate conforming to IS:
383, the size of coarse aggregate not
exceeding 25 mm, aggregate cement ratio
not to exceed 15:1, aggregate gradation after
blending to be as per table 600-1, cement
content not to be less than 150 kg/ cum,
optimum moisture content to be determined
during trial length construction, concrete
strength not to be less than 10 Mpa at 7 days,
mixed in a batching plant, transported to site,
laid with a paver with electronic sensor,
compacting with 8-10 tonnes vibratory roller,
finishing and curing.)

NO

Measurment (m)
L
B

400.90

3.00

D/H

0.1

QTY

UNIT

RATE (in LKR )

AMOUNT (in LKR)

120.27 CUM

5830.00

701174.10

10452.50
Sub Total

2514244.00
4568996.82

CUM

350.00

0.00

120.27

Providing and laying Cement Concrete for


plain concrete/ reinforced concrete i/c form
work, shuttering complete in as per drawings
and specifications (for village roads )
(iii) PCC M-20

400.90

3.00

0.2

240.54
240.54 CUM

III. R.C.C. DRAIN ALONG 3.6 M ROAD (300 X 400 MM)


1

Excavation for drains (Earthwork in


excavation for drain / chamber as per
drawing and techanicqal specification,
including setting out, construction of shoring
and bracing, removal of stumps and other
deleterious matter, dressing of sides and
bottom and backfilling with approved
material.
Drain -

c/c road excavation


400.90

0.00

PCC 1:3:6 in foundation (Plain cement


concrete 1:3:6 mix with crush stone
aggregate 40mm nominal size mechanically
mixed ,placed in foundation 7 compacted by
vibration including curing ).
1

400.90

0.80

0.10

32.07 CUM

7080.00

227069.76

2
1

400.90
400.90

0.15
0.30

0.50
0.10

60.14
12.03
72.16 CUM

10365.00

747959.13

140752.50

507849.10

Sub Total

1482877.99

Construction of RCC drain/ cover / chamber


placing in position providing shuttering and
concreting by using concrete mixture
compaction by vibration etc. complete as per
drawing and technical specification excluding
reinforcement with RCC M-20

Bottom-

Supplying , Fitting and placing un-coated


HYSD bar reinforcement in drain/ cover /
chamber complete as per drawing and
technical specification.

Quantity as per item No.-4 72.16


72.16 @. 50 kg/cum

3608.10
3.6081

kg
MT

DETAILED PROJECT REPORT

Page79

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

NO

Measurment (m)
L
B

D/H

400.90

0.30

QTY

UNIT

RATE (in LKR )

AMOUNT (in LKR)

36.08

cum

282.00

10,174.84

36.08

cum

95.38

3,441.23

IV. EXTERNAL WATER SUPPLY LINE


1
Excavation for all types and sizes of
foundations, trenches and drains or for any
other purpose including disposal of excavated
stuff upto 1.5 m lift and lead upto 50m (at
least 5m away from the excavated area),
including dressing and leveling of pits.
In all types of soil
850.00x0.30x0.3
2

Filling from available excavated stuff


(Excluding rock) in trenches, plinth, sides of
foundation etc. in layers not exceeding 20cm
in depth consolidating each deposited layer
by ramming and watering with a lead upto 50
M. and lift upto 1.5 M.

100 % OF ITEM NO. 1


3

0.30

Providing and fixing Chlorinated Polyvinyl


Chloride (CPVC) pipes, having thermal
stability for hot & cold water supply including
all CPVC plain & brass threaded fittings. This
included jointing of pipes & fittings with one
step CPVC solvent cement, trenching, refilling
& testing of joints complete as per direction
of Engineer in Charge
62.50 mm nominal inner dia pipes

150.00

150.00

2980.00

447,000.00

75 mm nominal inner dia pipes

50.00

50.00

4205.00

210,250.00

100mm nominal inner dia pipes

100.00

100.00

5812.50

581,250.00

1.00

1.00

each

8572.50

8,572.50

Providing and placing in position C.I. sluice


valves category A (Make: Kirloskar Bros.
Ltd., Indian Valve Co. (IVC), Fouress Engineers
Pvt. Ltd.,WAG) (with cap) complete:
100 mm diameter

DETAILED PROJECT REPORT

Page80

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

Providing, laying and jointing following socket


& spigot centrifugally csat (Spun) Ductile iron
pressure pipes inside cement mortor lining
(Class K7) conforming to IS 8329/2000 with
siutable Rubber gasket (push on) joints as per
IS: 5382/85 including.

NO

100 mm Dia
150 MM Dia
6

11

12

100.00
75.00

D/H

QTY

UNIT

RATE (in LKR )

AMOUNT (in LKR)

100.00
75.00

m
m

2405.00
3555.00

240,500.00
266,625.00

Labour for providing Rubber Gasket (push on)


joints to following D.I pipes class K8 and K9
including joints but excluding cost of Rubber
Gasket

36.00

36.00

each

290.00

10,440.00

Providing Laying Ductile Iron Double socket


Reducer conforming to IS 9523/2000 having
dimension as per table 21 of IS 9523/2000 in
the following nominal diameter/ sizes with
external bitumen coating and internal
cement mortor lining with finishing as per
clause 13 of IS-9523/2000.
100 mm x 80 mm
200 mm x 100 mm
200mmx150mm

4.00
2.00
2.00

4.00
2.00
2.00

each
each
each

1942.50
4855.00
4860.00

7,770.00
9,710.00
9,720.00

Providing Laying DI Double socket 900 bends


conforming to IS- 9523/2000 having
dimension as per table 15 of IS- 9523/2000 in
the following nominal diameter/sizes with
external bitumen coating and internal
100 mm Dia

4.00

4.00

each

1967.50

7,870.00

3.00
1.00
6.00

3.00
1.00
6.00

each
each
each

5352.50
5215.00
3737.50

16,057.50
5,215.00
22,425.00

3.00
1.00

3.00
1.00

each
each

3752.50
5570.00

11,257.50
5,570.00

Providing and Laying Ductile Iron Double


Socket branch flange Tee conforming to IS9523/2000 having dimension as per table 21
of IS-9523/2000 in the following nominal
diameter/sizes with external bitumen coating
and internal cement mortar lining with
finishing as per clause of IS-9523/2000.

150x100
150x80
100x80
10

Measurment (m)
L
B

Providing and laying all socketed tees


conforming to IS- 9523/2000 having
dimension as per table 21 of IS-9523/2000 in
the following nominal diameters/ sizes with
externalbitumen coating and internal cement
mortor lining with finishing as per clause 13
of IS-9523/2000.
100mmx 100mm
150mmx 100mm
Providing and fixing Chlorinated Polyvinyl
Chloride (CPVC) pipes in trenches, having
thermal stability for hot & cold water supply
including all CPVC plain & brass threaded
fittings. this included jointing of pipes &
fittings with one step CPVC solvent cement,
excavation of trenches, refilling the same and
testing of joints complete as per direction of
engineer in charge

19.6.6) 50 mm nominal outer dia

110.89

110.89

875.00

97,028.75

19.6.7) 62.5 mm nominal ineer dia pipes

270.79

270.79

2675.25

724,430.95

19.6.8) 75 mm nominal inner dia pipes

28.33

28.33

3495.38

99,023.97

Providing and fixing of following CI double


flanged sluice valves as per IS: 14846-2000
fitted with cast iron cap including jointig &
testing with cost of jointing material such as
bolts, nuts, rubber insertions etc. all
complete.
DETAILED PROJECT REPORT

Page81

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

13

Providing and fixing


of following CI double
PARTICULAR
flanged sluice valves as per IS: 14846-2000
fitted with cast iron cap including jointig &
testing with cost of jointing material such as
bolts, nuts, rubber insertions etc. all
complete.
100 mm Dia PN-1.6

Measurment (m)
L
B

QTY

UNIT

RATE (in LKR )

1.00

1.00

each

9730.00

9,730.00

1.00

1.00

each

8321.00

8,321.00

NO

D/H

AMOUNT (in LKR)

Constructing masonry Chamber 60x60x75


cm, inside with modular well burnt clay bricks
of 35 kg/ cm in cement mortar 1:4 (1 cement
: 4 coarse sand) for sluice valve, with C.I.
surface box 100mm. top diameter, 160 mm
bottom diameter and 180 mm deep (inside)
with chained lid and RCC top slab 1:2:4 mix (1
cement : 2 coarse sand : 4 graded stone
aggregate 20mm nominal size) necessary
excavation foundation concrete 1:5:10 (1
cement : 5 fine sand : 10 graded stone
aggregate 40 mm nominal size) and inside
plastering with cement mortar 1:3 (1 cement
: 3 coarse sand) 12 mm thick finished with a
floating coat of neat cement complete as per
standard design :

For 65 mm to 100 mm valve-

Sub Total

Total (i)
Add 5% of (i) for Bench Cutting & Levelling
Add 6% of (i) for Electrification Works & Street Lighting
Net Total (ii)
Contingency Charges of 5% of (ii)
Gross Total

2,812,383.24

9,123,934.33
456,196.72
547,436.06
10,127,567.11
506,378.36
10,633,945.47

DETAILED PROJECT REPORT

Page82

NARANGALA

Site Layout &


Planning

AREA STATEMENT
S.NO.
01

DESCRIPTION

TOTAL PLOT AREA

ROAD AREA

23,992.95 SQ.M.
(2.39 Hec.)
SQ.M

(100%)
(%)

Hosing unit Area

TOTAL UNIT NO. -- 50NO's


COVERED AREA / UNIT -

PLOT AREA / UNIT -

TOTAL COVERED
AREA BY ALL BLOCK .

2,750.00

(20.98%)

(50x55.0)

LEGEND
01

HOUSING BLOCK

02

PLANNING BOUNDARY

03

RD

ROAD DISTANCE

04

RL

ROAD LEVEL

Note:1.) Survey maps are not on WGS-84 projection.


2.) All the dimension are in meters unless
otherwise specified.
3.) The site planning is for 50 housing units.
4.) Dimension need not to be scaled.

PROJECT MANAGEMENT CONSULTANCY


FOR SRILANKA HOUSING PROJECTCONSTRUCTION OF 4,000 HOUSING UNITS
IN CENTRAL AND UVA PROVINCES IN SRILANKA

Layout Plan of Housing Units


at Narangala

MINISTRY OF EXTERNAL AFFAIRS,


GOVT. OF INDIA

Drawing No:- WAP/SL/NAR/DRG/008

General Abstract

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

GENERAL ABSTRACT
ABSTRACT ESTIMATE FOR CONSTRUCTION OF BUILDING & SITE DEVLOPMENT
AT NARANGALA DIVISION, SRILANKA
S.No.
A
B

SUB HEAD
Dwelling unit @ LKR.1298111 Per DU
Site Development Works including Site Clearance, Bench
Cutting,Construction of Road Pavement, Storm Water Drain,
External Water supply Line, and Electrification Works & Street
Lighting

Quantity

Unit

50

DU

Grand Total(i)
TO Say (lakhs) Single Unit Cost (Lakhs)
Development Works as percentage of (i)

AMOUNT
(in LKR.)
64905541.35
12,310,868.53
77,216,410
772.16
15.44
15.94

DETAILED PROJECT REPORT

Page83

Cost Estimate for


Site Development

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

DETAILED ESTIMATE FOR SITE DEVELOPMENT WORKS


AT NARANGALA DIVISION, SRI LANKA
I. SITE CLEARANCE
Sl.NO

PARTICULAR

NO

Measurment (m)
L
B

D/H

Earthwork
Clearing jungle including uprooting of
vegetation & trees of girth <300mm, disposal
with all leads of the site

QTY

UNIT

RATE (in LKR )

AMOUNT (in LKR)

23992.00

sq.m

12.05

289103.6

Sub Total

289,103.60

II. ROAD - 3.6 MT. WIDE


1

Excavation for drains (Earthwork in excavation


for drain / chamber as per drawing and
techanical specification, including setting out,
construction of shoring and bracing, removal
of staumps and other deleterious matter,
dressing of sides and bottom and backfilling
with approved material.
1

510.00

3.60

0.60

Average 50 % excavation taken

1101.60
550.80
550.80 cum.

350.00

192780.00

Construction of embankment/sub grade with


material obtained from Borrow pits
(Construction of embankment with approved
material/selectrd soil having C.B.R. > 5 (unless
specified otherwise in the contract) obtained
from borrow pits with all lifts and leads,
transporting to site , spreading, grading to
required slope and compacting to meet
requirement .

510.00

3.60

0.30

550.80 cum.

557.50

307071.00

510.00

3.00

0.15

229.50 cum

1635.00

375232.50

510.00

3.00

0.15

229.50
3690.00

846855.00

Construction of granular sub base by


providing close graded material , carriage of
mixed material to work site, spreading in
uniform layers with motor grader on prepared
surface watering rolling and compacting with
vibratory power roller at OMC to achieve the
desired density, complete .
By mix in place method
Disintegrated rock i.e. moorum having having
CBR value not less than 6 and PI and L.L not
more than 6 and 20 respectively.

Providing laying, spreading and compacting


stone aggregates of specific sizes to
specification including spreading in uniform
thickness, hand packing, rolling with vibratory
roller 8-10 tonnes in stages to proper grade
and chamber applying and brooming requisite
type of screening/ binding Materials to fill up
the interstices of coarse aggregate, watering
and compacting to the required density.)
Grading- II (Using Screening Crushable type
such as Moorum or Gravel)
i) Using Screening Crushable type such as
Moorum or Gravel
229.50 cum

DETAILED PROJECT REPORT

Page84

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

Dry Lean Cement Concrete Sub- base


(Construction of dry lean cement concrete Subbase over a prepared sub-grade with coarse
and fine aggregate conforming to IS: 383, the
size of coarse aggregate not exceeding 25 mm,
aggregate cement ratio not to exceed 15:1,
aggregate gradation after blending to be as
per table 600-1, cement content not to be less
than 150 kg/ cum, optimum moisture content
to be determined during trial length
construction, concrete strength not to be less
than 10 Mpa at 7 days, mixed in a batching
plant, transported to site, laid with a paver
with electronic sensor, compacting with 8-10
tonnes vibratory roller, finishing and curing.)

NO

Measurment (m)
L
B

510.00

3.00

D/H

0.1

QTY

UNIT

AMOUNT (in LKR)

153.00
153.00 CUM

RATE (in LKR )

5830.00

891990.00

10452.50
Sub Total

3198465.00
5812393.50

CUM

350.00

0.00

Providing and laying Cement Concrete for


plain concrete/ reinforced concrete i/c form
work, shuttering complete in as per drawings
and specifications (for village roads )
(iii) PCC M-20

510.00

3.00

0.2

306.00
306.00 CUM

III. R.C.C. DRAIN ALONG 3.6 M ROAD (300 X 400 MM)


1

Excavation for drains (Earthwork in excavation


for drain / chamber as per drawing and
techanicqal specification, including setting out,
construction of shoring and bracing, removal
of stumps and other deleterious matter,
dressing of sides and bottom and backfilling
with approved material.

Drain 2

c/c road excavation


510.00

0.00

PCC 1:3:6 in foundation (Plain cement


concrete 1:3:6 mix with crush stone aggregate
40mm nominal size mechanically mixed
,placed in foundation 7 compacted by
vibration including curing ).
1

510.00

0.80

0.10

40.80 CUM

7080.00

288864.00

2
1

510.00
510.00

0.15
0.30

0.50
0.10

76.50
15.30
91.80 CUM

10365.00

951507.00

Construction of RCC drain/ cover / chamber


placing in position providing shuttering and
concreting by using concrete mixture
compaction by vibration etc. complete as per
drawing and technical specification excluding
reinforcement with RCC M-20

Bottom-

Supplying , Fitting and placing un-coated HYSD


bar reinforcement in drain/ cover / chamber
complete as per drawing and technical
specification.

Quantity as per item No.-4 91.80


91.80 @. 50 kg/cum

4590.00

kg

DETAILED PROJECT REPORT

Page85

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

NO

Measurment (m)
L
B

D/H

QTY

UNIT

4.59

MT

RATE (in LKR )

AMOUNT (in LKR)

140752.50

646053.98

Sub Total

1886424.98

IV. EXTERNAL WATER SUPPLY LINE


1
Excavation for all types and sizes of
foundations, trenches and drains or for any
other purpose including disposal of excavated
stuff upto 1.5 m lift and lead upto 50m (at
least 5m away from the excavated area),
including dressing and leveling of pits.
In all types of soil
850.00x0.30x0.3
2

510.00

0.30

45.90

cum

282.00

12,943.80

45.90

cum

95.38

4,377.71

Filling from available excavated stuff


(Excluding rock) in trenches, plinth, sides of
foundation etc. in layers not exceeding 20cm
in depth consolidating each deposited layer by
ramming and watering with a lead upto 50 M.
and lift upto 1.5 M.

100 % OF ITEM NO. 1


3

0.30

Providing and fixing Chlorinated Polyvinyl


Chloride (CPVC) pipes, having thermal stability
for hot & cold water supply including all CPVC
plain & brass threaded fittings. This included
jointing of pipes & fittings with one step CPVC
solvent cement, trenching, refilling & testing
of joints complete as per direction of Engineer
in Charge
62.50 mm nominal inner dia pipes

50.00

50.00

2980.00

149,000.00

75 mm nominal inner dia pipes

70.00

70.00

4205.00

294,350.00

100mm nominal inner dia pipes

80.00

80.00

5812.50

465,000.00

1.00

1.00

each

8572.50

8,572.50

Providing and placing in position C.I. sluice


valves category A (Make: Kirloskar Bros. Ltd.,
Indian Valve Co. (IVC), Fouress Engineers Pvt.
Ltd.,WAG) (with cap) complete:
100 mm diameter

DETAILED PROJECT REPORT

Page86

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sl.NO

PARTICULAR

Providing, laying and jointing following socket


& spigot centrifugally csat (Spun) Ductile iron
pressure pipes inside cement mortor lining
(Class K7) conforming to IS 8329/2000 with
siutable Rubber gasket (push on) joints as per
IS: 5382/85 including.

NO

100 mm Dia
150 MM Dia
6

Measurment (m)
L
B

100.00
100.00

D/H

QTY

UNIT

RATE (in LKR )

AMOUNT (in LKR)

100.00
100.00

m
m

2405.00
3555.00

240,500.00
355,500.00

Labour for providing Rubber Gasket (push on)


joints to following D.I pipes class K8 and K9
including joints but excluding cost of Rubber
Gasket

36.00

36.00

each

290.00

10,440.00

Providing Laying Ductile Iron Double socket


Reducer conforming to IS 9523/2000 having
dimension as per table 21 of IS 9523/2000 in
the following nominal diameter/ sizes with
external bitumen coating and internal cement
mortor lining with finishing as per clause 13 of
IS-9523/2000.
100 mm x 80 mm
200 mm x 100 mm
200mmx150mm

4.00
2.00
2.00

4.00
2.00
2.00

each
each
each

1942.50
4855.00
4860.00

7,770.00
9,710.00
9,720.00

Providing Laying DI Double socket 900 bends


conforming to IS- 9523/2000 having dimension
as per table 15 of IS- 9523/2000 in the
following nominal diameter/sizes with
external bitumen coating and internal cement
mortar lining
100 mm Dia

4.00

4.00

each

1967.50

7,870.00

3.00
1.00
6.00

3.00
1.00
6.00

each
each
each

5352.50
5215.00
3737.50

16,057.50
5,215.00
22,425.00

3.00
1.00

3.00
1.00

each
each

3752.50
5570.00

11,257.50
5,570.00

Providing and Laying Ductile Iron Double


Socket branch flange Tee conforming to IS9523/2000 having dimension as per table 21 of
IS-9523/2000 in the following nominal
diameter/sizes with external bitumen coating
and internal cement mortar lining with
finishing as per clause of IS-9523/2000.

150x100
150x80
100x80
10

11

Providing and laying all socketed tees


conforming to IS- 9523/2000 having dimension
as per table 21 of IS-9523/2000 in the
following nominal diameters/ sizes with
externalbitumen coating and internal cement
mortor lining with finishing as per clause 13 of
IS-9523/2000.
100mmx 100mm
150mmx 100mm
Providing and fixing Chlorinated Polyvinyl
Chloride (CPVC) pipes in trenches, having
thermal stability for hot & cold water supply
including all CPVC plain & brass threaded
fittings. this included jointing of pipes &
fittings with one step CPVC solvent cement,
excavation of trenches, refilling the same and
testing of joints complete as per direction of
engineer in charge

DETAILED PROJECT REPORT

Page87

Sl.NO

12

13

thermal stability for hot & cold water supply


including all CPVC plain & brass threaded
fittings. this included jointing of pipes &
PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost
fittings with one step CPVC solvent cement,
excavation of trenches, refilling the same and
Measurment (m)
PARTICULAR
testing of joints complete as per direction of
NO
L
B
engineer in charge

Housing Units in Central and UVA Provinces in Sri Lanka

D/H

QTY

UNIT

RATE (in LKR )

AMOUNT (in LKR)

19.6.6) 50 mm nominal outer dia

110.89

110.89

875.00

97,028.75

19.6.7) 62.5 mm nominal ineer dia pipes

270.79

270.79

2675.25

724,430.95

19.6.8) 75 mm nominal inner dia pipes

28.33

28.33

3495.38

99,023.97

1.00

1.00

each

9730.00

9,730.00

1.00

1.00

each

8321.00

8,321.00

Providing and fixing of following CI double


flanged sluice valves as per IS: 14846-2000
fitted with cast iron cap including jointig &
testing with cost of jointing material such as
bolts, nuts, rubber insertions etc. all complete.
100 mm Dia PN-1.6
Constructing masonry Chamber 60x60x75 cm,
inside with modular well burnt clay bricks of
35 kg/ cm in cement mortar 1:4 (1 cement : 4
coarse sand) for sluice valve, with C.I. surface
box 100mm. top diameter, 160 mm bottom
diameter and 180 mm deep (inside) with
chained lid and RCC top slab 1:2:4 mix (1
cement : 2 coarse sand : 4 graded stone
aggregate 20mm nominal size) necessary
excavation foundation concrete 1:5:10 (1
cement : 5 fine sand : 10 graded stone
aggregate 40 mm nominal size) and inside
plastering with cement mortar 1:3 (1 cement :
3 coarse sand) 12 mm thick finished with a
floating coat of neat cement complete as per
standard design :

For 65 mm to 100 mm valve-

Sub Total

Total (i)
Add 5% of (i) for Bench Cutting & Levelling
Add 6% of (i) for Electrification Works & Street Lighting
Net Total (ii)
Contingency Charges of 5% of (ii)
Gross Total

2,574,813.68

10,562,735.76
528,136.79
633,764.15
11,724,636.69
586,231.83
12,310,868.53

DETAILED PROJECT REPORT

Page88

HOUSING UNIT Sloping Roof

Building Layout

Cost Estimate for


HATTON /
BADULLA REGION

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

DETAILED ESTIMATE FOR CONSTRUCTION OF HOUSES


AT HATTON & BADULLA REGION, SRI LANKA
A.Civil Work
S.
No.

FOR SINGLE UNIT

I. No.

PARTICULAR
NO

Measurment (m)
L
B

QTY

UNIT

RATE (LKR)

AMOUNT (IN LKR)

D/H

E-004 Excavation in foundations in soft


rock requiring manual digging, up
to a depth of 1.5m inclusive of
backfilling and disposal of surplus
materials.
For Column
For Beam

9
1

1.20
0.23

1.50
0.60

19.44
6.67
26.11

m3

1,199.00

31,301.45

m3

11,466.00

85,295.52

C-005 Mixing and placing in position


concrete 1:3:6 (40mm) using a
concrete mixer including fuel /
operator / handling.
Below Footing
Below Floor
Bed room
W.C./Bath
Hall
Kitchen
Below Beam

1.20
49.38

C-002 Mixing and placing in position


concrete grade 25, nominal mix
1:1 1/2:3 ( 20mm) using a concrete
mixer including fuel / operator /
handling/vibrator.
Box Footing
Column pedestal
Column upto Plinth
Plinth Beam
Horizontal

1.20

1.20

0.15

1.94

2
1
1
1
1

3.05
2.94
3.05
3.05
49.38

3.05
2.10
4.12
2.13
0.23

0.10
0.10
0.10
0.10
0.10

1.86
0.62
1.26
0.65
1.11
7.44

9
9
9

1.00
0.400
0.200

1.00
0.400
0.200

0.35
0.10
1.20

3.15
0.14
0.43

Vertical

8
1
3
3
1

3.05
1.37
3.05
4.12
2.10

0.200
0.200
0.200
0.200
0.200

0.20
0.20
0.20
0.20
0.20

0.98
0.05
0.37
0.49
0.08

Column upto Slab

0.200

0.200

3.00

1.08

8
1
3
3
1

3.05
1.37
3.05
4.12
2.10

0.150
0.150
0.150
0.150
0.150

0.20
0.20
0.20
0.20
0.20

0.73
0.04
0.27
0.37
0.06

8
1
3
3
1

3.05
1.37
3.05
4.12
2.10

0.150
0.150
0.150
0.150
0.150

0.20
0.20
0.20
0.20
0.20

0.73
0.04
0.27
0.37
0.06

Beam at Slab
Horizontal
Vertical

Beam at Lintel
Horizontal
Vertical

DETAILED PROJECT REPORT

Page89

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

S.
No.

I. No.

PARTICULAR
NO

0.08

0.15

Window Sill

1
3
2

1.80
1.50
0.90

0.20
0.20
0.20
Total :-

0.05
0.05
0.05

0.02
0.05
0.02
9.98

m3

16,936.00

168,949.30

at

70.00

698.30

kg

232.00

162,006.18

0.35
0.10
1.20
3.00

12.60
1.44
8.64
21.60
44.28

m2

1,303.00

C-006 ToR steel reinforcement bend to


shape laid in position and tied with
G.I. wire as directed.
1

9.98

C-008 Sawn timber formwork in class III


timber for columns, ground floor.
9
9
9
9

4.00
1.60
0.80
0.80

Assuming Shuttering can be re- used for


57696.84 minimum of 10 Houses

1/10 th of C008

5,769.68

C-009 Sawn timber form work in class III


timber for underside of ground
floor slabs.
Platform
Total Cost C-009

3.35

2.01
2.01

0.60

m2

Assuming Shuttering can be re- used for


2448.18 minimum of 10 Houses

1,218.00
1/10 th of C009

244.82

C-010 Sawn timber form work in class III


timber for concrete beams.
Beam at Slab
Horizontal
Vertical

Beam at Lintel
Horizontal
Vertical

Window Sill
Ventilator
Total Cost C-010
8

AMOUNT (IN LKR)

0.60

Total Cost C-008

RATE (LKR)

3.35

Box Footing
Column pedestal
Column upto Plinth
Column upto Slab

UNIT

70 kg/cum of RCC
5

QTY
D/H

Platform

Ventilator

Measurment (m)
L
B

8
1
3
3
1

3.05
1.37
3.05
4.12
2.10

0.55
0.55
0.55
0.55
0.55

13.42
0.75
5.03
6.80
1.16

8
1
3
3
1

3.05
1.37
3.05
4.12
2.10

0.55
0.55
0.55
0.55
0.55

13.42
0.75
5.03
6.80
1.16

1
3
2

1.80
1.50
0.90

0.10
0.10
0.10

0.18
0.45
0.18
55.13

m2

Assuming Shuttering can be re- used for


70508.71 minimum of 10 Houses

1,279.00
1/10 th of C010

7,050.87

C-012 Sawn timber formwork in class III


timber for ground concrete
work,at ground level plinth
beams,lintels etc.

DETAILED PROJECT REPORT

Page90

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

S.
No.

I. No.

PARTICULAR
NO

Plinth Beam
Horizontal

8
1
3
3
1

Vertical

Total Cost C-012


9

B-010 R.R masonry in 1:5 cement and


sand motar in foundations.(Upto
Plinth)
Below Beam
Horizontal

UNIT

9.76
0.55
3.66
4.94
0.84
19.75

m2

8
1
3
3
1

3.05
1.37
3.05
4.12
2.10

0.40
0.40
0.40
0.40
0.40

0.200
0.200
0.200
0.200
0.200

RATE (LKR)

AMOUNT (IN LKR)

0.50
0.50
0.50
0.50
0.50

2.44
0.14
0.92
1.24
0.21
4.94

991.00
1/10 th of C012

1,957.42

m3

9,168.00

45,271.58

m2

1,654.00

14,632.19

X-22 150 mm thick cement block stone


Badulla in 1:5 Cement and sand mortar (
SoR Size of the brick should be
L=150mm
x
W=125mm
x
H=75mm ).
Horizontal

3.05

0.150

2.55

5.83

Vertical

2
1
1
1

4.12
1.80
3.05
4.12

0.150
0.150
0.150
0.150

2.55
2.55
0.75
0.75
(A)

3.15
0.69
0.34
0.46
10.48

1
1
2
1
2

1.05
1.80
1.50
1.50
0.90

0.150
0.150
0.150
0.150
0.150

2.10
1.20
1.20
1.05
0.75
(B)
(A-B)

0.33
0.32
0.54
0.24
0.20
1.63
8.85

Extra Avrage Ht. For Sheet

Deduction : opening
Door
Window

11

3.05
1.37
3.05
4.12
2.10

QTY
D/H

Assuming Shuttering can be re-used for


19574.23 minimum of 10 Houses

Vertical

10

Measurment (m)
L
B

B-006 Masonry block work 100mm thick


in walls in cement and sand 1:5
motar using hollow blocks made
of cement and sand to the
proportion of 1:10, confirming to
SLS standard in ground floor.
Horizontal

For Fire Space

3
1
1
1
1
1

3.05
1.37
3.05
4.12
2.10
2.60

0.100
0.100
0.100
0.100
0.100
0.100

2.55
2.55
2.55
2.55
2.55
4.80

2.33
0.35
0.78
1.05
0.54
1.25

Staircase Railing Wall

4.80

0.100

0.90
(A)

0.43
6.73

0.90

0.100

2.10

0.76

Vertical

Deduction : opening
Door

DETAILED PROJECT REPORT

Page91

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

S.
No.

I. No.

Measurment (m)
L
B

PARTICULAR
NO

Without Door

2
1

0.75
1.00

0.100
0.100

QTY

UNIT

RATE (LKR)

AMOUNT (IN LKR)

2.10
2.10
(B)
(A-B)

0.32
0.21
1.28
5.45

m2

1,252.00

6,818.33

2.10

2.21
2.21

m2

9,451.00

20,839.46

7.56
3.15
10.71

m2

8,720.00

93,391.20

D/H

12(a) J-010 Door 28mm thick, cl.1 timber


battened sash with 95mm x 45mm
frame, in cl.1 timber, oxidized iron
heavy duty furniture 100mm x
62mm iron butt hinges with in side
and out side 100mm barrel bolts
and draw ring & painted sashes
and frame, two coats of enamel
paint with primer under coats.(3
Nos of hinges)
Door

1.05

12(b) K-16 Supplying and fixing approved


Badulla quality P.V.C. door with frame
SoR with all necessary fittings and lock
as directed (Quality should be
approved by the engineer)
4
2
13

14

15

2.10
2.10

J-004 Supplied & fixed oxidized iron


barrel bolts 150mm with iron
screws.

7.00

no.

284.00

1,988.00

J-026 Supplying & fixing lock rim or night


latch

1.00

no.

1,086.00

1,086.00

2.16
3.60
1.58
1.35
8.69

m2

4,412.00

38,318.22

J-058 TYPE-01 Anodized Aluminium


partition
with
aluminium
architectural sections with 10 - 15
micron coating glazed and
panelled with 3mm , plastic coated
ply board to both sides,at bottom
and 4.6mm thick glass at top.(The
used section SPR 105, SPR 106,
SPR 110, SPR 107, SPR 4521)
Window

16

0.90
0.75

1
2
1
2

1.80
1.50
1.50
0.90

1.20
1.20
1.05
0.75

S-002 16mm thick 1:1:5 cement, lime


and sand plastering to walls
finished smooth with lime putty.
Internal Wall
Bed room
Hall
Kitchen
W.C.

8
2
2
2
2
2
2

3.05
3.05
4.12
3.05
2.13
1.37
0.91

3.00
3.00
3.00
3.00
3.00
3.00
3.00

73.20
18.30
24.72
18.30
12.78
8.22
5.49

DETAILED PROJECT REPORT

Page92

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

S.
No.

I. No.

PARTICULAR
NO

Bath
Lobby of Toilet
Wash
Extra Avrage Ht. For Sheet
Fire Space

Deduction : Opening
Door

Without Door
Window

17

QTY

UNIT

RATE (LKR)

AMOUNT (IN LKR)

D/H

2
2
2
2
2
2
1
1
2

1.37
1.07
1.45
2.10
2.44
1.20
3.05
4.12
2.60

3.00
3.00
3.00
3.00
3.00
3.00
0.75
0.75
4.80
(A)

8.22
6.42
8.69
12.60
14.64
7.20
2.29
3.09
24.96
249.11

1
7
4
2
1
2
1
2

1.05
0.90
0.75
1.00
1.80
1.50
1.50
0.90

2.10
2.10
2.10
2.10
1.20
1.20
1.05
0.75
(B)
(A-B)

2.21
13.23
6.30
4.20
2.16
3.60
1.58
1.35
34.62
214.49
214.49

m2

580.00

124,406.71

S-002 16mm thick 1:1:5 cement, lime


and sand plastering to walls
finished smooth with lime putty.
External Wall (Incl. Plinth)
Back Side Wall
Sides
Front
Extra Avrage Ht. For Sheet
Fire Space

Deduction : Opening
Door
Window

18

Measurment (m)
L
B

J-12 Supplying and roofing with


Badulla 0.47mm thick colour coated Zink
SoR Aluminum metal roofing sheets
on special class timber frame
consist of 100mmx50mm purling
with
maximum
spacing of
1200mm centre to centre. (
Quality of timber and Brand,
Profile and Colour of the sheets
should be approved by the
engineer).

6.67

3.30

22.01

1
1
1
1
1
2

9.57
7.74
6.67
3.05
4.12
2.60

3.30
3.30
3.30
0.75
0.75
5.10
(A)

31.57
25.53
22.01
2.29
3.09
26.52
133.02

1
1
2
2
1
2

1.05
0.90
1.80
1.50
1.50
0.90

2.10
2.10
1.20
1.20
1.05
0.75
(B)
(A-B)

2.21
1.89
4.32
3.60
1.58
1.35
14.94
118.08
118.08

m2

580.00

68,485.21

81.22

m2

2,444.00

198,501.68

81.22

DETAILED PROJECT REPORT

Page93

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

S.
No.

19

I. No.

PARTICULAR
NO

Measurment (m)
L
B

21

22

23

UNIT

RATE (LKR)

AMOUNT (IN LKR)

30.00

894.00

26,820.00

J-32 Supplying and fixing 0.47mm thick


Badulla Zink Aluminum ridge capping of
SoR girth 470mm to match the colour
of the roof. Rate shall include all
necessary fasteners, etc.
1

20

QTY
D/H

R-038 Valance boards beaded 225mm x


20mm thick supplying and fixing
Ginisapu, including one coat of
primer and two coats of enamel
paint (Flat iron bracket measured
separately) .

R-017 Gutters pvc square type 150mm


with PVC brackets not exceeding
225mm fixed to valance board
using 20mm nails, rate includes
for specials.

20

20.00

979.00

19,580.00

20

20.00

749.00

14,980.00

6.00

499.00

2,994.00

2
1
1
1
1
1
1
1
1

3.05
3.05
3.05
0.75
3.40
3.16
1.45
1.37
1.37

m2

662.00

33,705.42

R-012 Down pipes pvc 90mm dia.


supplied and fixed with brackets
not exceeding 1.2m well secured
to walls with plastic rawl plugs.
Rate includes for specials.

F-006 Floor concrete 1:2 1/2:5(25mm)


62mm thick with expansion joints
filled with 1:2 bitumen and sand
rate
including
for
curing,
compacting ground and laying
polythene sheet under the
concrete.
Bed room
Hall
Kitchen
Fire pit
Wash Area
Landing
Front of Toilet
W.C./Bath

18.61
12.57
6.50
0.56
4.08
2.84
3.05
1.25
1.47

3.05
4.12
2.13
0.75
1.20
0.90
2.10
0.91
1.07

50.91
24 F-014 100mm high skirting in cement
and sand 1:3 projected or flush to
walls finished smooth with gray
cement floating including forming
groove.
Skirting
Bed room
Hall
Kitchen
Fire pit
Wash Area
Landing
Front of Toilet
W.C./Bath

2
1
1
1
1
1
1
1
1

12.20
14.34
10.36
3.00
9.20
8.12
7.10
4.56
4.88

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.90
0.90

2.44
1.43
1.04
0.30
0.92
0.81
0.71
4.10
4.39

DETAILED PROJECT REPORT

Page94

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

S.
No.

25

26

I. No.

PARTICULAR
NO

Measurment (m)
L
B

P-018 Apply white or colour washing to


walls one coat after patching up
and preparing surface.
Qty As Internal Wall Plaster

QTY

UNIT

RATE (LKR)

AMOUNT (IN LKR)

16.15

333.00

5,377.45

214.49

m2

40.00

8,579.77

118.08

m2

274.00

32,353.36

D/H

P-015 Apply two coats of weathershield


paint on external surfaces after
cleaning and preparation.

Sub Total

1,220,703.83

B. Internal Water Supply & Sanitation Work


1

W-030 Pipes PVC supplied and laid with


specials, size 32mm dia. (Type
1000) rate includes for cutting
trencthes,testing and backfilling,
depth of the trench not less than
450mm.

8.00

8.00

401.00

3,208.00

12.00

12.00

209.00

2,508.00

1.00

1.00

no.

4,187.00

4,187.00

1.00

1.00

no.

6,816.00

6,816.00

1.00

1.00

no.

8,520.00

8,520.00

1.00

1.00

no.

9,897.00

9,897.00

W-031 Pipes PVC supplied and laid with


specials, size 20mm dia. type 1000
rate includes for cutting trenches,
testing and back filling. Depth of
the trench not less than 450mm.

W-037 Gate valve, brass, supplying and


fixing, size 32mm dia. heavy
quality.
W-008 Approved sink stainless steel with
single drain board with chromium
plated wastewater chain, stay &
waste plug (tap, brackets, water ,
waste water connection & brick
work measured separately).

W-005 Approved closet squatting foot


rest type (Orissa pan) with trap,
supplied and fixed to working
order, including connection to
sewer line. Rate includes for
breaking floor and concreting,
cement rendering in damaged
areas.
W-018 Supply and install 500 L capacity
(confirming to SLS 1174) water
tank made of polymer materials of
approved quality on sand bed.
Rate for only water tank. PVC
pipes, valves, fittings measured
separately.

DETAILED PROJECT REPORT

Page95

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

S.
No.

10

11

12

I. No.

Measurment (m)
L
B

PARTICULAR

QTY

UNIT

2.00

2.00

no.

1,900.00

3,800.00

1.00

1.00

573.00

573.00

1.00

1.00

625.00

625.00

75mm diameter type 400 uPvc


pipes & fittings

5.00

455.00

2,275.00

110 mm diameter type 400 uPvc


pipes & fittings

3.00

667.50

2,002.50

1.00

no.

20,000.00

20,000.00

NO

RATE (LKR)

AMOUNT (IN LKR)

D/H

W-021 Supplying and fixing 20mm(1/2")


dia. approved brass heavy quality,
chromium plated bib tap with
20mm(1/2") dia. P.V.C. valve
faucet socket.

W-026 Pipes PVC supplied and laid with


specials, size 50mm dia. in wastes
of sinks. Type 600.
W-027 Pipes PVC supplied and laid with
specials, size 50mm dia. rate
includes for cutting trenches,
testing and backfilling. (Type 1000)
depth of the trench not less than
450mm.

Construction of septic tank for 5


persons

1.00

Sub Total

64,411.50

C. Internal Electrification Work


I-002 Pendent type lamp point wiring to be carried out with 2 x 1.0 mm 2
PVC insulated PVC sheathed
copper cables wired in concealed
conduit in wall and above ceiling
1
to be supplied and installed in to
working order.(Including sunk
switch)
3.00

nr

1,607.00

4,821.00

1.00

nr

1,658.00

1,658.00

1.00

nr

1596

1,596.00

I-021 Ceiling fan point wiring complete


with fan hook - to be carried out
with 2 x 1.0 mm2 PVC insulated
PVC sheathed copper cables and
2.5mm2 earth cable wired in
concealed conduit in wall and
above ceiling to be supplied and
installed in to working order.

I-022 5 A socket outlet - wiring to be


carried out with 2 x 1.0mm 2 PVC
insulated PVC sheathed copper
cables and 2.5mm2 earth cable
wired in concealed conduit in wall
and above ceiling to be supplied
and installed in to working order.

DETAILED PROJECT REPORT

Page96

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

S.
No.

I. No.

PARTICULAR

Measurment (m)
L
B

QTY

UNIT

1.00

nr

1,468.00

1,468.00

1.00

nr

212.50

212.50

1.00

nr

2,890.00

2,890.00

5.00

mtr

70.00

350.00

NO

RATE (LKR)

AMOUNT (IN LKR)

D/H

I-217 Supplying 1 No of 2P
MCB(6A,10A,16A,20A,25A,32A)

Providing and fixing wooden board


of suitable size for energy meter
etc complete as required

Earthing with G.I. earth pipe 4.5


mtr long, 40 mm dia including
accessories, and providing
masonry enclosure with cover
plate having locking arrangement
and watering pipe etc.

Supplying and laying 6 SWG G.I.


wire at 0.50 Meter below ground
level for conductor earth
electrode, including soldering,
excavation and refilling the trench
etc. as required.

Sub Total

Total

12,995.50

1,298,110.83

Say LKR 13 Lakhs per house

DETAILED PROJECT REPORT

Page97

ARCHITECTURAL
DRAWINGS

BED ROOM
10'0" X 10'0 "
WC
5'0" X 3'0 "

BATH
5'0" X 3'6 "

A
KITCHEN
8'0" X 7'0 "

A'

AREA STATEMENT
S.NO.

BED ROOM
10'0" X 9'6 "

FRONT ELEVATION

LEGEND
01
02

PROPOSED PLAN

03
04

Note:1.) Survey maps are not on WGS-84 projection.


2.) All the dimension are in meters unless
otherwise specified.
3.) The site planning is for 100 housing units.
4.) Dimension need not to be scaled.

PROJECT MANAGEMENT CONSULTANCY


FOR SRILANKA HOUSING PROJECTCONSTRUCTION OF 4,000 HOUSING UNITS
IN CENTRAL AND UVA PROVINCES IN SRILANKA

Prospective View
Ridge cover
Ridge 3"x5"
Rafter 2"x4"

4" concret
block wall

Kitchen

Hall

4"Base concrete

6" concret
block wall

2" floor finish

SECTION AT AA'

8"x8" plinth
beam
Ground
level
foundation
as per soil condition

2'-0"

2'0" bolder
filling

ROOF PLAN

Bed room

Ministry of External Affairs,


GOVT. OF. INDIA
1"
14'-112

Batten 2"x2" @ 3'c/c

1"
4'-112

GI Sheet

8'-0"

VERANDAH
8'5" X 6'0 "

DESCRIPTION

HALL
10'0" X 13'0 "

Size

Sl/No.

Sill Lvl.

Lintel Lvl.

Door Schedule
D

1200x2100

00

2100

D1

900x2100

00

2100

D2

800x2100

00

2100

G.Floor

Window Schedule
W

1500x1200

900

2100

KW

1200x1050 1050

2100

Ventilator Schedule
800x600

1500

2100

AREA STATEMENT
S.NO.
A

DESCRIPTION

D1

(1.20X2.10)

(.90X2.10)

D2

(.80X2.10)
60
46

EXHAUST
FAN

CEMENT CONCRETE
PLUG FOR FIXING 6MM
BOLT FOR HOLDFAST

SILL LVL.

GENERAL NOTES:
1. All Dimensions are in METER
2. The Consultant alone reserves
the copyright of this Drawing
3. . Any discrepancy in the
drawing shall to be brought to
the immediate notice of the
Consultant.

SILL LVL.
SILL LVL.

SECTION A - A
SECTION THROUGH DOOR FRAME

KW

PROJECT MANAGEMENT CONSULTANCY


FOR SRILANKA HOUSING PROJECTCONSTRUCTION OF 4,000 HOUSING UNITS
IN CENTRAL AND UVA PROVINCES IN SRILANKA

DETAIL A

W SIZE -1.50 X 1.20


DESIGN DETAIL - OPENEBLE SHUTTER WITH
GLASS WINDOW GLASS
TYPE - 4MM TH PLAIN GLASS

KW SIZE -1.20 X 1.05


DESIGN DETAIL - 2 TRACK , 1 SHUTTER
SLIDING WITH GLASS WINDOW GLASS
TYPE - 4MM TH PLAIN GLASS
LOCATION - KITCHEN

V SIZE - 800 X 600


DESIGN DETAIL - EXHAUST FAN
WITH FIX GLAZING & GLASS
LOUVERS GLASS TYPE - 4MM TH
PLAIN GLASS
LOCATION -TOILETS

OPENING DETAIL's

Ministry of External Affairs,


GOVT. OF. INDIA

CONSTRUCTION
DRAWINGS

PB2

PB2

PB2

AREA STATEMENT
S.NO.

PB4

DESCRIPTION

PB3

PB4

PB4

PB2

NOTE:
1. ALL DIMENSION ARE IN MM.
2. FOR M-20 GRADE, USE MIX (1:1.5:3)
3. USE HYSD Fe-415 GRADE OF REINF.

PB3

PB3

4. CLEAR COVER TO REINF.


a. SLAB

PB4

: 20MM.

b. BEAM

: 25MM.

c. COL

: 40MM.

d. FOOTING : 50MM.
REMOVAL OF FORMWORK
a. WALLS,COLUMN & VER. FACES

PB3

PB3
PB1

PB1

PB3

24 to 48 hours

3 days
b. SLAB (PROPS LEFT UNDER)
7 days
c. BEAM SOFFITS(PROPS LEFT UNDER)
- up to 4.5m - 7 days
d. REMOVAL OF PROPS
over 4.5m - 14 days
e. REMOVAL UNDER BEAMS AND ARCHES
- up to 6m - 14day
over 6m - 21days

PB1
PROJECT MANAGEMENT CONSULTANCY
FOR SRILANKA HOUSING PROJECTCONSTRUCTION OF 4,000 HOUSING UNITS
IN CENTRAL AND UVA PROVINCES IN SRILANKA

PB4
PB2

PB4

PB2
Ministry of External Affairs,
GOVT. OF. INDIA

SCHEDULE FOR PLINTH BEAMS


BEAM
TYPE

SIZE
WIDTH DEPTH
(b)
(D)
(mm)
(mm)

TOP R/F
STRAIGHT

TOP EXTRA
UPTO L/4 FROM
SUPPORT

BOTTOM R/F
STRAIGHT

VERTICAL STIRRUPS
BOTTOM EXTRA
'0.7 x L' AT
UPTO 2-D FROM
CENTRE
AT CENTRE
SUPPORT

SKIN R/F ON
EACH FACE

PB1

9"

12"

2-12

2-12

2-12

2-12

8 @ 150 C/C

8 @ 100 C/C

-----

PB2

9"

12"

2-12

2-10

2-12

-----

8 @ 150 C/C

8 @ 150C/C

-----

PB3

9"

9"

2-12

----

2-10

----

8 @ 150 C/C

8 @ 150 C/C

-----

PB4

5"

5"

2-10

----

2-10

----

8 @ 200 C/C

8 @ 150 C/C

-----

LB1

AREA STATEMENT

LB2

LB2

S.NO.

LB3

DESCRIPTION

LB1

LB3

NOTE:

LB1
LB1

LB3
LB2

LB2

1. ALL DIMENSION ARE IN MM.


2. FOR M-20 GRADE, USE MIX (1:1.5:3)
3. USE HYSD Fe-415 GRADE OF REINF.
4. CLEAR COVER TO REINF.
a. SLAB

: 20MM.

b. BEAM

: 25MM.

c. COL

: 40MM.

d. FOOTING : 50MM.
REMOVAL OF FORMWORK
a. WALLS,COLUMN & VER. FACES

LB1

b. SLAB (PROPS LEFT UNDER)

LB1
LB2

3 days

7 days
c. BEAM SOFFITS(PROPS LEFT UNDER)
- up to 4.5m - 7 days
d. REMOVAL OF PROPS
over 4.5m - 14 days
e. REMOVAL UNDER BEAMS AND ARCHES

LB2

LB1

24 to 48 hours

- up to 6m - 14day
over 6m - 21days

LB2

LB1

LB1

Ministry of External Affairs,


GOVT. OF. INDIA

SCHEDULE OF LINTEL BEAMS

LB1

9"x9"

2-12#

LB2

9"x6"

2-10#

LB3

5"x5"

2-12#

PROJECT MANAGEMENT CONSULTANCY


FOR SRILANKA HOUSING PROJECTCONSTRUCTION OF 4,000 HOUSING UNITS
IN CENTRAL AND UVA PROVINCES IN SRILANKA

2-10#

8#@150MMC/C

2-10#

8#@150MMC/C

2-10#

8#@150MMC/C

03

4'-0"

4'-0"
3'-6"

3'-6"

E
1"
6'-62

3'-6"

04

4'-0"

02

4'-0"

01

3'-6"
AREA STATEMENT

4'-0"
3'-6"

4'-0"

S.NO.

3'-10"

D
4'-6"

4'-0"

4'-6"
NOTE:

4'-6"

4'-0"

4'-6"

3'-6"

4'-0"

4'-0"

3'-6"

1"
24'-12

1. ALL DIMENSION ARE IN MM.


2. FOR M-20 GRADE, USE MIX (1:1.5:3)

3. USE HYSD Fe-415 GRADE OF REINF.


4. CLEAR COVER TO REINF.

3'-6"

a. SLAB

4'-0"

7'-8"

4'-0"

N.G.L. +/- 0.00")

3'-6"

4'-0"

4'-0"
8 MM
RING

@ 6" C/C

: 20MM.

b. BEAM

: 25MM.

c. COL

: 40MM.

d. FOOTING : 50MM.
REMOVAL OF FORMWORK
a. WALLS,COLUMN & VER. FACES

24 to 48 hours

b. SLAB (PROPS LEFT UNDER)

3 days

7 days
c. BEAM SOFFITS(PROPS LEFT UNDER)
- up to 4.5m - 7 days
d. REMOVAL OF PROPS
over 4.5m - 14 days
e. REMOVAL UNDER BEAMS AND ARCHES
- up to 6m - 14day
over 6m - 21days

3'-6"

6'-1"

4'-0"

4'-0"

4'-0"

4 -12
MAIN BARS

4'-0"

11"/13"

4'-0"

3'-6"

3'-6"

3'-6"

1'

(LVL -4'6")
P.C.C. (1:3:6)

6"

3'-6"

4"

1'

6"

3'-6"

4'-0"

3'-6"

4'-0"

3'-6"

3'-6"

4'-0"

4"

DESCRIPTION

10 MM 8" C/C
PARALLEL
TO LONG SIDE

1"
8'-42

01

10'-9"

02

03

1"
10'-42

TYPICAL SECTIONAL DETAILS OF


FOOTING
& COLUMN

04

29'-6"

SCHEDULE FOR FOOTINGS

SCHEDULE FOR COLUMNS

EXCAVATION

SIZE

FOOTING DETAILS

COLUMN NO.

COLUMN DETAILS

DEPTH AT DEPTH AT R/F PARALLEL TO R/F PARALLEL TO


EDGE
PEDESTAL
SHORT SIDE
LONG SIDE

WIDTH

DEPTH

WIDTH

DEPTH

F1

4'

4'

3'6"

3'6"

6"

11"

10 MM 6" C/C

10 MM 8" C/C

F2

4'6"

4'6"

4'

4'

6"

13"

10 MM 6" C/C

10 MM 8" C/C

COLUMN NO.

C1

(LVL -5')
10 MM 6" C/C
PARALLEL
TO SHORT SIDE

WIDTH

DEPTH

MAIN BARS

9"

9"

4 -12

RING
8

@ 6" C/C

PROJECT MANAGEMENT CONSULTANCY


FOR SRILANKA HOUSING PROJECTCONSTRUCTION OF 4,000 HOUSING UNITS
IN CENTRAL AND UVA PROVINCES IN SRILANKA

Ministry of External Affairs,


GOVT. OF. INDIA

BENEFICIERIES DATA
ANNEX- I

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

HELLBODDE ESTATE, KATUKITHULA


HOUSING BENEFICIARIES DETAILS
S.NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

NAME
M.Ramachandren
S.Sivaneshan
M.Letchumy
S.Saraswathy
S.Pushparani
S.Selvakumary
R.Ramachandren
S.Balan
M.Arumaugam
P.Ravichandren
M.Anthonyammah
M.Neeladevi
S.Sathyamoorthy
S.Doraraj
P.Kitnammah
S.Sebestiyan
A.Selvanayagam
A.Periyasamy
S.Vasanthakumari
G.G.Premalatha
P.Kaladevi
K.Sundrambal
L.Athistakumary
S.Sagunthaladevi
P.Vimalanathan
N.Yogamalar
A.Thangarany
P.Loorudamery

DIVISION
MM
MM
MM
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
LD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD

EPF NO.
7048
6694
6010
6687
6008
7033
7046
6652
7113
6094
7050
6720
6949
5304
6641
4983
6658
7252
6108
6874
6551
6912
7093
6678
7181
6699
6915
6914

DATE OF BIRTH
1975.03.02
1963.01.13
1967.10.15
1978.02.12
1969.08.24
1977.10.09
1962.04.17
1974.07.26
1973.06.30
1978.05.18
1983.12.21
1978.01.02
1978.08.21
1972.01.31
1958.11.24
1957.08.03
1962.09.13
1966.01.08
1965.12.04
1962.08.01
1984.10.05
1973.12.09
1989.04.13
1982.08.09
1986.06.10
1977.06.22
1976.10.16
1980.07.03

N.I.C. NO.
750623441V
630134749X
677893427X
785434480V
697372920X
777831011X
621084780V
742085853V
731822956V
787394700V
838564097V
785622504X
782345133X
720312751V
568292863V
572161991V
621953931X
660083111X
658393335V
627143575V
847790873V
738440722X
896044150V
827223204V
861624781V
776544620V
767904274V
806853895V
Detailed Project Report

Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka
S.NO.
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59

NAME

A.Arasakumar
K.Pannerselvi
K.Logeshwary
K.Gnanavadiuvoo
P.Rajendaren
S.Loganayagie
S.Reginamery
S.Indranie
P.Vijekumary
M.Maheshwary
P.Pushparany
A.Marudaveeran
V.Manoranjan
S.Merygnanayammah
G.Nadaraj
S.Ravinathan
F.Sagayaraj
K.Karpagamoorthy
M.Rajendren
S.Kitnammah
S.Mariyaie
S.Vijekumary
S.Thiyagaraj
K.Letchumy
K.Sridevi
M.Thillirani
M.Perumal
R.M.Bisomenike
M.Kuramachandren
M.Pushpanathan
S.Malani

DIVISION
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
MD
LD
LD
LD
LD
LD
LD
MD
MD
MM
MM
MM
MM
MM

EPF NO.
5852
6124
7183
7044
4811
6032
7261
5343
6155
5247
6701
6852
5377
7258
6892
7270
6921
7274
5020
7203
5507
6441
6980
6365
7204
6068
5763
6732
5509
4947
6386

DATE OF BIRTH
1975.10.18
1980.07.19
1969.07.28
1983.07.10
1969.03.21
1963.10.21
1977.03.26
1966.04.01
1967.04.01
1968.01.18
1975.08.21
1985.04.24
1973.09.06
1965.11.01
1960.10.20
1991.11.05
1974.10.26
1972.11.19
1970.02.18
1977.03.13
1975.03.30
1979.11.03
1980.03.30
1960.06.26
1983.01.22
1978.11.22
1958.08.28
1975.04.12
1978.06.23
1968.04.12
1980.01.29

N.I.C. NO.
752920095X
807014358V
697103848V
836924134V
690812266V
637950720X
775863560X
665425200V
676003991X
685184237X
757340402X
851153314V
732500944V
655016473V
600673212X
913101251V
743000919X
723244340V
700493360V
773315281V
755900389X
798085093V
800974094V
606783957V
835224872V
788274580V
583413835X
756034308V
731751293X
681034013V
805295074V
Detailed Project Report

Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka
S.NO.
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90

NAME

M.Paramasivam
S.Pushparany
M.Janakic
P.Karuppaiah
R.A.Jayantha
M.Ranjanie
M.Yasodha
A.Vasanthakumara
P.Marudaie
M.Nagaraj
S.Sivanoo
R.M.Punchibanda
K.Kesavan
M.Kanapathy(Premaladevi)
S.Veloo(Chithra)
P.Rajaletchumy
J.Athisdaletchumy
S.Vickneshwaran
S.Kumar
M.Mahendren
M.Thilagawathy
S.Srikanth
S.Sithran
M.Subramaniyam
S.Ramanathan
Dasitharan(Thavamani)
Paramasivam
Sathiyaraj
Krishanan
Kumareshwary
Somasundaram

DIVISION
MM
MM
MM
MM
MM
MM
MM
MM
MM
MM
MM
MM
MM
HBN
HBN
HBN
HBN
HBN
HBN
HBN
HBN
HBN
HBN
HBN
HBN
HBN
MM
MM
MM
MM
MM

EPF NO.
6446
5153
6991
5480
7155
7065
5364
7068
6983
6987
2700
5167
6979
5663
6960
4940
7207
6865
6958
6302
4402
6635
4869
5330
7174
6591
6132
7254
5012
5653
4547

DATE OF BIRTH
1971.12.21
1967.12.10
1977.03.14
1972.02.23
1989.03.18
1983.08.08
1968.03.05
1986.10.21
1976.03.15
1980.06.22
1958.07.08
1960.05.20
1986.07.07
1963.06.18
1978.05.02
1966.04.07
1994.06.12
1989.08.17
1982.12.17
1979.06.02
1985.02.21
1986.07.09
1959.10.05
1963.10.05
1977.06.15
1987.12.09
1962.04.17
1989.03.23
1969.08.04
1975.09.08
1966.08.08

N.I.C. NO.
713562742X
678452947X
775741580X
720542455X
890785220V
830594479V
685654075X
862954815V
565754232V
801742254X
581873269X
601414058V
861894878X
631703429X
781234907V
665983200V
946643483V
892304203V
828520387V
791544246V
850522316V
866914354V
591103644V
632793464V
771672760V
873443499V
621084119V
892363242X
692173082V
757740168V
662212806V
Detailed Project Report

Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka
S.NO.
91
92
93
94
95
96
97
98
99
100

Vijekumar
Mageshwary
Nagaraj
Abimannan
Pushparany
Letchumy
Kaliyammah
Pitchey
Krishnamoorthy
K.Periyasamy

NAME

DIVISION
MM
MM
MM
MM
MM
HBN
HBN
HBN
HBN
HBN

EPF NO.
4987
3453
6993
6994
5153
7257
7278
5848
6898
6741

DATE OF BIRTH
1969.06.26
1960.07.09
1979.10.07
1976.11.23
1967.12.10
1992.02.06
1983.08.28
1970.01.07
1975.01.14
1971.04.01

N.I.C. NO.
691783332V
606912781V
782810928V
763284638V
678452947V
925370240V
837101638V
700073254V
750145035V
710924694V

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

HOUSING BENEFICIARIES DETAILS


Region Plantation Company
PHDT Region

Elpitiya Plantation PLC


Nuware Eliya

No.

Sex
Name of Beneficiary

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.

Estate
Division

V.Vishuvanathann
V.Jayaletchurny
S.Ganeshan
P.Maheswary
S.Yogarani
A.Krisnavaney
M.Ramdhas
S.Pathmini
S.Krisnaveny
S.Gowry Santhakumary
K.Sasikumar
M.Jayanthi
K.Adistakumary
R.Sanmugaraj
Vijeyakumary
Sarathadevi
P.Jeyamalar
V.Subramaniyam
V.Karnaladevi
S.Kavitha
Muthukumar
V.Subramaniyam
P.Mahendran
M.Arunaithambi
P.Kamalnathan
D.Kogilavani
S.Kalaiselvi
J.Sivapoopathi
A.Vijayam

M
M
M

M
M
M
M
M

F
F
F
F
F
F
F
F
F
F
F
F
F
F
F

F
F
F
F

Age

Date of
Birth

48
45
47
36
44
38
48
39
46
45
35
31
45
45
37
33
40
36
42
29
34
34
24
36
29
30
50
38
36

1966.07.29
1969.07.28
1967.02.07
1979.06.03
1970.11.10
1976.06.01
1966.05.06
1975.07.29
1968.08.21
1969.09.29
1979.11.25
1963.06.04
1969.03.19
1971.09.11
1977.08.03
1981.06.19
1974.08.19
1978.08.02
1972.04.09
1985.03.14
1980.02.03
1980.08.30
1989.02.05
1978.01.02
1984.11.03
1984.05.29
1964.01.30
1976.02.28
1977.04.11

NIC No.
662073687V
697100415X

708154644V
766534600V
661273364X
757113988V
687731779X
697731779X
793304358X

727553446V
77833507V
816714702V
747324140V
782155431V
726001278X
855893754V
802433182X
890363660V
780022957X
843084370V
846443614V
645302818X
765594588V
776024619V

Register
ed
worker

EPF No

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

27/F/5327
27/F/6967
27/F/5087
27/F/7250
27/F/7153
27/F/5980
27/F/4795
27/F/6495
27/F/6988
27/F/5224
27/F/7254
27/F/6898
27/F/5738
27/F/5585
27/F/7181
27/F/6649
27/F/5628
27/F/6466
27/F/6030
27/F/6357
27/F/6478
27/F/7368
27/F/7202
27/F/6821
27/F/6699
27/F/7127
27/F/4769
27/F/7371
27/F/7332

Working in the
estate
uninterruptedly
during last 5
years
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

: Dunsinane
: Middle
Present
living
condition
(TS/LR)

EWHCS
member
(yes/no)

LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

No of
other
family
member
registere
d 1as
1
workers
in 1the
0
estate
0
0
1
1
0
0
1
0
0
1
1
1
1
1
0
1
1
0
1
1
0
0
0
0
1

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.

V.Ganeshan
S.Vijayaletechumy
G.Rasadeepam
S.Perumal
R.Loganathan
L.Luthamy
G.Logambal
M.GnavKrishnan
S.Menaga
P.Neshamalar

V.Ramakrushnan
S.Thrulogachelvan
P.Sundaraj
S.Chandrakumar
G.Gnanabalam
M.Rajarathan
S.Sathiyanathan
G.Renuka
K.Govindaraj
S.Sivakumar
S.Yogeshwary
M.Sasikala
K.Maligadevi
K.Yogeshwary
K.Sivanathan
R.Sagunthala
P.Somasundaram
P.Velusamy
L.Selvam
S.Sathasivam
M.Wijayaletchumy
E.Ravichanderan
R.Vijayalatha
A.Femando
S.Karthikamani
P.Mariaie

M
M

M
M

M
M
M
M
M
M
M
M
M
M

M
M
M
M
M
M
M
M

F
F

F
F

F
F
F

F
F
F
F
F

F
F
F

30
39
34
36
48
27
54
36
36
27
40
47
24
32
24
47
49
34
25
34
29
33
40
43
28
36
33
30
35
29
50
28
34
40
39
29
43
49
43

1984.10.30
1974.05.08
1979.07.08
1977.03.03
1966.09.18
1987.03.16
1960.05.26
1978.03.18
1979.08.29
1986.12.23
1974.09.21
1967.03.25
1989.10.15
1982.04.30
1989.01.23
1967.02.05
1965.02.07
1980.08.18
1989.03.03
1980.02.19
1985.02.11
1981.05.13
1974.08.30
1971.03.16
1986.12.01
1978.07.22
1977.06.05
1984.12.19
1969.11.08
1986.04.05
1964.07.18
1984.12.06
1980.06.13
1974.07.22
1975.12.18
1985.03.14
1975.12.25
1965.01.30
1971.01.10

843044875V
746791060V
796900593V
662623318X
875767535V
787653267V
792392946X
868584242V
747653267V
675858363X
892895074V
821214424V
890234526V
670383982X
650383982X
802315139V
890624677CV
800504147V
855424312V
No
747434362V
868364670V
787044735V
776574210V
843545360V
860965208V
642003186V
840375056V

753530045V
752110794V
655303278X
715104725X

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

27/F/7201
27/F/5979
27/F/6646
27/F/6475
27/F/4542
27/F/7322
27/F/4614
27/F/6235
27/F/6295
27/F/6904
27/F/7037
27/F/6968
27/F/7369
27/F/6476
27/F/7107
27/F/4797
27/F/4731
27/F/7372
27/F/7108
27/F/6272
27/F/7365
27/F/6480
27/F/6275
27/F/5990
27/F/6905
27/F/6833
27/F/6338
27/F/6470
27/F/5328
27/F/7351
27/F/4450
27/F/7275
27/F/6460
27/F/5783
27/F/6239
27/F/6933
27/F/5919
27/F/5320
27/F/5668

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

Detailed Project Report


Meeting Societys Needs Globally

0
0
0
1
1
0
2
1
1
0
0
1
2
0
1
1
1
0
0
1
2
0
0
1
0
0
0
0
0
1
1
1
1
0
1
0
1
0
1

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.
79.
80.
81.
82.
83.
84.
85.
86.
87.
88.
89.
90.
91.
92.
93.
94.
95.
96.
97.
98.
99.
100.
101.
102.
103.
104.
105.
106.
107.

G.Mahenderan
V.Theivanai
G.Kowsaliya
N.Balakirshnan
Gnanasegaram
Saraswathy
K.Sivanandan
S.Maruthaveeran
R.Sivakumar
M.Maheshwaran
V.Ragunathan
V.Sumathy
S.Vijayaletchumy
V.Subramaniyani
S.Vijayaletchumy
P.Kantharuban
R.Saraswathy
M.Vijayarani
S.Pathmanathan
R.Nagenderan
R.Sivakumar
V.Anbalagan
B.Kathirmani
K.Parashakthi
R.Thiruchelvam
Vickneshwaran
D.Vinothan
S.Ganeshan
P.Jothidhasan
G.Kalaivani
R.Veeraie
K.Ramachanderan
W.G.Victor
K.Kananathan
S.Kalaichelvi
N.Selvakumar
R.Puwaneshwary

M
M
M
M
M
M
M

M
M

M
M
M
M

M
M
M
M
M
M
M
M
M
M

F
F

F
F
F
F
F

F
F

F
F

F
F

26
37
23
31
41
34
30
39
30
40
26
43
40
38
40
36
46
53
44
39
47
47
43
35
33
34
36
30
47
33
29
53
40
51
52
49
46
26
46

1988.03.17
1977.10.14
1991.12.12
1983.01.05
1973.03.05
1980.11.19
1984.12.19
1975.07.29
1984.10.02
1974.04.12
1988.06.13
1970.09.19
1966.01.12
1976.05.26
1966.01.13
1978.09.24
1968.09.30
1961.03.14
1971.12.01
1975.07.26
1967.11.01
1967.04.06
1971.05.24
1979.07.08
1981.12.29
1980.10.09
1978.07.20
1986.04.20
1967.02.07
1981.04.14
1985.12.16
1959.03.21
1974.09.22
1963.10.20
1962.09.14
1965.02.14
1968.08.14
1988.10.25
1968.01.10

880774851V
778883844V
918471936V
730054804V
730685211V
808246147V
843545360V
752110794X
847764198V
741034620V
881654873V
707634006V
665124851V
761472844X
665124851V
782685732V
687742990X
615744948V
713362999X
752083495V
673063314X
716454371X
796904303V
813640732X
802835388V
787024866V
861115488V
811050202X
858512239V
590813320X
632943911X
622584123V
650453433V
687272617X
882994929V
685103567V

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

27/F/6751
27/F/6163
27/F/7152
27/F/6240
27/F/6910
27/F/6496
27/F/6470
27/F/5583
27/F/6469
27/F/6274
27/F/6976
27/F/5223
27/F/5760
27/F/6461
27/F/7162
27/F/6608
27/F/5015
27/F/4326
27/F/5459
27/F/6273
27/F/5011
27/F/5010
27/F/5582
27/F/7271
27/F/6698
27/F/6098
27/F/6974
27/F/5087
27/F/6747
27/F/6906
27/F/3646
27/F/5557
27/F/505
27/F/7200
27/F/4444
27/F/6834
27/F/7149
27/F/5454

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

LR
TS
LR
LR
LR
LR
LR
LR
LR
LR
LR
TS
LR
LR
TS
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
TS
TS
LR
LR
LR
LR
LR
LR
LR
LR

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

Detailed Project Report


Meeting Societys Needs Globally

1
0
0
0
1
1
0
1
0
0
1
0
0
0
0
0
1
1
1
0
1
0
1
1
1
0
0
1
0
0
1
1
1
1
1
0
1
0

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka
108.
109.
110.
111.
112.
113.
114.
115.
116.
117.
118.
119.
120.
121.
122.
123.
124.
125.
126.
127.
128.
129.
130.
131.
132.
133.
134.
135.
136.
137.
138.
139.
140.
141.
142.
143.
144.
145.
146.

V.Saraswathy
O.AlakiriSamy
K.Sarawanabawan
S.Mariaie
S.Manokaran
T.Sadasivam
S.Karthiga
S.Araie
R.Thambiraj
V.Paeameshwary
G.Vijaykumary
M.Muthuraman
P.Letchumy
V.Vellaiyan
S.Sathiyaseelan
P.Manoraja
S.Sivaneshwary
K.Sithradevi
R.Sridevi
N.Janaki
M.Sarasu
S.Balasubramaniyam
S.Thilpkumar
M.Amirtham
R.Wanaraja
A.selvarani
R.Selvakumar
A.Annaletchumi
M.Krishnakumar
P.Rajakumary
R.Subaharan
T.Rajamani
T.Meenakumary
A.Mageshwary
V.Jayaram
V.Iayavu
T.Savutharrajan
Sathiyaseelan
S.Mathiyalagan

M
M
M
M

M
M
M
M

M
M
M
M
M
M

M
M
M
M
M

F
F
F
F
F

F
F
F
F
F

F
F
F
F
F
F
F

36
50
43
49
54
29
35
47
47
51
32
48
40
39
32
32
36
45
37
48
46
43
38
39
32
45
34
49
42
49
34
48
50
55
51
54
44
29
34

1978.07.20
1964.04.23
1971.07.24
1965.03.06
1960.01.15
1985.02.16
1979.12.03
1969.06.23
1967.07.11
1963.12.13
1982.10.29
1966.01.03
1974.07.10
1975.02.15
1982.08.11
1984.10.22
1978.11.27
1969.04.28
1977.07.01
1966.09.04
1968.01.12
1971.11.23
1976.11.11
1975
1982.07.30
1969.11.20
1980.05.22
1965.08.01
1972.11.19
1965.05.24
1980.02.07
1966.09.29
1964.11.20
1959.07.12
1963.06.24
1960.09.02
2
1970.07.24
1985.04.28
1980.05.10

787024866V
641144061V
712064382V
655664637V
600154451X
850473986V
696754050V
671932994V
658433048V
828034723V
660035435V
746964048V
750464335X

788325304V
696193916X
776835102V
661022809V
713283479X
763165299V
822124373X
698253851X
801433138V
655080449V
728244277V
656453559V
800383307V
667733952V
648254733V
596943853V
631784500V
600404156V
702063825V
852102225V
801311903V

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

27/F/6098
27/F/6313
27/F/5458
27/F/5879
27/F/3644
27/F/6754
27/F/6856
27/F/5089
27/F/4796
27/F/7364
27/F/6490
27/F/5661
27/F/6006
27/F/6473
27/F/6463
27/F/7251
27/F/6651
27/F/6228
27/F/7100
27/F/5842
27/F/4793
27/F/5403
27/F/6464
27/F/6111
27/F/7360
27/F/5691
27/F/6517
27/F/7206
27/F/6296
27/F/6781
27/F/6917
27/F/4824
27/F/6531
27/F/5036
27/F/5797
27/F/6788
27/F/6782
27/F/6918
27/F/7272

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
TS
LR

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

Detailed Project Report


Meeting Societys Needs Globally

1
1
0
0
1
1
1
1
0
1
1
1
0
0
0
1
1
0
0
1
0
0
1
0
1
1
0
0
0
1
0
1
0
2
1
1
0
1
1

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka
147.
148.
149.
150.
151.
152.
153.
154.
155.
156.
157.
158.
159.
160.
161.
162.
163.
164.
165.
166.
167.
168.
169.
170.
171.
172.
173.
174.
175.
176.
177.
178.
179.
180.
181.
182.
183.
184.
185.

P.Thayabhalan
P.Vivegananthan
P.Paramananthan
V.Jamuna
V.Manonmani
A.Kanjani
V.Sooriyakala
P.Karuppai
K.Mahendrakumar
Veni Vanthani
S.Sivamalar
K.Katpagam
M.Santhakumary
K.Jayanthimala
T.Thiyaharaj
A.Ravikumar
P.Subramaniyam
M.Thilagarani
K.Latha
S.Ramakrishnan
Malligadevi
K.Mahindhkiumar
T.Vijayakumar
R.Kannatha
M.Ganasegaram
M.Vikneshwaran
V.Pushparani
W.Ruban
K.Veraiya
A.Visalatche
P.Selvanayagam
S.Angaleshwary
R.Chandramohan
Manjula
M.Kaliyamma
N.Sharmila
K.Thinamani
R.Balu
S.Ramesh

M
M
M
M

M
M
M

M
M
M
M

M
M
M
M
M

M
M

F
F
F
F
F
F
F
F
F

F
F
F

F
F
F

F
F
F
F
F

33
36
50
38
36
26
40
39
34
25
32
34
30
31
26
37
28
33
39
30
50
28
29
47
38
35
45
38
52
48
50
35
36
26
31
19
33
33
36

1981.02.07
1978.03.23
1964.06.18
1976.03.19
1978.10.27
1988.08.07
1974.11.06
1975.07.13
1980.06.03
1989.05.17
1982.08.25
1980.04.14
1984.10.15
1983.12.16
1988.03.19
1977.10.10
1986.01.11
1981.12.03
1975.09.10
1984.03.07
1964.02.11
1986.04.01
1985.01.28
1967.05.05
1976.12.11
1979.01.07
1969.02.28
1976.07.21
1952.09.08
1969.06.28
1964.12.29
1979.04.22
1978.01.13
1988.08.08
1983.06.11
1995.08.01
1980.05.26
1980.10.23
1977.09.10

810382139XS
641703168X
765794536V
788015569V
887202001V
748213627X
756951270X
801552625X
896383817V
827381640V
806073520X
847895268V
838515261V
880794477V
777844573X
860112140V
818385552V
757544288V
840673707V
645422708V
860924943V
853012726V
676263209V
763464083X
790072570V
695594364X
762032546V
696802491X
643643880X
796132809V
780134003V
887214522V
836633687V
806474991V
802975228V
772544510X2
22222

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

27/F/6525
27/F/6524
27/F/4821
27/F/6911
27/F/6997
27/F/7047
27/F/6851
27/F/6916
27/F/7162
27/F/7279
27/F/7081
27/F/7256
27/F/6941
27/F/6400
27/F/6864
27/F/7281
27/F/7303
27/F/7060
27/F/6055
27/F/7048
27/F/9175
27/F/7057
27/F/6685
27/F/5659
27/F/6269
27/F/6270
27/F/6734
27/F/6516
27/F/5780
27/F/7068
27/F/4855
27/F/7363
27/F/6260
27/F/7345
27/F/7282
27/F/7284
27/F/6418
27/F/7273
27/F/6520

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

TS
LR
LR
LR
LR
TS
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
TS
LR
LR
LR
LR
LR
TS
LR
LR
LR
LR
LR
LR
TS
TS
LR
TS
LR

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

Detailed Project Report


Meeting Societys Needs Globally

1
1
0
0
0
0
0
1
0
0
0
0
1
1
0
1
1
0
0
2
0
1
1
0
1
1
1
0
2
0
1
0
1
0
0
0
0
1
1

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka
186.
187.
188.
189.
190.
191.
192.
193.
194.
195.
196.
197.
198.
199.
200.
201.
202.
203.
204.
205.
206.
207.
208.
209.
210.
211.
212.
213.
214.
215.
216.
217.
218.
219.
220.
221.
222.
223.
224.

R.Sasikala
M.Sangaravadivu
A.Jonsan
P.chandrasegaran
A.Mahendran
P.Mahendraraj
R.Yogarani
N.Karuppaiya
P.Ramachandran
M.Anjaladevi
R.Ramachandran
K.Balasubramaniyam
A.Mahendran
M.Maheswary
P.Kamaychi
P.Chaminda Rohitha
P.Nalindakumar
P.Selvakumar
K.Manimala
Indrani
M.Asokan
S.Mahaaletchumy
S.Thamilchelvan
S.Kamalawathy
S.Menaka
K.Navamani
S.Balasuntharam
A.Mageshwary
V.Parameshwary
R.Logashwaran
M.Karthikee
S.Kitnasami
P.Sarathadevi
K.Veerasamy
A.SARASWATHI
T.Thamotharam
Ramakrishnan
Munisegaran
Ganeshan

M
M
M
M
M
M
M
M
M

M
M
M

M
M

M
M
M
M
M
M
M
M

F
F

F
F

F
F
F
F
F
F
F
F

F
F

25
43
41
47
26
31
31
47
48
43
42
50
26
41
43
38
36
28
39
48
42
33
21
50
35
43
49
44
39
24
29
43
37
52
48
25
41
23
51

1989.03.20
1971.05.13
1973.08.04
1967.11.12
1988.08.08
1983.07.31
1983.03.09
1967.05.17
1968.02.18
1961.02.22
1977.11.30
1964.06.13
1988.08.08
1973.11.11
1971.07.19
1979.06.21
1978.10.18
1986.04.06
1975.05.07
1966.04.08
1972.01.14
1981.02.13
1993.03.12
1964.03.05
1979.09.23
1971.07.31
1965.02.02
1970.09.09
1976.01.31
1989.04.07
1984.11.14
1971.03.21
1977.10.11
1962.11.17
1966.10.10
1989.06.09
1973.12.14
1990.11.29
1963.12.12

895805173V
716344509V
722172785X
673171583V
882214680V
832134007V
835695069V
671383060X
680493626X
615534049X
723352800V
641654049V
882214680V
738163737V
717010302V
761734377V
782925890V
860973677V
756284290V
666094506V
720143380V
815444965V
930724319V
648605153V
717133820V
707534451V
765314305V
890982026V
843194400V
810811873X
777854704V
623224757V
667543200X
891613776V
733493879V
903343788V
633474397X

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

27/F/6998
27/F/5338
27/F/6511
27/F/6257
27/F/7153
27/F/7265
27/F/6691
27/F/4830
27/F/4831
27/F/3616
27/F/7109
27/F/7199
27/F/7157
27/F/7154
27/F/5241
27/F/7198
27/F/7264
27/F/6687
27/F/7014
27/F/6396
27/F/6791
27/F/6393
27/F/7156
27/F/4482
27/F/6127
27/F/6134
27/F/6252
27/F/7067
27/F/6980
27/F/7190
27/F/6583
27/F/6574
27/F/6984
27/F/5872
27/F/4621
27/F/7270
27/F/5568
27/F/7269
27/F/5878

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

LR
LR
LR
LR
LR
LR
LR
LR
LR
TS
TS
LR
TS
LR
LR
TS
TS
TS
TS
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
TS
LR
LR
TS
LR
LR
TS
LR
LR
LR

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

Detailed Project Report


Meeting Societys Needs Globally

1
0
1
1
0
1
0
1
0
0
0
1
0
1
0
1
1
1
0
0
0
0
1
1
1
0
0
0
0
2
1
1
0
1
0
1
1
1
1

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka
225.
226.
227.
228.
229.
230.
231.
232.
233.
234.
235.
236.
237.
238.
239.
240.
241.
242.
243.
244.
245.
246.
247.
248.
249.
250.
251.
252.
253.
254.
255.
256.
257.
258.
259.
260.
261.
262.
263.

S.Saravanan
K.Vijaya
R.Pathmanathan
S.Sivakumary
S.Supuletchumy
P.malaselvi
S.Senthilkumar
R.Valarmathi
S.Sanmuganathan
P.Sanmuganathan
P.anantharaj
R.Periyasami
R.Ramanathan
P.Thana;etchumy
K.Kavitha
M.Vasanthakumary
P.Sivananthan
S.Kaleswary
Muthulingam
Vijayaletchumi

M
M
M

K.Premananthan
A.Magadhevi
R.Vasanthakumary
K.Vanithakumary
Mahendran
S.Sivaraj
M.Kumuthavalli
R.Sagunthalamma
S.Sivakumar
A.Selvakumari
A.Masimalai
M.Jeyakumar
K.Ranjani
R.Umarani
U.Thiruselvam
V.Umavathani
N.Rajamanikkam
S.Palaniyandy

M
M
M
M

M
M

M
M

M
M
M

M
M
M

F
F
F
F
F

F
F

F
F
F
F
F
F

F
F
F

F
F
F

33
44
47
38
46
40
29
49
39
36
49
54
43
43
23
39
32
30
53
47
46
26
29
42
46
25
22
45
42
39
25
49
35
40
31
36
28
53
38

1981.03.02
1969.12.30
1966.07.15
1977.09.20
1968.07.18
1975.06.29
1985.07.29
1965.07.24
1975.07.27
1978.05.02
1967.06.07
1960.03.08
1971.05.18
1971.10.10
1991.04.04
1976.03.08
1982.05.18
1984.11.16
1961.05.13
1966.03.31
1968.06.01
1988.07.12
1985.05.16
1972.10.15
1968.05.03
1989.08.30
1992.01.21
1968.03.10
1971.04.21
1975.05.15
1989.02.20
1963.05.12
1979.08.29
1974.03.12
1984.02.03
1977.04.25
1986.03.17
1960.06.28
1976.03.11

810625767V
698424532V
661927326V
776444670V
687003250V
852114223V
757103702X
781233986V
671594029V
600683853V
717843363V
765683297X
821394767V
843211722X
665914356V
686534073V
881940345V
856374009V

820210392V
685703718X
716174860V
752894795V
895513668V
792425046V
747083711V
845344302V
771164579V
865773447V
601803704V
760713759V

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

27/F/6576
27/F/6200
27/F/4184
27/F/7013
27/F/5359
27/F/6874
27/F/6715
27/F/4780
27/F/6978
27/F/6714
27/F/5814
27/F/3781
27/F/6248
27/F/6033
27/F/6779
27/F/6601
27/F/6589
27/F/7044
27/F/5255
27/F/6798
27/F/5904
27/F/7176
27/F/6876
27/F/5471
27/F/7059
27/F/7171
27/F/7355
27/F/4815
27/F/6034
27/F/5586
27/F/7020
27/F/3974
27/F/6584
27/F/6733
27/F/7177
27/F/7374
27/F/7191
27/F/5841
27/F/6586

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

LR
LR
LR
LR
LR
LR
TS
LR
LR
TS
LR
LR
TS
LR
TS
LR
LR
LR
LR
TS
LR
LR
LR
LR
LR
TS
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
TS
LR
LR

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

Detailed Project Report


Meeting Societys Needs Globally

1
0
0
0
1
0
2
1
0
0
1
1
0
0
1
1
1
1
1
0
0
0
0
1
0
1
1
1
0
1
1
1
1
0
0
1
0
1
1

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka
264.
265.
266.
267.
268.
269.
270.
271.
272.
273.
274.
275.
276.
277.
278.
279.
280.
281.
282.
283.
284.
285.
286.
287.
288.
289.
290.
291.
292.
293.
294.
295.
296.
297.
298.
299.
300.
301.
302.

V.Jothimalar
V.Logeshwary
M.Vijayaletchumy
V.Nadaraj
S.Elaiaraja
K.Sivakumar
R.Raguwaran
R.Maheshwary
A.Mahenderamani
M.Deivanai
A.Leela
T.Ramanathan
R.Thiraviyadevi
S.Iruvandy
R.Kalaichelvi
Thavasimani
P.Shathiyavani
S.Muthaie
V.Sathiavani
S.Kannadasan
S.Selvakumar
M.Ramar
T.G.Mallika
V.Kohiladasan
K.Ramachandran
A.Seethaletchumy
A.Senthamilchelvi
A.Artpudamary
S.Jesubalan
S.Kalaichevam
P.Jothivel
P.Anandaraja
S.Rajendran
N.Kamaladevi
M.Kalimuthu
Sivaraj
Rajasree
M.Indragandi
M.Baskaran

M
M
M
M

M
M

M
M
M
M
M

M
M
M
M
M
M
M

F
F
F

F
F
F
F
F
F
F
F
F
F

F
F
F

F
F

33
36
50
46
27
31
25
49
50
42
50
46
32
49
39
28
41
45
32
34
40
22
36
39
50
45
44
23
41
44
46
29
52
36
44
39
35
49
39

1981.04.07
1978.01.10
1964.05.18
1967.12.28
1986.08.01
1983.08.26
1992.03.20
1965.02.06
1963.07.01
1976.01.24
1964.05.09
1967.08.18
1981.06.14
1965.11.29
1976.08.04
1986.01.10
1971.09.16
1969.02.26
1982.09.26
1980.07.09
1974.10.21
1992.06.24
1977.07.26
1975.04.05
1964.09.01
1969.08.31
1969.02.23
1986.08.03
1973.12.13
1970.11.12
1968.02.18
1985.12.16
1962.02.07
1978.10.09
1970.11.16
1975.08.04
1979.05.21
1965.07.01
1975.02.06

815485052V
785105710V
646394341V
673635083V
862143035
832391972
655424994
636834756
646304040
672304253
816960329
653344481
767174381
867812563
717600053
695573294
801912338
742954765
777084461V
750961053X
642454013X
697443452V

733484306V
703170994X
680495041X
853514918V
620384950V
787834477V
703214339V
796424443V
656837565V
750364233V

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

27/F/6357
27/F/6123
27/F/5617
27/F/5844
27/F/7178
27/F/7169
27/F/7268
27/F/5257
27/F/5865
27/F/6125
27/F/5202
27/F/5379
27/F/6922
27/F/5907
27/F/5643
27/F/6873
27/F/6794
27/F/6825
27/F/6325
27/F/6579
+
27/F/6569
27/F/7105
27/F/6158
27/F/6451
27/F/5926
27/F/6065
27/F/6071
27/F/7144
27/F/5439
27/F/5186
27/F/5937
27/F/6870
27/F/5949
27/F/7336
27/F/5185
27/F/6454
27/F/6382
27/F/5932
27/F/5574

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

TS
LR
LR
LR
LR
TS
LR
LR
LR
TS
LR
LR
TS
LR
LR
TS
LR
LR
LR
LR
LR
LR
TS
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

m.BaskaranM

Detailed Project Report


Meeting Societys Needs Globally

0
0
0
0
1
1
0
0
1
0
0
1
0
2
0
0
1
0
0
1
1
1
0
1
0
0
0
0
0
1
1
1
1
0
0
0
0
1
0

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka
303.
304.
305.
306.
307.
308.

P.Pudalvaraj
A.Soodamony
T.Manjula
S.Srivalli
V.Karuppannan
K.Ramasamy

M
M

F
F
F

34
37
36
47
47
46

1980.05.21
1977.06.12
1977.10.19
1967.06.14
1967.09.28
1968.02.21

801425186V
775414996V
777935046V
676663304X
672824503X
680212330X

Yes
Yes
Yes
Yes
Yes
Yes

27/F/6930
27/F/7145
27/F/6242
27/F/5478
27/F/5957
27/F/5928

Yes
Yes
Yes
Yes
Yes
Yes

TS
TS
TS
TS
TS
TS

Yes
Yes
Yes
Yes
Yes
Yes

Detailed Project Report


Meeting Societys Needs Globally

0
0
0
0
1
1

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

HOUSING BENEFICIARIES DETAILS


Region Plantation Company
PHDT Region

:Elpitiya Plantation PLC


:Nuware Eliya

Estate
Division

Sex
Name of Beneficiary

Age

M
1.
2.
3.
4.
5.

6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.

R.Nagraj
P.Rameshbabu
R.Yogarani
S.Madhanaletchumy
P.Govindhasamy

T.Kalaiyarashan
S.Pushparani
K.Subramaniyam
P.Palaniyandi
V.Dheivanai
N.Sivayogan
V.Athishtakumary
M.Pappu
R.Sellammha
N.Letchumy
S.Mageshwaran
V.Sathiyaraj
N.Marmuthu
P.Chanrakamala
S.Dharmarathinam
R.Singaraj
T.Sellamuththu
S.Rukmani
A.Prabagaran
T.Kumar
V.Vanoja
S.Seethletchumy

M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M

Date of Birth

NIC No.

F
F
F
F
F
F
F

F
F
F

44
38
42
46
43
31
46
44
52
41
30
34
32
39
51
37
29
34
31
32
28
50
37
40
26
50

09.11.1970
05.07.1976
19.05.1972
08.07.1968
14.11.1971
07.10.1983
20.04.1969
02.04.1974
29.08.1962
21.12.1973
03.12.1984
10.12.1980
30.06.1981
12.11.1975
15.10.1963
22.06.1977
09.02.1985
01.04.1980
09.10.1983
10.11.1982
16.12.1986
04.10.1985
17.09.1964
14.05.1977
03.05.1974
22.08.1988
30.04.1964

703142893V
761874160V
726403066X
685774844V
837815134V
696115109V
740934902V
622423243X
738563719V
843384676V
808455900V
816824184V
758173534X
637894145V
771743722X
580403813V
800925096X
837832101V
823155727V
863422493V
852785063V
647613896V
771353878V
741243970V
646213134X

Registered
worker

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

EPF No

27/F/5214
27/F/6537
27/F/5647
27/F/4849
27/F/5099
27/F/6768
27/F/5475
27/F/5563
27/F/3543
27/F/6063
27/F/6544
27/F/6317
27/F/7088
27/F/6341
27/F/4403
27/F/6536
27/F/7115
27/F/6662
27/F/6429
27/F/7338
27/F/6775
27/F/7001
27/F/5502
27/F/6555
27/F/7098
27/F/6869
27/F/4678

: Dunsinane
: Factory

Working in the
estate
uninterruptedly during
last 5 years

Present living
condition(TS/LR)

EWHCS
member
(yes/no)

No of other
family
member
registered
as workers
in the
Estate

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
TS
LR
LR
LR
LR
LR
LR

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

0
1
1
1
1
1
0
1
1
0
1
0
1
1
1
1
1
1
1
1
0
1
2
1
0
1
2

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sex
Name of Beneficiary

Age

M
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.

S.Puvaneshwaran
S.Pushpanayagi
R.Sivaraja
M.Karunaneedhy
S.Vellaiyammha
N.Vijeraj
P.Nageshwaran
A.Marmuththu
K.Kanthneshan
A.Vijayakumar
R.Ganthymathy
V.Selvaraja
T.Subramaniyam
P.Sivakumar
V.Jeyaletchumy
V.Kalaiselvan
S.Rathnam
G.Ananthagowry
S.Nageshwaran
R.Kumar
A.Manogaran
S.Vimalawathy
P.Sivakumar
V.Kirshnakanthan
K.Premnath
K.Veerammha
N.Sivakumar
L.Ravichandhiran
S.Mageshwary
M.Muthuganesha
D.Rathakirshnan
n
S.Pushparani

M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M

Date of Birth

NIC No.

F
F

F
F

F
F
F

23
46
38
45
50
47
47
44
38
47
44
43
42
40
38
37
44
34
44
33
33
40
45
38
26
50
30
27
50
41
22
43

26.02.1991
31.07.1968
08.09.1975
11.03.1971
21.06.1964
14.04.1968
05.11.1967
01.07.1970
07.10.1975
05.12.1967
11.02.1970
11.06.1971
10.12.1972
10.09.1974
14.02.1976
09.08.1977
22.04.1970
02.09.1980
01.04.1970
16.06.1981
19.01.1981
03.03.1973
26.08.1973
15.02.1976
26.04.1987
24.08.1964
16.07.1984
23.10.1987
05.03.1964
09.12.1973
26.01.1992
14.10.1971

910573810V
687330721V
752523525X
710713537X
648122497X
681053344X
701834631X
673403603X
705423512V
711634100X
723454930X
742543897X
765453437X
772224264V
701134214X
807465406V
700925404V
811685291V
810192941V
760464813V
871174571V
647373127X
841984420V
647493920V
733444274V
920262490V
717883861X

Registered
worker

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

EPF No

27/F/7292
27/F/5642
27/F/6216
27/F/5698
27/F/5651
27/F/5290
27/F/4853
27/F/5102
27/F/6543
27/F/5061
27/F/5219
27/F/5292
27/F/5566
27/F/5592
27/F/6167
27/F/6866
27/F/5213
27/F/6087
27/F/5215
27/F/6903
27/F/6583
27/F/6008
27/F/5296
27/F/7287
27/F/7248
27/F/4479
27/F/7099
27/F/6770
27/F/5975
27/F/5561
27/F/7339
27/F/5299

Working in the
estate
uninterruptedly during
last 5 years

Present living
condition(TS/LR)

EWHCS
member
(yes/no)

No of other
family
member
registered
as workers
in the
Estate

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

LR
LR
LR
LR
LR
LR
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
LR
LR
LR
LR
LR
LR
LR

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

1
0
0
1
0
1
1
0
0
1
0
0
0
0
0
1
0
0
1
0
0
0
1
0
1
0
1
1
1
0
0
0

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sex
Name of Beneficiary

Age

M
60.
61.
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.
79.
80.
81.
82.
83.
84.
85.
86.
87.
88.
89.
90.
91.

K.Sarashwathy
P.Vinayagamoorth
S.Nallammha
y
P.Govindharaj
S.Rajkumar
G.Selvakumar
M.Anbalagan
P.Pushpam
M.Punniyamoorth
K.Vijayakanth
y
R.Kirshnakumar
J.Shanthamery
T.Amurthalingam
K.Sunil
K.Mathyvanan
chanrakumara
S.Deebam
J.Sivakumar
N.Jhosap
M.Francis
K.Anandharaj
Y.Asokkumar
P.Saroja
K.Anbalagan
M.Kathiresan
A.Thanapakkiyam
S.Kirshnadevi
C.Manimala
K.Jeyasangar
V.Thiyagarajan
P.Thiruselvi
K.Ganammha
P.Thanalechumy

M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M

M
M

Date of Birth

NIC No.

F
F
F

F
F
F
F
F
F
F

28
28
38
38
31
23
46
55
31
29
25
40
24
33
35
25
31
40
47
25
34
46
34
39
49
46
27
46
29
41
38
53

28.04.1988
25.02.1986
01.04.1981
29.12.1976
10.03.1982
04.06.1991
04.04.1968
07.08.1959
18.05.1983
04.01.1985
06.04.1989
08.06.1974
13.01.1990
19.09.1981
11.12.1989
07.06.1983
12.07.1967
12.05.1989
21.04.1980
15.02.1968
23.02.1972
07.10.1975
11.12.1965
25.05.1968
08.04.1987
25.10.1968
04.11.1985
01.03.1973
10.01.1976
13.10.1961

886189439V
860563894V
815925408V
763643867V
820705157V
911563851V
680344502V
597203080V
831394781V
850044635V
890973620V
746701225X
900233195V
812635913V
792954600V
898460851V
831593954V
741701790X
671943252V
891334646V
801125328V
685465400V
752813922X
658464388V
686464342V
875994930V
682993910V
853093939V
735615687V
611873788X

Registered
worker

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

EPF No

27/F/6982
27/F/6869
27/F/6824
27/F/6769
27/F/6539
27/F/7110
27/F/4858
27/F/4407
27/F/6560
27/F/6666
27/F/7111
27/F/5562
27/F/7280
27/F/6549
27/F/6665
27/F/6900
27/F/6761
27/F/6558
27/F/5717
27/F/7340
27/F/7291
27/F/5641
27/F/5430
27/F/3561
27/F/5156
27/F/5046
27/F/7341
27/F/5693
27/F/7041
27/F/6335
27/F/6081
27/F/6550

Working in the
estate
uninterruptedly during
last 5 years

Present living
condition(TS/LR)

EWHCS
member
(yes/no)

No of other
family
member
registered
as workers
in the
Estate

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
TS
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR
LR

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

1
1
1
0
0
1
0
1
1
0
0
0
0
0
0
0
1
0
0
0
1
0
0
1
0
0
0
1
2
0
0
2

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

Sex
Name of Beneficiary

Age

M
92.
93.
94.
95.
96.

M.Mageshwaran
K.Mailivganam
V.Vijayakumar
P.Parameshwary
T.Balasubramaniy
am

M
M
M
M

Date of Birth

NIC No.

25
50
33
49
31

08.03.1989
29.12.1963
23.10.1980
06.03.1965
08.08.1983

890682073V
633654603V
802975937V
655663495X
832214728V

Registered
worker

YES
YES
YES
YES
YES

EPF No

27/F/6772
27/F/4218
27/F/6552
27/F/4387
27/F/7142

Working in the
estate
uninterruptedly during
last 5 years

Present living
condition(TS/LR)

EWHCS
member
(yes/no)

No of other
family
member
registered
as workers
in the
Estate

YES
YES
YES
YES
YES

LR
LR
TS
LR
TS

YES
YES
YES
YES
YES

1
1
0
2
0

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

01ST DIVISION DIYAGAMA WEST DAYAGAMA


HOUSING BENEFICIARIES DETAILS
S.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

Name of the Proposed Beneficiary


GURUSAMY KAVITHA
KATHIRVELU MOHANAMBAL
ANTHONIDAS ASLINMARY
NADARAJ NIRMALADEVI
RATHIRAI KALYAM
GOVINDASAMY ARULMANI
ANTHOIAMMAH JOSEPH
CHANDERASEKAR KAVITHAS
S.LOGESWARY
ANGAMUTHU PARAMESWARY
PERUMAL DEVERAJ
MAHENDRAN SUMATHY
PERUMAL MUTHUSAMY
NAGAN SUBRAMANIAM
ARCHANDRAN MAHESWARY
RAMASAMY RAMAKRISHNAN
ANGAMUTHU JEYAKUMAR
PILLAI RAMALINGAM
ANGAMUTHU KATHIRESON
MARITHAI SUBRAMANIAM
ARUMUGAM YOGAKUMAR
RAMAR RAJKUMAR
SUKRIAN MAHAVISHNU
RENGAN KRISHNAVENAN
SUBRAMANIAM SASIKUMAR
SELLADURIA NALINIKANTH
MURUGALINGAM
VELLAYAN RAJU

NIC No.
798194542 V
897454785 V
846444440 V
No NIC
856933261 V
661563320 X
701183991 V
627763264 V
826323582 V
868212594 V
660214259 X
926814182 V
720963551 X
810275391 V
886992553 V
870464232 V
823225342 V
661493690 V
782705113 V
682013532 X
800534682 V
833244388 V
582803846 X
700924947 X
831293624 V
881524457 V
642004174 V
610614473 V

EPF No. (Employment) Status)


536
587
456
173
373
64
125
538
540
547
1154
539
203
284
400
271
288
108
221
92
253
411
1428
124
534
552
81

EWHCS Member
DW/1/536
DW/1/587
DW/1/456
DW/1/173
DW/1/373
DW/1/64
DW/1/125
DW/1/538
DW/1/540
DW/1/547
DW/1/1154
DW/1/539
DW/1/203
DW/1/284
DW/1/400
DW/1/271
DW/1/288
DW/1/108
DW/1/221
DW/1/92
DW/1/253
DW/1/411
DW/1/1428
DW/1/124
DW/1/534
DW/1/552
DW/1/82
DW/1/
Detailed Project Report

Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka
S.No.
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52

Name of the Proposed Beneficiary


KANNAN KALAICHELVAM
RAMACHNDRAN SHANTHY
KATHIRVELU SIVAKUMAR
RAMAIAH MAHALINGAM
SUPPIAH VIJERATNAM
VELUATHAM PUWANESWARY
GANESHAN SARASWATHY
AMMASY THANGAVEL
SIGAMANI INDRAKNATH
THANGAVEL VIJEMALAR
RAJAGOBAL SAKUNTHALA
MOTTAYAN KUMAR
SUBRAMANIAM LINGANAYAGI
GANESHAN SAKUNTHALADEVI
MOTTAYAN JEYALETCHUMY
RAMAJEYAM YOGATHAMANI
SANNASI MOHANRAJ
SINNAIH PUSHPARADHA
SEBASTIAN PUSHPARADHA
SAVIRIAR SOOSAI
KRISHNA KALIMUTHU
MARIMUTHU
LETCHUMY
KALIMUTHU

NIC No.
891292899 V
806363859 X
783392640 V
700924939 X
793624662 V
825703969 V
No NIC
602564240 V
848070951 V
818074328 V
No NIC
790025792 V
807980567 X
875924036 V
706074628 V
868483016 V
853405159 V
845035184 V
748143572 X
691752674 X
743652274 V
523154815 V
743652274 V

EPF No. (Employment) Status)


535
520
256
136
252
1855
1218
113
344
457
1491
413
476
473
199
487
316
419
185
119
217
46
152
217

EWHCS Member
DW/1/535
DW/1/520
DW/1/256
DW/1/136
DW/1/252
DW/1/1855
DW/1/1218
DW/1/113
DW/1/344
DW/1/457
DW/1/1491
DW/1/413
DW/1/476
DW/1/473
DW/1/199
DW/1/487
DW/1/316
DW/1/419
DW/1/185
DW/1/119
DW/1/217
DW/1/46
DW/1/152
DW/1/217

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

02ND DIVISION DIYAGAMA WEST DAYAGAMA


HOUSING BENEFICIARIES DETAILS
S.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Name of the Proposed Beneficiary


MUTHIAH JEYAKUMAR
SUPPIAH RAMASUNDARAM
SANKAR SUBRAMANIAM
K.UDAYASOORIYA
PALANIVEL SAKUNTHALADEVI
SUBRAMANIAM VIJEKUMAR
VEERASAMY MOHANRAJ
VEMBADY MANICKAM
VEMBADY MALAIYANDY
KALIMUTHU SIVABALAN
SUVIKAN VELANGANIYAMMAH
ARUCHUNAN MUTHUKUMAR
SENGOL NANADAN
RAMAN SARASWATHY
PONNIAH RAJKUMAR
SANDANAM FRANCIS
SUBRAMANIAM SELLAMMAH
KANAPATHY KALADEVI
RAMAN PATHMANADAN
RAMADAS VINOTH
SANGAR PUSHPARANI
ANGAMUTHU VIJELETCHUMY
SUBRANMANIAM VIJELETCJUMY
PERIYASAMY SIVAKUMARY
ARUCHUNAN RAVICHANDRAN
RAMASANY VADIVEL
MURUGESU VIJELETCHUMY

N I C No.
622643510 X
780422009 X
831054736 V
931973061 V
887762333 V
861594467 V
701904021 V
731373515 V
673455557 V
WORKER
845144621 V
722213548 X
850795150 V
687312970 X
760734497 V

917572470 V
720894295 X
893082832 V
915995125 V
895834777 V
701054334 V
691074340 X
602963496 X
776683668 V

E P F No (Employment
Status)
1032
2462
2446
2471
2430
1798
2125
1519
2084
2424
2402
2148
2314
2085
2199
2147
2418
2458
2146
2464
2467
2349
2442
1450
2107
2034
2047

EWHCS Member
DW/2/1032
DW/2/2462
DW/2/2446
DW/2/2471
DW/2/2430
DW/2/1798
DW/2/2125
DW/2/1519
DW/2/2084
DW/2/2424
DW/2/2402
DW/2/2148
DW/2/2314
DW/2/2085
DW/2/2199
DW/2/2147
DW/2/2418
DW/2/2458
DW/2/2146
DW/2/2464
DW/2/2467
DW/2/2349
DW/2/2442
DW/2/1450
DW/2/2107
DW/2/2034
DW/2/2047
Detailed Project Report

Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

S.No.
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53

Name of the Proposed Beneficiary


KATHIRESON MOORTHY
M.DEVAGI
T.RAMESHVARAN
P.RADHAKRISHNAN
P.KRISHNAMOORTHY
P.SATHIYAPALAN
R.SUNDARAJ
J.ANTHONYSAMY
REETAMARY
SELVAM.P
P.PUSHPANATHAN
S.CHANDRAMOHAN
S.SELVANATCHI
P.VISHVANTHAN
M.SELLAMMAH
U.RAJESWARY
P.RAMACHANDRAN
S.KRISHNAMANAN
P.UMACHANDRA
P.SIVAKUMAR
M.PARIMALAM
P.PRADEEPAN
V.JEGANATHAN
M.VIJELETCHUMY
P.SELVAM
D.KRISHNAKUMAR

N I C No.
732593896 V
667383424 X
811366030 V
702243556 X
690242970 X
571812215 V
683033260 V
665564606 V
771702830 V
692303075 X
840524299 V
717904508 V
741273152 X
586523181 V
777924230 V
691964329 V
705973091 X
868594217 V
701054334 V
741743779 V
No IC
571835266 V
776683558 V
771702830 X
911564734 V

E P F No (Employment
Status)
1620
1653
2212
2423
2454
2154
571
2104
2061
2436
2181
2318
2122
2164
2225
2447
2119
2187
2417
2116
2224
2334
2028
2455
2436
2448

EWHCS Member
DW/2/1620
DW/2/1653
DW/2/2212
DW/2/2423
DW/2/2454
DW/2/2154
DW/2/571
DW/2/2104
DW/2/2061
DW/2/2436
DW/2/2181
DW/2/2318
DW/2/2122
DW/2/2164
DW/2/2225
DW/2/2447
DW/2/2119
DW/2/2187
DW/2/2417
DW/2/2116
DW/2/2224
DW/2/2334
DW/2/2028
DW/2/2455
DW/2/2436
DW/2/2448

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

03RD DIVISION DIYAGAMA WEST DAYAGAMA


HOUSING BENEFICIARIES DETAILS
S.No.

Name of the Proposed Beneficiary

NIC No.

EPF No. (Employment) Status)

EWHCS Member

S.THANAPAKIYAM

645624062 X

2542

DW/3/2542

G. PACKIYAWATHY

625323851 V

2335

DW/3/2335

J. NICKALES

712111747 X

2890

DW/3/2890

D. YOGARAJ

833243806 V

3280

DW/3/3280

V. VISVANATHAN

690044871 V

2400

DW/3/2400

M. JEYAPRIYA

3423

DW/3/3423

J. KALADEVI

717563140 X

2829

DW/3/2829

R. SUSILA

715113562 X

3101

DW/3/3101

G. SASIKUMAR

803544179 V

2904

DW/3/2904

10

S. K. RAHENDRAN

622214296 X

2751

DW/3/2751

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

04TH DIVISION DIYAGAMA WEST DAYAGAMA


HOUSING BENEFICIARIES DETAILS
S.No.

Name of the Proposed Beneficiary

S. RAGUNATHAN

L. GOBINATH

NIC No.

EPF No. (Employment) Status)

EWHCS Member

1876

DW/4/1846

880063162 V

1871

DW/4/1871

G. CHNADRAKUMARY

877934128 V

1938

DW/4/1938

P. MAHALINGAM

721993841 V

1288

DW/4/1288

M. LAWENDRASELVAM

831092018V

1622

DW/4/1622

R. NAGAMMAH

1815

DW/4/1815

K. SELVAKUMARY

1768

DW/4/1768

N. JANAGARAJ

1899

DW/4/1899

R. RAJESWARY

1898

DW/4/1898

10

S. SHANTHY

1814

DW/4/1814

890714404 V

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

05TH DIVISION DIYAGAMA WEST DAYAGAMA


HOUSING BENEFICIARIES DETAILS
S.No.

Name of the Proposed Beneficiary

NIC No.

EPF No. (Employment) Status)

EWHCS Member

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

R. MAHONARAN
E. PANDURENGAN
S. YOESWARAN
D. M. RANJAN
K. RAVI
R. ASOCKUMAR
S. SABAPATHY
A. THILAGAWATHY
K. SUBRAMANIAM
D. M. SHANTHAMANHULA
R. SUBRAMANIAM
D. NADARAJ
A. PRAGALATHAN
R. VIGNESWARAN
S. CHANDRASEGAR
A. KALIAMMAH
E. ELANGESON
R. SHANTHAKUMARY
B. INDRAKUMAR
V. PUSHPARAJ
R.BALASUBRAMANIAM
M. MARIMUTHU
K. SOUNDARAJAN
K. SINGARAJ
K. KUMARAVEL

692643887 X
712463538 X
731422826 X
732463607
820303857
662573345
631074634 V
846771204 V
823305672 V
841234596 V
763224635 V
701664035 X
730223153 V
850095264 V
840974669 V
715373246 X
830675396 V
756954091 V
840831272 V
801774717 V
702517193 X
853484733 V
901222282 V
612743789 X
833021834 X

1463
1957
1985
1528
1762
1350
965
1983
1742
1926
1669
1612
1575
1818
1928
1458
1940
1828
1768
1986
1455
1817
1974
935
1739

DW/5/1463
DW/5/1957
DW/5/1985
DW/5/1528
DW/5/1762
DW/5/1350
DW/5/965
DW/5/1983
DW/5/1742
DW/5/1926
DW/5/1669
DW/5/1612
DW/5/1575
DW/5/1818
DW/5/1928
DW/5/1458
DW/5/1940
DW/5/1828
DW/5/1768
DW/5/1986
DW/5/1455
DW/5/1817
DW/5/1974
DW/5/935
DW/5/1739

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

BONGWANA DIVISION HOUSING BENEFICIARIES DETAILS

S/No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Name of the
beneficiary/House
Owner
Solatchy
Thirumaran
Subramaniyam
Kamalam
Muthukumar
Vijaya
Pushpavalli
Suresh
Jeyapragash
Manivannan
Pushbaraj
Thamil Selvi
Sathiyamoorthy
Loganathan
Yogeaswary
Rajeswary
Athiletchumy
Appadurai
Lalitha
Paramanathan
Kavitha
Jemila umma
Amirthalingamma
Savithri
Kanagalingam
Karunagaran
Vijayan
Sivaji Ganeshan
Kartbagaraj
Kalimuthu

ID No.

588073750X
801494641V
643353008V
635383771X
911821761V
705201293V
748274910V
802983808V
873373997V
682332921V
720662043X
Nil
773004595X
732231439X
786834635V
635111356X
85538400V
601142732V
715852667V
761862790V
875391690V
796474130V
656644206V
706544194V
801033545V
811473855V
902461965V
683324256X
743533798V
610222579X

Male/
Female
F
M
M
F
M
M
F
M
M
M
M
F
M
F
F
F
M
F
M
F
F
F
F
M
M
M
M
M
M

DD/MM/YY
(D.O.B.)

Age

02.11.1958
28.05.1980
13.11.1964
07.02.1963

57
35
51
52

20.01.1970

45
41
35
28
47
43
41
38
42
37
52
30
55
44
39
28
36
50
45
35
34
25
47
41
54

24.10.1980
02.12.1987
20.08.1968
06.03.1972
26.07.1974
26.10.1977
10.09.1973
01.06.1978
11.01.1963
07.02.1985
23.04.1960
25.03.1971
04.07.1976
08.02.1987
26.05.1979
12.06.1965
02.06.1970
12.04.1980
23.06.1981
02.09.1990
27.11.1968
18.12.1974
22.01.1961

Registered
Worker
YES/NO

No.
Years
Service

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

40
13
32
16
17
18
7
32
27
20
13
25
7
33
7
38
18
8
6
7
33
28
4
17
8
31
23
21

E.P.F
No.

E.W.H.C
S. No.

Present living
Place Line
house/Temp.
Sheds etc.

1891
2771
2221
2671
2995
2654
2981
2580
2937
2218
2346
2536
2754
2382
2938
2201
2944
1991
2574
2920
2955
2946
2471
2313
2970
2628
2930
2238
2439
2486

A-20
A-424
A-58
A-382
2995
A-374
A-387
A-335
A-521
A-30
A-49
A-311
A-474
A-51
A-388
A-189
A-389
A-135
A-332
A-524
A-555
A-457
A-07
A-220
A-390
A-361
A-391
A-201
A-271
A-258

L/Room
L/Room
L/Room
L/Room
L/Room
T/Shed
L/Room
L/Room
T/Shed
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
T/Shed
L/Room
L/Room
L/Room
L/Room
L/Room
T/Shed
L/Room
L/Room
L/Room

No. of
other
family
members,
including
beneficiary
1
1
1
1
2
2
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Children
Age
Below
18 yrs

Whether
Effected by
disaster;
landslide,
burned
house

0
3
0
1
0
0
2
2
6
0
3
3
0
3
2
0
1
0
1
1
2
3
0
0
2
3
0
1
3
0

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

S/No

31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63

Name of the
beneficiary/House
Owner
Selvaraj
Shanmugalingam
Punithawathy
Indrananthan
Rajaletchumy
Kalimuthu
Dharshini
Kamaladhasan
Kaliswary
Mahaletchumy
Maheswary
Nageeran
Pasubathy
Perumal
Sivakumar
Ratha
Maheaswary
Ashokumar
Sivalingam
Kanagaraj
Shanmugaraj
Sorubarany
Manivannan
Wijayakumar
Thiruchelvam
Karunagaran
Nagajothiy
Logaraj
M.Letchumy
P.Thanaletchumy
R.Kogillavanine
E.Balakrishan
R.ramakrishan

ID No.

663431323V
723510732X
750621678V
750621678V
655623892V
650902955X
816154600V
852251700V
848405361V
875452754V
768381526X
811153451V
681583696X
572161900V
791984999V
638272000V
785554728V
672993555V
700522857X
812995898V
842894867V
725484232X
822561829V
752483981V
770693780V
842930758V
821462927V
803151881X
848491203V
825463780V
Nil
752130507X
863531750V

Male/
Female
M
M
F
M
M
F
M
F
F
F
M
F
M
M
F
M
M
M
M
F
M
F
M
M
F
M
M
F
F
M
M

DD/MM/YY
(D.O.B.)

Age

08.11.1966
16.12.1972
09.03.1966
02.03.1975
02.06.1965
03.03.1965
26.04.1981
12.08.1985
05.12.1984
14.02.1987
03.12.1976
04.04.1981
06.06.1968
03.09.1957
16.07.1979
22.11.1963
24.02.1978
25.10.1967
25.04.1970
25.09.1981
18.05.1984
17.02.1972
12.09.1982
04.09.1975
09.03.1977
19.08.1984
02.01.1984
18.01.1981
24.12.1984
15.02.1982
06.04.1981
31.07.1975
18.12.1986

49
43
40
40
50
50
34
30
30
31
39
34
47
58
36
52
37
48
45
34
31
43
33
40
37
31
30
34
30
33
34
40
29

Registered
Worker
YES/NO

No.
Years
Service

E.P.F
No.

E.W.H.C
S. No.

Present living
Place Line
house/Temp.
Sheds etc.

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

10
25
17
10
22
35
10
7
9
8
13
15
28
38
10
37
19
6
10
10
8
23
15
23
20
13
8
13
4
17
10
8
4

2839
2393
2613
2850
2538
2145
2848
2939
2881
2888
2784
2701
2331
1949
2851
2072
2562
2954
2858
2843
2923
2446
2702
2440
2518
2772
2894
2752
2975
2637
2849
2907
2969

A-302
A-52
A-350
A-514
A-313
A-34
A-507
A-421
A-515
A-509
A-483
A-369
A-231
A123
A-324
A-157
A-326
A-537
A-536
A-358
A-541
A-275
A-397
A-272
A-299
A-479
A-553
A-419
A-549
A-368
A-542
A-526
A-392

L/Room
T/Shed
L/Room
L/Room
T/Shed
L/Room
L/Room
T/Shed
T/Shed
T/Shed
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
T/Shed
L/Room
T/Shed
L/Room
L/Room
L/Room
L/Room
T/Shed
T/Shed
L/Room
T/Shed
T/Shed
T/Shed
T/Shed
T/Shed

No. of
other
family
members,
including
beneficiary
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Children
Age
Below
18 yrs
2
1
3
2
2
0
3
2
3
1
4
3
3
2
1
0
2
3
0
3
1
1
2
3
4
2
3
2
0
3
2
0
1

Whether
Effected by
disaster;
landslide,
burned
house

Distaster
Distaster

Distaster

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

S/No

64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96

Name of the
beneficiary/House
Owner
P.Sivakumar
Kamalanathan
Seethaletchumy
Selvaraj
Kanthimathy
Anjalinmery
Ambigawathy
Jesudas
Yogaletchumy
Chandrabal
Yogeswary
Patamaraj
Tharmabalan
S.kalaichelvan
Seetha
Valliammah
R.Kanagachandra
V.Thambiraj
M.Sivaganam
Mhindan
R.Ravikumar
N.Balasundram
Mangaleaswary
Ranie
Maheaswary
Pushparaj
Jeganathan
Muthusamy
Annaletchumy
Saraswathiy
Rameshwary
Malarselvie
Deavadas

ID No.

761043315X
9010214158V
735734261V
770324610V
886461402V
646223890V
566852497X
773585237V
725084331X
792931880V
696972915X
781941719V
841454804V
803102333V
636502731X
796954620V
810764120V
802845375X
720663090V
92162697C.0
861043258V
710712756X
787614647V
607442096X
628222860X
782432826V
782915347V
662263273X
726273866V
777453360X
Nil
Nil
702142652X

Male/
Female
M
M
F
M
F
F
F
M
F
M
F
M
M
M
M
M
M
M
M
M
M
F
F
F
M
M
M
F
F
F
F
M

DD/MM/YY
(D.O.B.)
13.04.1976
30.04.1990
30.05.1973
01.02.1977
05.06.1988
01.05.1964
03.06.1956
23.12.1977
08.01.1982
26.01.1979
15.07.1969
12.07.1978
27.05.1984
08.05.1980
29.05.1963
24.05.1970
16.03.1981
19.10.1980
06.03.1972
03.09.1989
13.04.1986
21.05.1971
17.09.1978
31.09.1960
17.11.1962
30.09.1979
17.10.1978
13.08.1966
25.06.1972
01.09.1977
04.01.1984
20.09.1977
01.08.1970

Age

25
37
38
27
51
59
38
43
36
46
37
31
35
52
35
34
35
43
26
29
44
37
55
53
36
37
39
43
38
31
38
45

Registered
Worker
YES/NO

No.
Years
Service

E.P.F
No.

E.W.H.C
S. No.

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

20
8
20
18
11
38
33
20
22
8
27
17
15
16
36
8
8
10
18
9
13
25
13
38
35
16
18
31
16
17
15
17
28

2515
2928
2506
2578
2815
2362
2181
2527
2456
2924
2236
2631
2705
2646
2108
2899
2902
2855
2592
2880
2770
2384
2759
1953
2399
2595
2577
2292
2669
2610
2724
2618
2333

A-393
A-545
A-295
A-334
A-495
A-243
A-185
A-394
A-279
A-395
A-199
A-364
A-399
A-372
A-162
A-396
A-554
A-552
A-341
A-469
A-423
A-251
A-420
A-124
A-252
A-397
A-333
A-57
A-381
A-348
A-406
A-353
A-46

Present living
Place Line
house/Temp.
Sheds etc.
L/Room
T/Shed
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
T/Shed
T/Shed
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
T/Shed
L/Room
T/Shed
T/Shed
T/Shed
T/Shed
T/Shed

No. of
other
family
members,
including
beneficiary
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Children
Age
Below
18 yrs
2
1
2
2
3
0
0
2
1
2
0
2
2
3
0
3
3
3
3
0
4
3
2
0
0
3
3
1
5
3
2
2
3

Whether
Effected by
disaster;
landslide,
burned
house

Distaster

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

S/No

97
98
99

Name of the
beneficiary/House
Owner
Sundaram
Kumar
Sivaligam

ID No.

Male/
Female

732041150V
721391655X
630353734V

M
M
F

DD/MM/YY
(D.O.B.)

Age

22.07.1973
18.05.1972
04.02.1963

42
43
52

Registered
Worker
YES/NO

No.
Years
Service

E.P.F
No.

E.W.H.C
S. No.

YES
YES
YES

10
27
37

2863
2348
2066

A-248
A-398
A-399

Present living
Place Line
house/Temp.
Sheds etc.
T/Shed
L/Room

No. of
other
family
members,
including
beneficiary
1
1

Children
Age
Below
18 yrs

Whether
Effected by
disaster;
landslide,
burned
house

1
2
1

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

BRIDVIL DIVISION HOUSING BENEFICIARIES DETAILS


S/No

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

Name of the
beneficiary/House
Owner
Raju
R.Suweetha
P.Wijeyakumry
A.Chandraseagaran
S.Malanie
S.Vasanthiy
R.Nadaraj
M.Ramachandran
P.Anandababu
D.Rajendran
P.Rajendran
S.Kamaladeavie
M.Subeathabebe
F.Arulmary
K.Suthagaran
S.Pakkiaraj
S.Krishnamoorthiy
K.Lineaswaran
M.Wijeyaraj
S.Balakumar
P.Selvakumar
R.Navarajah
Rajeaswary
Manjula
R.Illangeaswary
S.Kamalprasath
S.Renukadeavie
V.Meenammah
S.Saravanan
P.Manivannan
M.Muniannah
K.Selvaraj
D.Vimala
D.Yogeaswary
S.Saraswathiy
S.Sathiyavanie
S.Sooriyabraba
Pushparanie
S.Loganathan
S.Malarchelvan

ID No.

Male/
Female

DD/MM/YY(Date of
Birth)

673165125V
Nil
798341820x
770183898x
Nil
826044241
612582726
630433878
860764911
680024065
Nil
84721380
748451609
675494207
802894945
861083896
852254637
790915364
800184118
800634997
761943936
850184976
638041758
758205991
665433870
873044322
815884825v
605503071
703284205
835663007
Nil
750964451X
858280176V
805244224V
735940627X
777053043V
796953063X
626662331X
773294437V
803075468V

M
F
F
M
F
F
M
M
M
M
M
F
F
F
M
M
M
M
M
M
M
M
M
F
F
M
F
F
M
M
F
M
F
F
F
F
F
F
M
M

11.11.1967
04.051983
01.06.1979
18.01.1977
23.05.1988
13.04.1982
14.05.1961
16.05.1963
16.03.1986
22.01.1968
12.04.1984
07.08.1984
10.12.1974
18.02.1967
15.10.1980
17.04.1986
12.08.1985
31.03.1979
18.01.1980
03.03.1980
12.07.1976
17.01.1985
30.10.1963
01.05.1975
09.10.1966
30.10.1987
28.03.1981
19.02.1960
23.11.1970
17.06.1983
27.09.1960
05.04.1975
23.11.1985
24.01.1983
03.04.1973
23.07.1977
13.07.1979
14.06.1962
24.11.1977
12.02.1982

Age(Yr)

46
30
34
36
25
31
52
50
27
45
29
29
39
46
33
26
28
33
33
37
28
50
40
49
28
34
55
35
32
55
40
30
32
42
37
36
53
38
35

Registered
Worker
YES/NO

No.
Years
Service

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

29
9
16
19
8
8
38
36
11
31
13
7
18
7
15
10
6
7
15
19
6
13
37
10
22
11
13
12
28
15
16
13
13
11
9
5
8
15
20
7

E.P.F
No.
1359
1919
1697
1603
1946
1936
1034
1145
1868
1310
1801
1972
1647
1978
1741
1897
1992
1666
1740
1609
1988
1796
1088
1890
1552
1871
1804
1847
1391
1768
1709
1506
1807
1852
1916
1998
1959
1788
1582
1970

E.W.H.C
S. No.
B-238
B-347
B-309
B-18
B-284
B-271
B-82
B-240
B-276
B-111
B-299
B-304
B-180
B-305
B-255
B-340
B-291
B-295
B-204
B-326
B-342
B-221
B-36
B-287
B-159
B-253
B-223
B-374
B-124
B-337
B-197
B-31
B-316
B-370
B-376
B-326
B-325
B-216
B-165
B-303

Present living
Place Line
house/Temp.
Sheds etc.
1/2L/Room
T/Shed
T/Shed
T/Shed
T/Shed
L/Room
L/Room
1/2L/Room
L/Room
T/Shed
L/Room
T/Shed
L/Room
T/Shed
L/Room
L/Room
T/Shed
L/Room
L/Room
T/Shed
House Other
L/Room
L/Room
T/Shed
L/Room
L/Room
L/Room
L/Room
L/Room
T/Shed
T/Shed
L/Room
T/Shed
T/Shed
T/Shed
T/Shed
T/Shed
T/Shed
L/Room

No. of other
family
members,
including
beneficiary

Children
Age
Below
18 yrs.

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

2
3
4
3
1
3
0
0
0
2
2
3
0
0
2
2
2
1
0
3
2
2
1
3
2
0
2
0
2
2
0
2
2
3
1
2
2
3
3
2

Whether
Effected by
disaster;
landslide,
burned
house

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

S/No

41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83

Name of the
beneficiary/House
Owner
R.Thilagavathiy
S.Murugan
M.Joshap
N.Imanuval
Pannirselvi
Vellaiammah
Valliammah
Rathika
Sinnammah
Sivalumar
Rajeswary
P.Mariaie
Athiletchumy
S.Kamatchu
A.Valliammah
Jesintha
Devi
Sundaraj
Thiresammah
Joshn
Puwaneswary
Lathayani
Parameswary
Alocias
S.Sundarakumar
Sritharan
Karunagaran
S.Vijaykumar
Vallianayagie
Paruvathiy
Selvakumary
Krishnakumary
Premaratna
Ummunabilla
P.Yoganathan
Pushpavallie
Kalaichelvan
Perumal
Sasikala
R.Sarawanakumar
V.Valliammah
Rajeswary
Kalaiselvy

ID No.

647332501X
702432715X
720161354X
596453204X
656453204X
805772040X
Nil
Nil
592582456V
840663388V
586962086X
766673715X
616774352V
746983409V
777064240V
795642838X
785964829V
840403157X
602522555X
615864030X
876192934V
655143041V
783203925X
Nil

851902570V
675353140X
688654785V

832455474V
586032909V
823013230V
819337854V
862273231V
678514233V
726552177X

Male/
Female
F
M
M
M

F
F
F
M
F
F
F
F
F
F
F
M
F
M
F
F
F
M
M
M
M
M
F
F
F
F
M
F
M
F
M
M
F
M
F
F
F

DD/MM/YY(Date of
Birth)

Age(Yr)

16.05.1964
30.08.1970
16.01.1972
11.05.1959
20.05.1965
01.04.1980
16.05.1968
22.02.1984
07.04.1956
03.3.1984
14.07.1958
07.05.1976
25.06.1961
16.07.1974
24.07.1977
04.03.1979
05.04.1978
09.02.1984

51
45
43
56
50
35
47
31
56
31
57
39
54
41
38
36
37
31

09.05.1960
14.05.1961
28.07.1987
01.05.1965
15.11.1978
14.09.1982

55
54
28
50
37
33

08.07.1985
04.02.1967
30.12.1968

30
48
47

04.10.1985
01.09.1983
12.04.1958
27.10.1982
15.01.1981

30
32
57
33
34

02.06.1986
15.05.1967

29
48

03.06.1972

43

Registered
Worker
YES/NO

No.
Years
Service

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

40
27
27
36
26
16
32
8
40
15
7
27
34
11
9
9
15
13

1466
1414
1415
1124
1433
1721
1290
1956
1539
1745
1982
1672
1251
1873
1917
1980
1731
1793

38
34
8
36
9
15
2
2
6
6
32
3
3
2
8
15
40
13
15
2
6
33
3
15

1003
1249
1945
1158
1924
1780
3001
2027
1995
1985
1283
1849
1973
2030
1935
1769
918
1781
1752
2012
1996
1327

E.P.F
No.

1773

E.W.H.C
S. No.
B-373
B-22
B-329
B-91
C-130
B-287
B-107
B-322
B-288
B-289
B-300
B-46
B-102
B-290
B-323
B-291
B-297
B-219
B-282
A-77
B-101
B-283
B-93
B-364
B-211
B-293
B-294
B-319
B-295
B-105
B-300
B-349
B-296
B-270
B-209
B-297
B-212
B-298
B-299
B-364
B-115
B-299
B-300

Present living
Place Line
house/Temp.
Sheds etc.

No. of other
family
members,
including
beneficiary

Children
Age
Below
18 yrs.

T/Shed
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
L/Room
T/Shed
T/Shed
L/Room
L/Room
L/ROOM
L/ROOM
L/ROOM
L/ROOM
T/SHED
T/SHED
L/ROOM
L/ROOM
L/ROOM

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

0
2
3
2
0
2
0
3
0
2
3
2
0
3
1
2
3
2
3
2
3
2
3
1
2
3
2
2
3
3
1
2
2
3
3
2
3
2
1
2
3
3
2

Whether
Effected by
disaster;
landslide,
burned
house

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

S/No

84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126

Name of the
beneficiary/House
Owner
S.Velliammah
Pappathiy
Adammash
Kanna
Valliyammah
Srelvarai
Ragumath be be
Majitha ummah
Balasaraswathiy
Deavaraj
Logeaswary
Pushpamalar
Chandrakumary
Subashinie
Sathiya
Shanthiy
Thiresammah
Marimuthu
Saraswathiy
Jeyashangar
Sivamalar
Chithrakala
Annapooaranam
Rajanikanth
Saravanakumr
Jothival
Richard
Wijendran
Karunagaran
Kobigaprasath
Robrtson
Sandisfernando
Rukkumoney
Thamilchelvan
Selvaranie
Preamakala
Nageandran
Vasanthakumry
Marimuthu
Muniandy
Mookkaie
Pannearselvie
Baskar

ID No.

666963644X
660544267V
NIL
726563772V
724838714V
783074869V
NIL
918167944V
826484322V
NIL
786192790V
657451363V
627431853X
601693011X
705640572X
NIL
895703281V
598213062V
781134325V
N/M
751813880V

722604531V
Cash

Male/
Female
F
F
M
M
F
F
F
F
F
M
F
F
F
F
F
F
F
M
F
M
F
F
F
M
M
M
M
M
M
M
M
M
F

681162496X

816794480V
601693011X
630364612X
797655260V
656453204X

F
F
M
F
M
M
F
F
M

DD/MM/YY(Date of
Birth)

Age(Yr)

14.07.1966

49

23
23.02.1966
14.05.1962

49
53

04.06.1972

43

15.11.1972
02.11.1969
10.12.1985
05.06.1990
01.05.1982
06.03.1989
31.05.1978
01.09.1965
15.05.1962
17.06.1960
23.05.1970
22.07.1982
10.03.1989

43
36
30
25
33
26
37
50
53
55
45
33
26

16.11.1959

55

22.04.1978

37

29.06.1975

40

16.10.1976

39

25.04.1968

47

02.06.1981
17.06.1960
05.02.1963
21.02.1979
20.05.1965
1965

34
55
52
36
50

Registered
Worker
YES/NO

No.
Years
Service

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

7
10
13
34
14
13
15
7
17
19
9
8
8
8
8
35
38
38
13
15
7
2
11
16
10
2
10
5
2
2
19
2
2
10
3
4
2
8
38
17
19
17
5

E.P.F
No.
1966
1785
1244
1857
1488
1456
2019
1420
1601
1920
1944
1932
1933
1652
1325
1022
1518
1515
1754
1964
2033
1879
1883
1996
2028
1884
2025
2027
2032
1607
9063
2024
1902
2018
2033
2022
1954
1518
1681
1615
1433
1862

E.W.H.C
S. No.
B-339
B-214
B-100
B-301
B-302
B-303
B-304
B-305
B-128
B-169
B-275
B-282
B-265
B-266
B-181
B-344
B-13
B-306
B-314
B-315
B-316
B-317
B-318
B-319
B-320
B-321
B-322
B-323
B-324
B-325
B-326
B-327
B-328
B-329
B-340
B-341
B-342
B-343
B-344
B-345
B-346
B-347

Present living
Place Line
house/Temp.
Sheds etc.

No. of other
family
members,
including
beneficiary

Children
Age
Below
18 yrs.

L/ROOM
L/ROOM
L/ROOM
L/ROOM
L/ROOM
L/ROOM
L/ROOM
T/SHED
L/ROOM
L/ROOM
L/ROOM
L/ROOM
L/ROOM
L/ROOM
L/ROOM
L/ROOM
L/ROOM
L/ROOM
L/ROOM
L/ROOM
L/ROOM
L/ROOM
L/ROOM
T/SHED
L/ROOM
T/SHED
L/ROOM
L/ROOM
L/ROOM
L/ROOM
L/ROOM
L/ROOM
T/SHED
L/ROOM
L/ROOM
T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
L/ROOM
T/SHED

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

3
2
3
2
2
3
0
2
0
3
3
2
3
2
3
2
3
2
3
2
2
1
0
3
2
3
2
0
3
2
2
3
0
3
0
2
0
3
2
3
2
3
2

Whether
Effected by
disaster;
landslide,
burned
house

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

S/No

127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154

Name of the
beneficiary/House
Owner
Palaniandy
Parameash
Kanagaraj
Kamalavasan
Sandanakumar
Arason
Pathmavathiy
Alguraju
Kaliappan
Seethaletchumy
Visvanathan
Dharumalingam
Karthigaraj
Anistella
Gleansmary
Parimalakanthiy
Wijeyakumar
Shanmugaraj
Srideavie
Sasikala
Ganamary
Sivaganam
Ameenabebe
Chandraseagaran
Pushpavallie
Ganaseager
Lilly
Sethaletchumy

ID No.

700063968X
706781684V
693423155X
822933785V
762584689V
670875032V
618592021X
690923343V
752654018V
688602871X

717413743X
826804904V
736383802V
667813883V
722720903X
673093442X
785964829V
856025268V
736383802V
552800080X
616143239X
6514411080V
782064495V
705153825V
658134377V

Male/
Female
M
F
M
M
M
M
F
M
M
F
M
M
M
F
F
F
M
M
F
F
F
M
F
M
F
M
F
F

DD/MM/YY(Date of
Birth)

Age(Yr)

06.01.1970
14.09.1984
07.02.1969
15.01.1981
13.09.1976
23.07.1967
24.12.1961
01.04.1969
21.10.1975
25.12.1968

45
36
46

28.09.1971
09.06.1982
11.05.1973
07.12.1966
28.09.1972
04.11.1967
05.04.1978
01.05.1985
11.05.1973
08.05.1955
14.05.1961
10.02.1965

44
33
42
49
43
48
37
30
42
60
54
50

23.07.1978
15.01.1970
1970

37
45
50

39
48
54
46
40
47

Registered
Worker
YES/NO

No.
Years
Service

E.P.F
No.

YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES
YES

17
15
28
15
19
29
29
10
13
18
15
13
17
16
17
12
25
32
13
12
15
16
19
25
18
19
11
23

1668
1323
1399
1749
1606
1357
1440
1887
1509
1614
1889
2020
1411
1713
1422
1557
1454
1285
1831
1841
1443
1700
1594
1164
1344
1626
1865
1553

E.W.H.C
S. No.
B-348
B-349
B-350
B-351
B-352
B-353
B-354
B-355
B-356
B-357
B-358
B-359
B-360
B-361
B-362
B-363
B-364
B-365
B-366
B-367
B-368
B-369
B-370
B-371
B-372
B-373
B-374
B-375

Present living
Place Line
house/Temp.
Sheds etc.

No. of other
family
members,
including
beneficiary

Children
Age
Below
18 yrs.

T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
T/SHED
L/ROOM
L/ROOM
L/ROOM
L/ROOM

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

2
3
0
0
0
3
2
0
3
0
2
3
2
1
2
3
0
3
2
1
2
3
2
3
0
3
2
2

Whether
Effected by
disaster;
landslide,
burned
house

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

LEDGERWATTE DIVISION- HOUSING BENEFICIARIES DETAILS


S.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

Name of the Beneficiary/ House Owner


M.SARASWATHY
S.AROGANAM
K.MANIRAJ
Y.D.MARGRET
N.SELVARAJ
L.SAVITHIRI
S.VENGADASALAM
S.NADARAJ
S.SIVAKUMAR
S.MATHURABANDIYAN
K.SAMAJOTHY
S.SHANMUGARAJAH
M.SHARMILA
R.NAWARATNARAJAH
S.NIRMALA
S.CHITRADEVI
M.SATHIYAVANI
K.MOORTHYRAJAH
V.YOGANAYAGI
S.PUSPARAJAH
K.JANAKI
BARATHY
S.SIVAKUMAR
K.WIJELETCHUMY
K.RAMAKRISHNAN
NAWAMANY
V.WIGNESWARAN
V.MURUGAIAH
K.ANPARASAN

NIC No.
706154361 V
655372800 V
851123814 V
688052789 V
672633303 V
836214676 V
850612609 V
781904929 V
880603221 V
713534242 X
630756062 V
LW 020158
875342720 V
752833303 V
888063773 V
706264655 V
875882805 V
751484097 V
625074975 V
592954257 V
LW 020153
708240842 V
822523080 V
786844959 V
673133738 X
631034772 V
821834147 V
671274164 X
751294166 V

Male/Female
Female
Female
Male
Female
Male
Female
Male
Male
Male
Male
Male
Male
Female
Male
Female
Female
Female
Male
Female
Male
Female
Female
Male
Female
Male
Male
Male
Male
Male
Detailed Project Report

Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka
S.No.
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60

Name of the Beneficiary/ House Owner


S.KARUPPAIE
K.PUWANESWARY
M.CHANDRAKANTHY
K.VANITHAKUMARY
A.VICTORIYA
V.SATHAKUMARY
M.GNANASOUNDARY
S.KALAICHELVAM
K.SATHIYADEVI
S.RANJANIDEVI
T.SAROJANI
P.PATHMANATHAN
S.LOGESWARAN
V.SUNDARY
K.SAROJADEVI
V.KALAIKUMAR
S.CHANDRAKANTHY
B.SASIKUMAR
A.PARWATHY
P.THIYAGARAJAH
N.PATKUNAM
T.SUBRAMANIAM
M.YOGARANEE
K.VASUDEVAN
R.SIVAKUMAR
K.RAJARATNAM
R.PRADEEPKUMAR
K.KAMALAM
R.MAHENDRAN
S.SELVARAJAH
R.SATHTHY

NIC No.
768243972 V
606364440 V
748074708 V
723414059 X
865261730 V
716962857 V
878624432 V
753493883 V
835955524 V
776754579 V
877203328 V
782194046 V
773134634 V
725204809 V
726114595 V
862054016 V
666633903 V
820473868 V
636364460 X
721873854 V
640914378 V
823033125 V
735203983 X
783483149 X
762804646 V
742263398 V
863032555 V
646685339 V
703383921 V
891603924 V
777373820 V

Male/Female
Female
Female
Female
Female
Female
Female
Female
Male
Female
Female
Female
Male
Male
Female
Female
Male
Female
Male
Female
Male
Male
Male
Female
Male
Male
Male
Male
Female
Male
Male
Female
Detailed Project Report

Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka
S.No.
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75

Name of the Beneficiary/ House Owner


R.WIGNESHWARAN
A.CHITRADEVI
D.SHANTHAKUMARY
P.SIRIDHAR
M.RASAIAH
S.VALLIAMMAH
S.RACKAMMAH
M.RAJALETCHUMY
K.KALAICHELVI
G.AKILESHWARAN
GAMINI SENERATH PRERA
R.SIVAJOTHY
K.MALLIKA
R.KARUPPIAH
M.GNANAMANIVASAGAM

NIC No.
790964195 X
826864230 V
688254922 V
740882201 X
722563921 V
675344590 V
636154539 V
775345586 V
847645210 V
772944780 V
672801079 V
845873755 V
705383669 V
602173488 V
632794240 V

Male/Female
Male
Female
Female
Male
Male
Female
Female
Female
Female
Male
Male
Female
Female
Male
Male

Detailed Project Report


Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

NARANGALA DIVISION HOUSING BENEFICIARIES DETAILS


S.No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28

Name of the Beneficiary/ House Owner


S.GANESAN
K.UDAYAKUMAR
S.YASOTHARAJ
M.BALAIAH
H.V.SRAMALATHA
A.RAVICHANDRAN
R.SUNDARARAJ
P.RAMANI
P.JAYANTHY
D.JESUDASAN
S.SIVACHITHRA
D.ROSALIN
K.M.KAMALAWATHY
R.M.JAYASUNDARA
R.D.ANULAWATHY
S.PUSHPALEELA
N.CHANDRA
S.THIRUCHELVAM
L.SATKUNAVALLEY
R.D.SEELAWATHY
K.D.MERY
G.H.PODINONA
T.KANAGARAJ
T.TAMILSELVI
S.TAMILSELVAM
R.M.GUNAPALA
T.VIJAYA
R.M.KARUNARATNE

NIC No.

Male/Female
610224512 V
640254866 V
820776100 V
610264190 V
756143360 V
700043746 X
602663655 X
676433309 V
745063276 V
600944088 V
758444180 V
717303580 V
667381479 V
613515305 V
687252659 V
636713309 V
727894330 V
651213215 V
867653538 V
698241497 V
685934361 V
596432859 V
640803665 V
856225321 V
730154259 X
621800990 V
756673653 V
730502761 V

Male
Male
Male
Male
Female
Male
Male
Female
Female
Male
Female
Female
Female
Male
Female
Female
Female
Male
Female
Female
Female
Female
Male
Female
Male
Male
Female
Male
Detailed Project Report

Meeting Societys Needs Globally

PMC for Sri Lanka Housing Project- Construction of 4,000 Low Cost Housing Units in Central and UVA Provinces in Sri Lanka

S.No.
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50

Name of the Beneficiary/ House Owner


L.V.R.THILAKARATNE
M.NAGADEVI
R.L.PABALAWATHY
K.D.KARUNAWATHY
R.D.KARUNAWATHY
R.M.GUNASEKARA
R.M.N.RATNAYAKE
R.M.KARUNARATNE
R.M.SUDUBANDA
R.M.RATNAYAKE
T.MEGALA
G.A.GNANAWATHY
R.D.WIJERATNE
R.D.MARTIN
R.D.SOMAWATHY
R.D.SUMANAWATHY
H.V.S.PREMAWATHY
M.RAVICHANDARN
S.MARUTHAMUTHU
R.SELVANAYAGAM
S.THIRUGNANAMOORTHY
D.MANIVANNAN

NIC No.

Male/Female
730112556 V
626493882 V
625483003 V
685965437 V
655563466 V
602830861 V
723284309 V
651331820 V
60353313 V
650380592 V
745230997 X
79697150 V
702681880 V
651263378 V
677251654 V
697400364 V
735592416 V
770181410 X
752302774 X
590243779 V
603024346 V
700383830 X

Male
Female
Female
Female
Female
Male
Male
Male
Male
Male
Female
Female
Male
Male
Female
Female
Female
Male
Male
Male
Male
Male

Detailed Project Report


Meeting Societys Needs Globally

NBRO REPORT
ANNEX- II

You might also like