Professional Documents
Culture Documents
R1
06.02.15
R0
02.02.15
Rev
Date
For Approval
Er. Ramesh
Description
Prepared By
DSR Item
no.
DESCRIPTION
2
4
5
EARTH WORK
CONCRETE WORK
REINFORCED CEMENT CONCRETE
220942.25
327889.45
8960384.10
FINISHING
1
2
3
4
5
6
7
8
9
10
10
6
7
8
9
10
11
12
13
21
22
23
BRICK WORK
STONE WORK
MARBLE WORK
WOOD WORK & PVC WORK
STEEL WORK
FLOORING
ROOFING
FINISHING
ALUMINIUM WORK
WATER PROOFING
HORTICULTURE & LANDSCAPING WORK
TOTAL (A)
2155990.50
659257.60
80277.25
279070.00
566799.60
1273033.21
330651.25
1717827.60
540924.70
726478.10
185884.57
18025410.19
146658.11
1678300.42
10756.04
270720.00
TOTAL (B)
2106434.57
Total A + B
20131844.76
Say
201.32 Lacs
Area of Building
767.00 Sqm
26247.52
2439.36
Total Reinforcement
Per Sqm
Per Sqft
60956.00 Kg
79.50 Kg/Sqm
7.40 Kg/Sqft
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
DSR.Rf.No
Description
Quantity
Unit
Rate
280.00
0.00
Cum
155.60
820.00
0.00
0.00
0.00
71.00
0.00
Cum
112.40
Cum
46.25
90.00
0.00
0.00
0.00
Cum
910.25
###
Amount (Rs.)
EARTH WORK
1.01
2.6
a)
2.6.1
1.02
2.25
1.03
a)
b)
2.26
2.26.1
1.04
2.27
Workshop Office
0.00
43568.00
###
###
92168.00
###
0.00
###
0.00
###
0.00
###
3283.75
###
0.00
###
81922.50
###
###
220942.25
###
###
Page No.3
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
2.00
DSR.Rf.No
2.01
4.1
a)
4.1.8
2.02
4.2
a)
4.2.3
2.03
4.11
2.04
2.05
Description
Quantity
0.00
0.00
CONCRETE WORK
4.12
4.13
Workshop Office
Unit
Rate
###
Amount (Rs.)
###
###
0.00
59.00
0.00
###
Cum
4301.15
253767.85
###
0.00
###
0.00
0.00
###
8.00
0.00
Cum
6450.00
51600.00
###
0.00
###
49.00
0.00
Sqm
314.85
15427.65
###
0.00
###
48.15
625.95
###
0.00
###
132.00
6468.00
###
###
327889.45
###
###
per 50kg
13.00 Cement
0.00
49.00
0.00
0.00
0.00
Sqm
Page No.4
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
3.00
DSR.Rf.No
Description
REINFORCED CEMENT CONCRETE
Quantity
0.00
0.00
3.01
5.9
a)
b)
5.9.1
5.9.2
c)
d)
e)
5.9.3
5.9.4
5.9.5
f)
g)
5.9.6
5.9.7
h)
5.9.15
i)
5.9.19
3.02
5.18
a)
5.18.2
3.03
5.22
a)
5.22.6
3.04
5.22A
a)
5.22A.6
3.05
5.30
3.06
5.37
Providing and laying in position ready mixed M-25 grade concrete for
reinforced cement concrete work, using cement content as per approved
design mix, manufactured in fully automatic batching plant and
transported to site of work in transit mixer for all leads having continuous
agitated mixer, manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of R.M.C. from
transit mixer to site of laying , excluding the cost of centering, shuttering
finishing and reinforcement including cost of admixtures in
recommended proportions as per IS : 9103 to accelerate/ retard setting
of concrete, improve workability without impairing strength and durability
as per direction of the Engineer - in - charge.
###
Amount (Rs.)
###
###
Unit
Rate
0.00
261.00
Sqm
196.45
###
51273.45
###
49.00
968.00
13.00
Sqm
Sqm
Sqm
360.8
401.65
401.65
17679.20
###
388797.20
###
5221.45
###
1288.00
516.00
Sqm
Sqm
332.15
435.35
427809.20
###
224640.60
###
89.00
Sqm
395.65
35212.85
###
24.00
172.00
0.00
Sqm
Sqm
196.45
492.35
4714.80
###
84684.20
###
0.00
###
Sqm
638.90
0.00
###
5750.10
###
0.00
###
0.00
13049.00 kilogram
0.00
68.10
0.00
###
888636.90
###
0.00
###
0.00
47907.00 kilogram
0.00
68.10
0.00
###
3262466.70
###
0.00
###
40 mm thick
Steel reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding all complete upto plinth level.
99.00
0.00
Metre
30.75
3044.25
###
0.00
###
0.00
(Note :- Cement content considered in this item is @ 330 kg/cum.
Excess/less cement used as per design mix is payable/recoverable
separately).
a)
b)
5.37.1
5.37.2
Workshop Office
0.00
107.00
387.00
0.00
0.00
0.00
0.00
###
Cum
Cum
6644.60
7363.00
0.00
###
710972.20
###
2849481.00
###
###
8960384.10
###
###
Page No.5
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
DSR.Rf.No
Description
Quantity
0.00
0.00
0.00
0.00
FINISHING WORK
1.00
BRICK WORK
1.01
6.1
Brick work with common burnt clay F.P.S. (non modular) bricks of class
designation 7.5 in foundation and plinth in:
Cement mortar 1:4 (1 cement : 4 coarse sand)
a)
6.1.1
1.02
6.4
a)
6.4.2
1.03
6.13
Half brick masonry with common burnt clay F.P.S. (non modular) bricks
of class designation 7.5 in superstructure above plinth level up to floor V
level.
a)
6.13.2
1.04
6.15
###
Amount (Rs.)
###
###
###
###
Unit
Rate
0.00
43.00
0.00
Cum
4918.65
###
211501.95
###
0.00
###
0.00
357.00
0.00
Cum
5426.15
0.00
###
1937135.55
###
0.00
###
0.00
10.00
0.00
Sqm
665.80
0.00
###
6658.00
###
0.00
###
Sqm
69.50
Brick work with common burnt clay F.P.S. (non modular) bricks of class
designation 7.5 in superstructure above plinth level up to floor V level in
all shapes and sizes in :
Workshop Office
10.00
0.00
0.00
0.00
695.00
###
###
2155990.50
###
###
Page No.6
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
2.00
DSR.Rf.No
2.01
7.36
Description
STONE WORK
3.01
MARBLE WORK
8.2
8.2.2
8.2.2.1
3.02
8.3
8.3.2
3.03
3.04
8.4
8.5
Unit
Rate
431.00
0.00
0.00
0.00
0.00
0.00
Sqm
1529.60
###
Amount (Rs.)
###
###
Wall lining butch work upto 10m height with Dholpur stone 40 mm thick
rough facing on the exposed surface with stone strips of minimum length
300 mm and required width including embedding every tenth layer and
bottom most layer in masonry or concrete after making necessary
chases of size 75x75mm and by providing layer of 75mm thick strips i/c
12mm thick bed of cement mortar 1:3 (1 Cement : 3 coarse sand) i/c
ruled pointing in cement mortar 1:2 (1 white cement : 2 stone dust) with
an admixture of pigment to match the shade of stone complete as per
direction of Engineer-in-charge.
Total of sub-head
3.00
Quantity
0.00
0.00
659257.60
###
###
659257.60
###
###
###
###
Providing and fixing 18mm thick gang saw cut mirror polished
premoulded and prepolished) machine cut for kitchen platforms, vanity
counters, window sills , facias and similar locations of required size of
approved shade, colour and texture laid over 20mm thick base cement
mortar 1:4 (1 cement : 4 coarse sand) with joints treated with white
cement, mixed with matching pigment, epoxy touch ups, including
rubbing, curing, moulding and polishing to edges to give high gloss finish
etc. complete at all levels.
0.00
0.00
13.00
0.00
###
###
50258.00
###
0.00
###
Sqm
3866.00
Metre
230.55
20.00
0.00
Metre
247.40
4948.00
###
0.00
###
12.00
0.00
each
386.60
4639.20
###
0.00
###
13.00
0.00
Sqm
212.85
2767.05
###
0.00
###
Sqm
3263.50
Granite work.
Extra for fixing marble /granite stone over and above corresponding
basic item, in facia and drops of width upto 150 mm with epoxy resin
based adhesive including cleaning etc. complete
0.00
###
4611.00
###
0.00
###
Extra for providing opening of required size & shape for wash
basins/kitchen sink in kitchen platform, vanity counters and similar
location in marble/Granite/stone work including necessary holes for pillar
taps etc. including rubbing and polishing of cut edges etc. complete.
3.05
8.6
Mirrior polishing on marble work/ granite work/ stone work where ever
required to give high gloss finish complete
3.06
8.1
Providing and fixing stone slab table rubbed, edges rounded and
polished of size 75x50 cm deep and 1.8 cm thick fixed in urinal
partitions by cutting a chase of appropriate width with chase cutter and
embedding the stone in the chase with epoxy grout or with cement
concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 6
mm nominal size) as per direction of Engineer-in-charge and finished
smooth.
a)
8.10.2
Workshop Office
0.00
4.00
0.00
0.00
0.00
0.00
###
13054.00
###
###
80277.25
###
###
Page No.7
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
4.00
DSR.Rf.No
4.01
9.20
Providing and fixing ISI marked flush door shutters conforming to IS:
2202 (Part I) decorative type, core of block board construction with
frame of 1st class hard wood and well matched teak 3 ply veneering with
vertical grains or cross bands and face veneers on both faces of
shutters.
9.20.1
9.83
Providing and fixing aluminium die cast body tubular type universal
hydraulic door closer (having brand logo with ISI, IS : 3564, embossed
on the body, door weight upto 35 kg and door width upto 700 mm) with
necessary accessories and screws etc. complete.
4.02
4.03
9.99
Description
WOOD WORK & PVC WORK
Quantity
0.00
0.00
Workshop Office
Unit
Rate
###
Amount (Rs.)
###
###
0.00
###
95.00
0.00
Sqm
2606.45
247612.75
###
0.00
###
35.00
0.00
Each
753.75
26381.25
###
0.00
###
30.00
0.00
0.00
0.00
Each
169.20
5076.00
###
###
279070.00
###
###
Page No.8
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
5.00
DSR.Rf.No
5.01
10.14
a)
a) i
10.14.1
10.14.1.1
5.02
10.28
Description
Quantity
0.00
0.00
STEEL WORK
Unit
Rate
###
Amount (Rs.)
###
###
Providing and fixing pressed steel door frames conforming to IS: 4351
manufactured from commercial mild steel sheet of 1.60 mm
thickness including hinges, jamb, lock jamb, bead and if required angle
threshold of mild steel angle of section 50x25mm, or base ties of 1.60
mm pressed mild steel welded or rigidly fixed together by mechanical
means, including M.S. pressed butt hinges, 2.5mm thick with mortar
guards, lock strike-plate and shock absorbers as specified and applying
a coat of approved steel primer after pre-treatment of the surface as
directed by Engineer-in-charge:
Profile B
Fixing with adjustable lugs with split end tail to each jamb.
0.00
0.00
192.00
0.00
Metre
377.70
Kg
619.40
###
###
72518.40
###
0.00
###
Providing and fixing stainless steel ( Grade 304) railing made of Hollow
tubes, channels, plates etc., including welding, grinding, buffing,
polishing and making curvature (wherever required) and fitting the same
with necessary stainless steel nuts and bolts complete, i/c fixing the
railing with necessary accessories & stainless steel dash fasteners ,
stainless steel bolts etc., of required size, on the top of the floor or the
side of waist slab with suitable arrangement as per approval of
Engineer-in-charge, ( for payment purpose only weight of stainless steel
members shall be considered excluding fixing accessories such as nuts,
bolts, fasteners etc.).
798.00
0.00
0.00
0.00
Total of sub-head
Workshop Office
494281.20
###
###
566799.60
###
###
Page No.9
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
6.00
DSR.Rf.No
6.01
11.3
a)
11.3.1
6.02
11.4
Description
Quantity
0.00
0.00
FLOORING
Rate
Sqm
353.35
Sqm
535.25
0.00
39.00
0.00
Sqm
377.25
0.00
###
14712.75
###
0.00
###
0.00
40.00
0.00
Sqm
1757.60
0.00
###
70304.00
###
0.00
###
0.00
475.00
0.00
Sqm
1141.40
0.00
###
542165.00
###
0.00
###
Sqm
1191.25
Sqm
608.35
Sqm
836.65
Sqm
1405.95
0.00
43.00
0.00
6.03
11.6
a)
11.6.1
18 mm thick.
6.04
11.23
Marble stone flooring with 18mm thick marble stone (sample of marble
shall be approved by Engineer-in-charge) over 20 mm (average) thick
base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed
with grey cement slurry including rubbing and polishing complete with :
11.23.2
6.05
11.26
a)
11.26.1
6.06
11.27
Based on
DSR Item
11.28.1
a)
6.07
11.36
6.08
11.41
a)
11.41.2
179844.00
###
0.00
###
71.00
0.00
6.07
###
15194.05
###
0.00
###
a)
###
Amount (Rs.)
###
###
Unit
Providing and fixing Ist quality ceramic glazed wall tiles conforming to
IS : 15622 (thickness to be specified by the manufacturer ) of approved
make in all colours, shades of any size as approved by Engineer-inCharge, in skirting, risers of steps and dados over 12 mm thick bed of
cement Mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey
cement slurry @ 3.3kg per sqm including pointing in white cement mixed
with pigment of matching shade complete.(Basic cost of Ceramic tiles
Rs.30 per sqft.)
Workshop Office
0.00
69.00
0.00
248.00
0.00
0.00
75.00
0.00
84578.75
###
0.00
###
0.00
###
41976.01
###
0.00
###
207489.20
###
0.00
###
0.00
###
105446.25
###
0.00
###
Page No.10
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
6.09
a)
DSR.Rf.No
Description
11.46
Providing and laying Vitrified tiles in different sizes (thickness to be
specified by manufacturer) with water absorption less than 0.08 % and
conforming to I.S. 15622, of approved make in all colours & shade in
skirting, riser of steps, over 12 mm thick bed of cement mortar 1:3 (1
cement: 3 coarse sand), including grouting the joint with white cement &
matching pigments etc. complete.
11.46.2
Workshop Office
Quantity
0.00
8.00
0.00
0.00
0.00
Unit
Rate
Sqm
1415.40
###
Amount (Rs.)
0.00
###
11323.20
###
###
1273033.21
###
###
Page No.11
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
7.00
DSR.Rf.No
7.01
12.21
a)
12.21.1
7.02
12.22
Description
Quantity
0.00
0.00
ROOFING
12.53
Rate
Metre
143.10
Each
186.65
###
Amount (Rs.)
###
###
###
25901.10
###
0.00
###
7.03
Unit
1306.55
###
0.00
###
0.00
###
(minimum) sheet with the help of rawl plugs at 450mm centre to centre
with 25mm long dry wall screws @ 230mm interval and laying 15mm
thick densified edges calicum silicate ceiling tiles of approved texture
(Spintone / Cosmos/hexa) in the grid including, cutting/ making opening
for services like diffusers, grills,light fittings, fixtures, smoke detectors
etc., whereever required, Main 'T' runners to be suspended from ceiling
using G.I. slotted cleats of size 25x35x1.6mm fixed to ceiling with 12.5
mm dia and 50mm long dash fasteners, 4mm G.I. adjustable rods with
galvanised steel level clips of size 85 x 30 x 0.8 mm,
spaced at
1200mm centre to centre along main 'T' , bottom exposed with 24mm of
all T-sections shall be pre-painted with polyster baked paint, for all
heights, as per specifications, drawings and as directed by engineer-incharge.
184.00
Sqm
1649.15
303443.60
###
Note :- Only calcium silicate false ceiling area will be measured from wall
to wall. No deduction shall be made for exposed frames/opening (cut
outs) having area less than 0.30 sqm.The calcium silicate ceiling tile
shall have NRC. value of 0.50(Minimum), light reflection > 85%, non combustible as per B.S. 476 part IV, 100% humidity resistance and also
having thermal conductivity<0.043 w/m 0 KC.
0.00
0.00
0.00
0.00
Total of sub-head
Workshop Office
###
###
330651.25
###
###
Page No.12
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
8.00
DSR.Rf.No
Description
Quantity
0.00
0.00
0.00
2253.00
0.00
8.01
a)
13.1
13.1.2
8.02
13.2
a)
13.2.1
8.03
a)
13.16
13.16.1
8.04
13.26
FINISHING
12 mm cement plaster of mix :
1:6 (1 cement : 6 fine sand)
0.00
1607.00
0.00
0.00
1161.00
0.00
13.41
a)
13.41.1
8.06
a)
13.45
13.45.1
Rate
Sqm
149.45
Sqm
189.40
Sqm
134.70
Sqm
110.95
###
Amount (Rs.)
###
###
###
336710.85
###
0.00
###
0.00
###
304365.80
###
0.00
###
0.00
###
156386.70
###
0.00
###
8.05
Unit
Total of sub-head
Workshop Office
378783.30
###
0.00
###
0.00
0.00
###
3414.00
0.00
0.00
Sqm
89.70
306235.80
###
0.00
###
0.00
###
1607.00
0.00
0.00
0.00
Sqm
146.45
235345.15
###
###
1717827.60
###
###
Page No.13
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
9.00
DSR.Rf.No
Description
Quantity
0.00
0.00
9.01
21.1
Providing and fixing aluminium work for doors, windows, ventilators and
partitions with extruded built up standard tubular sections / appropriate z
sections and other sections of approved make conforming to IS : 733
and IS : 1285, fixed with rawl plugs and screws or with fixing clips, or
with expansion hold fasteners including necessary filling up of gaps at
junctions, at top, bottom and sides with required PVC/neoprene felt etc.
Aluminium sections shall be smooth, rust fee, straight, mitred and
jointed mechanically wherever required including cleat angle, Aluminium
snap beading for glazing / panelling, C.P. brass/ stainless steel screws,
all complete as per architectural drawings and the directions of
Engineer-in-charge (Glazing and panelling to be paid for separately.
a)
a) i
21.1.1
21.1.1.1
ALUMINIUM WORK
21.1.2
b) i
21.1.2.1
21.3
a)
21.3.2
9.03
21.80
Filling the gap in between aluminium frame & adjacent RCC/ Brick/
Stone work by providing weather silicon sealant over backer rod of
approved quality as per architectural drawings and direction of Engineerin-charge complete.
a)
21.8.1
9.04
21.11
Providing and fixing stainless steel (SS 304 grade) adjustable friction
windows stays of approved quality with necessary stainless steel
screws etc. to the side hung windows as per direction of Engineer-incharge complete.
a)
21.11.3
9.05
21.15
a)
21.15.2
9.06
21.17
###
Amount (Rs.)
###
###
###
###
Kg.
348.50
238722.50
###
0.00
###
0.00
199.00
0.00
9.02
Rate
0.00
0.00
685.00
0.00
b)
Unit
0.00
###
Kg.
405.90
80774.10
###
0.00
###
0.00
90.00
0.00
Sqm
1054.20
0.00
###
94878.00
###
0.00
###
0.00
290.00
0.00
Metre
88.75
0.00
###
25737.50
###
0.00
###
0.00
48.00
0.00
Each
350.70
0.00
###
16833.60
###
0.00
###
0.00
60.00
0.00
Each
55.15
0.00
###
3309.00
###
0.00
###
Kg
403.35
355 X 19 mm
Providing and fixing aluminium casement windows fastener of required
length for aluminium windows with necessary screws etc. complete.
Powder coated minimum thickness 50 micron aluminium.
Providing and fixing anodised aluminium grill (anodised transparent or
dyed to required shade according to IS: 1868 with minimum anodic
coating of grade AC 15) of approved design/pattern, with approved
standard section and fixed to the existing window frame with C.P. brass/
stainless steel screws @ 200mm centre to centre, including cutting the
grill to proper opening size for fixing and operation of handles and
fixing approved anodised aluminium standard section around the
opening, all complete as per requirement and direction of Engineer-incharge. (Only weight of grill to be measured for payment).
200.00
0.00
0.00
0.00
Total of sub-head
Workshop Office
80670.00
###
###
540924.70
###
###
Page No.14
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
10.00
DSR.Rf.No
10.01
22.5
10.02
Description
WATER PROOFING
22.7
Quantity
0.00
0.00
Unit
Rate
284.00
0.00
Sqm
283.1
###
Amount (Rs.)
###
###
0.00
0.00
###
0.00
0.00
###
22.7.1
Total of sub-head
Workshop Office
634.00
0.00
0.00
0.00
0.00
Sqm
1019.05
646077.70
###
###
###
726478.10
###
###
Page No.15
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
11.00
DSR.Rf.No
11.01
23.2
Description
HORTICULTURE & LANDSCAPING WORK
Supplying and stacking of good earth at site including royalty and
carriage up to 1 km (earth measured in stacks will be reduced by 20%
for payment).
Unit
Rate
541.00
Cum
343.59
185884.57
###
###
###
185884.57
###
###
###
###
###
###
###
###
###
###
95.00
0.00
Sqm,
982.50
93337.50
###
0.00
###
0.00
150.00
0.00
Each
154.24
0.00
###
23135.40
###
0.00
###
0.00
38.00
0.00
Each
254.21
0.00
###
9659.90
###
0.00
###
0.00
204.00
0.00
Each
61.84
0.00
###
12614.54
###
0.00
###
Each
143.83
Total of sub-head
1.00
1.01
1.02
LAR
(a)
1.03
LAR
(a)
1.04
LAR
a)
1.05
LAR
a)
###
Amount (Rs.)
###
###
Quantity
0.00
0.00
Providing and fixing Stainless steel ISI marked tower bolts of approved
make,transparent or dyed to required colour or shade with steel nuts
and screws etc. complete.
250 x 10mm
Providing and fixing Stainless steel ISI marked Sliding door bolts
transparent or dyed to required colour or shade with steel nuts and
screws etc. complete.
250 x 16mm
Providing and fixing Stainless steel ISI marked handles , transparent or
dyed to required colour or shade with steel nuts and screws etc.
complete.
125mm
Providing and fixing Stainless steel ISI marked door stopper of approved
make , transparent or dyed to required colour or shade with steel nuts
and screws etc. complete.
Twin rubber stopper
Total of sub-head
Workshop Office
0.00
55.00
0.00
0.00
0.00
0.00
###
7910.76
###
###
146658.11
###
###
Page No.16
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
2.00
DSR.Rf.No
2.01
LAR
2.02
Description
FLOORING
LAR
###
Amount (Rs.)
###
###
Quantity
0.00
0.00
Unit
Rate
90.00
0.00
Sqm
1050.00
94500.00
###
0.00
###
186.00
0.00
0.00
0.00
0.00
0.00
Sqm
8515.06
1583800.42
###
###
1678300.42
###
###
###
###
141.00
0.00
0.00
0.00
0.00
0.00
Sqm
76.28
10756.04
###
###
10756.04
###
###
###
###
94.00
Cum
2880.00
270720.00
###
###
270720.00
###
###
###
Providing and fixing access raised floor of light grade (15KNm2) UDL
panels manufactured from pressed formed corrosion resistant
galvanized steel with total over wrap of one piece top, sides and bottom
flange encapsulating high performance chip board case stiched and with
a panel to cater in the size. 600x600x31mm. The panel has to be placed
on the pedestal made from all steel construction, zinc plated consisting
of anti-vibrational head cap with cruciform up stands four panels locating
studs, positively clipped pedestal clipped to the steel top plate. The
pedestal cap shall have an electrical conductor plate for dissipation of
static electricity. The steel based plate of the pedestal shall be fixed on
the sub-floor with epoxy pedestal adhesive and/or mechanical fixing.
The access floor should be able to take a point load of 2.5KN over
25mm sq. and UDL of 15KN/sq.mtr. The panel shall be finished with high
abrasion, anti-static HPL of mica colour Y606 having fire rating as per BS 476
clause 5,6&7.
Total of sub-head
3.00
3.01
FINISHING
LAR
Providing and fixing chicken wire mesh (26 gauge) at the junctions of
RCC & brick work fixed with wire nail in cement mortar 1:4 (1 cement : 4
fine sand) etc complete.
Total of sub-head
4.00
4.01
WATER PROOFING
LAR
Total of sub-head
Workshop Office
Page No.17
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Quantity
Total Depth
2.00
2.00
2.15
2.00
2.00
104.00
120.19
>10 Sqm
Total
224.19
SAY
225.00
Earthwork in excavation
F1
F2
1.02
1.03
1.04
Cum
Cum
13
13
2.00
2.15
Cum
224.19
224.19
Less PCC
Cum
-1
47.00
-47.00
Less RCC
Cum
-1
86.00
Below Flooring
Below platform near steps
Cum
Cum
1
1
475.38
3.65
Below Ramp
Cum
0.5
5.00
-86.00
3.50
1.150
1.300
546.68
16.61
1.50
1.300
4.87
SAY
659.35
660.00
Cum
13
2.00
2.00
0.500
26.00
F2
Cum
13
2.15
2.15
0.500
30.05
Total
56.05
SAY
57.00
0.150
71.31
Total
71.31
SAY
72.00
Sand Filling
Below Flooring
Cum
Workshop Office
475.38
Page No.18
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Quantity
CONCRETE WORK
2.01
a)
2.02
a)
Cum
13
2.00
2.00
0.075
3.90
F2
Cum
13
2.15
2.15
0.075
4.51
Cum
475.38
0.075
35.65
Cum
3.65
3.5
0.075
0.96
Cum
Cum
1
1
4.411
2.15
0.9
0.9
0.075
0.075
0.30
0.15
Cum
5.20
1.5
0.075
0.59
Total
SAY
46.05
47.00
Cum
14
2.550
0.23
0.15
1.23
Cum
2.000
0.23
0.15
0.35
Cum
Cum
4
2
0.900
1.375
0.23
0.23
0.15
0.15
0.12
0.09
V1
Cum
1.500
0.23
0.15
0.05
V2
Cum
0.600
0.23
0.15
0.08
Shaft
0
Cum
3.100
0.23
0.15
0.21
Cum
Cum
5
-5
0.30
0.01
0.30
4.550
4.550
2.05
-0.22
Cum
0.30
0.30
3.550
1.60
Cum
-5
0.01
3.550
-0.17
Total
5.40
SAY
6.00
First Floor
Workshop Office
Page No.19
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
2.03
2.04
2.05
Unit
No.
Quantity
Sqm
1.00
9.10
0.23
2.09
Sqm
1.00
5.60
0.23
1.29
Wall of On Grid-1/3
Sqm
1.00
9.10
0.23
2.09
Wall of On Grid-3
Wall of Mid Grid-3/4
Sqm
Sqm
1.00
1.00
5.60
4.55
0.23
0.23
1.29
1.05
Wall of On Grid-4
Sqm
1.00
5.60
0.23
1.29
Wall of l On Grid-4/6
Sqm
1.00
9.10
0.23
2.09
Wall of On Grid-4/6
Wall of Mid Grid-6/8
Sqm
Sqm
1.00
1.00
9.10
9.10
0.23
0.23
2.09
2.09
Sqm
1.00
9.10
0.23
2.09
Sqm
1.00
4.55
0.23
1.05
Sqm
1.00
3.12
0.23
0.72
Sqm
1.00
1.98
0.23
0.46
Sqm
1.00
1.65
0.23
0.38
Sqm
Sqm
1.00
1.00
2.90
9.10
0.23
0.23
0.67
2.09
Sqm
1.00
9.10
0.23
2.09
Sqm
1.00
4.55
0.23
1.05
Sqm
Sqm
1.00
1.00
4.55
5.60
0.23
0.23
1.05
1.29
Sqm
1.00
4.55
0.23
1.05
Wall of On Grid-13
Sqm
1.00
7.60
0.23
1.75
Sqm
0.00
1.00
0.00
5.60
0.00
0.23
0.00
1.29
Wall of On Grid-8
Sqm
1.00
5.60
0.23
1.29
Sqm
Sqm
1.00
1.00
5.02
5.60
0.23
0.23
1.15
1.29
Sqm
1.00
5.60
0.23
1.29
Sqm
1.00
0.52
0.23
0.12
Sqm
1.00
0.22
0.23
0.05
0.00
0.00
0.00
0.00
0.00
0.00
Sqm
1.00
1.45
0.23
0.33
Sqm
1.00
1.42
0.23
0.33
Sqm
Workshop Office
38.23
Total
38.23
SAY
39.00
0.26
9.94
Total
9.94
SAY
10.00
38.23
38.23
Total
38.23
SAY
39.00
Page No.20
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Quantity
Sqm
13
1.85
1.85
0.40
38.48
F2
Sqm
13
2.00
2.00
0.50
52.00
C1 (For F1)
Sqm
13
0.55
0.55
2.13
60.77
C1 (For F2)
Sqm
13
0.55
0.55
2.03
57.91
Total
209.17
Say
210.00
0.68
38.90
Total
SAY
38.90
39.00
b)
c)
Sqm
44
0.55
0.1
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
2.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
3.00
1.00
12.00
4.55
4.55
3.31
1.01
2.04
2.28
4.55
4.55
4.55
4.55
4.55
5.60
1.15
5.60
5.60
5.60
5.60
5.60
5.60
5.60
1.15
1.77
50.96
5.25
18.54
5.66
11.42
12.77
50.96
25.48
76.44
5.25
96.64
Sqm
4.00
1.50
1.50
9.00
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
0.00
6.00
1.00
1.00
4.00
1.00
12.00
0.00
4.55
2.32
2.00
4.55
4.55
4.55
0.00
5.60
5.60
5.60
5.60
1.15
1.77
0.00
152.88
12.99
11.20
101.92
5.25
96.64
Landing Slab
Sqm
2.00
1.50
1.50
4.50
Sqm
0.00
1.00
0.00
4.55
0.00
5.45
0.00
24.80
Total
SAY
Workshop Office
778.54
779.00
Page No.21
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
d)
Description
Unit
0
0
0.00
0.00
Quantity
e)
No.
0.00
0.00
LadiesToilet
Sqm
1.35
0.60
0.81
GentsToilet
Sqm
2.92
0.67
1.96
0
First Floor
Sqm
0
0
0.00
0.00
0.00
0.00
0.00
0.00
Sqm
1.41
0.71
1.00
Sqm
4.55
0.60
2.73
Toilet
LadiesToilet
Sqm
0
1
0.00
1.35
0.00
0.60
0.00
0.81
GentsToilet
Sqm
2.92
0.67
1.96
Total
9.27
SAY
10.00
0.00
Sqm
2
0
53.40
0.00
0.00
0.00
0.00
0.00
0.50
0.00
106.80
0.00
Sqm
13
5.50
0.50
71.50
Sqm
Sqm
2
1
54.6
60.45
0.45
0.23
0.55
0.40
169.26
62.26
Sqm
Sqm
13
2
0.00
5.6
5.6
0.45
0.23
0.55
0.40
112.84
11.54
Sqm
0.4
0.55
34.52
13
1.77
0
0
0.00
Sqm
54.6
0.45
0.55
169.26
Sqm
60.45
0.23
0.40
62.26
Vertical Beam
Beam on Grid 1-13 / A-B
Sqm
0
13
0
5.6
0
0.45
0.00
0.55
112.84
Sqm
5.6
0.23
0.40
5.77
Sqm
13
1.77
0.4
0.55
34.52
0
0
0
0
0
0
0.00
0.00
0
Mumty Beam Assume
Horizontal Beam
0.00
4.55
0.45
0.55
0.00
Sqm
5.6
0.45
0.55
17.36
D1
Sqm
12
2.03
0.23
0.15
12.91
D2
Sqm
1.23
0.23
0.15
2.61
D3
Sqm
1.13
0.23
0.15
4.19
Sqm
Vertical Beam
Beam on Grid 12-13 / A-B
14.11
Workshop Office
Page No.22
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
DW1(D)
Sqm
2.23
0.23
0.15
1.18
2.03
0.23
0.15
1.08
DW2(D)
Workshop Office
Quantity
Page No.23
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
0
W1
W2
Sqm
Sqm
14
5
0.00
0.00
2.55
2.00
0.23
0.23
0.15
0.15
18.92
5.30
W3
Sqm
DW2(W)
Sqm
0.90
0.23
0.15
1.91
1.38
0.23
0.15
1.46
Sqm
0
1
0.00
1.50
0
0.23
0.00
0.15
V1
0.00
0.80
V2
Sqm
0.60
0.23
0.15
1.27
Total
SAY
1036.45
1037.00
219.96
Window
Ventilation
Quantity
0
0
f)
Sqm
0.45
0.45
4.70
0.00
0.00
0.00
0.00
C1
Sqm
26
0
0.45
0.00
0.45
0.00
3.70
0.00
173.16
0.00
C1
Sqm
0.45
0.45
3.00
21.60
Total
Say
414.72
415.00
Terrace to Mumty
g)
26
Sqm
1.65
3.80
6.27
Flight 2
Flight 3
Sqm
Sqm
1
1
1.65
1.65
1.43
4.14
2.36
6.82
Sqm
12
1.65
0.16
3.10
Sqm
1.65
0.16
1.29
Sqm
13
1.65
0.16
3.36
Side
Sqm
9.37
0.16
1.47
Total
24.68
Staircase S2
Flight 1
Sqm
1.65
4.74
7.83
Flight 2
Sqm
1.65
1.74
2.87
Flight 3
Sqm
1.65
3.41
5.62
Sqm
15
1.65
0.15
3.64
Sqm
1.65
0.15
1.45
Sqm
11
1.65
0.15
2.67
Side
Sqm
9.89
0.15
1.45
Total
Workshop Office
25.53
Page No.24
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Quantity
Flight 1
Sqm
1.65
3.36
5.54
Flight 2
Sqm
1.65
1.38
2.28
Flight 3
For steps in Flight 1
Sqm
Sqm
1
11
1.65
1.65
3.36
0.14
5.54
2.49
Sqm
1.65
0.14
1.13
Sqm
11
1.65
0.14
2.49
Side
Sqm
8.10
0.14
1.11
Total
h)
Sqm
Sqm
Sqm
Sqm
0
V1
V2
i)
Sqm
Sqm
14
5
4
2
0
1
4
2.78
2.23
1.13
1.38
0.00
1.73
0.83
20.57
Total
70.78
SAY
71.00
0.150
0.150
0.150
0.150
11.68
3.35
1.36
0.83
0.150
0.150
0.52
1.00
Total
Say
18.72
19.00
Shuttering Projections
First Floor
Tapered Slab
Elevation A
0
Sqm
Sqm
1
1
11.50
43.45
1.75
1.75
20.12
76.02
Side Elevation
Sqm
8.45
1.75
14.78
Sqm
0
2
0.00
4.23
1.75
14.78
Elevation A
Sqm
3.25
1.75
11.37
Total
SAY
3.02
3.03
137.09
138.00
Sqm
2.899
1.2
6.9576
Total
6.96
SAY
7.00
Cum
43.80
70.00
As per cofficient
3066.00
Cum
20.77
220.00
As per cofficient
4570.00
Beams Up to Plinth
Cum
20.50
140.00
As per cofficient
2871.00
85.07
Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot
Workshop Office
Total
10507.00
Page No.25
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
H
SAY
Workshop Office
Quantity
10507.00
Page No.26
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
3.04
Description
Unit
No.
Cum
Cum
46.66
1.65
220.00
100.00
As per cofficient
As per cofficient
Slab
Cum
117.42
80.00
As per cofficient
9394.00
Cum
117.91
140.00
As per cofficient
16507.00
Cum
Cum
13.55
9.01
80.00
100.00
As per cofficient
As per cofficient
1085.00
902.00
Lintels
Cum
3.36
60.00
As per cofficient
202.00
Shelves
Cum
0.93
60.00
As per cofficient
56.00
0
Side Elevation
Metre
Metre
Metre
0
Mumty RCC For Projections
Elevation A
Elevation A
a)
10265.00
165.00
Total
38576.00
SAY
38576.00
First Floor
Tapered Slab
Elevation A
3.06
Quantity
310.48
3.05
Metre
Metre
1
1
1
0
0
2
2
11.50
43.45
8.45
0.00
0.00
4.23
3.25
11.50
43.45
8.45
8.45
6.50
Total
SAY
78.35
79.00
1.85
2.00
0.400
0.500
17.80
26.00
Total
43.80
Cum
Cum
Cum
13
0.55
0.55
2.125
8.36
C1 (For F2)
Cum
13
0.55
0.55
2.025
7.96
Total
16.32
0.45
0.845
Total
4.45
13
13
1.85
2.00
0
R.C.C. for columns
Column upto plinth lvl.
C1
Cum
26
Workshop Office
0.45
4.45
Page No.27
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Quantity
0.50
Horizontal Beams
Beam on Grid 1-13 / B
Cum
53.40
0.23
0.00
12.28
0.50
0.00
Vetical Beams
Beam on Grid 1-13 / A-B
3.06
b)
Cum
13
5.50
0.23
0.50
Total
20.50
8.22
Total
85.07
SAY
86.00
Cum
26
0.45
0.45
4.70
24.75
Cum
26
0.45
0.45
3.70
19.48
Cum
0.45
0.45
3.00
2.43
Total
46.66
0.10
0.68
Total
1.65
Slab Depth
0.150
0.150
7.64
0.79
2.78
Cum
44
0.55
1.65
Cum
2
1
4.55
4.55
5.60
1.15
3.31
5.60
0.150
0.150
Cum
Cum
Cum
1.01
5.60
0.150
0.85
Cum
Cum
1
1
2.04
2.28
5.60
5.60
0.150
0.150
1.71
1.92
Cum
4.55
5.60
0.150
7.64
Cum
4.55
5.60
0.175
4.46
4.55
5.60
Cum
Cum
4.55
1.15
0.150
0.150
11.47
0.79
Cum
12
4.55
1.77
0.150
14.50
Landing Slab
Cum
1.50
1.50
0.150
0.00
1.35
A-B / 1-7
A-B / 7-8
A-B / 7-8
A-B / 8-12
A-B / 12-13
0.00
Cum
Cum
Cum
Cum
Cum
6
1
1
4
1
Workshop Office
4.55
2.32
2.00
4.55
4.55
5.60
5.60
5.60
5.60
1.15
0.150
0.150
0.150
0.150
0.150
22.93
1.95
1.68
15.29
0.79
Page No.28
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Slab on Grid A / 1-17
Unit
Cum
No.
12
Workshop Office
L
4.55
B
1.77
Quantity
0.150
14.50
Page No.29
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Cum
No.
2
L
1.50
B
1.50
0.150
0.68
Cum
4.55
5.45
0.150
0.00
3.72
Total
117.42
Beam Depth
0.55
Horizantal Beam
Beam Depth
0.40
Landing Slab
Mumty Slab Assume
Mumty Slab
Unit
Quantity
Cum
54.60
0.45
0.55
27.03
Cum
60.45
0.23
0.40
5.56
Cum
13
5.60
0.45
0.55
18.02
Cum
5.60
0.23
0.40
1.03
Cum
13
1.77
0.40
0.55
5.06
Beam Depth
0.55
Beam Depth
0.40
Vertical Beam
Cum
54.60
0.45
0.55
27.03
Cum
60.45
0.23
0.40
5.56
0.00
Vertical Beam
Beam on Grid 1-13 / A-B
Cum
13
5.60
0.45
0.55
18.02
Cum
5.60
0.23
0.40
0.52
Cum
13
1.77
0.40
0.55
5.06
Cum
4.55
0.45
0.55
2.25
Cum
5.60
0.45
0.55
2.77
Total
117.91
Cum
Cum
Cum
1
1
1
11.50
43.45
8.45
0.173
0.173
0.173
1.99
7.52
1.46
Cum
Cum
2
2
4.23
3.25
0.173
0.173
1.46
1.12
Total
13.55
Slab Depth
0.150
Staircase S1
Flight 1
Flight 2
Cum
Cum
1
1
1.65
1.65
3.80
1.43
0.150
0.150
0.94
0.35
Flight 3
Cum
1.65
4.14
0.150
1.02
Cum
12
1.65
0.16
0.300
0.47
Workshop Office
Page No.30
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Quantity
Cum
1.65
0.16
0.300
0.19
Cum
13
1.65
0.16
0.300
0.50
Workshop Office
Page No.31
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
Staircase S2
No.
Quantity
0.00
0.00
1
1
1.65
1.65
4.74
1.74
0.150
0.150
1.17
0.43
Flight 1
Flight 2
Cum
Cum
Flight 3
Cum
1.65
3.41
0.150
0.84
Cum
15
1.65
0.15
0.300
0.55
Cum
Cum
6
11
1.65
1.65
0.15
0.15
0.300
0.300
0.22
0.40
0.00
0.00
0
Staircase S2
0.00
0.00
Flight 1
Cum
1.65
3.36
0.150
0.42
Flight 2
Cum
1.65
1.38
0.150
0.17
Flight 3
Cum
1.65
3.36
0.150
0.42
Cum
11
1.65
0.14
0.300
0.37
Cum
1.65
0.14
0.300
0.17
Cum
11
1.65
0.14
0.300
0.37
Total
9.01
Cum
Cum
12
4
2.03
1.23
0.230
0.230
0.15
0.15
0.84
0.17
D3
Cum
1.13
0.230
0.15
0.27
DW1(D)
DW2(D)
Cum
Cum
1
1
2.23
2.03
0.230
0.230
0.15
0.15
0.08
0.07
W1
Cum
14
2.55
0.230
0.15
1.23
W2
Cum
2.00
0.230
0.15
0.35
W3
Cum
0.90
0.230
0.15
0.12
DW2(W)
Cum
1.38
0.230
0.15
0.09
0.00
Window
0.00
0.00
V1
Cum
1.50
0.230
0.15
0.05
V2
Cum
0.60
0.230
0.15
0.08
Total
3.36
Thick
0.10
Cum
1.35
0.60
0.10
0.00
0.08
GentsToilet
Cum
2.92
0.67
0.10
0.20
0.00
First Floor
Toilet in C.W.M Office
Cum
1.41
0.71
0.10
0.00
0.10
Cum
4.55
0.60
0.10
0.27
Cum
Cum
1
1
1.35
2.92
0.60
0.67
0.10
0.10
Total
0.93
Toilet
LadiesToilet
GentsToilet
0.00
0.08
0.20
Workshop Office
Page No.32
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
H
Total
SAY
Workshop Office
Quantity
310.48
311.00
Page No.33
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
F.Ht
0.845
Quantity
FINISHING WORK
BRICK MASONARY WORK
1.01
0.00
Cum
9.10
0.23
0.84
1.77
Wall of On Grid-1
Cum
5.60
0.23
0.84
1.09
Wall of On Grid-1/3
Wall of On Grid-3
Cum
Cum
1
1
9.10
5.60
0.23
0.23
0.84
0.84
1.77
1.09
Cum
4.55
0.23
0.84
0.88
Wall of On Grid-4
Wall of l On Grid-4/6
Cum
Cum
1
1
5.60
9.10
0.23
0.23
0.84
0.84
1.09
1.77
Wall of On Grid-4/6
Cum
9.10
0.23
0.84
1.77
Cum
9.10
0.23
0.84
1.77
Cum
Cum
1
1
9.10
4.55
0.23
0.23
0.84
0.84
1.77
0.88
Cum
3.12
0.23
0.84
0.61
Cum
1.98
0.23
0.84
0.38
Cum
Cum
1
1
1.65
2.90
0.23
0.23
0.84
0.84
0.32
0.56
Cum
9.10
0.23
0.84
1.77
Cum
9.10
0.23
0.84
1.77
Cum
Cum
1
1
4.55
4.55
0.23
0.23
0.84
0.84
0.88
0.88
Wall of On Grid-12
Cum
5.60
0.23
0.84
1.09
Cum
4.55
0.23
0.84
0.88
Wall of On Grid-13
Cum
7.60
0.23
0.84
1.48
Total
26.28
Cum
5.60
0.23
0.84
1.09
Wall of On Grid-8
Cum
5.60
0.23
0.84
1.09
Cum
5.02
0.23
0.84
0.98
Wall of On Grid-9
Cum
5.60
0.23
0.84
1.09
Cum
5.60
0.23
0.84
1.09
Cum
0.52
0.23
0.84
0.10
Cum
0.22
0.23
0.84
0.04
Total
5.47
Sqm
1.45
0.23
0.84
0.28
Sqm
1.42
0.23
0.84
0.28
Workshop Office
Page No.34
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Steps Depth
0.150
Quantity
Cum
4.11
0.90
0.150
0.55
For steps
Cum
4.11
0.60
0.150
0.37
For steps
Cum
3.81
0.30
0.150
0.17
For steps
Cum
2.15
0.90
0.150
0.29
For steps
Cum
2.15
0.60
0.150
0.19
For steps
Cum
2.15
0.30
0.150
0.10
Total
33.98
Say
34.00
Side steps
1.02
Ground Floor
External Wall (230)
F.Ht
4.70
Beam Depth
0.55
C.Ht
4.15
Cum
Cum
Cum
Cum
Cum
1
1
1
1
1
9.10
5.60
9.10
5.60
4.55
0.23
0.23
0.23
0.23
0.23
4.15
4.15
4.15
4.15
4.15
4.15
8.69
5.35
8.69
5.35
4.34
Cum
Cum
1
1
5.60
9.10
0.23
0.23
4.15
4.15
5.35
8.69
Cum
9.10
0.23
4.15
8.69
Cum
9.10
0.23
4.15
8.69
Cum
Cum
1
1
9.10
4.55
0.23
0.23
4.15
4.15
8.69
4.34
Cum
3.12
0.23
4.55
3.27
Cum
1.98
0.23
4.55
2.07
Cum
Cum
1
1
1.65
2.90
0.23
0.23
4.15
4.15
1.57
2.77
Cum
9.10
0.23
4.15
8.69
Cum
9.10
0.23
4.15
8.69
Cum
4.55
0.23
4.15
4.34
Cum
4.55
0.23
4.15
4.34
Cum
5.60
0.23
4.15
5.35
Cum
4.55
0.23
4.15
4.34
Cum
7.60
0.23
4.15
7.25
DW1(D)
Cum
2.00
0.23
2.10
-0.97
D1
Cum
1.80
0.23
2.10
-7.82
D3
Cum
0.90
0.23
2.10
-0.87
W1
Cum
2.55
0.23
1.20
-5.63
W2
Cum
2.00
0.23
1.20
-1.10
W3
Cum
0.90
0.23
1.20
-0.75
V2
Cum
0.60
0.23
0.60
-0.17
Shaft
Cum
3.10
0.23
1.40
-1.00
Deduction
Workshop Office
Page No.35
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Workshop Office
Quantity
Page No.36
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Quantity
Cum
Cum
1
1
5.60
5.60
0.23
0.23
4.15
4.15
5.35
5.35
Cum
5.02
0.23
4.55
5.25
Cum
5.60
0.23
4.55
5.86
Cum
Cum
1
1
5.60
0.52
0.23
0.30
4.15
4.15
5.35
0.65
Cum
0.22
0.30
4.15
0.27
139.28
First Floor
Floor Height
3.70
Beam Depth
0.55
3.15
Cum
9.10
0.23
3.15
6.59
Cum
Cum
1
1
5.60
9.10
0.23
0.23
3.15
3.15
4.06
6.59
Cum
5.60
0.23
3.15
4.06
Cum
4.55
0.23
3.15
3.30
Cum
Cum
1
1
5.60
3.31
0.23
0.23
3.15
3.15
4.06
2.40
Cum
3.31
0.23
3.15
2.39
Cum
3.28
0.23
3.15
2.38
Cum
Cum
1
1
3.28
7.06
0.23
0.23
3.15
3.15
2.38
5.11
Cum
7.06
0.23
3.15
5.11
Cum
Cum
1
1
4.55
4.55
0.23
0.23
3.15
3.15
3.30
3.30
Cum
4.55
0.23
3.15
3.30
Cum
3.13
0.23
3.15
2.27
Cum
1.75
0.23
3.15
1.27
Cum
1.65
0.23
3.15
1.20
Cum
2.90
0.23
3.15
2.10
Cum
4.55
0.23
3.15
3.30
Cum
4.55
0.23
0.20
0.21
Cum
4.55
0.23
3.15
3.30
Cum
4.55
0.23
3.15
3.30
Cum
4.55
0.23
3.15
3.30
Cum
4.55
0.23
3.15
3.30
Cum
5.60
0.23
3.15
4.06
Cum
Cum
1
1
4.25
5.60
0.23
0.23
3.15
3.15
3.08
4.06
Cum
0.750
0.30
3.15
0.71
Cum
0.220
0.30
3.15
0.21
Workshop Office
Page No.37
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Quantity
DW2(D)
D1
Cum
Cum
1
3
1.80
1.80
0.23
0.23
2.10
2.10
-0.87
-2.61
D2
Cum
1.00
0.23
2.10
-1.93
D3
Cum
0.90
0.23
2.10
-1.30
DW2(W)
W1
Cum
Cum
2
6
1.38
2.55
0.23
0.23
2.10
1.20
-1.33
-4.22
W3
Cum
0.90
0.23
1.20
-0.25
W2
Cum
2.00
0.23
1.20
-0.55
V1
V2
Cum
Cum
1
2
1.50
0.60
0.23
0.23
0.60
0.60
-0.21
-0.17
Shaft
Cum
3.10
0.23
1.40
-1.00
Cum
6.04
0.23
3.30
4.58
Cum
Cum
1
1
6.04
5.60
0.23
0.23
3.30
3.15
4.58
4.06
Cum
2.77
0.23
3.55
2.26
Cum
1.21
0.23
3.30
0.92
Cum
Cum
1
1
2.00
5.60
0.23
0.23
3.55
3.15
1.63
4.06
Cum
1.35
0.23
3.15
0.98
Cum
0.96
0.23
3.15
0.70
Cum
Cum
1
1
2.71
5.60
0.23
0.23
3.15
3.15
1.96
4.06
Cum
5.60
0.23
3.15
4.06
Cum
5.60
0.23
3.15
4.06
Cum
0.90
0.23
2.10
-0.87
Deduction
Deduction
D3
116.55
Floor Height
3.00
Beam Depth
0.50
Mumty
2.50
Cum
6.05
0.23
2.50
3.48
Cum
6.05
0.23
2.50
3.48
Cum
5.23
0.23
2.50
3.00
Cum
5.23
0.23
2.50
3.00
Cum
0.90
0.23
2.10
-0.43
Parapet Wall
Cum
6.500
0.25
0.30
1.46
Parapet Wall
Parapet Wall
Cum
Cum
1
1
10.22
10.22
0.23
0.23
0.30
1.00
0.71
2.35
Parapet Wall
Cum
40.45
0.23
0.30
2.79
Parapet Wall
Cum
40.45
0.23
1.00
9.30
Mumty
Parapet Wall
Cum
5.23
0.23
0.300
0.72
Parapet Wall
Cum
6.50
0.23
0.300
0.90
Deduction
D3
Parapet Wall (Terrace)
Workshop Office
Page No.38
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Workshop Office
Quantity
Total
286.60
Say
287.00
Page No.39
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
1.03
Description
Unit
No.
Floor Height
2.40
Quantity
Sqm
1.45
2.40
3.48
Sqm
1.42
2.40
3.41
Sqm
0.80
2.10
-3.36
Sqm
1.10
2.40
2.64
Sqm
1.42
2.40
3.41
Sqm
1.64
2.40
3.94
Sqm
0.80
2.10
-5.04
Total
8.47
Say
8.00
Deduction
D4
First Floor
Internal Wall (115)
Toilet
Deduction
D4
1.04
Sqm
8.00
8.00
Total
Say
8.00
8.00
0.150
18.72
STONE WORK
2.01
External Cladding
150mm high at bottom
100mm wide stone edge around window
Window
W1
W2
W3
DW2(W)
Ventilation
V1
V2
Shaft
Shaft
Sqm
124.80
Sqm
Sqm
Sqm
Sqm
14
5
4
2
2.75
2.20
1.10
1.58
0.10
0.10
0.10
0.10
1.200
1.200
1.200
3.660
11.06
3.40
1.84
2.09
Sqm
Sqm
1
4
1.50
0.60
0.10
0.10
0.600
0.600
0.42
0.96
Sqm
3.10
0.10
1.400
1.80
Total
40.29
Workshop Office
Page No.40
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
W1
W2
W3
DW2(W)
Sqm
Sqm
Sqm
Sqm
V1
V2
Shaft
Quantity
28
10
8
2
0.10
0.10
0.10
0.10
1.200
1.200
1.200
2.100
3.28
1.17
0.94
0.41
Sqm
Sqm
1
4
0.10
0.10
0.600
0.600
0.06
0.23
Sqm
0.23
1.400
0.64
Sqm
Sqm
Sqm
Sqm
Sqm
1
3
1
2
2
10.22
6.50
40.45
5.23
6.50
0.300
0.300
0.300
0.300
0.300
3.07
5.85
12.14
3.14
3.90
Sqm
Sqm
Sqm
Sqm
Sqm
1
3
1
2
2
10.22
6.50
40.45
5.23
6.50
0.127
0.127
0.127
0.127
0.127
1.30
2.48
5.14
1.33
1.65
Sqm
44
0.18
0.630
4.99
Sqm
Sqm
Sqm
2
3
2
10.22
6.50
40.45
1.766
1.766
1.766
36.10
34.45
142.87
Sqm
Sqm
2
2
5.23
6.50
1.766
1.766
18.45
22.97
Window Jambs
Window
Ventilation
Shaft
Mumty
Top
Parapet wall
Mumty
Up Rights
Parapet wall
Around Slope Cladding of terrace(Chajjas)
Slope Cladding
Slope Cladding
Slope Cladding
Mumty
Slope Cladding
Slope Cladding
346.84
Total
Say
346.84
347.00
MARBLE WORK
3.01
Sqm
Sqm
1
1
Workshop Office
1.35
2.92
0.60
0.67
0.81
1.96
Page No.41
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Quantity
First Floor
Toilet in C.W.M Office
Pantry Cum Locker Room
Sqm
Sqm
1
1
1.41
4.55
0.71
0.60
1.00
2.73
Toilet
LadiesToilet
GentsToilet
Sqm
Sqm
1
1
1.35
2.92
0.60
0.67
0.81
1.96
Total
Say
3.02
0
Metre
Metre
Metre
Metre
Metre
Metre
1
1
0
0
1
1
0
0
1
1
1.35
3.591
1.35
3.59
2.121
3.15
2.12
3.15
1.35
3.591
1.35
3.59
0
0
3.03
3.04
9.27
10.00
Total
Say
15.15
16.00
Metre
16.00
Total
Say
Each
Each
16.00
16.00
4
5
4.00
5.00
Total
Say
3.05
3.06
9.00
9.00
Sqm
Sqm
10.00
Workshop Office
0.5
Total
Say
10.00
10.00
1.000
3.00
Total
Say
3.00
3.00
Page No.42
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Quantity
Sqm
Sqm
Sqm
Sqm
12
4
7
5
1.80
1.00
0.90
0.80
2.100
2.100
2.100
2.100
45.36
8.40
13.23
8.40
Total
Say
4.02
75.39
76.00
Door Closer
D1
D2
D3
D4
Each
Each
Each
Each
12
4
7
5
1.00
1.00
1.00
1.00
12.00
4.00
7.00
5.00
Total
Say
4.03
Each
Each
7
5
28.00
28.00
Both Face
2.00
2.00
14.00
10.00
Total
Say
24.00
24.00
STEEL WORK
5.01
5.02
Metre
12
1.80
2.10
72.00
D2
Metre
1.00
2.10
20.80
D3
D4
Metre
Metre
7
5
0.90
0.80
2.10
2.10
35.70
25.00
Total
153.50
Say
154.00
SS Railing
Railing of Staircase
Ground Floor to First Floor
Staircase S1
Flight 1
Sqm
3.30
1.88
3.80
Flight 2
Sqm
1.20
0.78
1.43
Flight 3
0
Sqm
0
1
0
3.60
0
2.04
0.00
0.00
4.14
0.00
Total
9.37
0.00
Staircase S2
Flight 1
Sqm
4.20
2.20
4.74
Flight 2
Sqm
1.50
0.88
1.74
Workshop Office
SQRT(K952^2+L952^2)
SQRT(K952^2+L952^2)
0.00
Page No.43
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Flight 3
Sqm
3.00
1.62
0
0
0
0
0
0
0
0
0.00
Total
Workshop Office
Quantity
3.41
0.00
9.89
0.00
0.00
Page No.44
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Quantity
0.00
0.00
0.00
0
0
0
0
0
0
0.00
0.00
0.00 SQRT(K952^2+L952^2)
0.00
0.00
Staircase S2
0.00
0.00
Flight 1
Sqm
3.00
1.51
3.36
Flight 2
Flight 3
Sqm
Sqm
1
1
1.20
3.00
0.69
1.51
1.38
3.36
0.00
0.00
0.00
Total
8.10
0.00
Metre
4.54
Landing
4.54
Total
31.90
Metre
Kg
10.00
10.00
Metre
Kg
1
8
10.00
Metre
10.00
Kg
10.00
Metre
10.00
Kg
Metre
Kg
Weight
75x75x3 mm thick insert plate
Weight
Total Weight for 10M Railing
Kg
Kg
10.00
1.96
19.64
2.25
10.00
16.85
0.90
10.00
0.58
17.26
10.00
1.58
13.17
10.00
10.00
0.14
1.13
68.05
6.80
6.80
SAY
For
Kg
31.90
8.00
Total
Say
Metre
8.00
255.17
255.17
256.00
64.28
64.28
Total
64.28
Metre
10.00
Kg
10.00
Metre
10.00
Kg
Workshop Office
10.00
1.96
19.64
10.00
2.25
0.90
16.85
Page No.45
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
25mm, 100 dia ss .shoe
Weight
75x75x3 mm thick insert plate
Weight
Unit
No.
Metre
10.00
Kg
Metre
Kg
Kg
Kg
For
Kg
Quantity
10.00
1.58
13.17
10.00
10.00
0.14
1.13
50.79
1
1
5.08
64.28
5.08
SAY
6.00
385.67
Total
385.67
Say
386.00
59.95
6.00
FLOORING
6.04
Flooring
Ground Floor
R.S Contractors & Store
Sqm
1.00
59.95
Hardcrete
Sqm
1.80
0.23
Hardcrete
0.83
Stair
Sqm
4.55
6.27
Kota Stone
28.53
Sqm
Sqm
1
2
1.00
1.80
59.98
0.23
Hardcrete
Hardcrete
59.98
0.83
Tool Room
Sqm
1.00
57.49
Hardcrete
57.49
Sqm
Sqm
2
1
1.80
1.00
0.23
5.41
Hardcrete
Cement Concrete
0.83
5.41
W.C
Sqm
1.42
1.75
2.48
Ent.Door W.C
Sqm
0.80
0.12
0.09
Sqm
1.00
4.43
4.43
Sqm
0.90
0.23
0.21
W.C
Sqm
1.42
1.87
2.65
Ent.Door W.C
Sqm
0.77
0.12
0.09
Sqm
1.00
11.03
11.03
Sqm
0.87
0.23
0.20
Consumables Store
Sqm
1.00
58.73
Hardcrete
58.73
Sqm
1.80
0.23
Hardcrete
0.83
Sqm
1.00
29.95
Hardcrete
29.95
Sqm
Sqm
1
1
1.80
1.00
0.23
29.54
Hardcrete
Kota Stone
0.41
29.54
Covered Corridor
Sqm
60.45
2.00
Kota Stone
120.90
Total
475.38
Ladies Toilet
Gents Toilet
Workshop Office
Page No.46
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Quantity
Outer of Stair
Sqm
1.00
7.14
Kota Stone
7.14
W.C
Sqm
1.00
2.28
2.28
Sqm
1.10
0.23
0.25
Toilet
Ent. Door (Toilet)
Sqm
Sqm
1
1
2.54
0.90
2.31
0.23
5.87
0.21
Sqm
1.00
19.07
19.07
Sqm
0.89
0.23
0.20
Ladies Toilet
W.C
Sqm
1.42
1.75
2.48
Ent.Door W.C
Sqm
0.80
0.12
0.09
Sqm
1.00
4.41
4.41
Sqm
0.90
0.23
0.21
W.C
Sqm
1.00
2.60
2.60
Ent.Door W.C
Urinal Area (Gents Toilet)
Sqm
Sqm
1
1
0.80
1.00
0.12
12.19
0.09
12.19
Sqm
0.90
0.23
0.21
Open Terrace
Sqm
4.55
5.98
Cement Concrete
27.19
Sqm
Sqm
1
1
1.69
1.00
0.34
28.65
Cement Concrete
Vitrified Tiles
0.57
28.65
Sqm
1.00
0.23
Vitrified Tiles
0.23
Documentation Center
Sqm
1.00
29.95
Vitrified Tiles
29.95
Sqm
Sqm
1
1
1.00
4.78
0.23
1.60
Vitrified Tiles
Kota Stone
0.23
7.65
Covered Corridor
Sqm
60.25
2.00
Kota Stone
First Floor
Gents Toilet
120.50
747.65
Non Skid Tiles
71.33
Sqm
Cement Concrete
33.17
Sqm
Vitrified Tiles
59.05
Sqm
Hardcrete
269.83
Sqm
Kota Stone
314.27
Sqm
71.33
Sqm
7.13
Cement Concrete
33.17
Sqm
3.32
Vitrified Tiles
59.05
Sqm
5.91
Hardcrete
269.83
Sqm
26.98
Kota Stone
314.27
Sqm
31.43
747.65
Sqm
Skirting
6.01
6.02
34.00
Hardcrete
269.83
Workshop Office
Page No.47
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
H
Say
6.03
Quantity
270.00
30.30
Say
6.04
White Marble
Qty taken in Flooring
10% Area of Marble Flooring
6.05
31.00
Sqm
314.27
0.1
31.43
Total
31.43
Say
32.00
Sqm
314.27
0.9
282.84
Sqm
28
1.65
0.300
13.86
Landing-1
Sqm
1.68
2.117
3.55
Landing-2
Sqm
1.68
1.817
3.04
Tread
Landing-1
Sqm
Sqm
27
1
1.65
1.68
0.300
1.667
13.37
2.79
Landing-2
Sqm
2.07
1.667
3.45
Stair - 2
Sqm
24
1.65
0.300
11.88
Landing-1
Sqm
1.68
1.667
2.79
Landing-2
Sqm
2.07
1.667
3.45
Tread
Sqm
4.41
0.300
1.32
Tread
Sqm
4.11
0.300
1.23
Tread
Sqm
3.81
0.300
1.14
Tread
Landing-1
Sqm
Sqm
1
1
3.50
3.50
0.300
3.650
1.05
12.78
Tread
Sqm
2.75
0.300
0.83
Tread
Tread
Sqm
Sqm
1
1
2.45
2.15
0.300
0.300
0.74
0.65
Landing-2
Sqm
3.05
4.389
13.39
Sqm
5.22
1.500
7.83
Ramp
Workshop Office
Total
381.97
Say
382.00
Page No.48
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Workshop Office
Quantity
Page No.49
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
6.06
Description
Unit
No.
Quantity
31.43
Stair -1
Riser
Sqm
31
1.65
0.15
7.76
Riser
Sqm
30
1.65
0.16
7.76
Riser
Sqm
27
1.65
0.14
6.11
Riser
Sqm
4.41
0.150
0.66
Riser
Sqm
4.11
0.150
0.62
Riser
Sqm
3.81
0.150
0.57
Riser
Sqm
3.50
0.150
0.53
Riser
Sqm
2.75
0.150
0.41
Riser
Sqm
2.45
0.150
0.37
Riser
Sqm
2.15
0.150
0.32
Stair -2
First Floor to Terrace
Stair -2
6.07
Total
56.52
Say
57.00
Ht.
2.10
Pantry Ht.
2.10
1.75
2.10
13.30
2.10
19.36
2.10
13.80
Ground Floor
Ladies Toilet
W.C
Sqm
1.42
Sqm
9.22
Gents Toilet
0.00
0.00
W.C
Sqm
1.42
1.87
0.00
Sqm
14.29
2.10
30.01
D4
V2
Sqm
Sqm
-4
-2
0.80
0.60
2.10
0.60
-6.72
-0.72
D3
Sqm
-2
0.90
2.10
-3.78
Deduction
Total
Workshop Office
65.24
Page No.50
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
0.00
W.C
Sqm
6.43
Toilet
Sqm
2.54
Quantity
First Floor
Sqm
18.95
Ladies Toilet
W.C
Sqm
0
1
0.00
1.42
Sqm
9.16
0.00
Gents Toilet
2.31
0.00
1.75
2.10
13.50
2.10
20.37
2.10
39.80
2.10
0.00
13.30
2.10
19.23
0.00
0.00
W.C
Sqm
6.57
2.10
13.80
Sqm
15.68
2.10
32.93
D4
Sqm
-6
0.80
2.10
-10.08
D3
Sqm
-4
0.90
2.10
-7.56
V1
V2
Sqm
Sqm
-1
-2
1.50
0.60
0.60
0.60
-0.90
-0.72
0.00
Deduction
Total
6.07
133.66
Total
198.90
Say
199.00
Dholpur stone
Window Sill
W1
Sqm
28
2.55
0.10
7.14
W2
Sqm
10
2.00
0.10
2.00
W3
Sqm
0.90
0.10
0.72
DW2
Sqm
4.55
0.10
0.46
Total
Stone Coping over 655 wide R.C.C Slab
6.08
6.09
Sqm
Sqm
Sqm
1
3
1
10.22
6.50
40.45
10.32
0.63
0.63
0.63
6.44
12.29
25.48
Total
Say
54.53
55.00
Say
59.05
60.00
Say
5.91
6.00
Workshop Office
Page No.51
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Quantity
ROOFING
7.01
7.02
Gola
Qty transfer length of parapet wall
144.30
144.30
Total
144.30
Say
145.00
Khurra
Total no of Khurra
7.03
Metre
Each
5.00
Total
5.00
Say
5.00
Sqm
1.00
1.00
59.95
59.95
Visitor Room
P.A.S Room
Sqm
Sqm
1.00
1.00
1.00
1.00
21.22
20.94
21.22
20.94
C.W.M Office
Sqm
1.00
1.00
45.02
45.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Total
Say
147.13
148.00
0.00
SECTION 13 FINISHING
8.01
Sqm
32.94
Stair
Sqm
4.55
Sqm
Tool Room
Sqm
Shaft
F.Ht
4.700
Slab Depth
0.150
C.Ht
4.550
4.55
149.88
4.55
77.76
32.50
4.55
147.88
38.11
4.55
173.40
Sqm
9.74
4.55
44.31
W.C
Sqm
1.42
4.55
22.36
Entrance Wall
Sqm
1.42
2.40
6.82
Sqm
7.80
4.55
35.48
4.55
23.43
Gents Toilet
6.27
1.75
0.00
0.00
W.C
Sqm
1.42
1.87
Entrance Wall
Sqm
1.42
2.40
6.82
Sqm
12.87
4.55
58.56
Consumables Store
Sqm
32.52
4.55
147.98
Sqm
22.06
4.55
100.37
Stair
Sqm
17.53
4.55
79.76
Workshop Office
Page No.52
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
D1
D3
Sqm
Sqm
9
2
1.80
0.90
2.10
2.10
Quantity
Deduction
-34.02
-3.78
D4
Sqm
0.80
2.10
-6.72
W1
Sqm
2.55
1.20
-24.48
W2
W3
Sqm
Sqm
2
3
2.00
0.90
1.20
1.20
-4.80
-3.24
V2
Sqm
0.60
0.60
-1.08
Shaft
Sqm
3.10
1.40
-4.34
D1
Sqm
1.80
0.180
2.10
9.72
D3
Sqm
0.90
0.180
2.10
1.84
D4
Sqm
0.80
0.065
2.10
1.30
W1
Sqm
2.55
0.180
1.20
10.80
W2
Sqm
2.00
0.180
1.20
2.30
W3
Sqm
0.90
0.180
1.20
2.27
V2
Shaft
Sqm
Sqm
3
1
0.60
3.10
0.180
0.190
0.60
1.40
1.30
1.71
Total
1023.57
Floor Height
3.700
Slab
0.150
First Floor
0.00
3.550
0.00
Meeting Room
Sqm
0
1
0.00
32.94
3.55
116.94
Outer of Stair
Visitor Room
Sqm
Sqm
1
1
4.55
19.14
3.55
3.55
60.67
67.95
P.A.S Room
Sqm
19.96
3.55
70.86
C.W.M Office
Sqm
27.96
3.55
99.26
W.C
Sqm
5.33
3.55
18.92
Entrance wall
Sqm
1.10
2.40
5.28
Toilet
Sqm
2.54
3.55
30.53
Sqm
18.95
3.55
67.27
Shaft
Sqm
2.90
1.75
3.55
33.02
W.C
Sqm
1.42
1.75
3.55
17.44
Entrance wall
Sqm
1.42
2.40
6.82
Sqm
7.74
3.55
27.46
W.C
Sqm
5.15
3.55
18.28
Entrance wall
Sqm
1.42
2.40
6.82
Sqm
14.26
3.55
50.62
Open Terrace
Sqm
4.55
3.55
58.58
Open Terraec
Sqm
4.55
0.20
0.91
Workshop Office
6.27
2.31
5.98
Page No.53
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Quantity
AE 1,2,3
Sqm
21.62
3.55
76.75
Documentation Center
Sqm
22.06
3.55
78.31
Stair
Sqm
17.75
3.55
63.01
D1
Sqm
1.80
2.10
-11.34
D2
D3
Sqm
Sqm
4
5
1.00
0.90
2.10
2.10
-8.40
-9.45
Deduction
D4
Sqm
0.80
2.10
-10.08
W1
Sqm
2.55
1.20
-18.36
W3
Sqm
0.90
1.20
-1.08
W2
Sqm
2.00
1.20
-2.40
V1
Sqm
1.50
0.60
-0.90
V2
DW2(D)
Sqm
Sqm
3
1
0.60
1.80
0.60
2.10
-1.08
-3.78
DW2(W)
Sqm
1.38
2.10
-5.78
Shaft
Sqm
3.10
1.40
-4.34
D1
Sqm
1.80
0.180
2.10
3.24
D2
Sqm
1.00
0.180
2.10
3.74
D3
D4
Sqm
Sqm
5
6
0.90
0.80
0.180
0.065
2.10
2.10
4.59
1.95
W1
Sqm
2.55
0.180
1.20
8.10
W3
W2
Sqm
Sqm
1
1
0.90
2.00
0.180
0.180
1.20
1.20
0.76
1.15
V1
Sqm
1.50
0.180
0.60
0.76
V2
Sqm
0.60
0.180
0.60
1.30
DW2
Sqm
4.55
0.180
2.10
2.39
Shaft
Sqm
3.10
0.190
1.40
1.71
Total
928.40
Floor Height
3.00
Slab
0.150
Mumty
2.85
Internal Plaster
Sqm
4.77
D3
Sqm
0.90
D3
Sqm
0.90
6.05
2.85
61.67
2.10
-1.89
0.180
2.10
0.92
Total
60.70
Deduction
Add D/W Jambs
Total
Less dado Tile in toilet
2012.67
-199.00
1813.67
Say
Workshop Office
1814.00
Page No.54
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Workshop Office
Quantity
Page No.55
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
8.02
Description
Unit
No.
Quantity
Sqm
128.76
4.70
605.17
D1
Sqm
1.80
2.10
-34.02
D3
Sqm
0.90
2.10
-3.78
W3
Sqm
0.90
1.20
-3.24
W2
Sqm
2.00
1.20
-4.80
W1
Sqm
2.55
1.20
-24.48
V2
DW1(D)
Sqm
Sqm
1
1
0.60
2.00
0.60
2.10
-0.36
-4.20
Shaft
Sqm
3.10
1.40
-4.34
Sqm
124.80
3.70
461.76
D1
Sqm
1.80
2.10
-11.34
D2
Sqm
1.00
2.10
-8.40
D3
Sqm
0.90
2.10
-5.67
W1
Sqm
2.55
1.20
-18.36
V2
Sqm
0.60
0.60
-0.36
V1
W2
Sqm
Sqm
1
1
1.50
2.00
0.60
1.20
-0.90
-2.40
a)
Ground Floor
External Plaster
Outer periphery of Building
Deduction
First Floor
External Plaster
Deduction
W3
Sqm
0.90
1.20
-1.08
DW2(D)
Sqm
1.80
2.10
-3.78
DW2(W)
Shaft
Sqm
Sqm
2
1
1.38
3.10
2.10
1.40
-5.78
-4.34
Sqm
24.34
3.00
73.02
Sqm
0.90
2.10
-1.89
Mumty
External Plaster
Deduction
D3
Parapet Wall (Internal Plaster)
Terrace
Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot
Workshop Office
Page No.56
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Quantity
Parapet Wall
Sqm
6.500
0.23
0.30
10.34
Parapet Wall
Parapet Wall
Sqm
Sqm
1
1
10.22
10.22
0.23
0.23
0.30
1.00
5.42
12.57
Parapet Wall
Sqm
40.45
0.23
0.30
21.44
Parapet Wall
Sqm
40.45
0.23
1.00
49.75
Mumty
Parapet Wall
Sqm
5.23
0.23
0.300
5.54
Parapet Wall
Sqm
6.50
0.23
0.300
6.89
Sqm
10.22
1.766
18.05
Internal Plaster
Sqm
10.22
0.127
1.30
Internal Plaster
Sqm
6.50
1.766
34.45
Internal Plaster
Sqm
6.50
0.127
2.48
Internal Plaster
Sqm
40.45
1.766
71.43
Internal Plaster
Sqm
40.45
0.127
5.14
Mumty (Chajjas)
Internal Plaster
Sqm
5.23
1.766
18.45
Internal Plaster
Sqm
5.23
0.127
1.33
Internal Plaster
Sqm
6.50
1.766
Internal Plaster
Sqm
6.50
0.127
22.97
1.65
Sqm
0.28
0.63
0.17
Sqm
35
2.00
0.63
Sqm
Sqm
1
2
0.48
1.01
0.63
0.63
44.10
0.30
Sqm
2.03
0.63
1.28
Sqm
Sqm
1
1
1.48
0.47
0.63
0.63
0.93
0.30
1.27
External Cladding
Less Quantity External Cladding around window
8.03
-40.29
Total
1293.69
Say
1294.00
0
0
0.00
59.95
59.95
Sqm
1.00
Stair
Sqm
4.55
6.27
28.53
Sqm
1.00
59.98
59.98
Tool Room
Sqm
1.00
57.49
57.49
Shaft
Ladies Toilet
Sqm
1
0
1.00
0.00
5.41
0.00
5.41
0.00
W.C
Sqm
1.42
1.75
2.48
Sqm
1.00
4.43
4.43
Gents Toilet
W.C
Sqm
0
1
0.00
1.42
0.00
1.87
0.00
2.65
Sqm
1.00
11.03
11.03
Consumables Store
Sqm
1.00
58.73
58.73
Sqm
Sqm
1
1
1.00
1.00
29.95
29.54
29.95
29.54
Covered Corridor
Sqm
60.45
2.00
120.90
Workshop Office
Page No.57
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
First Floor
0.00
0.00
0.00
0
Meeting Room
Sqm
0
1
0.00
1.00
0.00
59.95
0.00
59.95
Outer of Stair
Sqm
1.00
7.14
7.14
Visitor Room
Sqm
1.00
21.22
21.22
P.A.S Room
C.W.M Office
Sqm
Sqm
1
1
1.00
1.00
20.94
45.02
20.94
45.02
W.C
Sqm
1.00
2.28
2.28
Toilet
Sqm
2.54
2.31
5.87
Sqm
1
0
1.00
0.00
19.07
0.00
19.07
0.00
W.C
Sqm
1.42
1.75
2.48
Sqm
1.00
4.41
4.41
0.00
0.00
0.00
Gents Toilet
Quantity
W.C
Sqm
1.00
2.60
2.60
Sqm
1.00
12.19
12.19
AE 1,2,3
Documentation Center
Sqm
Sqm
1
1
1.00
1.00
28.65
29.95
28.65
29.95
Outer of Stair
Sqm
4.78
1.60
7.65
Covered Corridor
Sqm
60.25
2.00
120.50
0.00
0.00
0.00
Staircase S1
Flight 1
Flight 2
Sqm
Sqm
1
1
1.65
1.65
3.80
1.43
0.00
0.00
6.27
2.36
Flight 3
Sqm
1.65
4.14
0.00
6.82
Landing
Landing
Sqm
Sqm
1
1
1.65
1.68
2.12
1.82
Side
Sqm
9.37
0.16
0.00
1.47
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Staircase S2
3.49
3.04
Flight 1
Sqm
1.65
4.74
0.00
7.83
Flight 2
Sqm
1.65
1.74
0.00
2.87
Flight 3
Sqm
1.65
3.41
0.00
5.62
Landing
Sqm
1.65
1.67
Landing
Sqm
1.84
1.67
Side
Sqm
9.89
0.15
0.00
1.45
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Staircase S2
0.00
0.00
0.00
0.00
2.75
3.07
Flight 1
Flight 2
Sqm
Sqm
1
1
1.65
1.65
3.36
1.38
0.00
0.00
5.54
2.28
Flight 3
Sqm
1.65
3.36
0.00
5.54
Landing
Sqm
1.65
1.67
Landing
For steps in Flight 1
Sqm
Sqm
1
11
1.84
1.65
1.67
0.14
0.00
3.07
2.49
Sqm
1.65
0.14
0.00
1.13
Sqm
11
1.65
0.14
0.00
2.49
Side
Sqm
8.10
0.14
0.00
1.11
Workshop Office
2.75
Total
934.43
Say
935.00
Page No.58
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Workshop Office
Quantity
Page No.59
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
8.04
Description
No.
Sqm
Sqm
1
1
1814.00
935.00
1814.00
935.00
Total
2749.00
Say
2749.00
Sqm
2749.00
2749.00
Total
Say
8.06
Quantity
POP
On Internal wall
On Ceiling
8.05
Unit
Sqm
1294.00
2749.00
2749.00
1294.00
Total
Say
1294.00
1294.00
ALUMINIUM WORK
9.01
a)
Aluminium frame
Door
DW1(D)
DW2(D)
Rmt
Rmt
1
1
2.00
1.80
2.10
2.10
6.20
6.00
W1
W2
W3
DW2(W)
V1
V2
Rmt
Rmt
Rmt
Rmt
Rmt
Rmt
14
5
4
2
1
4
2.55
2.00
0.90
1.375
1.50
0.60
1.2
1.2
1.2
2.1
0.6
0.6
138.60
38.00
16.80
12.45
4.80
9.60
Window Frame
232.450
Frame Size (50x50) weight 2.37kg/M
Kg
232.45
2.37
550.91
Say
b)
Shutters
Door
DW1
DW2
Sqm
Sqm
1
1
2.00
1.80
551.00
2.100
2.100
4.20
3.78
Total
7.98
Sqm
7.98
0.80
6.38
Kg
6.38
6.50
41.50
Total
Say
41.50
42.00
1.200
1.200
1.200
0.600
23.52
4.20
4.32
0.57
Window
W1
W2
W3
V1
Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot
Sqm
Sqm
Sqm
Sqm
28
5
4
1
Workshop Office
0.700
0.700
0.900
0.950
Page No.60
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Quantity
Total
80% Area are openable
Shutter weight 4.5kg / Sqm
Sqm
32.61
0.80
26.09
Kg
26.09
4.50
117.40
Total
Say
9.02
32.61
117.40
118.00
Glass
Door
DW1(D)
DW2(D)
Sqm
Sqm
W1
W2
W3
DW2(W)
V1
Sqm
Sqm
Sqm
Sqm
Sqm
Window
1
1
0
28
10
8
4
2
2.00
1.80
2.10
2.10
4.20
3.78
1.15
1.15
1.15
1.15
1.15
1.20
1.20
1.20
1.20
1.20
38.64
13.80
11.04
5.52
2.76
Total
Sqm
79.74
79.74
0.90
71.77
Total
Say
9.03
Metre
232.45
232.45
Total
Say
9.04
Window stays
W1
W2
W3
V1
Each
Each
Each
Each
14
5
4
1
71.77
72.00
232.45
233.00
2.00
1.00
1.00
1.00
28.00
5.00
4.00
1.00
Total
Say
9.05
9.06
Window Faster
W1
W2
W3
V1
Aluminium Grill
W1
W2
W3
Each
Each
Each
Each
Sqm
Sqm
Sqm
14
5
4
1
28
5
4
Workshop Office
38.00
38.00
2.00
2.00
2.00
2.00
0.7
0.7
0.9
28.00
10.00
8.00
2.00
0
0
0
Total
Say
48.00
48.00
1.2
1.2
1.2
23.52
4.20
4.32
Total
32.04
Page No.61
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Wt assume 5Kg /Sqm
Unit
No.
Kg
32.04
5.00
160.20
Total
Say
Workshop Office
Quantity
160.20
161.00
Page No.62
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
Quantity
WATER PROOFING
10.01
First Floor
0.4
Sqm
Sqm
1
1
2.12
2.12
1.10
1.10
0.40
2.33
2.57
Horizontal
Vertical
Sqm
Sqm
1
1
2.54
2.54
2.31
2.31
0.40
5.87
3.88
Horizontal
Vertical
Sqm
Sqm
1
1
1.42
1.42
1.75
1.75
0.40
2.48
2.53
Horizontal
Vertical
Sqm
Sqm
1
1
1.00
9.62
4.57
0.40
4.57
3.85
Horizontal
Vertical
Sqm
Sqm
1
1
1.65
1.65
1.20
1.20
0.40
1.97
2.28
Horizontal
Vertical
Sqm
Sqm
1
1
1.00
15.68
12.19
0.40
12.19
6.27
Horizontal
Vertical
Sqm
Sqm
1.00
1.00
1.00
33.18
59.95
0.30
59.95
9.95
Horizontal
Vertical
Sqm
Sqm
1.00
1.00
1.00
19.14
21.22
0.30
21.22
5.74
Horizontal
Vertical
Sqm
Sqm
1.00
1.00
1.00
19.97
20.94
0.30
20.94
5.99
Horizontal
Vertical
Sqm
Sqm
1.00
1.00
1.00
27.97
45.02
0.30
45.02
8.39
Total
Say
228.00
228.00
Ladies toilet
Gents toilet
Meeting Room
Visitor Room
P.A.S Room
C.W.M Office
10.02
Sqm
Sqm
1
-1
60.45
2.90
8.51
1.75
514.67
-5.08
Total
Say
509.60
510.00
660.00
-225.00
Workshop Office
Page No.63
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
H
SAY
Workshop Office
Quantity
435.00
0.00
Page No.64
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.10
2.10
2.10
2.10
0.00
Total
Say
Quantity
1.01
1.02
0.00
Sqm
Sqm
Sqm
Sqm
0.00
0.00
0.00
12.00
4.00
7.00
5.00
0.00
0.00
0.00
1.80
1.00
0.90
0.80
0.00
0.00
0.00
Each
Each
Each
Each
Each
Each
12
4
7
5
1
1
2.00
1.00
1.00
1.00
2.00
2.00
24.00
4.00
7.00
5.00
2.00
2.00
Window
W1
W2
W3
Ventilation
Each
Each
Each
14
5
4
4.00
2.00
2.00
56.00
10.00
8.00
0.00
V1
Each
2.00
2.00
Tower Bolt
250 x 10mm
Door
D1
D2
D3
D4
DW1(D)
DW2(D)
Total
Say
1.03
Each
Each
Each
Each
Each
Each
12
4
7
5
1
1
1
1
1
1
1
1
45.36
8.40
13.23
8.40
75.39
76.00
120.00
120.00
0
0
12.00
4.00
7.00
5.00
1.00
1.00
Total
Say
Workshop Office
30.00
30.00
Page No.65
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
1.04
0.00
Description
Aluminium Handles 125mm
Door
D1
D2
D3
D4
DW1(D)
DW2(D)
Window
W1
W2
W3
Ventilation
V1
0
Unit
No.
0
Each
Each
Each
Each
Each
Each
0
12
4
7
5
1
1
0
4
2
2
2
4
4
48.00
8.00
14.00
10.00
4.00
4.00
0
Each
Each
Each
0
Each
0
14
5
4
0
1
4
2
2
56.00
10.00
8.00
2.00
Total
Say
1.05
0.00
0.00
Door Stoper
Door
D1
D2
D3
D4
DW1(D)
DW2(D)
0.00
Each
Each
Each
Each
Each
Each
12
4
7
5
1
1
Quantity
164.00
164.00
2
1
1
1
2
2
24.00
4.00
7.00
5.00
2.00
2.00
Total
Say
44.00
44.00
FLOORING
2.01
2.02
Sqm
71.33
Say
72.00
False Flooring
Meeting Room
Sqm
1.00
59.95
False Flooring
59.95
Sqm
Sqm
2
1
1.80
1.00
0.23
21.22
False Flooring
False Flooring
0.83
21.22
Sqm
1.00
0.23
False Flooring
0.23
P.A.S Room
Sqm
1.00
20.94
False Flooring
20.94
Sqm
Sqm
1
1
1.00
0.90
0.23
0.23
False Flooring
False Flooring
0.23
0.21
C.W.M Office
Sqm
1.00
45.02
False Flooring
45.02
Sqm
1.50
0.23
False Flooring
0.35
Total
Say
Workshop Office
148.97
149.00
Page No.66
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
Description
Unit
No.
0.15
4.550
Quantity
FINISHING
3.01
0.00
Sqm
40
Sqm
568.02
27.30
0.15
85.20
0
Total
Say
112.50
113.00
WATER PROOFING
4.01
Cilder Filling
First Floor
0
W.C in C.W.M Office
Horizontal
Cum
2.12
0.40
1.10
0.40
0.93
0.00
2.35
0.00
0.99
0.00
3.85
0.00
0.79
0.00
6.27
0.00
23.98
0.00
8.49
0.00
8.38
0.00
18.01
Total
Say
74.03
75.00
0.00
Horizontal
Cum
2.54
2.31
0.40
Horizontal
Cum
1.42
1.75
0.40
Horizontal
Cum
9.62
0.00
0.40
Horizontal
Cum
1.65
1.20
0.40
Horizontal
Cum
Horizontal
Cum
Horizontal
Cum
Horizontal
Cum
Horizontal
Cum
1
0
1
0
1
0
1
0
1
15.68
0.00
59.95
0
21.22
0
20.94
0
45.019
Workshop Office
0
0
0.40
0.40
0.40
0.40
Page No.67
NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECTPHASE III
Doors/Windows Shedule
Length
Height
Nos
1.80
1.00
0.90
0.80
2.00
1.80
2.10
2.10
2.10
2.10
2.10
2.10
12
4
7
5
1
1
DW2(W)
2.55
2.00
0.90
1.38
1.20
1.20
1.20
2.10
14
5
4
2
V1
V2
1.50
0.60
0.60
0.60
1
4
Frame Aluminium
Frame Aluminium
Shaft
3.10
1.40
Ground Floor
Door
D1
D2
D3
D4
DW1(D)
DW2(D)
Window
W1
W2
W3
Ventilation
Shaft
1
2
Footing
Columns
Beams
Wall
Slab
Stair
Lintels
Shelves
Projection
70
220
140
100
80
100
60
60
80
Kg / Cum
Kg / Cum
Kg / Cum
Kg / Cum
Kg / Cum
Kg / Cum
Kg / Cum
Kg / Cum
Kg / Cum
5
6
7
8
9
10
11
12
13
14
15