NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE

BUILDING FOR DELHI MRTS PROJECT-PHASE III

DRAFT COST ESTIMATE WORKSHOP OFFICE

Client : Delhi Metro Rail Corporation Ltd.

Architect: M/s Mahendra Raj Consultants Private Limited

Cost Engineering Consultant: M/s Creative Consultants & Engineers, GZB

Creative Consultants & Engineers ( An ISO 9001:2008 Certified Company)


Cost Engineering Consultant
105, Lower Ground Floor, New Arya Nagar
Patel Marg, Ghaziabad-201003
M:9810660190
Ph. No. 0120-2831067
Email: cce.engg@gmail.com
Website:www.creative-consultants.co.in
Document No:-

R1

06.02.15

R0

02.02.15

Rev

Date

For Approval

Er. Ramesh

Description

Prepared By

Er Arvind Er. Amit Chaudhary


Checked B Approved By

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE


BUILDING FOR DELHI MRTS PROJECT-PHASE III
SUMMARY OF CIVIL WORK (WORKSHOP OFFICE)
S. No.

DSR Item
no.

DESCRIPTION

AMOUNT (in Rs)

SCHEDULE A DSR ITEMS


STRUCTURE
1
2
3

2
4
5

EARTH WORK
CONCRETE WORK
REINFORCED CEMENT CONCRETE

220942.25
327889.45
8960384.10

FINISHING
1
2
3
4
5
6
7
8
9
10
10

6
7
8
9
10
11
12
13
21
22
23

BRICK WORK
STONE WORK
MARBLE WORK
WOOD WORK & PVC WORK
STEEL WORK
FLOORING
ROOFING
FINISHING
ALUMINIUM WORK
WATER PROOFING
HORTICULTURE & LANDSCAPING WORK
TOTAL (A)

2155990.50
659257.60
80277.25
279070.00
566799.60
1273033.21
330651.25
1717827.60
540924.70
726478.10
185884.57
18025410.19

SCHEDULE B NDSR ITEMS


FINISHING
1
2
3
4

WOOD WORK & PVC WORK


FLOORING
FINISHING
WATER PROOFING

146658.11
1678300.42
10756.04
270720.00

TOTAL (B)

2106434.57

Total A + B

20131844.76

Say

201.32 Lacs
Area of Building

767.00 Sqm

Cost Per Sqm


Cost Per Sqft.

26247.52
2439.36

Total Reinforcement
Per Sqm
Per Sqft

60956.00 Kg
79.50 Kg/Sqm
7.40 Kg/Sqft

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.

DSR.Rf.No

Description

Quantity

Unit

Rate

280.00
0.00

Cum

155.60

820.00
0.00
0.00
0.00
71.00
0.00

Cum

112.40

Cum

46.25

90.00
0.00
0.00
0.00

Cum

910.25

###
Amount (Rs.)

SCHEDULE A:- DSR ITEMS


STRUCTURE WORK

SCHEDULE A:- DSR ITEMS


STRUCTURE WORK
1.00

EARTH WORK

1.01

2.6

a)

2.6.1

All kinds of soil

1.02

2.25

Filling available excavated earth (excluding rock) in trenches, plinth,


sides of foundations etc. in layers not exceeding 20cm in depth:
consolidating each deposited layer by ramming and watering, lead up to
50 m and lift up to 1.5 m.

1.03
a)
b)

2.26
2.26.1

1.04

2.27

Earth work in excavation by mechanical means (Hydraulic excavator) /


manual means over areas (exceeding 30cm in depth. 1.5m in width as
well as 10 sqm on plan) including disposal of excavated earth, lead upto
50m and lift upto 1.5m,
disposed earth to be levelled and neatly dressed.

Extra for every additional lift of 1.5m or part thereof in.


All kinds of soil.
1.5 m to 3.0 m
Supplying and filling in plinth with river sand under floors including
watering, ramming consolidating and dressing complete.
Total of sub-head

Project:-Delhi Metro Rail Corporation Ltd.Ajronda Depot

Workshop Office

0.00
43568.00
###
###

92168.00
###
0.00
###
0.00
###
0.00
###
3283.75
###
0.00
###
81922.50
###
###
220942.25
###
###

Page No.3

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
2.00

DSR.Rf.No

2.01

4.1

Providing and laying in position cement concrete of specified grade


excluding the cost of centering and shuttering - All work up to plinth level
:

a)

4.1.8

1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm


nominal size).

2.02

4.2

Providing and laying cement concrete in retaining walls, return


walls, walls (any thickness) including attached pilasters, columns, piers,
abutments, pillars, posts, struts, buttresses, string or lacing courses,
parapets, coping, bed blocks, anchor blocks, plain window sills, fillets,
sunken floor,etc., up to floor five level, excluding the cost of centering,
shuttering and finishing :

a)

4.2.3

1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm


nominal size)

2.03

4.11

Providing and laying damp-proof course 50mm thick with cement


concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate
20mm nominal size).

2.04

2.05

Description

Quantity
0.00
0.00

CONCRETE WORK

4.12

4.13

Extra for providing and mixing water proofing material in cement


concrete work in doses by weight of cement as per manufacturers
specification.
Applying a coat of residual petroleum bitumen of grade of VG-10 of
approved quality using 1.7kg per square metre on damp proof course
after cleaning the surface with brushes and finally with a piece of cloth
lightly soaked in kerosene oil.
Total of sub-head

Project:-Delhi Metro Rail Corporation Ltd.Ajronda Depot

Workshop Office

Unit

Rate

###
Amount (Rs.)
###
###

0.00
59.00
0.00

###
Cum

4301.15

253767.85
###
0.00
###

0.00

0.00
###

8.00
0.00

Cum

6450.00

51600.00
###
0.00
###

49.00
0.00

Sqm

314.85

15427.65
###
0.00
###

48.15

625.95
###
0.00
###

132.00

6468.00
###
###
327889.45
###
###

per 50kg
13.00 Cement
0.00

49.00
0.00
0.00
0.00

Sqm

Page No.4

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
3.00

DSR.Rf.No

Description
REINFORCED CEMENT CONCRETE

Quantity
0.00
0.00

3.01

5.9

a)
b)

5.9.1
5.9.2

c)
d)
e)

5.9.3
5.9.4
5.9.5

Centering & shuttering including strutting, propping etc. and removal of


form work for:
Foundations, footings, bases of columns etc. for mass concrete.
Walls (any thickness) including attached pilasters, butteresses, plinth
and string courses etc.
Suspended floors, roofs, landings, balconies and access platform.
Shelves (cast in situ)
Lintels, beams, plinth beams, girders, bressumers and cantilevers.

f)
g)

5.9.6
5.9.7

Columns, Pillars, Piers, Abutments, Posts and Struts


Stairs (Excluding landings)

h)

5.9.15

Small lintels not exceeding 1.5m clear span, moulding as in cornices,


window sills, string courses, bands,copings, bed plates, anchor blocks
and the like.

i)

5.9.19

Weather shade, Chajjas, corbels etc., including edges

3.02

5.18

a)

5.18.2

3.03

5.22

a)

5.22.6

Thermo-Mechanically Treated bars.

3.04

5.22A

Steel reinforcement for R.C.C. work including straightening, cutting,


bending, placing in position and binding all complete above plinth level.

a)

5.22A.6

3.05

5.30

Add for plaster drip course/ groove in plastered surface or moulding to


R.C.C. projections.

3.06

5.37

Providing and laying in position ready mixed M-25 grade concrete for
reinforced cement concrete work, using cement content as per approved
design mix, manufactured in fully automatic batching plant and
transported to site of work in transit mixer for all leads having continuous
agitated mixer, manufactured as per mix design of specified grade for
reinforced cement concrete work including pumping of R.M.C. from
transit mixer to site of laying , excluding the cost of centering, shuttering
finishing and reinforcement including cost of admixtures in
recommended proportions as per IS : 9103 to accelerate/ retard setting
of concrete, improve workability without impairing strength and durability
as per direction of the Engineer - in - charge.

###
Amount (Rs.)
###
###

Unit

Rate

0.00
261.00

Sqm

196.45

###
51273.45
###

49.00
968.00
13.00

Sqm
Sqm
Sqm

360.8
401.65
401.65

17679.20
###
388797.20
###
5221.45
###

1288.00
516.00

Sqm
Sqm

332.15
435.35

427809.20
###
224640.60
###

89.00

Sqm

395.65

35212.85
###

24.00
172.00
0.00

Sqm
Sqm

196.45
492.35

4714.80
###
84684.20
###
0.00
###

Sqm

638.90

0.00
###
5750.10
###
0.00
###

0.00
13049.00 kilogram
0.00

68.10

0.00
###
888636.90
###
0.00
###

0.00
47907.00 kilogram
0.00

68.10

0.00
###
3262466.70
###
0.00
###

Providing precast cement concrete Jali 1:2:4 (1 cement : 2 coarse sand :


4 graded stone aggregate 6mm nominal size) reinforced with 1.6 mm dia
mild steel wire including centering and shuttering, roughening cleaning,
fixing and finishing in cement mortar 1:3 (1 cement: 3 fine sand) etc.
complete excluding plastering of the jambs, sills and soffits.
0.00
9.00
0.00

40 mm thick
Steel reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding all complete upto plinth level.

Thermo-Mechanically Treated bars.

99.00
0.00

Metre

30.75

3044.25
###
0.00
###

0.00
(Note :- Cement content considered in this item is @ 330 kg/cum.
Excess/less cement used as per design mix is payable/recoverable
separately).
a)
b)

5.37.1
5.37.2

All works upto plinth level.


All works above plinth level upto floor V level.
Total of sub-head

Project:-Delhi Metro Rail Corporation Ltd.Ajronda Depot

Workshop Office

0.00
107.00
387.00
0.00
0.00
0.00

0.00
###

Cum
Cum

6644.60
7363.00

0.00
###
710972.20
###
2849481.00
###
###
8960384.10
###
###

Page No.5

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.

DSR.Rf.No

Description

Quantity
0.00
0.00
0.00
0.00

FINISHING WORK
1.00

BRICK WORK

1.01

6.1

Brick work with common burnt clay F.P.S. (non modular) bricks of class
designation 7.5 in foundation and plinth in:
Cement mortar 1:4 (1 cement : 4 coarse sand)

a)

6.1.1

1.02

6.4

a)

6.4.2

Cement mortar 1:6 (1 cement : 6 coarse sand)

1.03

6.13

Half brick masonry with common burnt clay F.P.S. (non modular) bricks
of class designation 7.5 in superstructure above plinth level up to floor V
level.

a)

6.13.2

1.04

6.15

###
Amount (Rs.)
###
###
###
###

Unit

Rate

0.00
43.00
0.00

Cum

4918.65

###
211501.95
###
0.00
###

0.00
357.00
0.00

Cum

5426.15

0.00
###
1937135.55
###
0.00
###

0.00
10.00
0.00

Sqm

665.80

0.00
###
6658.00
###
0.00
###

Sqm

69.50

Brick work with common burnt clay F.P.S. (non modular) bricks of class
designation 7.5 in superstructure above plinth level up to floor V level in
all shapes and sizes in :

Cement mortar 1:4 (1 cement :4 coarse sand)


Extra for providing and placing in position 2 Nos. 6mm dia. M.S. bars at
every third course of half brick masonry.
Total of sub-head

Project:-Delhi Metro Rail Corporation Ltd.Ajronda Depot

Workshop Office

10.00
0.00
0.00
0.00

695.00
###
###
2155990.50
###
###

Page No.6

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
2.00

DSR.Rf.No

2.01

7.36

Description
STONE WORK

3.01

MARBLE WORK
8.2

8.2.2
8.2.2.1
3.02

8.3

8.3.2
3.03

3.04

8.4

8.5

Unit

Rate

431.00
0.00
0.00
0.00
0.00
0.00

Sqm

1529.60

###
Amount (Rs.)
###
###

Wall lining butch work upto 10m height with Dholpur stone 40 mm thick
rough facing on the exposed surface with stone strips of minimum length
300 mm and required width including embedding every tenth layer and
bottom most layer in masonry or concrete after making necessary
chases of size 75x75mm and by providing layer of 75mm thick strips i/c
12mm thick bed of cement mortar 1:3 (1 Cement : 3 coarse sand) i/c
ruled pointing in cement mortar 1:2 (1 white cement : 2 stone dust) with
an admixture of pigment to match the shade of stone complete as per
direction of Engineer-in-charge.

Total of sub-head
3.00

Quantity
0.00
0.00

659257.60
###
###
659257.60
###
###
###
###

Providing and fixing 18mm thick gang saw cut mirror polished
premoulded and prepolished) machine cut for kitchen platforms, vanity
counters, window sills , facias and similar locations of required size of
approved shade, colour and texture laid over 20mm thick base cement
mortar 1:4 (1 cement : 4 coarse sand) with joints treated with white
cement, mixed with matching pigment, epoxy touch ups, including
rubbing, curing, moulding and polishing to edges to give high gloss finish
etc. complete at all levels.
0.00
0.00
13.00
0.00

Granite of any colous and shade


Area of slab upto 0.50 sqm

###
###
50258.00
###
0.00
###

Sqm

3866.00

Metre

230.55

20.00
0.00

Metre

247.40

4948.00
###
0.00
###

12.00
0.00

each

386.60

4639.20
###
0.00
###

13.00
0.00

Sqm

212.85

2767.05
###
0.00
###

Sqm

3263.50

Providing edge moulding to 18mm thick marble stone counters,


Vanities etc. including machine polishing to edge to give high gloss finish
etc. complete as per design approved by Engineer-in-Charge.
0.00
20.00
0.00

Granite work.
Extra for fixing marble /granite stone over and above corresponding
basic item, in facia and drops of width upto 150 mm with epoxy resin
based adhesive including cleaning etc. complete

0.00
###
4611.00
###
0.00
###

Extra for providing opening of required size & shape for wash
basins/kitchen sink in kitchen platform, vanity counters and similar
location in marble/Granite/stone work including necessary holes for pillar
taps etc. including rubbing and polishing of cut edges etc. complete.

3.05

8.6

Mirrior polishing on marble work/ granite work/ stone work where ever
required to give high gloss finish complete

3.06

8.1

Providing and fixing stone slab table rubbed, edges rounded and
polished of size 75x50 cm deep and 1.8 cm thick fixed in urinal
partitions by cutting a chase of appropriate width with chase cutter and
embedding the stone in the chase with epoxy grout or with cement
concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 6
mm nominal size) as per direction of Engineer-in-charge and finished
smooth.

a)

8.10.2

Granite Stone of approved shade.


Total of sub-head

Project:-Delhi Metro Rail Corporation Ltd.Ajronda Depot

Workshop Office

0.00
4.00
0.00
0.00
0.00

0.00
###
13054.00
###
###
80277.25
###
###

Page No.7

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
4.00

DSR.Rf.No

4.01

9.20

Providing and fixing ISI marked flush door shutters conforming to IS:
2202 (Part I) decorative type, core of block board construction with
frame of 1st class hard wood and well matched teak 3 ply veneering with
vertical grains or cross bands and face veneers on both faces of
shutters.

9.20.1

35 mm thick including ISI marked Stainless Steel butt hinges with


necessary screws.

9.83

Providing and fixing aluminium die cast body tubular type universal
hydraulic door closer (having brand logo with ISI, IS : 3564, embossed
on the body, door weight upto 35 kg and door width upto 700 mm) with
necessary accessories and screws etc. complete.

4.02

4.03

9.99

Description
WOOD WORK & PVC WORK

Quantity
0.00
0.00

Providing and fixing 50cm long aluminium kicking plate 100x3.15


mm anodised (anodic coating not less than grade AC 10 as per
IS :1868) transparent or dyed to required colour or shade with
necessary screws etc. complete.
Total of sub-head

Project:-Delhi Metro Rail Corporation Ltd.Ajronda Depot

Workshop Office

Unit

Rate

###
Amount (Rs.)
###
###

0.00

###

95.00
0.00

Sqm

2606.45

247612.75
###
0.00
###

35.00
0.00

Each

753.75

26381.25
###
0.00
###

30.00
0.00
0.00
0.00

Each

169.20

5076.00
###
###
279070.00
###
###

Page No.8

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
5.00

DSR.Rf.No

5.01

10.14

a)
a) i

10.14.1
10.14.1.1

5.02

10.28

Description

Quantity
0.00
0.00

STEEL WORK

Unit

Rate

###
Amount (Rs.)
###
###

Providing and fixing pressed steel door frames conforming to IS: 4351
manufactured from commercial mild steel sheet of 1.60 mm
thickness including hinges, jamb, lock jamb, bead and if required angle
threshold of mild steel angle of section 50x25mm, or base ties of 1.60
mm pressed mild steel welded or rigidly fixed together by mechanical
means, including M.S. pressed butt hinges, 2.5mm thick with mortar
guards, lock strike-plate and shock absorbers as specified and applying
a coat of approved steel primer after pre-treatment of the surface as
directed by Engineer-in-charge:

Profile B
Fixing with adjustable lugs with split end tail to each jamb.

0.00
0.00
192.00
0.00

Metre

377.70

Kg

619.40

###
###
72518.40
###
0.00
###

Providing and fixing stainless steel ( Grade 304) railing made of Hollow
tubes, channels, plates etc., including welding, grinding, buffing,
polishing and making curvature (wherever required) and fitting the same
with necessary stainless steel nuts and bolts complete, i/c fixing the
railing with necessary accessories & stainless steel dash fasteners ,
stainless steel bolts etc., of required size, on the top of the floor or the
side of waist slab with suitable arrangement as per approval of
Engineer-in-charge, ( for payment purpose only weight of stainless steel
members shall be considered excluding fixing accessories such as nuts,
bolts, fasteners etc.).
798.00
0.00
0.00
0.00

Total of sub-head

Project:-Delhi Metro Rail Corporation Ltd.Ajronda Depot

Workshop Office

494281.20
###
###
566799.60
###
###

Page No.9

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
6.00

DSR.Rf.No

6.01

11.3

a)

11.3.1

6.02

11.4

Description

Quantity
0.00
0.00

FLOORING

Rate

Sqm

353.35

Sqm

535.25

0.00
39.00
0.00

Sqm

377.25

0.00
###
14712.75
###
0.00
###

0.00
40.00
0.00

Sqm

1757.60

0.00
###
70304.00
###
0.00
###

0.00
475.00
0.00

Sqm

1141.40

0.00
###
542165.00
###
0.00
###

Sqm

1191.25

Sqm

608.35

Sqm

836.65

Sqm

1405.95

Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded


stone aggregate) finished with a floating coat of neat cement including
cement slurry, but excluding the cost of nosing of steps etc. complete.
40mm thick with 20mm nominal size stone aggregate.

0.00
43.00
0.00

6.03

11.6

a)

11.6.1

18 mm thick.

6.04

11.23

Marble stone flooring with 18mm thick marble stone (sample of marble
shall be approved by Engineer-in-charge) over 20 mm (average) thick
base of cement mortar 1:4 (1 cement : 4 coarse sand) laid and jointed
with grey cement slurry including rubbing and polishing complete with :

11.23.2

6.05

11.26

a)

11.26.1

6.06

11.27

Based on
DSR Item
11.28.1

a)
6.07

Raj Nagar plain.


Kota stone slab flooring over 20 mm (average) thick base laid over and
jointed with grey cement slurry mixed with pigment to match the shade
of the slab including rubbing and polishing complete with base of cement
mortar 1 : 4 (1 cement : 4 coarse sand) :
25 mm thick.
Kota stone slabs 20 mm thick in risers of steps, skirting, dado and pillars
laid on 12 mm (average) thick cement mortar 1:3 (1 cement 3 coarse
sand) and jointed with grey cement slurry mixed with pigment to match
the shade of the slabs, including rubbing and polishing complete.

40 mm thick fine dressed stone flooring over 20 mm (average) thick


base of cement mortar 1:5 ( 1cement : 5 coarse sand) with joints
finished flush.
Dholpur Stone

11.36

6.08

11.41

a)

11.41.2

179844.00
###
0.00
###

Cement plaster skirting (up to 30 cm height) with cement mortar 1:3 (1


cement : 3 coarse sand) finished with a floating coat of neat cement.

71.00
0.00
6.07

###
15194.05
###
0.00
###

52 mm thick cement concrete flooring with concrete hardener topping,


under layer 40 mm thick cement concrete 1:2:4 (1 cement : 2 coarse
sand : 4 graded stone aggregate 20 mm nominal size) and top layer 12
mm thick cement hardener consisting of mix 1:2 (1 cement hardener mix
: 2 graded stone aggregate 6 mm nominal size) by volume,
.hardening compound mixed @ 2 litre per 50kg of cement or as per
manufacturers specifications. This includes cost of cement slurry, but
excluding the cost of nosing of steps etc. complete.
336.00
0.00

a)

###
Amount (Rs.)
###
###

Unit

Providing and fixing Ist quality ceramic glazed wall tiles conforming to
IS : 15622 (thickness to be specified by the manufacturer ) of approved
make in all colours, shades of any size as approved by Engineer-inCharge, in skirting, risers of steps and dados over 12 mm thick bed of
cement Mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey
cement slurry @ 3.3kg per sqm including pointing in white cement mixed
with pigment of matching shade complete.(Basic cost of Ceramic tiles
Rs.30 per sqft.)

Providing and laying vitrified floor tiles in different sizes (thickness to be


specified by the manufacturer) with water absorption's less than 0.08%
and conforming to IS : 15622 of approved make in all colours and
shades, laid on 20mm thick cement mortar 1:4 (1 cement : 4 coarse
sand) including grouting the joints with white cement and matching
pigments etc., complete.
Size of Tile 600x600 mm

Project:-Delhi Metro Rail Corporation Ltd.Ajronda Depot

Workshop Office

0.00
69.00
0.00

248.00
0.00

0.00
75.00
0.00

84578.75
###
0.00
###

0.00
###
41976.01
###
0.00
###

207489.20
###
0.00
###

0.00
###
105446.25
###
0.00
###

Page No.10

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
6.09

a)

DSR.Rf.No
Description
11.46
Providing and laying Vitrified tiles in different sizes (thickness to be
specified by manufacturer) with water absorption less than 0.08 % and
conforming to I.S. 15622, of approved make in all colours & shade in
skirting, riser of steps, over 12 mm thick bed of cement mortar 1:3 (1
cement: 3 coarse sand), including grouting the joint with white cement &
matching pigments etc. complete.
11.46.2

Size of Tile 600x600 mm


Total of sub-head

Project:-Delhi Metro Rail Corporation Ltd.Ajronda Depot

Workshop Office

Quantity

0.00
8.00
0.00
0.00
0.00

Unit

Rate

Sqm

1415.40

###
Amount (Rs.)

0.00
###
11323.20
###
###
1273033.21
###
###

Page No.11

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
7.00

DSR.Rf.No

7.01

12.21

a)

12.21.1

7.02

12.22

Description

Quantity
0.00
0.00

ROOFING

12.53

Rate

Metre

143.10

Each

186.65

###
Amount (Rs.)
###
###

Providing gola 75x75 mm in cement concrete 1:2:4 (1 cement : 2 coarse


sand : 4 stone aggregate 10mm and down gauge) including finishing
with cement mortar 1:3 (1 cement : 3 fine sand) as per standard design :
0.00
181.00
0.00

In 75x75mm deep chase

###
25901.10
###
0.00
###

Making khurras 45x45 cm with average minimum thickness of 5 cm


cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone
aggregate of 20 mm nominal size) over P.V.C. sheet
1mx1mx400micron, finished with 12mm cement plaster 1:3 (1 cement :3
coarse sand) and a coat of neat cement, rounding the edges and
making and finishing the outlet complete.
7.00
0.00

7.03

Unit

1306.55
###
0.00
###

Providing and Fixing 15 mm thick densified tegular edged eco friendly


light weight calcium silicate false ceiling tiles of approved texture
spintone/cosmos / Hexa or equivalent of size 595 x 595 mm in true
horizontal level suspended on inter locking metal grid of hot dipped
galvanised steel sections (galvanising @ 120 grams per sqm including
both side) consisting of main 'T' runner suitably spaced at joints to get
required length and of size 24x38mm
made from 0.33 mm thick
(minimum) sheet, spaced 1200mm centre to centre, and cross "T" of
size 24x28mm made out of 0.33mm (Minimum) sheet, 1200mm long
spaced between main'T' at 600mm centre to centre to form a grid of
1200x600mm and secondary cross 'T' of length 600mm and size 24
x28mm made of 0.33mm thick (Minimum) sheet to be inter locked at
middle of the 1200x 600mm panel to from grid of size 600x600mm,
resting on periphery walls /partitions on a Perimeter wall angle precoated steel of size(24x24X3000 mm made of 0.40 mm thick
0.00

0.00
###

(minimum) sheet with the help of rawl plugs at 450mm centre to centre
with 25mm long dry wall screws @ 230mm interval and laying 15mm
thick densified edges calicum silicate ceiling tiles of approved texture
(Spintone / Cosmos/hexa) in the grid including, cutting/ making opening
for services like diffusers, grills,light fittings, fixtures, smoke detectors
etc., whereever required, Main 'T' runners to be suspended from ceiling
using G.I. slotted cleats of size 25x35x1.6mm fixed to ceiling with 12.5
mm dia and 50mm long dash fasteners, 4mm G.I. adjustable rods with
galvanised steel level clips of size 85 x 30 x 0.8 mm,
spaced at
1200mm centre to centre along main 'T' , bottom exposed with 24mm of
all T-sections shall be pre-painted with polyster baked paint, for all
heights, as per specifications, drawings and as directed by engineer-incharge.
184.00

Sqm

1649.15

303443.60
###

Note :- Only calcium silicate false ceiling area will be measured from wall
to wall. No deduction shall be made for exposed frames/opening (cut
outs) having area less than 0.30 sqm.The calcium silicate ceiling tile
shall have NRC. value of 0.50(Minimum), light reflection > 85%, non combustible as per B.S. 476 part IV, 100% humidity resistance and also
having thermal conductivity<0.043 w/m 0 KC.
0.00
0.00
0.00
0.00

Total of sub-head

Project:-Delhi Metro Rail Corporation Ltd.Ajronda Depot

Workshop Office

###
###
330651.25
###
###

Page No.12

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
8.00

DSR.Rf.No

Description

Quantity
0.00
0.00
0.00
2253.00
0.00

8.01
a)

13.1
13.1.2

8.02

13.2

a)

13.2.1

15 mm cement plaster on the rough side of single or half brick wall of


mix :
1:4 (1 cement 4 fine sand)

8.03
a)

13.16
13.16.1

6 mm cement plaster of mix:


1:3 (1 cement : 3 fine sand)

8.04

13.26

FINISHING
12 mm cement plaster of mix :
1:6 (1 cement : 6 fine sand)

0.00
1607.00
0.00
0.00
1161.00
0.00

13.41

a)

13.41.1

8.06
a)

13.45
13.45.1

Rate

Sqm

149.45

Sqm

189.40

Sqm

134.70

Sqm

110.95

###
Amount (Rs.)
###
###
###
336710.85
###
0.00
###
0.00
###
304365.80
###
0.00
###
0.00
###
156386.70
###
0.00
###

Providing and applying plaster of paris putty of 2 mm thickness over


plastered surface to prepare the surface even and smooth complete
3414.00
0.00

8.05

Unit

Distempering with oil bound washable distemper of approved brand and


manufacture to give an even shade
New work (two or more coats) over and including water thinnable
priming coat with cement primer.
Finishing walls with textured exterior paint of required shade :
New work (Two or more coats applied @ 3.28 ltr/10 sqm) over and
including priming coat of exterior primer applied @
2.20kg/10 sqm.

Total of sub-head

Project:-Delhi Metro Rail Corporation Ltd.Ajronda Depot

Workshop Office

378783.30
###
0.00
###

0.00

0.00
###

3414.00
0.00
0.00

Sqm

89.70

306235.80
###
0.00
###
0.00
###

1607.00
0.00
0.00
0.00

Sqm

146.45

235345.15
###
###
1717827.60
###
###

Page No.13

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
9.00

DSR.Rf.No

Description

Quantity
0.00
0.00

9.01

21.1

Providing and fixing aluminium work for doors, windows, ventilators and
partitions with extruded built up standard tubular sections / appropriate z
sections and other sections of approved make conforming to IS : 733
and IS : 1285, fixed with rawl plugs and screws or with fixing clips, or
with expansion hold fasteners including necessary filling up of gaps at
junctions, at top, bottom and sides with required PVC/neoprene felt etc.
Aluminium sections shall be smooth, rust fee, straight, mitred and
jointed mechanically wherever required including cleat angle, Aluminium
snap beading for glazing / panelling, C.P. brass/ stainless steel screws,
all complete as per architectural drawings and the directions of
Engineer-in-charge (Glazing and panelling to be paid for separately.

a)
a) i

21.1.1
21.1.1.1

For fixed portion


Anodised aluminium (anodised transparent or dyed to required shade
according to IS: 1868, Minimum anodic coating of grade AC 15)

ALUMINIUM WORK

21.1.2

For shutters of doors, windows & ventilators including providing and


fixing hinges/ pivots and making provision for fixing of fittings wherever
required including the cost of EPDM rubber / neoprene gasket required
(Fittings shall be paid for separately).

b) i

21.1.2.1

Anodised aluminium (anodised transparent or dyed to required shade


according to IS: 1868, Minimum anodic coating of grade AC 15)

21.3

a)

21.3.2

with float glass panes of 5.50mm thickness

9.03

21.80

Filling the gap in between aluminium frame & adjacent RCC/ Brick/
Stone work by providing weather silicon sealant over backer rod of
approved quality as per architectural drawings and direction of Engineerin-charge complete.

a)

21.8.1

Upto 5mm depth and 5 mm width

9.04

21.11

Providing and fixing stainless steel (SS 304 grade) adjustable friction
windows stays of approved quality with necessary stainless steel
screws etc. to the side hung windows as per direction of Engineer-incharge complete.

a)

21.11.3

9.05

21.15

a)

21.15.2

9.06

21.17

###
Amount (Rs.)
###
###

###
###

Kg.

348.50

238722.50
###
0.00
###

0.00

199.00
0.00
9.02

Rate

0.00
0.00

685.00
0.00
b)

Unit

0.00
###

Kg.

405.90

80774.10
###
0.00
###

0.00
90.00
0.00

Sqm

1054.20

0.00
###
94878.00
###
0.00
###

0.00
290.00
0.00

Metre

88.75

0.00
###
25737.50
###
0.00
###

0.00
48.00
0.00

Each

350.70

0.00
###
16833.60
###
0.00
###

0.00
60.00
0.00

Each

55.15

0.00
###
3309.00
###
0.00
###

Kg

403.35

Providing and fixing glazing in aluminium door window ventilator shutters


and partitions etc. with PVC / neoprene gasket ect. Complete as per the
architectural drawing and the directions of engineer in charge.( cost of
aluminium snap beading shall be paid in basic item):

355 X 19 mm
Providing and fixing aluminium casement windows fastener of required
length for aluminium windows with necessary screws etc. complete.
Powder coated minimum thickness 50 micron aluminium.
Providing and fixing anodised aluminium grill (anodised transparent or
dyed to required shade according to IS: 1868 with minimum anodic
coating of grade AC 15) of approved design/pattern, with approved
standard section and fixed to the existing window frame with C.P. brass/
stainless steel screws @ 200mm centre to centre, including cutting the
grill to proper opening size for fixing and operation of handles and
fixing approved anodised aluminium standard section around the
opening, all complete as per requirement and direction of Engineer-incharge. (Only weight of grill to be measured for payment).

200.00
0.00
0.00
0.00

Total of sub-head

Project:-Delhi Metro Rail Corporation Ltd.Ajronda Depot

Workshop Office

80670.00
###
###
540924.70
###
###

Page No.14

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
10.00

DSR.Rf.No

10.01

22.5

10.02

Description
WATER PROOFING

22.7

Quantity
0.00
0.00

Unit

Rate

284.00
0.00

Sqm

283.1

###
Amount (Rs.)
###
###

Providing and laying water proofing treatment in sunken portion of WCs,


bathroom etc., by applying cement slurry mixed with water proofing
cement compound consisting of applying : a) First layer of slurry of
cement @ 0.488 kg/sqm mixed with water proofing cement compound
@ 0.253 kg/sqm. This layer will be allowed to air cure for 4 hours. b)
Second layer of slurry of cement @ 0.242 kg/sqm mixed with water
proofing cement compound @ 0.126 kg/sqm. This layer will be allowed
to air cure for 4 hours followed with water curing for 48 hours. The rate
includes preparation of surface, treatment and sealing of all joints,
corners, junctions of pipes and masonry with polymer mixed slurry.
80400.40
###
0.00
###

Providing and laying integral cement based water proofing treatment


including preparation of surface as required for treatment of roofs,
balconies, terraces etc consisting of following operations: a) Applying a
slurry coat of neat cement using 2.75 kg/sqm. of cement admixed with
water proofing compound conforming to IS. 2645 and approved by
Engineer-in-charge over the RCC slab including adjoining walls upto
300mm height including cleaning the surface before treatment. b)
Laying brick bats with mortar using broken bricks/brick bats 25 mm to
115mm size with 50% of cement mortar 1:5 (1 cement : 5 coarse sand)
admixed with water proofing compound conforming to IS : 2645 and
approved by Engineer-in-charge over 20 mm thick layer of cement
mortar of mix 1:5 (1 cement :5 coarse sand ) admixed with

0.00

0.00
###

0.00

0.00
###

water proofing compound conforming to IS : 2645 and approved by


Engineer- in-charge to required slope and treating similarly the adjoining
walls upto 300 mm height including rounding of junctions of walls and
slabs c) After two days of proper curing applying a second coat of
cement slurry using 2.75kg/ sqm of cement admixed with water proofing
compound conforming to IS : 2645 and approved by Engineer-in-charge.
d) Finishing the surface with 20 mm thick jointless cement mortar of mix
1:4 (1 cement :4 coarse sand) admixed with water proofing compound
conforming to IS : 2645 and approved by Engineer-in-charge including
laying glass fibre cloth of approved quality in top layer of plaster and
finally finishing the surface with trowel with neat cement slurry and
making pattern of 300x300 mm square 3mm deep. e) The whole terrace
so finished shall be flooded with water for a minimum period of two
weeks for curing and for final test. All above operations to be done in
order and as directed and specified by the Engineer-in-Charge :

22.7.1

With average thickness of 120mm and minimum thickness at khurra as


65 mm.

Total of sub-head

Project:-Delhi Metro Rail Corporation Ltd.Ajronda Depot

Workshop Office

634.00
0.00
0.00
0.00
0.00

Sqm

1019.05

646077.70
###
###
###
726478.10
###
###

Page No.15

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
11.00

DSR.Rf.No

11.01

23.2

Description
HORTICULTURE & LANDSCAPING WORK
Supplying and stacking of good earth at site including royalty and
carriage up to 1 km (earth measured in stacks will be reduced by 20%
for payment).

Unit

Rate

541.00

Cum

343.59

185884.57
###
###
###
185884.57
###
###
###
###
###
###
###
###
###
###

95.00
0.00

Sqm,

982.50

93337.50
###
0.00
###

0.00
150.00
0.00

Each

154.24

0.00
###
23135.40
###
0.00
###

0.00
38.00
0.00

Each

254.21

0.00
###
9659.90
###
0.00
###

0.00
204.00
0.00

Each

61.84

0.00
###
12614.54
###
0.00
###

Each

143.83

Total of sub-head

SCHEDULE B:- NDSR ITEMS


FINISHING WORK

1.00
1.01

1.02

WOOD & PVC WORK


LAR

LAR

(a)
1.03

LAR

(a)
1.04

LAR

a)
1.05

LAR

a)

###
Amount (Rs.)
###
###

Quantity
0.00
0.00

Providing and fixing 1 mm thick laminate of approved brand,colour,


shade & texture on flush door with adhesive and malamine finish on
door edges complete.Only plan area of door shall be measured.

Providing and fixing Stainless steel ISI marked tower bolts of approved
make,transparent or dyed to required colour or shade with steel nuts
and screws etc. complete.
250 x 10mm
Providing and fixing Stainless steel ISI marked Sliding door bolts
transparent or dyed to required colour or shade with steel nuts and
screws etc. complete.
250 x 16mm
Providing and fixing Stainless steel ISI marked handles , transparent or
dyed to required colour or shade with steel nuts and screws etc.
complete.
125mm
Providing and fixing Stainless steel ISI marked door stopper of approved
make , transparent or dyed to required colour or shade with steel nuts
and screws etc. complete.
Twin rubber stopper
Total of sub-head

Project:-Delhi Metro Rail Corporation Ltd.Ajronda Depot

Workshop Office

0.00
55.00
0.00
0.00
0.00

0.00
###
7910.76
###
###
146658.11
###
###

Page No.16

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
COST ESTIMATE (WORKSHOP OFFICE)
S. No.
2.00

DSR.Rf.No

2.01

LAR

2.02

Description
FLOORING

LAR

###
Amount (Rs.)
###
###

Quantity
0.00
0.00

Unit

Rate

90.00
0.00

Sqm

1050.00

94500.00
###
0.00
###

186.00
0.00
0.00
0.00
0.00
0.00

Sqm

8515.06

1583800.42
###
###
1678300.42
###
###
###
###

141.00
0.00
0.00
0.00
0.00
0.00

Sqm

76.28

10756.04
###
###
10756.04
###
###
###
###

94.00

Cum

2880.00

270720.00
###
###
270720.00
###
###
###

Providing and laying anti skid floor tiles 305x305mm (thickness to be


specified by the manufacturer) of 1st quality conferming to relevent IS of
approved make in colours such as white lvory, gray fume, red and brown
laid on 20mm thick cement mortor 1:4 including pointing the joints with
white cement and matching pigment etc.

Providing and fixing access raised floor of light grade (15KNm2) UDL
panels manufactured from pressed formed corrosion resistant
galvanized steel with total over wrap of one piece top, sides and bottom
flange encapsulating high performance chip board case stiched and with
a panel to cater in the size. 600x600x31mm. The panel has to be placed
on the pedestal made from all steel construction, zinc plated consisting
of anti-vibrational head cap with cruciform up stands four panels locating
studs, positively clipped pedestal clipped to the steel top plate. The
pedestal cap shall have an electrical conductor plate for dissipation of
static electricity. The steel based plate of the pedestal shall be fixed on
the sub-floor with epoxy pedestal adhesive and/or mechanical fixing.
The access floor should be able to take a point load of 2.5KN over
25mm sq. and UDL of 15KN/sq.mtr. The panel shall be finished with high
abrasion, anti-static HPL of mica colour Y606 having fire rating as per BS 476
clause 5,6&7.

Total of sub-head
3.00
3.01

FINISHING
LAR

Providing and fixing chicken wire mesh (26 gauge) at the junctions of
RCC & brick work fixed with wire nail in cement mortar 1:4 (1 cement : 4
fine sand) etc complete.
Total of sub-head

4.00
4.01

WATER PROOFING
LAR

Providing and laying cinder filling approved quality of cinder including


supply of labour, material, and tools and plant etc. required for proper
completion of the work as per direction of Engineer-in-charge.

Total of sub-head

Project:-Delhi Metro Rail Corporation Ltd.Ajronda Depot

Workshop Office

Page No.17

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

Quantity

Total Depth

2.00

2.00
2.15

2.00
2.00

104.00
120.19

>10 Sqm

Total

224.19

SAY

225.00

SCHEDULE A:- DSR ITEMS


STRUCTURE WORK
EARTHWORK
1.01

Earthwork in excavation
F1
F2

1.02

1.03

1.04

Cum
Cum

13
13

2.00
2.15

Backfilling of earth in plinth


Total Excavation

Cum

224.19

224.19

Less PCC

Cum

-1

47.00

-47.00

Less RCC

Cum

-1

86.00

Below Flooring
Below platform near steps

Cum
Cum

1
1

475.38
3.65

Below Ramp

Cum

0.5

5.00

-86.00
3.50

1.150
1.300

546.68
16.61

1.50

1.300

4.87

SAY

659.35
660.00

extra for additional lift of 1.5m or part thereof


in.
1.5 M to 3.0 M
F1

Cum

13

2.00

2.00

0.500

26.00

F2

Cum

13

2.15

2.15

0.500

30.05

Total

56.05

SAY

57.00

0.150

71.31

Total

71.31

SAY

72.00

Sand Filling
Below Flooring

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Cum

Workshop Office

475.38

Page No.18

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

Quantity

CONCRETE WORK
2.01

a)

2.02
a)

Providing and laying in position cement concrete of


specified grade excluding the cost of centering and
shuttering - All work up to plinth level :
PCC Below Footing
F1

Cum

13

2.00

2.00

0.075

3.90

F2

Cum

13

2.15

2.15

0.075

4.51

PCC Below Flooring

Cum

475.38

0.075

35.65

PCC Below platform near steps

Cum

3.65

3.5

0.075

0.96

PCC Below Steps

Cum
Cum

1
1

4.411
2.15

0.9
0.9

0.075
0.075

0.30
0.15

PCC Below Ramp

Cum

5.20

1.5

0.075

0.59

Total
SAY

46.05
47.00

Providing and laying cement concrete in


retaining walls, return walls, walls (any thickness)
including attached pilasters, columns, piers,
1:2:4 (1 cement : 2 coarse sand : 4 graded stone
abutments, pillars, posts, struts, buttresses, string
aggregate
20 mm nominal size)
Window
or
lacingSill
courses, parapets, coping, bed blocks,
anchor
blocks,
plain window sills, fillets, sunken
W1
floor,etc., up to floor five level, excluding the cost of
W2
centering, shuttering and finishing :
W3
DW2(W)

Cum

14

2.550

0.23

0.15

1.23

Cum

2.000

0.23

0.15

0.35

Cum
Cum

4
2

0.900
1.375

0.23
0.23

0.15
0.15

0.12
0.09

V1

Cum

1.500

0.23

0.15

0.05

V2

Cum

0.600

0.23

0.15

0.08

Shaft
0

Cum

3.100

0.23

0.15

0.21

Cum
Cum

5
-5

0.30
0.01

0.30

4.550
4.550

2.05
-0.22

Cum

0.30

0.30

3.550

1.60

Cum

-5

0.01

3.550

-0.17

Total

5.40

SAY

6.00

Pcc around the Rain water pipe


Less Pipe
Ground Floor

First Floor

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Page No.19

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

2.03

Providing and laying damp-proof course 50mm


thick
with
cement
External
Wall
(230) concrete 1:2:4 (1 cement : 2
coarse sand : 4 graded stone aggregate 20mm
Wall
of Mid
Grid-1/3
nominal
size).
Wall of On Grid-1

2.04

2.05

Unit

No.

Quantity

Sqm

1.00

9.10

0.23

2.09

Sqm

1.00

5.60

0.23

1.29

Wall of On Grid-1/3

Sqm

1.00

9.10

0.23

2.09

Wall of On Grid-3
Wall of Mid Grid-3/4

Sqm
Sqm

1.00
1.00

5.60
4.55

0.23
0.23

1.29
1.05

Wall of On Grid-4

Sqm

1.00

5.60

0.23

1.29

Wall of l On Grid-4/6

Sqm

1.00

9.10

0.23

2.09

Wall of On Grid-4/6
Wall of Mid Grid-6/8

Sqm
Sqm

1.00
1.00

9.10
9.10

0.23
0.23

2.09
2.09

Wall of Mid Grid-6/8

Sqm

1.00

9.10

0.23

2.09

Wall of Mid Grid-8/9

Sqm

1.00

4.55

0.23

1.05

Wall of Mid Grid-8/9

Sqm

1.00

3.12

0.23

0.72

Wall of Mid Grid-8/9

Sqm

1.00

1.98

0.23

0.46

Wall of Near Grid-9

Sqm

1.00

1.65

0.23

0.38

Wall of Mid Grid-8/9


Wall of Mid Grid-9/11

Sqm
Sqm

1.00
1.00

2.90
9.10

0.23
0.23

0.67
2.09

Wall of Mid Grid-9/11

Sqm

1.00

9.10

0.23

2.09

Wall of Mid Grid-11/12

Sqm

1.00

4.55

0.23

1.05

Wall of Mid Grid-11/12


Wall of On Grid-12

Sqm
Sqm

1.00
1.00

4.55
5.60

0.23
0.23

1.05
1.29

Wall of Mid Grid-12/13

Sqm

1.00

4.55

0.23

1.05

Wall of On Grid-13

Sqm

1.00

7.60

0.23

1.75

Internal Wall (230)


Wall of On Grid-6

Sqm

0.00
1.00

0.00
5.60

0.00
0.23

0.00
1.29

Wall of On Grid-8

Sqm

1.00

5.60

0.23

1.29

Wall of Mid Grid-8/9


Wall of On Grid-9

Sqm
Sqm

1.00
1.00

5.02
5.60

0.23
0.23

1.15
1.29

Wall ofOn Grid-11

Sqm

1.00

5.60

0.23

1.29

Wall of Near Grid-13

Sqm

1.00

0.52

0.23

0.12

Wall of Near Grid-13

Sqm

1.00

0.22

0.23

0.05

230 mm brick work below Half B/W

0.00

0.00

0.00

Low Hight Wall 115mm Internal

0.00

0.00

0.00

wall of Mid Grid 8-9

Sqm

1.00

1.45

0.23

0.33

wall of Mid Grid 8-9

Sqm

1.00

1.42

0.23

0.33

Extra for providing and mixing water proofing


material
in from
cement
Qty
transfer
DPCconcrete work in doses by
per 50kg Cement
weight of cement as per manufacturers
specification.

Applying a coat of residual petroleum bitumen of


grade of VG-10 of approved quality using 1.7kg per
square metre on damp proof course after cleaning
Same
as DPC
Qty
the surface
with
brushes and finally with a piece of
cloth lightly soaked in kerosene oil.

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Sqm

Workshop Office

38.23

Total

38.23

SAY

39.00

0.26

9.94
Total

9.94

SAY

10.00

38.23

38.23
Total

38.23

SAY

39.00

Page No.20

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

Quantity

REINFORCED CEMENT CONCRETE


3.01
a)

Centering & Shuttering for foundation & PCC


Foundation
Footing
F1

Sqm

13

1.85

1.85

0.40

38.48

F2

Sqm

13

2.00

2.00

0.50

52.00

C1 (For F1)

Sqm

13

0.55

0.55

2.13

60.77

C1 (For F2)

Sqm

13

0.55

0.55

2.03

57.91

Total

209.17

Say

210.00

0.68

38.90

Total
SAY

38.90
39.00

Shuttering for Pedestal

b)

Shuttering For Wall


Up Rights

c)

Sqm

44

0.55

0.1

Shuttering for Slab


Ground Floor Roof
Slab on Grid A-B / 1-3
Slab on Grid A-B / 3-4
Slab on Grid A-B / 4-5
Slab on Grid A-B / 4-5
Slab on Grid A-B / 5-6
Slab on Grid A-B / 5-6
Slab on Grid A-B / 6-8
Slab on Grid A-B / 8-9
Slab on Grid A-B / 9-12
Slab on Grid A-B / 12-13
Slab on Grid A / 1-2
0.00
Landing Slab

Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm

2.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
3.00
1.00
12.00

4.55
4.55
3.31
1.01
2.04
2.28
4.55
4.55
4.55
4.55
4.55

5.60
1.15
5.60
5.60
5.60
5.60
5.60
5.60
5.60
1.15
1.77

50.96
5.25
18.54
5.66
11.42
12.77
50.96
25.48
76.44
5.25
96.64

Sqm

4.00

1.50

1.50

9.00

First Floor Roof


Slab on Grid A-B / 1-7
Slab on Grid A-B / 7-8
Slab on Grid A-B / 7-8
Slab on Grid A-B / 8-12
Slab on Grid A-B / 12-13
Slab on Grid A / 1-17

Sqm
Sqm
Sqm
Sqm
Sqm
Sqm

0.00
6.00
1.00
1.00
4.00
1.00
12.00

0.00
4.55
2.32
2.00
4.55
4.55
4.55

0.00
5.60
5.60
5.60
5.60
1.15
1.77

0.00
152.88
12.99
11.20
101.92
5.25
96.64

Landing Slab

Sqm

2.00

1.50

1.50

4.50

Mumty Slab Assume


Mumty Slab

Sqm

0.00
1.00

0.00
4.55

0.00
5.45

0.00
24.80
Total
SAY

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

778.54
779.00

Page No.21

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
d)

Description

Unit

0
0

0.00
0.00

Quantity

Shutttring for shelves


Ground Floor
Toilet

e)

No.

0.00

0.00

LadiesToilet

Sqm

1.35

0.60

0.81

GentsToilet

Sqm

2.92

0.67

1.96

0
First Floor

Sqm

0
0

0.00
0.00

0.00
0.00

0.00
0.00

Toilet in C.W.M Office

Sqm

1.41

0.71

1.00

Pantry Cum Locker Room

Sqm

4.55

0.60

2.73

Toilet
LadiesToilet

Sqm

0
1

0.00
1.35

0.00
0.60

0.00
0.81

GentsToilet

Sqm

2.92

0.67

1.96
Total

9.27

SAY

10.00

Shuttering for Beams


Plinth Beam
Horizontal Beams

0.00

Beam on Grid 1-13 / B


Vetical Beams

Sqm

2
0

53.40
0.00

0.00

0.00

0.00

0.00

0.50
0.00

106.80
0.00

Beam on Grid 1-13 / A-B

Sqm

13

5.50

0.50

71.50

Sqm
Sqm

2
1

54.6
60.45

0.45
0.23

0.55
0.40

169.26
62.26

Beam on Grid 1-13 / A-B


Beam on Mid Grid 4-6 / A-B

Sqm
Sqm

13
2

0.00

5.6
5.6

0.45
0.23

0.55
0.40

112.84
11.54

Beam on Grid 2-11/ A

Sqm

0.4

0.55

34.52

Ground Floor Roof Beam


Horizantal Beam
Beam on Grid 1-13 / B
Beam on Grid 1-13 / A
Vertical Beam

13

1.77

First Floor Roof Beam


Horizantal Beam

0
0

0.00

Beam on Grid 1-13 / A-B

Sqm

54.6

0.45

0.55

169.26

Beam on Grid 1-13 / B

Sqm

60.45

0.23

0.40

62.26

Vertical Beam
Beam on Grid 1-13 / A-B

Sqm

0
13

0
5.6

0
0.45

0.00
0.55

112.84

Beam on Mid Grid 7-8 / A-B

Sqm

5.6

0.23

0.40

5.77

Beam on Grid 2-12 / A

Sqm

13

1.77

0.4

0.55

34.52

0
0

0
0

0
0

0.00
0.00

0
Mumty Beam Assume
Horizontal Beam

0.00

4.55

0.45

0.55

0.00

Sqm

5.6

0.45

0.55

17.36

D1

Sqm

12

2.03

0.23

0.15

12.91

D2

Sqm

1.23

0.23

0.15

2.61

D3

Sqm

1.13

0.23

0.15

4.19

Beam on Grid 12-13 / A-B

Sqm

Vertical Beam
Beam on Grid 12-13 / A-B

14.11

Shuttering for Lintel


Door

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Page No.22

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

DW1(D)

Sqm

2.23

0.23

0.15

1.18

2.03

0.23

0.15

1.08

DW2(D)

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Quantity

Page No.23

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

0
W1
W2

Sqm
Sqm

14
5

0.00

0.00

2.55
2.00

0.23
0.23

0.15
0.15

18.92
5.30

W3

Sqm

DW2(W)

Sqm

0.90

0.23

0.15

1.91

1.38

0.23

0.15

1.46

Sqm

0
1

0.00
1.50

0
0.23

0.00
0.15

V1

0.00
0.80

V2

Sqm

0.60

0.23

0.15

1.27

Total
SAY

1036.45
1037.00

219.96

Window

Ventilation

Quantity

0
0

f)

Shuttering for columns


Ground Floor to First Floor
C1

Sqm

First Floor to Terrace

0.45

0.45

4.70

0.00

0.00

0.00

0.00

C1

Sqm

26
0

0.45
0.00

0.45
0.00

3.70
0.00

173.16
0.00

C1

Sqm

0.45

0.45

3.00

21.60

Total
Say

414.72
415.00

Terrace to Mumty

g)

26

Shuttring for Staircase


Ground Floor to First Floor
Staircase S1
Flight 1

Sqm

1.65

3.80

6.27

Flight 2
Flight 3

Sqm
Sqm

1
1

1.65
1.65

1.43
4.14

2.36
6.82

For steps in Flight 1

Sqm

12

1.65

0.16

3.10

For steps in Flight 2

Sqm

1.65

0.16

1.29

For steps in Flight 3

Sqm

13

1.65

0.16

3.36

Side

Sqm

9.37

0.16

1.47

Total

24.68

Staircase S2
Flight 1

Sqm

1.65

4.74

7.83

Flight 2

Sqm

1.65

1.74

2.87

Flight 3

Sqm

1.65

3.41

5.62

For steps in Flight 1

Sqm

15

1.65

0.15

3.64

For steps in Flight 2

Sqm

1.65

0.15

1.45

For steps in Flight 3

Sqm

11

1.65

0.15

2.67

Side

Sqm

9.89

0.15

1.45

Total

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

25.53

Page No.24

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

Quantity

Flight 1

Sqm

1.65

3.36

5.54

Flight 2

Sqm

1.65

1.38

2.28

Flight 3
For steps in Flight 1

Sqm
Sqm

1
11

1.65
1.65

3.36
0.14

5.54
2.49

For steps in Flight 2

Sqm

1.65

0.14

1.13

For steps in Flight 3

Sqm

11

1.65

0.14

2.49

Side

Sqm

8.10

0.14

1.11

First Floor to Terrace


Staircase S2

Total

h)

Shuttering for Sill


W1
W2
W3
DW2(W)

Sqm
Sqm
Sqm
Sqm
0

V1
V2

i)

Sqm
Sqm

14
5
4
2
0
1
4

2.78
2.23
1.13
1.38
0.00
1.73
0.83

20.57
Total

70.78

SAY

71.00

0.150
0.150
0.150
0.150

11.68
3.35
1.36
0.83

0.150
0.150

0.52
1.00

Total
Say

18.72
19.00

Shuttering Projections
First Floor
Tapered Slab
Elevation A
0

Sqm
Sqm

1
1

11.50
43.45

1.75
1.75

20.12
76.02

Side Elevation

Sqm

8.45

1.75

14.78

Mumty RCC For Projections


Elevation A

Sqm

0
2

0.00
4.23

1.75

14.78

Elevation A

Sqm

3.25

1.75

11.37
Total
SAY

3.02

Cement Concrete Jali


Shat near grid 8 & 9

3.03

137.09
138.00

Sqm

2.899

1.2

6.9576

Total

6.96

SAY

7.00

Steel reinforcement for RCC work up to Plinth


Footing

Cum

43.80

70.00

As per cofficient

3066.00

Columns Up to Plinth with Pedastal

Cum

20.77

220.00

As per cofficient

4570.00

Beams Up to Plinth

Cum

20.50

140.00

As per cofficient

2871.00

85.07
Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Total

10507.00
Page No.25

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

H
SAY

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Quantity
10507.00

Page No.26

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
3.04

Description

Unit

No.

Columns Above Plinth


Wall

Cum
Cum

46.66
1.65

220.00
100.00

As per cofficient
As per cofficient

Slab

Cum

117.42

80.00

As per cofficient

9394.00

Beams Above Plinth

Cum

117.91

140.00

As per cofficient

16507.00

Projection & Other Items


Stair

Cum
Cum

13.55
9.01

80.00
100.00

As per cofficient
As per cofficient

1085.00
902.00

Lintels

Cum

3.36

60.00

As per cofficient

202.00

Shelves

Cum

0.93

60.00

As per cofficient

56.00

0
Side Elevation

Metre
Metre
Metre

0
Mumty RCC For Projections
Elevation A
Elevation A

a)

10265.00
165.00

Total

38576.00

SAY

38576.00

Add or deduct for plaster drip course/groove in


plastered surface or moulding to R.C.C. Projections

First Floor
Tapered Slab
Elevation A

3.06

Quantity

Steel reinforcement for RCC work above Plinth

310.48

3.05

Metre
Metre

1
1
1
0
0
2
2

11.50
43.45
8.45
0.00
0.00
4.23
3.25

11.50
43.45
8.45

8.45
6.50
Total
SAY

78.35
79.00

1.85
2.00

0.400
0.500

17.80
26.00

Total

43.80

Providing and laying in position ready mixed M-25


grade concrete for reinforced cement concrete
work, using cement content as per approved
design mix, manufactured in fully automatic
All works upto
batching
plantplinth
and level.
transported to site of work in
transit mixer for all leads having continuous
agitated
Footing mixer, manufactured as per mix design of
specified
grade for reinforced cement concrete
F1
work including pumping of R.M.C. from transit
F2
mixer to site of laying , excluding the cost of
centering, shuttering finishing and reinforcement
including cost of admixtures in recommended
proportions as per IS : 9103 to accelerate/ retard
setting of concrete, improve workability without
impairing
and durability as per direction of
R.C.C. forstrength
Pedestal
the Engineer - in - charge.
C1 (For F1)

Cum
Cum

Cum

13

0.55

0.55

2.125

8.36

C1 (For F2)

Cum

13

0.55

0.55

2.025

7.96

Total

16.32

0.45

0.845

Total

4.45

13
13

1.85
2.00

0
R.C.C. for columns
Column upto plinth lvl.
C1

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Cum

26

Workshop Office

0.45

4.45

Page No.27

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

Quantity

RCC for Beam


Plinth Beam

Floor Beam Depth

0.50

Horizontal Beams
Beam on Grid 1-13 / B

Cum

53.40

0.23

0.00
12.28

0.50

0.00

Vetical Beams
Beam on Grid 1-13 / A-B

3.06

b)

Providing and laying in position ready mixed M-25


grade concrete for reinforced cement concrete
work, using cement content as per approved
design mix, manufactured in fully automatic
All
works above
plinthtransported
level upto floor
V level.
batching
plant and
to site
of work in
transit mixer for all leads having continuous
agitated
Column mixer, manufactured as per mix design of
specified
gradetofor
reinforced
Ground Floor
First
Floor cement concrete
work including pumping of R.M.C. from transit
mixer to site of layingC1, excluding the cost of
centering,
First Floorshuttering
to Terracefinishing and reinforcement
including cost of admixtures
in recommended
C1
proportions as per IS : 9103 to accelerate/ retard
Terrace
to Mumty
setting of
concrete, improve workability without
impairing strength and durability
as per direction of
C1
the Engineer - in - charge.

RCC for Wall


Up Rights

Cum

13

5.50

0.23

0.50

Total

20.50

8.22

Total

85.07

SAY

86.00

Cum

26

0.45

0.45

4.70

24.75

Cum

26

0.45

0.45

3.70

19.48

Cum

0.45

0.45

3.00

2.43

Total

46.66

0.10

0.68

Total

1.65

Slab Depth

0.150
0.150

7.64
0.79
2.78

Cum

44

0.55

RCC for SLABS

1.65

Ground Floor Roof


Slab on Grid A-B / 1-3
Slab on Grid A-B / 3-4

Cum

2
1

4.55
4.55

5.60
1.15

3.31

5.60

0.150
0.150

Slab on Grid A-B / 4-5

Cum
Cum

Slab on Grid A-B / 4-5

Cum

1.01

5.60

0.150

0.85

Slab on Grid A-B / 5-6


Slab on Grid A-B / 5-6

Cum
Cum

1
1

2.04
2.28

5.60
5.60

0.150
0.150

1.71
1.92

Slab on Grid A-B / 6-8

Cum

4.55

5.60

0.150

7.64

Slab on Grid A-B / 8-9

Cum

4.55

5.60

0.175

4.46

Slab on Grid A-B / 9-12

4.55

5.60

Slab on Grid A-B / 12-13

Cum
Cum

4.55

1.15

0.150
0.150

11.47
0.79

Slab on Grid A / 1-2

Cum

12

4.55

1.77

0.150

14.50

Landing Slab

Cum

1.50

1.50

0.150

0.00
1.35

First Floor Roof


Slab on Grid
Slab on Grid
Slab on Grid
Slab on Grid
Slab on Grid

A-B / 1-7
A-B / 7-8
A-B / 7-8
A-B / 8-12
A-B / 12-13

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

0.00
Cum
Cum
Cum
Cum
Cum

6
1
1
4
1

Workshop Office

4.55
2.32
2.00
4.55
4.55

5.60
5.60
5.60
5.60
1.15

0.150
0.150
0.150
0.150
0.150

22.93
1.95
1.68
15.29
0.79
Page No.28

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description
Slab on Grid A / 1-17

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Unit
Cum

No.
12

Workshop Office

L
4.55

B
1.77

Quantity

0.150

14.50

Page No.29

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Cum

No.
2

L
1.50

B
1.50

0.150

0.68

Cum

4.55

5.45

0.150

0.00
3.72

Total

117.42

Ground Floor Roof Beam

Beam Depth

0.55

Horizantal Beam

Beam Depth

0.40

Landing Slab
Mumty Slab Assume
Mumty Slab

Unit

Quantity

Beam on Grid 1-13 / B

Cum

54.60

0.45

0.55

27.03

Beam on Grid 1-13 / A

Cum

60.45

0.23

0.40

5.56

Beam on Grid 1-13 / A-B

Cum

13

5.60

0.45

0.55

18.02

Beam on Mid Grid 4-6 / A-B

Cum

5.60

0.23

0.40

1.03

Beam on Grid 2-11/ A

Cum

13

1.77

0.40

0.55

5.06

Beam Depth

0.55

Beam Depth

0.40

Vertical Beam

First Floor Roof Beam


Horizantal Beam
Beam on Grid 1-13 / A-B

Cum

54.60

0.45

0.55

27.03

Beam on Grid 1-13 / B

Cum

60.45

0.23

0.40

5.56
0.00

Vertical Beam
Beam on Grid 1-13 / A-B

Cum

13

5.60

0.45

0.55

18.02

Beam on Mid Grid 7-8 / A-B

Cum

5.60

0.23

0.40

0.52

Beam on Grid 2-12 / A

Cum

13

1.77

0.40

0.55

5.06

Beam on Grid 12-13 / A-B


Vertical Beam

Cum

4.55

0.45

0.55

2.25

Beam on Grid 12-13 / A-B

Cum

5.60

0.45

0.55

2.77

Total

117.91

Mumty Beam Assume


Horizontal Beam

RCC For Projections


First Floor
Tapered Slab
Elevation A
Side Elevation

Cum
Cum
Cum

1
1
1

11.50
43.45
8.45

0.173
0.173
0.173

1.99
7.52
1.46

Mumty RCC For Projections


Elevation A
Elevation A

Cum
Cum

2
2

4.23
3.25

0.173
0.173

1.46
1.12

Ground Floor to First Floor

Total

13.55

Slab Depth

0.150

Staircase S1
Flight 1
Flight 2

Cum
Cum

1
1

1.65
1.65

3.80
1.43

0.150
0.150

0.94
0.35

Flight 3

Cum

1.65

4.14

0.150

1.02

For steps in Flight 1

Cum

12

1.65

0.16

0.300

0.47

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Page No.30

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

Quantity

For steps in Flight 2

Cum

1.65

0.16

0.300

0.19

For steps in Flight 3

Cum

13

1.65

0.16

0.300

0.50

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Page No.31

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

Staircase S2

No.

Quantity

0.00

0.00

1
1

1.65
1.65

4.74
1.74

0.150
0.150

1.17
0.43

Flight 1
Flight 2

Cum
Cum

Flight 3

Cum

1.65

3.41

0.150

0.84

For steps in Flight 1

Cum

15

1.65

0.15

0.300

0.55

For steps in Flight 2


For steps in Flight 3

Cum
Cum

6
11

1.65
1.65

0.15
0.15

0.300
0.300

0.22
0.40

0.00

First Floor to Terrace

0.00

0
Staircase S2

0.00
0.00

Flight 1

Cum

1.65

3.36

0.150

0.42

Flight 2

Cum

1.65

1.38

0.150

0.17

Flight 3

Cum

1.65

3.36

0.150

0.42

For steps in Flight 1

Cum

11

1.65

0.14

0.300

0.37

For steps in Flight 2

Cum

1.65

0.14

0.300

0.17

For steps in Flight 3

Cum

11

1.65

0.14

0.300

0.37

Total

9.01

RCC for Lintle / Sill


Door
D1
D2

Cum
Cum

12
4

2.03
1.23

0.230
0.230

0.15
0.15

0.84
0.17

D3

Cum

1.13

0.230

0.15

0.27

DW1(D)
DW2(D)

Cum
Cum

1
1

2.23
2.03

0.230
0.230

0.15
0.15

0.08
0.07

W1

Cum

14

2.55

0.230

0.15

1.23

W2

Cum

2.00

0.230

0.15

0.35

W3

Cum

0.90

0.230

0.15

0.12

DW2(W)

Cum

1.38

0.230

0.15

0.09

0.00

Window

0.00

0.00

V1

Cum

1.50

0.230

0.15

0.05

V2

Cum

0.60

0.230

0.15

0.08

Total

3.36

Thick

0.10

RCC for Shelves


Ground Floor
Toilet
LadiesToilet

Cum

1.35

0.60

0.10

0.00
0.08

GentsToilet

Cum

2.92

0.67

0.10

0.20
0.00

First Floor
Toilet in C.W.M Office

Cum

1.41

0.71

0.10

0.00
0.10

Pantry Cum Locker Room

Cum

4.55

0.60

0.10

0.27

Cum
Cum

1
1

1.35
2.92

0.60
0.67

0.10
0.10

Total

0.93

Toilet
LadiesToilet
GentsToilet

0.00
0.08
0.20

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Page No.32

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

H
Total
SAY

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Quantity
310.48
311.00

Page No.33

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

F.Ht

0.845

Quantity

FINISHING WORK
BRICK MASONARY WORK
1.01

Brick work with common burnt clay F.P.S. (non


modular) bricks of class designation 7.5 in
foundation and plinth in:

0.00

Full B/W Up to Plinth Level


Ground Floor
External Wall (230)
Wall of Mid Grid-1/3

Cum

9.10

0.23

0.84

1.77

Wall of On Grid-1

Cum

5.60

0.23

0.84

1.09

Wall of On Grid-1/3
Wall of On Grid-3

Cum
Cum

1
1

9.10
5.60

0.23
0.23

0.84
0.84

1.77
1.09

Wall of Mid Grid-3/4

Cum

4.55

0.23

0.84

0.88

Wall of On Grid-4
Wall of l On Grid-4/6

Cum
Cum

1
1

5.60
9.10

0.23
0.23

0.84
0.84

1.09
1.77

Wall of On Grid-4/6

Cum

9.10

0.23

0.84

1.77

Wall of Mid Grid-6/8

Cum

9.10

0.23

0.84

1.77

Wall of Mid Grid-6/8


Wall of Mid Grid-8/9

Cum
Cum

1
1

9.10
4.55

0.23
0.23

0.84
0.84

1.77
0.88

Wall of Mid Grid-8/9

Cum

3.12

0.23

0.84

0.61

Wall of Mid Grid-8/9

Cum

1.98

0.23

0.84

0.38

Wall of Near Grid-9


Wall of Mid Grid-8/9

Cum
Cum

1
1

1.65
2.90

0.23
0.23

0.84
0.84

0.32
0.56

Wall of Mid Grid-9/11

Cum

9.10

0.23

0.84

1.77

Wall of Mid Grid-9/11

Cum

9.10

0.23

0.84

1.77

Wall of Mid Grid-11/12


Wall of Mid Grid-11/12

Cum
Cum

1
1

4.55
4.55

0.23
0.23

0.84
0.84

0.88
0.88

Wall of On Grid-12

Cum

5.60

0.23

0.84

1.09

Wall of Mid Grid-12/13

Cum

4.55

0.23

0.84

0.88

Wall of On Grid-13

Cum

7.60

0.23

0.84

1.48

Total

26.28

Internal Wall (230)


Wall of On Grid-6

Cum

5.60

0.23

0.84

1.09

Wall of On Grid-8

Cum

5.60

0.23

0.84

1.09

Wall of Mid Grid-8/9

Cum

5.02

0.23

0.84

0.98

Wall of On Grid-9

Cum

5.60

0.23

0.84

1.09

Wall ofOn Grid-11

Cum

5.60

0.23

0.84

1.09

Wall of Near Grid-13

Cum

0.52

0.23

0.84

0.10

Wall of Near Grid-13

Cum

0.22

0.23

0.84

0.04

Total

5.47

230 mm brick work below Half B/W


Low Hight Wall 115mm Internal
wall of Mid Grid 8-9

Sqm

1.45

0.23

0.84

0.28

wall of Mid Grid 8-9

Sqm

1.42

0.23

0.84

0.28

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Page No.34

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

Steps Depth

0.150

Quantity

Brick Work in Steps


Ground Floor Entrance
Front Steps
For steps

Cum

4.11

0.90

0.150

0.55

For steps

Cum

4.11

0.60

0.150

0.37

For steps

Cum

3.81

0.30

0.150

0.17

For steps

Cum

2.15

0.90

0.150

0.29

For steps

Cum

2.15

0.60

0.150

0.19

For steps

Cum

2.15

0.30

0.150

0.10

Total

33.98

Say

34.00

Side steps

1.02

Brick work with common burnt clay F.P.S. (non


modular) bricks of class designation 7.5 in
superstructure above plinth level up to floor V level
in all shapes and sizes in :

Ground Floor
External Wall (230)

F.Ht

4.70

Beam Depth

0.55

C.Ht

4.15

Front Wall of R.S Contractors & Store Mid Grid-1/3


Left Side Wall of R.S Contractors & Store On Grid-1
Back Wall of R.S Contractors & Store On Grid-1/3
Right Side Wall of R.S Contractors & Store On GridBack Wall of of Stair Mid Grid-3/4

Cum
Cum
Cum
Cum
Cum

1
1
1
1
1

9.10
5.60
9.10
5.60
4.55

0.23
0.23
0.23
0.23
0.23

4.15
4.15
4.15
4.15
4.15
4.15

8.69
5.35
8.69
5.35
4.34

Left Side Wall of PPIO& Crew Control On Grid-4


Front Wall of PPIO& Crew Control On Grid-4/6

Cum
Cum

1
1

5.60
9.10

0.23
0.23

4.15
4.15

5.35
8.69

Back Wall of PPIO& Crew Control On Grid-4/6

Cum

9.10

0.23

4.15

8.69

Front Wall of Tool Room Mid Grid-6/8

Cum

9.10

0.23

4.15

8.69

Back Wall of Tool Room Mid Grid-6/8


Front Wall of Gents & Ladies Toilet Mid Grid-8/9

Cum
Cum

1
1

9.10
4.55

0.23
0.23

4.15
4.15

8.69
4.34

Back Wall of Gents & Ladies Toilet Mid Grid-8/9

Cum

3.12

0.23

4.55

3.27

Side Wall of Gents & Ladies Toilet Mid Grid-8/9

Cum

1.98

0.23

4.55

2.07

Back Wall of Gents & Ladies Toilet Near Grid-9


Shaft Wall of Gents & Ladies Toilet Mid Grid-8/9

Cum
Cum

1
1

1.65
2.90

0.23
0.23

4.15
4.15

1.57
2.77

Front Wall of Consumables Store Mid Grid-9/11

Cum

9.10

0.23

4.15

8.69

Back Wall of Consumables Store Mid Grid-9/11

Cum

9.10

0.23

4.15

8.69

Front Wall of See In Spection Mid Grid-11/12

Cum

4.55

0.23

4.15

4.34

Back Wall of See In Spection Mid Grid-11/12

Cum

4.55

0.23

4.15

4.34

Right Side Wall of See In Spection On Grid-12

Cum

5.60

0.23

4.15

5.35

Back Wall of Stair Mid Grid-12/13

Cum

4.55

0.23

4.15

4.34

Right Side Wall of Stair On Grid-13

Cum

7.60

0.23

4.15

7.25

DW1(D)

Cum

2.00

0.23

2.10

-0.97

D1

Cum

1.80

0.23

2.10

-7.82

D3

Cum

0.90

0.23

2.10

-0.87

W1

Cum

2.55

0.23

1.20

-5.63

W2

Cum

2.00

0.23

1.20

-1.10

W3

Cum

0.90

0.23

1.20

-0.75

V2

Cum

0.60

0.23

0.60

-0.17

Shaft

Cum

3.10

0.23

1.40

-1.00

Deduction

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Page No.35

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Unit

No.

Workshop Office

Quantity

Page No.36

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

Quantity

Mid Wall of PPIO& Crew Control & Tool Room On Gr


Mid Wall of Tool Room & Ladies toilet On Grid-8

Cum
Cum

1
1

5.60
5.60

0.23
0.23

4.15
4.15

5.35
5.35

Mid Wall of Ladies & Gents tolet Mid Grid-8/9

Cum

5.02

0.23

4.55

5.25

Mid Wall of Ladies toilet & Consumables Store On

Cum

5.60

0.23

4.55

5.86

Mid Wall of Consumables Store & See Inspection sta


Wall of in Stair Near Grid-13

Cum
Cum

1
1

5.60
0.52

0.23
0.30

4.15
4.15

5.35
0.65

Wall of in Stair Near Grid-13

Cum

0.22

0.30

4.15

0.27

Internal Wall (230)

139.28
First Floor

Floor Height

3.70

Beam Depth

0.55

External Wall (230)

3.15

Front Wall of Meeting Room Mid Grid-1/3

Cum

9.10

0.23

3.15

6.59

Left side Wall of Meeting Room On Grid-1


Back Wall of Meeting Room Mid Grid-1/3

Cum
Cum

1
1

5.60
9.10

0.23
0.23

3.15
3.15

4.06
6.59

Right Side Wall of Meeting Room On Grid-3

Cum

5.60

0.23

3.15

4.06

Back Wall of of Stair Mid Grid-3/4

Cum

4.55

0.23

3.15

3.30

Left Side Wall of Visitors Room On Grid-4


Front Wall of Visitors Room Near Grid-4

Cum
Cum

1
1

5.60
3.31

0.23
0.23

3.15
3.15

4.06
2.40

Back Wall of Visitors Room Near Grid-4

Cum

3.31

0.23

3.15

2.39

Front Wall of P.A.S Room Near Grid-5/6

Cum

3.28

0.23

3.15

2.38

Back Wall of P.A.S Room Near Grid-5/6


Front Wall of C.W.M Office Mid Grid-6/7

Cum
Cum

1
1

3.28
7.06

0.23
0.23

3.15
3.15

2.38
5.11

Back Wall of C.W.M Office Near Grid-6/7

Cum

7.06

0.23

3.15

5.11

Front Wall of Pantry Cum Locker Room Mid Grid-7/8


Back Wall of Toilet Mid Grid-7/8

Cum
Cum

1
1

4.55
4.55

0.23
0.23

3.15
3.15

3.30
3.30

Front Wall of Gents & Ladies Toilet Mid Grid-8/9

Cum

4.55

0.23

3.15

3.30

Back Wall of Gents & Ladies Toilet Near Grid-8

Cum

3.13

0.23

3.15

2.27

Side Wall of Gents & Ladies Toilet Mid Grid-8/9

Cum

1.75

0.23

3.15

1.27

Back Wall of Gents & Ladies Toilet Near Grid-9

Cum

1.65

0.23

3.15

1.20

Shaft Wall of Gents & Ladies Toilet Mid Grid-8/9

Cum

2.90

0.23

3.15

2.10

Front Wall of OpenTerrace Mid Grid-9/10

Cum

4.55

0.23

3.15

3.30

Back Wall of OpenTerrace Mid Grid-9/10

Cum

4.55

0.23

0.20

0.21

Front Wall of AE1,2,3, Mid Grid-10/11

Cum

4.55

0.23

3.15

3.30

Back Wall of AE1,2,3, Mid Grid-10/11

Cum

4.55

0.23

3.15

3.30

Front Wall of Documentation Centre Mid Grid-11/12

Cum

4.55

0.23

3.15

3.30

Back Wall of Documentation Centre Mid Grid-11/12

Cum

4.55

0.23

3.15

3.30

Side Wall of Documentation Centre On Grid-12

Cum

5.60

0.23

3.15

4.06

Back Wall of Stair Mid Grid-12-13


Side Wall of Stair On Grid-13

Cum
Cum

1
1

4.25
5.60

0.23
0.23

3.15
3.15

3.08
4.06

Wall of Stair On Grid-13

Cum

0.750

0.30

3.15

0.71

Wall of Stair On Grid-13

Cum

0.220

0.30

3.15

0.21

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Page No.37

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

Quantity

DW2(D)
D1

Cum
Cum

1
3

1.80
1.80

0.23
0.23

2.10
2.10

-0.87
-2.61

D2

Cum

1.00

0.23

2.10

-1.93

D3

Cum

0.90

0.23

2.10

-1.30

DW2(W)
W1

Cum
Cum

2
6

1.38
2.55

0.23
0.23

2.10
1.20

-1.33
-4.22

W3

Cum

0.90

0.23

1.20

-0.25

W2

Cum

2.00

0.23

1.20

-0.55

V1
V2

Cum
Cum

1
2

1.50
0.60

0.23
0.23

0.60
0.60

-0.21
-0.17

Shaft

Cum

3.10

0.23

1.40

-1.00

Mid Wall of Visitors Room & P.A.S Room Near Grid-

Cum

6.04

0.23

3.30

4.58

Mid Wall of P.A.S Room & C.W.M Office Mid Grid-5/


Mid Wall of C.W.M Office & Pantry Or Toilet On Grid

Cum
Cum

1
1

6.04
5.60

0.23
0.23

3.30
3.15

4.58
4.06

Mid Wall of Toilet & Pantry Mid Grid-7/8

Cum

2.77

0.23

3.55

2.26

Mid Wall of Toilet & Pantry Mid Grid-7/8

Cum

1.21

0.23

3.30

0.92

Mid Wall of Toilet & Pantry Mid Grid-7/8


Mid Wall of Toilet & Pantry On Grid-8

Cum
Cum

1
1

2.00
5.60

0.23
0.23

3.55
3.15

1.63
4.06

Mid Wall of Gents & ladies toilet Mid Grid-8/9

Cum

1.35

0.23

3.15

0.98

Mid Wall of Gents & ladies toilet Mid Grid-8/9

Cum

0.96

0.23

3.15

0.70

Mid Wall of Gents & ladies toilet Mid Grid-8/9


Mid Wall of Gents & ladies toilet & Open Terrace On

Cum
Cum

1
1

2.71
5.60

0.23
0.23

3.15
3.15

1.96
4.06

Mid Wall of Open Terrace & AE 1,2,3 On Grid/10

Cum

5.60

0.23

3.15

4.06

Mid Wall of AE 1,2,3 & Documentation Centre On Gr

Cum

5.60

0.23

3.15

4.06

Cum

0.90

0.23

2.10

-0.87

Deduction

Internal Wall (230)

Deduction
D3

116.55
Floor Height

3.00

Beam Depth

0.50

Mumty

2.50

External Wall (230)


Left Side Wall

Cum

6.05

0.23

2.50

3.48

Right Side Wall

Cum

6.05

0.23

2.50

3.48

Back Side Wall

Cum

5.23

0.23

2.50

3.00

Front Side Wall

Cum

5.23

0.23

2.50

3.00

Cum

0.90

0.23

2.10

-0.43

Parapet Wall

Cum

6.500

0.25

0.30

1.46

Parapet Wall
Parapet Wall

Cum
Cum

1
1

10.22
10.22

0.23
0.23

0.30
1.00

0.71
2.35

Parapet Wall

Cum

40.45

0.23

0.30

2.79

Parapet Wall

Cum

40.45

0.23

1.00

9.30

Mumty
Parapet Wall

Cum

5.23

0.23

0.300

0.72

Parapet Wall

Cum

6.50

0.23

0.300

0.90

Deduction
D3
Parapet Wall (Terrace)

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Page No.38

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Unit

No.

Workshop Office

Quantity

Total

286.60

Say

287.00

Page No.39

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
1.03

Description

Unit

No.

Floor Height

2.40

Quantity

Half B/W above plinth in superstructure


Ground Floor
Internal Wall (115)
Toilet
Front wall of WC in Toilet Mid Grid 8-9

Sqm

1.45

2.40

3.48

Front wall of WC in Toilet Mid Grid 8-9

Sqm

1.42

2.40

3.41

Sqm

0.80

2.10

-3.36

Front wall of WC in Toilet Mid Grid 8-9


Toilet

Sqm

1.10

2.40

2.64

Front wall of WC in Toilet Mid Grid 8-9

Sqm

1.42

2.40

3.41

Front wall of WC in Toilet Mid Grid 8-9

Sqm

1.64

2.40

3.94

Sqm

0.80

2.10

-5.04

Total

8.47

Say

8.00

Deduction
D4

First Floor
Internal Wall (115)
Toilet

Deduction
D4

1.04

Extra for providing and placing in position 2 Nos.


6mm
dia as half brick masonary
Qty same
As total quantity of Half Brick work

Sqm

8.00

8.00
Total
Say

8.00
8.00

0.150

18.72

STONE WORK
2.01

External Cladding
150mm high at bottom
100mm wide stone edge around window
Window
W1
W2
W3
DW2(W)
Ventilation
V1
V2
Shaft
Shaft

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Sqm

124.80

Sqm
Sqm
Sqm
Sqm

14
5
4
2

2.75
2.20
1.10
1.58

0.10
0.10
0.10
0.10

1.200
1.200
1.200
3.660

11.06
3.40
1.84
2.09

Sqm
Sqm

1
4

1.50
0.60

0.10
0.10

0.600
0.600

0.42
0.96

Sqm

3.10

0.10

1.400

1.80

Total

40.29

Workshop Office

Page No.40

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

W1
W2
W3
DW2(W)

Sqm
Sqm
Sqm
Sqm

V1
V2
Shaft

Quantity

28
10
8
2

0.10
0.10
0.10
0.10

1.200
1.200
1.200
2.100

3.28
1.17
0.94
0.41

Sqm
Sqm

1
4

0.10
0.10

0.600
0.600

0.06
0.23

Sqm

0.23

1.400

0.64

Sqm
Sqm
Sqm
Sqm
Sqm

1
3
1
2
2

10.22
6.50
40.45
5.23
6.50

0.300
0.300
0.300
0.300
0.300

3.07
5.85
12.14
3.14
3.90

Sqm
Sqm
Sqm
Sqm
Sqm

1
3
1
2
2

10.22
6.50
40.45
5.23
6.50

0.127
0.127
0.127
0.127
0.127

1.30
2.48
5.14
1.33
1.65

Sqm

44

0.18

0.630

4.99

Sqm
Sqm
Sqm

2
3
2

10.22
6.50
40.45

1.766
1.766
1.766

36.10
34.45
142.87

Sqm
Sqm

2
2

5.23
6.50

1.766
1.766

18.45
22.97

Window Jambs
Window

Ventilation

Shaft

Stone Cladding of Parapet wall


Bottom
Parapet wall

Mumty
Top
Parapet wall

Mumty
Up Rights
Parapet wall
Around Slope Cladding of terrace(Chajjas)
Slope Cladding
Slope Cladding
Slope Cladding
Mumty
Slope Cladding
Slope Cladding

346.84
Total
Say

346.84
347.00

MARBLE WORK
3.01

Granite of any colous and shade


On Counter Basins
Ground Floor
Toilet
LadiesToilet
GentsToilet

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Sqm
Sqm

1
1

Workshop Office

1.35
2.92

0.60
0.67

0.81
1.96

Page No.41

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

Quantity

First Floor
Toilet in C.W.M Office
Pantry Cum Locker Room

Sqm
Sqm

1
1

1.41
4.55

0.71
0.60

1.00
2.73

Toilet
LadiesToilet
GentsToilet

Sqm
Sqm

1
1

1.35
2.92

0.60
0.67

0.81
1.96
Total
Say

3.02

Providing edge moulding to 18mm thick marble


stone
counters,
Ground
Floor Vanities etc. including machine
polishing to edge to give high gloss finish etc.
Toilet
complete as per design approved by Engineer-inLadiesToilet
Charge.
GentsToilet
0
First Floor
Toilet in C.W.M Office
Pantry Cum Locker Room
0
Toilet
LadiesToilet
GentsToilet

0
Metre
Metre

Metre
Metre

Metre
Metre

1
1
0
0
1
1
0
0
1
1

1.35
3.591

1.35
3.59

2.121
3.15

2.12
3.15

1.35
3.591

1.35
3.59

0
0
3.03

3.04

Extra for fixing marble /granite stone over and


above corresponding basic item, in facia and drops
of width upto 150 mm with epoxy resin based
adhesive including cleaning etc. complete
Extra for providing Opening in countersfor oval
shape wash basin
Ground Floor
First Floor

9.27
10.00

Total
Say

15.15
16.00

Metre

16.00
Total
Say

Each
Each

16.00
16.00

4
5

4.00
5.00
Total
Say

3.05

3.06

Mirrior polishing on marble work/ granite work/


stone work where ever required to
give as
high
gloss
Same
counter
finish complete

Providing and fixing stone slab table rubbed,


edges rounded and polished of size
75x50
cm
Urinal
Partition
deep and 1.8 cm thick fixed in urinal partitions
by cutting a chase of appropriate width with chase
cutter and embedding the stone in the chase with
epoxy grout or with cement concrete 1:2:4 (1
cement : 2 coarse sand : 4 graded stone aggregate
6 mm nominal size) as per direction of Engineer-incharge and finished smooth.

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

9.00
9.00

Sqm

Sqm

10.00

Workshop Office

0.5

Total
Say

10.00
10.00

1.000

3.00

Total
Say

3.00
3.00

Page No.42

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

Quantity

WOOD & PVC WORK


4.01

35 mm th.Flush Doors as / specs.


D1
D2
D3
D4

Sqm
Sqm
Sqm
Sqm

12
4
7
5

1.80
1.00
0.90
0.80

2.100
2.100
2.100
2.100

45.36
8.40
13.23
8.40

Total
Say
4.02

75.39
76.00

Door Closer
D1
D2
D3
D4

Each
Each
Each
Each

12
4
7
5

1.00
1.00
1.00
1.00

12.00
4.00
7.00
5.00
Total
Say

4.03

Anodised Aluminium Kick Plate


Both faces of Doors
D3
D4

Each
Each

7
5

28.00
28.00

Both Face
2.00
2.00

14.00
10.00
Total
Say

24.00
24.00

STEEL WORK
5.01

5.02

Pressed Steel door frames


D1

Metre

12

1.80

2.10

72.00

D2

Metre

1.00

2.10

20.80

D3
D4

Metre
Metre

7
5

0.90
0.80

2.10
2.10

35.70
25.00

Total

153.50

Say

154.00

SS Railing
Railing of Staircase
Ground Floor to First Floor
Staircase S1

Flight 1

Sqm

3.30

1.88

3.80

Flight 2

Sqm

1.20

0.78

1.43

Flight 3
0

Sqm
0

1
0

3.60
0

2.04
0.00

0.00

4.14
0.00

Total

9.37

0.00

Staircase S2

Flight 1

Sqm

4.20

2.20

4.74

Flight 2

Sqm

1.50

0.88

1.74

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

SQRT(K952^2+L952^2)

SQRT(K952^2+L952^2)

0.00

Page No.43

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

Flight 3

Sqm

3.00

1.62

0
0

0
0

0
0

0
0

0.00
Total

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Quantity
3.41

0.00
9.89

0.00
0.00

Page No.44

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

Quantity

0.00

0.00

0.00

0
0

0
0

0
0

0.00
0.00
0.00 SQRT(K952^2+L952^2)

0.00
0.00

Staircase S2

0.00

0.00

Flight 1

Sqm

3.00

1.51

3.36

Flight 2
Flight 3

Sqm
Sqm

1
1

1.20
3.00

0.69
1.51

1.38
3.36

0.00

0.00

0.00

Total

8.10

0.00

Metre

4.54

First Floor to Terrace

Landing

4.54

Total

31.90

Railling weight of 10M


Type A
50.8mm dia stainless steel handrail (1.58mm thick
for straight)
Weight

Metre
Kg

10.00

10.00

38.1mm dia 2.5mm thick stainless steel uprights @


1.2m c/c
Weight

Metre
Kg

1
8

10.00

16mm dia stainless steel tubular member (1.58mm


thick for straight)
Weight

Metre

10.00

Kg

10.00

25mm, 100 dia ss .shoe

Metre

10.00

Kg

Metre
Kg

Weight
75x75x3 mm thick insert plate
Weight
Total Weight for 10M Railing

Kg

Total Weight for 1M Railing

Kg

10.00
1.96

19.64

2.25

10.00
16.85

0.90

10.00
0.58

17.26
10.00

1.58

13.17

10.00

10.00
0.14

1.13
68.05

6.80

6.80
SAY

For

Kg

31.90

8.00
Total
Say

Corridor First Floor

Metre

8.00
255.17
255.17
256.00

64.28

64.28
Total

64.28

Railling weight of 10M


Type C
50.8mm dia stainless steel handrail (1.58mm thick
for straight)
Weight

Metre

10.00

Kg

10.00

38.1mm dia 2.5mm thick stainless steel uprights @


1.2m c/c
Weight

Metre

10.00

Kg

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

10.00
1.96

19.64
10.00

2.25

0.90

16.85

Page No.45

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description
25mm, 100 dia ss .shoe
Weight
75x75x3 mm thick insert plate
Weight

Unit

No.

Metre

10.00

Kg

Metre
Kg

Total Weight for 10M Railing

Kg

Total Weight for 1M Railing

Kg

For

Kg

Quantity
10.00

1.58

13.17

10.00

10.00
0.14

1.13
50.79

1
1

5.08
64.28

5.08
SAY

6.00
385.67

Total

385.67

Say

386.00

59.95

6.00

FLOORING
6.04

Flooring
Ground Floor
R.S Contractors & Store

Sqm

1.00

59.95

Hardcrete

Ent. Door (R.S Contractors & Store)

Sqm

1.80

0.23

Hardcrete

0.83

Stair

Sqm

4.55

6.27

Kota Stone

28.53

PPIO & Crew Control


Ent. Door (PPIO & Crew Control)

Sqm
Sqm

1
2

1.00
1.80

59.98
0.23

Hardcrete
Hardcrete

59.98
0.83

Tool Room

Sqm

1.00

57.49

Hardcrete

57.49

Ent. Door (Tool Room)


Shaft

Sqm
Sqm

2
1

1.80
1.00

0.23
5.41

Hardcrete
Cement Concrete

0.83
5.41

W.C

Sqm

1.42

1.75

Non Skid Tiles

2.48

Ent.Door W.C

Sqm

0.80

0.12

Non Skid Tiles

0.09

Washbasin Area (Ladies Toilet)

Sqm

1.00

4.43

Non Skid Tiles

4.43

Ent. Door Washbasin Area

Sqm

0.90

0.23

Non Skid Tiles

0.21

W.C

Sqm

1.42

1.87

Non Skid Tiles

2.65

Ent.Door W.C

Sqm

0.77

0.12

Non Skid Tiles

0.09

Urinal Area (Gents Toilet)

Sqm

1.00

11.03

Non Skid Tiles

11.03

Ent. Door Urinal Area

Sqm

0.87

0.23

Non Skid Tiles

0.20

Consumables Store

Sqm

1.00

58.73

Hardcrete

58.73

Ent. Door (Consumables Store)

Sqm

1.80

0.23

Hardcrete

0.83

See Inspection & Inspection Staff

Sqm

1.00

29.95

Hardcrete

29.95

Ent.See Inspection & Inspection Staff


Stair

Sqm
Sqm

1
1

1.80
1.00

0.23
29.54

Hardcrete
Kota Stone

0.41
29.54

Covered Corridor

Sqm

60.45

2.00

Kota Stone

120.90

Total

475.38

Ladies Toilet

Gents Toilet

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Page No.46

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

Quantity

Outer of Stair

Sqm

1.00

7.14

Kota Stone

7.14

W.C

Sqm

1.00

2.28

Non Skid Tiles

2.28

Ent. Door (Toilet W.C)

Sqm

1.10

0.23

Non Skid Tiles

0.25

Toilet
Ent. Door (Toilet)

Sqm
Sqm

1
1

2.54
0.90

2.31
0.23

Non Skid Tiles


Non Skid Tiles

5.87
0.21

Pantry Cum Locker Room

Sqm

1.00

19.07

Non Skid Tiles

19.07

Ent. Door (Pantry Cum Locker Room)

Sqm

0.89

0.23

Non Skid Tiles

0.20

Ladies Toilet
W.C

Sqm

1.42

1.75

Non Skid Tiles

2.48

Ent.Door W.C

Sqm

0.80

0.12

Non Skid Tiles

0.09

Washbasin Area (Ladies Toilet)

Sqm

1.00

4.41

Non Skid Tiles

4.41

Ent. Door Washbasin Area

Sqm

0.90

0.23

Non Skid Tiles

0.21

W.C

Sqm

1.00

2.60

Non Skid Tiles

2.60

Ent.Door W.C
Urinal Area (Gents Toilet)

Sqm
Sqm

1
1

0.80
1.00

0.12
12.19

Non Skid Tiles


Non Skid Tiles

0.09
12.19

Ent. Door (Urinal Area)

Sqm

0.90

0.23

Non Skid Tiles

0.21

Open Terrace

Sqm

4.55

5.98

Cement Concrete

27.19

Ent. Door (Open Terrace)


AE 1,2,3

Sqm
Sqm

1
1

1.69
1.00

0.34
28.65

Cement Concrete
Vitrified Tiles

0.57
28.65

Ent. Door (AE 1,2,3)

Sqm

1.00

0.23

Vitrified Tiles

0.23

Documentation Center

Sqm

1.00

29.95

Vitrified Tiles

29.95

Ent. Door (Documentation)


Outer of Stair

Sqm
Sqm

1
1

1.00
4.78

0.23
1.60

Vitrified Tiles
Kota Stone

0.23
7.65

Covered Corridor

Sqm

60.25

2.00

Kota Stone

First Floor

Gents Toilet

120.50

747.65
Non Skid Tiles

71.33

Sqm

Cement Concrete

33.17

Sqm

Vitrified Tiles

59.05

Sqm

Hardcrete

269.83

Sqm

Kota Stone

314.27

Sqm

Non Skid Tiles

71.33

Sqm

7.13

Cement Concrete

33.17

Sqm

3.32

Vitrified Tiles

59.05

Sqm

5.91

Hardcrete

269.83

Sqm

26.98

Kota Stone

314.27

Sqm

31.43

Total Floor Area

747.65

Sqm

Skirting

6.01

Cement Concrete flooring


33.17

Qty taken in Flooring


Say

6.02

34.00

Hardcrete
269.83

Qty taken in Flooring


Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Page No.47

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

H
Say

6.03

Quantity
270.00

Cement Plaster skirting


Qty taken in Flooring

30.30
Say

6.04

White Marble
Qty taken in Flooring
10% Area of Marble Flooring

6.05

31.00

Sqm

314.27

0.1

31.43
Total

31.43

Say

32.00

Kota Sone Flooring


10% Area of Marble Flooring

Sqm

314.27

0.9

282.84

Ground Floor to First Floor


Stair Steps (Tread)
Stair -1
Tread

Sqm

28

1.65

0.300

13.86

Landing-1

Sqm

1.68

2.117

3.55

Landing-2

Sqm

1.68

1.817

3.04

Tread
Landing-1

Sqm
Sqm

27
1

1.65
1.68

0.300
1.667

13.37
2.79

Landing-2

Sqm

2.07

1.667

3.45

Stair - 2

First Floor to Terrrace


Stair - 2
Tread

Sqm

24

1.65

0.300

11.88

Landing-1

Sqm

1.68

1.667

2.79

Landing-2

Sqm

2.07

1.667

3.45

Tread

Sqm

4.41

0.300

1.32

Tread

Sqm

4.11

0.300

1.23

Tread

Sqm

3.81

0.300

1.14

Tread
Landing-1

Sqm
Sqm

1
1

3.50
3.50

0.300
3.650

1.05
12.78

Tread

Sqm

2.75

0.300

0.83

Tread
Tread

Sqm
Sqm

1
1

2.45
2.15

0.300
0.300

0.74
0.65

Landing-2

Sqm

3.05

4.389

13.39

Sqm

5.22

1.500

7.83

Ground Floor Entrance


Front Steps

Front Side Steps

Ramp

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Total

381.97

Say

382.00
Page No.48

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Unit

No.

Workshop Office

Quantity

Page No.49

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
6.06

Description

Unit

No.

Quantity

Kota Stone Skirting


Kota stone Skirting as per flooring summary
Ground Floor to First Floor

31.43

Stair -1
Riser

Sqm

31

1.65

0.15

7.76

Riser

Sqm

30

1.65

0.16

7.76

Riser

Sqm

27

1.65

0.14

6.11

Riser

Sqm

4.41

0.150

0.66

Riser

Sqm

4.11

0.150

0.62

Riser

Sqm

3.81

0.150

0.57

Riser

Sqm

3.50

0.150

0.53

Riser

Sqm

2.75

0.150

0.41

Riser

Sqm

2.45

0.150

0.37

Riser

Sqm

2.15

0.150

0.32

Stair -2
First Floor to Terrace
Stair -2

Ground Floor Entrance


Front Steps

Front Side Steps

6.07

Providing & fixing glaze Tiles in Dado

Total

56.52

Say

57.00

Ht.

2.10

Pantry Ht.

2.10

1.75

2.10

13.30

2.10

19.36

2.10

13.80

Ground Floor
Ladies Toilet
W.C

Sqm

1.42

Washbasin Area (Ladies Toilet)

Sqm

9.22

Gents Toilet

0.00

0.00

W.C

Sqm

1.42

1.87

0.00

Urinal Area (Gents Toilet)

Sqm

14.29

2.10

30.01

D4
V2

Sqm
Sqm

-4
-2

0.80
0.60

2.10
0.60

-6.72
-0.72

D3

Sqm

-2

0.90

2.10

-3.78

Deduction

Total

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

65.24

Page No.50

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

0.00
W.C

Sqm

6.43

Toilet

Sqm

2.54

Pantry Cum Locker Room

Quantity

First Floor

Sqm

18.95

Ladies Toilet
W.C

Sqm

0
1

0.00
1.42

Washbasin Area (Ladies Toilet)

Sqm

9.16

0.00

Gents Toilet

2.31

0.00
1.75

2.10

13.50

2.10

20.37

2.10

39.80

2.10

0.00
13.30

2.10

19.23

0.00

0.00

W.C

Sqm

6.57

2.10

13.80

Urinal Area (Gents Toilet)

Sqm

15.68

2.10

32.93

D4

Sqm

-6

0.80

2.10

-10.08

D3

Sqm

-4

0.90

2.10

-7.56

V1
V2

Sqm
Sqm

-1
-2

1.50
0.60

0.60
0.60

-0.90
-0.72

0.00
Deduction

Total

6.07

133.66
Total

198.90

Say

199.00

Dholpur stone
Window Sill
W1

Sqm

28

2.55

0.10

7.14

W2

Sqm

10

2.00

0.10

2.00

W3

Sqm

0.90

0.10

0.72

DW2

Sqm

4.55

0.10

0.46

Total
Stone Coping over 655 wide R.C.C Slab

6.08

6.09

Sqm
Sqm
Sqm

1
3
1

10.22
6.50
40.45

10.32

0.63
0.63
0.63

6.44
12.29
25.48
Total
Say

54.53
55.00

Say

59.05
60.00

Say

5.91
6.00

Vitrified Tiles Flooring

Vitrified Tiles Skiritng

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Page No.51

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

Quantity

ROOFING
7.01

7.02

Gola
Qty transfer length of parapet wall

144.30

144.30
Total

144.30

Say

145.00

Khurra
Total no of Khurra

7.03

Metre

Each

5.00
Total

5.00

Say

5.00

Calcium Silicate Panels False Ceilling


Meeting Room

Sqm

1.00

1.00

59.95

59.95

Visitor Room
P.A.S Room

Sqm
Sqm

1.00
1.00

1.00
1.00

21.22
20.94

21.22
20.94

C.W.M Office

Sqm

1.00

1.00

45.02

45.02

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00
Total
Say

147.13
148.00
0.00

SECTION 13 FINISHING
8.01

Plaster Internal (1:6, 12mm thick)


0.00
Ground Floor
0.00
R.S Contractors & Store

Sqm

32.94

Stair

Sqm

4.55

PPIO & Crew Control

Sqm

Tool Room

Sqm

Shaft

F.Ht

4.700

Slab Depth

0.150

C.Ht

4.550

4.55

149.88

4.55

77.76

32.50

4.55

147.88

38.11

4.55

173.40

Sqm

9.74

4.55

44.31

W.C

Sqm

1.42

4.55

22.36

Entrance Wall

Sqm

1.42

2.40

6.82

Washbasin Area (Ladies Toilet)

Sqm

7.80

4.55

35.48

4.55

23.43

Gents Toilet

6.27

1.75

0.00

0.00

W.C

Sqm

1.42

1.87

Entrance Wall

Sqm

1.42

2.40

6.82

Urinal Area (Gents Toilet)

Sqm

12.87

4.55

58.56

Consumables Store

Sqm

32.52

4.55

147.98

See Inspection & Inspection Staff

Sqm

22.06

4.55

100.37

Stair

Sqm

17.53

4.55

79.76

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Page No.52

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

D1
D3

Sqm
Sqm

9
2

1.80
0.90

2.10
2.10

Quantity

Deduction
-34.02
-3.78

D4

Sqm

0.80

2.10

-6.72

W1

Sqm

2.55

1.20

-24.48

W2
W3

Sqm
Sqm

2
3

2.00
0.90

1.20
1.20

-4.80
-3.24

V2

Sqm

0.60

0.60

-1.08

Shaft

Sqm

3.10

1.40

-4.34

D1

Sqm

1.80

0.180

2.10

9.72

D3

Sqm

0.90

0.180

2.10

1.84

D4

Sqm

0.80

0.065

2.10

1.30

W1

Sqm

2.55

0.180

1.20

10.80

W2

Sqm

2.00

0.180

1.20

2.30

W3

Sqm

0.90

0.180

1.20

2.27

V2
Shaft

Sqm
Sqm

3
1

0.60
3.10

0.180
0.190

0.60
1.40

1.30
1.71

Total

1023.57

Floor Height

3.700

Slab

0.150

Add D/W Jambs

First Floor

0.00

3.550

0.00
Meeting Room

Sqm

0
1

0.00
32.94

3.55

116.94

Outer of Stair
Visitor Room

Sqm
Sqm

1
1

4.55
19.14

3.55
3.55

60.67
67.95

P.A.S Room

Sqm

19.96

3.55

70.86

C.W.M Office

Sqm

27.96

3.55

99.26

W.C

Sqm

5.33

3.55

18.92

Entrance wall

Sqm

1.10

2.40

5.28

Toilet

Sqm

2.54

3.55

30.53

Pantry Cum Locker Room

Sqm

18.95

3.55

67.27

Shaft

Sqm

2.90

1.75

3.55

33.02

W.C

Sqm

1.42

1.75

3.55

17.44

Entrance wall

Sqm

1.42

2.40

6.82

Washbasin Area (Ladies Toilet)

Sqm

7.74

3.55

27.46

W.C

Sqm

5.15

3.55

18.28

Entrance wall

Sqm

1.42

2.40

6.82

Urinal Area (Gents Toilet)

Sqm

14.26

3.55

50.62

Open Terrace

Sqm

4.55

3.55

58.58

Open Terraec

Sqm

4.55

0.20

0.91

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

6.27

2.31

5.98

Page No.53

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

Quantity

AE 1,2,3

Sqm

21.62

3.55

76.75

Documentation Center

Sqm

22.06

3.55

78.31

Stair

Sqm

17.75

3.55

63.01

D1

Sqm

1.80

2.10

-11.34

D2
D3

Sqm
Sqm

4
5

1.00
0.90

2.10
2.10

-8.40
-9.45

Deduction

D4

Sqm

0.80

2.10

-10.08

W1

Sqm

2.55

1.20

-18.36

W3

Sqm

0.90

1.20

-1.08

W2

Sqm

2.00

1.20

-2.40

V1

Sqm

1.50

0.60

-0.90

V2
DW2(D)

Sqm
Sqm

3
1

0.60
1.80

0.60
2.10

-1.08
-3.78

DW2(W)

Sqm

1.38

2.10

-5.78

Shaft

Sqm

3.10

1.40

-4.34

D1

Sqm

1.80

0.180

2.10

3.24

D2

Sqm

1.00

0.180

2.10

3.74

D3
D4

Sqm
Sqm

5
6

0.90
0.80

0.180
0.065

2.10
2.10

4.59
1.95

W1

Sqm

2.55

0.180

1.20

8.10

W3
W2

Sqm
Sqm

1
1

0.90
2.00

0.180
0.180

1.20
1.20

0.76
1.15

V1

Sqm

1.50

0.180

0.60

0.76

V2

Sqm

0.60

0.180

0.60

1.30

DW2

Sqm

4.55

0.180

2.10

2.39

Shaft

Sqm

3.10

0.190

1.40

1.71

Total

928.40

Add D/W Jambs

Floor Height

3.00

Slab

0.150

Mumty

2.85

Internal Plaster

Sqm

4.77

D3

Sqm

0.90

D3

Sqm

0.90

6.05

2.85

61.67

2.10

-1.89

0.180

2.10

0.92

Total

60.70

Deduction
Add D/W Jambs

Total
Less dado Tile in toilet

2012.67
-199.00
1813.67

Say

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

1814.00

Page No.54

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Unit

No.

Workshop Office

Quantity

Page No.55

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
8.02

Description

Unit

No.

Quantity

Sqm

128.76

4.70

605.17

D1

Sqm

1.80

2.10

-34.02

D3

Sqm

0.90

2.10

-3.78

W3

Sqm

0.90

1.20

-3.24

W2

Sqm

2.00

1.20

-4.80

W1

Sqm

2.55

1.20

-24.48

V2
DW1(D)

Sqm
Sqm

1
1

0.60
2.00

0.60
2.10

-0.36
-4.20

Shaft

Sqm

3.10

1.40

-4.34

Sqm

124.80

3.70

461.76

D1

Sqm

1.80

2.10

-11.34

D2

Sqm

1.00

2.10

-8.40

D3

Sqm

0.90

2.10

-5.67

W1

Sqm

2.55

1.20

-18.36

V2

Sqm

0.60

0.60

-0.36

V1
W2

Sqm
Sqm

1
1

1.50
2.00

0.60
1.20

-0.90
-2.40

Plaster External (1:4, 20mm thick)

a)
Ground Floor
External Plaster
Outer periphery of Building

Deduction

First Floor
External Plaster

Deduction

W3

Sqm

0.90

1.20

-1.08

DW2(D)

Sqm

1.80

2.10

-3.78

DW2(W)
Shaft

Sqm
Sqm

2
1

1.38
3.10

2.10
1.40

-5.78
-4.34

Sqm

24.34

3.00

73.02

Sqm

0.90

2.10

-1.89

Mumty
External Plaster
Deduction
D3
Parapet Wall (Internal Plaster)
Terrace
Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Page No.56

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

Quantity

Parapet Wall

Sqm

6.500

0.23

0.30

10.34

Parapet Wall
Parapet Wall

Sqm
Sqm

1
1

10.22
10.22

0.23
0.23

0.30
1.00

5.42
12.57

Parapet Wall

Sqm

40.45

0.23

0.30

21.44

Parapet Wall

Sqm

40.45

0.23

1.00

49.75

Mumty
Parapet Wall

Sqm

5.23

0.23

0.300

5.54

Parapet Wall

Sqm

6.50

0.23

0.300

6.89

Around Slope Plaster of terrace


Internal Plaster

Sqm

10.22

1.766

18.05

Internal Plaster

Sqm

10.22

0.127

1.30

Internal Plaster

Sqm

6.50

1.766

34.45

Internal Plaster

Sqm

6.50

0.127

2.48

Internal Plaster

Sqm

40.45

1.766

71.43

Internal Plaster

Sqm

40.45

0.127

5.14

Mumty (Chajjas)
Internal Plaster

Sqm

5.23

1.766

18.45

Internal Plaster

Sqm

5.23

0.127

1.33

Internal Plaster

Sqm

6.50

1.766

Internal Plaster

Sqm

6.50

0.127

22.97
1.65

Plaster below 600MM Wide RCC Slab at Terrace

Sqm

0.28

0.63

0.17

Sqm

35

2.00

0.63

Sqm
Sqm

1
2

0.48
1.01

0.63
0.63

44.10
0.30

Sqm

2.03

0.63

1.28

Sqm
Sqm

1
1

1.48
0.47

0.63
0.63

0.93
0.30

1.27

External Cladding
Less Quantity External Cladding around window

8.03

-40.29
Total

1293.69

Say

1294.00

Ceiling Plaster (6mm, 1:3)


Ground Floor

0
0

0.00

59.95

59.95

R.S Contractors & Store

Sqm

1.00

Stair

Sqm

4.55

6.27

28.53

PPIO & Crew Control

Sqm

1.00

59.98

59.98

Tool Room

Sqm

1.00

57.49

57.49

Shaft
Ladies Toilet

Sqm

1
0

1.00
0.00

5.41
0.00

5.41
0.00

W.C

Sqm

1.42

1.75

2.48

Washbasin Area (Ladies Toilet)

Sqm

1.00

4.43

4.43

Gents Toilet
W.C

Sqm

0
1

0.00
1.42

0.00
1.87

0.00
2.65

Urinal Area (Gents Toilet)

Sqm

1.00

11.03

11.03

Consumables Store

Sqm

1.00

58.73

58.73

See Inspection & Inspection Staff


Stair

Sqm
Sqm

1
1

1.00
1.00

29.95
29.54

29.95
29.54

Covered Corridor

Sqm

60.45

2.00

120.90

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Page No.57

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

First Floor

0.00

0.00

0.00

0
Meeting Room

Sqm

0
1

0.00
1.00

0.00
59.95

0.00
59.95

Outer of Stair

Sqm

1.00

7.14

7.14

Visitor Room

Sqm

1.00

21.22

21.22

P.A.S Room
C.W.M Office

Sqm
Sqm

1
1

1.00
1.00

20.94
45.02

20.94
45.02

W.C

Sqm

1.00

2.28

2.28

Toilet

Sqm

2.54

2.31

5.87

Pantry Cum Locker Room


Ladies Toilet

Sqm

1
0

1.00
0.00

19.07
0.00

19.07
0.00

W.C

Sqm

1.42

1.75

2.48

Washbasin Area (Ladies Toilet)

Sqm

1.00

4.41

4.41

0.00

0.00

0.00

Gents Toilet

Quantity

W.C

Sqm

1.00

2.60

2.60

Urinal Area (Gents Toilet)

Sqm

1.00

12.19

12.19

AE 1,2,3
Documentation Center

Sqm
Sqm

1
1

1.00
1.00

28.65
29.95

28.65
29.95

Outer of Stair

Sqm

4.78

1.60

7.65

Covered Corridor

Sqm

60.25

2.00

120.50

Ground Floor to First Floor

0.00

0.00

0.00

Staircase S1
Flight 1
Flight 2

Sqm
Sqm

1
1

1.65
1.65

3.80
1.43

0.00
0.00

6.27
2.36

Flight 3

Sqm

1.65

4.14

0.00

6.82

Landing
Landing

Sqm
Sqm

1
1

1.65
1.68

2.12
1.82

Side

Sqm

9.37

0.16

0.00

1.47

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Staircase S2

3.49
3.04

Flight 1

Sqm

1.65

4.74

0.00

7.83

Flight 2

Sqm

1.65

1.74

0.00

2.87

Flight 3

Sqm

1.65

3.41

0.00

5.62

Landing

Sqm

1.65

1.67

Landing

Sqm

1.84

1.67

Side

Sqm

9.89

0.15

0.00

1.45

0.00

0.00

0.00

0.00

First Floor to Terrace

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Staircase S2

0.00

0.00

0.00

0.00

2.75
3.07

Flight 1
Flight 2

Sqm
Sqm

1
1

1.65
1.65

3.36
1.38

0.00
0.00

5.54
2.28

Flight 3

Sqm

1.65

3.36

0.00

5.54

Landing

Sqm

1.65

1.67

Landing
For steps in Flight 1

Sqm
Sqm

1
11

1.84
1.65

1.67
0.14

0.00

3.07
2.49

For steps in Flight 2

Sqm

1.65

0.14

0.00

1.13

For steps in Flight 3

Sqm

11

1.65

0.14

0.00

2.49

Side

Sqm

8.10

0.14

0.00

1.11

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

2.75

Total

934.43

Say

935.00
Page No.58

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Unit

No.

Workshop Office

Quantity

Page No.59

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
8.04

Description

No.

Sqm
Sqm

1
1

1814.00
935.00

1814.00
935.00
Total

2749.00

Say

2749.00

Oil bond distemper on internal walls


Same as pop

Sqm

2749.00

2749.00
Total
Say

8.06

Quantity

POP
On Internal wall
On Ceiling

8.05

Unit

Exterior Paint on External Side


Qty Transfer from External Plaster

Sqm

1294.00

2749.00
2749.00
1294.00

Total
Say

1294.00
1294.00

ALUMINIUM WORK
9.01
a)

Aluminium frame
Door
DW1(D)
DW2(D)

Rmt
Rmt

1
1

2.00
1.80

2.10
2.10

6.20
6.00

W1
W2
W3
DW2(W)
V1
V2

Rmt
Rmt
Rmt
Rmt
Rmt
Rmt

14
5
4
2
1
4

2.55
2.00
0.90
1.375
1.50
0.60

1.2
1.2
1.2
2.1
0.6
0.6

138.60
38.00
16.80
12.45
4.80
9.60

Window Frame

232.450
Frame Size (50x50) weight 2.37kg/M

Kg

232.45

2.37

550.91
Say

b)

Shutters
Door
DW1
DW2

Sqm
Sqm

80% Area are openable


Shutter weight 6.5kg / Sqm

1
1

2.00
1.80

551.00

2.100
2.100

4.20
3.78

Total

7.98

Sqm

7.98

0.80

6.38

Kg

6.38

6.50

41.50
Total
Say

41.50
42.00

1.200
1.200
1.200
0.600

23.52
4.20
4.32
0.57

Window
W1
W2
W3
V1
Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Sqm
Sqm
Sqm
Sqm

28
5
4
1

Workshop Office

0.700
0.700
0.900
0.950

Page No.60

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

Quantity

Total
80% Area are openable
Shutter weight 4.5kg / Sqm

Sqm

32.61

0.80

26.09

Kg

26.09

4.50

117.40
Total
Say

9.02

32.61

117.40
118.00

Glass
Door
DW1(D)
DW2(D)

Sqm
Sqm

W1
W2
W3
DW2(W)
V1

Sqm
Sqm
Sqm
Sqm
Sqm

Window

1
1
0
28
10
8
4
2

2.00
1.80

2.10
2.10

4.20
3.78

1.15
1.15
1.15
1.15
1.15

1.20
1.20
1.20
1.20
1.20

38.64
13.80
11.04
5.52
2.76
Total

90% Area are glazing

Sqm

79.74

79.74

0.90

71.77
Total
Say

9.03

Filling the gap in between aluminium frame


Length tranfer from frame qty

Metre

232.45

232.45
Total
Say

9.04

Window stays
W1
W2
W3
V1

Each
Each
Each
Each

14
5
4
1

71.77
72.00

232.45
233.00

2.00
1.00
1.00
1.00

28.00
5.00
4.00
1.00
Total
Say

9.05

9.06

Window Faster
W1
W2
W3
V1

Aluminium Grill
W1
W2
W3

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Each
Each
Each
Each

Sqm
Sqm
Sqm

14
5
4
1

28
5
4

Workshop Office

38.00
38.00

2.00
2.00
2.00
2.00

0.7
0.7
0.9

28.00
10.00
8.00
2.00

0
0
0

Total
Say

48.00
48.00

1.2
1.2
1.2

23.52
4.20
4.32

Total

32.04
Page No.61

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description
Wt assume 5Kg /Sqm

Unit

No.

Kg

32.04

5.00

160.20
Total
Say

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Quantity

160.20
161.00

Page No.62

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

Quantity

WATER PROOFING
10.01

Water proofing in toilet sunken area


Toilet Sunken Depth

First Floor

0.4

W.C in C.W.M Office


Horizontal
Vertical

Sqm
Sqm

1
1

2.12
2.12

1.10
1.10

0.40

2.33
2.57

Horizontal
Vertical

Sqm
Sqm

1
1

2.54
2.54

2.31
2.31

0.40

5.87
3.88

Horizontal
Vertical

Sqm
Sqm

1
1

1.42
1.42

1.75
1.75

0.40

2.48
2.53

Horizontal
Vertical

Sqm
Sqm

1
1

1.00
9.62

4.57
0.40

4.57
3.85

Horizontal
Vertical

Sqm
Sqm

1
1

1.65
1.65

1.20
1.20

0.40

1.97
2.28

Horizontal
Vertical

Sqm
Sqm

1
1

1.00
15.68

12.19
0.40

12.19
6.27

Horizontal
Vertical

Sqm
Sqm

1.00
1.00

1.00
33.18

59.95
0.30

59.95
9.95

Horizontal
Vertical

Sqm
Sqm

1.00
1.00

1.00
19.14

21.22
0.30

21.22
5.74

Horizontal
Vertical

Sqm
Sqm

1.00
1.00

1.00
19.97

20.94
0.30

20.94
5.99

Horizontal
Vertical

Sqm
Sqm

1.00
1.00

1.00
27.97

45.02
0.30

45.02
8.39

Total
Say

228.00
228.00

Toilet in C.W.M Office

Ladies toilet in W.C

Ladies toilet

Gents toilet in W.C

Gents toilet

Meeting Room

Visitor Room

P.A.S Room

C.W.M Office

10.02

Brick bat coba


On Terrace area(Total Area)
Less Shaft

Sqm
Sqm

1
-1

60.45
2.90

8.51
1.75

514.67
-5.08
Total
Say

509.60
510.00

HORTICULTURE AND LANDSCAPING WORK


11.01

Supplying and stacking of good earth at site


including royalty and carriage up to 1 km (earth
measured in stacks will be reduced by 20% for
payment).
Total Filling
Less Excavation

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

660.00
-225.00
Workshop Office

Page No.63

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

H
SAY

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

Quantity
435.00
0.00

Page No.64

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

0.00
0.00
0.00
0.00
0.00
0.00
0.00

2.10
2.10
2.10
2.10
0.00
Total
Say

Quantity

SCHEDULE B:- NDSR ITEMS


FINISHING WORK
WOOD & PVC WORK

1.01

Providing and fixing 1 mm thick laminate of


approved brand,colour, shade & texture on flush
door with adhesive and malamine finish on door
edges complete.Only plan area of door shall be
measured.
D1
D2
D3
D4
0.00
0.00
0.00

1.02
0.00

Sqm
Sqm
Sqm
Sqm
0.00
0.00
0.00

12.00
4.00
7.00
5.00
0.00
0.00
0.00

1.80
1.00
0.90
0.80
0.00
0.00
0.00

Each
Each
Each
Each
Each
Each

12
4
7
5
1
1

2.00
1.00
1.00
1.00
2.00
2.00

24.00
4.00
7.00
5.00
2.00
2.00

Window
W1
W2
W3
Ventilation

Each
Each
Each

14
5
4

4.00
2.00
2.00

56.00
10.00
8.00
0.00

V1

Each

2.00

2.00

Tower Bolt
250 x 10mm
Door
D1
D2
D3
D4
DW1(D)
DW2(D)

Total
Say
1.03

Sliding Door Bolt


D1
D2
D3
D4
DW1(D)
DW2(D)

Each
Each
Each
Each
Each
Each

12
4
7
5
1
1

1
1
1
1
1
1

45.36
8.40
13.23
8.40
75.39
76.00

120.00
120.00

0
0

12.00
4.00
7.00
5.00
1.00
1.00

Total
Say

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

30.00
30.00

Page No.65

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.
1.04
0.00

Description
Aluminium Handles 125mm
Door
D1
D2
D3
D4
DW1(D)
DW2(D)
Window
W1
W2
W3
Ventilation
V1
0

Unit

No.

0
Each
Each
Each
Each
Each
Each

0
12
4
7
5
1
1

0
4
2
2
2
4
4

48.00
8.00
14.00
10.00
4.00
4.00

0
Each
Each
Each
0
Each

0
14
5
4
0
1

4
2
2

56.00
10.00
8.00

2.00
Total
Say

1.05
0.00
0.00

Door Stoper
Door
D1
D2
D3
D4
DW1(D)
DW2(D)

0.00

Each
Each
Each
Each
Each
Each

12
4
7
5
1
1

Quantity

164.00
164.00

2
1
1
1
2
2

24.00
4.00
7.00
5.00
2.00
2.00

Total
Say

44.00
44.00

FLOORING
2.01

2.02

Anti skid floor tiles


Qty taken in Flooring

Sqm

71.33
Say

72.00

False Flooring
Meeting Room

Sqm

1.00

59.95

False Flooring

59.95

Ent. Door (Meeting Room)


Visitor Room

Sqm
Sqm

2
1

1.80
1.00

0.23
21.22

False Flooring
False Flooring

0.83
21.22

Ent. Door (Visitor Room)

Sqm

1.00

0.23

False Flooring

0.23

P.A.S Room

Sqm

1.00

20.94

False Flooring

20.94

Ent. Door (P.A.S Room)


Ent. Door (P.A.S Room)

Sqm
Sqm

1
1

1.00
0.90

0.23
0.23

False Flooring
False Flooring

0.23
0.21

C.W.M Office

Sqm

1.00

45.02

False Flooring

45.02

Ent. Door (C.W.M Office)

Sqm

1.50

0.23

False Flooring

0.35

Total
Say

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

148.97
149.00

Page No.66

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECT-PHASE III
Civil Works (Workshop Office)
DETAIL OF QUANTITIES
S.No.

Description

Unit

No.

0.15

4.550

Quantity

FINISHING
3.01

Chicken wire mesh


Junction of Column and Wall
Ground Floor
Junction of Beam and Wall
Ground Floor

0.00

Sqm

40

Sqm

568.02

27.30

0.15

85.20

0
Total
Say

112.50
113.00

WATER PROOFING

4.01

Cilder Filling
First Floor
0
W.C in C.W.M Office
Horizontal

Cum

2.12

0.40

1.10

0.40

0.93
0.00
2.35
0.00
0.99
0.00
3.85
0.00
0.79
0.00
6.27
0.00
23.98
0.00
8.49
0.00
8.38
0.00
18.01

Total
Say

74.03
75.00

Toilet in C.W.M Office

0.00
Horizontal

Cum

2.54

2.31

0.40

Horizontal

Cum

1.42

1.75

0.40

Horizontal

Cum

9.62

0.00

0.40

Horizontal

Cum

1.65

1.20

0.40

Horizontal

Cum

Horizontal

Cum

Horizontal

Cum

Horizontal

Cum

Horizontal

Cum

1
0
1
0
1
0
1
0
1

15.68
0.00
59.95
0
21.22
0
20.94
0
45.019

Ladies toilet in W.C


Ladies toilet
Gents toilet in W.C
Gents toilet
Meeting Room
Visitor Room
P.A.S Room
C.W.M Office

Project:-Delhi Metro Rail Corporation Ltd. Ajronda Depot

Workshop Office

0
0

0.40
0.40
0.40
0.40

Page No.67

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE BUILDING FOR DELHI MRTS PROJECTPHASE III
Doors/Windows Shedule
Length

Height

Nos

1.80
1.00
0.90
0.80
2.00
1.80

2.10
2.10
2.10
2.10
2.10
2.10

12
4
7
5
1
1

35 mm Thick Flush Door With Prelaminated Board


35 mm Thick Flush Door With Prelaminated Board
35 mm Thick Flush Door With Prelaminated Board
35 mm Thick Flush Door With 450 wide AL. Kick Plate at Base
Glazed Doubal Pivoted Door Anodised Aluminium Frame
Glazed Doubal Pivoted Door & Fixed Glazing Anodised Aluminium Frame

DW2(W)

2.55
2.00
0.90
1.38

1.20
1.20
1.20
2.10

14
5
4
2

Shuttar Frame Aluminium


Shuttar Frame Aluminium
Shuttar Frame Aluminium
Shuttar Frame Aluminium

V1
V2

1.50
0.60

0.60
0.60

1
4

Frame Aluminium
Frame Aluminium

Shaft

3.10

1.40

Ground Floor

Door
D1
D2
D3
D4
DW1(D)
DW2(D)
Window
W1
W2
W3
Ventilation

Shaft

NAME OF WORK : PROPOSED AJRONDA DEPOT CUM WORKSHOP INCUDING SERVICE


BUILDING FOR DELHI MRTS PROJECT-PHASE III

1
2

Pcc around the Rain water pipe 1:2:4


Below Foundation and Flooring 1:4:8

Cofficent for Reinforcement

Footing
Columns
Beams
Wall
Slab
Stair
Lintels
Shelves
Projection

70
220
140
100
80
100
60
60
80

Kg / Cum
Kg / Cum
Kg / Cum
Kg / Cum
Kg / Cum
Kg / Cum
Kg / Cum
Kg / Cum
Kg / Cum

Ready mixed M-25 grade concrete for


reinforced cement concrete work

5
6
7
8
9
10
11
12
13
14
15

Aluminium Grill wt assume 5kg/sqm


Assume Aluminium Frame Size (50x50) weight 2.37kg/M
SS Railing weight for Type A
8 kg / Rm
SS Railing weight for Type C
6 kg / Rm
Openable shutter Door
80% with 6.5 kg / Sqm
Openable shutter Window
80% with 4.5 kg / Sqm
Glazing
90% of Total Area
Jali
Cement Concrete Jail
Meeting Room,Visitors Room,P.A.S Room & C.W.M Office
False flooring below
400mm
Sunken Depth for Toilets
300mm
Rooms