You are on page 1of 1

Remove existing

sign

NEW

Existing

Remove existing
sign

Existing

NEW

Existing

NEW

Traffic islands

Existing

4.0m
2.5m
3.3m

4.0m
2.5m
3.3m

EE
T

ROAD

Remove
existing

1.2m

Mount Pleasant Laboratories

1.2m

Realign T
y pe K C k
erb an
Extend ro
ad pavem d channel and prov
ent to suit
ide Grate
d
and realig
n footpath Side Entry Pits
and drive
ways

BERTHA SREET Junction


Remove existing junction
continuity line marking
Repaint centre line and holding
line

NEW

NEW

4.0m
2.5m
3.5m

1.5m

NEW

PR
OS
PE

WESTBUR
Y

PROSPECT STREET Junction


Remove existing junction
continuity line marking
Repaint holding line. Realign
pedestrian access
including tactiles. New traffic
island and approach line.

CT
ST
R

Existing

Remove existing
sign

NEW

NEW

Remove existing
signs

Traffic islands

New central traffic island and signage

Existing

New pedestrian traffic island,


signage access ramps and footpaths
including tactiles
Remove existing
signs

Street
Names

New pedestrian traffic island


and signage
including tactiles

4.8m
3.0m
4.0m
NEW

2.1m

PEDESTRIAN ISLAND
Realign Type KC kerb and channel and
amend the W-Beam guard rail to
terminate short of the access ramp.
Relocate Grated Side Entry Pit

Existing

WE

ST

BU

RY
RO
A

D
O

TL

ET

NEW

SO

U
TH

ER
N

NEW

Ov

erp

NEW
Located 100m before
the end of the
overtaking lane,
southern side

as

IMPORTANT NOTE
The base map information shown with this design,
has been drawn from L.C.C. 1: 500 Detail Survey
mapping records and should be treated as a graphical
representation only. The base map data may be
incomplete and the accuracy cannot be guaranteed.

Improve vehicle safety, bicycle safety


and pedestrian safety and amenity by
asphalt overlaying the roadway,
providing right turn lane, uphill bicycle
lane and pedestrian crossing points
with central islands.

DESIGN FEATURES

OV WES
ER TB
LA UR
YR Y
OA ROA
DW D
A F
AN Y, R ROM
AM D R EMO NO
EN EPA VE RM
D S IN
E AN
IGN T LI XIS STO
AG NEM TING NE
E R AR R RO
EQ KIN OAD AD
UIR G
T
L
EM AS INE O BE
EN DET MA RT
H
TS
R
A
TO ILED KING A ST
SU
WH REE
IT
ER T
EN
EC
E

Asphalt overlay roadway


Paint new line marking , including central right turning lane and uphill bicycle lane.
Construct new access ramps, traffic islands and pedestrian refuge traffic islands.
Realign kerb and channel to suit new pedestrian crossing.
Widen the road pavement to obtain the road width needed from 171 to 183 Westbury Road.
Install and update traffic signs.
Remove redundant line marking, signs and traffic islands.

NEW
NEW

Existing

ET

Street
Name

ST

RE

4.0m
2.5m
3.5m

Existing

SS
AR
Y

LIN
E

DESIGN OBJECTIVES

NEW

1.5m

Y RO
R
U
ESTB

Traffic island
Traffic island

W
Traffic island

g footp

PLAN

ath

Street
Name

Island outstand

NEW
New pedestrian traffic island,
signage, access ramps and footpaths
including tactiles.

AD

Traffic island

Existin

CAROLINE SREET Junction


Remove existing junction
continuity line marking

Existing

Existing

RO

AS
PH
AL
T

CA

Existing

BERT
HA S
TREE
T

Street
Name

Remove existing traffic


island and signs

Existing
Information
Sign

Existin

Existing

g one

Existing

N.T.S.
Existing

NORMANSTONE ROAD
Junction Exit
Remove existing holding line
marking and relocate as
C
shown

NORM

ANST

way

ONE

ROAD

NEW
End overtaking lane at entry to
Normanstone Road
Provide 105m traffic merge to one lane
2014

This drawing and the


information it contains is,
and remains the property
of Launceston City
Council, and may only be
used for the purpose of
which it was intended.
Any scales shown on this
drawing are correct at A1
sheet size only. DO NOT
scale a drawing plotted at
any other size.

WESTBURY ROAD
TRAFFIC MANAGEMENT
CONCEPT PLAN
Town Hall St John Street, Launceston Tasmania 7250
T: 03 6323 3000 F: 03 6323 3001 Email: council@launceston.tas.gov.au

JUNE 2015

You might also like