STANDARD OPERATING PROCEDURE
Doc. No.
TITLE: HT/LT Switchgear charging
DEPARTMENT : OPERATION
Issue No. /
Date
Rev. No /
Date
OPN/SOP/001
01/ 12.09.13
00/ 12.09.13
Prepared by:
Reviewed by:
Approved by:
Signature:
Signature:
Signature:
Name:
Manager (Operation)
DGM (Operation)
V.P. (O&M)
Page 1 of 7
Issue No. /
Date
Rev. No /
Date
OPN/SOP/001
01/ 12.09.13
00/ 12.09.13
INDEX
Section
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
Description
System Name
System Description
Purpose
Scope
Responsibility
Procedure
Safety Checks
Records
Page No.
3-3
3-3
3-3
4
4
4-14
14
15-15
SYSTEM NAME:
HT/LT Switchgear charging.
SYSTEM DESCRIPTION:
There are eight HT panel. Four for unit-1 and four for unit-2.OCA, OCB, OCC, OCD and
1CA, 1CB, 2CA,2CB.Working voltage for HT switchgear is 6.6 KV. Station board Feed by ST
OCA, OCB for UNIT-1 OCC, OCD for UNIT-2 . Unit board Feed by UAT, 1CA ,1CB for UNIT1, 2CA, 2CB for UNIT -2. Siemens made 8BK80 with 3AK VCB 2000A for station & unit I/c &
Tie, 1250A for motor ,trafo, o/g etc feeder. In LT SWITCHGEAR working voltage is 415 Type
of module in LT SWITCHGEAR are ACB module DOL module SFU and MCCB.
1.0
PURPOSE:
The purpose of making this Standard Operating Procedure (SOP) is to provide
standard instructions in a sequential manner for charging of HT/LT switchgear.
Prepared by:
Reviewed by:
Approved by:
Signature:
Signature:
Signature:
Name:
Manager (Operation)
DGM (Operation)
V.P. (O&M)
Page 2 of 7
2.0
OPN/SOP/001
01/ 12.09.13
Issue No. /
Date
Rev. No /
Date
00/ 12.09.13
SCOPE:
It includes all activities for charging of HT/LT SWTCHGEAR and associated outgoing
feeders.
RESPONSIBILITY:
First Line Responsibility:
Shift In Charge/Unit In charge - Will instruct Unit In charge/DCS Engineer for charging
of HT/LT switchgear
Second Line Responsibility:
DCS Engineer Will inform Field Operators to prepare for charging of HT/LT switchgear
Third Line Responsibility:
Area Field Operators (Elect) - Will prepare & make ready for system charging and give
clearance to DCS Engineer for charging of switchgear
3.0
PROCEDURE:
6.1
Sl No.
1
Pre-Requisites :
Activity Description
Permission for charging of HT/LT switchgear.
3
4
Prepared by:
Reviewed by:
Responsibility
Shift In Charge /Unit
In charge
Unit In Charge/DCS
Engineer
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Approved by:
Signature:
Signature:
Signature:
Name:
Manager (Operation)
DGM (Operation)
V.P. (O&M)
Page 3 of 7
OPN/SOP/001
01/ 12.09.13
Issue No. /
Date
Rev. No /
Date
00/ 12.09.13
10
Turn on A.C, D.C and line PT MCB of incomer and ensure that
all indications (spring charge,TCS healthy, breaker in service
etc)are healthy.
supply to all relay is healthy and all FLAGs are RESET
11
12
13
13
14
15
16
17
Prepared by:
Reviewed by:
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
Approved by:
Signature:
Signature:
Signature:
Name:
Manager (Operation)
DGM (Operation)
V.P. (O&M)
Page 4 of 7
OPN/SOP/001
01/ 12.09.13
Issue No. /
Date
Rev. No /
Date
00/ 12.09.13
engg.
20
21
22
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Prepared by:
Reviewed by:
Approved by:
Signature:
Signature:
Signature:
Name:
Manager (Operation)
DGM (Operation)
V.P. (O&M)
Page 5 of 7
OPN/SOP/001
01/ 12.09.13
Issue No. /
Date
Rev. No /
Date
00/ 12.09.13
Down all the MCB (AC, DC) except motor and panel space
heater.
Put the respective lock key in the LOTO cabinet and give one
key of LOTO cabinet to PTW HOLDER.
Responsibility
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Field
Operator/Electrical
engg.
Activity Description
Before isolating any trafo feeder make sure that the supply to
outgoing LT MCC board is available from other source
(incomer) and bus coupler in AUTO mode.
E
Down all the MCB (AC, DC) except panel space heater MCB.
Prepared by:
Reviewed by:
Responsibility
Approved by:
Signature:
Signature:
Signature:
Name:
Manager (Operation)
DGM (Operation)
V.P. (O&M)
Page 6 of 7
OPN/SOP/001
01/ 12.09.13
Issue No. /
Date
Rev. No /
Date
00/ 12.09.13
4
5
Field Operator
Field Operator
Field Operator
Prepared by:
Reviewed by:
Responsibility
Approved by:
Signature:
Signature:
Signature:
Name:
Manager (Operation)
DGM (Operation)
V.P. (O&M)
Page 7 of 7